1 1m3 Galian Tanah Keras Sedalam 1 meter

No. Uraian Satuan Kwantitas Harga Satuan Jumlah


(Rp) (Rp)
I Tenaga
1 Pekerja Oh 0.6250 125,000.00 78,125.00
2 Mandor Oh 0.0625 225,000.00 14,062.50
Jumlah 92,187.50

2 1 m3 Urugan Kembali
No. Uraian Satuan Kwantitas Harga Satuan Jumlah
(Rp) (Rp)
I Tenaga
1 Pekerja Oh 0.1920 125,000.00 24,000.00
2 Mandor Oh 0.0192 225,000.00 4,320.00
Jumlah 28,320.00

3 1m3 Urugan Pasir


No. Uraian Satuan Kwantitas Harga Satuan Jumlah
(Rp) (Rp)
I Bahan
1 Pasir Urug m3 1.2000 1,000,000.00 1,200,000.00

II Tenaga
1 Pekerja Oh 0.3000 125,000.00 37,500.00
2 Mandor Oh 0.0100 225000.00 2,250.00

Jumlah 1,239,750.00

4 1m3 Pasangan Batu Gunung / Kali 1 Pc : 4 Ps


No. Uraian Satuan Kwantitas Harga Satuan Jumlah
(Rp) (Rp)
I Bahan
1 Batu Gunung/Batu Kali M3 1.1000 #REF! #REF!
2 Semen Semen Pc 50 Kg sak 3.2600 1,167,917.00 3,807,409.42
3 Pasir pasangan M3 0.5200 1,000,000.00 520,000.00

II Tenaga
1 Pekerja Oh 1.5000 125,000.00 187,500.00
2 Tukang Batu Oh 0.6000 150,000.00 90,000.00
3 Kepala Tukang Oh 0.0600 200,000.00 12,000.00
4 Mandor Oh 0.0750 225000.00 16,875.00

Jumlah #REF!

5 1m2 Acian Tembok


No. Uraian Satuan Kwantitas Harga Satuan Jumlah
(Rp) (Rp)
I Bahan
1 Semen portland 50 kg Zak 0.026 1,167,917.00 30,365.84

II Tenaga
1 Pekerja Oh 0.200 125,000.00 25,000.00
2 Tukang Batu Oh 0.150 150,000.00 22,500.00
3 Kepala Tukang Oh 0.0150 200,000.00 3,000.00
4 Mandor Oh 0.0100 225000.00 2,250.00

Jumlah 83,115.84
6 1m3 Membuat Beton Tak Bertulang, 1Pc : 2 Ps : 3 Kr,
No. Uraian Satuan Kwantitas Harga Satuan Jumlah
(Rp) (Rp)
I Bahan
1 Semen Portland 50 kg sak 6.7200 1,167,917.00 7,848,402.24
2 Pasir beton M3 0.5400 1,000,000.00 540,000.00
3 Kerikil / Koral M3 0.8100 #REF! #REF!

II Tenaga
1 Pekerja Oh 2.000 125000.00 250,000.00
2 Tukang Batu Oh 0.350 150000.00 52,500.00
3 Kepala Tukang Oh 0.0350 200000.00 7,000.00
4 Mandor Oh 1.0000 225000.00 225,000.00

Jumlah #REF!
7 1 M3 Pasangan Konstruksi Kuda kuda Kayu Kelas III
No. Uraian Satuan Kwantitas Harga Satuan Jumlah
(Rp) (Rp)
I Bahan
1 Balok Kelas III m3 1.1000 #REF! #REF!
2 Besi Strip kg 15.000 #REF! #REF!
3 Paku Campuran kg 0.800 #REF! #REF!

II Tenaga
1 Pekerja Oh 4.000 125,000.00 500,000.00
2 Tukang Kayu Oh 12.000 150,000.00 1,800,000.00
3 Kepala Tukang Oh 1.2000 200,000.00 240,000.00
4 Mandor Oh 0.20000 225,000.00 45,000.00

Jumlah #REF!
8 1 M3 Pasangan Gording Konsol Balok Nok kayu Kelas III
No. Uraian Satuan Kwantitas Harga Satuan Jumlah
(Rp) (Rp)
I Bahan
1 Balok Kelas III M3 1.1000 #REF! #REF!

