EXECUTIVE SUMMARY
Milagrosa National High School creates School Improvement Plan (SIP) as a milestone in determining the school performance and the needed facilities both for
physical development and learners’ improvement towards the attainment of the school’s vision and mission.
This SIP contains School Situational Overview which provides data on the current status of children, especially the school age children, in the community as
well as the causes of shortfalls and inequities in the children’s outcomes. It also includes assessment of status and trends in the realization of the school’s
contributions to the achievement of the Division Goals and Objectives, and assessment of school systems and processes that facilitate and hinder the attainment of
school objectives and targets.
The Situational Analysis presents the detailed and in-depth analysis of the problems and challenges faced by the school which is essential in the delivery of
basic education under the three major categories of contributory objectives such as Provision of Equitable Access, Quality and Governance of basic Education, and
the Management of Education Services. This will ensure that goals and objectives set by the planning team are relevant, attainable and challenge the school towards
continuous school improvement.
School Implementation Plan includes the Annual Improvement Plan and other school plans needed in the implementation of the school programs,
projects, and activities. These plans guide the school planning team and lead them on how the school will achieve its goal and move towards realization of DepEd’s
mission and vision.
Monitoring and Evaluation Plan is designed to set in motion appropriate processes to monitor the implementation of this SIP and to evaluate the outputs and
effects of the activities contained in the program. This will also enable the school to track the progress of the program and determine the effectiveness of the SIP in
achieving its stated objectives and activities reflected in the Planning Worksheets and Annual Improvement Plan. Data gathered during M & E are reflected in this
plan that will serve as basis for tracking progress of and making timely adjustments on the School Improvement Plan.
In the making of this School Improvement Plan (SIP), the SPT collected data on barangay Milagrosa’s total population of school-age youth. The SPT also
gathered documents that provide information on current department thrusts, status of school learning outcomes, etc. Then, data are organized by the school planning
team for analysis.
The school head called a meeting for the SPT last May, 2016 for the sharing of the DepEd core values, vision and mission. There were 9 members of the
team attended the meeting, and each shared his/her thoughts and opinion of the DepEd mission and vision.
To update the priority needs and the realization of the activities, the SIP Terminal Review (STR) and Annual Plan Review (APR) are prepared for the
monitoring and evaluation during the scheduled M & E of the program. Hence, all activities and priority needs from the annual plan are reflected in the Planning
Worksheet and in the Monitoring and Evaluation for the proper implementation of the plan in which the results will be used as the basis for the next plan of
implementation.
II. INTRODUCTION
A. DEPED MISSION AND VISION
The Department of Education's Vision, Mission, and Core Values (VMV) statements serve as guiding principles in its
unwavering thrust to provide quality education that cultivates passion for the country that is anchored on a set of core
values.
OUR VISION
We dream of Filipinos
Who passionately love their country
And whose values and competencies
Enable them to realize their full potential
And contribute meaningfully to building the nation.
The SPT understands that the Department envisions producing learners equipped with values and competencies
that could contribute to make the nation a better place to live. The vision could be attained if the teachers,
administrators and staff, learners, and other stakeholders will do their role in the process. The SPT shares that the
school, and all the people involved in the school must work together to ensure that the learners learn, nurtured, and
safe in school.
B. SCHOOL SITUATION (SITUATIONAL ANALYSIS)
i. ACCESS
SCHOOL PROFILE
Enrollment by Sex
80 GRADE 7
S.Y 2015-2016
ii. Quality
55
NAT results by subject, 2014
50.45
40.93
34.22 35.98
In the recent NAT, results show
that the students performed poorly in
all the subject areas. Interventions are
needed for them to improve
performance in all subject areas.
ENGLISH MATH SCIENCE FILIPINO AR.PAN
Literacy level
Number of learners by literacy level, SY 2013
ENGLISH FILIPINO
PHIL-IRI results show no
70 70 72 72
FILIPINO improvement in the students’ literacy.
Students remain in their level of literacy.
168 168 164 164
28 28 30 30
PRETEST POST TEST PRETEST POST TEST
iii. Governance
25
Developing Child friendly
school!!
25%
Stakeholders have 60
Number of volunteer hours
10
0
GRADE 7 GRADE 8 GRADE 9 GRADE 10
LEARNER-CLASSROOM RATIO
LEARNER-CLASSROOM RATIO, 2015
60
0
GRADE 7 GRADE 8 GRADE 9 GRADE 10
III. PLANNING WORKSHEET (ANNEX 5)
TIME FRAME
DEPED PRIORITY
LEARNING GENERAL CY
INTERMEDIATE IMPROVEMENT ROOT CAUSE/S CY 2015- CY2017-
STAGE OBJECTIVE/S 2016-
OUTCOMES AREA 2016 2018
2017
IO2: Learners
access programs Students need a place
To provide conducive to stay for learning and
responsive to their LEARNING PARKS
IMPROVEMENT/CLUB study environment and recreation during
needs and ORGANIZATION learning parks outside the outside classes.
consistent with their
classroom.
