RINCIAN VOLUME :

Pemasangan Jembatan Pipa HDPE Ø 250 mm


Di Jl. Kesunean Raya (Sungai Kesunean)
No. Anggaran 41.41.03 Rp.346.255.000,00
Usulan Perubahan RKAP Tahun 2019 Rp. 606.000.000,00

I. BAHAN PENGADAAN PERUMDA AIR MINUM


1 Pipa Steel All Flange Ø 250 mm PN 10 @ 1 bt = 6.00 m' = 6.000 bh
2 Pipa Steel All Flange Ø 250 mm PN 10 @ 1 bt = 2.00 m' = 2.000 bh
3 Pipa Steel All Flange Ø 100 mm PN 10 @ 1 bt = 1.00 m' = 1.000 bh
4 Pipa PVC Ø 150 mm (Selongsong) PN 10 = 1.000 m'
5 Pipa PVC Ø 100 mm (Blow Off) PN 10 = 2.000 m'
6 Stub End HDPE Ø 250 mm PN 10 = 2.000 bh
7 Flange Steel Ø 250 mm PN 10 = 10.000 bh
8 Bend Steel 45° Ø 250 mm PN 10 = 4.000 bh
9 Tee CI All Flange Ø 250 mm x 100 mm PN 10 = 1.000 bh
10 Bend CI All Flange 90° Ø 100 mm PN 10 = 2.000 bh
11 Gate Valve Ø 100 mm PN 10 = 1.000 bh
12 Flange Socket Collar CI/PVC Ø 100 mm PN 10 = 1.000 bh
13 Flange Steel Ø 2" PN 10 = 1.000 bh
14 Double Neple GIP Ø 2" PN 10 = 2.000 bh
15 Skeep Ø 2" PN 10 = 1.000 bh
16 Air Vent Ø 2" PN 10 = 1.000 bh
17 Street Cap Ø 150 mm = 1.000 bh
18 Baud Mur 20/75 = 168.000 bh
19 Baud Mur 16/65 = 40.000 bh
20 Karet Packing t = 5 mm = 3.000 m'
21 Tiang Pancang Ø 30 cm P = 6 m' = 24.000 bh
II PEKERJAAN PERSIAPAN

1 Sewa Gudang Penyimpanan Barang = 1.000 Ls

III PEKERJAAN PASANGAN PONDASI :

1 Galian Tanah Keras


- Bawah 2.60 mx 2.60 mx 1.20 mx 2 bh = 16.224 m3
- Atas 1.05 mx 2.60 mx 2.00 mx 2 bh = 5.460 m3 +
21.684 m3

2 Pemadatan Tanah
2.60 mx 2.60 mx 2 bh = 13.520 m2

3 Urugan Pasir (Bawah Pondasi)


- Bawah 2.60 mx 2.60 mx 0.10 mx 2 bh = 1.352 m3

4 Beton Tumbuk 1 : 3 : 5 (Lantai Kerja)


- Bawah 2.60 mx 2.60 mx 0.10 mx 2 bh = 1.352 m3

5 Urugan Kembali
Total Galian Tanah Keras - Cor K - 350 (Bawah)
- Galian Tanah Keras = 21.684 m3
- Alas Trapesium 0.500 x 2.500 mx 0.100 mx 2.000 mx 2 bh = 0.500 m3
- Alas Pesegi 2.000 mx 0.500 mx 2.000 mx 2 bh = 4.000 m3
- body 0.300 m x 0.500 mx 0.400 mx 2.000 bh x 2 bh = 0.240 m3 -
16.944 m3

6 Pembuatan Beton Cor K - 350 (Ready Mix)


- Alas Trapesium 0.500 x 2.500 mx 0.100 mx 2.000 mx 2 bh = 0.500 m3
- Alas Pesegi 2.000 mx 0.500 mx 2.000 mx 2 bh = 4.000 m3
- body 0.300 m x 0.500 mx 2.000 mx 2.000 bh x 2 bh = 1.200 m3
- Atas 0.600 mx 0.600 mx 1.000 mx 2 bh = 0.720 m3 +
6.420 m3

7 Mengangkut Beton Cor K - 350 = 6.420 m3

8 Pemadatan Beton saat pengecoran (Vibrator) = 6.420 m3

9 Bekisting Pondasi
- Alas Pesegi 2.000 mx 0.500 mx 4 sisi x 2 bh = 8.000 m2
- Alas Trapesium 0.500 x 2.500 mx 0.100 mx 4 sisi x 2 bh = 1.000 m2 +
9.000 m2

10 Bekisting Kolom
- body 0.500 mx 2.000 mx 4 sisi x 2 bh = 8.000 m2
0.300 mx 2.000 mx 4 sisi x 2 bh = 4.800 m2
- Atas 1.000 mx 0.600 mx 4 sisi x 2 bh = 4.800 m2
1.000 mx 0.600 mx 1 sisi x 2 bh = 1.200 m2 +
18.800 m2

11 Buangan Tanah = 4.740 m3


Galian Tanah Keras - Urugan Kembali

12 Penetrasi tiang pancang beton Ø 30 cm P = 6 m' = 24.000 bh


= 144.000 m'
IV PEKERJAAN PEMBESIAN :
1 Pembesian Pondasi (D 16 , D 13 , D 10)
- alas D 16 ( 1,58 kg/m') 2.870 mx 15 bh x 2 sisi x 2 bh = 172.200 m'
2.000 mx 1 bh x 1 sisi x 2 bh = 4.000 m'+
176.200 m'
278.396 kg
- alas D 13 ( 1,04 kg/m') 2.100 mx 15 bh x 2 sisi x 2 bh = 126.000 m'
131.040 kg
- body D 16 ( 1,58 kg/m') 4.244 mx 14 bh x 2 sisi x 2 bh = 237.664 m'
375.509 kg
- Atas tegak pendek D 10 ( 0,617 kg/m') 2.080 mx 7 bh x 1 sisi x 2 bh = 29.120 m'
17.967 kg
- Atas tegak panjang D 16 ( 1,58 kg/m') 2.950 mx 7 bh x 1 sisi x 2 bh = 41.300 m'
65.254 kg
- Ring body D 10 ( 0,617 kg/m') 1.400 mx 15 bh x 2 sisi x 2 bh = 84.000 m'
51.828 kg
Total Pembesian Pondasi = 919.994 kg

2 Besi Plat t = 10 mm (Dudukan Konstruksi Jembatan )


Plat Dudukan Konstruksi Jembatan 0.550 mx 0.275 mx 2 sisi x 2 bh = 0.605 m2
1 lbr (1,20 m x 2,40 m = 2,880 m2 ; 233 kg/lbr)
Total Besi Plat t = 10 mm (80,903 kg/m2) = 48.946 kg

3 Pemasangan angkur Ø 22 mm 12 bh x 2 bh = 24.000 bh


4 Pabrikasi konstruksi besi:
- 1/2 IWF.350.175.7.11
1 btg (12 m ; 595,2 kg/btg)
bawah 36.000 m x 2 bh = 72.000 m'
atas 32.000 m x 2 bh = 64.000 m'
Miring Depan Belakang 2.140 m x 4 bh = 8.560 m' +
144.560 m'
Besi IWF.350.175.7.11 (49,6 kg/m') = 7,170.176 kg
Total Besi 1/2 IWF.350.175.7.11 = 3,585.088 kg

- Besi Siku ˩L. 60.60.6


1 btg (6 m ; 32,52 kg/btg)
Tegak 1.040 mx 2 bh x 2 sisi x 33 bh = 137.280 m'
Miring berdiri 1.310 mx 2 bh x 2 sisi x 32 bh = 167.680 m' +
304.960 m'
Total Besi Siku ˩L. 60.60.6 = 1,652.883 kg

- Besi Siku L. 60.60.6


1 btg (6 m ; 32,52 kg/btg)
Atas 0.850 mx 1 bh x 1 sisi x 33 bh = 28.050 m'
Bawah 0.850 mx 1 bh x 1 sisi x 35 bh = 29.750 m'
Melintang atas 1.160 mx 1 bh x 1 sisi x 34 bh = 39.440 m'
Melintang bawah 1.000 mx 1 bh x 1 sisi x 34 bh = 34.000 m' +
131.240 m'
Total Besi Siku ˩L. 60.60.6 = 711.321 kg

- Besi U 100.50.5
1 btg (6 m ; 56,2 kg/btg)
Bawah 0.670 mx 1 bh x 1 sisi x 35 bh = 23.450 m'
Total Besi 100.50.5 219.648 kg

