Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
PROPERTY LINE
ARCHITECTURAL
SEPTIC TANK
2 3
3.92
4.00
DN
STRUCTURAL
25.30
PROPOSED HOTEL BUILDING ELECTRICAL
30.16
PROPERTY LIN
PROPERTY LINE
DN
E
SANITARY
14.28
FIRE DEPARTMENT
10.96
PARKING
EXIT
6
1
PROPERTY LINE
ENTRANCE
10.00 10.00
5M RROW
ENRO
FROM THE OFFICE OF: DESIGNED BY: IN CHARGE OF CONSTRUCTION: PROJECT TITLE: SHEET CONTENTS: REVISIONS: SHEET NUMBER:
SITE DEVELOPMENT PLAN
1:500
A PROPOSED 3-STOREY
PRC NO:
VALIDITY:
ARCHITECT
PTR NO:
DATE ISSUED:
PRC NO:
VALIDITY:
PTR NO:
DATE ISSUED:
HOTEL BUILDING
OWNER/ REPRESENTATIVE: AS SHOWN ABOVE A1
TIN: PLACE ISSUED: TIN: PLACE ISSUED:
ADDRESS: 1 OF 4
REPUBLIC OF THE PHILIPPINES
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
83.00
OFFICE OF THE BUILDING OFFICIAL
6.00 6.00 6.00 6.06 5.94 6.00 6.00 6.00 6.00 6.00 6.00 5.00 6.00 6.00
6.00 2.00 3.00 1.20 4.80 0.00 2.50 3.50
UP
UP
F
FIRE EXIT
5.00
5.00
STORAGE ROOM PANTRY
KITCHEN
E FUNCTION ROOM FUNCTION ROOM FUNCTION ROOM FUNCTION ROOM FUNCTION ROOM FUNCTION ROOM FUNCTION ROOM FUNCTION ROOM FUNCTION ROOM FUNCTION ROOM
PROCESSED BY DUMAGUETE CITY, NEGROS ORIENTAL
(60 SQM) (60 SQM) (60 SQM) (60 SQM) (60 SQM) (60 SQM) (60 SQM) (60 SQM) (60 SQM) (60 SQM)
FEMALE CR
15.00
RESTAURANT
5.00
5.00
ADMIN OFFICE MALE CR
2.00
HALLWAY
25.00
25.00
5.00
HALLWAY
C 3.00
FUNCTION ROOM FUNCTION ROOM FUNCTION ROOM FUNCTION ROOM FUNCTION ROOM RECEPTION AREA
(96 SQM) (96 SQM) (96 SQM) (96 SQM) (96 SQM)
5.00
5.00
UP
LOBBY
10.00
B UP
COMMERCIAL SPACE COMMERCIAL SPACE COMMERCIAL SPACE COMMERCIAL SPACE COMMERCIAL SPACE COMMERCIAL SPACE COMMERCIAL SPACE COMMERCIAL SPACE COMMERCIAL SPACE COMMERCIAL SPACE
5.00
5.00
ELEV ELEV
2.00
ENTRANCE
6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 11.00 12.00 2.00
60.00 23.00
83.00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
83.00
ARCHITECTURAL
6.00 6.00 6.00 6.06 5.94 6.00 6.00 6.00 6.00 6.00 6.00 5.00 6.00 6.00
3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
UP
UP
F
FIRE EXIT
STRUCTURAL
4.40
5.00
5.00
5.00
STORAGE
MALE CR
0.60
E FEMALE CR
2.00
3.80
5.00
5.00
3.00
HALLWAY
1.20
D GYM
HALLWAY
HALLWAY
ELECTRICAL
3.00
25.00
5.00
5.00
5.00
2.00
HALLWAY
29.00
C
2.00
HALLWAY HALLWAY
FIRE EXIT
5.00
5.00
10.00
B
6.00
OPEN MEZZANINE
UP
SANITARY
5.00
5.00
DN
ELEV ELEV
2.00
HALLWAY HALLWAY
A
2.00
4.00
4.00
3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 11.00 12.00
FIRE DEPARTMENT
60.00 23.00
83.00
ENRO
FROM THE OFFICE OF: DESIGNED BY: IN CHARGE OF CONSTRUCTION: PROJECT TITLE: SHEET CONTENTS: REVISIONS: SHEET NUMBER:
A PROPOSED 3-STOREY
PRC NO:
VALIDITY:
ARCHITECT
PTR NO:
DATE ISSUED:
PRC NO:
VALIDITY:
PTR NO:
DATE ISSUED:
OWNER/ REPRESENTATIVE:
HOTEL BUILDING
AS SHOWN ABOVE A2
TIN: PLACE ISSUED: TIN: PLACE ISSUED:
ADDRESS:
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
DN
FIRE EXIT
5.00
5.00
MALE CR
E FEMALE CR
2.00
HALLWAY HALLWAY HALLWAY
PROCESSED BY DUMAGUETE CITY, NEGROS ORIENTAL
5.00
3.00
HALLWAY
D
HALLWAY
HALLWAY
5.00
5.00
HALLWAY
29.00
C
2.00
HALLWAY HALLWAY
5.00
MEZZANINE
B
6.00
DN
5.00
2.00 ELEV ELEV
HALLWAY HALLWAY
A
REVIEWED BY LAND USE AND ZONING
4.00
3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00
60.00 11.00 12.00
83.00
LINE AND GRADE
3RD FLOOR PLAN
1:500
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 A B C D E F ARCHITECTURAL
0.15
3RD FLOOR CEILING LN. 3RD FLOOR CEILING LN.
