Our Solutions for
Power Transformers (outdoor)
■ HV-CONNEX Plug-in Bushings
■ MV-CONNEX Multiple Transformer Bushings
■ MV-CONNEX Separable Connectors
■ MV-CONNEX Surge Arresters

4
Public energy grids are our core markets since
almost 100 years.

6 February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India
CONNEX – Reliability and Safety with the Pluggable
Bushing and the Surge Arrester

7 February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India
An Universal Connection Interface

Designed not only to meet cable standards, the CONNEX socket is an integral part of the
transformer world

Transformer
Testing: IEC 60137
Housing: EN 50299

Cable termination

Testing: IEC 60840 and IEC 62067


GIS
Testing: IEC 62271-203
Housing: IEC 62271-209

8 February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India
CONNEX Technology– high voltage

Size 4 Size 5-S Size 6 Size 6-S

Um 72.5kV 145kV 170kV 245kV

IN 2500A 2500A 2500A 2500A

Cross section* 1600 mm² 1600 mm² 2500 mm² 2500 mm²
Max. diameter over
55.4 mm/ 55.4 mm/ 64.9 mm/ 64.9 mm/
conductor/insulatio
78.0 mm 76.0 mm 110.5 mm 113.5 mm
n

* Valid only, if values comply to max. diameter over conductor/max. diameter over insulation

9 February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India
CONNEX Plug in Contacts – extra high voltage

Size 7 Size 8

245 – 362 kV 362 kV – 420 kV

3000 mm2 3000 mm2

4000 A 4000 A

10 February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India
MV & HV CONNEX Plug in Terminations in
Horizontal Position

11 February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India
Connecting Principle - High Voltage (Um = 52..245 kV)
Air insulated Conventional Type / Wet Type Pluggable Dry-Type / CONNEX
Bare conductor Epoxy Insulator with Oil Filling Metal enclosed / touch proof
Frame construction needed Transformer compartment has to Separation of Cable System and
be opened for assembly Transformer in view of Assembly
and testing
Prevention against animals must Relatively High Assembly Time Integration of Epoxy Insulator in
be taken Transformer as an Interface
Space requirement very high Dielectric test of cable system Dielectric test of cable system
only with additional effort and transformer feasible
feasible
Medium Flexibility Low Flexibility Highest Flexibility

12 February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India
Principle & Function of the CONNEX pluggable
system

Figure 2: Example of a pluggable system U M = 550kV

13 February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India
Motivation: conventional type vs. plug-in dry-type

Conventional type Plug-in dry-type

transformer
compartment

Assembly directly on the cable  Transformer compartment completely


closed
Compartment has to be opened and sealed at manufacturing site
Treatment of oil  Testing of transformer at manufacturing site
Expansion box necessary in horizontal  No expensive oil works on site
application  Quick assembly

14 February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India
Comparison

ESU 145 - V CONNEX Size 5-S 145kV

15 February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India
HV-CONNEX Pluggable Bushings
Initially designed for testing purposes, pluggable bushings were introduced
already 20 years ago

16 February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India
Principle of a pluggable HV-CONNEX Bushing

Bushing

■ For conventional bushing, field control


inside and outside transformer is in one
piece
■ Pluggable bushings have two parts. One
integrated in the transformer (socket), the
other consists of the conventional part
and a plug connector
■ Socket is permanently installed in the
Connector transformer and air and oil tight
■ Bushing is connected by plugging in
■ Connection is done automatically in the
Socket
socket during the plugging process

17 February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India
Benefit of a pluggable Bushing

■ Flexibility even for high voltage equipment


becomes more and more important
■ Very short connection and disconnection time
■ No oil or gas works on site due to dry system
■ Connection of Transformer by cable or
overhead line is interchangeable
■ Complete range of pluggable components
available
■ Sockets are pre-installed into the transformer

18 February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India
Pluggable Bushing Advantages

The Bushing Advantages

■ Based on the proven technology of dry


RIP-Transformer bushing is designed for
Pfisterer socket CONNEX size 5-s, 6, 6-S,
7 and 7-S (145 kV up to 362 kV Umax)
■ Very compact dimensions
■ Heatpipe technology for higher currents
applicable
■ Oil and gas tight system
■ Core can be fixed to flange
■ No loss of insulation media
■ Operates with damaged housing
temporarily
■ No loss of insulation media

19 February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India
Benefits of CONNEX

■ Short on site installation time with factory


tested components
■ Time Savings of 75%
■ Installation position can be freely selected
■ Compact design allows smaller
connection compartment
■ Maintenance free
■ Touch proof for maximum safety
■ Water tight and offshore proved
■ Individual installation instruction for all
cable types

20 February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India
Tests at factory site
Fully pluggable transformer on HV and MV side

■ Transformer completed for Acceptance


Test at factory
■ Final configuration as later on site
■ Tests can be done as with conventional
bushings
■ Transformer stays sealed during transport

21 February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India
Laboratory Tests

Preparing for
Plugging

■ Tests in High
Voltage Test
Laboratory
■ Combined test of
bushing and
PFISTERER
socket, IEC 60137
■ Test values cover
IEC and IEEE,
ANSI Test Tap
available

22 February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India
Innovation in Protection –
Pluggable solid insulated Surge Arrester
HV-CONNEX Surge Arrester Size 4 up to Umax 72.5
kV