- Besi Plat t = 6 mm
1 lbr (1,20 m x 2,40 m = 2,880 m2 ; 140 kg/lbr)
0.600 mx 0.150 m x 2 sisi x 8 bh = 1.440 m2
Total Besi Plat t = 6 mm (48,611 kg/m2) 70.000 kg

- Besi Plat t = 10 mm
Sayap ujung Konstruksi Jembatan 0.175 mx 0.175 mx 2 sisi x 2 bh = 0.123 m2
1 lbr (1,20 m x 2,40 m = 2,880 m2 ; 233 kg/lbr)
0.5 x 0.300 mx 0.280 mx 2 sisi x 2 bh = 0.168 m2 +
0.168 m2
Total Besi Plat t = 10 mm (80,903 kg/m2) = 13.592 kg

5 Erection Jembatan = 6,252.532 kg

6 Pasang Clamp Ø 22 mm = 35.000 bh

7 Melubangi Besi = 94.000 bh

8 Pengelasan (dengan las listrik)


- Tegak Atas 34.800 cm x 66 titik = 2,296.800 cm'
˩L. 60.60.6 ke 1/2 IWF.350.175.7.11
- Tegak Bawah 34.800 cm x 66 titik = 2,296.800 cm'
˩L. 60.60.6 ke 1/2 IWF.350.175.7.11
- Tegak Miring Atas 29.500 cm x 64 titik = 1,888.000 cm'
˩L. 60.60.6 ke 1/2 IWF.350.175.7.11
- Tegak Miring bawah 43.600 cm x 64 titik = 2,790.400 cm'
˩L. 60.60.6 ke 1/2 IWF.350.175.7.11
- Tegak Atas 1/2 segitiga 153.760 cm x 4 titik = 615.040 cm'
plat 10 mm ke 1/2 IWF.350.175.7.11
- Tegak plat ujung 16.400 cm x 8 titik = 131.200 cm'
plat 10 mm ke 1/2 IWF.350.175.7.11
- Bawah 21.800 cm x 70 titik = 1,526.000 cm'
U 100.50.5 ke 1/2 IWF.350.175.7.11 10.000 cm x 70 titik = 700.000 cm'
9.000 cm x 70 titik = 630.000 cm'

- Atas 41.000 cm x 66 titik = 2,706.000 cm'


L. 60.60.6 ke 1/2 IWF.350.175.7.11
- Bawah 41.000 cm x 70 titik = 2,870.000 cm'
L. 60.60.6 ke 1/2 IWF.350.175.7.11
- Melintang Atas 43.500 cm x 34 titik = 1,479.000 cm'
L. 60.60.6 ke 1/2 IWF.350.175.7.11
- Melintang Atas 43.900 cm x 34 titik = 1,492.600 cm'
L. 60.60.6 ke 1/2 IWF.350.175.7.11
- Melintang bawah 25.560 cm x 68 titik = 1,738.080 cm'
L. 60.60.6 ke 1/2 IWF.350.175.7.11
- Miring Atas Depan Belakang 16.800 cm x 8 titik = 134.400 cm'
1/2 IWF.350.175.7.11 ke 1/2 IWF.350.175.7.11 17.500 cm x 8 titik = 140.000 cm'
- Miring bawah Depan Belakang 41.180 cm x 8 titik = 329.440 cm'
1/2 IWF.350.175.7.11 ke 1/2 IWF.350.175.7.11 17.500 cm x 8 titik = 140.000 cm'
- Accesories Ø 2" (Flange Steel Ø 2" ke Double Neple GIP Ø 2") 62.800 cm'
- Accesories Ø 250 mm (Flange Steel Ø 250 mm ke Bend Steel Ø 250 mm) 1,256.000 cm' +
Total Pengelasan = 25,222.560 cm'

9 Bar Pengaman :
- Besi Strip 4.5 mm x 50 mm 1.000 m x 2 bh = 2.000 m'
1 btg (6 m ; 11 kg/btg) 0.920 m x 2 bh = 1.840 m' +
3.840 m'
Total Besi Strip 4.5 mm x 50 mm = 7.040 kg

- Besi Beton D 16 0.300 m x 9 titik x 2 bh = 5.400 m'


1 btg (12 m ; 18,96 kg/btg) Total Besi Beton D 16 8.532 kg

- Pengelasan (dengan las listrik) 18 titik x 2 bh = 36.000 cm'


1 titik = 1 cm'

10 Pasang Baud Mur (Bar Pengaman) = 4.000 bh

11 Pengecatan Besi (Baru)


- 1/2 IWF.350.175.7.11
bawah 0.700 mx 36.000 mx 2 bh = 50.400 m2
atas 0.700 mx 32.000 mx 2 bh = 44.800 m2
Miring Depan Belakang 0.700 mx 2.140 mx 4 bh = 5.992 m2
- Besi Siku ˩L. 60.60.6
Tegak 0.240 mx 2 bh x 1.040 m x 33 bh = 16.474 m2
Miring berdiri 0.240 mx 2 bh x 1.310 m x 32 bh = 20.122 m2
- Besi Siku L. 60.60.6
Atas 0.240 mx 0.850 mx 33.000 bh = 6.732 m2
Bawah 0.240 mx 0.850 mx 35.000 bh = 7.140 m2
Melintang atas 0.240 mx 1.160 mx 34.000 bh = 9.466 m2
Melintang bawah 0.240 mx 1.000 mx 34.000 bh = 8.160 m2
- U 100.50.5
Bawah 0.300 mx 0.670 m x 35.000 bh = 7.035 m2
- Besi Plat t = 10 mm = 0.168 m2
Sayap ujung Konstruksi Jembatan
- Bar Pengaman 0.500 x 2.669 mx 2.000 bh = 2.669 m2
0.050 m x 1.000 mx 2.000 bh = 0.100 m2
- Pipa Ø 250 mm 0.785 mx 40.000 m= 31.400 m2 +

Total Besi Pengecatan Besi (Baru) = 210.657 m2

V PEKERJAAN PIPA & ACCESORIES :

1 Pasang Pipa Steel All Flange Ø 250 mm @ 1 bt = 6.00 m' = 36.000 m'
2 Pasang Pipa Steel All Flange Ø 250 mm @ 1 bt = 2.00 m' = 4.000 m'
3 Pasang Pipa Steel All Flange Ø 100 mm @ 1 bt = 1.00 m' = 1.000 m'
4 Pasang Pipa PVC Ø 150 mm (Selongsong) = 1.000 m'
5 Pasang Pipa PVC Ø 100 mm (Blow Off) = 2.000 m'
6 Pasang Stub End HDPE Ø 250 mm = 2.000 bh
7 Pasang Flange Steel Ø 250 mm = 2.000 bh
8 Pasang Bend steel 45° + Flange Steel Ø 250 mm = 4.000 bh
9 Pasang Tee CI All Flange Ø 250 mm x 100 mm = 1.000 bh
10 Pasang Bend CI All Flange 90° Ø 100 mm = 2.000 bh
11 Pasang Gate Valve Ø 100 mm = 1.000 bh
12 Pasang Flange Socket Collar CI/PVC Ø 100 mm = 1.000 bh
13 Pasang Flange Steel Ø 2" = 1.000 bh
14 Pasang Double Neple GIP Ø 2" = 2.000 bh
15 Pasang Skeep Ø 2" = 1.000 bh
16 Pasang Air Vent Ø 2" = 1.000 bh
17 Pasang Street Cap Ø 150 mm = 1.000 bh
18 Pengurasan Pipa Steel All Flange Ø 250 mm = 40.000 m'

VI PEKERJAAN LAIN-LAIN
1 Mobilisasi = 1.000 Ls
2 Dokumentasi ( As Built Drawing ) = 1.000 Ls
3 Pengamanan utilitas PLN/Telkom/Gas/Utilitas Jalan/Kepolisian = 1.000 Ls
4 Plang Rambu Keamanan Lalu-lintas = 1.000 Ls
5 Alat Bantu Keselamatan Kerja ( Sabuk ) (5 Set) = 1.000 Ls
PERUMDA AIR MINUM
KOTA CIREBON

RENCANA ANGGARAN BIAYA :

Pemasangan Jembatan Pipa HDPE Ø 250 mm


Di Jl. Kesunean Raya (Sungai Kesunean)
No. Anggaran 41.41.03 Rp.346.255.000,00
Usulan Perubahan RKAP Tahun 2019 Rp. 606.000.000,00

HARGA SATUAN JUMLAH HARGA


NO JENIS BAHAN / PEKERJAAN VOLUME SAT.
( Rp. ) ( Rp. )