3.88
3.88
3.73
3.73
3RD FLOOR LN. 3RD FLOOR LN.
STRUCTURAL
0.15
0.15
2ND FLOOR CEILING LN. 2ND FLOOR CEILING LN.
3.88
3.88
3.73
3.73
2ND FLOOR LN. 2ND FLOOR LN.
0.15
0.15
1ST FLOOR CEILING LN. 1ST FLOOR CEILING LN.
3.88
3.88
3.73
3.73
1ST FLOOR LN. 1ST FLOOR LN.
0.10
0.10
NAT. GROUND LN. NAT. GROUND LN.
15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 F E D C B A
SANITARY
LN. OF ROOF DECK LN. OF ROOF DECK
0.15
0.15
3RD FLOOR CEILING LN. 3RD FLOOR CEILING LN.
3.88
3.88
3.73
3.73
3RD FLOOR LN. 3RD FLOOR LN.
0.15
0.15
2ND FLOOR CEILING LN. 2ND FLOOR CEILING LN.
FIRE DEPARTMENT
3.88
3.88
3.73
3.73
2ND FLOOR LN. 2ND FLOOR LN.
0.15
0.15
1ST FLOOR CEILING LN. 1ST FLOOR CEILING LN.
3.88
3.88
3.73
3.73
1ST FLOOR LN. 1ST FLOOR LN.
0.10
A PROPOSED 3-STOREY
PRC NO:
VALIDITY:
ARCHITECT
PTR NO:
DATE ISSUED:
PRC NO:
VALIDITY:
PTR NO:
DATE ISSUED:
OWNER/ REPRESENTATIVE:
HOTEL BUILDING
AS SHOWN ABOVE A3
TIN: PLACE ISSUED: TIN: PLACE ISSUED:
ADDRESS:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
2.10
2.10
2.10
2.10
D1 D2 D3 D4 D5 1.40 0.30 0.30 0.30
1.00
17 16 17 16 19
1.80
2.20
0.20
DOOR SCHEDULE
1.00
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
D1 2.10 0.90 185
D2
D3
2.10
2.10
0.80
0.70
3
1 REVIEWED BY LAND USE AND ZONING
3.00
2.10
D6 3 1.80 20
D7 2.10 1.80 3
0.10
1.80 1.08
0.30
25MM X 25MM SQUARE PIPE
ARCHITECTURAL
0.18
2.70
2.58
10MM DIA MAIN REBARS SOACED
@ 150MM O.C. B.W.
1.80
1.86
STRUCTURAL
0.99
FINISH FLOOR LINE
2-12MM DIA VERTICAL BARS SPACED @ 0.30M O.C
0.60
0.85
0.90
0.25
25MM X 600MM X1000MM CLASS "A" RC FOOTING
SECTION W/ 5-12MM DIA BED BARS
0.60
W1 W2
ELECTRICAL
0.60
WINDOW SCHEDULE
W3 0.60 0.60 5
W3
FIRE DEPARTMENT
DOORS AND WINDOW SCHEDULE
1:100
ENRO
FROM THE OFFICE OF: DESIGNED BY: IN CHARGE OF CONSTRUCTION: PROJECT TITLE: SHEET CONTENTS: REVISIONS: SHEET NUMBER:
A PROPOSED 3-STOREY
PRC NO:
VALIDITY:
ARCHITECT
PTR NO:
DATE ISSUED:
PRC NO:
VALIDITY:
PTR NO:
DATE ISSUED:
OWNER/ REPRESENTATIVE:
HOTEL BUILDING
AS SHOWN ABOVE A4
TIN: PLACE ISSUED: TIN: PLACE ISSUED:
ADDRESS: 2 OF 4
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
83.00
6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 5.00 6.00 6.00
C1 GB1 C2 GB1 C2 GB1 C2 GB1 C2 GB1 C1 GB1 C1 GB1 C1 GB1 C2 GB1 C2 GB1 C1 C1 C1 GB1 C1 GB1 C1
F
PROCESSED BY DUMAGUETE CITY, NEGROS ORIENTAL
GB1
GB3
GB1
GB1
GB1
5.00
5.00
C1 C2 C2 C2 C2 C2 C2 C2 C2 C2 C1 GB1 C2 GB1 C1 C2 C1
E
GB3
GB1
GB1
15.00
5.00
5.00
C1 C2 GB2 C2 GB2 C2 GB2 C2 C1 GB2 C1 GB2 C1 GB2 C2 GB2 C2 C2 C2 C2 C2 C1
D GB2 GB2
GB1
GB3
GB1
25.00
25.00
5.00
5.00
GB3
C1 C2 C2 C2 C2 C1 C1 C1 C2 C2 C1 GB1 C2 GB1 C1 C2 C1
C GB2 GB2 GB2 GB2 GB2 GB2 GB2
GB1
GB1
5.00
5.00
GB1
GB1
C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C1
10.00
B
REVIEWED BY LAND USE AND ZONING
GB3
GB1
5.00
5.00
GB1
GB1
GB1
C1 C2 C2 C2
GB1 GB1 GB1 GB1 C2 GB1 C2 GB1 C1 GB1 C1 GB1 C1 GB1 C2 GB1 C2 GB1 C1 GB1 C1 GB1 C1
A
6.00 6.00 12.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 5.00 6.00 6.00
