Equipment Type: Welding Machine (MILLER)
Equipment Code: W-003
Location: Room A.1
Operation Procedure:

PRE-OPERATION
 Used a complete PPE as a safety precaution
 WELDING GLOVES
 WELDING APRON
 WELDING HELMET
 SAFETY SHOES
 RESPIRATOR
 SAFETY GLASSES
 EAR PLUGS
 Make sure the area you assign was cleared

OPERATION
 Prepare the equipment, tools and materials
 Check the machine to a good condition
 Ensure machines point to right place to avoid
rain.

 Doing the job training.


POST- OPERATION
 Switch off the machine for checking the good condition and return to
warehouse or welding cabinet.
 And the job well done.

Date Developed: Document No. NTTA-TM1-07


April 2019 Issued by:
Trainers
Date Revised:
Methodology Level I Page 2 of 61
Developed by:
JOEMAR R.
Templates JOEMAR PURGATORIO
PURGATORIO Revision # 01
Template #2

HOUSEKEEPING SCHEDULE
Qualification: SMAW NC II Station/Bldg

Area/Section: Practical Work Area

In-Charge: Joemar purgatorio

Schedule for the 2nd Semester, 2018


Responsible Dail Ever Weekly Every Monthly Remarks
ACTIVITIES
Person y y 15th
other Day
Day
Seiri

(Sort ) Welder
students
Disposing of waste
materials like scraps, & X
follow waste segregation
system.
Seiton

(systematize) Welder
students X
Arranging the chairs &
table in orderly manner
Seiso
Welder
(sweep) students X
Cleaning the welding
booths and cubicle from
dust /rust and sweep
the floor.

Seiketsu
(standardize) Welder
X
Students
Keeping the scraps and
clean the area properly.

Date Developed: Document No. NTTA-TM1-07


April 2019 Issued by:
Trainers
Date Revised:
Methodology Level I Page 3 of 61
Developed by:
JOEMAR R.
Templates JOEMAR PURGATORIO
PURGATORIO Revision # 01
Check the tools inside
the toolbox and logbook
the items when pull out Welder
X
and pull in. students /
tool keeper

Shitsuke

(self-discipline) Welder
students
Maintaining the
equipment and
check the tools
inside the toolbox
and Logbook the
item when pull out
and pull in.

Template # 3

SUMMARY OF THE HOUSEKEEPING ACTIVITIES

DAILY TASK YES NO


1. Disposing of waste materials like scraps, & follow waste
segregation system.
2. Keeping the scraps and clean the area properly.
3. Check the tools inside the toolbox and logbook the items
when pull out and pull in.

Date Developed: Document No. NTTA-TM1-07


April 2019 Issued by:
Trainers
Date Revised:
Methodology Level I Page 4 of 61
Developed by:
JOEMAR R.
Templates JOEMAR PURGATORIO
PURGATORIO Revision # 01
WEEKLY TASK YES NO
4. Arranging the chairs & table in orderly manner.
5. Cleaning the cubicle and welding booths from dust /rust
and sweep the floor.

MONTHLY TASK YES NO

Template # 4

HOUSEKEEPING INSPECTION CHECKLIST

Qualification
Title SMAW NC II
Area/Section In-charge:
PRACTICAL WORK
AREA JOEMAR PURGATORIO
Location
YES NO INSPECTION ITEMS
1. Is disposing of waste materials like scraps and fallow
the waste segregation?
2. Is arranging the chairs and tables in orderly manner?
3. Is cleaning the cubicle and welding booths from dust

Date Developed: Document No. NTTA-TM1-07


April 2019 Issued by:
Trainers
Date Revised:
Methodology Level I Page 5 of 61
Developed by:
JOEMAR R.
Templates JOEMAR PURGATORIO
PURGATORIO Revision # 01
/rust and sweep the floor?

