TABLA DE JORNALES
TABLA DE JORNALES
March-14
PEON
S/.
39.40
46.43
0.30
11.82
0.17
0.00
0.60
98.42
12.30
MUNICIPALIDAD DISTRITAL DE ECHARATI - DIVISION DE ESTUDIOS Y PROYECTOS DE INFRAESTRUCTURA
DISTANCIA VIRTUAL
CENTROS DE ABASTECIMIENTO :
LIMA : (Otros materiales)
CHIMBOTE : (Vigas Metalicas)
CUSCO : (Cemento, acero corrugado, madera, etc)
DISTANCIA VIRTUAL
DISTANCIA VIRTUAL
( Km )
DISTANCIA VIRTUAL
( Km )
MUNICIPALIDAD DISTRITAL DE ECHARATI - DIVISION DE ESTUDIOS Y PROYECTOS DE INFRAESTRUCTURA
MUNICIPALIDAD DISTRITAL DE ECHARATI - DIVISION DE ESTUDIOS Y PROYECTOS DE INFRAESTRUCTURA
VEHICULO TIPO = C3 y C2
CAPACIDAD DE CARGA = 15000 kg y 8000 kg
COSTO APLICADO = SEGÚN DISTANCIA
CICLO = NORMAL + FRV
FRV = FACTOR DE RETORNO AL VACIO, TRANSPORTE NORMAL 1, TRANSPORTE ESPECIAL 1.4. (*)
COSTO ACTUAL
ESPECIAL
( SOLES/KG )
1.642
1.441
0.521
0.300
0.270
A. EQUIPO TRANSPORTADO
PESO DISTRIBUCIO
UND. UNIDAD BASE PARA EL CALCULO TON SEMI TRAILER
35tn
1 CARGADOR S/LLANTAS 160-195 HP 3 YD3. 18.585
2 CIZALLA 0.050
1 COMPACTADOR VIBR. TIPO PLANCHA 4 HP 0.150
1 COMPRESORA NEUMATICA 750PCM 5.000
1 EQUIPO DE CORTE 0.400
1 EQUIPO DE PINTURA 0.050
1 EQUIPO PARA ARENADO 0.050
1 EXCAVADOR SOBRE ORUGA 170-250 HP 1.1-2.75 yd3 25.000 25.000
2 GATAS 50 TON 0.060
2 GRUA HIDRAULICA DE 18 TON 18.000
1 GRUPO ELECTROGENO 90 KW 1.700
2 MARTILLO NEUMATICO DE 25-29 Kg. 0.029
2 MEZCLADORA DE CONCRETO 18 HP DE 11 P3 2.200
2 MOTOBOMBA 8" 0.500
1 MOTONIVELADORA 125 11.515
2 MOTOSIERRA DE 16" 0.025
1 NIVEL AUTOMATICO 0.010
1 RODILLO LISO VIBR AUTOP 101-135HP 10-12T 7.300
1 SOLDADORA 0.050
2 TECLE 5 TON 0.030
2 TIRFORD 5 TON 0.020
1 TRACTOR DE ORUGAS 190-240 HP 20.520 20.520
2 VIBRADOR DE CONCRETO 4 HP 1.5" 0.020
CAPACIDAD
PESO CARGA
VEHICULOS EFECTIVA DE
EQUIPOS
CARGA
B. EQUIPO AUTOTRANSPORTADO
ALQUILER
CANT. DESCRIPCION HORAS
HORARIO
2 VOLQUETE DE 15 M3 22.00 235.12
2 VOLQUETE DE 10 M3 22.00 189.36
ON Y DESMOVILIZACION DE EQUIPOS
18.585
0.100
0.150
5.000
0.4
0.050
0.050
0.12
36.000
1.700
0.058
4.400
1
11.515
0.05
0.010
7.300
0.050
0.060
0.04
0.040
NUMERO DE
VIAJES
2.00
3.00
3.00
0.00
km
km/h
h
MUNICIPALIDAD DISTRITAL DE ECHARATI - DIVISION DE ESTUDIOS Y PROYECTOS DE INFRAESTRUCTURA
ON Y DESMOVILIZACION DE EQUIPOS
9158.60
14441.46
10416.78
0.00
S/. 34,016.84
34,016.84
34,016.84
6,803.37
74,837.05
MUNICIPALIDAD DISTRITAL DE ECHARATI - DIVISION DE ESTUDIOS Y PROYECTOS DE INFRAESTRUCTURA
ON Y DESMOVILIZACION DE EQUIPOS
COSTO TOTAL
EN NUEVOS TOTAL
SOLES S/.
