VALORIZACIÓN MENSUAL

MES DE: DICIEMBR

PROYECTO : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y TRATAMIENTO DE AREAS VERDES EN LAS URBANIZACIONES DE MIRAFLORES, S

MODALIDAD : POR ADMINISTRACION DIRECTA


EJECUTOR : MUNICIPALIDAD PROVINCIAL DE ANDAHUAYLAS
RESIDENTE : ING. KARLO P. MARTINEZ VARGAS
SUPERVISOR : ING. FREDY HUAMAN GONZALES
FECHA : DICIEMBRE - 2018

PRESUPUESTO
Ítem PARTIDA Precio
Und Metrado Parcial
Unitario
CONSTRUCCION DE PISTAS Y VEREDAS
01 OBRAS PROVISIONALES 14,517.10
01.01 CARTEL DE OBRA 8.50 m X 3.60 m und 1.00 1,449.86 1,449.86
01.02 ALQUILER DE OFICINA Y ALMACEN mes 12.00 672.27 8,067.24
01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPO glb 1.00 5,000.00 5,000.00
02 PISTAS DE CONCRETO 744,858.89
02.01 TRABAJOS PRELIMINARES 32,844.43
02.01.01 LIMPIEZA DEL TERRENO MANUAL m2 12,880.17 1.15 14,812.20
02.01.02 TRAZOS Y REPLANTEO EN TERRENO NORMAL CON EQUIPO m2 12,880.17 1.40 18,032.24
02.02 MOVIMIENTO DE TIERRAS 242,892.89
02.02.01 CORTE DE TERRENNO A NIVEL DE SUB RASANTE m3 8,897.21 6.83 60,767.94
02.02.02 ELIMINACION DE MATERIAL EXCEDENTE d=15 km m3 10,951.59 16.63 182,124.94
02.03 MEJORAMIENTO DE SUB RASANTE 199,642.64
02.03.01 PERFILADO, RIEGO Y COMPACTADO DE SUB-RASANTE m2 12,880.17 15.50 199,642.64
02.04 SUB BASE E=0.15 124,912.03
02.04.01 RELLENO CON MATERIAL DE PRESTAMO P/SB m3 1,932.03 30.52 58,965.56
02.04.02 EXTENDIDO NIVELACION REFINE Y PERFILADO DE SUB BASE m2 12,880.17 3.05 39,284.52
VALORIZACIÓN MENSUAL
MES DE: DICIEMBR

PROYECTO : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y TRATAMIENTO DE AREAS VERDES EN LAS URBANIZACIONES DE MIRAFLORES, S

MODALIDAD : POR ADMINISTRACION DIRECTA


EJECUTOR : MUNICIPALIDAD PROVINCIAL DE ANDAHUAYLAS
RESIDENTE : ING. KARLO P. MARTINEZ VARGAS
SUPERVISOR : ING. FREDY HUAMAN GONZALES
FECHA : DICIEMBRE - 2018

PRESUPUESTO
Ítem PARTIDA Precio
Und Metrado Parcial
Unitario
02.04.03 RIEGO Y COMPACTADO DE SUB BASE m2 12,880.17 2.07 26,661.95
02.05 BASE E=0.20 m 144,566.91
02.05.01 RELLENO CON MATERIAL DE PRESTAMO P/SB m3 2,576.03 30.52 78,620.44
02.05.02 EXTENDIDO, RIEGO Y COMPACTADO DE BASE m2 12,880.17 3.05 39,284.52
02.05.03 RIEGO Y COMPACTADO DE BASE m2 12,880.17 2.07 26,661.95
02.06 PISTAS 1,125,779.56
02.06.01 ENCOFRADO Y DESENCOFRADO DE LOSA DE PAVIMENTO m2 2,075.14 38.01 78,876.07
02.06.02 CONCRETO f'c=210Kg/cm2 m3 2,576.03 356.61 918,638.06
02.06.03 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 12,347.93 4.27 52,725.66
02.06.04 JUNTAS DE DILATACION m 10,624.44 7.11 75,539.77

03 MUROS REFORZADOS 826,368.04

03.01 TRABAJOS PRELIMINARES 642.75

03.01.01 LIMPIEZA DEL TERRENO MANUAL m2 252.06 1.15 289.87

03.01.02 TRAZOS Y REPLANTEO EN TERRENO NORMAL CON EQUIPO m2 252.06 1.40 352.88
03.02 MOVIMIENTO DE TIERRAS 283,509.09
03.02.01 EXCAVACION MANUAL TERRENO NORMAL m3 1,250.42 34.20 42,764.36
VALORIZACIÓN MENSUAL
MES DE: DICIEMBR