4. Is the area properly kept clean?


5. Maintaining the equipment and check the tools inside
the toolbox and Logbook the item when pull out and pull
in.

Remarks :

Inspected by: Joemar R. Purgatorio Date: April 26, 2019

Date Developed: Document No. NTTA-TM1-07


April 2019 Issued by:
Trainers
Date Revised:
Methodology Level I Page 6 of 61
Developed by:
JOEMAR R.
Templates JOEMAR PURGATORIO
PURGATORIO Revision # 01
Template #5
EQUIPMENT MAINTENANCE SCHEDULE
EQUIPMENT TYPE : SMAW welding machine (MILLER)
EQUIPMENT CODE: W-003
LOCATION : MCCTEST MANDAUE
Schedule for the Month of March
MANPOWER Daily Every Weekly Every Monthly Remarks
ACTIVITIES Other 15th
Day Day

1. Trainer Activity is
Ensuring the done before
X
welding machine and after
and keep properly. using the
equipment
2. Trainees Activity is
Checking the Smaw done before
Trainer X
handle and ground using the
cable kept dry and equipment
all parts are well
secured.

3. Trainees Activity is
Avoid operate done before
Trainer X
welding without using the
welding helmet. equipment
4. Activity is
Trainees done before
Inspecting the other X
parts of welding before Trainer using the
and after using. equipment

5. Trainees Check
warranty
Running the Trainer X
and after
equipment for 10
service
minutes and
assistance
observe for unusual
from dealer.
noise or abnormal
operation; repair is
necessary. Send to
technician.

Date Developed: Document No. NTTA-TM1-07


April 2019 Issued by:
Trainers
Date Revised:
Methodology Level I Page 7 of 61
Developed by:
JOEMAR R.
Templates JOEMAR PURGATORIO
PURGATORIO Revision # 01
Template #6
Welding Machine (MILLER)

In-charge:
Practical Work Area JOEMAR R. PURGATORIO
MCCTEST MANDAUE
INSPECTION ITEMS

1. Is welding machine will keep properly?


2. Is the smaw handle and ground cable will keep dry? All
parts are well secured?
3. Is operating without welding helmet is always avoided?
4. Is the inspection of other parts of welding before and after sing?
5. Is running the equipment to 10 minutes for unusual noise
or abnormal operation? If any repair is necessary?
Remarks :
Inspected by: Joemar R. Purgatorio Date: May 03, 2019

Template # 7

INSPECTION REPORT (PRE)

Property ID Number W-003

Property Name Welding machine

Location Practical work area

Findings: Recommendations:

This Welding Replacement of cable wire.


machine have a
cable defects.

Inspected By: Reported To:

Date Developed: Document No. NTTA-TM1-07


April 2019 Issued by:
Trainers
Date Revised:
Methodology Level I Page 8 of 61
Developed by:
JOEMAR R.
Templates JOEMAR PURGATORIO
PURGATORIO Revision # 01
Joemar purgatorio Jaymar escalada

Date Inspected: Date Reported:

May 03, 2019 May 03, 2019

Template # 8

WASTE SEGREGATION LIST

Qualification SMAW NC II

Area Section Practical Work Area

In-Charge JOEMAR R. PURGATORIO

GENERAL ACCUMULATED WASTE WASTE SEGREGATION METHOD

Recycle Compose Dispose

1.Broken welding X
helmet (plastic)

2. Broken welding X
goggles

3. Torn welding
gloves

Date Developed: Document No. NTTA-TM1-07


April 2019 Issued by:
Trainers
Date Revised:
Methodology Level I Page 9 of 61
Developed by:
JOEMAR R.
Templates JOEMAR PURGATORIO
PURGATORIO Revision # 01
4.Torn/damage welding X
aprons

5. Broken electrode/
Electrode boxes.
X

6. Metal scraps

7.Broken dark/ X
clear glass

8. Used cable wire

9.Used rags

10.Electrode

handle scraps X

Date Developed: Document No. NTTA-TM1-07


April 2019 Issued by:
Trainers
Date Revised:
Methodology Level I Page 10 of 61
Developed by:
JOEMAR R.
Templates JOEMAR PURGATORIO
PURGATORIO Revision # 01
Template #9

DANGER/CAUTION TAG-OUT INDEX AND RECORD AUDITS

DESCRIPTION

LOG DATE TYPE (System DATE


SERIAL ISSUED Components, COMPLETED
(DANGER/CAUTION) Test
References,
etc.)

