Sei sulla pagina 1di 7

AG

Elevator power-off leveling device

HCYD22-XX-AG2 USER MANUAL V4.70


HCYD 电梯停电应急供电装置

Directory

Overview …………………………………………1

Working principle … … … … … … … … … … … … … … 1

Dimensions … … … … … … … … … … … … … … … … 1

The main technical parameters… … … … … … … … … … … 2

Work Environment … … … … … … … … … … … … … … 2

Wiring… … … … … … … … … … … … … … … … … … 2

Termi nal blocks , c onnectors referenc e table … … … … … 3

Operation… … … … … … … … … … … … … … … … … 4

External wiring diagram and schematic … … … … … … … … 4

Troubleshooting ………………… … … … … … … … ……5


HCYD 电梯停电应急供电装置

Overview
HCYD22 elevator emergency power supply device is a power failure
stop running for the elevator, through inverter power supply to the
elevator rescue a safety device automatically. Mains normal standby mode
when the device is detected, when the mains power failure or phase,
equipment delayed start, through pre -tuned inverter lowest frequency, low
traction elevator to the floor leveling position, open the elevator door,
ensure that passengers safe to leave the el evator.
Working principle
This device is always monitoring the presence or absence of the mains, there is
electricity in the case the device is not put into operation. When the power cut, means to
lift a start signal, the output of two-phase AC220V AC delay, this time to adjust your speed
to move the elevator to leveling, open the elevator door.
Specific action sequence is as follows: When a mains, device HC - TDGK board
LED1, LED5, LED9 normally on, KY do, LED2 flashing, device detecting mains.
When power outage LED4 bright immediately, LED6 normally on, KY disconnect,
LED1, LED5, LED9 out; LED11 after 15 seconds LED12, LED15 bright, bright; 28
seconds after LED13, LED16 bright, device output, output terminals on L2, N2 AC220V
voltage, LED14 bright 33 seconds.
When the device terminals output AC220V voltage at L2, N2, device to stop output,
after the completion of the work, the device to exit.
Device from the connector KKA output enable signal on 1, 2, 3, 4 sub phase sequence
relay in elevator control cabinet.
If the device operates incoming call, the device will exit.
Dimensions
Dimensions( L × W × H): 3 40 *2 65 *1 60 mm

—— 1 ——
HCYD 电梯停电应急供电装置

The main technical parameters


1.Input voltage: Two -phase AC 220V ± 10%
2.Output voltage: Two-phase AC 220V± 15%
3.Battery: 12V/7AH(2 sessions);
4.Drive power: ≤ 5.5KW
Work Environment
1、 Ambient temperature: -5 ℃ to 50 ℃;

2、 Relative humidity: <90% non-condensing;

3、 air shall not contain explosive, corrosive and other harmful gases or dust.

4、 absence of severe vibration, no strong electromagnetic interference

Wiring
1、 Cable Connection
Means all signal lines are output from the connector, KKA -1, KKA-2 as an
emergency run signal; KKA -3, KKA-4 for connecting elevator phase

—— 2 ——
HCYD 电梯停电应急供电装置

sequence relay normally open.


2、 Connect the main power cable
he device chained to the main power supply and an elevator between:
terminal block L1, N1 , is the input, L2, N2 is output. Make sure L2, N2 is
the elevator control cabinet with control transformer connected.

Termi nal bl ocks , connec tors referenc e table

Plug-number Features
12 11 10 9 8 7
KKA-1 Start signal
6 5 4 3 2 1
KKA-2 Start signal

KKA-3 Phase sequence Short

KKA-4 Phase sequence Short


Connectors order

Te r m i n a l b l o c k
Features
number
PE PE

L1 Power input

N1 Power input
L2 Power output PE L1 N1 L2 N2
N2 Power output

Terminal block order

—— 3 ——
HCYD 电梯停电应急供电装置

Internal table

T D G K Connector The corresponding TDGK


The corresponding names
No. names Connector No.
J1.1 KY.L1 J4.1 Power resistors tube top
J1.5 KY.L3 J4.2 Power resistors tube top
J1.7 KY.A1 J4.3 Battery +
J1.9 KY.A2 J4.4 Battery -
J3.1 Transformer input J4.7 KB.A
J3.3 Transformer input J4.8 KB.1A
J3.5 Transformer output
J3.6 Transformer output

Operating

Switched power supply, the power switch on the unit panel is in

position "I" will 24V switch within the device (FA).


Note: Please confirm whether start control cabinet all power before the unit is isolated total power line, setting the
elevator drive emergency desired frequency, the frequency of the inverter is set slightly lower than the speed of access.

External wiring diagram and schematic

—— 4 ——
HCYD 电梯停电应急供电装置

Contactor KY: KY contactor has three normally open a normally closed contacts, normally open
three-phase electric control cabinet is isolated;

Troubleshooting
The device is maintenance-free, with automatic discharge function. Recommended a trial is
conducted quarterly to measure FA and whether there is between 0V and 24V DC voltage, in order to
ensure proper functioning of equipment.

NO Phenomenon Check Procedure Approach

Send listing and control of


Check the rocker switch panel
1 electrical equipment without Open to the "I" position
charge indication

Measure the voltage between More than 12 hours to charge


2 DY buzzer
the FA and 0V is lower than the battery
20V

—— 5 ——