PROYECTO : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y TRATAMIENTO DE AREAS VERDES EN LAS URBANIZACIONES DE MIRAFLORES, S

MODALIDAD : POR ADMINISTRACION DIRECTA


EJECUTOR : MUNICIPALIDAD PROVINCIAL DE ANDAHUAYLAS
RESIDENTE : ING. KARLO P. MARTINEZ VARGAS
SUPERVISOR : ING. FREDY HUAMAN GONZALES
FECHA : DICIEMBRE - 2018

PRESUPUESTO
Ítem PARTIDA Precio
Und Metrado Parcial
Unitario
03.02.02 RELLENO Y COMPACTADO CON MATERIAL GRANULAR 2" m3 3,083.95 51.04 157,404.81

03.02.03 ELIMINACION DE MATERIAL EXCEDENTE d=15 km m3 5,011.42 16.63 83,339.91

03.03 OBRAS DE CONCRETO 542,216.20


03.03.01 ENCOFRADO Y DESENCOFRADO CARAVISTA EN MUROS m2 1,152.09 62.85 72,408.86

03.03.02 CONCRETO MUROS REFORZADOS f'c=210 KG/CM2 m3 374.60 347.29 130,094.83

03.03.03 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 29,917.36 4.27 127,747.13


03.03.04 CONCRETO CICLOPEO f'c=210 kg/cm2 m3 660.39 320.97 211,965.38
04 CUNETAS Y ALCANTARILLAS 193,229.17
04.01 TRABAJOS PRELIMINARES 1,396.69
04.01.01 LIMPIEZA DEL TERRENO MANUAL m2 547.72 1.15 629.88
04.01.02 TRAZOS Y REPLANTEO EN TERRENO NORMAL CON EQUIPO m2 547.72 1.40 766.81
04.02 MOVIMIENTO DE TIERRAS 26,754.79
04.02.01 EXCAVACION Y PERFILADO m3 438.17 39.01 17,093.01
04.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 547.72 1.01 553.20
04.02.03 ELIMINACION DE MATERIAL EXCEDENTE d=15 km m3 547.72 16.63 9,108.58
04.03 OBRAS DE CONCRETO 165,077.69
VALORIZACIÓN MENSUAL
MES DE: DICIEMBR

PROYECTO : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y TRATAMIENTO DE AREAS VERDES EN LAS URBANIZACIONES DE MIRAFLORES, S

MODALIDAD : POR ADMINISTRACION DIRECTA


EJECUTOR : MUNICIPALIDAD PROVINCIAL DE ANDAHUAYLAS
RESIDENTE : ING. KARLO P. MARTINEZ VARGAS
SUPERVISOR : ING. FREDY HUAMAN GONZALES
FECHA : DICIEMBRE - 2018

PRESUPUESTO
Ítem PARTIDA Precio
Und Metrado Parcial
Unitario
04.03.01 ENCOFRADO Y DESENCOFRADO DE CUNETAS Y ALCANTARILLAS m2 1,251.92 46.60 58,339.47
04.03.02 CONCRETO f'c=210Kg/cm2 m3 226.91 356.61 80,918.38
04.03.03 ACERO DE REFUERZO GRADO 60 kg 6,191.81 4.17 25,819.85
04.04 VARIOS ALCANTARILLA 107,765.68
04.04.01 ALCANTARILLA MOVIL METALICA 0.54 m x 1.00 m und 29.00 270.64 7,848.56
04.04.02 ALCANTARILLA METALICA 0.54 cm ANCHO m 102.44 221.11 22,650.51
04.04.03 TAPA DE CONCRETO f'c=210 kg/cm2 und 808.00 90.65 73,245.20
04.04.04 JUNTAS DE DILATACION m 565.60 7.11 4,021.42
05 SARDINELES DE CONCRETO 34,908.04
05.01 TRABAJOS PRELIMINARES 176.41
05.01.01 LIMPIEZA DEL TERRENO MANUAL m2 69.18 1.15 79.56
05.01.02 TRAZOS Y REPLANTEO EN TERRENO NORMAL CON EQUIPO m2 69.18 1.40 96.85
05.02 MOVIMIENTO DE TIERRAS 1,861.45
05.02.01 EXCAVACION Y PERFILADO m3 31.13 39.01 1,214.38
05.02.02 ELIMINACION DE MATERIAL EXCEDENTE d=15 km m3 38.91 16.63 647.07
05.03 OBRAS DE CONCRETO 32,870.18
05.03.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 415.08 53.87 22,360.36
VALORIZACIÓN MENSUAL
MES DE: DICIEMBR