I BAHAN PENGADAAN PERUMDA AIR MINUM


1 Pipa Steel All Flange Ø 250 mm PN 10 @ 1 bt = 6.00 m' 6.000 bh 11,270,976.00 67,625,856.00
2 Pipa Steel All Flange Ø 250 mm PN 10 @ 1 bt = 2.00 m' 2.000 bh 3,756,992.00 7,513,984.00
3 Pipa Steel All Flange Ø 100 mm PN 10 @ 1 bt = 1.00 m' 1.000 bh 2,081,714.00 2,081,714.00
4 Pipa PVC Ø 150 mm (Selongsong) PN 10 1.000 m' 265,430.00 265,430.00
5 Pipa PVC Ø 100 mm (Blow Off) PN 10 2.000 m' 126,500.00 253,000.00
6 Stub End HDPE Ø 250 mm PN 10 2.000 bh 1,514,333.33 3,028,666.67
7 Flange Steel Ø 250 mm PN 10 10.000 bh 802,083.33 8,020,833.33
8 Bend Steel 45° Ø 250 mm PN 10 4.000 bh 1,378,630.00 5,514,520.00
9 Tee CI All Flange Ø 250 mm x 100 mm PN 10 1.000 bh 895,300.00 895,300.00
10 Bend CI All Flange 90° Ø 100 mm PN 10 2.000 bh 650,540.00 1,301,080.00
11 Gate Valve Ø 100 mm PN 10 1.000 bh 8,979,300.00 8,979,300.00
13 Flange Steel Ø 2" PN 10 1.000 bh 643,500.00 643,500.00
14 Double Neple GIP Ø 2" PN 10 2.000 bh 36,300.00 72,600.00
15 Skeep Ø 2" PN 10 1.000 bh 746,900.00 746,900.00
16 Air Vent Ø 2" PN 10 1.000 bh 6,737,500.00 6,737,500.00
17 Street Cap Ø 150 mm 1.000 bh 218,800.00 218,800.00
18 Baud Mur 20/75 168.000 bh 16,600.00 2,788,800.00
19 Baud Mur 16/65 40.000 bh 5,968.00 238,720.00
20 Karet Packing t = 5 mm 3.000 m' 374,300.00 1,122,900.00
21 Tiang Pancang Ø 30 cm P = 6 m' 24.000 bh 180,000.00 4,320,000.00
Sub Total I 122,369,404.00
KODE HARGA SATUAN JUMLAH HARGA
NO JENIS BAHAN / PEKERJAAN VOLUME SAT.
ANALISA ( Rp. ) ( Rp. )

II PEKERJAAN PERSIAPAN
1 Sewa Gudang Penyimpanan Barang PAM-AN.33 1.000 Ls 2,321,850.00 2,321,850.00
Sub Total II 2,321,850.00

III PEKERJAAN PASANGAN PONDASI :


1 Galian Tanah Keras ABK-II.04 21.684 m3 94,599.00 2,051,284.72
2 Pemadatan Tanah PAM-AN.43 13.520 m2 12,788.00 172,893.76
3 Urugan Pasir (Bawah Pondasi) A.2.3.1.11. 1.352 m3 170,292.00 230,234.78
4 Beton Tumbuk 1 : 3 : 5 (Lantai Kerja) B.01.a 1.352 m3 865,027.70 1,169,517.45
5 Urugan Kembali A.2.3.1.9 16.944 m3 52,900.00 896,337.60
6 Pembuatan Beton Cor K - 350 (Ready Mix) B.13.a 6.420 m3 1,745,067.50 11,203,333.35
7 Mengangkut Beton Cor K - 350 B.14.a 6.420 m3 43,378.00 278,486.76
8 Pemadatan Beton saat pengecoran (Vibrator) B.15.a 6.420 m3 106,950.00 686,619.00
9 Bekisting Pondasi ABK-III.09 9.000 m2 188,206.70 1,693,860.30
10 Bekisting Kolom A.4.1.1.21 18.800 m2 222,849.47 4,189,570.08
11 Buangan Tanah ABK-II.07 4.740 m3 154,905.00 734,249.70
12 Penetrasi tiang pancang beton Ø 30 cm P = 6 m' F.04.c 144.000 bh 101,119.50 14,561,208.00
Sub Total III 37,867,595.50

IV PEKERJAAN PEMBESIAN :
1 Pembesian Pondasi (D 16 , D 13 , D 10) A.4.1.1.17 919.994 kg 3,717.95 3,420,492.29
2 Besi Plat t = 10 mm (Dudukan Konstruksi Jembatan ) ABK-V.10 48.946 kg 35,207.25 1,723,265.15
3 Pemasangan angkur Ø 22 mm - 24.000 bh 91,800.00 2,203,200.00
4 Pabrikasi konstruksi besi:
- 1/2 IWF.350.175.7.11 ABK-V.09 3,585.088 kg 30,975.25 111,048,997.07
- Besi Siku ˩L. 60.60.6 ABK-V.10 1,652.883 kg 35,207.25 58,193,472.04
- Besi Siku L. 60.60.6 ABK-V.10 711.321 kg 35,207.25 25,043,649.24
- Besi U 100.50.5 ABK-V.10 219.648 kg 35,207.25 7,733,213.78
- Besi Plat t = 6 mm ABK-V.10 70.000 kg 35,207.25 2,464,501.87
- Besi Plat t = 10 mm ABK-V.10 13.592 kg 35,207.25 478,526.52
5 Erection Jembatan PAM-AN 6,252.532 kg 1,318.94 8,246,683.13
6 Pasang Clamp Ø 22 mm - 35.000 bh 116,600.00 4,081,000.00
7 Melubangi Besi PAM-AN.50 94.000 bh 7,069.63 664,544.75
8 Pengelasan (dengan las listrik) PAM-AN.47 25,222.560 cm' 2,855.11 72,013,057.17
9 Bar Pengaman :
- Besi Strip 4.5 mm x 50 mm ABK-V.10 7.040 kg 35,207.25 247,859.04
- Besi Beton D 16 A.4.1.1.17 8.532 kg 3,717.95 31,721.55
- Pengelasan (dengan las listrik) PAM-AN.47 36.000 cm' 2,855.11 102,783.78
10 Pasang Baud Mur (Bar Pengaman) ABK-V.35 4.000 bh 17,250.00 69,000.00
11 Pengecatan Besi (Baru) A.4.7.1.19. 210.657 m2 35,388.84 7,454,898.74
Sub Total IV 305,220,866.11

V PEKERJAAN PIPA & ACCESORIES :


1 Pasang Pipa Steel All Flange Ø 250 mm @ 1 bt = 6.00 m' PAM-AN.12.1 36.000 m' 131,307.00 4,727,052.00
2 Pasang Pipa Steel All Flange Ø 250 mm @ 1 bt = 2.00 m' PAM-AN.12.1 4.000 m' 131,307.00 525,228.00
3 Pasang Pipa Steel All Flange Ø 100 mm @ 1 bt = 1.00 m' PAM-AN.06.1 1.000 m' 57,125.10 57,125.10
4 Pasang Pipa PVC Ø 150 mm (Selongsong) PAM-AN.08 1.000 m' 40,871.00 40,871.00
5 Pasang Pipa PVC Ø 100 mm (Blow Off) PAM-AN.06 2.000 m' 28,562.55 57,125.10
6 Pasang Stub End HDPE Ø 250 mm PAM-AN.17 2.000 bh 129,697.77 259,395.53
7 Pasang Flange Steel Ø 250 mm PAM-AN.17 2.000 bh 129,697.77 259,395.53
8 Pasang Bend steel 45° + Flange Steel Ø 250 mm PAM-AN.17 4.000 bh 129,697.77 518,791.07
9 Pasang Tee CI All Flange Ø 250 mm x 100 mm PAM-AN.17 1.000 bh 129,697.77 129,697.77
10 Pasang Bend CI All Flange 90° Ø 100 mm PAM-AN.20 2.000 bh 51,879.57 103,759.13
11 Pasang Gate Valve Ø 100 mm PAM-AN.20.2 1.000 bh 122,925.80 122,925.80
12 Pasang Flange Socket Collar CI/PVC Ø 100 mm PAM-AN.20 1.000 bh 51,879.57 51,879.57
13 Pasang Flange Steel Ø 2" PAM-AN.21 1.000 bh 29,211.07 29,211.07
14 Pasang Double Neple GIP Ø 2" PAM-AN.21 2.000 bh 29,211.07 58,422.15
15 Pasang Skeep Ø 2" PAM-AN.21 1.000 bh 29,211.07 29,211.07
16 Pasang Air Vent Ø 2" PAM-AN.21 1.000 bh 29,211.07 29,211.07
17 Pasang Street Cap Ø 150 mm PAM-AN.19 1.000 bh 77,822.80 77,822.80
18 Pengurasan Pipa Steel All Flange Ø 250 mm PAM-AN.26 40.000 m' 6,547.45 261,898.13
Sub Total V 7,339,021.89
KODE HARGA SATUAN JUMLAH HARGA
NO JENIS BAHAN / PEKERJAAN VOLUME SAT.
ANALISA ( Rp. ) ( Rp. )
VI PEKERJAAN LAIN-LAIN
1 Mobilisasi PAM-AN.49 1.000 Ls 1,703,150.00 1,703,150.00
2 Dokumentasi ( As Built Drawing ) PAM-AN.44 1.000 Ls 742,325.00 742,325.00
Pengamanan utilitas PLN/Telkom/Gas/Utilitas
3 PAM-AN.31 1.000 Ls 43,700,000.00 43,700,000.00
Jalan/Kepolisian
4 Plang Rambu Keamanan Lalu-lintas PAM-AN.29.1 1.000 Ls 2,196,500.00 2,196,500.00
5 Alat Bantu Keselamatan Kerja ( Sabuk ) (5 Set) PAM-AN.48.1 1.000 Ls 1,569,750.00 1,569,750.00
Sub Total VI 49,911,725.00