5172.64
4165.92
S/. 9,338.56
9,338.56
9,338.56
1,867.71
20,544.83
95,381.88
Análisis de precios unitarios
Materiales
FLETE TON
MADERA P2
SEGURO DE TRANSPORTE TON
Equipos
HERRAMIENTAS MANUALES %MO
GRUA HIDRAULICA AUTOP. 127HP 18TON-9M. HM 1.00
DISTANCIA
Fecha 3/1/2014
DISTANCIA 2,653.48 KM
OPERACIÓN
COSTO COMBUSTIBLES LUBRICANTES Y GRASAS COSTO
EQUIPO MECANICO UNIDAD ALQUILER HORA TOTAL
MAQUINA SECA CANT. SUB CANT. SUB HORARIO
P.U. P.U.
gln/hr TOTAL gln/hr TOTAL
MOTOSIERRA hm 5.5 0.10 17.22 1.72 0.02 70.26 1.05 8.28
EQUIPO DE SOLDADURA hm 9.5 0.00 0.00 0.00 0.00 0.00 0.00 9.50
MEZCLADORA DE CONCRETO DE 11p3 hm 12.5 0.00 0.00 0.00 0.00 0.00 0.00 12.50
CAMION VOLQUETE 15 m3 hm 174.04 4.00 17.22 68.88 0.10 70.26 7.03 249.95
SOLDADORA ELECTDIESEL 300 AMP hm 35 0.50 17.22 8.61 0.02 70.26 1.41 45.02
MOTOBOMBA 8" (34 HP) hm 60 0.50 17.22 8.61 0.02 70.26 1.05 69.66
CAMIONETA PICK UP DOBLE CABINA 4 X 4 hm 33.6 1.80 17.22 31.00 0.09 70.26 6.32 70.92
CAMION CISTERNA 4 X 2 (AGUA) 2,000 gl hm 20 3.30 17.22 56.83 0.18 70.26 12.65 89.47
EQUIPO DE CORTE hm 3.5 0.00 17.22 0.00 0.00 70.26 0.00 3.50
AMOLADORA BOSCH hm 9 0.00 17.22 0.00 0.00 70.26 0.00 9.00
TIRFOR DE 5 ton hm 14.5 0.00 17.22 0.00 0.00 70.26 0.00 14.50
GATAS DE 50 ton hm 40 0.00 17.22 0.00 0.00 70.26 0.00 40.00
ROCIADOR DE PINTURA hm 20 0.00 17.22 0.00 0.00 70.26 0.00 20.00
TECLE DE 5 ton hm 7.75 0.00 17.22 0.00 0.00 70.26 0.00 7.75
COMPRESORA NEUMATICA 250-330 PCM, 87 HP hm 30 3.00 17.22 51.66 0.23 70.26 15.81 97.47
COMPACTADOR VIBRATORIO TIPO PLANCHA 4 HP hm 7.5 0.16 17.22 2.76 0.00 70.26 0.21 10.47
RODILLO LISO VIBRATORIO MANUAL 10.8HP 0.8-1.1 ton
hm 37.5
0.26 17.22 4.48 0.01 70.26 0.63 42.61
RODILLO LISO VIBR. AUTOP. 101-135HP 10-12 ton hm 187.42 3.60 17.22 61.99 0.12 70.26 8.43 257.84
RODILLO TANDEM EST 8-10 ton hm 187.42 2.26 17.22 38.92 0.12 70.26 8.43 234.77
RODILLO NEUMATICO AUTOP 81-100HP hm 119.01 0.20 17.22 3.44 0.17 70.26 11.59 134.05
CARGADOR SOBRE LLANTAS 125-155 HP 3 yd3 hm 240.97 4.00 17.22 68.88 0.10 70.26 7.03 316.88
TRACTOR DE ORUGAS DE 190-240 HP hm 294.98 6.00 17.22 103.32 0.10 70.26 7.03 405.33
PAVIMENTADORA SOBRE ORUGAS 105 HP hm 160 3.50 17.22 60.27 0.23 70.26 15.81 236.08
MARTILLO NEUMATICO DE 25 kg hm 15 0.00 17.22 0.00 0.00 70.26 0.00 15.00
VIBRADOR DE CONCRETO 4 HP 1.50" hm 9 0.16 17.22 2.76 0.02 70.26 1.05 12.81
ZARANDA METALICA DE 2 1/2" hm 10 0.00 17.22 0.00 0.00 70.26 0.00 10.00
EXCAVADORA SOBRE ORUGA 170-250 HP 1.1-2.75 Y3 hm 321.3 6.00 17.22 103.32 0.12 70.26 8.43 433.05
EXCAVADORA SOBRE ORUGA 251-325 HP 2.00-3.80 Y3 hm 348.08 7.00 17.22 120.54 0.12 70.26 8.43 477.05
RETROEXCAVADORA SOBRE LLANTAS 58HP, 1Y3 hm 174.04 2.50 17.22 43.05 0.10 70.26 7.03 224.12
MOTONIVELADORA DE 130-135 HP hm 240.97 5.00 17.22 86.10 0.10 70.26 7.03 334.10
GRUPO GENERADOR 100-110 KW, 150 HP hm 75.9 3.50 17.22 60.27 0.10 70.26 7.03 143.20
CAMION GRUA 16 TON; 420 HP hm 170 5.00 17.22 86.10 0.53 70.26 36.89 292.99
GRUA AUTOPROPULSADA DE 45-50 ton hm 396.48 5.00 17.22 86.10 0.20 70.26 14.05 496.63
TEODOLITO hm 17 0.00 17.22 0.00 0.00 70.26 0.00 17.00
NIVEL TOPOGRAFICO hm 5.5 0.00 17.22 0.00 0.00 70.26 0.00 5.50