WM- April Danger grounded Welding Machine May 2019


003 2019 cable .
(MILLER)

2019-01 April Danger grounded May 2019


2019 cable

2019-01 April Live wire May 2019


2019

Date Developed: Document No. NTTA-TM1-07


April 2019 Issued by:
Trainers
Date Revised:
Methodology Level I Page 11 of 61
Developed by:
JOEMAR R.
Templates JOEMAR PURGATORIO
PURGATORIO Revision # 01
Template #10

WORK REQUEST

UNIT: DESCRIPTION:

W-003 WELDING MACHINE

Observation/s: Date Reported:

Defective welding cable May 02, 2019

Activity: Reported By:

Replacing cable wire as needed. Joemar R. Purgatorio

Spare Parts Used: Signature:

Welding Cable Oliver Bentulan

Date Developed: Document No. NTTA-TM1-07


April 2019 Issued by:
Trainers
Date Revised:
Methodology Level I Page 12 of 61
Developed by:
JOEMAR R.
Templates JOEMAR PURGATORIO
PURGATORIO Revision # 01
Template #11

BREAKDOWN/REPAIR REPORT

Property ID WM-003
Number:

Property Name: WELDING MACHINE (MILLER)

Location: WELDING AND FABRICATION WORK SHOP

Findings: Recommendations:

Defective Replacement of welding cable


welding cable

Inspected By: Reported To:

Robert Noprada Janel gasta

Date: Date:

May 02, 2019 May 02, 2019

Subsequent Action Taken: Recommendation:

Inspection the equipment and cable Welding machine have new cable wire.
wire.

By: Reported to:

Technician Larry Pascual

Date: May 15, 2019 Date: May 15, 2019

Date Developed: Document No. NTTA-TM1-07


April 2019 Issued by:
Trainers
Date Revised:
Methodology Level I Page 13 of 61
Developed by:
JOEMAR R.
Templates JOEMAR PURGATORIO
PURGATORIO Revision # 01
Template #12

SALVAGE REPORT

AREA/SECTION: Practical Work Area/

IN-CHARGE: Larry Pagubo

Facility Type: Part ID: Recommendation:

Welding machine WC-002 Forward to other


has defective workshops as a
welding cable. general purposes

Date Developed: Document No. NTTA-TM1-07


April 2019 Issued by:
Trainers
Date Revised:
Methodology Level I Page 14 of 61
Developed by:
JOEMAR R.
Templates JOEMAR PURGATORIO
PURGATORIO Revision # 01
Template #13

PURCHASE REQUEST

QUALIFICATION: SMAW NC II

AREA: PRACTICAL WORK AREA

Item No. Particular/Speci No. Unit Total Amount


fication of Amount
Pcs.

1 Welding Cable for 6m Php 120 Php 720


Welding Machine

Cable size 1”

Date Developed: Document No. NTTA-TM1-07


April 2019 Issued by:
Trainers
Date Revised:
Methodology Level I Page 15 of 61
Developed by:
JOEMAR R.
Templates JOEMAR PURGATORIO
PURGATORIO Revision # 01
Template #14

EQUIPMENT RECORD WITH CODE AND DRAWING

NO. LOCATIO EQPT. QTY TITLE DESCRIPTION P.O. DRAWING


N NO. NO. REFERENC
E

1 Practical W-003 1 Workshop Miller Serial QW-


Work welding No. C135-003 009
Area cable

Date Developed: Document No. NTTA-TM1-07


April 2019 Issued by:
Trainers
Date Revised:
Methodology Level I Page 16 of 61
Developed by:
JOEMAR R.
Templates JOEMAR PURGATORIO
PURGATORIO Revision # 01
Template #15

INSPECTION REPORT (POST)

AREA/SECTION: PRACTICAL WORK AREA

IN-CHARGE : JOEMAR R, PURGATORIO

Facility Type Incident Action Taken Progress/Remarks

Get a new cable


wire and replace
Welding Cable Damaged Provide for a new damaged parts.
cable

Reported By: Date:

Joemar R. Purgatorio April 20, 2019

Date Developed: Document No. NTTA-TM1-07


April 2019 Issued by:
Trainers
Date Revised:
Methodology Level I Page 17 of 61
Developed by:
JOEMAR R.
Templates JOEMAR PURGATORIO
PURGATORIO Revision # 01

Potrebbero piacerti anche