60.00 11.00 12.00
83.00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 ARCHITECTURAL
83.00
6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 5.00 6.00 6.00
FB-1
5.00
5.00
FB-1
E
5.00
5.00
S4
D ELECTRICAL
FB-1
FB-F
25.00
25.00
S5
5.00
5.00
FB-1
FB-1
FB-1
FB-1
C S1 S2 S3 FB-1
5.00
5.00
FB-1
B SANITARY
FB-1
5.00
5.00
FB-1
A
FB-1 FB-1 FB-1
6.00 5.00 6.00 6.00
6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 5.00 6.00 6.00
FIRE DEPARTMENT
60.00 11.00 12.00
ENRO
FROM THE OFFICE OF: DESIGNED BY: IN CHARGE OF CONSTRUCTION: PROJECT TITLE: SHEET CONTENTS: REVISIONS: SHEET NUMBER:
A PROPOSED 3-STOREY
PRC NO:
VALIDITY:
ARCHITECT
PTR NO:
DATE ISSUED:
PRC NO:
VALIDITY:
PTR NO:
DATE ISSUED:
OWNER/ REPRESENTATIVE:
HOTEL BUILDING
AS SHOWN ABOVE S1
TIN: PLACE ISSUED: TIN: PLACE ISSUED:
ADDRESS: 3 OF 4
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
F C1 FB-2 C2 FB-2 C2 FB-2 C2 FB-2 C2 FB-2 C1 FB-2 C1 FB-2 C1 FB-2 C2 FB-2 C2 FB-2 C2 FB-2 C2 FB-2 C2 FB-2 C2 FB-2 C1
5.00
5.00
PROCESSED BY DUMAGUETE CITY, NEGROS ORIENTAL
FB-2
FB-2
FB-2
FB-2
FB-2
C1 C2 C1 C1 C1
E
S3 S4
5.00
5.00
FB-2
FB-2
FB-2
FB-2
FB-2
C1 C1 C2 C2 C1
D
25.00
5.00
5.00
FB-2
FB-2
FB-2
FB-2
FB-2
29.00
C C1 S1 C1 S2 C1 FB-2 C2 FB-2 C1 C2 FB-3 C1
FB-2
FB-2
FB-2
FB-2
FB-2
5.00
5.00
C2 C2 C2 C2 C1
B FB-2
S5
FB-2
FB-2
FB-2
FB-2
LAND USE AND ZONING
5.00
5.00
C1 C1 C2 C1 FB-2 C1 FB-2 C1
REVIEWED BY
A
4.00
FB-2
FB-2
FB-2
FB-2 FB-2 FB-2 FB-2 FB-2 FB-2 FB-2 FB-2 FB-2 FB-2
6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 5.00 6.00 6.00
60.00 11.00 12.00 LINE AND GRADE
3RD FLOOR FRAMING PLAN
1:500
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 ARCHITECTURAL
83.00
6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 5.00 6.00 6.00
F C1 RB-1 C2 RB-1 C2 RB-1 C2 RB-1 C2 RB-1 C1 RB-1 C1 RB-1 C1 RB-1 C2 RB-1 C2 RB-1 C2 RB-1 C2 RB-1 C2 RB-1 C2 RB-1 C1
STRUCTURAL
5.00
5.00
RB-1
RB-2
RB-2
RB-2
RB-1
C1 C2 C1 C1 C1
E
S1 S1
5.00
5.00
RB-1
RB-2
RB-2
RB-2
RB-1
C1 C1 C2 C2 C1
D ELECTRICAL
RB-2
25.00
5.00
5.00
RB-1
RB-2
RB-2
RB-1
C1 C2 C2 C1
29.00
C1 C1
C
C1
S1 S1 RB-1 RB-1 RB-1 RB-1
RB-1
RB-1
5.00
5.00
RB-1
RB-1
RB-2
C2 C2 C2 C2 C1
B S1
SANITARY
RB-1
RB-1
5.00
5.00
RB-1
RB-2
RB-1
C1 C1 C2 C1 C1 C1
RB-1 RB-1
A
RB-1
4.00
RB-1
RB-2
RB-1 RB-1 RB-1 RB-1 RB-1 RB-1 RB-1 RB-1 RB-1 RB-1
ENRO
FROM THE OFFICE OF: DESIGNED BY: IN CHARGE OF CONSTRUCTION: PROJECT TITLE: SHEET CONTENTS: REVISIONS: SHEET NUMBER:
A PROPOSED 3-STOREY
PRC NO:
VALIDITY:
ARCHITECT
PTR NO:
DATE ISSUED:
PRC NO:
VALIDITY:
PTR NO:
DATE ISSUED:
OWNER/ REPRESENTATIVE:
HOTEL BUILDING
AS SHOWN ABOVE S2
TIN: PLACE ISSUED: TIN: PLACE ISSUED:
ADDRESS:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
F C1 GB-1 C2 GB-1 C2 GB-1 C2 GB-1 C2 GB-1 C1 GB-1 C1 GB-1 C1 GB-1 C2 GB-1 C2 GB-1 C1 GB-1 C1 GB-1 C1 GB-1 C1 GB-1 C1
GB-3
GB-3
GB-1
GB-1
GB-3
GB-1
5.00
5.00
GB-3
5.00
GB-3
GB-3
GB-3
GB-3
GB-1
GB-3
GB-3
GB-1
