Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
b. International
Country Period Keywords (Wastewater Treatment Plants)
Azerbaijan 2011 Baku
China 1997 Jiaxing
For Libya 2002 Ain Zara,Sirte
For Nigeria 1999 - 2001 Abuja
Palestine/Jordan 1995 - 2000 Al Bireh, Salfeet, Wadi Arab, Gaza
c. Ongoing Projects
Location Date from - Company Position Description
date to
Jordan/ 05/2015 - on- Dorsch International Process and Gaza Central Wastewater Project Phase 1 (600.000 P.E.);
Palestine going Consultants GmbH Tender Expert KfW funded
Short-term Tasks: Revision and update of conceptual process design;
Specifications for Volume 3/4 for FIDIC YELLOW Book
Tender.
Montenegro 08/2015 – FWT – Fichtner Process Expert Conceptual design for Nizip WWTP (140.000 P.E.) EU-
ongoing Project
Short-term stephane.meister- Tasks: Process, M&E design for the WWTP for FIDIC
mann@fwt.fichtner.de YELLOW Book Tender.
Gaza 06/2015 – Dorsch Wastewater KfW; Central Gaza WWTP (Phase 1: 600,000 P.E./
ongoing Treatment Ex- 30.000 m3/day),
Short-term Tanja.Baur@dorsch.de pert Indicative budget: NN
Position: Process Expert for WWTP and Sludge Treat-
ment and
FIDIC YELLOW Book Tender Elaboration.
Albania 03/2014 - EPTISA SEE Process & Supervision of Construction and of Supplies for Sewerage
12/2016 Wastewater System and Wastewater Treatment Plant in Velipoja area
Short-term Mr. Alvaro Diez Treatment Ex- – Phase III, EuropeAid/133963/C/SER/AL
Santaclara
adiez@eptisa.com
pert Tasks: Review of Contractors Process, M&E installations
for the WWTP
Turkey 01/2013 - FWT – Fichtner Process Expert Conceptual design for Nizip WWTP (140.000 P.E.) EU-
05/2014 christian.koopmann Project
Short-term @fwt.fichtner.de
Tasks: Process, M&E design for the WWTP for FIDIC
YELLOW Book Tender.
04/2012 - Montene- Alternative Consulting, Process & Preparation of Preliminary design for the construction of
04/2013 gro Belgrade Wastewater waste water treatment plant and sewerage network in the
Short-term Treatment Expert Municipality of Plav and the urban settlement of Gusinje,
Ms. EC Framework Contract N° 2011/279306-1
Radmila Stanisavljevic Tasks: Design for WWTP Plav (18.000 P.E) and Pumping
radmila@alternative- Stations. Process, M&E Design, etc.; Collaboration and
C_41 consulting.com
management of sewerage network design team.
Estimated budget for WWTP: appr. 5 Mio. €
06/2008 - Romania EPTISA Proyectos Inter- Wastewater & Technical Assistance for Project Implementation and
07/2011 nacionales S.A. Sludge Treatment Works Supervision for the ISPA Contracts in Ramnicu
short term Expert, Valcea, Romania, EuropeAid/120969/D/SV/RO:
Mrs. Cristina Chilom Mechanical Su- WWTP Ramnicu Valcea 130,000 P.E.
cristi- pervisor Rehabilitation and upgrade for CNP-Removal by second-
na.chilom@piu.aquarim.ro ary treatment acc. 91/271/EEC.
Mr. Ion Tiana
itaina@eptisaromania.com
Indicative budget: 11 Mio. EUR
Activities performed: (Conceptual Design) Sludge Man-
C_34
C_33 agement Strategy, Works Supervision for Process & Hy-
draulic Design and Mechanical Works acc. FIDIC P&DB.
Tests on and after Completion, Commissioning. Proposal
for Digester rehabilitation.
