Sei sulla pagina 1di 12

LOG SHEET OF DIVERSIFIED TRAINING FOR ARCHITECTS LICENSURE EXAMINATION

SUMMARY

FIELD OF PRACTICE MINIMUM


% (MAX) CREDIT HOURS TOTAL NO. OF HOURS
ACCOMPLISHED
balance/excess

ARCHITECTURAL DESIGNING/DRAFTING, STRUCTURAL


CONCEPTUALIZATION, PLANNING & THE LIKE 30% 1152 1188 A 36

PREPARATION OF CONTRACT DOCUMENTS,


SPECIFICATION WRITING, BILL OF MATERIALS, COST
ESTIMATES, GENERAL CONDITIONS, BIDDING 25% 960 1008 B 48
DOCUMENTS, CLERK OF WORKS AND THE LIKE

FIELD SUPERINTEDENCE, PROJECT MANAGEMENT


ADMINISTRATION & THE LIKE 15% 576 608 C 32

TECHNICAL, ECONOMIC AND FINANCIAL FEASIBILITY


STUDIES, PROJECT PROMOTIONAL, PRE-DESIGN & THE
LIKES
10% 384 400 D 16

ARCHITECTURAL LAY-OUTING OF MECHANICAL


ELECTRICAL, ELECTRONIC, SANITARY, PLUMBING,
COMMUNICATIONS AND OTHER UTILITY SYSTEMS,
EQUIPMENT AND FIXTURES ARCH'L LIGTHING,
10% 384 432 E 48
ACOUSTICS AND ALLIED FIELD OF PRACTICE

ARCHITECTURAL INTERIORS/SPACE PLANNING,


RESTORATION/PRESERVATION AND OTHER ANCILLARY
SERVICES
10% 384 424 F 40

TOTAL 3840 4060 220

PERIOD COVERED Corresponding Number of hours of Described


PROJECT TITLE/DESCRIPTION & LOCATION FROM TO Training (FOP)
Day Mo. Yr. Day Mo. Yr. A B C D E
CCMC 29 5 17 29 8 17 608

UC LAPU-LAPU 30 8 17 18 11 17
30 8 17 26 10 17 400
26 10 17 18 11 17 160
UC BANILAD 20 10 17 29 12 17 272

VELEZ 2 1 18 20 1 18 136

MODEQUILLO CLINIC 22 1 18 17 3 18
22 1 18 17 2 18 192
17 2 18 12 3 18 160
12 3 18 17 3 18

TOTAL NO OF HOURS 328 272 608 400 320

PERIOD COVERED Corresponding Number of hours of Described


FROM TO Training (FOP)
Day Mo. Yr. Day Mo. Yr. A B C D E
MANDAUE CIVIC CENTER 19 3 18 12 5 18
19 3 18 3 4 18 112
3 4 18 12 5 18 272

ARC HOSPITAL 14 5 18 19 6 18 256

VSMMC BRAIN CENTER 20 6 18 29 9 18


20 6 18 30 9 18 492
30 8 18 29 9 18

EMALL RENOVATION 1 10 18 31 10 18 216

GOOD RIDE AUTO 1 11 18 22 11 18 152

TOTAL NO OF HOURS
860 528 112

PERIOD COVERED Corresponding Number of hours of Described


PROJECT TITLE/DESCRIPTION & LOCATION FROM TO Training (FOP)
Day Mo. Yr. Day Mo. Yr. A B C D E
JESUIT RETREAT HOUSE 23 11 18 28 1 19
23 11 18 26 12 19 208
26 12 19 28 1 19

TOTAL NO OF HOURS
208

PERIOD COVERED Corresponding Number of hours of Described


PROJECT TITLE/DESCRIPTION & LOCATION FROM TO Training (FOP)
Day Mo. Yr. Day Mo. Yr. A B C D E
TOTAL NO OF HOURS

PERIOD COVERED Corresponding Number of hours of Described


PROJECT TITLE/DESCRIPTION & LOCATION FROM TO Training (FOP)
Day Mo. Yr. Day Mo. Yr. A B C D E

TOTAL NO OF HOURS

PERIOD COVERED Corresponding Number of hours of Described


PROJECT TITLE/DESCRIPTION & LOCATION FROM TO Training (FOP)
Day Mo. Yr. Day Mo. Yr. A B C D E
TOTAL NO OF HOURS

PERIOD COVERED Corresponding Number of hours of Described


PROJECT TITLE/DESCRIPTION & LOCATION FROM TO Training (FOP)
Day Mo. Yr. Day Mo. Yr. A B C D E

TOTAL NO OF HOURS

PERIOD COVERED Corresponding Number of hours of Described


PROJECT TITLE/DESCRIPTION & LOCATION FROM TO Training (FOP)
Day Mo. Yr. Day Mo. Yr. A B C D E
TOTAL NO OF HOURS
TION

balance/excess

36

48

DAEBFC
32

16

48

A B C D E F
40
368 110.4 92 55.2 36.8 36.8 36.8
220

hours of Described Total No.


OP) of hours CALCULATOR
F 34
NO. OF DAYS

HOURS PER DAY 8


TOTAL
32

hours of Described Total No.


OP) of hours CALCULATOR 76
F
NO. OF DAYS 20
HOURS PER DAY 8
TOTAL 160

DAEBFC

216

216
47
hours of Described Total No.
OP) of hours CALCULATOR
F
NO. OF DAYS 26
HOURS PER DAY 8
208
HOURS PER DAY 8
47
TOTAL 208 17

208

hours of Described Total No.


OP) of hours CALCULATOR
F
NO. OF DAYS

HOURS PER DAY 8


TOTAL
hours of Described Total No.
OP) of hours CALCULATOR
F
NO. OF DAYS

HOURS PER DAY 8


TOTAL

hours of Described Total No.


OP) of hours CALCULATOR
F
NO. OF DAYS

HOURS PER DAY 8


TOTAL
hours of Described Total No.
OP) of hours CALCULATOR
F
NO. OF DAYS

HOURS PER DAY 8


TOTAL

hours of Described Total No.


OP) of hours CALCULATOR
F
NO. OF DAYS

HOURS PER DAY 8


TOTAL
TOTAL

Potrebbero piacerti anche