PLANILLA DE SUSTENTACION DE METRADOS

01 MODULO DE ALMACENES Y PARQUE MOTOR

02.01.01 5
01.01 TRABAJOS PRELIMINARES
01.01.01 Limpieza de Terreno Manual
Partida Descripción Nº veces Largo (m) Ancho (m) Alto (m)

VEREDA DE ALMACEN 1.00 61.95 1.50


VEREDA FRONTAL 1.00 95.56 1.00
VEREDA LATERAL 1.00 51.70 1.00
1.00 1.00 97.77
Parque motor 1.00 43.75 11.85
1.00 6.40 11.85

01.01.02 Trazo y Replanteo


VEREDA DE ALMACEN 1.00 60.00 1.50
VEREDA FRONTAL 1.00 95.56 1.00
VEREDA LATERAL 1.00 51.70 1.00
1.00 1.00 97.77
Parque motor 1.00 43.75 11.85
1.00 6.40 11.85

01.02 MOVIMIENTO DE TIERRAS


01.02.01 Excavacion en terreno natural

Partida Descripción Nº veces Largo (m) Ancho (m) Alto (m)

zapata Z-2 1.00 1.20 1.20 1.20


1.00 1.00 97.77 0.60
Parque motor 1.00 43.75 11.85 0.60
1.00 6.40 11.85 0.60

01.02.02 Afirmado con material granular e=4" para zapata, parque motor y vereda
Descripción Nº veces Largo (m) Ancho (m) Alto (m)

zapata Z-2 1.00 1.20 1.20


VEREDA DE ALMACEN 1.00 60.00 1.50
VEREDA FRONTAL 1.00 95.56 1.00
VEREDA LATERAL 1.00 51.70 1.00
1.00 1.00 97.77
Parque motor 1.00 43.75 11.85
1.00 6.40 11.85

01.02.03 Arena fina para adoquinado


Descripción Nº veces Largo (m) Ancho (m) Alto (m)

VEREDA FRONTAL 1.00 95.56 1.00 0.10


VEREDA LATERAL 1.00 51.70 1.00 0.10
01.02.04 Nivelacion interior y apisonado para pisos

Descripción Nº veces Largo (m) Ancho (m) Alto (m)

VEREDA DE ALMACEN 1.00 60.00 1.50


VEREDA FRONTAL 1.00 95.56 1.00
VEREDA LATERAL 1.00 51.70 1.00
1.00 1.00 97.77
Parque motor 1.00 43.75 11.85
1.00 6.40 11.85

01.03 OBRAS DE CONCRETO SIMPLE


01.03.01 Zolado para zapata e=4" C:H 1:12

Descripción Nº veces Largo (m) Ancho (m) Alto (m)

Zapata: Z-2 1.00 1.20 1.20

01.03.02 Falso piso de concreto 4"


Descripción Nº veces Largo (m) Ancho (m) Alto (m)

1.00 1.00 97.77


Parque motor 1.00 43.75 11.85
1.00 6.40 11.85

01.03.03 Canaleta de concreto para evacuacion e=0.10 cm

Descripción Nº veces Largo (m) Ancho (m) Alto (m)

Canaleta de concreto para evacuacion 2.00 75.00

01.03.04 Encofrado y desencofrado de canaleta


Descripción Nº veces Largo (m) Ancho (m) Alto (m)

Encofrado y desencofrado de canaleta 2.00 75.00 0.50

01.03.05 Concreto para muro de F'c=175Kg/cm2

Descripción Nº veces Largo (m) Ancho (m) Alto (m)

concreto para vereda 2.00 61.95 0.20 1.50

01.04 OBRAS DE CONCRETO ARMADO


ZAPATAS

01.04.01 Concreto en Zapata f'c = 210 Kg/cm2

Descripción Nº veces Largo (m) Ancho (m) Alto (m)

Zapata: Z-2 1.00 1.20 1.20 0.50


01.04.02 Acero Fy = 4200 Kg/cm2 en Zapatas
LONGITUD POR DIAMETRO
Descripción ElementoLongitud Veces/Est. Nº Est. 3/8"
VARILLA. 1.05 1 6
Zapata: Z-2
VARILLA 1.05 1 6
SUB TOTAL (m) 0.00
SUB TOTAL (kg) 0.00
TOTAL (kg) 12.60

COLUMNAS

1.05.01 Concreto en Columnas - Concreto f'c = 210 Kg/cm2


PARQUE
Descripción Nº veces Largo (m) Ancho (m) Alto (m)
MOTOR
C2 PARQUE MOTOR
SEGUNDO
PISO
ALMACEN C2 1.00 0.45 0.40 7.50
SEGUNDO PISO ALMACEN
C2 - CENTRALES 7.00 0.25 0.25 2.00
C2-FRONTAL COE 3.00 0.25 0.25 0.70
C2 - CENTRALES COE 2.00 0.25 0.25 1.40
C2 - COSTADOS 10.00 0.25 0.25 0.70
C1 - COSTADOS 2.00 0.40 0.25 0.70

1.05.02 Encofrado y desencofrado en Columnas


Descripción 02.04.08 Encofrado y desencofrado en Columnas
PARQUE
Descripción Nº veces Largo (m) # caras Alto (m)
MOTOR
C2 PARQUE MOTOR
SEGUNDO
PISO
ALMACEN C2 1.00 0.85 2.00 7.50
SEGUNDO PISO ALMACEN
C2 - CENTRALES 7.00 1.00 1.00 2.00
C2-FRONTAL COE 3.00 1.00 1.00 1.40
C2 - LATERALES 2.00 1.30 1.00 0.70
C2 - LATERALES 13.00 1.00 1.00 0.70

1.05.03
02.04.09 Acero Fy = 4200 Kg/cm2 grado 60 en Columnas
Descripción LONGITUD POR DIAMETRO
PARQUE
Descripción
MOTOR ElementoLongitud Veces/Est. Nº Col. 3/8"
PARQUE MOTOR
Varilla Ver 8.25 2 1
C2 Varilla Ver 8.25 4 1
C2 Varilla Ver 8.25 4 1
SEGUNDO Estribos 1.53 34 1 52.02
PISO Estribos 1.13 34 1 38.42
ALMACEN
C2 SEGUNDO PISO ALMACEN
C2 C2 Varilla Ver 2.00 4 7
C2 Varilla Ver 1.40 4 3
C2 Varilla Ver 0.70 4 15
C2 C2 Estribos 1.10 17 25 467.50
C2 C2 Estribos 1.10 10 25 275.00
C2 Estribos 1.10 7 25 192.50
SUB TOTAL (m) 1025.44
P(Kg/m) 0.560
SUB TOTAL (kg) 574.25
TOTAL (kg) 829.73

VIGAS

1.05.01 Concreto en Vigas - Concreto f'c = 210 Kg/cm2


Descripción Nº veces Largo (m) Ancho (m) Alto (m)

SEGUNDO
PISO
ALMACEN V1 5.00 12.80 0.25 0.40
V2 2.00 8.50 0.25 0.40

1.05.02 Encofrado y desencofrado en vigas


Descripción 02.04.08 Encofrado y desencofrado en Columnas

Descripción Nº veces Largo (m) # caras Alto (m)

SEGUNDO
PISO
ALMACEN V1 3.00 12.80 2.00 0.40
V2 2.00 8.50 2.00 0.40

1.05.03
02.04.09 Acero Fy = 4200 Kg/cm2 grado 60 en vigas
Descripción LONGITUD POR DIAMETRO
Descripción ElementoLongitud Veces/Est. Nº VIG. 3/8"
Varilla Ver 13.40 4 5
V1
Varilla Ver 1.30 68 5 442.00

Varilla Ver 9.10 4 2


V2
Varilla Ver 1.30 53 2 137.80
SUB TOTAL (m) 579.80
P(Kg/m) 0.560
SUB TOTAL (kg) 324.69
TOTAL (kg) 853.20
1.05 MUROS Y TABIQUES DE ALBAÑILERIA
Unidad:
1.05.01 Muro de cabeza KK de arcilla
Elemento
Gráfico Descripción Nº veces Long (m) Alto (m)
s
PARQUE MOTOR: Primer piso
Herramientas y lubricantes 1.00 10.21 1.00 3.00
Herramientas y lubricantes 1.00 8.18 1.00 3.00
Metrado
Total (m2)

1.05.02 Muro de Soga - Ladrillo KK de arcilla Unidad:


#Element
Gráfico Descripción Nº veces Largo (m) Alto (m)
os
segundo piso: sobre cielo razo
Laterales del sobre cielo 5.00 10.36 2.00 2.00
almacen del COE 1.00 7.25 1.00 1.40
Centro de emergencia 1.00 7.17 1.00 1.40
fachada sobre cielo razo(archivo y almacen) 1.00 8.07 1.00 1.40
fachada sobre cielo razo 2.00 56.46 1.00 0.70
Metrado
Total (m2)

1.06 CUBIERTAS
1.06.01 Cobertura con gran onda en almacenes Unidad:
Gráfico Descripción Cantidad Largo (m) Ancho (m) Alto (m)

ALMACENES 1.00 51.60 13.20


COA 1.00 7.98 9.80
Metrado
Total (m2)

1.06.02 Cobertura con Gran Onda Unidad:


Gráfico Descripción Cantidad Largo (m) Ancho (m) Alto (m)

PARQUE MOTOR 1.00 61.00 17.00

ENTRADA PUERTA 2 1.00 4.00 5.00

CONTROL DE VIGILANCIA 1.00 4.07 6.10

Metrado
Total (m2)
1.06.03 Cobertura con Teja Andina Unidad:
Gráfico Descripción Cantidad Largo (m) Ancho (m) Alto (m)

