THERMOPAC AUDIT CERTIFICATE-NORTHSTAR PLYWOOD, JAGADHRI

DAMPER DAMPER
HEATING FUEL AS PER POSITION OF POSITION OF POSITION OF
THERMOPACK DESIGN PR./ SURFACE DESIGN/ FUEL ID FAN/ AMP FD PA FAN LOAD/
SR. NO. NO. TEMP. IN/OUT MAKE TEMP. AREA USED LOAD / HP FAN/AMP/HP HP
2kg/cm2/ 280
20lackcal/hr 165/190 THERMOTECH deg C 160 wood 90%/25HP 60%/10 HP NA

HEAT
FURNACE DUST FUEL GENERATION/DAY/ BOOSTER PUMP OIL LEVEL IN D-
SR. NO. FLUE GAS TEMP INDSIDE TEMP FD AIR TEMP APH IN/ OUT TEMP COLLECTOR CONSUMED/ DAY EFFICIENCY IN PLANT TANK
360lkcal/day/75 yes (On
250 900 120 40/170 y 23314kg/day % presses) 50%

POLLUTION
ASH QTY. PER NORMS IN AC DRIVE IN POSITION OF
SR. NO. OIL TESTING PH IGNITION TEMP. DAY TESTING FANS DRIVE SCOPE AUTO CONTROL MAN POWER
done yearly 600kg/day no yes no 3/shift

CHINENY HEIGHT/ FD FORCE/ ID DRAFT/ DESIN POSITION OF POSITION OF INSULATION CONDITION OF FUEL YARD SAFTEY VALVE
SR. NO. DIA DESIGN FLOW FLOW BELTS BRGS. SURFACE TEMP. REFRACTORY POSITION DATA
220mmwc/7200 370mmwc/1080
30m/0.7m m3/hr 0m3/hr ok ok 60 ok NA

OIL PUMP CAP./ MOTOR OF OIL P/P BUNKKER


SR. NO. PR. LOAD HOLDING CAP FUEL RATE CHEMICAL USED OIL SIDE FIRE SIDE FIRE SAFTEY TRAINING ETC
120m3/hr/50mlc 30HP NA 971KG/HR NA NA NA NA

RESULT = DESIGNATED EFFICIENCY 70%

RESULTED EFFICIENCY 70%


Dynamic Engineers and Energy Consultants
SC0-384-85, Preet Colony, Gali No-7,Ambala Road, Zirakpur, Dist.-Mohali, Punjab-1
Tel-9814307771, E mail: viksin.chd@gmail.com

THERMOPAC AUDIT CERTIFICATE-BABA PLYWOOD,YNAGAR

DAMPER
HEATING FUEL AS PER POSITION OF DAMPER POSITION
THERMOPAC TEMP. DESIGN PR./ SURFACE DESIGN/ ID FAN/ AMP POSITION OF OF PA FAN
SR. NO. NO. IN/OUT MAKE TEMP. AREA FUEL USED LOAD / HP FD FAN/AMP/HP LOAD/ HP
2kg/cm2/ 280
15lac kcal/hr 180/210 Thermax deg C 145 wood 90%/20HP 90%/7.5 HP NA

FURNACE HEAT
INDSIDE FD AIR DUST FUEL GENERATION/DAY/ BOOSTER PUMP IN OIL LEVEL IN
SR. NO. FLUE GAS TEMP TEMP TEMP APH IN/ OUT TEMP COLLECTOR CONSUMED/ DAY EFFICIENCY PLANT D-TANK
315lkcal/day/55
280 900 120 40/120 y 21800kg/day % yes (On presses) 40%

POLLUTION
IGNITION ASH QTY. PER NORMS IN AC DRIVE IN POSITION OF
SR. NO. OIL TESTING PH TEMP. DAY TESTING FANS DRIVE SCOPE AUTO CONTROL MAN POWER
done yearly 700kg/day no yes no 3/shift

FD FORCE/ ID DRAFT/
CHINENY DESIGN DESIN POSITION OF POSITION OF INSULATION CONDITION OF FUEL YARD SAFTEY VALVE
SR. NO. HEIGHT/ DIA FLOW FLOW BELTS BRGS. SURFACE TEMP. REFRACTORY POSITION DATA
220mmw 400mmw
c/5400m3 c/9000m3
30m/0.7m /hr /hr ok ok 65 ok NA

MOTOR OF BUNKKER
OIL PUMP CAP./ OIL P/P HOLDING
SR. NO. PR. LOAD CAP FUEL RATE CHEMICAL USED OIL SIDE FIRE SIDE FIRE SAFTEY TRAINING ETC
90m3/hr/60mlc 25HP NA 910KG/HR NA NA NA NA

RESULT = DESIGNATED EFFICIEN 70%

RESULTED EFFICIENC 58%

For Dynamic Engineers and Energy Consultants

VIKAS SINGLA