08/2007 - Romania IGIP GmbH Process Engineer Technical Assistance for the Management and Supervi-
12/2012 (PLANCENTER/IGIP) sion of ISPA Contracts in Constanta, 2000/RO/16/P/PE/
short term 003-01: WWTP Constanta Nord 355,000 P.E. and WWTP
Mr. Bogdan Oprea Eforie South 140,000 P.E.
bogdan.oprea@mfinate.ro Rehabilitation and upgrade for CNP-Removal by second-
Mr. Hartmut Beck ary/tertiary treatment acc. 91/271/EEC with simultaneous
Hartmut.Beck@IGIP.COM
aerobic sludge stabilisation and sludge dewatering.
Indicative budget: 28 + 11 Mio. EUR
C_32
Activities performed: Works Supervision for Process &
Hydraulic Design, Design Review acc. FIDIC P&DB 5.2
plus Tests on and after Completion, Commissioning.
06/2008 – Romania Romania EPTISA Proyec- Process Engineer Technical Assistance for the Management and Supervi-
08/2009 tos Internacionales S.A. sion of ISPA Contracts in Craiova, 2000/RO/16/P/PE/002
short term WWTP Craiova 350,000 P.E.
Mr. Ion Tiana Rehabilitation and upgrade for CNP-Removal by second-
itaina@eptisaromania.com ary/tertiary treatment acc. 91/271/EEC with sludge diges-
tion with sludge dewatering and digester gas utilisation by
CHP.
Indicative budget: 29 Mio. EUR
C_31
Activities performed: Works Supervision and Design Re-
C_30
view for Process & Hydraulic Design as well as Design
Review for Mechanical Works, acc. FIDIC P&DB. Review
of procedures for Test on Completion. Supervision of
Commissioning and Tests after Completion.
05/2003 Serbia MVV Consulting GmbH Mechanical Ex- Improvement of the Water Supply and Wastewater Dis-
pert, posal Systems of the City of Kragujevac – Serbia and
Mr. Andreas Koch Wastewater & Montenegro; Municipality of Kragujevac, Local Utility ViK -
a.koch@mvv-decon.com Sludge Treatment Vodovod i Kanalizacija Kragujevac;
Expert Pre-feasibility study with technical appraisal of the DWT
C_28 and WW disposal systems for the City of Kragujevac.
C_21 Activities performed: Inspection and Analysis of existing
WWTP; Elaboration of a rehabilitation concept & cost es-
timation.
11/2001 - China Passavant Roediger Project Manager, Sludge Dewatering Facilities for WWTP Jiaxing
06/2002 Products Sludge Treatment (1,000,000 P.E.): Sludge Dewatering Facilities (Chamber
Expert Filter Press)
Mr. Philippe Anstotz Indicative budget: 10 Mio USD
Philippe.Anstotz@passavant- Activities performed: Project Management on contrac-
C_19 geiger.de tor’s side with Process and Mechanical Engineering, incl.
specifications of mechanical equipment and Procurement.
09/2001 - Germany Passavant Roediger Project Manager, Wastewater Treatment Plant Wiesbaden (325,000 P.E.):
08/2002 Products Sludge Treatment New Sludge Dewatering Facilities (Chamber Filter Press).
Expert Indicative budget: 7 Mio. DM
Mr. Philippe Anstotz Activities performed: Detailed Design of sludge dewater-
Philippe.Anstotz@passavant- ing and conditioning facilities. Project Management on
C_19 geiger.de contractor’s side. Detailed process and mechanical engi-
neering, incl. detailed specifications of mechanical equip-
ment and procurement. Coordination of electro- & Scada
design. Project Management, incl. O&M Documentation,
testing & commissioning.
2001 Germany/ Passavant Roediger Sales Manager - Thermal Power Plant CCPP Ankara (1,300 m³/h) – Turkey
Turkey Products Technical Expert for Balcke-Dürr Engineering GmbH, Germany; Design
Proposal for chill water intake and mechanical pre-
Mr. Philippe Anstotz treatment for thermal power plant; inlet stoplog , coarse
Philippe.Anstotz@passavant- bar screen, cable operated bar screen, microsieve unit,
geiger.de coagulator, sludge dewatering.