PORTADA DE INGRESO 1.00 5.00 4.00


CONTROL DE VIGILANCIA 1.00 4.07 6.10
Metrado
Total (m2)

1.06.04 Cumbera Articulada Unidad:


Gráfico Descripción Cantidad Largo (m) Ancho (m) Alto (m)

ALMACENES 1.00 51.60 1.00


PORTADA DE INGRESO 1.00 7.98 1.00
Metrado
Total (ml)

01.07 ESTRUCTURA METALICA

01.07.01 COBERTURA PARQUE MOTOR kg 6,229.80


01.07.02 COBERTURA EN ALMACENES kg 2,866.32
01.07.03 ACERO f'y= 4200 kg/cm2 PARA kg 4,970.81
VIGAS EN CELOCIA PARQUE MOTOR

01.07.04 ACERO f'y= 4200 kg/cm2 PARA kg 2,277.69


VIGAS EN CELOCIA ALAMACENES

1.08 REVOQUES, ENLUCIDOS Y MOLDURAS


1.08.01 TARRAJEO DE MUROS
Muro de cabeza KK de arcilla Unidad:
Elemento
Descripción Nº veces Long (m) Alto (m)
s
PARQUE MOTOR: Primer piso
Herramientas y lubricantes 2.00 10.21 1.00 3.00
Herramientas y lubricantes 2.00 8.18 1.00 3.00
Segundo Piso :
EJE POSTERIOR 1.00 50.35 1.00 3.00
CONTRO DE PATRIMONIO 1.00 9.31 1.00 3.00
OPERACION DE MAQUINARIA 1.00 9.31 1.00 3.00
EJE ESCALERA BANOS 1.00 8.41 1.00 3.00
Metrado
Total (m2)

Muro de Soga - Ladrillo KK de arcilla Unidad:


#Element
Descripción Nº veces Largo (m) Alto (m)
os
Primer Piso :
AUDITORIO 1.00 9.15 1.00 3.00
CONTROL DE PATRIMONIO 2.00 9.16 1.00 3.00
2.00 9.31 1.00 3.00
2.00 9.31 1.00 3.00
CENTRO DE EMERGENCIA 2.00 6.42 1.00 3.00
CENTRO DE EMERGENCIA 2.00 6.42 1.00 3.00
ALMACEN COA 1.00 6.52 1.00 3.00
SSHH 2.00 1.93 1.00 3.00
SSHH 2.00 3.90 1.00 3.00
ESCALERA 2.00 3.50 1.00 3.00
ALMACEN 2.00 1.30 1.00 3.00
FACHADA 2.00 8.92 1.00 3.00
FACHAD 2.00 28.00 1.00 0.90
fachada sobre cielo razo 1.00 56.46 1.00 0.70
Laterales del sobre cielo 1.00 10.36 1.00 2.00
almacen del COE 0.00 7.25 1.00 1.40
Centro de emergencia 0.00 7.17 1.00 1.40
fachada sobre cielo razo(archivo y almacen) 1.00 8.07 1.00 1.40
Guardiania y Control 2.00 10.00 1.00 2.90
Metrado
Total (m2)

1.08.02 TARRAJEO DE COLUMNAS MEZCLA 1:5 C:A


Partida: Tarrajeo de superficie de Columnas con Cemento - Arena Unidad:
Cantidad
Gráfico Descripción Largo (m) # Veces Alto (m)
(m2)
PARQUE MOTOR
C1 6.00 0.90 2.00 7.50
C2 10.00 0.85 2.00 7.50
SEGUNDO PISO ALMACEN
C1 34.00 0.65 2.00 3.00
C2 20.00 0.50 2.00 3.00
SOBRE CIELO RASO
C2 - CENTRALES 7.00 1.00 1.00 2.00
C2-FRONTAL COE 3.00 1.00 1.00 1.40
C2 - LATERALES 2.00 1.30 1.00 0.70
C2 - LATERALES 13.00 1.00 1.00 0.70
Metrado
Total (m2)

1.08.03 TARRAJEO DE VIGAS MEZCLA 1:5 C:A


Tarrajeo de Superficie de Vigas con Cemento Arena Unidad:
Cantidad
Descripción Largo (m) # Veces Alto (m)
(m2)
Segundo piso almacen
VS 1.00 56.46 1.00 0.60
VS 1.00 59.06 1.00 0.90
VS-01 5.00 12.46 1.00 0.90
VS-02 2.00 9.00 1.00 0.60
VA-01 7.00 10.36 1.00 0.60
VA-02 1.00 9.26 1.00 0.60
Metrado
Total (m2)

1.08.04 CIELO RASO CON TEkNOPORT


Partida: Cielo Raso Con Tecknoport Unidad:
Cantidad
Gráfico Descripción Largo (m) # Veces Alto (m)
(m2)
2do piso sin considerar del pasadiso 538.10 1.00

Metrado
Total (m2)

1.08.05 TARRAJEO DE ESCALERA


Partida: 02.10.06.01 Revestimiento en fondo de Escalera - Mezcla 1:5 C:A Unidad:
Gráfico Descripción Cantidad Largo (m) Ancho (m) Alto (m)

Losa inclinada de 1er y 2do tramos 1.00 6.76 1.73


losa plana - descanso 2.00 3.50 3.00
Metrado
Total (m2)

02.10.06.02 Revest. paso y c/paso en Escalera - Mez. 1:4 C:A e = 3cm Unidad:
Descripción Cantidad Largo (m) Ancho (m) Alto (m)

Pasos 23.00 1.73 0.25


Contrapasos 23.00 1.73 0.18
Metrado
Total (m2)

01.08.06 02.10.08.01 Vestidura de derrames Ancho =0.15 Unidad:


Descripción Cantidad Long (m) # Veces Alto (m)

SEGUNDO PISO
P1 6.00 3.00
P3 3.00 3.00
P4 4.00 2.00
P5 1.00 2.10

SEGUNDO PISO
V- 1 5.00 7.20
V- 2 6.00 6.70
V- 3 3.00 3.90
V- 4 1.00 5.20
V- 5 1.00 3.90
V- 6 2.00 3.10
V- 7 4.00 4.00
Metrado
Total (ml)
1.09 PISOS Y PAVIMENTOS
Pisos de Acabado pulido f'c=140 Kg/cm2 e = 4" Unidad:
Descripción Nº VECES Largo (m) Ancho (m) Area (m2)

PRIMER PISO
Almacen Para Materiales 1.00 25.50 9.96 253.98
Alamacen para Alimentos 1.00 19.80 9.96 197.21
oficina de Control 1.00 6.77 3.05 20.65
Guardiania 1.00 6.75 10.35 69.86
SS-HH 1.00 10.11 3.50 35.39
SEGUNDO PISO
SS-HH 1.00 3.50 4.90 17.15
Auditorio municipal 1.00 23.60 9.96 235.06
almacen 1.00 10.11 2.20 22.24
archivo general 1.00 19.80 9.96 197.21
centro de operacion de emergencia 1.00 6.77 3.05 20.65
almacen del coe 1.00 6.75 10.35 69.86
Pasadiso 1.00 104.00
Guardiania 1.00 15.20
Metrado
Total (m2)

SSHH Piso con Ceramicos


SS-HH primer piso 1.00 3.50 4.90 17.15
SS-HH segundo piso 1.00 4.12 3.50 14.42

Metrado
Total (m2)

01.10 ZOCALOS Y
CONTRAZOCALOS

Partida: 02.12.02 Zócalo de Ceramico de 20 x 20 cm Unidad:


Nº de Longitud
Gráfico Descripción Cantidad Alto (m)
veces (m)
Zocalos en el Interior de SS.HH 1.00 2.00 20.54 1.80

Metrado
Total (m2)

1.11 CARPINTERIA DE MADERA

Partida: Puertas Contraplacadas Unidad:


Cantidad Largo (m) Ancho (m) Alto (m)
Primer piso
P2 (Puerta contraplacada ) 1.00 0.90 3.00
Metrado
Total (m2)
Partida: Puertas de madera Tableradas Unidad:
Gráfico Descripción Cantidad Largo (m) Ancho (m) Alto (m)

segundo piso
P1 + una en almacen 7.00 1.00 3.00
P3 3.00 0.80 3.00
P5 1.00 2.00 2.10
P4 4.00 0.80 1.80
Metrado
Total (m2)

Partida: Estructura caseta de vigilancia Unidad:


Ancho
Gráfico Descripción Cantidad Largo (pie) Alto (pulg)
(pulg)
segundo piso
P3 8.00 10.29 2.00 3.00
Metrado
Total (p2)

Partida: Puertas Metalicas Unidad:


Gráfico Descripción Cantidad Largo (m) Ancho (m) Alto (m)

P3 puerta metalica(colocacion) 1.00 4.00 4.00


Metrado
Total (m2)

Partida: 02.14.02 Baranda - Pasamanos de Tub. Ø 2" Unidad:


Descripción Cantidad Largo (m) Ancho (m) Alto (m)

Escalera Graderio de acceso 1.00 15.80


Baranda Segundo Piso 1.00 61.94 1.00
Baranda Primer Piso 1.00 54.95 1.00
Metrado
Total (ml)
1.13 CERRAJERIA

1.13.01 Cerradura de Tres golpes para puerta exterior Unidad:


Gráfico Descripción Cantidad Largo (m) # Veces Alto (m)

Puertas 17.00 1.00


Metrado
Total (und)

1.13.02 Cerradura para Puerta contraplacadas con perilla Unidad:


Gráfico Descripción Cantidad Largo (m) # Veces Alto (m)

Puertas Contraplacadas 9.00 1.00


Metrado
Total (und)

