CONSTRUCTION PROJECT

MANAGEMENT

INTRODUCTION

Project Management
Based on PMBOK Fifth Edition
INTRODUCTION

• Name
• Position
• Involvement in projects
• Expect to learn from the seminar

Project Management
Based on PMBOK Fifth Edition
Learning Objectives
✓ To enhance the Team’s PM
skills by providing a
structured approach to
project management.
(performance, vocabulary
and advocacy)

✓to align our work processes


with the PMI’s best practices.

Project Management
Based on PMBOK Fifth Edition
What is
PMI?
Project Management Institute is the world's
leading non-profit professional membership
association created for the project management
profession.
Globally recognized in promoting PM standards,
certifications and professional courses.

Project Management
Based on PMBOK Fifth Edition
PMBOK Guide

➢ The PMBOK provides the standard


for project management

➢ It also provides and promotes a


common vocabulary in the field of
project management.

Project Management
Based on PMBOK Fifth Edition
What is a
Project

A project is a temporary endeavour undertaken


to create a unique product, service, or result.

Project Management
Based on PMBOK Fifth Edition
WHAT IS A PROJECT?
PROJECTS BAU (ROUTINE / OPERATIONS)
• Temporary endeavor • Ongoing function/operation
• Defined start & finish dates specific to
• Process fulfilment on a repeatable basis
the project scope and goals
• Creates a new or enhanced product or • Creates the same product or service
service repeatedly
• Specific budget and schedule for the • Recurring operational expense/budget
specific project - non-recurring budget
• Maintains the status quo
• Operates outside the business
operations & often cross functional • Goals and deadlines are routine
• Vehicle for organizational change • Scope of work limited by the functional or
• Staffed with PM specialists and SME’s process boundary
from the business • Staffed by operational staff trained in the
business process
What is Project
Management?

Project management is the


application of knowledge, skills,
tools, and techniques to project
activities to meet the project
requirements.

Project Management
Based on PMBOK Fifth Edition
PROJECT
MANAGEMENT
PROCESS GROUPS

Project Management
Based on PMBOK Fifth Edition
KNOWLEDGE AREAS INITIATION PLANNING EXECUTION MONITORING AND CONTROL CLOSING
35. MONITOR AND CONTROL
1. DEVELOP PROJECT 3.DEVELOP PROJECT 27. DIRECT AND PROJECT WORK 46. CLOSE PROJECT OR
INTEGRATION
CHARTER MANAGEMENT PLAN MANAGE PROJECT 36. PERFORM INTEGRATED PHASE
WORK CHANGE CONTROL
4.PLAN SCOPE MANAGEMENT
5. COLLECT REQUIREMENTS 37. VALIDATE SCOPE
SCOPE
6. DEFINE SCOPE 38. CONTROL SCOPE
7. CREATE WBS
8.PLAN SCHEDULE MANAGEMENT
9. DEFINE ACTIVITIES 39. CONTROL
10.SEQUENCE ACTIVITIES SCHEDULE
TIME 11.ESTIMATE ACTIVITY
RESOURCES
12.ESTIMATE ACTIVITY DURATIONS
13.DEVELOP SCHEDULE
14. PLAN COST MANAGEMENT
COST 15. ESTIMATE COSTS 40. CONTROL COSTS
16. DETERMINE BUDGET
17. PLAN QUALITY MANAGEMENT 28. PERFORM QUALITY 41. CONTROL QUALITY
QUALITY
ASSURANCE
29. ACQUIRE PROJECT
18. PLAN HUMAN RESOURCE TEAM
HUMAN RESOURCE MANAGEMENT 30. DEVELOP PROJECT
MANAGEMENT TEAM
31. MANAGE PROJECT
TEAM
19. PLAN COMMUNICATIONS 32. MANAGE 42. CONTROL
COMMUNICATIONS MANAGEMENT COMMUNICATIONS COMMUNICATION
MANAGEMENT
20. PLAN RISK MANAGEMENT
21. IDENTIFY RISKS 43. CONTROL RISKS
22. PERFORM QUALITATIVE RISK
ANALYSIS
RISK MANAGEMENT
23. PERFORM QUANTITATIVE RISK
ANALYSIS
24. PLAN RISK RESPONSES