C1 GB-2 C2 GB-2 C2 GB-2 C2 GB-2 C2 GB-2 C2 GB-2 C2 GB-2 C2 GB-2 C2 GB-2 C2 GB-2 C1 C1 C1 GB-2 C2 GB-2 C1 PROCESSED BY DUMAGUETE CITY, NEGROS ORIENTAL
E GB-1 GB-1
GB-3
GB-3
GB-3
GB-3
GB-3
GB-3
GB-3
GB-3
GB-1
GB-3
GB-3
5.00
5.00
5.00
GB-1
GB-3
GB-3
GB-3
C1 GB-2 C2 GB-2 C2 GB-2 C2 GB-2 C2 GB-2 C1 GB-2 C1 GB-2 C1 GB-2 C2 GB-2 C2 GB-2 C2 GB-2 C2 GB-2 C2 GB-2 C2 GB-2 C1
D
GB-3
GB-3
GB-3
GB-3
GB-3
25.00
25.00
GB-3
GB-3
GB-3
GB-3
GB-3
GB-3
5.00
5.00
5.00
GB-1
GB-3
GB-3
GB-1
C1 GB-2 C2 GB-2 C2 GB-2 C2 GB-2 C2 GB-2 C1 GB-2 C1 GB-2 C1 GB-2 C2 GB-2 C2 GB-2 C1 GB-1 C2 GB-1 C1 GB-2 C2 GB-2 C1
C
GB-3
5.00
5.00
5.00
GB-3
GB-1
GB-1
GB-3
GB-1
GB-1
GB-3
GB-3
GB-3
GB-3
GB-3
GB-3
GB-3
C2 GB-2 C2 GB-2 C2 GB-2 C2 GB-2 C2 GB-2 C2 GB-2 C2 GB-2 C2 GB-2 C2 GB-2 C2 GB-2 C2 C2 GB-2 C2 GB-2 C1
B
GB-3
GB-1
GB-1
GB-3
GB-3
GB-1
5.00
5.00
GB-3
GB-3
5.00
GB-3
GB-3
GB-3
LAND USE AND ZONING
GB-1
GB-3
GB-3
C1 GB-1 C2 GB-1 C2 GB-1 C2 GB-1 C2 GB-1 C1 GB-1 C1 GB-1 C1 GB-1 C2 GB-1 C2 GB-1 C2 C1 GB-1 C1 GB-1 C1
REVIEWED BY
A
6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 5.00 6.00 6.00
60.00 11.00 12.00
83.00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
ARCHITECTURAL
83.00
6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 5.00 6.00 6.00
F C1 FB-1 C2 FB-1 C2 FB-1 C2 FB-1 C2 FB-1 C1 FB-1 C1 FB-1 C1 FB-1 C2 FB-1 C2 FB-1 C1 FB-1 C1 FB-1 C1 FB-1 C1 FB-1 C1
FB-1
FB-1
FB-1
FB-1
5.00
5.00
STRUCTURAL
FB-1
FB-1
FB-1
FB-1
FB-1
FB-1
FB-1
FB-1
FB-1
FB-1
FB-1
C1 FB-1 C2 FB-1 C2 FB-1 C2 FB-1 C2 FB-1 C2 FB-1 C2 FB-1 C2 FB-1 C2 FB-1 C2 FB-1 C2 C2 C2 FB-1 C2 FB-1 C1
E FB-1 FB-1
5.00
5.00
FB-1
FB-1
FB-1
FB-1
FB-1
FB-1
FB-1
FB-1
FB-1
FB-1
FB-1
FB-1
FB-1
FB-1
FB-1
C1 FB-1 C2 FB-1 C2 FB-1 C2 FB-1 C2 FB-1 C1 FB-1 C1 FB-1 C1 FB-1 C2 FB-1 C2 FB-1 C2 FB-1 C2 FB-1 C2 FB-1 C2 FB-1 C1
D
25.00
FB-1
FB-1
FB-1
FB-1
5.00
5.00
ELECTRICAL
FB-1
FB-1
FB-1
FB-1
FB-1
FB-1
FB-1
FB-1
FB-1
FB-1
FB-1
29.00
C1 FB-1 C2 FB-1 C2 FB-1 C2 FB-1 C2 FB-1 C1 FB-1 C1 FB-1 C1 FB-1 C2 FB-1 C2 FB-1 C1 FB-1 C1 FB-1 C1 FB-1 C2 FB-1 C1
C
5.00
5.00
FB-1
FB-1
FB-1
FB-1
FB-1
FB-1
FB-1
FB-1
FB-1
FB-1
FB-1
FB-1
FB-1
FB-1
C2 FB-1 C2 FB-1 C2 FB-1 C2 FB-1 C2 FB-1 C2 FB-1 C2 FB-1 C2 FB-1 C2 FB-1 C2 FB-1 C1 C1 FB-1 C2 FB-1 C1
B
FB-1
FB-1
FB-1
FB-1
5.00
5.00
FB-1
FB-1
FB-1
FB-1
FB-1
FB-1
FB-1
SANITARY
FB-1
FB-1
FB-1
C1 FB-1 C2 FB-1 C2 FB-1 C2 FB-1 C2 FB-1 C1 FB-1 C1 FB-1 C1 FB-1 C2 FB-1 C2 FB-1 C1 C1 FB-1 C1 FB-1 C1
A
4.00
FB-1
FB-1
FB-1
FB-1
FB-1
FB-1
FB-1
FB-1
FB-1
FB-1
FB-1
FB-1 FB-1 FB-1 FB-1 FB-1 FB-1 FB-1 FB-1 FB-1 FB-1
6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 5.00 6.00 6.00
60.00 11.00 12.00
83.00 FIRE DEPARTMENT
2ND FLOOR BEAM PLAN
1:500
ENRO
FROM THE OFFICE OF: DESIGNED BY: IN CHARGE OF CONSTRUCTION: PROJECT TITLE: SHEET CONTENTS: REVISIONS: SHEET NUMBER:
A PROPOSED 3-STOREY
PRC NO:
VALIDITY:
ARCHITECT
PTR NO:
DATE ISSUED:
PRC NO:
VALIDITY:
PTR NO:
DATE ISSUED:
OWNER/ REPRESENTATIVE:
HOTEL BUILDING
AS SHOWN ABOVE S3
TIN: PLACE ISSUED: TIN: PLACE ISSUED:
ADDRESS:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
83.00
6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 5.00 6.00 6.00
F C1 FB-2 C2 FB-2 C2 FB-2 C2 FB-2 C2 FB-2 C1 FB-2 C1 FB-2 C1 FB-2 C2 FB-2 C2 FB-2 C2 FB-2 C2 FB-2 C2 FB-2 C2 FB-2 C1
5.00
5.00
FB-2
FB-2
FB-2
FB-2
FB-2
FB-2
FB-2
FB-2
FB-2
FB-2
FB-2
FB-2
FB-2
FB-2
FB-2
C1 FB-3 C2 FB-3 C2 FB-3 C2 FB-3 C2 FB-3 C2 FB-3 C2 FB-3 C2 FB-3 C2 FB-3 C2 FB-3 C1 FB-3 C2 FB-3 C1 FB-3 C2 FB-3 C1
E
FB-2
5.00
5.00
FB-2
FB-2
FB-2
FB-2
FB-2
FB-2
FB-2
FB-2
FB-2
FB-2
FB-2
FB-2
FB-2
FB-2
C1 FB-3 C2 FB-3 C2 FB-3 C2 FB-3 C2 FB-3 C1 FB-3 C1 FB-3 C1 FB-3 C2 FB-3 C2 FB-3 C2 FB-3 C2 FB-3 C2 FB-3 C2 FB-3 C1
D
25.00
FB-2
5.00
5.00
FB-2
FB-2
FB-2
FB-2
FB-2
FB-2
FB-2
FB-2
FB-2
FB-2
FB-2
FB-2
FB-2
FB-2
29.00
C1 FB-3 C2 FB-3 C2 FB-3 C2 FB-3 C2 FB-3 C1 FB-3 C1 FB-3 C1 FB-3 C2 FB-3 C2 FB-3 C2 FB-2 C2 FB-2 C2 FB-3 C2 FB-3 C1
C
FB-2
FB-2
FB-2
FB-2
FB-2
FB-2
FB-2
FB-2
FB-2
FB-2
FB-2
FB-2
FB-2
FB-2
5.00
5.00
C2 FB-3 C2 FB-3 C2 FB-3 C2 FB-3 C2 FB-3 C2 FB-3 C2 FB-3 C2 FB-3 C2 FB-3FB-3 C2 FB-3FB-3 C2 C2 FB-3 C2 FB-3 C1
B
REVIEWED BY LAND USE AND ZONING
FB-2
FB-2
FB-2
FB-2
FB-2
FB-2
FB-2
FB-2
FB-2
FB-2
FB-2
FB-2
FB-2
FB-2
5.00
5.00
C1 FB-3 C2 FB-3 C2 FB-3 C2 FB-3 C2 FB-3 C1 FB-3 C1 FB-3 C1 FB-3 C2 FB-3
FB-3 C2 FB-3
FB-3 C2 C2 FB-2 C1 FB-2 C1
A
FB-2
4.00
FB-2
FB-2
FB-2
FB-2
FB-2
FB-2
FB-2
FB-2
FB-2
FB-2
FB-2 FB-2 FB-2 FB-2 FB-2 FB-2 FB-2 FB-2 FB-2 FB-2
6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 5.00 6.00 6.00
60.00 11.00 12.00 LINE AND GRADE
83.00
ARCHITECTURAL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
83.00
6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 5.00 6.00 6.00
F
STRUCTURAL
C1 RB-1 C2 RB-1 C2 RB-1 C2 RB-1 C2 RB-1 C1 RB-1 C1 RB-1 C1 RB-1 C2 RB-1 C2 RB-1 C2 RB-1 C2 RB-1 C2 RB-1 C2 RB-1 C1
5.00
5.00
RB-1
RB-2
RB-2
RB-2
RB-2
RB-2
RB-2
RB-2
RB-2
RB-2
RB-2
RB-2
RB-2
RB-2
RB-1
C1 RB-1 C2 RB-1 C2 RB-1 C2 RB-1 C2 RB-1 C2 RB-1 C2 RB-1 C2 RB-1 C2 RB-1 C2 RB-1 C1 RB-1 C2 RB-1 C1 RB-1 C2 RB-1 C1
E
5.00
5.00
RB-1
RB-2
RB-2
RB-2
RB-2
RB-2
RB-2
RB-2
RB-2
RB-2
RB-2
RB-2
RB-2
RB-2
ELECTRICAL
RB-1
C1 RB-1 C2 RB-1 C2 RB-1 C2 RB-1 C2 RB-1 C1 RB-1 C1 RB-1 C1 RB-1 C2 RB-1 C2 RB-1 C2 RB-1 C2 RB-1 C2 RB-1 C2 RB-1 C1
D
25.00
5.00
5.00
RB-1
RB-2
RB-2
RB-2
RB-2
RB-2
RB-2
RB-2
RB-2
RB-2
RB-2
RB-2
RB-2
RB-2
RB-1
C2 C2 RB-1 C2 C2 C1 C1 C1 C2 C1 C2 C1
29.00
C1 RB-1 RB-1 RB-1 RB-1 RB-1 RB-1 RB-1 C2 RB-1 C2 RB-1 C1 RB-1 RB-1 RB-1 RB-1
C
RB-1
RB-2
RB-1
5.00
5.00
RB-1
RB-1
RB-2
RB-2
RB-2
RB-2
RB-2
RB-2
RB-2
RB-2
C2 RB-1 C2 RB-1 C2 RB-1 C2 RB-1 C2 RB-1 C2 RB-1 C2 RB-1 C2 RB-1 C2 RB-1 RB-2
C2 RB-1 C2 C2 RB-1 C2 RB-1 C1 SANITARY
B
RB-1
RB-1
5.00
5.00
RB-1
RB-2
RB-2
RB-2
RB-2
RB-2
RB-2
RB-2
RB-2
RB-2
RB-1
RB-2
C1 RB-1 C2 RB-1 C2 RB-1 C2 RB-1 C2 RB-1 C1 RB-1 C1 RB-1 C1 RB-1 C2 RB-1 C2 RB-1 C2 C1 C1 C1
RB-1 RB-1
A
RB-1
4.00
RB-1
RB-2
RB-2
RB-2
RB-2
RB-2
RB-2
RB-2
RB-2
RB-2
RB-1 RB-1 RB-1 RB-1 RB-1 RB-1 RB-1 RB-1 RB-1 RB-1