PROYECTO : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y TRATAMIENTO DE AREAS VERDES EN LAS URBANIZACIONES DE MIRAFLORES, S

MODALIDAD : POR ADMINISTRACION DIRECTA


EJECUTOR : MUNICIPALIDAD PROVINCIAL DE ANDAHUAYLAS
RESIDENTE : ING. KARLO P. MARTINEZ VARGAS
SUPERVISOR : ING. FREDY HUAMAN GONZALES
FECHA : DICIEMBRE - 2018

PRESUPUESTO
Ítem PARTIDA Precio
Und Metrado Parcial
Unitario

05.03.02 CONCRETO f'c=175 kg/cm2 m3 31.13 320.01 9,961.91

05.03.03 JUNTAS ASFALTICAS EN SARDINELES m 69.18 7.92 547.91

05.04 OBRAS DE CONCRETO ARMADO EN SARDINELES 17,043.30

05.04.01 EXCAVACION Y PERFILADO m3 39.95 39.01 1,558.45


05.04.02 RELLENO COMPACTADO MANUAL MATERIAL PROPIO m3 33.28 1.01 33.61
05.04.03 ENCOFRADO Y DESENCOFRADO NORMAL m2 80.23 53.87 4,321.99
05.04.04 CONCRETO f'c=210Kg/cm2 m3 16.17 356.61 5,766.38
05.04.05 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 1,255.94 4.27 5,362.86
06 BERMAS DE CONCRETO 51,830.79
06.01 TRABAJOS PRELIMINARES 524.75
06.01.01 TRAZOS Y REPLANTEO EN TERRENO NORMAL CON EQUIPO m2 374.82 1.40 524.75
06.02 MOVIMIENTO DE TIERRAS 15,288.32
06.02.01 EXCAVACION Y PERFILADO (e=0.10m) m3 37.49 39.01 1,462.48
06.02.02 PERFILADO, RIEGO Y COMPACTADO DE SUB-RASANTE m2 374.90 15.50 5,810.95
06.02.03 RELLENO CON MATERIAL DE PRESTAMO m3 148.19 33.00 4,890.27
06.02.04 EXTENDIDO, RIEGO Y COMPACTADO m2 347.90 4.50 1,565.55
VALORIZACIÓN MENSUAL
MES DE: DICIEMBR

PROYECTO : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y TRATAMIENTO DE AREAS VERDES EN LAS URBANIZACIONES DE MIRAFLORES, S

MODALIDAD : POR ADMINISTRACION DIRECTA


EJECUTOR : MUNICIPALIDAD PROVINCIAL DE ANDAHUAYLAS
RESIDENTE : ING. KARLO P. MARTINEZ VARGAS
SUPERVISOR : ING. FREDY HUAMAN GONZALES
FECHA : DICIEMBRE - 2018

PRESUPUESTO
Ítem PARTIDA Precio
Und Metrado Parcial
Unitario
06.02.05 ELIMINACION DE MATERIAL EXCEDENTE d=15 km m3 93.75 16.63 1,559.06
06.03 OBRAS DE CONCRETO 36,017.73
06.03.01 CONCRETO f'c=210Kg/cm2 m3 74.98 356.61 26,738.62
06.03.02 ENCOFRADO Y DESENCOFRADO EN VEREDAS m2 172.25 53.87 9,279.11
07 VEREDAS DE CONCRETO 648,748.99
07.01 TRABAJOS PRELIMINARES 115,788.74
07.01.01 TRAZOS NIVEL Y REPLANTEO VEREDAS m2 6,509.99 1.40 9,113.99
07.01.02 DEMOLICION VEREDA ANTIGUA m2 2,605.00 40.95 106,674.75
07.02 MOVIMIENTO DE TIERRAS 192,359.16
07.02.01 EXCAVACION Y PERFILADO (e=0.10m) m3 726.94 39.01 28,357.93
07.02.02 PERFILADO, RIEGO Y COMPACTADO DE SUB-RASANTE m2 6,509.99 15.50 100,904.85
07.02.03 RELLENO CON MATERIAL DE PRESTAMO PARA BASE VEREDAS m3 651.00 31.19 20,304.69
07.02.04 EXTENDIDO, RIEGO Y COMPACTADO m2 6,509.99 4.50 29,294.96
07.02.05 ELIMINACION DE MATERIAL EXCEDENTE d=15 km m3 811.59 16.63 13,496.74
07.03 OBRAS DE CONCRETO 340,601.10
07.03.01 CONCRETO f'c=175 kg/cm2 PARA VEREDAS m3 848.27 320.01 271,454.88
07.03.02 ENCOFRADO Y DESENCOFRADO EN VEREDAS m2 988.02 53.87 53,224.64
VALORIZACIÓN MENSUAL
MES DE: DICIEMBR

