Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Process Overview........................................................................................................................2
Note 1 – Number of packages.................................................................................................3
Note 2 – Volume information..................................................................................................3
Note 3 – Reference PO number and Line...............................................................................4
Note 4 – Delivery date at customer.........................................................................................4
Note 5 – Shipments with gross weight equal or less than net weight are not accepted..........5
Prerequisites for process set-up (Users)......................................................................................8
ZFRA Output maintenance.....................................................................................................8
Technical details (GDC/ BASIS team).....................................................................................10
Customer profile...................................................................................................................10
EDI/ DEV settings................................................................................................................12
Process Overview
The purpose is to send a confirmation via EDI to Hilti after the shipment is completed in SAP.
How is it done:
2. Packing is done.
Note 1 – Number of packages
For shipments to Hilti US information on the number of packages is required. This can
be done in two ways:
a. Nested packing - boxes in pallets
b. Pack on pallets and complete the packages information in the Contents field of the
HU. The format should be X CARTON, where X is the number of packages.
Should an incoming EDI ORDER fail and the SO must be created manually by
Customer Service, make sure that Purchase order item number is maintain exactly as
in the PO for each line item. Failure to do so will cause the shipment advice to error
out.
3. The output ZFRA is created with status 1 – Send/ processed with daily scheduled job
4. Hilti requires one IDOC XML per shipment.
Step 1 - Batch job ZSD_NL_DD_RSNAST00_ZFRA_14:45 PM runs daily at 12:45 PM CET
and processes all the ZFRA outputs.
Step 2 - the IDOC is transformed into an XML file and saved on the P16 server
5. EUREDI script will run and will transmit the XML file to the customer at 13:05 PM CET
T-code VV71.
Use VV72 to modify and VV73 to display.
Execute.
And add the SHPADV message type in the outbound parameters with the following options:
Message control:
EDI/ DEV settings
XML Port: ZHLTXMLPRT - XML Hilti shipment File transfer has been defined for this
shipment confirmation.
Function module: Z_S_EDI_PATH_CREATE_HILTI ensures that the name of the xml file is
in the format:
HILTI_DELV_SHP_ADV_YYYYMMDD_HHMMSS_SHIPNO.XML
ZTZ_FIXDATA entries for Modification when XML generated on the field <SNDPRT>.The changes for
Partner Function and Partner number in XML for HILTI:
SAPLEDI7 SHPMNT1 1 SHPADVZHLTXMLPRT
SAPLEDI7 SNDPRN 1 0001000427
SAPLEDI7 SNDPRT 1 LI