Activities performed: Elaboration of the Design Proposal
for turn-key-quotation, bidding documents.
1998 Portugal Independent Consultant Water Treatment Upgrade of Pre-treatment Facilities of Porto Waterworks –
Engineer Expert Portugal for PASSAVANT WERKE AG, Aarbergen, Ger-
many; Elaboration of a turn-key price proposal for addi-
tional mechanical pre-treatment by microsieves.
11/1996 - Libya Independent Consultant Wastewater WWTP Ain Zara/Tripolis (600,000 P.E.). WWTP for C-
07/1997 Engineer Treatment Expert Removal by secondary treatment, incl. sludge digestion
and sludge dewatering, acc. local standards.
Mr. Philippe Anstotz Activities performed: Tender design for Contractors di-
C_11 Philippe.Anstotz@passavant- rect turn-key proposal, including revision and upgrade of
geiger.de origin design with regard on process, hydraulic and me-
Mr. Thomas Blanche
thomas.blanche@gmx.de
chanical design, coordination of civil and electro/Scada
designs. Preparation of bidding documents and documen-
tation.
1996 Jordan/ Independent Consultant Wastewater WWTP - Petra, Jordan (3,000 P.E.). Basic design for turn-
Yugoslavia Engineer Treatment Expert key-quotation;
Activities performed: Process design with electro-
mechanical engineering, BoQ. Client: ENERGOPRO-
JECT, Belgrade
01/1996 - Yugoslavia Independent Consultant Wastewater & WWTP - Gornij Milanovac (appr. 100,000 P.E.): Study for
05/1996 Engineer Sludge Treatment reconstruction of sludge digestion facilities, incl. sludge
Expert dewatering and biogas utilisation CHP.
Activities performed: Conceptual design, incl. process
C_11 design, mechanical and hydraulic engineering, coordina-
tion of special and local inputs for E&Scada, BoQ with cost
estimates and documentation. Client: ROEDI-
GER/PASSAVANT/ENERGOPROJECT
01/1995 - Germany Independent Consultant Wastewater Diverse WWTP: Werneuchen, 7,500/5,000 P.E. (11/1996
12/1996 Engineer Treatment Expert - 05/1997)/ Weissenfels, 15,000 P.E. (09-12/1996)/ Stad-
tilm 2 x 7,500/2 x 5,000 P.E (03-07/1996)/ Wiehe, 3,500
Mr. Thomas Blanche P.E./ Ruppachtal-Esterau, 6,000 P.E. (01-05/1995)
C_11 thomas.blanche@gmx.de CNP-Removal by secondary/tertiary treatment, acc.
91/271/EEC; extended aeration and sludge dewatering.
Activities performed: Tender Proposals for several pro-
jects in Germany; analogous to FIDIC P&DB (functional
tender), incl. architectural and civil design, process design,
mechanical and hydraulic engineering, coordination of
special and local inputs for E&Scada, cost estimates and
tendering assistance for project calculation of Contractors
proposals.
11/1995 - Germany Independent Consultant Wastewater Schmalkalden Wastewater Treatment Plant (50,000
07/1996 Engineer Treatment Expert P.E.).
Activities performed: Detailed hydraulic engineering for
C_11 waste water treatment line. Detailed & workshop design of
sludge digestion plant, digester gas storage tank and
CHP.
1995 Germany Independent Consultant Project Manager Building area “Auf dem Röhling II” for the town of Muder-
Engineer Design Engineer hausen/VG Hahnstätten, 1.5 ha; Infrastructure design for
water supply, sewers and roads;
Mr. Thomas Blanche Activities performed: Detailed design and detail engi-
thomas.blanche@gmx.de neering, tender and works supervision, audit of invoices.