PROYECTO : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y TRATAMIENTO DE AREAS VERDES EN LAS URBANIZACIONES DE MIRAFLORES, S

MODALIDAD : POR ADMINISTRACION DIRECTA


EJECUTOR : MUNICIPALIDAD PROVINCIAL DE ANDAHUAYLAS
RESIDENTE : ING. KARLO P. MARTINEZ VARGAS
SUPERVISOR : ING. FREDY HUAMAN GONZALES
FECHA : DICIEMBRE - 2018

PRESUPUESTO
Ítem PARTIDA Precio
Und Metrado Parcial
Unitario
07.03.03 RELLENO DE JUNTAS CON ASFALTO m 2,010.30 7.92 15,921.58
08 ESCALINATAS DE CONCRETO 118,402.98
08.01 TRABAJOS PRELIMINARES 2,259.15
08.01.01 LIMPIEZA DEL TERRENO MANUAL m2 885.94 1.15 1,018.83
08.01.02 TRAZOS Y REPLANTEO EN TERRENO NORMAL CON EQUIPO m2 885.94 1.40 1,240.32
08.02 MOVIMIENTO DE TIERRAS 56,704.73
08.02.01 EXCAVACION Y PERFILADO m3 944.64 39.01 36,850.41
08.02.02 RELLENO COMPACTADO MANUAL MATERIAL PROPIO m3 180.87 1.08 195.34
08.02.03 ELIMINACION DE MATERIAL EXCEDENTE d=15 km m3 1,180.72 16.65 19,658.99
08.03 OBRAS DE CONCRETO 59,439.10
08.03.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 302.88 53.87 16,316.15
08.03.02 CONCRETO f'c=175 kg/cm2 m3 134.57 320.45 43,122.96
09 SEÑALIZACION EN PAVIMENTO 12,924.58
09.01 SEÑALIZACION HORIZONTAL EN PAVIMENTO m2 517.19 24.99 12,924.58
10 VARIOS 132,129.86
10.01 NIVELACION DE BUZONES EN GENERAL und 22.00 105.28 2,316.16
10.02 BARANDAS PARA VEREDAS m 350.67 200.95 70,467.14
VALORIZACIÓN MENSUAL
MES DE: DICIEMBR

PROYECTO : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y TRATAMIENTO DE AREAS VERDES EN LAS URBANIZACIONES DE MIRAFLORES, S

MODALIDAD : POR ADMINISTRACION DIRECTA


EJECUTOR : MUNICIPALIDAD PROVINCIAL DE ANDAHUAYLAS
RESIDENTE : ING. KARLO P. MARTINEZ VARGAS
SUPERVISOR : ING. FREDY HUAMAN GONZALES
FECHA : DICIEMBRE - 2018

PRESUPUESTO
Ítem PARTIDA Precio
Und Metrado Parcial
Unitario
10.03 BARANDAS PARA ESCALINATAS m 295.33 200.95 59,346.56
11 TRATAMIENTO DE AREAS VERDES 8,218.59
11.01 SEMBRIO DE ARBOLES Y ARBUSTOS und 60.00 16.17 970.20
11.02 SEMBRIO DE GRASS m2 454.16 15.96 7,248.39
12 MITIGACION AMBIENTAL 10,000.00
12.01 MITIGACION AMBIENTAL glb 1.00 10,000.00 10,000.00
COSTO DIRECTO 4,046,725.58

GASTOS GENERALES glb 1.00 78,332.50


GASTOS DE SUPERVISION glb 1.00 59,311.25
LIQUIDACION glb 1.00 5,023.00
TOTAL PRESUPUESTO 4,189,392.33

4046725.62
VALORIZACIÓN MENSUAL
MES DE: DICIEMBR

PROYECTO : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR, PEATONAL Y TRATAMIENTO DE AREAS VERDES EN LAS URBANIZACIONES DE MIRAFLORES, S