II Tenaga
1 Pekerja Oh 5.000 125,000.00 625,000.00
2 Tukang Kayu Oh 7.500 150,000.00 1,125,000.00
3 Kepala Tukang Oh 0.7500 200,000.00 150,000.00
4 Mandor Oh 0.02500 225,000.00 5,625.00

Jumlah #REF!

9 1 M2 Pasangan Atap seng Gelombang


No. Uraian Satuan Kwantitas Harga Satuan Jumlah
(Rp) (Rp)
I Bahan
1 Seng Gelombang BJLS 0,20 Lbr 0.7000 #REF! #REF!
2 Paku Seng kg 0.020 #REF! #REF!

II Tenaga
1 Pekerja Oh 0.120 125,000.00 15,000.00
2 Tukang Kayu Oh 0.060 150,000.00 9,000.00
3 Kepala Tukang Oh 0.0060 200,000.00 1,200.00
4 Mandor Oh 0.0060 225000.00 1,350.00

Jumlah #REF!

10 1 m2 Pasangan Nok Atap Seng Plat


No. Uraian Satuan Kwantitas Harga Satuan Jumlah
(Rp) (Rp)
I Bahan
1 Seng plat Bjls 0,20 mm lbr 0.7000 #REF! #REF!
2 Paku Seng Kg 0.0400 #REF! #REF!

II Tenaga
1 Pekerja Oh 0.150 125,000.00 18,750.00
2 Tukang kayu Oh 0.070 150,000.00 10,500.00
3 Kepala Tukang Oh 0.0080 200,000.00 1,600.00
4 Mandor Oh 0.0060 225,000.00 1,350.00

Jumlah #REF!

11 1 m2 Pengecatan Permukaan Besi


No. Uraian Satuan Kwantitas Harga Satuan Jumlah
(Rp) (Rp)
I Bahan
1 Cat Besi kg 0.1000 #REF! #REF!
2 Kuas Cat bh 0.0100 #REF! #REF!

II Tenaga
1 Pekerja Oh 0.020 125,000.00 2,500.00
2 Tukang Cat Oh 0.200 150,000.00 30,000.00
3 Kepala Tukang Oh 0.0200 200,000.00 4,000.00
4 Mandor Oh 0.0100 225,000.00 2,250.00

Jumlah #REF!
12 1M' Pasangan Lesplank 2/20 cm Kayu Kelas III
No. Uraian Satuan Kwantitas Harga Satuan Jumlah
(Rp) (Rp)
I Bahan
1 Papan Kelas II M3 0.0145 #REF! #REF!
2 Paku Campuran Kg 0.0600 #REF! #REF!

II Tenaga
1 Pekerja Oh 0.150 125,000.00 18,750.00
2 Kayu Oh 0.2500 150,000.00 37,500.00
3 Kepala Tukang Oh 0.0250 200,000.00 5,000.00
4 Mandor Oh 0.0750 225,000.00 16,875.00

Jumlah #REF!

13 1 M2 Mengecat kayu
No. Uraian Satuan Kwantitas Harga Satuan Jumlah
(Rp) (Rp)
I Bahan
1 Cat Kayu Ltr 0.1500 #REF! #REF!

4 Kuas Cat Bh 0.0100 #REF! #REF!

II Tenaga
1 Pekerja Oh 0.160 125,000.00 20,000.00
2 Tukang Cat Oh 0.160 150,000.00 24,000.00
3 Kepala Tukang Oh 0.0160 200,000.00 3,200.00
4 Mandor Oh 0.00250 225,000.00 562.50

Jumlah #REF!

14 1 Tiang Raja dan kursi Baja dengan Ø 4"/Kg


No. Uraian Satuan Kwantitas Harga Satuan Jumlah
(Rp) (Rp)
I Bahan
1 Baja Ø 4" Kg 1.1 0.00 -
2 Genzet 20KVa Unit 0.002 0.00 -
3 Travo Las Unit 0.002 0.00 -
4 Mesin Gurinda Unit 0.001 0.00 -
5 Mesin Bor Unit 0.001 0.00 -
6 Mata Gerinda Bh 0.003 0.00 -
7 Mata Bor Bh 0.003 0.00 -
8 Kawat Las Kg 0.0030 0.00 -