Jumlah Sub Total ( II + III + IV + V + VI ) 402,661,058.51


Dibulatkan 402,661,000.00
PPN 10 % 40,266,100.00
Jumlah Total (II + III + IV + V ) 442,927,100.00
TOTAL (I + II + III + IV + V) 565,296,504.00

Terbilang : Lima Ratus Enam Puluh Lima Juta Dua Ratus Sembilan Puluh Enam Ribu Lima Ratus Empat Rupiah

Cirebon, 25 Maret 2019

Disetujui, Diketahui, Dibuat,


DIREKTUR UTAMA DIREKTUR TEKNIK KABAG PERWASTEK
PERUMDA AIR MINUM PERUMDA AIR MINUM PERUMDA AIR MINUM
KOTA CIREBON KOTA CIREBON KOTA CIREBON

SOPYAN SATARI, SE, MM AGUS SALIM, SE, MM TINA MEILANI, ST


NIK. 82.00159 NIK. 82.00121 NIK. 91.00284
PERUMDA AIR MINUM
KOTA CIREBON

ANALISA SATUAN PEKERJAAN


Pemasangan Jembatan Pipa HDPE Ø 250 mm
Di Jl. Kesunean Raya (Sungai Kesunean)
No. Anggaran 41.41.03 Rp.346.255.000,00
Usulan Perubahan RKAP Tahun 2019 Rp. 606.000.000,00

HARGA JUMLAH
NO. ANALISA JENIS PEKERJAAN VOL. SAT. SATUAN UPAH (Rp) BAHAN (Rp) ALAT (Rp) HARGA
(Rp) (Rp)
1 PAM-AN.33 Sewa Gudang Penyimpanan Pipa 1 bh 2,019,000.00 - - 2,019,000.00
UPAH

1.000 ls Sewa lahan / tempat penyimpanan 819,000.00 819,000.00 819,000.00


15.000 OH Pekerja jaga malam 80,000.00 1,200,000.00 1,200,000.00
BAHAN
ALAT

JUMLAH : A 2,019,000.00
Overhead & Profit 15% : B 302,850.00
JUMLAH TOTAL : C = (A+B) 2,321,850.00

HARGA JUMLAH
NO. ANALISA JENIS PEKERJAAN VOL. SAT. SATUAN UPAH (Rp) BAHAN (Rp) ALAT (Rp) HARGA
(Rp) (Rp)
2 ABK-II.04 Galian Tanah Keras ( Kedalaman s/d 3 m ) 1.00 M³ 82,260.00 82,260.00
0.735 OH Tukang Gali 100,000.00 73,500.00 73,500.00
UPAH

0.073 OH Mandor 120,000.00 8,760.00 8,760.00


BAHAN
ALAT

JUMLAH : A 82,260.00
Overhead & Profit 15% : B 12,339.00
JUMLAH TOTAL : C = (A+B) 94,599.00

HARGA JUMLAH
NO. ANALISA JENIS PEKERJAAN VOL. SAT. SATUAN UPAH (Rp) BAHAN (Rp) ALAT (Rp) HARGA
(Rp) (Rp)
3 ABK-II.07 Buangan Tanah / lumpur (sejauh 150 m) 1.00 M³ 47,200.00 87,500.00 134,700.00
0.515 OH Pekerja 80,000.00 41,200.00 41,200.00
UPAH

0.050 OH Mandor 120,000.00 6,000.00 6,000.00


BAHAN
ALAT

1.000 Ls Alat bantu ( dump Truck ) 87,500.00 87,500.00 87,500.00


( Per jam / 3,5 m3 / rit )
JUMLAH : A 134,700.00
Overhead & Profit 15% : B 20,205.00
JUMLAH TOTAL : C = (A+B) 154,905.00

HARGA JUMLAH
NO. ANALISA JENIS PEKERJAAN VOL. SAT. SATUAN UPAH (Rp) BAHAN (Rp) ALAT (Rp) HARGA
(Rp) (Rp)
4 A.2.3.1.9 Pengurugan Kembali Galian Tanah 1.00 M³ 46,000.00 - 46,000.00
0.500 OH Pekerja 80,000.00 40,000.00 40,000.00
UPAH

0.050 OH Mandor 120,000.00 6,000.00 6,000.00


BAHAN
ALAT

JUMLAH : A 46,000.00
Overhead & Profit 15% : B 6,900.00
JUMLAH TOTAL : C = (A+B) 52,900.00

HARGA JUMLAH
NO. ANALISA JENIS PEKERJAAN VOL. SAT. SATUAN UPAH (Rp) BAHAN (Rp) ALAT (Rp) HARGA
(Rp) (Rp)
5 A.2.3.1.11. Pengurugan dengan pasir urug 1.00 M³ 25,200.00 122,880.00 148,080.00
0.300 OH Pekerja 80,000.00 24,000.00 24,000.00
UPAH

0.010 OH Mandor 120,000.00 1,200.00 1,200.00


BAHAN

1.200 m3 Pasir Urug 102,400.00 122,880.00 122,880.00


ALAT

JUMLAH : A 148,080.00
Overhead & Profit 15% : B 22,212.00
JUMLAH TOTAL : C = (A+B) 170,292.00

Page 8
HARGA JUMLAH
NO. ANALISA JENIS PEKERJAAN VOL. SAT. SATUAN UPAH (Rp) BAHAN (Rp) ALAT (Rp) HARGA
(Rp) (Rp)
6 F.04.c Per-m' penetrasi tiang pancang beton 1.00 M' 58,680.00 - 29,250.00 87,930.00
kotak 30 x 30 cm
0.540 OH Pekerja 80,000.00 43,200.00 43,200.00
UPAH

0.090 OH Tukang Batu 100,000.00 9,000.00 9,000.00


0.054 OH Mandor 120,000.00 6,480.00 6,480.00
BAHAN

0.090 Hr Sewa Tripod tinggi 7 m 125,000.00 11,250.00 11,250.00


0.090 Hr Sewa Alat pancang+ Hammer 2 ton 200,000.00 18,000.00 18,000.00
ALAT

(manual)

JUMLAH : A 87,930.00
Overhead & Profit 15% : B 13,189.50
JUMLAH TOTAL : C = (A+B) 101,119.50

HARGA JUMLAH
NO. ANALISA JENIS PEKERJAAN VOL. SAT. SATUAN UPAH (Rp) BAHAN (Rp) ALAT (Rp) HARGA
(Rp) (Rp)
7 B.01.a Pembuatan beton tumbuk 1:3:5 (K40 s/d K60 1.00 M³ 145,860.00 606,338.00 - 752,198.00
1.320 OH Pekerja 80,000.00 105,600.00 105,600.00
UPAH

0.220 OH Tukang Batu 100,000.00 22,000.00 22,000.00


0.022 OH Kepala Tukang 110,000.00 2,420.00 2,420.00
0.132 OH Mandor 120,000.00 15,840.00 15,840.00
200.000 Kg Semen PC ( 50 Kg ) 1,260.00 252,000.00 252,000.00
BAHAN

0.522 m3 Pasir Beton 299,000.00 156,078.00 156,078.00


0.862 m3 Koral Beton/Kerikil 230,000.00 198,260.00 198,260.00
ALAT

JUMLAH : A 752,198.00
Overhead & Profit 15% : B 112,829.70
JUMLAH TOTAL : C = (A+B) 865,027.70