MODALIDAD : POR ADMINISTRACION DIRECTA


EJECUTOR : MUNICIPALIDAD PROVINCIAL DE ANDAHUAYLAS
RESIDENTE : ING. KARLO P. MARTINEZ VARGAS
SUPERVISOR : ING. FREDY HUAMAN GONZALES
FECHA : DICIEMBRE - 2018

PRESUPUESTO
Ítem PARTIDA Precio
Und Metrado Parcial
Unitario

________________________
ING. RESIDENTE DE OBRA
Firma y Sello
N MENSUAL DE OBRA N° 03
DE: DICIEMBRE 2018

IRAFLORES, SAN AGUSTIN, SANTA TERESA, ROSITA Y BELLA VISTA ALTA DEL DISTRITO DE ABANCAY - PROVINCIA DE ABANCAY- APURIMAC

FECHA :13/12/2018
DISTRITO : PACUCHA
PROVINCIA : ANDAHUAYLAS
REGION : APURIMAC

VALORIZACION
saldo por valorizar
valorizacion (elaboracion propia) valorizacion (valorizacion nº 07) valorizacion (valorizacon tecnica)
Metrado S/. % Metrado S/. % Metrado S/. % Metrado S/. %

8,319.62 9,798.61 14,517.10 6,197.49


1.00 1,449.86 100 1.00 1,449.86 100.00% 1.00 1,449.86 100.00% 0.00 0.00 0.00%
6.50 4,369.76 54.17 8.70 5,848.75 72.50% 12.00 8,067.24 100.00% 5.50 3,697.49 45.83%
0.50 2,500.00 50 0.50 2,500.00 50.00% 1.00 5,000.00 100.00% 0.50 2,500.00 50.00%
310,884.17 674,492.77 336,400.96 1,559,753.56
14,812.20 17,924.52 32,844.43 5,679.15 14,919.92
12,880.63 14,812.72 17.33 12,880.17 14,812.20 100.00% 2,232.12 2,566.94 17.33% -0.46 -0.53 0.00%
2,222.71 3,111.79 17.26 12,880.17 18,032.24 100.00% 2,223.01 3,112.21 17.26% 10,657.46 14,920.44 82.74%
31,614.13 241,487.59 62,894.66 211,278.76
1,539.87 10,517.31 17.31 8,817.07 60,220.59 99.10% 1,539.87 10,517.31 17.31% 7,357.34 50,250.63 82.69%
1,268.60 21,096.82 11.58 10,900.00 181,267.00 99.53% 3,149.57 52,377.35 28.76% 9,682.99 161,028.12 88.42%
33,014.23 49,294.03 34,456.04 166,628.41
2,129.95 33,014.23 16.54 3,180.26 49,294.03 24.69% 2,222.97 34,456.04 17.26% 10,750.22 166,628.41 83.46%
20,955.39 31,265.28 21,558.50 103,956.64
324.12 9,892.14 16.78 483.58 14,758.86 25.03% 333.45 10,176.89 17.26% 1,607.91 49,073.41 83.22%
2,160.79 6,590.41 16.78 3,223.91 9,832.93 25.03% 2,222.97 6,780.06 17.26% 10,719.38 32,694.11 83.22%
N MENSUAL DE OBRA N° 03
DE: DICIEMBRE 2018