II Tenaga
1 Pekerja Oh 0.020 125,000.00 2,500.00
2 Tukang Besi Oh 0.020 150,000.00 3,000.00
3 Kepala Tukang Oh 0.0020 200,000.00 400.00
4 Mandor Oh 0.0070 225,000.00 1,575.00

III Upah Erection


1 Transport Kg 1.000 1,045.00 1,045.00
2 Pekerja Oh 0.010 0.00 -
3 Tukang Besi Oh 0.0050 0.00 -
4 Mandor Oh 0.0020 0.00 -
Jumlah 8,520.00

15 1 Kuda-Kuda Baja dengan Ø 3"/Kg


No. Uraian Satuan Kwantitas Harga Satuan Jumlah
(Rp) (Rp)
I Bahan
1 Baja Ø 3" Kg 1.1 0.00 -
2 Genzet 20KVa Unit 0.002 0.00 -
3 Travo Las Unit 0.002 0.00 -
4 Mesin Gurinda Unit 0.001 0.00 -
5 Mesin Bor Unit 0.001 0.00 -
6 Mata Gerinda Bh 0.003 0.00 -
7 Mata Bor Bh 0.003 0.00 -
8 Kawat Las Kg 0.0030 0.00 -

II Tenaga
1 Pekerja Oh 0.020 0.00 -
2 Tukang Besi Oh 0.020 1,045.00 20.90
3 Kepala Tukang Oh 0.0020 0.00 -
4 Mandor Oh 0.0070 0.00 -

III Upah Erection


1 Transport Kg 1.000 1,045.00 1,045.00
2 Pekerja Oh 0.010 0.00 -
3 Tukang Besi Oh 0.0050 0.00 -
4 Mandor Oh 0.0020 0.00 -
Jumlah 1,065.90

16 1 Kuda-Kuda Baja dengan L 40.40.4 /Kg


No. Uraian Satuan Kwantitas Harga Satuan Jumlah
(Rp) (Rp)
I Bahan
1 Baja L 40.40.4 Kg 1.1 0.00 -
2 Genzet 20KVa Unit 0.002 0.00 -
3 Travo Las Unit 0.002 0.00 -
4 Mesin Gurinda Unit 0.001 0.00 -
5 Mesin Bor Unit 0.001 0.00 -
6 Mata Gerinda Bh 0.003 0.00 -
7 Mata Bor Bh 0.003 0.00 -
8 Kawat Las Kg 0.0030 0.00 -
9 Baut Ø 0.8 mm-12 mm Bh 0.1500 0.00 -

II Tenaga
1 Pekerja Oh 0.020 0.00 -
2 Tukang Besi Oh 0.020 1,045.00 20.90
3 Kepala Tukang Oh 0.0020 0.00 -
4 Mandor Oh 0.0070 0.00 -

III Upah Erection


1 Transport Kg 1.000 1,045.00 1,045.00
2 Pekerja Oh 0.010 0.00 -
3 Tukang Besi Oh 0.0050 0.00 -
4 Mandor Oh 0.0020 0.00 -
Jumlah 1,065.90

17 1 m2 pasang lantai keramik ( 30 x 30 ) cm


No. Uraian Satuan Kwantitas Harga Satuan Jumlah
(Rp) (Rp)
I Bahan
1 Keramik 30 x 30 Dos 1.000 0.00 -
2 Semen Portland sak 0.2830 0.00 -
3 Pasir pasangan m3 0.039 0.00 -
4 Semen warna kg 0.500 0.00 -
sub.total
II Tenaga
1 Pekerja Oh 0.620 125,000.00 77,500.00
2 Tukang Batu Oh 0.350 150,000.00 52,500.00
3 Kepala Tukang Oh 0.035 200,000.00 7,000.00
4 Mandor Oh 0.030 225,000.00 6,750.00
sub.total
Jumlah 143,750.00
bulan Toraja Utara, 06 Juli 2010
pelaksana Konsultan Perencana
perusahaan CV. ARCI PRATAMA
nama direktur Handi Restu P, ST
pelaksana Penawar
nama direktur Direktur/Direktris
perusahaan PT/CV/Firma
REKAPITULASI ANGGARAN BIAYA
PENGADAAN PENGAMAN JALAN KABUPATEN YALIMO
TAHUN ANGGARAN 2013