PROCUREMENT 25. PLAN PROCUREMENT 33. CONDUCT 44. CONTROL 47. CLOSE
MANAGEMENT PROCUREMENTS PROCUREMENTS PROCUREMENTS

Project Management
STAKEHOLDER
2. IDENTIFY
STAKEHOLDERS
26. PLAN STAKEHOLDER
MANAGEMENT
34. MANAGE
STAKEHOLDER
ENGAGEMENT
45. CONTROL STAKEHOLDER

Based on PMBOK Fifth Edition


5 PROJECT MANAGEMENT PROCESS GROUP

Project Management
Based on PMBOK Fifth Edition
KNOWLEDGE
AREAS

Project Management
Based on PMBOK Fifth Edition
10 KNOWLEDGE AREAS

A Knowledge Area represents a complete


set of concepts, terms, and activities that
make up a professional field, project
management field, or area of
specialization.

Project Management
Based on PMBOK Fifth Edition
KNOWLEDGE AREAS INITIATION PLANNING EXECUTION MONITORING AND CONTROL CLOSING
35. MONITOR AND CONTROL
1. DEVELOP PROJECT 3.DEVELOP PROJECT 27. DIRECT AND PROJECT WORK 46. CLOSE PROJECT OR
INTEGRATION
CHARTER MANAGEMENT PLAN MANAGE PROJECT 36. PERFORM INTEGRATED PHASE
WORK CHANGE CONTROL
4.PLAN SCOPE MANAGEMENT
5. COLLECT REQUIREMENTS 37. VALIDATE SCOPE
SCOPE
6. DEFINE SCOPE 38. CONTROL SCOPE
7. CREATE WBS
8.PLAN SCHEDULE MANAGEMENT
9. DEFINE ACTIVITIES 39. CONTROL
10.SEQUENCE ACTIVITIES SCHEDULE
TIME 11.ESTIMATE ACTIVITY
RESOURCES
12.ESTIMATE ACTIVITY DURATIONS
13.DEVELOP SCHEDULE
14. PLAN COST MANAGEMENT
COST 15. ESTIMATE COSTS 40. CONTROL COSTS
16. DETERMINE BUDGET
17. PLAN QUALITY MANAGEMENT 28. PERFORM QUALITY 41. CONTROL QUALITY
QUALITY
ASSURANCE
29. ACQUIRE PROJECT
18. PLAN HUMAN RESOURCE TEAM
HUMAN RESOURCE MANAGEMENT 30. DEVELOP PROJECT
MANAGEMENT TEAM
31. MANAGE PROJECT
TEAM
19. PLAN COMMUNICATIONS 32. MANAGE 42. CONTROL
COMMUNICATIONS MANAGEMENT COMMUNICATIONS COMMUNICATION
MANAGEMENT
20. PLAN RISK MANAGEMENT
21. IDENTIFY RISKS 43. CONTROL RISKS
22. PERFORM QUALITATIVE RISK
ANALYSIS
RISK MANAGEMENT
23. PERFORM QUANTITATIVE RISK
ANALYSIS
24. PLAN RISK RESPONSES

PROCUREMENT 25. PLAN PROCUREMENT 33. CONDUCT 44. CONTROL 47. CLOSE
MANAGEMENT PROCUREMENTS PROCUREMENTS PROCUREMENTS

Project Management
STAKEHOLDER
2. IDENTIFY
STAKEHOLDERS
26. PLAN STAKEHOLDER
MANAGEMENT
34. MANAGE
STAKEHOLDER
ENGAGEMENT
45. CONTROL STAKEHOLDER

Based on PMBOK Fifth Edition


CONSTRUCTION EXTENSION

4 - Additional Knowledge Areas for Construction


Projects in PMBOK 2000 Edition

Project Management
Based on PMBOK 2000 Edition
KNOWLEDGE AREAS INITIATION PLANNING EXECUTION MONITORING AND CONTROL CLOSING

