Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Key enhancements:
• Brand new Control Panel with “Smart” Workflow
• Streamlined Project Setup
• Integrated 3D Visualizer with Dynamic Connectivity to Gantt Chart
Production Scheduler (EPS)
• Redeveloped and enhanced Open Pit module
• Brand new Project Manager based on CAE MineTrust technology
• Integration with Hard Dollar project costing software
(cost as the 5th dimension)
Conceptualise Control
CAE Studio 5D Planner is integrated with a full Gantt Chart Production
CAE Studio 5D Planner provides an advanced mine design system Scheduler (EPS), placing all data from design, block model interrogation,
within a full 3D environment. Its object-oriented 3D design interface sequence and schedule in a single database. This results in a single source
allows digitizing in multiple viewpoints in real time. Interrogation of block of the truth, eliminating the need for manual creation of schedules and
models during the design stage allows economic criteria to be used in reducing errors.
the design of production excavations.
Create Collaborate
CAE Studio 5D Planner maximizes the use of automated processes CAE Studio 5D Planner includes the new Project Manager, which uses
to eliminate many repetitive tasks normally associated with Mine CAE MineTrust database technology to manage spatial geological, design
Planning. This dramatically speeds up the planning process allowing and survey data for a multi-user, multi-role environment. In addition, multiple
for thorough scenario investigation leading to the optimal mine plan. options to present and distribute mining information are available, from
spreadsheet reports and Gantt charts
through to dynamic 3D animations and even
PDF3D documents.
cae.com/mining
Global offices
Inside CAE Studio 5D Planner AUSTRALIA
Perth
Level 3, 41-43 Ord Street
Flexible design types make it easy to customise The file naming convention can be built up from attributes Brisbane
mine development and production stopes for any and then split out to create a summary structure in the Gantt Level 15, 120 Edward Street
Brisbane, Queensland, 4000
mining method. Derived Activities model other Chart Production Scheduler (EPS). It can mimic the actual Tel +61 7 3248 0000
mining tasks, such as drilling and backfill, to be mine naming convention allowing a better understanding of
incorporated into your schedule. By creating a the schedule and improve communication to others. Real time BRAZIL
database of standard design definitions, design animated 3D graphical representations of the mine plan in EPS Belo Horizonte
consistency is maintained throughout a project mine simplify planning and reporting. Alameda da Serra, 360 – 7o andar
site or company. Changes in the database Vila de Serra – Nova Lima – MG
34000-000
are automatically applied to the design. Tel +55 31 3264 9377
Functions within EPS include:
Open Pit CANADA
Montreal
Strategic planning data contained in imported
models can be used by CAE Studio 5D Planner
Calendars 3200 Guenette
Saint-Laurent, Quebec
H4S 2G5 Canada
to define more detailed designs and schedules Multiple calendars can be applied to both resources and Tel +1 514 341 2000 ext. 2404
resulting in medium term and budget plans that activities e.g. development and backfill crews working on
honour the optimized long term plan. Designs can different shift systems. It is possible to schedule shutdown or Sudbury
be as detailed as required making CAE Studio non-work periods and define multiple reporting calendars for 866 Newgate Avenue, Unit 2
Sudbury, Ontario P3A 5J9
5D Planner suitable for feasibility studies or more different purposes. Toll-free: 1 800 240 6941
detailed budget planning. Tel +1 705 688 0101
Geological Model
cost scenarios based on a cost database. India
Tel +91 11 41290000
UNITED KINGDOM
Wells
Unit A, Underwood Business Park
Wookey Hole Road,
Wells, Somerset BA5 1AF
United Kingdom
Tel +44 1749 683 350