No. JENIS PEKERJAAN BIAYA

A PEKERJAAN PERSIAPAN Rp 32,500,000.00

B PEKERJAAN TANAH DAN BETON Rp 800,251,079.96

C PEKERJAAN BESI PENGAMAN Rp 7,021,627,604.17

SUB JUMLAH BIAYA I (A+B+C+D) Rp 7,854,378,684.13

PPN 10.00% Rp 785,437,868.41


PPh 2.00% Rp -

GRAND TOTAL BIAYA Rp 8,639,816,552.54


Dibulatkan Rp 8,639,816,500.00
Delapan Milyar Enam Ratus Tiga Puluh Sembilan Juta Delapan Ratus Enam Belas Ribu Lima
Terbilang :
Ratus Rupiah

Toraja Utara, Juli 2011

KEPALA DINAS PERHUBUNGAN KOMUNIKASI DAN


INFORMATIKA

CALVYN TANDIARRANG, SE. MS


NIP. 19580404 198603 1 002
RENCANA ANGGARAN BIAYA (RAB)
PENGADAAN PENGAMAN JALAN KABUPATEN YALIMO
TAHUN ANGGARAN 2013

HARGA JUMLAH
No URAIAN PEKERJAAN Kode VOLUME
SATUAN HARGA
1 2 3 5 6
A PEKERJAAN PERSIAPAN
1 Pengukuran/Pematokan Ls 1.00 Pkt Rp 5,000,000.00 Rp 5,000,000.00
2 Papan Proyek Ls 1.00 Pkt Rp 2,000,000.00 Rp 2,000,000.00
3 Administrasi dan dokumentasi Ls 1.00 Pkt Rp 3,000,000.00 Rp 3,000,000.00
4 Pembersihan/Land Claring Ls 1.00 Pkt Rp 2,500,000.00 Rp 2,500,000.00
5 Mobilisasi Bahan Ls 1.00 Pkt Rp 15,000,000.00 Rp 15,000,000.00
6 Back Up Data Ls 1.00 Pkt Rp 5,000,000.00 Rp 5,000,000.00
Jumlah Rp 32,500,000.00
B PEKERJAAN TANAH DAN BETON
1 Galian Tanah 1 111.375 m3 Rp 92,187.50 Rp 10,267,382.81
3 Pek. Beton 1 : 2 : 3 3 101.250 m3 Rp 7,792,868.12 Rp 789,027,897.15
6 Urugan Tanah 2 33.750 m3 Rp 28,320.00 Rp 955,800.00
Jumlah Rp 800,251,079.96
C PEKERJAAN BESI PENGAMAN
1 Pekerjaan Pemasangan Guard Rail 4 1,500.00 m' Rp 4,681,085.07 Rp 7,021,627,604.17
Jumlah Rp 7,021,627,604.17

REKAPITULASI

A PEKERJAAN PERSIAPAN Rp 32,500,000.00

B PEKERJAAN TANAH DAN BETON Rp 800,251,079.96

C PEKERJAAN BESI PENGAMAN Rp 7,021,627,604.17

REAL COST Rp 7,854,378,684.13

PPN 10% Rp 785,437,868.41

TOTAL Rp 8,639,816,552.54

PERENCANAAN Rp 345,592,662.10

PENGAWASAN Rp 259,194,496.58

ADM. PROYEK Rp 215,995,413.81

JUMLAH TOTAL Rp 9,460,599,125.03

TERBILANG : SEMBILAN MILYAR EMPAT RATUS ENAM PULUH JUTA LIMA RATUS SEMBILAN PULUH SEMBILAN RIBU SERATUS
DUA PULUH LIMA RUPIAH KOMA NOL TIGA SEN

Yalimo, April 2013

An. Kepala Dinas Perhubungan,


Komunikasi dan Informatika
Kabupaten Yalimo

YAFET HALUK, ST, MT


NIP.
DAFTAR ANALISA
BERDASARKAN SNI 2002

1 1m3 Galian Tanah Keras Sedalam 1 meter


No. Uraian Satuan Kwantitas Harga Satuan Jumlah
(Rp) (Rp)
I Tenaga
1 Pekerja Oh 0.6250 125,000.00 78,125.00
2 Mandor Oh 0.0625 225,000.00 14,062.50
Jumlah 92,187.50

