Sei sulla pagina 1di 2
MAHARASHTRA STATE POWER GENERATION CO. LTD. Office of the Chief Engineer (Expert Support Team) “Prakashgad’, 3" floor, Prof. Anant Kanekar Marg, Bandra (East), MUMBAI 400 051 Phone: (0) 2647 4211/ 26472131 —Ext, 2215) (P) 26581525 E-mail: ceest@mahagenco.in ReENo. CE/EST/ "7" 9 9 Date: D a 4 MAY 2019 The Chief Engineer (O&M) MSPGCL, Koradi, Thermal Power Station, . Koradi. Sub: _89" Operational Review Team (ORT) meeting at Koradi TPS on dtd 24.05.2019. | With reference to subject matter, it is to inform that the 89" Operational Review Team (ofp meeting of KORADI Thermal Power station is scheduled on 24.05.2019 at 10:00 hrs. Shri. P. N. Bhadane, SE(EST) & Shri. A.S.Gawade EE(EST) from O&M Support Group will be reaching at Koradi TPS guest house on 22.05.2019 evening and leave on 24.05.2019 by evening. Necessary arrangement for guest house & conveyance may please be done & confirmed. Chief Engineer (EST) MAHAGENCO, H.0. Mumbai, Copy s.w.rs.t 1. Director (Operations) ‘Mahagenco HO O&M Support Group Agenda for 89" ORT of Koradi TPS Date: - 24/05/2019 Time: 10:00 hrs, Venue: Conference Hall (660 MW) Description Resp. Time Performance of Mahagenco stations and previous ORT Issues HO 10:00 — 11:00 ‘A) ORT Issues of 210MW. B) ORT Issues of U-8, 9 & 10. HO 11:00 ~ 12:00 Presentation by POG: A) Performance parameter including MERC AVF & PLF. Unit wise pro- rata targets achieved for year 2019-20 of 210MW & 660MW. ion of performance test, high energy drain & furnace temp. ied out during the month of April-19. C) Tripping Event analysis for Unit-8, 9 & 10. D) Reason for generation loss on account of O & M factor (U-8, 9 & 10). POG 12:00- 13:00 Presentation by CHP: A) Previous ORT issues. Outage of Conveyor stream ete and action plan, B) Status of critical spares, Status of AMC / routine contraets, Action plan to reduce Demurrage hours & Transit loss, Dozer & LOCO availability. ©) Priorities & Constraints of CHP 660MW. CHP Presentation by MPD: ‘A) Section wise Preventive maintenance schedule & status of 210MW. B) Loadability Constraints of units 3X660MW. C) Report of condition monitoring & exceptions if any of 3X660MW. D) Section wise Preventive maintenance schedule & status (%) (660MW) E) O/H preparedness of Unit 8 and status of major supply proposals. F) Monsoon Preparedness. MPD 230 — 14:00

Potrebbero piacerti anche