HARGA JUMLAH
NO. ANALISA JENIS PEKERJAAN VOL. SAT. SATUAN UPAH (Rp) BAHAN (Rp) ALAT (Rp) HARGA
(Rp) (Rp)
8 A.4.1.1.17 Pembesian ( dengan Besi Polos / Ulir ) 10.00 Kg 13,850.00 18,480.00 32,330.00
0.070 OH Pekerja 80,000.00 5,600.00 5,600.00
UPAH

0.070 OH Tukang Besi 100,000.00 7,000.00 7,000.00


0.007 OH Kepala Tukang 110,000.00 770.00 770.00
0.004 OH Mandor 120,000.00 480.00 480.00
BAHAN

1.050 Kg Besi Beton ( Polos/Ulir ) 15,000.00 15,750.00 15,750.00


0.150 Kg Kawat Beton 18,200.00 2,730.00 2,730.00
ALAT

JUMLAH : A 32,330.00
Overhead & Profit 15% : B 4,849.50
SUB TOTAL : C = (A+B) 37,179.50
TOTAL : D = (C/10) 3,717.95

HARGA JUMLAH
NO. ANALISA JENIS PEKERJAAN VOL. SAT. SATUAN UPAH (Rp) BAHAN (Rp) ALAT (Rp) HARGA
(Rp) (Rp)
9 ABK-III.09 Pembuatan Bekisting untuk Pondasi 1.00 M² 53,460.00 110,198.00 163,658.00
0.300 OH Pekerja 80,000.00 24,000.00 24,000.00
UPAH

0.260 OH Tukang kayu 100,000.00 26,000.00 26,000.00


0.026 OH Kepala Tukang 110,000.00 2,860.00 2,860.00
0.005 OH Mandor 120,000.00 600.00 600.00
0.040 m3 Kayu Arbise persegian 2,578,700.00 103,148.00 103,148.00
BAHAN

0.300 kg Paku biasa 2-5" 17,300.00 5,190.00 5,190.00


0.100 ltr Minyak bekisting 18,600.00 1,860.00 1,860.00
ALAT

JUMLAH : A 163,658.00
Overhead & Profit 15% : B 24,548.70
JUMLAH TOTAL : C = (A+B) 188,206.70

HARGA JUMLAH
NO. ANALISA JENIS PEKERJAAN VOL. SAT. SATUAN UPAH (Rp) BAHAN (Rp) ALAT (Rp) HARGA
(Rp) (Rp)
10 A.4.1.1.21 Pemasangan bekisting untuk sloof / 1.00 M² 71,980.00 121,802.15 193,782.15
kolom praktis
0.500 OH Pekerja 80,000.00 40,000.00 40,000.00
UPAH

0.260 OH Tukang kayu 100,000.00 26,000.00 26,000.00


0.026 OH Kepala Tukang 110,000.00 2,860.00 2,860.00
0.026 OH Mandor 120,000.00 3,120.00 3,120.00
0.045 m3 Kayu Abise persegian 2,578,700.00 114,752.15 114,752.15
BAHAN

0.300 kg Paku biasa 2-5" 17,300.00 5,190.00 5,190.00


0.100 ltr Minyak bekisting 18,600.00 1,860.00 1,860.00
ALAT

JUMLAH : A 193,782.15
Overhead & Profit 15% : B 29,067.32
JUMLAH TOTAL : C = (A+B) 222,849.47

Page 9
HARGA JUMLAH
NO. ANALISA JENIS PEKERJAAN VOL. SAT. SATUAN UPAH (Rp) BAHAN (Rp) ALAT (Rp) HARGA
(Rp) (Rp)
11 ABK-V.09 Pembuatan Kuda Kuda Besi IWF 1.00 kg 7,260.00 19,675.00 26,935.00
0.006 OH Pekerja 80,000.00 480.00 480.00
UPAH

0.060 OH Tukang besi 100,000.00 6,000.00 6,000.00


0.006 OH Kepala tukang 110,000.00 660.00 660.00
0.001 OH Mandor 120,000.00 120.00 120.00
1.100 kg Besi IWF 17,500.00 19,250.00 19,250.00
BAHAN

0.250 bh Kawat las 1,700.00 425.00 425.00


ALAT

JUMLAH : A 26,935.00
Overhead & Profit 15% : B 4,040.25
JUMLAH TOTAL : C = (A+B) 30,975.25

HARGA JUMLAH
NO. ANALISA JENIS PEKERJAAN VOL. SAT. SATUAN UPAH (Rp) BAHAN (Rp) ALAT (Rp) HARGA
(Rp) (Rp)
12 ABK-V.10 Pembuatan Kuda Kuda Besi siku 1.00 kg 9,640.00 20,975.00 30,615.00
0.008 OH Pekerja 80,000.00 640.00 640.00
UPAH

0.080 OH Tukang besi 100,000.00 8,000.00 8,000.00


0.008 OH Kepala tukang 110,000.00 880.00 880.00
0.001 OH Mandor 120,000.00 120.00 120.00
1.150 kg Besi siku 17,500.00 20,125.00 20,125.00
BAHAN

0.500 bh Kawat las 1,700.00 850.00 850.00


ALAT

JUMLAH : A 30,615.00
Overhead & Profit 15% : B 4,592.25
JUMLAH TOTAL : C = (A+B) 35,207.25

HARGA JUMLAH
NO. ANALISA JENIS PEKERJAAN VOL. SAT. SATUAN UPAH (Rp) BAHAN (Rp) ALAT (Rp) HARGA
(Rp) (Rp)
13 ABK-V.35 Pemasangan baut dia 12 mm - 15 cm 1.00 Bh 10,000.00 5,000.00 15,000.00
UPAH

0.100 OH Tukang kayu 100,000.00 10,000.00 10,000.00


BAHAN

1.000 bh Baut dia 12 mm - 15 cm 5,000.00 5,000.00 5,000.00


ALAT

JUMLAH : A 15,000.00
Overhead & Profit 15% : B 2,250.00
JUMLAH TOTAL : C = (A+B) 17,250.00

HARGA JUMLAH
NO. ANALISA JENIS PEKERJAAN VOL. SAT. SATUAN UPAH (Rp) BAHAN (Rp) ALAT (Rp) HARGA
(Rp) (Rp)
14 A.4.7.1.19. Pengecatan permukaan baja galvanis 1.00 M² 30,772.90 18,292.90 30,772.90
secara manual sistem 1 lapis cat mutakhir
0.060 OH Pekerja 80,000.00 4,800.00 4,800.00
UPAH

0.060 OH Tukang Cat 100,000.00 6,000.00 6,000.00


0.012 OH Kepala tukang 110,000.00 1,320.00 1,320.00
0.003 OH Mandor 120,000.00 360.00 360.00
0.300 kg Cat 60,000.00 18,000.00 18,000.00 18,000.00
BAHAN

0.010 bh Kuas 7,490.00 74.90 74.90 74.90


0.010 ltr Pengencer 21,800.00 218.00 218.00 218.00
ALAT

JUMLAH : A 30,772.90
Overhead & Profit 15% : B 4,615.94
JUMLAH TOTAL : C = (A+B) 35,388.84

HARGA JUMLAH
NO. ANALISA JENIS PEKERJAAN VOL. SAT. SATUAN UPAH (Rp) BAHAN (Rp) ALAT (Rp) HARGA
(Rp) (Rp)
15 PAM-AN Erection konstruksi besi 1 Kg. 274.00 72.90 800.00 1,146.90

0.0010 OH Pekerja 80,000.00 80.00 80.00


0.0010 OH Tukang besi 100,000.00 100.00 100.00
UPAH

0.0002 OH Kepala tukang 110,000.00 22.00 22.00


0.0001 OH Mandor 120,000.00 12.00 12.00
0.0002 OH Operator terampil 175,000.00 35.00 35.00
0.0002 OH Operator kurang terampil 125,000.00 25.00 25.00
BAHAN

0.0100 ltr Bahan Bakar (solar) 5,150.00 51.50 51.50


0.0010 ltr Minyak pelumas 21,400.00 21.40 21.40

1.0000 jam Alat bantu 300.00 300.00 300.00


ALAT

1.0000 ls Sewa alat berat 500.00 500.00 500.00

JUMLAH : A 1,146.90

Page 10
Overhead & Profit 15% : B 172.04
JUMLAH TOTAL : C = (A+B) 1,318.94

HARGA JUMLAH
NO. ANALISA JENIS PEKERJAAN VOL. SAT. SATUAN UPAH (Rp) BAHAN (Rp) ALAT (Rp) HARGA
(Rp) (Rp)
16 PAM-AN.47 Pengelasan dengan Las Listrik 1 Cm' 860.00 1,097.70 525.00 2,482.70