2 1 m3 Urugan Kembali
No. Uraian Satuan Kwantitas Harga Satuan Jumlah
(Rp) (Rp)
I Tenaga
1 Pekerja Oh 0.1920 125,000.00 24,000.00
2 Mandor Oh 0.0192 225,000.00 4,320.00
Jumlah 28,320.00

3 1m3 Membuat Beton Tak Bertulang, 1Pc : 2 Ps : 3 Kr,


No. Uraian Satuan Kwantitas Harga Satuan Jumlah
(Rp) (Rp)
I Bahan
1 Semen Portland 50 kg sak 218.0000 23,358.34 5,092,118.12
2 Pasir beton M3 0.5200 1,000,000.00 520,000.00
3 Kerikil / Koral M3 0.8700 2,200,000.00 1,914,000.00

II Tenaga
1 Pekerja Oh 1.6500 125,000.00 206,250.00
2 Tukang Batu Oh 0.2500 150,000.00 37,500.00
3 Kepala Tukang Oh 0.0250 200,000.00 5,000.00
4 Mandor Oh 0.0800 225,000.00 18,000.00

Jumlah 7,792,868.12

4 1 Batang Pemasangan Guard Rail (4320 mm)


No. Uraian Satuan Kwantitas Harga Satuan Jumlah
(Rp) (Rp)
I Bahan
1 beam 4320 x 312 x 2,7 mm Kg 46.0 96,062.50 4,418,875.00
2 post (tiang penyangga) 1800 x 178 x 76 x 6,0 mm Kg 27.0 96,062.50 2,593,687.50
3 blocking piece (besi pengikat) 350 x 178 x 76 x 6,0 mm Kg 6.0 96,062.50 576,375.00
4 sleeve beam (terminal-end) 725 x 2,7 mm Kg 0.4 96,062.50 38,425.00
5 Post Bolt bh 1.0 61,450.00 61,450.00
6 Spice Bolt bh 8.0 3,000.00 24,000.00

II Tenaga
1 Pekerja Oh 0.0200 125,000.00 2,500.00
2 Tukang Besi Oh 0.0200 150,000.00 3,000.00
3 Kepala Tukang Oh 0.0020 200,000.00 400.00
4 Mandor Oh 0.0070 225,000.00 1,575.00

III Upah Erection


1 Transport Kg 12,500.00 1,000.00 12,500,000.00
2 Pekerja Oh 0.0100 125,000.00 1,250.00
3 Tukang Besi Oh 0.0050 150,000.00 750.00
4 Mandor Oh 0.0020 225,000.00 450.00
Jumlah 20,222,287.50
Untuk 1 M' Pasangan Guard Rail = Jumlah : 4,32 M 4,681,085.07
DAFTAR HARGA SATUAN
BAHAN DAN UPAH
KABUPATEN YALIMO TAHUN 2013

A. DAFTAR HARGA SATUAN BAHAN

No. Jenis Bahan Bangunan Satuan Harga


(1) (2) (3) (4)
1 Semen Pc 50 Kg Zak Rp 1,167,917.00
2 Pasir Beton m3 Rp 1,000,000.00
3 Pasir Pasang m3 Rp 1,000,000.00
4 Pasir Urug / Timbunan m3 Rp 1,000,000.00
5 Tanah Timbunan m3 Rp 550,000.00
6 Baut M 16 x 40 mm (Post Bolt Galv) Bh Rp 61,450.00
7 Baut Ø 5/8" x 1 1/4" (Spice Bolt Galv) Bh Rp 43,500.00
8 Steel Galv Struktures kg. Rp 96,062.50
9 Batu Pecah 2/3 m3 Rp 2,200,000.00

B. DAFTAR UPAH PEKERJAAN

No. URAIAN Satuan Harga


(1) (2) (3) (4)
1 Pekerja Org/Hari Rp 125,000.00
2 Tukang Kayu Org/Hari Rp 150,000.00
3 Tukang Batu Org/Hari Rp 150,000.00
4 Tukang Cat Org/Hari Rp 150,000.00
5 Tukang Besi Org/Hari Rp 150,000.00
6 Tukang Listrik Org/Hari Rp 150,000.00
7 Tukang Pipa Org/Hari Rp 150,000.00
8 Kepala Tukang Org/Hari Rp 200,000.00
9 Mandor Org/Hari Rp 225,000.00