Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
2. ASSOCIATED PUBLICATIONS
Precautions
4. PROCEDURES
CP-DOG-005
Page 1 of Section 1 : 2
Rev 02
11th September 1998
CORMORANT ALPHA DRILLING OPERATIONS GUIDE
4.1 PREPARATION
4.2 PERFORMANCE
1) Take up the weight of the kelly and kelly sock (rathole) with the
pull back tugger.
3) Raise the blocks in a controlled manner until the top of the open
hook is just below the level that the kelly bail, when lent into the
rotary table will reach.
5) Pick up with the blocks engaging the kelly bail with the hook
subsequently closing the hook.
7) Maintain contact with the kelly by the pull back tugger during this
operation.
CP-DOG-005
Page 2 of Section 1 : 2
Rev 02
11th September 1998
CORMORANT ALPHA DRILLING OPERATIONS GUIDE
8) When the kelly is free of the sock control the forward passage
by paying out the tugger line in a controlled manner, do not let
the kelly swing past the centre of the rotary.
5. ON COMPLETION
CP-DOG-005
Page 3 of Section 1 : 2
Rev 02
11th September 1998