0.004 OH Pekerja 80,000.00 320.00 320.00


UPAH

0.002 OH Tukang las 100,000.00 200.00 200.00


0.002 OH Kepala tukang 110,000.00 220.00 220.00
0.001 OH Mandor 120,000.00 120.00 120.00
BAHAN

0.040 kg Kawat las (RD 3,2) 23,580.00 943.20 943.20


0.030 ltr Solar 5,150.00 154.50 154.50
ALAT

1.000 ls Alat bantu ( genset, dll ) 525.00 525.00 525.00

JUMLAH : A 2,482.70
Overhead & Profit 15% : B 372.41
JUMLAH TOTAL : C = (A+B) 2,855.11

HARGA JUMLAH
NO. ANALISA JENIS PEKERJAAN VOL. SAT. SATUAN UPAH (Rp) BAHAN (Rp) ALAT (Rp) HARGA
(Rp) (Rp)
17 PAM-AN.50 1 Titik Melobang Konstruksi Besi 1 Ttk 5,330.00 - 817.50 6,147.50
Dengan Bor

0.036 OH Pekerja 80,000.00 2,880.00 2,880.00


UPAH

0.020 OH Tukang besi 100,000.00 2,000.00 2,000.00


0.003 OH Kepala tukang 110,000.00 330.00 330.00
0.001 OH Mandor 120,000.00 120.00 120.00
BAHAN
ALAT

0.025 Hr Alat bantu 32,700.00 817.50 817.50

JUMLAH : A 6,147.50
Overhead & Profit 15% : B 922.13
JUMLAH TOTAL : C = (A+B) 7,069.63

Untuk 1 Titik Melobang Konstruksi Kayu Dengan Bor JUMLAH D = 0,5 x C 3,534.81

HARGA JUMLAH
NO. ANALISA JENIS PEKERJAAN VOL. SAT. SATUAN UPAH (Rp) BAHAN (Rp) ALAT (Rp) HARGA
(Rp) (Rp)
18 PAM-AN.28 Dewatering (pengeringan) 1 hari 102,500.00 98,250.00 163,000.00 363,750.00
UPAH

0.500 OH Pekerja 80,000.00 40,000.00 40,000.00


0.500 OH Operator kurang terampil 125,000.00 62,500.00 62,500.00
BAHAN

15.000 lt Bahan bakar (bensin) 6,550.00 98,250.00 98,250.00


ALAT

1.000 hari Sewa Pompa Air 163,000.00 163,000.00 163,000.00

JUMLAH : A 363,750.00
Overhead & Profit 15% : B 54,562.50
JUMLAH TOTAL : C = (A+B) 418,312.50

HARGA JUMLAH
NO. ANALISA JENIS PEKERJAAN VOL. SAT. SATUAN UPAH (Rp) BAHAN (Rp) ALAT (Rp) HARGA
(Rp) (Rp)
19 PAM-AN.29 Plang Rambu Keamanan Lalu Lintas 1 unit 50,000.00 131,000.00 - 181,000.00
UPAH

0.500 OH Tukang kayu 100,000.00 50,000.00 50,000.00

1.000 btg Papan 2/30 cm - 4 m' (ky. Terentang) 61,000.00 61,000.00 61,000.00
BAHAN

1.000 btg Usuk 5/7 cm - 4 m' (ky. Terentang) 36,000.00 36,000.00 36,000.00
0.250 kg Paku reng/usuk 16,000.00 4,000.00 4,000.00
0.500 kg Cat kayu sek. Bee brand 60,000.00 30,000.00 30,000.00
ALAT

JUMLAH : A 181,000.00
Overhead & Profit 15% : B 27,150.00
JUMLAH TOTAL : C = (A+B) 208,150.00

HARGA JUMLAH
NO. ANALISA JENIS PEKERJAAN VOL. SAT. SATUAN UPAH (Rp) BAHAN (Rp) ALAT (Rp) HARGA
(Rp) (Rp)
20 PAM-AN.29.1 Plang Rambu Keamanan Lalu Lintas 1 ls 1,910,000.00 - - 1,910,000.00
UPAH

10.000 unit Plang Rambu Keamanan Lalu Lintas 181,000.00 1,810,000.00 1,810,000.00

Page 11
UPAH 100.000 m' Pita pengaman 1,000.00 100,000.00 100,000.00

JUMLAH : A 1,910,000.00
Overhead & Profit 15% : B 286,500.00
JUMLAH TOTAL : C = (A+B) 2,196,500.00

HARGA JUMLAH
NO. ANALISA JENIS PEKERJAAN VOL. SAT. SATUAN UPAH (Rp) BAHAN (Rp) ALAT (Rp) HARGA
(Rp) (Rp)
21 PAM-AN.31 Pengamanan Utilitas 1 Ls 38,000,000.00 - - 38,000,000.00
1.000 ls Pengamanan Utilitas PLN 1,000,000.00 1,000,000.00 1,000,000.00
1.000 ls Pengamanan Utilitas Gas 1,000,000.00 1,000,000.00 1,000,000.00
1.000 ls Pengamanan Utilitas Telepon 1,000,000.00 1,000,000.00 1,000,000.00
1.000 ls Pengamanan Arus Lalu Lintas / Dinas Terkait 10,000,000.00 10,000,000.00 10,000,000.00
1.000 ls Pendampingan Instansi hukum Terkait 20,000,000.00 20,000,000.00 20,000,000.00
1.000 ls Pengamanan Utilitas Jalan 5,000,000.00 5,000,000.00 5,000,000.00
JUMLAH : A 38,000,000.00
Overhead & Profit 15% : B 5,700,000.00
JUMLAH TOTAL : C = (A+B) 43,700,000.00

HARGA JUMLAH
NO. ANALISA JENIS PEKERJAAN VOL. SAT. SATUAN UPAH (Rp) BAHAN (Rp) ALAT (Rp) HARGA
(Rp) (Rp)
22 PAM-AN.49 Mobilisasi dan Demobilisasi 1 Ls 600,000.00 131,000.00 750,000.00 1,481,000.00
UPAH

2.000 OH Supir terampil 175,000.00 350,000.00 350,000.00


2.000 OH Pembantu supir 125,000.00 250,000.00 250,000.00
BAHAN

20.000 ltr Bahan bakar (bensin) 6,550.00 131,000.00 131,000.00


ALAT

2.000 Hr Sewa kendaraan 375,000.00 750,000.00 750,000.00

JUMLAH : A 1,481,000.00
Overhead & Profit 15% : B 222,150.00
JUMLAH TOTAL : C = (A+B) 1,703,150.00

HARGA JUMLAH
NO. ANALISA JENIS PEKERJAAN VOL. SAT. SATUAN UPAH (Rp) BAHAN (Rp) ALAT (Rp) HARGA
(Rp) (Rp)
23 PAM-AN.44 Dokumentasi (asbuilt drawing) 1 ls 350,500.00 242,000.00 53,000.00 645,500.00
UPAH

1.000 OH Juru foto 115,000.00 115,000.00 115,000.00


1.500 OH Juru gambar 157,000.00 235,500.00 235,500.00

1.000 Rol Film 31,500.00 31,500.00 31,500.00


BAHAN

1.000 Kali Cuci Film 8,500.00 8,500.00 8,500.00


36.000 Lbr Cetak Foto 3,000.00 108,000.00 108,000.00
40.000 Lbr Copy A3 1,500.00 60,000.00 60,000.00
4.000 Lbr Print A3 8,500.00 34,000.00 34,000.00
ALAT

1.000 ls Peralatan Gambar 53,000.00 53,000.00 53,000.00

JUMLAH : A 645,500.00
Overhead & Profit 15% : B 96,825.00
JUMLAH TOTAL : C = (A+B) 742,325.00

HARGA JUMLAH
NO. ANALISA JENIS PEKERJAAN VOL. SAT. SATUAN UPAH (Rp) BAHAN (Rp) ALAT (Rp) HARGA
(Rp) (Rp)
24 PAM-AN.19 Pemasangan Accessories Ø 6" 1 bh 42,672.00 - 25,000.00 67,672.00

0.133 OH Tukang pipa 100,000.00 13,340.00 13,340.00


UPAH

0.267 OH Pekerja 80,000.00 21,328.00 21,328.00


0.067 OH Mandor 120,000.00 8,004.00 8,004.00
BAHAN
ALAT

0.500 ls Peralatan pas. Accessories 50,000.00 25,000.00 25,000.00

JUMLAH : A 67,672.00
Overhead & Profit 15% : B 10,150.80
JUMLAH TOTAL : C = (A+B) 77,822.80