23 February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India
Innovation in Protection –
Pluggable solid insulated Surge Arrester
HV-CONNEX Surge Arrester Size 5-S up to Umax 145
kV

News: HV-CONNEX Surge Arrester Size 6 up to UC =


144 kV (Ur = 180 kV) will be available April 2017

24 February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India
Plug including Polymer insulating part Head flange incl.
contact and incl. FRP tube housing pressure release
insulating part field grading system

25 February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India
HV-CONNEX Separable Surge Arrester

Schedule of Test
Type test based on IEC 60099-4
 Nominal discharge current (8/20 µs) 20 kA
 Line discharge class 4

Dielectrical Test
 Power frequency voltage test 275 kV
 Lightning Impulse test (1.2/50 µs) 650 kV
 Partial discharge test 1.05 * Uc
(<10 pC)

Short circuit test


 Rated short circuit test (0.2 s) 40 kA
 Reduced short circuit test (0.2 s) 25 kA, 12
kA

Operating duty test (Accelerated aging


procedure, Conditioning tests
and Operating duty test

26 February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India
HV-CONNEX Surge Arrester

State of the Art:


Gas insulated Surge Arresters

■ Costly
■ Relatively long assembly time
■ A lot of space required
■ Complex assembly

Our approach …

27 February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India
HV-CONNEX Surge Arrester – Compact Design

28 February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India
Advantages & Benefit of HV-CONNEX Pluggable SA
series

Pluggable

+ No Frame construction + Easy assembly


GIS needed + Quick Assembly AIS
+ Space requirement + FAT testing of equipment
+ Minimum influence by with minimal effort
climatic conditions + testing of equipment at site
+ Optimum distance to the "hot with minimal effort
spot" + Monitoring, Maintenance not
+ Encapsulated - touchproof needed
systems + In the event of an
overvoltage, relatively short
down time
− Complex assembly
− Assembly time
− FAT testing of equipment − Frame construction needed
− testing of equipment at site − High space requirement
− Monitoring, Regulations − Huge influence by climatic
Pressure Vessels, conditions
Maintenance needed − Positioning crucial
− In the event of an − Air insulated not touchproof
breakdown, relatively long
down time

29 February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India
Case Study – Mobile test setup

Country: any
Voltage level: up to Um = 245kV
Year: any

Description: Final test after cable installation and


accessory installation.

Using same interface for testing as for use.


Mobile HV generator built on trucks have to be
connected rapid and without complicated
procedures, ideally completely touch proof due to
safety issues. Using preassembledTest
Test joint and tested
truck in front of transformer Pre-assembled test cable
test equipment.

30 February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India
Case Study EON Westfalen Weser

Country: Germany
Quantity: 3 substations

Base Parameters: Refurbishment of


substation due to urbanization
scheduled within 5 years.
Connection to an existing Overhead
Line (OHL).
Connection to a cable system as part
of the refurbishment.

Task: Reduction of down time.


Change of connecting elements from
OHL to cable without oil works at the
transformer.

Solution: Transformer equipped with


sockets as an interface, exchange of
connecting February
31
elements22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India
Case Study – Mobile Substation
Mobile Substation -
Italy

Country: any
Voltage level: up to Um = 170kV
Year: any

Description: Major events and Black Outs require


temporary power supply.

Mobile substation built on trucks have to be


Mobile Substation -
connected rapid and without complicated Spain
procedures, ideally completely touch proof due to
safety issues

32 February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India
Case Study Canada – Padmount Transformers

Country: Canada
Voltage level: up to Um = 145kV
Year: any

Description: Padmount transformers

Transformer to be shipped completely assembled


(no onsite testing and oil processing required).
HV cable termination to be pre-assembled.
Short circuit tested design.
Safe for and from the public.

33 February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India
Case Study – Offshore

Country: any
Voltage level: up to Um = 245kV
Year: any

Description: Wind farms require Off Shore


substations / transformer platforms.

Offshore Certification required


Special demand on material and components
Specially trained personnel required

34 February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India
High-Voltage Field-Installation Cables – Secure and
Reliable System Operation in Cases of
Reconstructions and Incidents from 145 kV to 362 kV

35 February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India
IXOSIL ESS cable termination

 Highest mechanical stability due to glass fiber


reinforced hollow insulator
 Silicon shielding for ideal water-repellent behavior
 Installation of overhead line conductors without
special tools thanks to SICON bolted technique
 Maintenance-free
Technical data
Maximum nominal current limited only by the high-voltage
cable
Maximum operating voltage Um = 300 - 420 kV
Cu or Al conductors up to 2500 mm2
Tested according to IEC 62067
Pollution class (65 mm/kV) according to IEC 60815
36 February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India
IXOSIL MSA slip-on joint

 Simple installation due to proven


slip-on system
 The patented SICON bolted
connection
allows easy and safe installation of
the conductor
 Customized cable shielding
Technical data
Maximum nominal current limited only by the high-
voltage cable
Maximum operating voltage Um = 300 - 420 kV
Cu or Al conductors up to 2500 mm2
Tested according to IEC 62067

37 February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India
5. Conclusion
The network is changing and higher voltages and increased power
transmission require new solutions

Liquid and gasous insulation is minimized and if possible


substituted by solid alternatives

38 February 22nd & 23rd, 2017 Scope Complex, Lodhi Road, Delhi, India