SAFETY PLANNING SAFETY PLAN


SAFETY MANAGEMENT ADMINISTRATION REPORTING
EXECUTION

ENVIRONMENTAL ENVIRONMENTAL PLANNING ENVIRONMENTAL ENVIRONMENTAL CONTROL


MANAGEMENT ASSURANCE

FINANACIAL CONTROL ADMINISTRATION AND


FINANCIAK MANAGEMENT FINANCIAL PLANNING RECORDS

CLAIM MANAGEMET CLAIM IDENTIFICATION CLAIIM PREVENTION CLAIM RESOLUTION


CLAIM QUANTIFICATION

Project Management
Based on PMBOK Fifth Edition
PROJECT MANAGEMENT PROCESSES

A process is a set of
interrelated actions and
activities performed to
create a pre-specified
product, service, or result.

Project Management
Based on PMBOK Fifth Edition
+ 13
PROCESSES

Project Management
Based on PMBOK Fifth Edition
KNOWLEDGE AREAS INITIATION PLANNING EXECUTION MONITORING AND CONTROL CLOSING
35. MONITOR AND CONTROL
1. DEVELOP PROJECT 3.DEVELOP PROJECT 27. DIRECT AND PROJECT WORK 46. CLOSE PROJECT OR
INTEGRATION
CHARTER MANAGEMENT PLAN MANAGE PROJECT 36. PERFORM INTEGRATED PHASE
WORK CHANGE CONTROL
4.PLAN SCOPE MANAGEMENT
5. COLLECT REQUIREMENTS 37. VALIDATE SCOPE
SCOPE
6. DEFINE SCOPE 38. CONTROL SCOPE
7. CREATE WBS
8.PLAN SCHEDULE MANAGEMENT
9. DEFINE ACTIVITIES 39. CONTROL
10.SEQUENCE ACTIVITIES SCHEDULE
TIME 11.ESTIMATE ACTIVITY
RESOURCES
12.ESTIMATE ACTIVITY DURATIONS
13.DEVELOP SCHEDULE
14. PLAN COST MANAGEMENT
COST 15. ESTIMATE COSTS 40. CONTROL COSTS
16. DETERMINE BUDGET
17. PLAN QUALITY MANAGEMENT 28. PERFORM QUALITY 41. CONTROL QUALITY
QUALITY
ASSURANCE
29. ACQUIRE PROJECT
18. PLAN HUMAN RESOURCE TEAM
HUMAN RESOURCE MANAGEMENT 30. DEVELOP PROJECT
MANAGEMENT TEAM
31. MANAGE PROJECT
TEAM
19. PLAN COMMUNICATIONS 32. MANAGE 42. CONTROL
COMMUNICATIONS MANAGEMENT COMMUNICATIONS COMMUNICATION
MANAGEMENT
20. PLAN RISK MANAGEMENT
21. IDENTIFY RISKS 43. CONTROL RISKS
22. PERFORM QUALITATIVE RISK
ANALYSIS
RISK MANAGEMENT
23. PERFORM QUANTITATIVE RISK
ANALYSIS
24. PLAN RISK RESPONSES

PROCUREMENT 25. PLAN PROCUREMENT 33. CONDUCT 44. CONTROL 47. CLOSE
MANAGEMENT PROCUREMENTS PROCUREMENTS PROCUREMENTS

Project Management
STAKEHOLDER
2. IDENTIFY
STAKEHOLDERS
26. PLAN STAKEHOLDER
MANAGEMENT
34. MANAGE
STAKEHOLDER
ENGAGEMENT
45. CONTROL STAKEHOLDER

Based on PMBOK Fifth Edition


KNOWLEDGE AREAS INITIATION PLANNING EXECUTION MONITORING AND CONTROL CLOSING

SAFETY PLANNING SAFETY PLAN


SAFETY MANAGEMENT ADMINISTRATION REPORTING
EXECUTION

ENVIRONMENTAL ENVIRONMENTAL PLANNING ENVIRONMENTAL ENVIRONMENTAL CONTROL


MANAGEMENT ASSURANCE

FINANACIAL CONTROL ADMINISTRATION AND


FINANCIAK MANAGEMENT FINANCIAL PLANNING RECORDS

CLAIM MANAGEMET CLAIM IDENTIFICATION CLAIIM PREVENTION CLAIM RESOLUTION


CLAIM QUANTIFICATION

Project Management
Based on PMBOK Fifth Edition
Process Data Flow Diagram

Project Management
Based on PMBOK Fifth Edition
Process Data Flow Diagram
TOOLS AND
INPUTS OUTPUTS
TECHNIQUES

Project Management
Based on PMBOK Fifth Edition
INPUTS

Any item, whether internal or


external to the project that is
required by a process before
that process proceeds.