HARGA JUMLAH
NO. ANALISA JENIS PEKERJAAN VOL. SAT. SATUAN UPAH (Rp) BAHAN (Rp) ALAT (Rp) HARGA
(Rp) (Rp)
25 PAM-AN.08 Pemasangan Pipa PVC / HDPE Ø 6" 1 m' 31,940.00 - 3,600.00 35,540.00

0.118 OH Pekerja 80,000.00 9,424.00 9,424.00


UPAH

0.196 OH Tukang pipa 100,000.00 19,640.00 19,640.00


0.020 OH Kepala tukang 110,000.00 2,156.00 2,156.00
0.006 OH Mandor 120,000.00 720.00 720.00
BAHAN

Page 12
Angkutan pipa Ø 6" setiap 20 batang (120 m)
0.008 Trip Sewa kendaraan 375,000.00 3,125.00 3,125.00
ALAT

0.008 ls Bongkar muat 57,000.00 475.00 475.00

JUMLAH : A 35,540.00
Overhead & Profit 15% : B 5,331.00
JUMLAH TOTAL : C = (A+B) 40,871.00

HARGA JUMLAH
NO. ANALISA JENIS PEKERJAAN VOL. SAT. SATUAN UPAH (Rp) BAHAN (Rp) ALAT (Rp) HARGA
(Rp) (Rp)
26 PAM-AN.43 Pemadatan Tanah (stamper) 100 m2 500,000.00 262,000.00 350,000.00 1,112,000.00
UPAH

4.000 OH Operator kurang terampil 125,000.00 500,000.00 500,000.00


BAHAN

40.000 ltr Bahan Bakar (Bensin) 6,550.00 262,000.00 262,000.00


ALAT

2.000 hari Sewa stemper 175,000.00 350,000.00 350,000.00

JUMLAH : A 1,112,000.00
Overhead & Profit 15% : B 166,800.00
JUMLAH TOTAL : C = (A+B) 1,278,800.00
UNTUK PER METER : D = C/100 12,788.00

HARGA JUMLAH
NO. ANALISA JENIS PEKERJAAN VOL. SAT. SATUAN UPAH (Rp) BAHAN (Rp) ALAT (Rp) HARGA
(Rp) (Rp)
27 PAM-AN.12 Pemasangan Pipa PVC / HDPE Ø 10" 1 m' 49,890.00 - 7,200.00 57,090.00

0.184 OH Pekerja 80,000.00 14,728.00 14,728.00


UPAH

0.307 OH Tukang pipa 100,000.00 30,680.00 30,680.00


0.031 OH Kepala tukang 110,000.00 3,366.00 3,366.00
0.009 OH Mandor 120,000.00 1,116.00 1,116.00
BAHAN

Angkutan pipa Ø 10" setiap 10 batang (60 m)


0.017 Trip Sewa kendaraan 375,000.00 6,250.00 6,250.00
ALAT

0.017 ls Bongkar muat 57,000.00 950.00 950.00

JUMLAH : A 57,090.00
Overhead & Profit 15% : B 8,563.50
JUMLAH TOTAL : C = (A+B) 65,653.50

HARGA JUMLAH
NO. ANALISA JENIS PEKERJAAN VOL. SAT. SATUAN UPAH (Rp) BAHAN (Rp) ALAT (Rp) HARGA
(Rp) (Rp)
28 PAM-AN.12.1 Pemasangan Pipa Steel Ø 10" 1 m' 114,180.00 - - 114,180.00
UPAH

2.000 x Pemasangan Pipa PVC / HDPE Ø 10" 57,090.00 114,180.00 114,180.00

JUMLAH : A 114,180.00
Overhead & Profit 15% : B 17,127.00
JUMLAH TOTAL : C = (A+B) 131,307.00

HARGA JUMLAH
NO. ANALISA JENIS PEKERJAAN VOL. SAT. SATUAN UPAH (Rp) BAHAN (Rp) ALAT (Rp) HARGA
(Rp) (Rp)
29 PAM-AN.06 Pemasangan Pipa PVC / HDPE Ø 4" 1 m' 21,957.00 - 2,880.00 24,837.00

0.081 OH Pekerja 80,000.00 6,480.00 6,480.00


UPAH

0.135 OH Tukang pipa 100,000.00 13,500.00 13,500.00


0.014 OH Kepala tukang 110,000.00 1,485.00 1,485.00
0.004 OH Mandor 120,000.00 492.00 492.00
BAHAN

Angkutan pipa Ø 4" setiap 25 batang (150 m)


0.007 Trip Sewa kendaraan 375,000.00 2,500.00 2,500.00
ALAT

0.007 ls Bongkar muat 57,000.00 380.00 380.00

JUMLAH : A 24,837.00
Overhead & Profit 15% : B 3,725.55
JUMLAH TOTAL : C = (A+B) 28,562.55

HARGA JUMLAH
NO. ANALISA JENIS PEKERJAAN VOL. SAT. SATUAN UPAH (Rp) BAHAN (Rp) ALAT (Rp) HARGA
(Rp) (Rp)
30 PAM-AN.06.1 Pemasangan Pipa Steel Ø 4" 1 m' 49,674.00 - - 49,674.00
UPAH

2.000 x Pemasangan Pipa PVC / HDPE Ø 4" 24,837.00 49,674.00 49,674.00

JUMLAH : A 49,674.00
Overhead & Profit 15% : B 7,451.10
JUMLAH TOTAL : C = (A+B) 57,125.10

Page 13
HARGA JUMLAH
NO. ANALISA JENIS PEKERJAAN VOL. SAT. SATUAN UPAH (Rp) BAHAN (Rp) ALAT (Rp) HARGA
(Rp) (Rp)
31 PAM-AN.17 Pemasangan Accessories Ø 10" 1 bh 71,114.00 - 41,666.67 112,780.67

0.222 OH Tukang pipa 100,000.00 22,230.00 22,230.00


UPAH

0.444 OH Pekerja 80,000.00 35,552.00 35,552.00


0.111 OH Mandor 120,000.00 13,332.00 13,332.00
BAHAN
ALAT

0.833 ls Peralatan pas. Accessories 50,000.00 41,666.67 41,666.67

JUMLAH : A 112,780.67
Overhead & Profit 15% : B 16,917.10
JUMLAH TOTAL : C = (A+B) 129,697.77

HARGA JUMLAH
NO. ANALISA JENIS PEKERJAAN VOL. SAT. SATUAN UPAH (Rp) BAHAN (Rp) ALAT (Rp) HARGA
(Rp) (Rp)
32 PAM-AN.20 Pemasangan Accessories Ø 4" 1 bh 28,446.00 - 16,666.67 45,112.67

0.089 OH Tukang pipa 100,000.00 8,890.00 8,890.00


UPAH

0.178 OH Pekerja 80,000.00 14,216.00 14,216.00


0.045 OH Mandor 120,000.00 5,340.00 5,340.00
BAHAN
ALAT

0.333 ls Peralatan pas. Accessories 50,000.00 16,666.67 16,666.67

JUMLAH : A 45,112.67
Overhead & Profit 15% : B 6,766.90
JUMLAH TOTAL : C = (A+B) 51,879.57

HARGA JUMLAH
NO. ANALISA JENIS PEKERJAAN VOL. SAT. SATUAN UPAH (Rp) BAHAN (Rp) ALAT (Rp) HARGA
(Rp) (Rp)
Pemasangan Gate/Check valve/Meter
33 PAM-AN.20.2 1 bh 56,892.00 - 50,000.00 106,892.00
Air/Hydrant Ø 4"

0.178 OH Tukang pipa 100,000.00 17,780.00 17,780.00


UPAH

0.355 OH Pekerja 80,000.00 28,432.00 28,432.00


0.089 OH Mandor 120,000.00 10,680.00 10,680.00
BAHAN
ALAT

Peralatan pas. gate valve/check valve/meter


1.000 ls 50,000.00 50,000.00 50,000.00
air/hydrant

JUMLAH : A 106,892.00
Overhead & Profit 15% : B 16,033.80
JUMLAH TOTAL : C = (A+B) 122,925.80

HARGA JUMLAH
NO. ANALISA JENIS PEKERJAAN VOL. SAT. SATUAN UPAH (Rp) BAHAN (Rp) ALAT (Rp) HARGA
(Rp) (Rp)
34 PAM-AN.21 Pemasangan Accessories Ø 2" 1 bh 17,067.60 - 8,333.33 25,400.93
UPAH