interests and
7-10 aptitudes
IO6: Learners are Sports equipment and To develop the students Students lacks
well-rounded, facilities
potential in sports and enthusiasm in going to
happy and smart improve fitness school
No efficient internet
To improve and/or
connection in the
Internet Connectivity facilitate the learning
school that could cater
process of learners
all the students
PLANNING WORKSHEET for GOVERNANCE
TIME FRAME
DEPED INTERMEDIATE PRIORITY
GENERAL OBJECTIVE/S ROOT CAUSE/S SY SY SY
OUTCOMES IMPROVEMENT AREA
2016 2017 2018
Lack of support
Conduct regular meeting for To strengthen linkage and
from the
IO1: Education leaders and managers parents and other stakeholders cooperation among stakeholders
stakeholders
practice participative and inclusive Conduct regular meeting and To ensure order and harmonious Differences of views
management processes dialogue between teachers and relationship between the internal and opinions on
School Head in the school stakeholders. different issues
IO2: Internal systems and processes Uninformed
needed for continuous improvement To send teachers in all trainings teachers
in place Teachers’ training initiated and required by the
Department of Education
Teachers are
misinformed on the
GAD TRAINING To train teachers on GAD nature and
processes on GAD
SCHOOL BUDGET
PROJECT OUTPUT FOR PERSON(S) SCHEDULE/
IMPROVEMENT ACTIVITIES PER BUDGET SOURCE
OBJECTIVE THE YEAR RESPONSIBLE VENUE
PROJECT TITLE ACTIVITY
Coordinate with
advisers to -DORP
Coordinator 3RD WEEK OF
List of SARDOS identify students
JULY
at risk of -Advisers
dropping out
To reduce the
risk of dropout Letter of -Teachers
Bukas ang rate from 3.83 agreement Conduct meeting 3rd Saturday of
-Advisers 2,000 MOOE
Bukas Mo to 0%.
between advisers with parents July
and parents -Parents
-Subject Teachers
Concrete reasons After 1st
Conduct Home -DORP
of students grading 2,000 MOOE
Visitation Coordinator
dropping out onward
Adviser
-Parents
Teacher/s sponsor
From
a student that ADOPT-A-
-Teachers enrollment
really needs help CHILD
onwards
esp. financial help
Refreshing MOOE/
-Learning Parks June 2016-
ambiance and Landscaping 16,000.00 SOLICITATION/SI
Coordinator March 2016
aesthetic impact NKING FUNDS
-School Head
Concrete mini MOOE/FUND
Park fencing -Learning Parks May 2016 50,000.00
fence RAISING
Coordinator
To provide
conducive study
environment
Park Improvement Durable Learning Learning Parks -Learning Parks MOOE/FUND
and learning JUNE 2016 15,000.00
Plan sheds Repair Coordinator RAISING
parks for
students outside
the classroom.
-School head
Evaluation and Evaluate the
monitoring result of the -Project team 0
results project.
-SSG adviser
To improve and
enhance school
NEW BUILDING: facilities to Classroom will be Landscaping the
Advisers, teachers,
NEW LIVES TO motivate learners conducive for front of the 6 June - March 18,000.00 MOOE
and parents
BRING learning classrooms
to come to school.
Repair and
Classroom will be
maintenance of Advisers, teachers,
conducive for June - March 6,000.00 MOOE
electrical wiring and parents
learning
of 6 classrooms
Repair of the
Teachers fells Teachers and
ceiling of the June - March 400.00 MOOE
comfortable parents
faculty room
GIVE PRIZE AND
Pack To increase 95% AWARDS TO PRIZE AND
participation rate PARTICIPATION WINNERS AWARD
(Participation MOOE/FUND
from75% to 95%. AND/OR COMMITTEE JUNE 2016 15,000
acknowledgem RATE IN ALL
PARTICIPANTS
RAISING
ent), PREMYO!! ACTIVITIES
OF THE
ACTIVITIES
Students reading
English subject June 7-10,
levels are Conduct IRI
teachers 2016
identified
READING pa
MORE!!! Reading Conduct Reading English subject After every
assessment chart assessment teachers grading exam
-Project Team
To ensure order
ASSEMBLY and harmonious
School School Head
MEETINGS and relationship
Stronger linkage Foundation Day September
gatherings between the Teachers 5,000.00 Fund raising
with stakeholders 2016
internal and
Parents
external
stakeholders
To strengthen the
teachers’
GAD 14 TEACHERS VALUES School Head, OCTOBER 24,
empowerment in 4,490.00 MOOE
TRAINING/INSET ORIENTED ON ORIENTATION Teachers 2016
the field of
teaching.
INFORMATION
14 TEACHERS
DRIVE GENDER School Head, OCTOBER 25,
WERE INFORMED 4,490.00 MOOE
AND Teachers 2016
ON GAD
DEVELOPMENT
LEADERSHIP
14 TEACHERS AND School Head, October 26-
13,470.00 MOOE
TRAINED STEWARDSHIP Teachers 28, 2016
TRAINING
Name of Project Objectives and Date of Monitoring Accomplis Issues/Pro Recommendations/ Signature of SPT and
Project Targets hments/ blems/ Project Team Leader
Action Points
Status to Challenges
Date
Every Quarter
READING pa MORE!!! to reduce the frustration
level of Grade 7 students in
reading