IRAFLORES, SAN AGUSTIN, SANTA TERESA, ROSITA Y BELLA VISTA ALTA DEL DISTRITO DE ABANCAY - PROVINCIA DE ABANCAY- APURIMAC

FECHA :13/12/2018
DISTRITO : PACUCHA
PROVINCIA : ANDAHUAYLAS
REGION : APURIMAC

VALORIZACION
saldo por valorizar
valorizacion (elaboracion propia) valorizacion (valorizacion nº 07) valorizacion (valorizacon tecnica)
Metrado S/. % Metrado S/. % Metrado S/. % Metrado S/. %
2,160.79 4,472.84 16.78 3,223.91 6,673.49 25.03% 2,222.97 4,601.55 17.26% 10,719.38 22,189.12 83.22%
24,252.77 35,977.08 627.74 120,314.14
432.16 13,189.52 16.78 644.81 19,679.60 25.03% 17.26 526.78 0.67% 2,143.87 65,430.91 83.22%
2,160.79 6,590.41 16.78 3,183.91 9,710.93 24.72% 19.72 60.15 0.15% 10,719.38 32,694.11 83.22%
2,160.79 4,472.84 16.78 3,181.91 6,586.55 24.70% 19.72 40.82 0.15% 10,719.38 22,189.12 83.22%
183,123.14 283,624.36 211,184.87 942,655.71
436.73 16,600.11 21.05 544.01 20,677.82 26.22% 529.67 20,132.76 25.52% 1,638.41 62,275.96 78.95%
432.16 154,112.58 16.78 644.73 229,917.17 25.03% 444.59 158,545.24 17.26% 2,143.87 764,525.48 83.22%
2,906.43 12,410.46 23.54 3,539.00 15,111.53 28.66% 3,782.46 16,151.10 30.63% 9,441.50 40,315.21 76.46%
0.00 0.00 0.00 2,520.09 17,917.84 23.72% 2,300.39 16,355.77 21.65% 10,624.34 75,539.06 100.00%

176,909.53 826,368.04 321,673.93


649,458.85
463.59 642.75 603.57 179.16

181.80 209.07 72.13 252.06 289.87 100.00% 236.87 272.40 93.97% 70.26 27.87%
80.80
181.80 254.52 72.13 252.06 352.88 100.00% 236.55 331.17 93.85% 70.26 98.36 27.87%
22,017.25 283,509.09 54,931.11 261,492.18
493.73 16,885.57 39.49 1,250.42 42,764.36 100.00% 627.07 21,445.79 50.15% 756.70 25,879.14 60.52%
N MENSUAL DE OBRA N° 03
DE: DICIEMBRE 2018

IRAFLORES, SAN AGUSTIN, SANTA TERESA, ROSITA Y BELLA VISTA ALTA DEL DISTRITO DE ABANCAY - PROVINCIA DE ABANCAY- APURIMAC

FECHA :13/12/2018
DISTRITO : PACUCHA
PROVINCIA : ANDAHUAYLAS
REGION : APURIMAC

VALORIZACION
saldo por valorizar
valorizacion (elaboracion propia) valorizacion (valorizacion nº 07) valorizacion (valorizacon tecnica)
Metrado S/. % Metrado S/. % Metrado S/. % Metrado S/. %
0.00 0.00 0.00 3,083.95 157,404.81 100.00% 324.05 16,539.51 10.51% 3,083.95 157,404.81 100.00%

308.58 5,131.69 6.16 5,011.42 83,339.91 100.00% 1,018.99 16,945.80 20.33% 4,702.84 93.84%
78,208.23
154,428.69 542,216.20 266,139.25 387,787.51
808.17 50,793.48 70.15 1,152.09 72,408.86 100.00% 900.42 56,591.40 78.16% 343.92 21,615.37 29.85%

108.15 37,559.41 28.87 374.60 130,094.83 100.00% 262.31 91,097.64 70.02% 266.45 71.13%
92,535.42
3,276.06 13,988.78 10.950 29,917.36 127,747.13 100.00% 5,897.60 25,182.75 19.71% 26,641.30 113,758.35 89.05%
162.28 52,087.01 24.57 660.39 211,965.38 100.00% 290.58 93,267.46 44.00% 498.11 159,878.37 75.43%
0.00 0.00 0.00 0.00 0.00 0.00 300,994.86 155.77%
0.00 0.00 0.00 1,396.69
0.00 0.00 0 0.00 0.00 0.00% 0.00 0.00 0.00% 547.72 629.88 100.00%
0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00 0.00% 547.72 766.81 100.00%
0.00 0.00 0.00 26,754.79
0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00 0.00% 438.17 17,093.01 100.00%
0.00 0.00 0 0.00 0.00 0.00% 0.00 0.00 0.00% 547.72 553.20 100.00%
0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00 0.00% 547.72 9,108.58 100.00%
0.00 0.00 0.00 165,077.69
N MENSUAL DE OBRA N° 03
DE: DICIEMBRE 2018