1.13.03 Bisagra capuchina de 3" x 3" Unidad:


#
Gráfico Descripción Cantidad Largo (m) Elemento Alto (m)
s
Puertas 11.00 3.00
Metrado
Total (und)

1.13.04 Bisagra capuchina de 4 " x 4 " Unidad:


#
Gráfico Descripción Cantidad Largo (m) Elemento Alto (m)
s
Puertas- contraplacadas 9.00 6.00
Metrado
Total (und)

1.13.05 Cerrojo de aluminio 3" para puerta Unidad:


Gráfico Descripción Cantidad Largo (m) # Veces Alto (m)

Puertas 20.00 2.00


Metrado
Total (und)

1.13.06 Manija de bronce 4" para puerta Unidad:


Gráfico Descripción Cantidad Largo (m) # Veces Alto (m)

Puertas 20.00 1.00


Metrado
Total (und)

1.14 VIDRIOS, CRISTALES Y SIMILARES


1.14.01 Vidrio semidoble incoloro Unidad:
Factor
Gráfico Descripción Cantidad Largo (m) Alto (m)
(p2/m2)
PRIMER PISO
V1 8.00 3.00 2.10 10.76
V-2 3.00 1.50 3.00 10.76
V-3 2.00 1.00 3.00 10.76
V-4 1.00 1.50 1.20 10.76
V-5 2.00 1.50 0.15 10.76

SEGUNDO PISO
V-1 5.00 3.00 2.10 10.76
V-2 7.00 2.50 2.10 10.76
V-3 3.00 1.50 2.10 10.76
V-4 1.00 1.00 2.10 10.76
V-5 1.00 1.50 1.20 10.76
V-6 2.00 0.70 1.20 10.76
V-7 4.00 1.00 1.50 10.76
Metrado
Total (p2)

1.15 PINTURA
Partida: Pintura de Muros Interiores, Exteriores y Columnas con Latex Acrilico Unidad:
Cantidad
Gráfico Descripción Largo (m) # Veces Alto (m)
(m2)
Muros 1er y 2do piso 1358.00 1.00
Columnas almacen y parque motor 622.82 1.00
Metrado
Total (m2)

Partida: Pintura Látex 2 manos en Vigas ycielorraso Unidad:


Cantidad
Gráfico Descripción Largo (m) # Veces Alto (m)
(m2)
vigas 500.81 1.00
Cielorrasos 661.66 1.00
Metrado
Total (m2)

Partida: Pintura Barniz en puertas de madera 2 Manos Unidad:


Cantidad
Gráfico Descripción Largo (m) # Veces Alto (m)
(m2)
Puertas 5.40 2.00
Puertas con tablero 76.32 2.00
Metrado
Total (m2)

1.16 INSTALACIONES SANITARIAS

1.16.01 APARATOS Y ACCESORIOS SANITARIOS

1.16.01.01 Inodoro Tanque Bajo Blanco Unidad:


Gráfico Descripción Cantidad Nº veces Ancho (m) Alto (m)

Inodoro Tanque Bajo 6.00 1.00


Metrado
Total (pza)

1.16.01.02 Lavatorio de Pared de Color + 1 Llave Unidad:


Gráfico Descripción Cantidad Nº veces Ancho (m) Alto (m)

Lavatorio de Pared de Color + 1 Llave 4.00 1.00


Metrado
Total (pza)

1.16.01.03 Urinario Mingitorio Unidad:


Gráfico Descripción Cantidad Nº veces Long (m) Alto (m)

Urinario Mingitorio 3.00 1.00


Metrado
Total (ml)

1.16.02 SISTEMA DE DESAGUE


1.16.02.01 Sombrero de Ventilacon 2" Unidad:
Gráfico Descripción Cantidad Nº veces Ancho (m) Alto (m)

Sombrero de Ventilación PVC de 2" 2.00 1.00

1.16.02.02 Sumidero de Bronce de 2" Unidad:


Gráfico Descripción Cantidad Nº veces Ancho (m) Alto (m)

Sumidero de bronce de 2" por SS.HH. 4.00 1.00


Metrado
Total (pza)

1.16.03 Registro de Bronce de 4" Unidad:


Gráfico Descripción Cantidad Nº veces Ancho (m) Alto (m)

Registro de bronce de 4" por SS.HH. 4.00 1.00


Metrado
Total (pza)

1.16.02.04 Caja de registro de desague 12"x24" Unidad:


Gráfico Descripción Cantidad Nº veces Ancho (m) Alto (m)

Caja de registro de desague 12"x24" 3.00 1.00


Metrado
Total (pza)

1.16.03 SISTEMA DE AGUA FRIA

1.16.03.01 02.18.03 .01 Salida de agua fria con Tuberia de PVC 1/2" - SAP Unidad:
Gráfico Descripción Cantidad Nº veces Ancho (m) Alto (m)

Salida de agua fria con tub PVC 1/2" p 16.00 1.00


Metrado
Total (pza)

1.16.03.04 02.18.03.05 Valvula de Compuerta de Bronce 1/2" Unidad:


Gráfico Descripción Cantidad Nº veces Ancho (m) Alto (m)

Valvula de Compuerta de Bronce 1/2" 6.00 1.00


Metrado
Total (pza)

1.16.03.05 02.18.03.06 Grifo de Bronce 1/2" Unidad:


Gráfico Descripción Cantidad Nº veces Ancho (m) Alto (m)

Grifos de bronce de 1/2" 4.00 1.00


Metrado
Total (pza)
1.16.04 SISTEMA DE EVACUACION DE AGUA DE LLUVIAS
Partida: 02.19.01 Canaleta de Calamina Galvanizada de aguas de lluvia Unidad:
Gráfico Descripción Cantidad Long (m) Ancho (m) Alto (m)

Canaleta de Calamina Galvanizada Ofic 2.00 64.55


Canaleta de Calamina Galvanizada fach 2.00 62.09
Metrado
Total (ml)

Partida: 02.19.02 Tuberia de Bajada PVC-SAL 4" P/Lluvias Unidad:


Gráfico Descripción Cantidad Long (m) Ancho (m) Alto (m)

Tuberia de Bajada PVC-SAL 4" P/Lluvias Oficinas 1.00 13.50


Tuberia de Bajada PVC-SAL 4" P/Lluvias Fachada Principal1.00 10.00
Metrado
Total (ml)

1.17 INSTALACIONES ELECTRICAS

1.17.01 SALIDA PARA PUNTOS


1.17.01.01 Salida Para centros de luz Unidad:
Gráfico Descripción Cantidad Long (m) Ancho (m) Alto (m)

ALMACEN
Lampara en banos de 1x32 W., 220V, 60 HZ 4
Fluorescente en segundo piso 32
Braquet empotrado en eje A 3
PARQUE MOTOR
Fluorescente en vereda externa 12
Fluorescente en parque motor 19
Lampara en caseta de 1x32 W., 220V, 60 HZ 2
Metrado
Total (pto)

1.17.01.02 Salida Para tomacorriente Unipolar Simple Unidad:


Gráfico Descripción Cantidad Long (m) Ancho (m) Alto (m)

ALMACEN
segundo piso 58
PARQUE MOTOR
primer piso 19
GARAJE 2
Metrado
Total (pto)

INTERRUPTORES
1.17.01.03 Interruptor simple Unidad:
Gráfico Descripción Cantidad Long (m) Ancho (m) Alto (m)

Almacen segundo piso 20


Parque motor y eflorecentes exteriores 16
Caseta 2
Metrado
Total (und)

1.17.01.04 interruptor de Conmutacion Simple Unidad:


Gráfico Descripción Cantidad Long (m) Ancho (m) Alto (m)

Interruptores simples 2.00


Metrado
Total (und)

1.17.01.05 Interruptor Conmutacion Doble Unidad:


Gráfico Descripción Cantidad Long (m) Ancho (m) Alto (m)

Interruptores simples 2.00


Metrado
Total (und)
1.17.02 TUBERIAS PVC
1.17.02.01 Tubería PVC SAP D=3/4" Unidad:
Gráfico Descripción Cantidad Long (m) Ancho (m) Alto (m)

Tubería PVC-SEL 3/4" 1.00 20.00


Tubería PVC-SEL 3/4" 1.00 1153.00
Metrado
Total (ml)

1.17.03 CABLEADO
1.17.03.01 Cable Electrico TW AWG-MCM Nº 12 - 4.0 mm2 Unidad:
Gráfico Descripción Cantidad Long (m) Ancho (m) Alto (m)

Cable Electrico TW AWG Nº 12 - 4.00 mm2 2.00 340.00


Metrado
Total (ml)
1.17.03.02 Cable Electrico TW AWG-MCM Nº 14 - 2.5 mm2 Unidad:
Gráfico Descripción Cantidad Long (m) Ancho (m) Alto (m)

Cable Electrico TW AWG Nº 14 - 2.5 mm2 2.00 833.00


Metrado
Total (ml)

1.17.04 TABLERO DE DISTRIBUCION


1.17.04.01 Tablero distribución Unidad:
Gráfico Descripción Cantidad Long (m) Ancho (m) Alto (m)

Tablero automático de 8 polos 2


Tablero automático de 9 polos 1
Metrado
Total (und)
1.17.05 LAMPARAS Y ARTEFACTOS
1.17.05.01 Fluorescente recto 2x40W Incluyendo Equipo y Pantall Unidad:
Gráfico Descripción Cantidad Long (m) Ancho (m) Alto (m)

Fluorescente recto 2x40 W 66.00


Metrado
Total (und)

1.17.05.02 Fluorescente recto 2x20W Incluyendo Equipo y Pantall Unidad:


Gráfico Descripción Cantidad Long (m) Ancho (m) Alto (m)

