Sei sulla pagina 1di 2

CAE Studio 5D Planner

CAE’s successor to Mine2-4D

Detailed Mine Planning for Open Pit and


Underground Operations
CAE Mining has taken the lead in developing CAE Studio 5D Planner, CAE’s successor to Mine2-4D, the highly
popular solution for mine design and scheduling. Whilst maintaining its popular process-oriented approach,
CAE Mining has made improvements in usability, processing and data management. Some of the biggest
improvements are a result of upgrading CAE Studio 5D Planner’s platform to CAE Studio.
CAE Studio 5D Planner incorporates many of CAE Studio’s features including stunning 3D visualization and a
completely revamped, comprehensive data management system.

Key enhancements:
• Brand new Control Panel with “Smart” Workflow
• Streamlined Project Setup
• Integrated 3D Visualizer with Dynamic Connectivity to Gantt Chart
Production Scheduler (EPS)
• Redeveloped and enhanced Open Pit module
• Brand new Project Manager based on CAE MineTrust technology
• Integration with Hard Dollar project costing software
(cost as the 5th dimension)

Conceptualise Control
CAE Studio 5D Planner is integrated with a full Gantt Chart Production
CAE Studio 5D Planner provides an advanced mine design system Scheduler (EPS), placing all data from design, block model interrogation,
within a full 3D environment. Its object-oriented 3D design interface sequence and schedule in a single database. This results in a single source
allows digitizing in multiple viewpoints in real time. Interrogation of block of the truth, eliminating the need for manual creation of schedules and
models during the design stage allows economic criteria to be used in reducing errors.
the design of production excavations.

Create Collaborate
CAE Studio 5D Planner maximizes the use of automated processes CAE Studio 5D Planner includes the new Project Manager, which uses
to eliminate many repetitive tasks normally associated with Mine CAE MineTrust database technology to manage spatial geological, design
Planning. This dramatically speeds up the planning process allowing and survey data for a multi-user, multi-role environment. In addition, multiple
for thorough scenario investigation leading to the optimal mine plan. options to present and distribute mining information are available, from
spreadsheet reports and Gantt charts
through to dynamic 3D animations and even
PDF3D documents.
cae.com/mining
Global offices
Inside CAE Studio 5D Planner AUSTRALIA
Perth
Level 3, 41-43 Ord Street

Underground Naming Conventions West Perth WA 6005


Tel +61 8 6462 0900

Flexible design types make it easy to customise The file naming convention can be built up from attributes Brisbane
mine development and production stopes for any and then split out to create a summary structure in the Gantt Level 15, 120 Edward Street
Brisbane, Queensland, 4000
mining method. Derived Activities model other Chart Production Scheduler (EPS). It can mimic the actual Tel +61 7 3248 0000
mining tasks, such as drilling and backfill, to be mine naming convention allowing a better understanding of
incorporated into your schedule. By creating a the schedule and improve communication to others. Real time BRAZIL
database of standard design definitions, design animated 3D graphical representations of the mine plan in EPS Belo Horizonte
consistency is maintained throughout a project mine simplify planning and reporting. Alameda da Serra, 360 – 7o andar
site or company. Changes in the database Vila de Serra – Nova Lima – MG
34000-000
are automatically applied to the design. Tel +55 31 3264 9377
Functions within EPS include:
Open Pit CANADA
Montreal
Strategic planning data contained in imported
models can be used by CAE Studio 5D Planner
Calendars 3200 Guenette
Saint-Laurent, Quebec
H4S 2G5 Canada
to define more detailed designs and schedules Multiple calendars can be applied to both resources and Tel +1 514 341 2000 ext. 2404
resulting in medium term and budget plans that activities e.g. development and backfill crews working on
honour the optimized long term plan. Designs can different shift systems. It is possible to schedule shutdown or Sudbury
be as detailed as required making CAE Studio non-work periods and define multiple reporting calendars for 866 Newgate Avenue, Unit 2
Sudbury, Ontario P3A 5J9
5D Planner suitable for feasibility studies or more different purposes. Toll-free: 1 800 240 6941
detailed budget planning. Tel +1 705 688 0101

3D Mining blocks are automatically generated by


intersecting pushback boundaries, topographical Resources CHILE
Santiago
surfaces, bench definitions and blast or pseudo Resources can be either equipment or labour and can be Santa Magdalena, 75
blast outlines. assigned to mining activities. Resource levelling allows the Oficina 903, Providencia
Santiago 751-0038
creation of a resource based schedule where advance and Tel +56 2 2334 5952

Activity Sequencing production rates are dictated by resource availability and


relative work priorities. COLOMBIA
Calle 29 N° 41 - 105 Of. 1206
Using CAE Studio 5D Planner’s leading Edificio Soho
methodology, a design can be automatically
sequenced quickly and easily. Changes to the Prices/Costs Medellín, Antioquia
Tel +57 - 4 - 403 17 75
design do not require manual re-sequencing. Prices and costs can be profiled over time to reflect the INDIA
Manual link creation is also possible and the variations in planned revenue, cost and cash flow. Available New Delhi
sequence can be “tested” at the click of a button. integration with Hard Dollar, industry-leading project cost 601, Elegance Tower
estimation and control software, allows for multiple detailed Jasola District Centre
New Delhi - 110 025

Geological Model
cost scenarios based on a cost database. India
Tel +91 11 41290000

Depletion Production Scheduler KAZAKHSTAN


Karaganda
All development and extraction can be 201, 2 Lenin Street
• Activities can be Rate-driven or Duration-driven or Cyclic 100012, Karaganda
interrogated against a block model. (e.g. drill/charge/blast/muck), where each stage in the Republic of Kazakhstan
Development can be “depleted” from the model cycle can have its own resources Tel +7 7212 425138
ensuring it is not double-counted within a stope • Actuals can be entered and tracked and compared to
or mining area when calculating the production multiple schedule baselines with real time visibility of the MEXICO
tonnes and grade. impact on the remaining schedule and period quantities Callejón del Capulín #101, esquina
con Avenida Torreón, centro Histórico
• Resource availabilities may be profiled over time, which will Zacatecas, Zac.
be taken into account during resource levelling C.P. 98000
Tel +52 492 22 122
• A dynamic and customisable summary view (Crosstab)
always shows the period quantities of the schedule, PERU
making it easy to see the impact of adjustments or delays Lima
on the bottom line. Av. Manuel Olguín, 335 Oficina 503
Torre Link Tower
• Tonnages, grades and other base properties are Surco, Lima - Peru
dynamically calculated and powerful grouping, filtering and Tel +51 1 434 2727
pivot table functions allows for easy reporting with
copy-paste exporting to Excel. SOUTH AFRICA
Johannesburg
9 Fricker Road
Illovo Boulevard, Illovo
Johannesburg, 2196
Republic of South Africa
Tel +27 11 772 7960

UNITED KINGDOM
Wells
Unit A, Underwood Business Park
Wookey Hole Road,
Wells, Somerset BA5 1AF
United Kingdom
Tel +44 1749 683 350

UNITED STATES OF AMERICA


Denver
10901 W. Toller Drive #205
Littleton, CO 80127
United States
Tel +1 303 985 7713

© 2012 CAE Mining


caemining@cae.com

Potrebbero piacerti anche