6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 5.00 6.00 6.00
FIRE DEPARTMENT
60.00 11.00 12.00
83.00
ENRO
FROM THE OFFICE OF: DESIGNED BY: IN CHARGE OF CONSTRUCTION: PROJECT TITLE: SHEET CONTENTS: REVISIONS: SHEET NUMBER:
A PROPOSED 3-STOREY
PRC NO:
VALIDITY:
ARCHITECT
PTR NO:
DATE ISSUED:
PRC NO:
VALIDITY:
PTR NO:
DATE ISSUED:
OWNER/ REPRESENTATIVE:
HOTEL BUILDING
AS SHOWN ABOVE S4
TIN: PLACE ISSUED: TIN: PLACE ISSUED:
ADDRESS:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
83.00
OFFICE OF THE BUILDING OFFICIAL
6.00 6.00 6.00 6.06 5.94 6.00 6.00 6.00 6.00 6.00 6.00 5.00 6.00 6.00
6.00 2.00 3.00 1.20 4.80 0.00 2.50 3.50
FIRE EXIT
5.00
5.00
STORAGE ROOM PANTRY
KITCHEN
E FUNCTION ROOM
(60 SQM)
FUNCTION ROOM
(60 SQM)
FUNCTION ROOM
(60 SQM)
FUNCTION ROOM
(60 SQM)
FUNCTION ROOM
(60 SQM)
FUNCTION ROOM
(60 SQM)
FUNCTION ROOM
(60 SQM)
FUNCTION ROOM
(60 SQM)
FUNCTION ROOM
(60 SQM)
FUNCTION ROOM
(60 SQM)
PROCESSED BY DUMAGUETE CITY, NEGROS ORIENTAL
FEMALE CR
15.00
RESTAURANT
5.00
5.00
ADMIN OFFICE MALE CR
2.00
HALLWAY
25.00
25.00
5.00
HALLWAY
C 3.00
FUNCTION ROOM FUNCTION ROOM FUNCTION ROOM FUNCTION ROOM FUNCTION ROOM RECEPTION AREA
(96 SQM) (96 SQM) (96 SQM) (96 SQM) (96 SQM)
5.00
5.00
LOBBY
10.00
B
COMMERCIAL SPACE COMMERCIAL SPACE COMMERCIAL SPACE COMMERCIAL SPACE COMMERCIAL SPACE COMMERCIAL SPACE COMMERCIAL SPACE COMMERCIAL SPACE COMMERCIAL SPACE COMMERCIAL SPACE
5.00
5.00
ELEV ELEV
2.00
ENTRANCE
6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 11.00 12.00 2.00
60.00 23.00
83.00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
83.00
ARCHITECTURAL
6.00 6.00 6.00 6.06 5.94 6.00 6.00 6.00 6.00 6.00 6.00 5.00 6.00 6.00
3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
FIRE EXIT
STRUCTURAL
4.40
5.00
5.00
5.00
STORAGE
MALE CR
0.60
E FEMALE CR
2.00
3.80
5.00
5.00
3.00
1.20
D GYM
3.00
ELECTRICAL
25.00
5.00
5.00
5.00
2.00
29.00
C
2.00
FIRE EXIT
5.00
5.00
10.00
B
6.00
OPEN MEZZANINE
SANITARY
5.00
5.00
ELEV ELEV
2.00
2.00
4.00
4.00
3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
ENRO
FROM THE OFFICE OF: DESIGNED BY: IN CHARGE OF CONSTRUCTION: PROJECT TITLE: SHEET CONTENTS: REVISIONS: SHEET NUMBER:
A PROPOSED 3-STOREY
PRC NO:
VALIDITY:
ARCHITECT
PTR NO:
DATE ISSUED:
PRC NO:
VALIDITY:
PTR NO:
DATE ISSUED:
OWNER/ REPRESENTATIVE:
HOTEL BUILDING
AS SHOWN ABOVE S5
TIN: PLACE ISSUED: TIN: PLACE ISSUED:
ADDRESS: 4 OF 5
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 OFFICE OF THE BUILDING OFFICIAL
83.00
6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 5.00 6.00 6.00
3.00 6.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 5.00 3.00 3.00 3.00 3.00
4.40
5.00
5.00
5.00
MALE CR
PROCESSED BY DUMAGUETE CITY, NEGROS ORIENTAL
0.60
E FEMALE CR
2.00
3.80
5.00
5.00
3.00
1.20
D
25.00
5.00
5.00
5.00
C 29.00
2.00
5.00
5.00
MEZZANINE
B
6.00
5.00
5.00
ELEV ELEV
REVIEWED BY LAND USE AND ZONING
2.00
A
4.00
3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00