En Pasadizos y SSHH 36.00


Metrado
Total (und)
1.17.06 INTERRUPTORES
1.17.06.01 Interruptor Termomagnetico Monofasico 2x32 AMP. Unidad:
Gráfico Descripción Cantidad Long (m) Ancho (m) Alto (m)

Llave Interruptor Termomagnetica de 2x15 AMP. 7.00


Metrado
Total (und)
1.17.06.02 nterruptor Termomagnetico 2x40 AMP. Unidad:
Gráfico Descripción Cantidad Long (m) Ancho (m) Alto (m)

Llave Interruptor Termomagnetica de 3x20 AMP. 5.00


Metrado
Total (und)

1.17.06.03 Interruptor Termomagnetico Trifasico 2x60 AMP. Unidad:


Gráfico Descripción Cantidad Long (m) Ancho (m) Alto (m)

Llave Interruptor Termomagnetica de 3x60 AMP. 4.00


Metrado
Total (und)

1.17.07 POZO PUESTA A TIERRA


1.17.07.01 Pozo Puesta a Tierra Unidad:
Gráfico Descripción Cantidad Long (m) Ancho (m) Alto (m)

Pozo de tierra del Sistema eléctrico 1.00


Metrado
Total (und)
1.17.08 PRUEBA ELECTRICA
1.17.08.01 Prueba Electrica Unidad:
Gráfico Descripción Cantidad Long (m) Ancho (m) Alto (m)

prueba electrica 1.00


Metrado
Total (glb)

1.18 VEREDAS
1.18.01 Veredas Concreto f'c=140 Kg/cm2 e = 4" Unidad:
Gráfico Descripción Cantidad Largo (m) Ancho (m) Alto (m)

Frontal Almacenes , Guardiania y Control 1.00 61.95 1.50

Metrado
Total (m2)
1.18.02 Veredas - Encofrado y desencofrado Unidad:
Gráfico Descripción Cantidad Largo (m) Ancho (m) Alto (m)

Frontal Alamcenes, Guardiania y Control 2.00 61.95 0.20 1.50

Metrado
Total (m2)

1.18.03 Juntas de dilatación con Arena y Asfalto Unidad:


Gráfico Descripción Cantidad Long (m) Ancho (m) Alto (m)

Veredas interiores 21.00 1.50

Metrado
Total (ml)

1.18.04 Sardineles de Concreto de f'c=140 Kg/Cm2 E = 4" Unidad:


Gráfico Descripción Cantidad Long (m) Ancho (m) Alto (m)

fachada principal 1.00 85.14


fachada lateral 1.00 51.23
borde 4.00 1.00
Metrado
Total (ml)

1.18.05 Sardineles Encofrado y Desencofrado Unidad:


Gráfico Descripción Cantidad Long (m) lados (m) Alto (m)

fachada principal 1.00 85.14 2.00 0.10


fachada lateral 1.00 51.23 2.00 0.10
borde 4.00 1.00 2.00 0.10
Metrado
Total (m2)

1.18.06 Colocacion Adoquines de Concreto de Color Unidad:


Gráfico Descripción Cantidad Largo (m) Ancho (m) Alto (m)

Frontal Parque Motor 1.00 95.56 1.00


fachada lateral 1.00 51.70 1.00
Metrado
Total (m2)

1.18.07 RAMPA DE CONCRETO Unidad:


Cantidad
Gráfico Descripción Largo (m) Ancho Perim (m)
(ml)
Rampas de concreto 1.00 14.09 4.00
Metrado
Total (m2)
932.23
Parcial

92.93
95.56
51.70
97.77
518.44
75.84

929.31
90.00
95.56
51.70
97.77
518.44
75.84

416.96

Parcial

1.73
58.66
311.06
45.50

930.75
Parcial

1.44
90.00
95.56
51.70
97.77
518.44
75.84

14.73
Parcial

9.56
5.17
929.31

Parcial

90.00
95.56
51.70
97.77
518.44
75.84

1.44
Parcial
(m3)
1.44

692.05
Parcial
(m2)
97.77
518.44
75.84

150.00
Parcial
(ml)
150.00

75.00
Parcial
(m2)
75.00

37.17
Parcial
(m3)
37.17

1.44
Parcial
(m3)
1.44
LONGITUD POR DIAMETRO
1/2" 5/8"
6.30
6.30
12.60 0.00
12.60 0.00
12.60
TOTAL 12.60

3.53
Parcial
(m3)

1.35

0.88
0.13
0.18
0.44
0.14

41.87
Parcial
(m2)

12.75

14.00
4.20
1.82
9.10

LONGITUD POR DIAMETRO

1/2" 5/8" 3/4"

16.50
33.00
33.00
56.00
16.80
42.00

131.30 33.00 33.00


0.994 1.552 2.235
130.51 51.22 73.76
829.73
TOTAL 829.73

8.10
Parcial
(m3)

6.40
1.70

14.40
Parcial
(m2)

10.32
4.08

LONGITUD POR DIAMETRO


1/2" 5/8"
268.00

72.80

0.00 340.80
0.994 1.551
0.00 528.51
853.20
TOTAL 853.20
m2
Metrado
Parcial

30.63
24.53

55.16

m2
Metrado
Parcial

103.60
5.08
5.02
11.30
79.04

215.70

m2
Metrado
Parcial
681.12
78.20

759.32

m2
Metrado
Parcial

1037.00

20.00

24.83

1081.83
m2
Metrado
Parcial
20.00
24.83

44.83

ml
Metrado
Parcial
51.60
7.98

59.58

882.06 m2
m2
Metrado
Parcial

61.26
49.05

151.05
27.93
27.93
25.23

342.45

m2
Metrado
Parcial
27.45
54.96
55.86
55.86
38.52
38.52
19.56
11.58
23.40
21.00
7.80
53.52
50.40
39.52
10.36
0.00
0.00
11.30
20.00

539.61

m2
Metrado
Parcial

81.00
127.50

132.60
60.00

14.00
4.20
1.82
9.10

430.22

m2
Metrado
Parcial

33.88
53.15
56.07
10.80
43.51
5.56
202.97

m2
Metrado
Parcial
538.10

538.10

m2
Metrado
Parcial
11.69
21.00
32.69

m2
Metrado
Parcial
9.95
7.16

17.11

ml
Metrado
Parcial

18.00
9.00
8.00
2.10

36.00
40.20
11.70
5.20
3.90
6.20
16.00

134.10
m2
Metrado
Parcial

253.98
197.21
20.65
69.86
35.39

17.15
235.06
22.24
197.21
20.65
69.86
104.00
15.20

1831.30

17.15
14.42

31.57

m2
Metrado
Parcial
73.94

73.94

m2
Metrado
Parcial
2.70

2.70
m2
Metrado
Parcial

21.00
7.20
4.20
5.76

38.16

m2
Metrado
Parcial

38.00

38.00

m2
Metrado
Parcial
16.00

16.00

ml
Metrado
Parcial
15.80
61.94
54.95

132.69

und
Metrado
Parcial
17.00

17.00

und
Metrado
Parcial
9.00

9.00

und
Metrado
Parcial

33.00

33.00

und
Metrado
Parcial

54.00

54.00

und
Metrado
Parcial
40.00

40.00

und
Metrado
Parcial
20.00

20.00

p2
Metrado
Parcial

542.30
145.26
64.56
19.37
4.69

338.94
395.43
101.68
22.60
19.37
18.08
64.56

1,736.83

m2
Metrado
Parcial
1358.00
622.82

1,980.82

m2
Metrado
Parcial
500.81
661.66

1162.47

m2
Metrado
Parcial
10.80
161.24

172.04

PZA
Metrado
Parcial
6.00

6.00

PZA
Metrado
Parcial
4.00

4.00

Und
Metrado
Parcial
3.00

3.00
PZA
Metrado
Parcial
2.00

PZA
Metrado
Parcial
4.00

4.00

PZA
Metrado
Parcial
4.00

4.00

PZA
Metrado
Parcial
3.00

3.00

PZA
Metrado
Parcial
8.00

8.00

PZA
Metrado
Parcial
6.00

6.00

PZA
Metrado
Parcial
4.00

4.00
ml
Metrado
Parcial
129.10
124.18

253.28

ml
Metrado
Parcial
13.50
10.00

23.50

pto
Metrado
Parcial

4
32
3

12
19
2

72.00

pto
Metrado
Parcial

58

19
2

79.00

und
Metrado
Parcial
20
16
2
38.00

und
Metrado
Parcial
2.00

2.00

und
Metrado
Parcial
2.00

2.00

ml
Metrado
Parcial
20.00
1153.00

1173.00

ml
Metrado
Parcial
680.00

680.00
ml
Metrado
Parcial
1666.00

1666.00

und
Metrado
Parcial
2
1

3.00

und
Metrado
Parcial
66.00
66.00

und
Metrado
Parcial
36.00

36.00

und
Metrado
Parcial
7.00

7.00
und
Metrado
Parcial
5.00

5.00

und
Metrado
Parcial
4.00

4.00

und
Metrado
Parcial
1.00

1.00

ml
Metrado
Parcial

1.00

m2
Metrado
Parcial
92.93

92.93
m2
Metrado
Parcial
185.85

185.85

ml
Metrado
Parcial
31.50

31.50

ml
Metrado
Parcial
85.14
51.23
4.00

140.37

m2
Metrado
Parcial
17.03
10.25
0.80

28.07

m2
Metrado
Parcial
95.56
51.70

147.26

m2
Metrado
Parcial
56.36

56.36
Segundo piso almacen
VS 1.00
VS 1.00
VS-01 5.00
VS-02 2.00
VA-01 7.00
VA-02 1.00
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso almacen
56.46 1.00 0.60 33.88 VS 1.00
59.06 1.00 0.90 53.15 VS 1.00
12.46 1.00 0.90 56.07 VS-01 5.00
9.00 1.00 0.60 10.80 VS-02 2.00
10.36 1.00 0.60 43.51 VA-01 7.00
9.26 1.00 0.60 5.56 VA-02 1.00
Metrado Total
(m2) 202.97
Segundo piso
56.46 1.00 0.60 33.88 VS
59.06 1.00 0.90 53.15 VS
12.46 1.00 0.90 56.07 VS-01
9.00 1.00 0.60 10.80 VS-02
10.36 1.00 0.60 43.51 VA-01
9.26 1.00 0.60 5.56 VA-02
Metrado Total
(m2) 202.97
PLANILLA DE SUSTENTACION DE METRADOS

