Sei sulla pagina 1di 1

A B A B A B A B

1 1 1 1

2 2 2 2

3 3 3 3

3' 3' 3' 3'

4 4 4 4

4' 4' 4' 4'

5 5 5 5

GROUND FLOOR PLAN ROOF DECK PLAN ROOF PLAN


SECOND FLOOR PLAN

A B B A 5 4' 4 3' 3 2 2 3 3' 4 4' 5


1 1

FRONT ELEVATION REAR ELEVATION RIGHT SIDE ELEVATION LEFT SIDE ELEVATION

CIVIL ENGINEER: DISCLAIMER: PROJECT TITLE: OWNER: SHEET CONTENTS: LOCATION CADD BY: MRH
SHEET NO:
DESIGNED BY: MRH
REPUBLIC ACT 545 SECTION 25 (4) GROUND FLOOR PLAN
MARK ROGER HUBERIT II DRAWINGS AND SPECIFIATIONS DULY SIGNED, STAMPED OR SEALED AS TWO STOREYS /W LOLITA T. DELA CRUZ SECOND FLOOR PLAN DATE: 2/19/19

REG. NO.: PTR NO.:


INSTRUMENTS OF SERVICE ARE THE PROPERTIES AND DOCUMENTS OF THE
ENGINEER, WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR
ROOF DECK
ROOF DECK PLAn
ROOF PLAN
B6 L2-A HAWK S. CAMELLA II
SOLDIERS HILL PUTATAN MUNTINLUPA CHECKED BY: MRH 02
A-2
NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON, WITHOUT THE WRITTEN CONSENT
OF THE ENGINEER OR AUTHOR OF SAID DOCUMENTS, TO DUPLICATE OR MAKE
FRONT ELEVATION DATE:
DATE: DATE: COPIES OF SAID DOCUMENTS FOR THE USE IN THE REPETITION OF AND FOR
PROJECTS OR BUILDING, WHETHER EXECUTED PARTLY OR IN WHOLE
RESIDENTIAL BLDG. REAR ELEVATION
SIDE ELEVATION (L&R) REVISION:

Potrebbero piacerti anche