IRAFLORES, SAN AGUSTIN, SANTA TERESA, ROSITA Y BELLA VISTA ALTA DEL DISTRITO DE ABANCAY - PROVINCIA DE ABANCAY- APURIMAC

FECHA :13/12/2018
DISTRITO : PACUCHA
PROVINCIA : ANDAHUAYLAS
REGION : APURIMAC

VALORIZACION
saldo por valorizar
valorizacion (elaboracion propia) valorizacion (valorizacion nº 07) valorizacion (valorizacon tecnica)
Metrado S/. % Metrado S/. % Metrado S/. % Metrado S/. %
0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00 0.00% 1,251.92 58,339.47 100.00%
0.00 0.00 0 0.00 0.00 0.00% 0.00 0.00 0.00% 226.91 80,918.38 100.00%
0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00 0.00% 6,191.81 25,819.85 100.00%
0.00 0.00 0.00 107,765.68
0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00 0.00% 29.00 7,848.56 100.00%
0.00 0.00 0 0.00 0.00 0.00% 0.00 0.00 0.00% 102.44 22,650.51 100.00%
0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00 0.00% 808.00 73,245.20 100.00%
0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00 0.00% 565.60 4,021.42 100.00%

0.00 0.00 64.57 176.41


0.00 0.00 0.00 0.00 0.00 0.00% 25.32 29.12 36.60% 69.18 79.56 100.00%
0.00 0.00 0 0.00 0.00 0.00% 25.32 35.45 36.60% 69.18 96.85 100.00%

31.13 1,214.38 100 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
38.91 647.07 100.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

415.08 22,360.36 100.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
N MENSUAL DE OBRA N° 03
DE: DICIEMBRE 2018

IRAFLORES, SAN AGUSTIN, SANTA TERESA, ROSITA Y BELLA VISTA ALTA DEL DISTRITO DE ABANCAY - PROVINCIA DE ABANCAY- APURIMAC

FECHA :13/12/2018
DISTRITO : PACUCHA
PROVINCIA : ANDAHUAYLAS
REGION : APURIMAC

VALORIZACION
saldo por valorizar
valorizacion (elaboracion propia) valorizacion (valorizacion nº 07) valorizacion (valorizacon tecnica)
Metrado S/. % Metrado S/. % Metrado S/. % Metrado S/. %

31.13 9,963.06 100.01 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF!
69.18 547.91 100.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

3.45 134.58 8.64 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
1.78 1.80 5.35 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
18.74 1,009.52 23.36 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
1.41 502.82 8.720 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
96.80 413.34 7.71 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

304.94 426.92 81.3563843978 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

30.50 1,189.81 81.3550280075 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
305.04 4,728.12 81.37 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
30.50 1,006.50 20.5816856738 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
305.04 1,372.68 87.68 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
N MENSUAL DE OBRA N° 03
DE: DICIEMBRE 2018

IRAFLORES, SAN AGUSTIN, SANTA TERESA, ROSITA Y BELLA VISTA ALTA DEL DISTRITO DE ABANCAY - PROVINCIA DE ABANCAY- APURIMAC

FECHA :13/12/2018
DISTRITO : PACUCHA
PROVINCIA : ANDAHUAYLAS
REGION : APURIMAC

VALORIZACION
saldo por valorizar
valorizacion (elaboracion propia) valorizacion (valorizacion nº 07) valorizacion (valorizacon tecnica)
Metrado S/. % Metrado S/. % Metrado S/. % Metrado S/. %
74.26 1,234.94 79.2106666667 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

58.89 21,000.76 78.5409442518 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
137.60 7,412.51 79.88 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

5,687.39 7,962.35 87.36 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
5.00 204.75 0.19 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
21,039.92 32,028.47 33,605.90 171,319.08
108.45 4,230.63 14.92 110.07 4,293.83 15.14% 115.49 4,505.26 15.89% 618.49 24,127.29 85.08%
1,084.47 16,809.29 16.66 1,100.68 17,060.54 16.91% 1,154.89 17,900.80 17.74% 5,425.52 84,095.56 83.34%
0.00 0.00 0.00 110.07 3,433.08 16.91% 115.49 3,602.13 17.74% 651.00 20,304.69 100.00%
0.00 0.00 0.00 1,100.68 4,953.06 16.91% 1,154.89 5,197.01 17.74% 6,509.99 29,294.96 100.00%
0.00 0.00 0.00 137.58 2,287.96 16.95% 144.36 2,400.71 17.79% 811.58 13,496.58 100.00%
87,829.98 49,060.81 60,576.34 252,767.38
108.14 34,605.88 12.75 120.15 38,449.20 14.16% 157.06 50,260.77 18.52% 740.12 236,845.80 87.25%
988.01 53,224.10 100.00 160.22 8,631.05 16.22% 191.49 10,315.57 19.38% 0.00 0.00 0.00%
N MENSUAL DE OBRA N° 03
DE: DICIEMBRE 2018