01 MODULO DE ALMACENES Y PARQUE MOTOR

02.01.01 5
01.01 TRABAJOS PRELIMINARES
01.01.01 Limpieza de Terreno Manual
Partida Descripción Nº veces Largo (m) Ancho (m)
VEREDA DE ALMACEN 1.00 60.00 1.50
VEREDA FRONTAL 1.00 95.56 1.00
VEREDA LATERAL 1.00 51.70 1.00
1.00 1.00 97.77
Parque motor 1.00 43.75 11.85
1.00 6.40 11.85

01.01.01 Trazo y Replanteo


VEREDA DE ALMACEN 1.00 60.00 1.50
VEREDA FRONTAL 1.00 95.56 1.00
VEREDA LATERAL 1.00 51.70 1.00
1.00 1.00 97.77
Parque motor 1.00 43.75 11.85
1.00 6.40 11.85

02.02. MOVIMIENTO DE TIERRAS


02.02.01 Excavación En terreno Natural

Partida Descripción Nº veces Largo (m) Ancho (m)

zapata Z-2 1.00 1.20 1.20


1.00 1.00 97.77
Parque motor 1.00 43.75 11.85
1.00 6.40 11.85

02.02.02 Afirmado e=10cm para zapata, parque motor y vereda de almacen compactado
Descripción Nº veces Largo (m) Ancho (m)
zapata Z-2 1.00 1.20 1.20
VEREDA DE ALMACEN 1.00 60.00 1.50
VEREDA FRONTAL 1.00 95.56 1.00
VEREDA LATERAL 1.00 51.70 1.00
1.00 1.00 97.77
Parque motor 1.00 43.75 11.85
1.00 6.40 11.85

02.02.03 Arena fina para adoquinado


Descripción Nº veces Largo (m) Ancho (m)
VEREDA FRONTAL 1.00 95.56 1.00
VEREDA LATERAL 1.00 51.70 1.00

02.02.04 Nivelacion interior y apisonado para pisos


Descripción Nº veces Largo (m) Ancho (m)
VEREDA DE ALMACEN 1.00 60.00 1.50
VEREDA FRONTAL 1.00 95.56 1.00
VEREDA LATERAL 1.00 51.70 1.00
1.00 1.00 97.77
Parque motor 1.00 43.75 11.85
Parque motor
1.00 6.40 11.85

02.02.05. Acarreo de material excedente, con transporte (carguio a mano)

Descripción Cantidad Largo (m) Ancho (m)

zapata Z-2 1.00 1.20 1.20


1.00 1.00 97.77
Parque motor 1.00 43.75 11.85
1.00 6.40 11.85
01.03 OBRAS DE CONCRETO SIMPLE
01.03.01 Zolado para zapata e=4" C:H 1:12

Descripción Nº veces Largo (m) Ancho (m)

Zapata: Z-2 1.00 1.20 1.20

01.03.02 Falso piso de concreto 4"

Descripción Nº veces Largo (m) Ancho (m)

1.00 1.00 97.77


Parque motor 1.00 43.75 11.85
1.00 6.40 11.85
01.03.02 Canaleta de concreto para evacuacion e=0.10 cm

Descripción Nº veces Largo (m) Ancho (m)

Canaleta de concreto para evacuacion 2.00 75.00

01.03.02 Encofrado y desencofrado de canaleta

Descripción Nº veces Largo (m) Ancho (m)

Encofrado y desencofrado de canaleta 2.00 75.00 0.50


DOS

#REF! M2

929.31 M2
Alto (m) Parcial
90.00
95.56
51.70
97.77
518.44
75.84

929.31 M2
90.00
95.56
51.70
97.77
518.44
75.84

416.96 M3

Alto (m) Parcial

1.20 1.73
0.60 58.66
0.60 311.06
0.60 45.50

930.75 M2
Alto (m) Parcial
1.44
90.00
95.56
51.70
97.77
518.44
75.84

14.73 M3
Alto (m) Parcial
0.10 9.56
0.10 5.17

929.31 M2
Alto (m) Parcial
90.00
95.56
51.70
97.77
518.44
75.84

519.03 M3
Parcial
FACTOR
(m3)
1.20 1.73
0.60 58.66
0.60 311.06
0.60 45.50
1.44 M3
Parcial
Alto (m)
(m3)
1.44

692.05 M2
Parcial
Alto (m)
(m2)
97.77
518.44
75.84
150.00 ML

Alto (m) Parcial (ml)

150.00

75.00 M2
Parcial
Alto (m)
(m2)
75.00
COLUMNAS

02.04.08 Encofrado y desencofrado en Columnas


Descripción Nº veces Largo (m) # caras Alto (m) Parcial (m2)
PARQUE MOTOR
C1 6.00 0.90 2.00 7.50 81.00
C2 10.00 0.85 2.00 7.50 127.50
SEGUNDO PISO
ALMACEN
C1 34.00 0.65 2.00 3.00 132.60
C2 20.00 0.50 2.00 3.00 60.00
SOBRE CIELO RASO
C2 - CENTRALES 7.00 1.00 1.00 2.00 14.00
C2-FRONTAL COE 3.00 1.00 1.00 1.40 4.20
C2 - LATERALES 2.00 1.30 1.00 0.70 1.82
C2 - LATERALES 13.00 1.00 1.00 0.70 9.10

COLUMNAS PRIMER PISO

02.04.08 Encofrado y desencofrado en Columnas


Primer piso
C1 34.00 0.65 2.00 3.00 132.60
C2 20.00 0.50 2.00 3.00 60.00
430.22 M2

192.60 M2
v

622.82
VIGAS
Partida: 02.04.11 Encofrado y desencofrado de Vigas Unidad:
Gráfico Descripción Nº veces Largo (m) # caras Perim (m)

Segundo piso almacen


VS 1.00 56.46 1.00 0.60
VS 1.00 59.06 1.00 0.90
VS-01 5.00 12.46 1.00 0.90
VS-02 2.00 9.00 1.00 0.60
VA-01 7.00 10.36 1.00 0.60
VA-02 1.00 9.26 1.00 0.60
Metrado Total
(m2)
m2
Metrado
Parcial

33.88
53.15
56.07
10.80
43.51
5.56

202.97
02.07.00 MUROS Y TABIQUES DE ALBAÑILERIA
02.07.01 Muro de cabeza KK de arcilla Unidad:
Gráfico Descripción Nº veces Long (m) Elementos Alto (m)

PARQUE MOTOR: Primer piso


Herramientas y lubricantes 1.00 10.21 1.00 3.00
Herramientas y lubricantes 1.00 8.18 1.00 3.00
Metrado
Total (m2)

02.07.02 Muro de Soga - Ladrillo KK de arcilla Unidad:


Gráfico Descripción Nº veces Largo (m) #Elementos Alto (m)

segundo piso: sobre cielo razo


Laterales del sobre cielo 5.00 10.36 2.00 2.00
almacen del COE 1.00 7.25 1.00 1.40
Centro de emergencia 1.00 7.17 1.00 1.40
fachada sobre cielo razo(archivo y almacen) 1.00 8.07 1.00 1.40
fachada sobre cielo razo 2.00 56.46 1.00 0.70
Metrado
Total (m2)

02.08 CUBIERTAS
Partida: 02.08.01 Cobertura con gran onda en almacenes Unidad:
Gráfico Descripción Cantidad Largo (m) Ancho (m) Alto (m)

ALMACENES 1.00 51.60 13.20


COA 1.00 7.98 9.80
Metrado
Total (m2)

Partida: 02.08.02 Cobertura con Gran Onda Unidad:


Gráfico Descripción Cantidad Largo (m) Ancho (m) Alto (m)

PARQUE MOTOR 1.00 61.00 17.00


ENTRADA PUERTA 2 1.00 4.00 5.00
CONTROL DE VIGILANCIA 1.00 4.07 6.10
Metrado
Total (m2)

Partida: 02.08.03 Cumbera Articulada Unidad:


Gráfico Descripción Cantidad Largo (m) Ancho (m) Alto (m)

ALMACENES 1.00 50.60 1.00


PORTADA DE INGRESO 1.00 5.00 1.00

Metrado
Total (ml)
m2
Metrado
Parcial

30.63
24.53

55.16

m2
Metrado
Parcial

103.60
5.08
5.02
11.30
79.04

215.70

m2
Metrado
Parcial
681.12
78.86

759.98

m2
Metrado
Parcial
1037.00
20.00
24.83

1081.83

ml
Metrado
Parcial
50.60
5.00

55.60
TARRAJEO DE MUROS
Muro de cabeza KK de arcilla
Descripción Nº veces Long (m) Elementos

PARQUE MOTOR: Primer piso


Herramientas y lubricantes 2.00 10.21 1.00
Herramientas y lubricantes 2.00 8.18 1.00
Segundo Piso :
EJE POSTERIOR 1.00 50.35 1.00
CONTRO DE PATRIMONIO 1.00 9.31 1.00
OPERACION DE MAQUINARIA 1.00 9.31 1.00
EJE ESCALERA BANOS 1.00 8.41 1.00