Usually an output from the


predecessor process.

Project Quality Management


Based on PMBOK Fifth Edition
TOOLS AND TECHNIQUES

• Mechanisms applied to inputs


to create an output.
• Tools are something tangible
such as a template or software
• Techniques are systematic
procedures used to perform an
activity.

Project Quality Management


Based on PMBOK Fifth Edition
OUTPUTS

A product, result, or
service generated by
a process.
May be an input to a
successor process.

Project Quality Management


Based on PMBOK Fifth Edition
IMPORTANT INPUTS

Organizational Process Assets

Enterprise Environmental Factors

Project Management
Based on PMBOK Fifth Edition
Organizational Process Assets

Organizational process assets are


the plans, processes, policies,
procedures, and knowledge bases
specific to and used by the
performing organization.

Project Management
Based on PMBOK Fifth Edition
Categories
1. Processes and Procedures
2. Corporate Knowledge Base

Project Management
Based on PMBOK Fifth Edition
Enterprise Environmental Factors

Enterprise environmental factors


refer to conditions, not under the
control of the project team, that
influence, constrain, or direct the
project.
Project Management
Based on PMBOK Fifth Edition
Enterprise Environmental Factors

Factors include but are not limited


to;
➢ Organizational Culture
➢ Government or industry standards
➢ Political climate
➢ Marketplace condition

Project Management
Based on PMBOK Fifth Edition
Role of the Project Manager

The project manager is the


person assigned by the
performing organization to
lead the team that is
responsible for achieving the
project objectives.

Project Management
Based on PMBOK Fifth Edition
Project Management
Based on PMBOK Fifth Edition
Competencies of the Construction
Manager

➢Knowledge

➢Performance

➢Personal

Project Management
Based on PMBOK Fifth Edition
Responsibilities and Competencies of the Project Manager

Project Management
Based on PMBOK Fifth Edition
Interpersonal Skill
➢ Leadership
➢ Team building
➢ Motivation
➢ Communication
➢ Influencing
➢ Decision making
➢ Political and cultural awareness
➢ Negotiation
➢ Trust building
➢ Conflict management and
➢ Coaching / mentoring

Project Management
Based on PMBOK Fifth Edition
Boss, who is
our Project
Manager for
this project?

Project Management
Based on PMBOK Fifth Edition
Project Success

The Construction Manager is responsible and accountable for


setting realistic and achievable boundaries for the project
and to accomplish the project within the approved baselines.

Project Management
Based on PMBOK Fifth Edition
Organizational Influences on
Construction Project
Management

Project Management
Based on PMBOK Fifth Edition
Organizational Influences on Construction
Project Management

1. Organizational Cultures and Styles


2. Organizational Communications
3. Organizational Structures
4. Organizational process Assets
5. Enterprise Environment Factors

Project Management
Based on PMBOK Fifth Edition
Organizational Influences on Construction Project Management

1. Organizational Cultures and Styles

An organization’s culture and style affect


how it conducts projects. Cultures and
styles are group phenomena known as
cultural norms, which develop over time.

Project Management
Based on PMBOK Fifth Edition
1. Organizational Cultures and Styles

➢ Shared visions, mission, values, beliefs, and


expectations;
➢ Regulations, policies, methods, and procedures;
➢ Motivation and reward systems;
➢ Risk tolerance;
➢ View of leadership, hierarchy, and authority
relationships;
➢ Code of conduct, work ethic, and work hours; and
➢ Operating environments.

Project Management
Based on PMBOK Fifth Edition
Organizational Influences on Construction Project Management

2. Organizational Communications

Project management success in an


organization is highly dependent on an
effective organizational communication
style, especially in the face of globalization
of the project management profession.