60.00
83.00
11.00 12.00 LINE AND GRADE
F
150MM DIA PVC PIPE (SOIL PIPE)
FIRE EXIT
5.00
5.00
STORAGE ROOM PANTRY
KITCHEN
E FUNCTION ROOM FUNCTION ROOM FUNCTION ROOM FUNCTION ROOM FUNCTION ROOM FUNCTION ROOM FUNCTION ROOM FUNCTION ROOM FUNCTION ROOM FUNCTION ROOM
(60 SQM) (60 SQM) (60 SQM) (60 SQM) (60 SQM) (60 SQM) (60 SQM) (60 SQM) (60 SQM) (60 SQM)
FEMALE CR
15.00
RESTAURANT
5.00
5.00
ADMIN OFFICE MALE CR
ELECTRICAL
D
2.00
HALLWAY
25.00
25.00
5.00
SV HALLWAY
3.00
WP
SV
C RECEPTION AREA
FUNCTION ROOM FUNCTION ROOM FUNCTION ROOM FUNCTION ROOM FUNCTION ROOM
(96 SQM) (96 SQM) (96 SQM) (96 SQM) (96 SQM)
5.00
5.00
LOBBY SANITARY
10.00
B
COMMERCIAL SPACE COMMERCIAL SPACE COMMERCIAL SPACE COMMERCIAL SPACE COMMERCIAL SPACE COMMERCIAL SPACE COMMERCIAL SPACE COMMERCIAL SPACE COMMERCIAL SPACE COMMERCIAL SPACE
5.00
5.00
ELEV ELEV
A
1.95
2.00
CO CO ENTRANCE
ENRO
FROM THE OFFICE OF: DESIGNED BY: IN CHARGE OF CONSTRUCTION: PROJECT TITLE: SHEET CONTENTS: REVISIONS: SHEET NUMBER:
A PROPOSED 3-STOREY
PRC NO:
VALIDITY:
ARCHITECT
PTR NO:
DATE ISSUED:
PRC NO:
VALIDITY:
PTR NO:
DATE ISSUED:
OWNER/ REPRESENTATIVE:
HOTEL BUILDING
AS SHOWN ABOVE S6
TIN: PLACE ISSUED: TIN: PLACE ISSUED:
ADDRESS:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
OFFICE OF THE BUILDING OFFICIAL
83.00
6.00 6.00 6.00 6.06 5.94 6.00 6.00 6.00 6.00 6.00 6.00 5.00 6.00 6.00
3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
FIRE EXIT
4.40
5.00
5.00
5.00
STORAGE
MALE CR
PROCESSED BY DUMAGUETE CITY, NEGROS ORIENTAL
0.60
E CO SV
FEMALE CR
2.00
CO SV
3.80
CO
5.00
5.00
3.00
1.20
D GYM
3.00
25.00
5.00
5.00
5.00
2.00
29.00
C CO SVCO SV
2.00
CO SV
CO SV
FIRE EXIT
5.00
5.00
10.00
B
6.00
MEZZANINE
5.00
5.00
CO SV ELEV ELEV
LAND USE AND ZONING
2.00
A CO SVCO SV
REVIEWED BY
4.00
4.00
WC WC WC
LAV LAV LAV
CO CO CO
3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 11.00 12.00
60.00
83.00
23.00
LINE AND GRADE
2ND FLOOR DRAINAGE LAYOUT
1:500
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
ARCHITECTURAL
83.00
6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 5.00 6.00 6.00
3.00 6.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 5.00 3.00 3.00 3.00 3.00
CO SV 150MM DIA PVC PIPE (SOIL PIPE)
F STRUCTURAL
5.00
5.00
MALE CR
E CO SV
FEMALE CR
2.00
SV
CO SVCO
5.00
3.00
D ELECTRICAL
5.00
5.00
29.00
C CO SV
2.00
SV
COCO SV
5.00
B MEZZANINE
SANITARY
6.00
5.00
CO SV ELEV ELEV
2.00
CO SV
A
CO CO
4.00
WC WC WC
LAV LAV LAV
CO
3.00
CO
3.00
CO
3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
FIRE DEPARTMENT
6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00
60.00 11.00 12.00
83.00
A PROPOSED 3-STOREY
PRC NO:
VALIDITY:
ARCHITECT
PTR NO:
DATE ISSUED:
PRC NO:
VALIDITY:
PTR NO:
DATE ISSUED:
OWNER/ REPRESENTATIVE:
HOTEL BUILDING
AS SHOWN ABOVE S7
TIN: PLACE ISSUED: TIN: PLACE ISSUED:
ADDRESS:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
UP
UP
F
PROCESSED BY DUMAGUETE CITY, NEGROS ORIENTAL
5.00
5.00