Muro de Soga - Ladrillo KK de arcilla


Descripción Nº veces Largo (m) #Elementos

Primer Piso :
AUDITORIO 1.00 9.15 1.00
CONTROL DE PATRIMONIO 2.00 9.16 1.00
2.00 9.31 1.00
2.00 9.31 1.00
CENTRO DE EMERGENCIA 2.00 6.42 1.00
CENTRO DE EMERGENCIA 2.00 6.42 1.00
ALMACEN COA 1.00 6.52 1.00
SSHH 2.00 1.93 1.00
SSHH 2.00 3.90 1.00
ESCALERA 2.00 3.50 1.00
ALMACEN 2.00 1.30 1.00
FACHADA 2.00 8.92 1.00
FACHAD 2.00 28.00 1.00
fachada sobre cielo razo 1.00 56.46 1.00
Laterales del sobre cielo 1.00 10.36 1.00
almacen del COE 0.00 7.25 1.00
Centro de emergencia 0.00 7.17 1.00
fachada sobre cielo razo(archivo y almacen) 1.00 8.07 1.00
Guardiania y Control 2.00 10.00 1.00
Unidad: m2
Metrado
Alto (m)
Parcial

3.00 61.26
3.00 49.05

3.00 151.05
3.00 27.93
3.00 27.93
3.00 25.23
Metrado
Total (m2) 342.45

Unidad: m2
Metrado
Alto (m)
Parcial

3.00 27.45
3.00 54.96
3.00 55.86
3.00 55.86
3.00 38.52
3.00 38.52
3.00 19.56
3.00 11.58
3.00 23.40
3.00 21.00
3.00 7.80
3.00 53.52
0.90 50.40
0.70 39.52
2.00 10.36 169.38
1.40 0.00 508.14
1.40 0.00
1.40 11.30
2.90 20.00
Metrado
Total (m2) 539.61
2.10 REVOQUES, ENLUCIDOS Y MOLDURAS
02.10.01 TARRAJEO DE MUROS
Partida: 02.10.01.01 Tarrajeo de muros Interior y Exterior - Mezcla 1:5 C:A
Cantidad
Gráfico Descripción Long (m) # Veces
(m2)

Muros de cabeza 342.45 1.00


Muros de soga 539.61 1.00

02.10.02 TARRAJEO DE COLUMNAS MEZCLA 1:5 C:A


Partida: 02.10.01.02 Tarrajeo de superficie de Columnas con Cemento - Arena
Cantidad
Gráfico Descripción Largo (m) # Veces
(m2)
Del encofrado de columnas 430.22 1.00

02.10.03 TARRAJEO DE VIGAS MEZCLA 1:5 C:A


Partida: Tarrajeo de Superficie de Vigas con Cemento Arena
Cantidad
Gráfico Descripción Largo (m) # Veces
(m2)
Del encofrado de vigas 202.97 1.00

02.10.04 TARRAJEO EN CIELOS RASO MEZCLA 1:5 C:A


Partida: Tarrajeo en Cielorrasos, (Mortero 1:5 )
Cantidad
Gráfico Descripción Largo (m) # Veces
(m2)
1er piso 0.00 1.00

02.10.05 CIELO RASO CON TECNOPORT


Partida: Cielo Raso Con Tecknoport
Cantidad
Gráfico Descripción Largo (m) # Veces
(m2)
2do piso sin considerar del pasadiso 538.10 1.00

02.10 .06 TARRAJEO DE ESCALERA


Partida: 02.10.06.01 Revestimiento en fondo de Escalera - Mezcla 1:5 C:A
Gráfico Descripción Cantidad Largo (m) Ancho (m)

Losa inclinada de 1er y 2do tramos 1.00 6.76 1.73


losa plana - descanso 1.00 3.50 3.00
Partida: 02.10.06.02 Revest. paso y c/paso en Escalera - Mez. 1:4 C:A e = 3cm.
Gráfico Descripción Cantidad Largo (m) Ancho (m)

Pasos 23.00 1.73 0.25


Contrapasos 23.00 1.73 0.18
02.10.08 VESTIDURA DE DERRAMES
Partida: 02.10.08.01 Vestidura de derrames Ancho =0.15
Gráfico Descripción Cantidad Long (m) # Veces

SEGUNDO PISO

V- 1 5.00 7.20
V- 2 6.00 6.70
V- 3 3.00 3.90
V- 4 1.00 5.20
V- 5 1.00 3.90
V- 6 2.00 3.10

02.11 PISOS Y PAVIMENTOS


02.11.01 Pisos de Acabado pulido f'c=140 Kg/cm2 e = 4"
Descripción Nº VECES Largo (m) Ancho (m)

Almacen Para Materiales 1.00 25.50 9.96


Alamacen para Alimentos 1.00 19.80 9.96
oficina de Control 1.00 6.77 3.05
Guardiania 1.00 6.75 10.35
SS-HH 1.00 10.11 3.50
SEGUNDO PISO

SS-HH 1.00 3.50 4.90


Auditorio municipal 1.00 23.60 9.96
almacen 1.00 10.11 2.20
archivo general 1.00 19.80 9.96
centro de operacion de emergencia 1.00 6.77 3.05
almacen del coe 1.00 6.75 10.35

02.11.02 SSHH Piso con Ceramicos


SS-HH primer piso 1.00 3.50 4.90
SS-HH segundo piso 1.00 4.12 3.50

02.13 CARPINTERIA DE MADERA

Partida: 02.13.01 Puertas Contraplacadas


Cantidad Largo (m) Ancho (m)
Primer piso
Segundo piso
P2 (Puerta contraplacada ) 1.00 0.90

Partida: 02.13.02 Puertas de madera Tableradas


Gráfico Descripción Cantidad Largo (m) Ancho (m)

segundo piso

P1 + una en almacen 7.00 1.00

P3 2.00 0.80

P4 1.00 2.00
P6 2.00 0.80

02.14 CARPINTERIA METALICA

Partida: 02.14.01 Puertas Metalicas


Gráfico Descripción Cantidad Largo (m) Ancho (m)

P3 puerta metalica(colocacion) 1.00 4.00

Partida: 02.14.02 Baranda - Pasamanos de Tub. Ø 2"


Descripción Cantidad Largo (m) Ancho (m)

Escalera Graderio de acceso 1.00 15.80


Baranda Segundo Piso 1.00 61.94
Baranda Primer Piso 1.00 54.95

02.15 CERRAJERIA

Partida: 02.15.01 Cerradura de Tres golpes para puerta exterior


Gráfico Descripción Cantidad Largo (m) # Veces
Puertas 17.00 1.00

Partida: 02.15.02 Cerradura para Puerta contraplacadas con perilla


Gráfico Descripción Cantidad Largo (m) # Veces
Puertas Contraplacadas 5.00 1.00

Partida: 02.15.03 Bisagra capuchina de 3" x 3"


Gráfico Descripción Cantidad Largo (m) # Elementos

Puertas 11.00 3.00

Partida: 02.15.04 Bisagra capuchina de 4 " x 4 "


Gráfico Descripción Cantidad Largo (m) # Elementos

Puertas- contraplacadas 9.00 6.00

Partida: 02.15.05 Cerrojo de aluminio 3" para puerta


Gráfico Descripción Cantidad Largo (m) # Veces

Puertas 20.00 2.00

Partida: 02.15.06 Manija de bronce 4" para puerta


Gráfico Descripción Cantidad Largo (m) # Veces

Puertas 20.00 1.00

02.16 VIDRIOS, CRISTALES Y SIMILARES


Partida: 02.16.01 Vidrio semidoble incoloro
Gráfico Descripción Cantidad Largo (m) Alto (m)

PRIMER PISO
V1 8.00 3.00 2.10
V-2 3.00 1.50 3.00
V-3 2.00 1.00 3.00
V-4 1.00 1.50 1.20
V-5 1.00 1.50 0.15
SEGUNDO PISO
V-1 5.00 3.00 2.10
V-2 6.00 2.50 2.10
V-3 5.00 1.50 2.10
V-4 1.00 1.00 2.10
V-5 1.00 1.50 1.20
V-6 1.00 0.70 1.20
V-7 4.00 1.00 1.50

02.17 PINTURA
Partida: 02.17.01 Pintura de Muros Interiores, Exteriores y Columnas con Latex Acrilico
Cantidad
Gráfico Descripción Largo (m) # Veces
(m2)
Muros 1er y 2do piso 430.22 1.00
Columnas 202.97 1.00

Partida: 02.17.01 Pintura Látex 2 manos en Vigas ycielorraso


Cantidad
Gráfico Descripción Largo (m) # Veces
(m2)

Cielorrasos 661.66 1.00

Partida: 02.17.03 Pintura Barniz en puertas de madera 2 Manos


Cantidad
Gráfico Descripción Largo (m) # Veces
(m2)
Puertas 2.70 2.00
Puertas con tablero 34.80 2.00
Unidad: m2
Metrado
Alto (m)
Parcial

