BEDROOM-1 KEY NO. BEDROOM-2 KEY NO. COMMON T&B KEY NO. MASTER T&B KEY NO. UTILITY T&B KEY NO. UTILITY ROOM KEY NO. REMARKS
PROJECT : ONE WILSON SQUARE
LOCATION : Wilson St. Cor. Ortigas Ave., Greenhills San Juan City DATE : SEPTEMBER 22, 2
MASTER MASTER
FLOOR / MAIN DOOR BEDROOM KEY BEDROOM-1 BEDROOM-2 COMMON T&B KEY
UNIT KEY NO. KEY NO. KEY NO. T&B KEY NO.
NO. NO.
***NOTHING FOLLOWS***
Noted by:
SUBJECT : TURN OVER OF KEYS @ 8th floor unit A2, E1, F2, J1 OWS - OO2
MASTER MASTER
FLOOR / MAIN DOOR BEDROOM KEY BEDROOM COMMON T&B KEY
UNIT KEY NO. KEY NO. T&B KEY NO.
NO. NO.
8F-A2 52112 334624 511266
8F-E1 45245 241574 242454
8F-F2 51236 237643 516742
8F-J1 15452 523355 477513
* * *NOTHINGS FOLLOW * * *
Noted by:
ERIC I ABUTAR
DATE : SEPTEMBER 22, 2018
OWS - O15
UTILITY UTILITY
T&B KEY ROOM KEY REMARKS
NO. NO.
OWS - OO2
UTILITY
ROOM KEY REMARKS
NO.
1PAIR
1PAIR
1PAIR
1PAIR
37th floor uplaster wall METER ROOM 36th Floor unfinish at door jamb METER R
33rd floor inc chb laying METER ROOM 33RD FLOOR no topping at flooring AUXIL
33RD FLOORunfinish plaster of wall ELECT. ROOM 32ND floor no topping Electrical room
31ST FLOOR unfinish firehost cabinet 31st floor unfinish plaster of wall ELECT. R
29TH FLOOR unfinish plastering ELECTRICAL ROOM 27TH FLOOR cutting of steel bar
unplaster wall 23rd AUXILLIARY ROOM rectify damage
unfinish plaster of wall ELECT. ROOM 26th floor unplaster work METER ROOM
OR cutting of steel bar 26TH FLOOR UNTOPPING WORK ELECTRICAL ROOM
rectify 21st floor
For approval
Sample of Steel Plate
300mm diameter
100mm thk
By: C-E CONSTRUCTION
ONE WILSON SQUARE