Sei sulla pagina 1di 1

Wastewater Disposal System

Table of Contents

1. Introduction .............................................................................................................. 1
2. Inventory of present facilities ................................................................................. 1
2.1. Existing plans, information and data ..................................................................... 1
2.2. Documentation of complete sewerage system. ..................................................... 2
2.3. Documentation of complete storm water system.................................................. 2
3. Design of Sewer Network ....................................................................................... 2
3.1. Estimation of Wastewater Collection ..................................................................... 2
3.2. Wastewater Collection Network /Design Criteria ............................................... 3
3.2.1. Wastewater Flow / Peak factor .................................................................................... 3
3.2.2. Hydraulics ..................................................................................................................
. 3.2.3. Design Velocity Limits are listed below....................................................................... 3
3.2.4. Depth of Flow ............................................................................................................. 3
3.2.5. Pipe Gradients ............................................................................................................ 4
3.2.6. Minimum Pipe Diameter ............................................................................................ 4
3.2.7. Pipe Material .............................................................................................................. 4
3.2.8. Minimum Cover Requirement .................................................................................... 4
3.2.9. Utility Crossings ........................................................................................................ 4
Vertical Clearance .............................................................................................................. 4
500 mm ................................................................................................................................ 4
3.3. Manholes................................................................................................................... 4
3.4. Basis of Wastewater Collection Network Design .................................................. 4
3.5. Lift Manhole with Submersible Pump ................................................................... 5
3.6. Wastewater Receiving Tank / Collection Tank..................................................... 5
3.7. Individual Connection Points (House Connections or Connections to Service
Area) 5
4. Appendices ............................................................................................................... 5

ABC Consultants

Potrebbero piacerti anche