342.45
539.61
Metrado
Total (m2) 882.06

Unidad: m2
Metrado
Alto (m)
Parcial
430.22
Metrado
Total (m2) 430.22

Unidad: m2
Metrado
Alto (m)
Parcial
202.97
Metrado
Total (m2) 202.97

Unidad: m2
Metrado
Alto (m)
Parcial
0.00

Metrado
Total (m2) 0.00

Unidad: m2
Metrado
Alto (m)
Parcial
538.10

Metrado
Total (m2) 538.10

Unidad: m2
Metrado
Alto (m)
Parcial
11.69
10.50
Metrado
Total (m2) 22.19

Unidad: m2
Metrado
Alto (m)
Parcial
9.95
7.16
Metrado
Total (m2) 17.11
Unidad: ml
Metrado
Alto (m)
Parcial

36.00
40.20
11.70
5.20
3.90
6.20
Metrado
Total (ml) 97.00

Unidad: m2
Metrado
Area (m2)
Parcial
253.98 253.98
197.21 197.21
20.65 20.65
69.86 69.86
35.39 35.39

17.15 17.15
235.06 235.06
22.24 22.24
197.21 197.21
20.65 20.65
69.86 69.86
Metrado
Total (m2) 1139.25

17.15 17.15
14.42 14.42

Metrado
Total (m2) 31.57

Unidad: m2
Metrado
Alto (m)
Parcial
3.00 2.70
Metrado
Total (m2) 2.70

Unidad: m2
Metrado
Alto (m)
Parcial

3.00 21.00

3.00 4.80

2.10 4.20
3.00 4.80
Metrado
Total (m2) 34.80

Unidad: m2
Metrado
Alto (m)
Parcial
4.00 16.00
Metrado
Total (m2) 16.00

Unidad: ml
Metrado
Alto (m)
Parcial
15.80
1.00 61.94
1.00 54.95
Metrado
Total (ml) 132.69

Unidad: und
Metrado
Alto (m)
Parcial
17.00
Metrado
Total (und) 17.00

Unidad: und
Metrado
Alto (m)
Parcial
5.00
Metrado
Total (und) 5.00

Unidad: und
Metrado
Alto (m)
Parcial
33.00
Metrado
Total (und) 33.00

Unidad: und
Metrado
Alto (m)
Parcial
54.00
Metrado
Total (und) 54.00

Unidad: und
Metrado
Alto (m)
Parcial
40.00
Metrado
Total (und) 40.00

Unidad: und
Metrado
Alto (m)
Parcial
20.00
Metrado
Total (und) 20.00

Unidad: p2
Factor Metrado
(p2/m2) Parcial
10.76 542.30
10.76 145.26
10.76 64.56
10.76 19.37
10.76 2.42
10.76 338.94
10.76 338.94
10.76 169.47
10.76 22.60
10.76 19.37
10.76 9.04
10.76 64.56
Metrado
Total (p2) 1,736.83

Unidad: m2
Metrado
Alto (m)
Parcial
430.22
202.97
Metrado
Total (m2) 633.19

Unidad: m2
Metrado
Alto (m)
Parcial

661.66
Metrado
Total (m2) 661.66

Unidad: m2
Metrado
Alto (m)
Parcial
5.40
69.60
Metrado
Total (m2) 75.00
02.18 APARATOS Y ACCESORIOS SANITARIOS

Partida: 02.18.01.01 Inodoro Tanque Bajo Blanco


Nº Ancho
Gráfico Descripción Cantidad
veces (m)
Inodoro Tanque Bajo 6.00 1.00

Partida: 02.18.01.02 Lavatorio de Pared de Color + 1 Llave


Nº Ancho
Gráfico Descripción Cantidad
veces (m)
Lavatorio de Pared de Color + 1 Llave 4.00 1.00

Partida: 02.18.01.04 Urinario Mingitorio



Gráfico Descripción Cantidad Long (m)
veces
Urinario Mingitorio 3.00 1.00

SISTEMA DE DESAGUE

Partida: 02.18.02.01 Salida de PVC Desague 2"


Nº Ancho
Gráfico Descripción Cantidad
veces (m)
Salida de desague en PVC por SS.HH. 2.00 1.00

Partida: 02.18.02 .02 Salida de Desague 4"


Nº Ancho
Gráfico Descripción Cantidad
veces (m)
Salida de Desague 13.00 1.00

Partida: 02.18.02.03 Salida de Ventilacon 2"


Nº Ancho
Gráfico Descripción Cantidad
veces (m)
Salida de Ventilación PVC de 2" 2.00 1.00

Partida: 02.18.02.04 Sombrero de Ventilacon 2"


Nº Ancho
Gráfico Descripción Cantidad
veces (m)
Sombrero de Ventilación PVC de 2" 2.00 1.00

Partida: 02.18.02.05 Tubería PVC SAL 4"



Gráfico Descripción Cantidad Long (m)
veces
Tuberia PVC D=4" 1.00 1.00 75.00

Partida: 02.18.02.06 Tubería PVC SAP D=2"



Gráfico Descripción Cantidad Long (m)
veces
Tuberia PVC D=2" en Lavadero y SS.HH. 1.00 1.00 32.50

Partida: 02.18.02.07 Accesrios PVC en Desague


Nº Ancho
Gráfico Descripción Cantidad
veces (m)
Codo de 90° PVC 4" 9.00 1.00

Partida: 02.18.02.08
Nº Ancho
Gráfico Descripción Cantidad
veces (m)
Codo de PVC 2" 8.00 1.00

Partida: 02.18.02.09
Nº Ancho
Gráfico Descripción Cantidad
veces (m)
Yee de PVC 4" 5.00 1.00

Partida: 02.18.02.10
Nº Ancho
Gráfico Descripción Cantidad
veces (m)
Yee de PVC 2" 4.00 1.00

Partida: 02.18.02.11
Nº Ancho
Gráfico Descripción Cantidad
veces (m)
Yee de PVC 4"- 2" 5.00 1.00

Partida: 02.18.02.12 Sumidero de Bronce de 2"


Nº Ancho
Gráfico Descripción Cantidad
veces (m)
Sumidero de bronce de 2" por SS.HH. 4.00 1.00
Partida: 02.18.02.13 Registro de Bronce de 4"
Nº Ancho
Gráfico Descripción Cantidad
veces (m)
Registro de bronce de 4" por SS.HH. 4.00 1.00

Partida: 02.18.02.14 Caja de registro de desague 12"x24"


Nº Ancho
Gráfico Descripción Cantidad
veces (m)
Caja de registro de desague 12"x24" 3.00 1.00
02.18.03 SISTEMA DE AGUA FRIA

Partida: 02.18.03 .01 Salida de agua fria con Tuberia de PVC 1/2" - SAP
Nº Ancho
Gráfico Descripción Cantidad
veces (m)
Salida de agua fria con tub PVC 1/2" por SS.HH. 16.00 1.00

Partida: 02.18.03.02 Red de Distribucion Tuberia de PVC 1/2" - SAP


Long Ancho
Gráfico Descripción Cantidad
(m) (m)
Red de Distribucion con tub PVC 1/2" por SS.HH. 1.00 94.25

Partida: 02.18.03.03 Accesorios PVC de 1/2"


Nº Ancho
Gráfico Descripción Cantidad
veces (m)
Codos de 90° PVC de 1/2" 24.00 1.00

Partida: 02.18.03.04
Nº Ancho
Gráfico Descripción Cantidad
veces (m)
TEE PVC de 1/2" 12.00 1.00

Partida: 02.18.03.05 Valvula de Compuerta de Bronce 1/2"


Nº Ancho
Gráfico Descripción Cantidad
veces (m)
Valvula de Compuerta de Bronce 1/2" 6.00 1.00

Partida: 02.18.03.06 Grifo de Bronce 1/2"


Nº Ancho
Gráfico Descripción Cantidad
veces (m)
Grifos de bronce de 1/2" 4.00 1.00

02.19 SISTEMA DE LLUVIAS


Partida: 02.19.01 Canaleta de Calamina Galvanizada de aguas de lluvia
Long Ancho
Gráfico Descripción Cantidad
(m) (m)
Canaleta de Calamina Galvanizada Oficinas 1.00 64.55
Canaleta de Calamina Galvanizada fachada principal 1.00 75.96
Partida: 02.19.02 Tuberia de Bajada PVC-SAL 4" P/Lluvias
Long Ancho
Gráfico Descripción Cantidad
(m) (m)
Tuberia de Bajada PVC-SAL 4" P/Lluvias Oficinas 1.00 8.50
Tuberia de Bajada PVC-SAL 4" P/Lluvias Fachada Principal 1.00 4.70
Unidad: PZA
Metrado
Alto (m)
Parcial
6.00
Metrado
Total (pza) 6.00

Unidad: PZA
Metrado
Alto (m)
Parcial
4.00
Metrado
Total (pza) 4.00

Unidad: Und
Metrado
Alto (m)
Parcial
3.00
Metrado
Total (ml) 3.00

Unidad: pto
Metrado
Alto (m)
Parcial
2.00
Metrado
Total (pza) 2.00

Unidad: PZA
Metrado
Alto (m)
Parcial
13.00

Unidad: PZA
Metrado
Alto (m)
Parcial
2.00

Unidad: PZA
Metrado
Alto (m)
Parcial
2.00

Unidad: ml
Metrado
Alto (m)
Parcial
75.00

Unidad: ml
Metrado
Alto (m)
Parcial
32.50
Metrado
Total (ml) 32.50

Unidad: glob
Metrado
Alto (m)
Parcial
9.00
Metrado
Total (Glb) 9.00

Unidad: glob
Metrado
Alto (m)
Parcial
8.00
Metrado
Total (Glb) 8.00

Unidad: glob
Metrado
Alto (m)
Parcial
5.00
Metrado
Total (Glb) 5.00
Unidad: glob
Metrado
Alto (m)
Parcial
4.00
Metrado
Total (Glb) 4.00