0.053 OH Tukang pipa 100,000.00 5,334.00 5,334.00


0.107 OH Pekerja 80,000.00 8,529.60 8,529.60
0.027 OH Mandor 120,000.00 3,204.00 3,204.00
BAHAN
ALAT

0.167 ls Peralatan pas. Accessories 50,000.00 8,333.33 8,333.33

JUMLAH : A 25,400.93
Overhead & Profit 15% : B 3,810.14
JUMLAH TOTAL : C = (A+B) 29,211.07

Page 14
HARGA JUMLAH
NO. ANALISA JENIS PEKERJAAN VOL. SAT. SATUAN UPAH (Rp) BAHAN (Rp) ALAT (Rp) HARGA
(Rp) (Rp)
35 PAM-AN.26 Pengurasan Pipa PVC / HDPE Ø 10" 400 m' 788,000.00 1,079,375.00 410,000.00 2,277,375.00

4.000 OH Tukang pipa 100,000.00 400,000.00 400,000.00


UPAH

0.400 OH Kepala tukang 110,000.00 44,000.00 44,000.00


4.000 OH Pekerja 80,000.00 320,000.00 320,000.00
0.200 OH Mandor 120,000.00 24,000.00 24,000.00
BAHAN

19.625 m3 Penyediaan air bersih 55,000.00 1,079,375.00 1,079,375.00

1.000 ls Penyediaan alat bantu 27,500.00 27,500.00 27,500.00


ALAT

2.500 hari Mesin test (sewa termasuk BBM) 153,000.00 382,500.00 382,500.00

JUMLAH : A 2,277,375.00
Overhead & Profit 15% : B 341,606.25
JUMLAH TOTAL : C = (A+B) 2,618,981.25
JUMLAH PER M' : D = C/400 6,547.45

HARGA JUMLAH
NO. ANALISA JENIS PEKERJAAN VOL. SAT. SATUAN UPAH (Rp) BAHAN (Rp) ALAT (Rp) HARGA
(Rp) (Rp)
Beton Menggunakan Ready Mix dan
36 B.13.a 1 m3 119,750.00 953,700.00 444,000.00 1,517,450.00
Pompa Beton
1.000 OH Pekerja 80,000.00 80,000.00 80,000.00
UPAH

0.250 OH Tukang Batu 100,000.00 25,000.00 25,000.00


0.025 OH Kepala Tukang 110,000.00 2,750.00 2,750.00
0.100 OH Mandor 120,000.00 12,000.00 12,000.00
BAHAN

1.020 m3 Ready Mixed (K - 350) 935,000.00 953,700.00 953,700.00


ALAT

0.120 hari Sewa Pompa dan conveyor beton 3,700,000.00 444,000.00 444,000.00

JUMLAH : A 1,517,450.00
Overhead & Profit 15% : B 227,617.50
JUMLAH TOTAL : C = (A+B) 1,745,067.50

HARGA JUMLAH
NO. ANALISA JENIS PEKERJAAN VOL. SAT. SATUAN UPAH (Rp) BAHAN (Rp) ALAT (Rp) HARGA
(Rp) (Rp)
Beton Dicorkan pada tapak berjarak < 25
37 B.14.a 1 m3 37,720.00 - - 37,720.00
m dengan beda tinggi < 1 m
UPAH

0.410 OH Pekerja 80,000.00 32,800.00 32,800.00


0.041 OH Mandor 120,000.00 4,920.00 4,920.00
BAHAN

-
ALAT

JUMLAH : A 37,720.00
Overhead & Profit 15% : B 5,658.00
JUMLAH TOTAL : C = (A+B) 43,378.00

HARGA JUMLAH
NO. ANALISA JENIS PEKERJAAN VOL. SAT. SATUAN UPAH (Rp) BAHAN (Rp) ALAT (Rp) HARGA
(Rp) (Rp)
Pemadatan beton saat mengecor
38 B.15.a 1 m3 23,000.00 - 70,000.00 93,000.00
(Vibrator)
UPAH

0.250 OH Pekerja 80,000.00 20,000.00 20,000.00


0.025 OH Mandor 120,000.00 3,000.00 3,000.00
BAHAN

-
ALAT

0.100 hari sewa vibrator 700,000.00 70,000.00 70,000.00

JUMLAH : A 93,000.00
Overhead & Profit 15% : B 13,950.00
JUMLAH TOTAL : C = (A+B) 106,950.00

Page 15
HARGA UPAH BAHAN ALAT JUMLAH
NO. ANALISA JENIS PEKERJAAN VOL. SAT. SATUAN (Rp) (Rp) (Rp) HARGA
(Rp) (Rp)
39 Pemasangan angkur Ø 22 mm 1 Buah 1,000.00 82,500.00 83,500.00
UPAH

0.0100 OH Tukang besi 100,000.00 1,000.00 1,000.00


BAHAN

1.0000 Bh Angkur Ø 22 mm 82,500.00 82,500.00 82,500.00


ALAT

JUMLAH : A 83,500.00
KEUNTUNGAN 10% : B 8,350.00
JUMLAH TOTAL : C = (A+B) 91,850.00
DIBULATKAN : D 91,800.00

HARGA UPAH BAHAN ALAT JUMLAH


NO. ANALISA JENIS PEKERJAAN VOL. SAT. SATUAN (Rp) (Rp) (Rp) HARGA
(Rp) (Rp)
40 Pemasangan Clamp Ø 250 mm 1 Buah 1,000.00 105,000.00 106,000.00
UPAH

0.0100 OH Tukang besi 100,000.00 1,000.00 1,000.00


BAHAN

1.0000 Bh Clamp Ø 250 mm 105,000.00 105,000.00 105,000.00


ALAT

JUMLAH : A 106,000.00
KEUNTUNGAN 10% : B 10,600.00
JUMLAH TOTAL : C = (A+B) 116,600.00
DIBULATKAN : D 116,600.00

HARGA JUMLAH
NO. ANALISA JENIS PEKERJAAN VOL. SAT. SATUAN UPAH (Rp) BAHAN (Rp) ALAT (Rp) HARGA
(Rp) (Rp)
41 PAM-AN.48 Alat Bantu Keselamatan Kerja ( Sabuk ) 1 set - - 273,000.00 273,000.00

1.000 set Sewa Sabuk pengaman (safety belt) + alat bantu 273,000.00 273,000.00 273,000.00
ALAT

pendukung K3

JUMLAH : A 273,000.00
Overhead & Profit 15% : B 40,950.00
JUMLAH TOTAL : C = (A+B) 313,950.00

HARGA JUMLAH
NO. ANALISA JENIS PEKERJAAN VOL. SAT. SATUAN UPAH (Rp) BAHAN (Rp) ALAT (Rp) HARGA
(Rp) (Rp)
42 PAM-AN.48.1 Alat Bantu Keselamatan Kerja ( Sabuk ) 5 set - - 1,365,000.00 1,365,000.00

5.000 set Sewa Sabuk pengaman (safety belt) + alat bantu 273,000.00 1,365,000.00 1,365,000.00
ALAT

pendukung K3

JUMLAH : A 1,365,000.00
Overhead & Profit 15% : B 204,750.00
JUMLAH TOTAL : C = (A+B) 1,569,750.00

Page 16
PERUSAHAAN UMUM DAERAH AIR MINUM
KOTA CIREBON .

LEMBAR INFORMASI

NAMA PEKERJAAN : Pemasangan Jembatan Pipa HDPE Ø 250 mm


Di Jl. Kesunean Raya (Sungai Kesunean)

KODE ANGGARAN : — 41.41.03 Pipa Trandist Dalam Rp. 346,255,000.00


Proses

JADWAL ANGGARAN : — RKAP Th. 2019

NILAI RAB : — Bahan Rp. 122,369,404.00


— Upah Rp. 402,661,058.51
— Dibulatkan Rp. 402,661,000.00
— PPN 10 % Rp. 40,266,100.00
— Sub total Rp. 442,927,100.00
— Total Rp. 565,296,504.00

( Usulan Perubahan RKAP Tahun 2019) Rp. 606,000,000.00

JADWAL ANGGARAN : — Triwulan I RKAP 2019

PELAKSANA : — Melalui Proses Lelang LPSE

WAKTU PELAKSANAAN : — 60 Hari Kalender

KETERANGAN
- Tujuan Pekerjaan : — Memperbaiki tekanan dan supply air ke area kawasan Pesisir
Cangkol dan Sekitarnya

Cirebon, 26 Maret 2019

Kabag Perwastek
Dikirim ke Dirtek : ……………..2019

Kembali ke Perwastek:………..2019

TINA MEILANI, ST
NIK. 91.00284
tulisan cad
0.85 42.5
0.175 8.75

175.000 350

Potrebbero piacerti anche