TABLA DE CÁLCULO DE CIMIENTOS.

Capacidad de carga del terreno.- 14700 kg/m2

Tamaño de la corrona.- 30 cm
Factor de Carga por Cimentación. 1.12 %

Factor de Carga NTC-04. 1.40 %

Seccion
WS/C (kg/m) WS/T (kg/m) WU (kg/m) B=WU/Rt practica. Tipo
Tramo. Tipo. V=B-C V=(B-C)/2 h=1.72V Cim.
B H
1(C-E) L 6962.30 7797.78 10916.89 74.26 44.26 76.13 80 90 CL-2
1(E-G) L 6962.30 7797.78 10916.89 74.26 44.26 76.13 80 90 CL-2
2(B-C) I 5183.16 5805.14 8127.19 55.29 12.64 21.75 60 30 CI-1
2(C-D) I 7115.30 7969.14 11156.79 75.90 22.95 39.47 80 60 CI-2
2(D-E) I 6234.44 6982.57 9775.60 66.50 18.25 31.39 80 60 CI-2
2(E-F) I 6234.44 6982.57 9775.60 66.50 18.25 31.39 80 60 CI-2
2(F-G) I 7115.30 7969.14 11156.79 75.90 22.95 39.47 80 60 CI-2
2(G-H) I 5183.16 5805.14 8127.19 55.29 12.64 21.75 60 30 CI-1
3(A-B) I 6337.10 7097.55 9936.57 67.60 18.80 32.33 80 60 CI-2
3(H-I) I 6337.10 7097.55 9936.57 67.60 18.80 32.33 80 60 CI-2
4(C-D) I 7499.93 8399.92 11759.89 80.00 25.00 43.00 80 60 CI-2
4(F-G) I 7499.93 8399.92 11759.89 80.00 25.00 43.00 80 60 CI-2
5(A-C) I 7243.44 8112.65 11357.71 77.26 23.63 40.65 80 60 CI-2
5(G-I) I 7243.44 8112.65 11357.71 77.26 23.63 40.65 80 60 CI-2
6(B-C) I 6517.58 7299.69 10219.57 69.52 19.76 33.99 80 60 CI-2
6(C-D) I 5619.50 6293.84 8811.38 59.94 14.97 25.75 60 30 CI-1
6(D-E) I 7021.74 7864.35 11010.09 74.90 22.45 38.61 80 60 CI-2
6(E-F) I 7021.74 7864.35 11010.09 74.90 22.45 38.61 80 60 CI-2
6(F-G) I 5619.50 6293.84 8811.38 59.94 14.97 25.75 60 30 CI-1
6(G-H) I 6517.58 7299.69 10219.57 69.52 19.76 33.99 80 60 CI-2
7(A-B) I 4134.50 4630.64 6482.90 44.10 7.05 12.13 60 30 CI-1
7(H-I) I 4134.50 4630.64 6482.90 44.10 7.05 12.13 60 30 CI-1
8(C´-F´) I 4358.85 4881.91 6834.68 46.49 8.25 14.19 60 30 CI-1
9(C´-D´) I 2860.98 3204.30 4486.02 30.52 0.26 0.44 40 30 CI-5
9(E´D´) I 2860.98 3204.30 4486.02 30.52 0.26 0.44 40 30 CI-5
A(3-5) L 5396.85 6044.47 8462.26 57.57 27.57 47.41 60 60 CL-3
A(5-6) L 5912.76 6622.29 9271.21 63.07 33.07 56.88 80 60 CL-1
A(6-7) L 6337.05 7097.50 9936.49 67.60 37.60 64.66 80 90 CL-2
B(2-3) I 6337.10 7097.55 9936.57 67.60 18.80 32.33 80 60 CI-2
B(6-7) I 6337.05 7097.50 9936.49 67.60 18.80 32.33 80 60 CI-2
C(2-3) I 8106.64 9079.44 12711.21 86.47 28.24 48.56 100 60 CI-4
C(3-4) I 8054.91 9021.50 12630.10 85.92 27.96 48.09 100 60 CI-4
C(4-5) I 7833.44 8773.45 12282.83 83.56 26.78 46.06 100 60 CI-4
C(5-6) I 7833.44 8773.45 12282.83 83.56 26.78 46.06 100 60 CI-4
C´(8-9) I 5911.28 6620.63 9268.89 63.05 16.53 28.43 80 30 CI-3
D(2-4) I 7788.78 8723.43 12212.81 83.08 26.54 45.65 100 60 CI-4
E(1-2) I 6300.59 7056.66 9879.33 67.21 18.60 32.00 80 60 CI-2
E(2-4) I 8272.96 9265.72 12972.00 88.24 29.12 50.09 100 60 CI-4
E(4-6) I 9971.26 11167.81 15634.94 106.36 38.18 65.67 120 90 CI-6
F(2-4) I 7788.77 8723.42 12212.79 83.08 26.54 45.65 100 60 CI-4
F´(8-9) I 5911.28 6620.63 9268.89 63.05 16.53 28.43 80 30 CI-3
G(2-3) I 8106.64 9079.44 12711.21 86.47 28.24 48.56 100 60 CI-4
G(3-4) I 8054.91 9021.50 12630.10 85.92 27.96 48.09 100 60 CI-4
G(4-5) I 7833.44 8773.45 12282.83 83.56 26.78 46.06 100 60 CI-4
G(5-6) I 7837.44 8777.93 12289.11 83.60 26.80 46.10 100 60 CI-4
H(2-3) I 6337.10 7097.55 9936.57 67.60 18.80 32.33 80 60 CI-2
H(6-7) I 6337.05 7097.50 9936.49 67.60 18.80 32.33 80 60 CI-2
I(3-3´) I 7940.31 8893.15 12450.41 84.70 27.35 47.04 100 60 CI-4
I(3´-5) I 5396.85 6044.47 8462.26 57.57 13.78 23.71 60 30 CI-1
I(5-6) I 5912.76 6622.29 9271.21 63.07 16.53 28.44 80 30 CI-3
I(6-7) I 6337.05 7097.50 9936.49 67.60 18.80 32.33 80 60 CI-2