Unidad: glob
Metrado
Alto (m)
Parcial
5.00
Metrado
Total (Glb) 5.00

Unidad: PZA
Metrado
Alto (m)
Parcial
4.00
Metrado
Total (pza) 4.00

Unidad: PZA
Metrado
Alto (m)
Parcial
4.00
Metrado
Total (pza) 4.00

Unidad: PZA
Metrado
Alto (m)
Parcial
3.00
Metrado
Total (pza) 3.00
Unidad: PZA
Metrado
Alto (m)
Parcial
16.00
Metrado
Total (pza) 16.00

Unidad: ml
Metrado
Alto (m)
Parcial
94.25
Metrado
Total (ml) 94.25

Unidad: PZA
Metrado
Alto (m)
Parcial
24.00
Metrado
Total (pza) 24.00

Unidad: PZA
Metrado
Alto (m)
Parcial
12.00
Metrado
Total (pza) 12.00

Unidad: PZA
Metrado
Alto (m)
Parcial
6.00
Metrado
Total (pza) 6.00

Unidad: PZA
Metrado
Alto (m)
Parcial
4.00
Metrado
Total (pza) 4.00

Unidad: ml
Metrado
Alto (m)
Parcial
64.55
75.96
Metrado
Total (ml) 140.51

Unidad: ml
Metrado
Alto (m)
Parcial
8.50
4.70
Metrado
Total (ml) 13.20
02.20 INSTALACIONES ELECTRICAS
02.20.01 SALIDAS DE PUNTOS
Partida: 02.20.01.01 Salida Para centros de luz Unidad:
Gráfico Descripción Cantidad Long (m) Ancho (m) Alto (m)

ALMACEN
Lampara en banos de 1x32 W., 220V, 60 HZ 4
Fluorescente en primer piso 28
Fluorescente en segundo piso 32
Braquet empotrado en eje A 3
PARQUE MOTOR
Fluorescente en vereda externa 12
Fluorescente en parque motor 19
Lampara en caseta de 1x32 W., 220V, 60 HZ 2
Metrado
Total (pto)

Partida: 02.20.01.02 Salida Para tomacorriente Unipolar Simple Unidad:


Gráfico Descripción Cantidad Long (m) Ancho (m) Alto (m)

ALMACEN
primer piso 35
segundo piso 58
PARQUE MOTOR
primer piso 19
GARAJE 2
Metrado
Total (pto)

02.20.06 INTERRUPTORES
Partida: 02.20.01.03 Interruptor simple Unidad:
Gráfico Descripción Cantidad Long (m) Ancho (m) Alto (m)

Almacen primer piso 23


Almacen segundo piso 20
Parque motor y eflorecentes exteriores 16
Caseta 2
Metrado
Total (und)

Partida: 02.20.01.04 interruptor de Conmutacion Simple Unidad:


Gráfico Descripción Cantidad Long (m) Ancho (m) Alto (m)

Interruptores simples 2.00


Metrado
Total (und)

Partida: 02.20.01.05 Interruptor Conmutacion Doble Unidad:


Gráfico Descripción Cantidad Long (m) Ancho (m) Alto (m)

Interruptores simples 0.00


Metrado
Total (und)
02.20.02 TUBERIAS PVC
Partida: 02.20.02.01 Tubería PVC SAP D=3/4" Unidad:
Gráfico Descripción Cantidad Long (m) Ancho (m) Alto (m)

Tubería PVC-SEL 3/4" 1.00 20.00


Tubería PVC-SEL 3/4" 1.00 1153.00
Metrado
Total (ml)
Partida: 02.20.03.01 Cable Electrico TW AWG-MCM Nº 12 - 4.0 mm2 Unidad:
Gráfico Descripción Cantidad Long (m) Ancho (m) Alto (m)

Cable Electrico TW AWG Nº 12 - 4.00 mm2 2.00 320.00


Metrado
Total (ml)
Partida: 02.20.03.02 Cable Electrico TW AWG-MCM Nº 14 - 2.5 mm2 Unidad:
Gráfico Descripción Cantidad Long (m) Ancho (m) Alto (m)

Cable Electrico TW AWG Nº 14 - 2.5 mm2 2.00 833.00


Metrado
Total (ml)
Partida: 02.20.04.01 Tablero distribución Unidad:
Gráfico Descripción Cantidad Long (m) Ancho (m) Alto (m)

Tablero automático de 8 polos 2


Tablero automático de 9 polos 1
Metrado
Total (und)
02.20.05 LAMPARAS Y ARTEFACTOS
Partida: 02.20.05.01 Fluorescente recto 2x40W Incluyendo Equipo y Pantall Unidad:
Gráfico Descripción Cantidad Long (m) Ancho (m) Alto (m)

Fluorescente recto 2x40 W 66.00


Metrado
Total (und)

Partida: 02.20.05.02 Fluorescente recto 2x20W Incluyendo Equipo y Pantall Unidad:


Gráfico Descripción Cantidad Long (m) Ancho (m) Alto (m)

En Pasadizos y SSHH 36.00


Metrado
Total (und)
02.20.06 INTERRUPTORES
Partida: 02.20.06.01 Interruptor Termomagnetico Monofasico 2x32 AMP. Unidad:
Gráfico Descripción Cantidad Long (m) Ancho (m) Alto (m)

Llave Interruptor Termomagnetica de 2x15 AMP. 7.00


Metrado
Total (und)
Partida: 02.20.06.02 Interruptor Termomagnetico 2x40 AMP. Unidad:
Gráfico Descripción Cantidad Long (m) Ancho (m) Alto (m)

Llave Interruptor Termomagnetica de 3x20 AMP. 5.00


Metrado
Total (und)
Partida: 02.20.06.03 Interruptor Termomagnetico Trifasico 2x60 AMP. Unidad:
Gráfico Descripción Cantidad Long (m) Ancho (m) Alto (m)

Llave Interruptor Termomagnetica de 3x60 AMP. 4.00


Metrado
Total (und)

02.20.07 POZO PUESTA A TIERRA


Partida: 02.20.07.01 Pozo Puesta a Tierra Unidad:
Gráfico Descripción Cantidad Long (m) Ancho (m) Alto (m)

Pozo de tierra del Sistema eléctrico 1.00


Metrado
Total (und)

Partida: Prueba Electrica Unidad:


Gráfico Descripción Cantidad Long (m) Ancho (m) Alto (m)

prueba electrica 1.00


Metrado
Total (glb)

02.21 VEREDAS
Partida: 02.21.01 Veredas Concreto f'c=140 Kg/cm2 e = 4" Unidad:
Gráfico Descripción Cantidad Largo (m) Ancho (m) Alto (m)

Frontal Almacenes , Guardiania y Control 1.00 61.95 1.50

Metrado
Total (m2)

Partida: 02.21.02 Veredas - Encofrado y desencofrado Unidad:


Gráfico Descripción Cantidad Largo (m) Ancho (m) Alto (m)

Frontal Alamcenes, Guardiania y Control 1.00 61.95 0.15

Metrado
Total (m2)

Partida: 02.21.03 Juntas de dilatación con Arena y Asfalto Unidad:


Gráfico Descripción Cantidad Long (m) Ancho (m) Alto (m)

Veredas interiores 21.00 1.50

Metrado
Total (ml)

Partida: 02.21.04 Sardineles de Concreto de f'c=140 Kg/Cm2 E = 4" Unidad:


Gráfico Descripción Cantidad Long (m) Ancho (m) Alto (m)

fachada principal 1.00 85.14


fachada lateral 1.00 51.23
borde 4.00 1.00
Metrado
Total (ml)

Partida: 02.21.05 Sardineles Encofrado y Desencofrado Unidad:


Gráfico Descripción Cantidad Long (m) lados (m) Alto (m)

fachada principal 1.00 85.14 2.00 0.10


fachada lateral 1.00 51.23 2.00 0.10
borde 4.00 1.00 2.00 0.10
Metrado
Total (m2)

Partida: 02.21.06 Colocacion Adoquines de Concreto de Color Unidad:


Gráfico Descripción Cantidad Largo (m) Ancho (m) Alto (m)

Frontal Parque Motor 1.00 95.56 1.00


fachada lateral 1.00 51.70 1.00
Metrado
Total (m2)

Partida: 02.21.07 RAMPA DE CONCRETO Unidad:


Cantidad
Gráfico Descripción Largo (m) Ancho Perim (m)
(ml)
Rampas de concreto 1.00 14.09 4.00
pto
Metrado
Parcial

4
28
32
3

12
19
2

100.00

pto
Metrado
Parcial

35
58

19
2

114.00

und
Metrado
Parcial
23
20
16
2

61.00

und
Metrado
Parcial
2.00

2.00

und
Metrado
Parcial
0.00
0.00

ml
Metrado
Parcial
20.00
1153.00

1173.00
ml
Metrado
Parcial
640.00

640.00
ml
Metrado
Parcial
1666.00

1666.00
und
Metrado
Parcial
2
1

3.00

und
Metrado
Parcial
66.00

66.00

und
Metrado
Parcial
36.00

36.00

und
Metrado
Parcial
7.00

7.00
und
Metrado
Parcial
5.00

5.00
und
Metrado
Parcial
4.00

4.00

und
Metrado
Parcial
1.00

1.00

ml
Metrado
Parcial

1.00

m2
Metrado
Parcial
92.93

92.93

m2
Metrado
Parcial
9.29

9.29

ml
Metrado
Parcial
31.50

31.50

ml
Metrado
Parcial
85.14
51.23
4.00
140.37

m2
Metrado
Parcial
17.03
10.25
0.80

28.07

m2
Metrado
Parcial
95.56
51.70

147.26

m2
Metrado
Parcial
56.36