Project Management
Based on PMBOK Fifth Edition
Organizational Influences on Construction Project Management

3. Organizational Structures

Organizational structure is an enterprise


environmental factor, which can affect
the availability of resources and
influence how projects are conducted

Project Management
Based on PMBOK Fifth Edition
Organizational Structures

➢Functional
➢Weak Matrix
➢Balanced Matrix
➢Strong matrix
➢Projectized

Project Management
Based on PMBOK Fifth Edition
Organizational Structures

Project Management
Based on PMBOK Fifth Edition
Organizational Structures

Weak matrix organizations maintain many of the characteristics of a functional


organization, and the role of the project manager is more of a coordinator or
expediter.

Project Management
Based on PMBOK Fifth Edition
Organizational Structures

Project coordinators have power to make some decisions, have some


authority, and report to a higher-level manager.

Project Management
Based on PMBOK Fifth Edition
Organizational Structures

Strong matrix organizations have many of the characteristics of the projectized


organization, and have full-time project managers with considerable authority and
full-time project administrative staff.

Project Management
Based on PMBOK Fifth Edition
Organizational Structures

Most of the organization’s resources are involved in project work, and project
managers have a great deal of independence and authority.

Project Management
Based on PMBOK Fifth Edition
Organizational Structures

An organization may manage most of its projects in a strong matrix, but allow
small projects to be managed by functional departments

Project Management
Based on PMBOK Fifth Edition
KNOWLEDGE AREAS INITIATION PLANNING EXECUTION MONITORING AND CONTROL CLOSING
35. MONITOR AND CONTROL
1. DEVELOP PROJECT 3.DEVELOP PROJECT 27. DIRECT AND PROJECT WORK 46. CLOSE PROJECT OR
INTEGRATION
CHARTER MANAGEMENT PLAN MANAGE PROJECT 36. PERFORM INTEGRATED PHASE
WORK CHANGE CONTROL
4.PLAN SCOPE MANAGEMENT
5. COLLECT REQUIREMENTS 37. VALIDATE SCOPE
SCOPE
6. DEFINE SCOPE 38. CONTROL SCOPE
7. CREATE WBS
8.PLAN SCHEDULE MANAGEMENT
9. DEFINE ACTIVITIES 39. CONTROL
10.SEQUENCE ACTIVITIES SCHEDULE
TIME 11.ESTIMATE ACTIVITY
RESOURCES
12.ESTIMATE ACTIVITY DURATIONS
13.DEVELOP SCHEDULE
14. PLAN COST MANAGEMENT
COST 15. ESTIMATE COSTS 40. CONTROL COSTS
16. DETERMINE BUDGET
17. PLAN QUALITY MANAGEMENT 28. PERFORM QUALITY 41. CONTROL QUALITY
QUALITY
ASSURANCE
29. ACQUIRE PROJECT
18. PLAN HUMAN RESOURCE TEAM
HUMAN RESOURCE MANAGEMENT 30. DEVELOP PROJECT
MANAGEMENT TEAM
31. MANAGE PROJECT
TEAM
19. PLAN COMMUNICATIONS 32. MANAGE 42. CONTROL
COMMUNICATIONS MANAGEMENT COMMUNICATIONS COMMUNICATION
MANAGEMENT
20. PLAN RISK MANAGEMENT
21. IDENTIFY RISKS 43. CONTROL RISKS
22. PERFORM QUALITATIVE RISK
ANALYSIS
RISK MANAGEMENT
23. PERFORM QUANTITATIVE RISK
ANALYSIS
24. PLAN RISK RESPONSES

PROCUREMENT 25. PLAN PROCUREMENT 33. CONDUCT 44. CONTROL 47. CLOSE
MANAGEMENT PROCUREMENTS PROCUREMENTS PROCUREMENTS

Project Management
STAKEHOLDER
2. IDENTIFY
STAKEHOLDERS
26. PLAN STAKEHOLDER
MANAGEMENT
34. MANAGE
STAKEHOLDER
ENGAGEMENT
45. CONTROL STAKEHOLDER

Based on PMBOK Fifth Edition