IRAFLORES, SAN AGUSTIN, SANTA TERESA, ROSITA Y BELLA VISTA ALTA DEL DISTRITO DE ABANCAY - PROVINCIA DE ABANCAY- APURIMAC

FECHA :13/12/2018
DISTRITO : PACUCHA
PROVINCIA : ANDAHUAYLAS
REGION : APURIMAC

VALORIZACION
saldo por valorizar
valorizacion (elaboracion propia) valorizacion (valorizacion nº 07) valorizacion (valorizacon tecnica)
Metrado S/. % Metrado S/. % Metrado S/. % Metrado S/. %
0.00 0.00 0.00 250.07 1,980.55 12.44% 0.00 0.00 0.00% 2,010.30 15,921.58 100.00%
0.00 48,238.32 0.00 118,402.98
0.00 2,045.32 0.00 2,259.15
0.00 0.00 0.00 700.00 805.00 79.01% 0.00 0.00 0.00% 885.94 1,018.83 100.00%
0.00 0.00 0.00 885.94 1,240.32 100.00% 0.00 0.00 0.00% 885.94 1,240.32 100.00%
0.00 46,193.00 0.00 56,704.73
0.00 0.00 0.00 800.00 31,208.00 84.69% 0.00 0.00 0.00% 944.64 36,850.41 100.00%
0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00 0.00% 180.87 195.34 100.00%
0.00 0.00 0.00 900.00 14,985.00 76.22% 0.00 0.00 0.00% 1,180.72 19,658.99 100.00%
0.00 0.00 0.00 59,439.10
0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00 0.00% 302.88 16,316.15 100.00%
0.00 0.00 0 0.00 0.00 0.00% 0.00 0.00 0.00% 134.57 43,122.96 100.00%
0.00 0.00 0.00 12,924.58
0.00 0.00 0 0.00 0.00 0.00% 0.00 0.00 0.00% 517.19 12,924.58 100.00%
421.12 0.00 0.00 131,708.74
4.00 421.12 18.182 0.00 0.00 0.00% 0.00 0.00 0.00% 18.00 1,895.04 81.82%
0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00 0.00% 350.67 70,467.14 100.00%
N MENSUAL DE OBRA N° 03
DE: DICIEMBRE 2018

IRAFLORES, SAN AGUSTIN, SANTA TERESA, ROSITA Y BELLA VISTA ALTA DEL DISTRITO DE ABANCAY - PROVINCIA DE ABANCAY- APURIMAC

FECHA :13/12/2018
DISTRITO : PACUCHA
PROVINCIA : ANDAHUAYLAS
REGION : APURIMAC

VALORIZACION
saldo por valorizar
valorizacion (elaboracion propia) valorizacion (valorizacion nº 07) valorizacion (valorizacon tecnica)
Metrado S/. % Metrado S/. % Metrado S/. % Metrado S/. %
0.00 0.00 0 0.00 0.00 0.00% 0.00 0.00 0.00% 295.33 59,346.56 100.00%
0.00 0.00 0.00 8,218.59
0.00 0.00 0 0.00 0.00 0.00% 0.00 0.00 0.00% 60.00 970.20 100.00%
0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00 0.00% 454.16 7,248.39 100.00%
0.00 0.00 0.00 10,000.00
0.00 0.00 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 10,000.00 100.00%
1,773,616.93 43.83% #REF! #REF! #REF! #REF! #REF! #REF!

0.00 0.00 0.00% 0.00 #REF! #REF! 0.00 #REF! #REF! #REF! #REF!
0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 59,311.25 100.00%
0.00 0.00 0.00% 0.00 #REF! #REF! 0.00 #REF! #REF! #REF! #REF!
1,773,616.93 42.34% #REF! #REF! #REF! #REF! #REF! #REF!

0.04
N MENSUAL DE OBRA N° 03
DE: DICIEMBRE 2018

IRAFLORES, SAN AGUSTIN, SANTA TERESA, ROSITA Y BELLA VISTA ALTA DEL DISTRITO DE ABANCAY - PROVINCIA DE ABANCAY- APURIMAC

FECHA :13/12/2018
DISTRITO : PACUCHA
PROVINCIA : ANDAHUAYLAS
REGION : APURIMAC

VALORIZACION
saldo por valorizar
valorizacion (elaboracion propia) valorizacion (valorizacion nº 07) valorizacion (valorizacon tecnica)
Metrado S/. % Metrado S/. % Metrado S/. % Metrado S/. %

_____________________________
ING. SUPERVISOR DE OBRA
Firma y Sello