E
FEMALE CR
15.00
5.00
5.00
MALE CR
ADMIN OFFICE
D
2.00
25.00 HALLWAY
25.00
5.00
3.00
C
5.00
5.00
UP
10.00
B UP
REVIEWED BY LAND USE AND ZONING
5.00
5.00
ELEV ELEV
A
1.95
2.00
ENTRANCE
6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 11.00 12.00 2.00
60.00 23.00
83.00 LINE AND GRADE
1ST FLOOR SPRINKLER LAYOUT
1:500
ARCHITECTURAL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
83.00
6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 5.00 6.00 6.00
F STRUCTURAL
5.00
E
5.00
D ELECTRICAL
25.00
5.00
C
5.00
B SANITARY
5.00
A
4.00
FIRE DEPARTMENT
ENRO
FROM THE OFFICE OF: DESIGNED BY: IN CHARGE OF CONSTRUCTION: PROJECT TITLE: SHEET CONTENTS: REVISIONS: SHEET NUMBER:
A PROPOSED 3-STOREY
PRC NO:
VALIDITY:
ARCHITECT
PTR NO:
DATE ISSUED:
PRC NO:
VALIDITY:
PTR NO:
DATE ISSUED:
OWNER/ REPRESENTATIVE:
HOTEL BUILDING
AS SHOWN ABOVE S8
TIN: PLACE ISSUED: TIN: PLACE ISSUED:
ADDRESS: 5 OF 5
REPUBLIC OF THE PHILIPPINES
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 5.00 6.00 6.00
5.00
E PROCESSED BY DUMAGUETE CITY, NEGROS ORIENTAL
5.00
D
25.00
5.00
C
5.00
B
5.00
ARCHITECTURAL
1.00
L/4 L/2 L/2 UP
0.20
2.20
0.05
DN
1.05
1.00
1.00
10mm Ø BENT BARS
STRUCTURAL
L/2
PLAN
10mm Ø BEND BARS SPACED @ 300mm O.C. B.W. 50MM X50MM SQUARE PIPE SANITARY
10mm Ø CUT BARS SPACED @ 300mm
0.10
(on top of bottom straught bars) 25MM X 25MM SQUARE PIPE
0.30
10mm Ø BOTTOM BARS SPACED @ 300mm O.C.
10mm TOP BARS SPACED @ 300mm O.C.
0.18
SECTION
FIRE DEPARTMENT
ENRO
FROM THE OFFICE OF: DESIGNED BY: IN CHARGE OF CONSTRUCTION: PROJECT TITLE: SHEET CONTENTS: REVISIONS: SHEET NUMBER:
A PROPOSED 3-STOREY
PRC NO:
VALIDITY:
ARCHITECT
PTR NO:
DATE ISSUED:
PRC NO:
VALIDITY:
PTR NO:
DATE ISSUED:
HOTEL BUILDING
OWNER/ REPRESENTATIVE: AS SHOWN ABOVE S9
TIN: PLACE ISSUED: TIN: PLACE ISSUED:
ADDRESS:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
GB-1
12MM Ø HOOPS SPACED @ 8-135MM ; REST @ 135MM O.C.
0.45 0.45 0.45
0.35
0.35
0.35
3-16MM Ø RB BOT BARS 3-16MM Ø RB BOT BARS
@ SUPPORT @MIDSPAN @ SUPPORT
3-20MM Ø RB TOP BARS
3RD FLOOR FINISH FLOOR LINE 3-16MM Ø RB BOT BARS
FB-2
0.35
12MM Ø HOOPS SPACED @ 7-135MM ; REST @ 135MM O.C.
0.30 0.35 REVIEWED BY LAND USE AND ZONING
4-20MM Ø RB TOP BARS 4-20MM Ø RB TOP BARS
0.60
0.60
0.60
5-20MM Ø RB BOT BARS 5-20MM Ø RB BOT BARS
3.88
0.70
0.70
0.70
6-20MM Ø RB BOT BARS 6-20MM Ø RB BOT BARS
STRUCTURAL
(+300MM ELEV) GROUND FLOOR FINISH FLOOR LINE
0.30
0.40
W/ 16-25MM DIA VERTICAL BARS 100MM THK CHB RETAINING 100MM THK CHB RETAINING
WALL W/ 10MM DIA REBAR WALL W/ 10MM DIA REBAR
0.40
O.C. O.C.
(F-1) 350MM X 1020MM X 1020MM CLASS "A"
0.26
ENRO
FROM THE OFFICE OF: DESIGNED BY: IN CHARGE OF CONSTRUCTION: PROJECT TITLE: SHEET CONTENTS: REVISIONS: SHEET NUMBER:
A PROPOSED 3-STOREY
PRC NO:
VALIDITY:
ARCHITECT
PTR NO:
DATE ISSUED:
PRC NO:
VALIDITY:
PTR NO:
DATE ISSUED:
OWNER/ REPRESENTATIVE:
HOTEL BUILDING
AS SHOWN ABOVE S10
TIN: PLACE ISSUED: TIN: PLACE ISSUED:
ADDRESS: