Executive Summary
Power Sector
May-14
Executive Summary for the Month of May- 2014
Contents
SN Section A - Highlights of Power Sector Page
1 Electricity Generation for May, 2014 & during April '14 to May.2014 1
2 Generating Capacity Addition for May, 2014 & during April '14 to May.2014 2
3 List of Projects Commissioned in May 2014 3
4 All India Installed Capacity (MW) Region-wise as on 30.04.2014 3
5 All India Installed Capacity (MW) Sector-wise as on 30.04.2014 4
6 Transmission Lines Added during May. 2014 and April '14 to May.'14 5
7 Transformation Capacity Addition During May. 2014 and April '14 to May.'14 6
8 Power Supply Position (Demand & Availabilty) in May 2014 7
9 Peak Shortage of Power Supply (MW) in Different Regions 8-9
10 All India PLF Sector-wise for May.'14 and for the last One Year 10
11 T & D and AT & C Losses (%)
12 All India Village Electrification & Pumpsets Energisation
13 Average cost of Power & Average Realisation 11
14 All India per Capita Consumption of Electricity KWh
15 All India Coal consumption for Power Generation
Section B - Capacity Addition
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets & Achievements during May.2014 and April 2014 to May. 2014 13
3 Installed Capacity in various Regions including their shares 14-19
Section C - Transmission Lines
1 Programme and Achievements of Transmission Lines in May 2014 and April 2014 to May. 2014
20
2 List of Transmission lines commissioned/Ready for commissioning in May.2014
Section D - Sub Stations
Programme and Achievements of Sub-Stationsin May. 2014 and during April 2014 to May 2014
1 21
2 List of Sub Stations commissioned/Ready for commissioning in May. 2014
Section E - Electricity Generation
1 Electricity Generation Targets and Achievements for 2014-15 22
Section F - Power supply position
1 Power Supply Position (Provisional) for May '14 23
2 Peak Demand and Peak Met (Provisional) for May, '14 24
3 Power Supply Position (Revised) for April, 2014 . 25
4 Peak Demand and Peak Met (Revised) for April, 2014 26
5 Notified Power cuts / Restrictions on Industries during May. 2014 27
6 Power Supply to Agricultural Sector during May. 2014 28
Section G - Growth of Power Sector
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since 2006 31
5 Average cost of power supply & Average realisation (Paisa/kwh)
6 Growth of Rural Electrification & Pump Sets Energisation
32
7 Status of Hydro Schemes Cleared by the CEA during April '14 to May '14
Section A - Highlights of Power Sector
SN Contents Page
1 Electricity Generation for May 2014 & during April '14 to May.2014 1
2 Generating Capacity Addition for May.2014 & during April '14 to May 2014 2
3 List of Projects Commissioned in May. 2014 3
4 All India Installed Capacity (MW) Region-wise as on 31.05.2014 3
5 All India Installed Capacity (MW) Sector-wise as on 31.05.2014 4
6 Transmission Lines Added during May '14 and April '14 to May.'14 5
7 Transformation Capacity Addition During May '14 and April '14 to May.'14 6
8 Power Supply Position (Demand & Availabilty) in May 2014 7
9 Peak Shortage of Power Supply (MW) in Different Regions 8-9
10 All India PLF Sector-wise for May '14 and for the last One Year 10
11 T & D and AT & C Losses (%)
12 All India Village Electrification & Pumpsets Energisation
13 Average cost of Power & Average Realisation 11
14 All India per Capita Consumption of Electricity KWh
15 All India Coal consumption for Power Generation
1. Electricity Generation for May 2014 (BU)
91.000
89.662
90.000
89.000
88.000
87.000
BU
86.000
85.000 84.351
84.000
83.000
82.000
81.000
May '13 Mayl '14
180.000
176.814
175.000
170.000
BU
165.000
162.220
160.000
155.000
150.000
1
2. Generating Capacity Addition for May 2014 (MW)
Achievement Targets Achievement % Change w.r.t.
Type
May-13 May-14 2013
Thermal 1570 660 2586.1 65
Hydro 0 68.67 130 NA
Nuclear 0 0 0 NA
All India 1570 728.67 2716.1 73
3000
2716.1
2500
2000
1570
1500
1000
500
0
Mayl.'13 1 May.'14
Generating Capacity Addition during April '13 to May '13 & April '14 to May '14 (MW)
3500
3251.1
3000
2500
2000 1852
1500
1000
500
0
Apr '13 to May. 13 1 Apr '14 to May '14
2
3. List of Projects Commissioned during May 2014
(i) Thermal
Total 248509.63 MW
300000.00
248509.64
250000.00
200000.00 171376.09
150000.00
100000.00
40661.41 39375.36
50000.00 31692.14
4780
0.00
Thermal Nuclear Hydro RES Total Captive
Sector THERMAL
Nuclear Hydro RES Grand Total
Coal Gas Diesel Total
Central 45925.01 7065.53 0.00 52990.54 4780.00 10485.41 0.00 68255.95
State 54428.00 6974.42 602.61 62005.03 0.00 27482.00 3803.67 93290.70
Private 47215.38 8568.00 597.14 56380.52 0.00 2694.00 27888.47 86962.99
All India 147568.39 22607.95 1199.75 171376.09 4780.00 40661.41 31692.14 248509.64
68255.95, 27%
86962.99, 35%
Central 68255.95
Central
State 93290.70
Private 86962.99 State
Private
93290.70, 38%
4
6. Transmission Lines Added during May 2014 (ckms)
2000 1811
1800
1600
1400
1200 1028
ckm
1000
800
600
400
200
0
May-13 1 May-14
3000
2490
2500
2000
1693
ckms
1500
1000
500
5
7. Transformation Capacity Addition during May 2014 (MVA)
6000 5115
5000
4000
MVA
3000
2000 1605
1000
0
All India Transformation Capacity Addition duringApril'13 to May'13& April'14 to May '14
8000
6195
6000
MVA
4000 3295
2000
6
8. Power Supply Position (Demand & Availability) in May 2014
Energy (MU)
Region Deficit (%)
Demand Availability
May'13 May'14 May'13 May'14 May'13 May'14
Northern 28072 28069 26392 26421 -6.0 -5.9
Western 27992 27989 27749 27644 -0.9 -1.2
Southern 25160 24007 22102 22720 -12.2 -5.4
Eastern 9195 9883 9068 9773 -1.4 -1.1
North Eastern 995 1064 892 970 -10.4 -8.8
All India 91414 91012 86203 87528 -5.7 -3.8
Power (MW)
Region Deficit (%)
PEAK Demand Peak Met
May'13 May'14 May'13 May'14 May'13 May'14
Northern 42620 41803 40738 39598 -4.4 -5.3
Western 38054 42486 37216 41050 -2.2 -3.4
Southern 37429 36051 32090 34409 -14.3 -4.6
Eastern 15465 16371 15110 16085 -2.3 -1.7
North Eastern 1993 2140 1810 1986 -9.2 -7.2
All India 135561 138851 126964 133128 -6.3 -4.1
7
9. Peak Shortage of Power Supply (MW) in Different Regions
Chandigarh Delhi Haryana HP J&K Punjab Rajasthan UP Utrakhand
May 13 0 0 0 5 572 0 46 610 125
May' 14 0 20 0 0 States (MW)
Northern 477 0 117 3685 75
May 14
3685
4000 May' 13
3600
3200
2800
2400
MW
2000
1600
1200
610
572
477
800
125
117
400
75
46
20
0
0
0
Haryana
Utrakhand
HP
J&K
UP
Chandigarh
Punjab
Rajasthan
Delhi
States
May 14
May'13
900
1000
663
800
526
MW
600
400
101
200
42
25
11
4
6
0
Dadar 0
Haveli 0
0
Chatisgarh
Maharashtra
MP
Daman &
Gujarat
Goa
Nagar
Diu
States
1548
1534
2000
MW
1005
815
1000
453
303
195
15
10
0
Puducherry
Tamil Nadu
AP
Kerala
Lakshyadeep
Karnataka
States
8
Bihar DVC Jharkhand Odisha West Bengal Sikkim A&N Island
May 13 299 0 43 6 36 0 8
May 14 150 20 30 30 20 0 8
Eastern States (MW)
May' 14
299
350
300 May '13
250
MW
150
200
150
100
43
36
30
30
20
20
50
8
6
0
0
0
Island
Jharkhand
Odisha
Bihar
Bengal
DVC
Sikkim
A&N
West
States
160
140
120
120
100
MW
80
60
40
17
20
4
4
3
3
2
2
1
0
Meghalaya
Nagaland
Arunachal
Mizoram
Manipur
Tripura
Assam
States
9
10. All India Plant Load Factor* Sector-wise for May' 13 and May' 14
%PLF
Sector May'13 May'14
Central 77.33 78.15
State 66.31 60.45
Private 79.25 72.94
ALL INDIA 70.68 68.15
Sector-Wise Plant Load Factor for May 2013 and May 2014
79.25
78.15
77.33
72.94
70.68
68.15
66.31
60.45
100
% PLF
50
0
Central State Private ALL INDIA
May'13 May'14
69.82
69.38
69.05
68.44
68.15
66.58
65.44
64.65
61.85
80
60.86
63.4
55.94
60
40
20
0
November
May
June
July
January
February
March
April
August
September
October
December
2013-14 2014-15
2010-11 2011-12
T&D Losses 23.97 23.65
AT&C Losses 26.04 27
Realization(paise/unit)
Year cost of supply (paise/unit) Including
Only Agriculture
Agriculture
2010-11 378 301 115.12
Source:- PFC Reports on the performance of State Power Utilities
2012-13 917.18*
15. All India Coal consumption for Power Generation (Million Tonnes)
2013-14 487.9
11
Section B - Capacity Addition
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets & Achievements during May.2014 and April 2014 to May. 2014 13
(i) Targets
(MW)
Type/Sector Central State Private Total
Thermal 14,878.00 13,922.00 43,540.00 72,340.00
Hydro 6,004.00 1,608.00 3,285.00 10,897.00
Nuclear 5,300.00 0.00 0.00 5,300.00
Total 26,182.00 15,530.00 46,825.00 88,537.00
Achievement of Capacity Addition during the Current Plan upto May' 2014
90,000.00
80,000.00
40,009.90
70,000.00
60,000.00
50,000.00
10,897.00
40,000.00
5,300.00
30,000.00
1,689.01
20,000.00
10,000.00
0
0.00
Thermal Hydro Nuclear
Target Achievement
12
2. Capacity Addition Targets / Achievements during May 2014 & April 2014 to May 2014
(MW)
Target 2014- May-14 Apr '14-May '14 Deviation
Schemes Sector
15 Target* Achievement Target* Achievement (+) / (-)
Central 2818.3 0 0 0 0 0
State 6770 0 1026.1 0 1026.1 1026.1
Thermal
Pvt. 5370 660 1560 660 2095 1435
Total 14958.3 660 2586.1 660 3121.1 2461.1
Central 336 68.67 130 137.34 130 -7.34
State 210 0 0 0 0 0
Hydro
Pvt. 296 0 0 0 0 0
Total 842 68.67 130 137.34 130 -7.34
Nuclear Central 2000 0 0 0 0 0
Central 5154.3 68.67 130 137.34 130 -7.34
State 6980 0 1026.1 0 1026.1 1026.1
All India
Pvt. 5666 660 1560 660 2095 1435
Total 17800.3 728.67 2716.1 797.34 3251.1 2453.76
Targets and Achievements during May'14 & April '14 to May '14
Target
20000
18000 Achievement
16000
14000
12000
MW
10000
8000
3251.1
3121.1
6000
797.34
137.34
4000
660
130
2000
0
0
Thermal Hydro Nuclear Total
5000
2716.1
2586.1
4000
3000
728.67
2000
660
68.67
130
1000
0
0
Thermal Hydro Nuclear Total
13
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN
NORTHERN REGION
(As on 31.05.2014)
Modewise breakup
Central - Unallocated 977.19 290.35 0.00 1267.54 129.80 629.89 0.00 2027.23
Total (Northern Private 8570.00 108.00 0.00 8678.00 0.00 2148.00 4699.27 15525.27
Region) Central 12000.50 2344.06 0.00 14344.56 1620.00 7260.21 0.00 23224.77
Grand Total 35883.50 5331.26 12.99 41227.75 1620.00 16460.76 5935.77 65244.28
14
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN
WESTERN REGION
(As on 31.05.2014)
Modewise breakup
Gujarat State * 4470.00 2321.82 17.28 6809.10 0.00 772.00 15.60 7596.70
Private 8620.00 4160.00 0.20 12780.20 0.00 0.00 4414.60 17194.80
Central 2648.27 424.27 0.00 3072.54 559.32 0.00 0.00 3631.86
Sub-Total 15738.27 6906.09 17.48 22661.84 559.32 772.00 4430.20 28423.36
Dadra & Nagar Private 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Naveli Central 44.37 27.10 0.00 71.47 8.46 0.00 0.00 79.93
Sub-Total 44.37 27.10 0.00 71.47 8.46 0.00 0.00 79.93
Central - Unallocated 1622.35 196.91 0.00 1819.26 228.14 0.00 0.00 2047.40
Total (Western Private 27944.00 4388.00 0.20 32332.20 0.00 447.00 10789.83 43569.03
Region) Central 11738.01 3533.59 0.00 15271.60 1840.00 1520.00 0.00 18631.60
Grand Total 59114.51 10915.41 17.48 70047.40 1840.00 7447.50 11271.07 90605.97
15
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN
SOUTHERN REGION
(As on 31.05.2014)
Modewise breakup
Central - Unallocated 1367.08 0.00 0.00 1367.08 150.48 0.00 0.00 1517.56
Total (Southern Private 3360.00 4047.50 576.80 7984.30 0.00 0.00 12250.52 20234.82
Region) Central 10640.00 359.58 0.00 10999.58 1320.00 0.00 0.00 12319.58
Grand Total 26582.50 4962.78 939.32 32484.60 1320.00 11398.03 13784.67 58987.30
16
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN
EASTERN REGION
(As on 31.05.2014)
Modewise breakup
Central - Unallocated 1454.16 0.00 0.00 1454.16 0.00 0.00 0.00 1454.16
Total (Eastern Private 7341.38 0.00 0.14 7341.52 0.00 99.00 142.97 7583.49
Region) Central 11546.50 90.00 0.00 11636.50 0.00 845.20 0.00 12481.70
Grand Total 25927.88 190.00 17.20 26135.08 0.00 4113.12 432.86 30681.06
17
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN
NORTH-EASTERN REGION
(As on 31.05.2014)
Modewise breakup
Central - Unallocated 0.00 55.40 0.00 55.40 0.00 127.15 0.00 182.55
Total (North- Eastern Private 0.00 24.50 0.00 24.50 0.00 0.00 0.03 24.53
Region) Central 0.00 738.30 0.00 738.30 0.00 860.00 0.00 1598.30
Grand Total 60.00 1208.50 142.74 1411.24 0.00 1242.00 256.67 2909.91
(As on 31.05.2014)
Modewise breakup
18
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
LOCATED IN THE REGIONS OF MAIN LAND AND ISLANDS
(As on 31.05.2014)
(UTILITIES)
Modewise breakup
North Eastern Private 0.00 24.50 0.00 24.50 0.00 0.00 0.03 24.53
Region Central 0.00 738.30 0.00 738.30 0.00 860.00 0.00 1598.30
Sub Total 60.00 1208.50 142.74 1411.24 0.00 1242.00 256.67 2909.91
Note : - RES include SHP, BP, U&I, Solar and Wind Energy. Installed capacity in respect of RES (MNER) as on : 31.03.2014
SHP=Small Hydro Project (≤ 25 MW), BP=Biomass Power, U&I=Urban & Industrial Waste Power
*Break up of RES all India is given below (in MW) :
Bio-Power Total Capacity
Small Hydro Power Wind Power Solar Power
BM Power/Cogen. Waste to Energy
20
Section D - Sub Stations
SN Contents Page
(Fig. in MVA)
Voltage Level Programme May '14 Apr 2014 - May '14
/Sector 2014-15 Programme Achievement Programme
Achievement
Achievement
+/- 500 kV HVDC
Central Sector 0 0 0 0 0
State Sector 0 0 0 0 0
JV/Private Sector 0 0 0 0 0
Total 0 0 0 0 0
765 kV
Central Sector 18000 0 0 0 0
State Sector 1500 0 0 0 0
JV/Private Sector 10500 0 0 6000 0
Total 30000 0 0 6000 0
400 kV
Central Sector 4565 630 515 630 830
State Sector 4775 0 630 0 1445
JV/Private Sector 0 0 0 0 0
Total 9340 630 1145 630 2275
220 kV
Central Sector 0 0 100 0 200
State Sector 8531 200 360 720 820
JV/Private Sector 0 0 0 0 0
Total 8531 200 460 720 1020
Grand Total 47871 830 1605 7350 3295
As on 31-MAy-2014
Voltage Level Name of Capacity Added
Type Executing Agency
(kV) Sub-Station (MW/MVA)
CENTRAL Sector:
21
Section E - Electricity Generation
SN Contents Page
1 Electricity Generation Targets and Achievements for 2014-15 22
1. Electricity Generation (MU) Targets and Achievememts for 2014-15
Programme
200000 Achievement
176814
180000 168322
160000 149367
143060
140000
120000
100000
80000
60000
40000
19702 21553
20000
5074 5559
0
Thermal Hydro Nuclear Total
22
Section F - Power supply position
SN Contents Page
1 Power Supply Position (Provisional) for May '14 and April'14 to May'14 23
2 Peak Demand and Peak Met (Provisional) for May '14 and April'14 to May'14 24
3 Power Supply Position (Revised) for April '14 25
4 Peak Demand and Peak Met (Revised) for April '14 26
5 Notified Power cuts / Restrictions on Industries during May. 2014 27
6 Power Supply to Agricultural Sector during May. 2014 28
ãäÌã²ãì¦ã ‚ãã¹ãîãä¦ãà ãäÔ©ããä¦ã (¹ãîÌããÃÌãÊããñ‡ãŠ¶ã) / Power Supply Position (Provisional)
¹ãîÌããê àãñ¨ã / Eastern Region 16,371 16,085 -286 -1.7 16,548 16,309 -239 -1.4
‚ãÁ¥ããÞãÊã ¹ÇãªñÍã / Arunachal Pradesh 115 111 -4 -3.5 115 111 -4 -3.5
‚ãÔã½ã / Assam 1,332 1,212 -120 -9.0 1,343 1,230 -113 -8.4
½ã¥ããè¹ãìÀ / Manipur 110 109 -1 -0.9 115 112 -3 -2.6
½ãñÜããÊã¾ã / Meghalaya 299 296 -3 -1.0 299 296 -3 -1.0
ãä½ã•ããñÀ½ã / Mizoram 75 73 -2 -2.7 77 76 -1 -1.3
¶ããØããÊãõ¥¡ / Nagaland 105 104 -1 -1.0 105 104 -1 -1.0
ãä¨ã¹ãìÀã / Tripura 236 233 -3 -1.3 246 246 0 0.0
„§ãÀ -¹ãîÌããê àãñ¨ã / North-Eastern Region 2,140 1,986 -154 -7.2 2,197 2,045 -152 -6.9
Ôã½¹ãî¥ãà ¼ããÀ¦ã / All India 138,851 133,128 -5,723 -4.1 141,886 134,972 -6,914 -4.9
# Lakshadweep and Andaman & Nicobar Islands are stand- alone systems, power supply position of these,does not form part of regional requirement and availability 24
# Being stand- alone systems, power supply position of these,does not form part of regional requirement and availability 26
À㕾ã /àãñ¨ã / State/ Region …•ããà ‡ãŠ›ãõ¦ããè / Energy Cut ½ããâØ㠇㊛ãõ¦ããè / Demand cut
„§ãÀãŒãâ¡ / Uttarakhand 0.527 MU/day on HT/LT industries . 140 MW cut on HT/LT industries.
‡ãñŠÀÊã / Kerala Nil; However, there was load shedding up to 580 MW during peak hours (35.59 MU for the month)
20% and 90% Cut on base Demand & Energy Consumption in respect of HT industrial and commercial consumers during
¦ããä½ãÊã ¶ãã¡ / Tamil Nadu day time and evening peak hours. 2 Hour Load Shedding for Chennai and 3 hours Load Shedding for areas other than
Chennai City by rotation. However, there was load shedding up to 2019 MW during peak hours (292.12 MU for the month).
¹ãì¡ìÞãñÀãè / Puducherry Nil; However, there was load shedding up to 35 MW during peak hours (0.685 MU for the month)
Note:- Although some states have reported "No Notified Power Cuts", load shedding/restrictions are imposed on industries on day to day basis
depending upon availability of power vis-à-vis requirement.
* Data not received from these States. 27
À㕾ã /àãñ¨ã / State/ Region ‚ããõÔã¦ã ãäÌã²ãì¦ã ‚ãã¹ãîãä¦ãà Üãâ›ãò ½ãò / Average Hours of Supply
„§ãÀãè àãñ¨ã / Northern Region
Þãâ¡ãèØ㤠/ Chandigarh*
ãäÖ½ããÞãÊã ¹ÇãªñÍã / Himachal Pradesh HPSEBL has only 2% agriculture consumers and uninterrupted power is being supplied to agriculture sector
¹ãâ•ããºã / Punjab Three Phase Supply :06:09 hrs/day (Average) Single phase Supply : 23:30 hrs/day (Average)
Àã•ãÔ©ãã¶ã / Rajasthan Three Phase Supply :6.30 hrs/day (Average) Single phase Supply( FRP/Non FRP Feeders) : 24.00 hrs/day (Average)
„§ãÀ ¹ÇãªñÍã / Uttar Pradesh Three Phase Supply :12:51 hrs/day (Average) Single phase Supply : 12:51 hrs/day (Average)
„§ãÀãŒãâ¡ / Uttarakhand Three Phase Supply :24 hrs/day (Average) Single phase Supply : 24 hrs/day (Average)
Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture. Single Phase supply
Øãì•ãÀã¦ã / Gujarat
during rest of 16 hours by providing LSTC. Jyotigram Yojana 24 hrs.
½ã£¾ã ¹ãƪñÍã / Madhya Pradesh Three Phase Supply(Mixed) : 23:10 hrs /day (Average) Single phase Supply:NIL
½ãÖãÀãÓ›È / Maharashtra Three Phase Supply : 9 hrs/day (Average) Single phase Supply : 18 hrs/day (Average)
‡ãŠ¶ããۇ㊠/ Karnataka Three Phase Supply : 6 hrs/day Single Phase Supply : 6 - 12 hrs/day
¦ããä½ãÊã¶ãã¡î / Tamil Nadu Three Phase Supply : 9 hrs/day (6 hrs during day time and 3 hrs during night time)
Hyderabad :
3 Hours in two spells 3 Hours in two spells 3 Hours in two spells
Tirupati , Vizag and Warangal:
Corporations and District Headquarters 3 Hours in two spells 3 Hours in two spells 3 Hours in two spells
Towns & Municipalties 4 Hours in two spells 4 Hours in two spells 4 Hours in two spells
Mandal HQ 6 Hours in two spells 6 Hours in two spells 6 Hours in two spells
Lighting supply during 06.00PM to Lighting supply during 06.00PM Lighting supply during 06.00PM
Rurals 06.00AM and day supply along with to 06.00AM and day supply along to 06.00AM and day supply
agriculture supply. with agriculture supply. along with agriculture supply.
Total 2,48,509.64 MW
4
2.1
,69
31
1
1.4
,66
40
.39
68
7,5
14
.0 0
80
4,7 .7 5
99
1,1
5
7.9
,60
22
29
2. Growth of Transmission Sector Since 6th Plan
Total (AC+HVDC) ckm 52034 79455 117376 152269 198407 257481 293826 364921
AC Substations 400 MVA 9330 21580 40865 60380 92942 151,027 179727 196027
Transformation 220 MVA 37291 53742 84177 116363 156497 223,774 257614 299774
Capacity
Total AC MVA 46621 75322 125042 176743 249439 399801 520341 669801
Inter-regional
transmission MW 14050 27750 33950 65550
Capacity
Coal Consumption
YEAR
Million Tonnes
2004-05 278.00
2005-06 281.00
2006-07 302.00
2007-08 330.00
2008-09 355.00
2009-10 367.00
2010-11 387.00
2011-12 417.56
2012-13 454.60
2013-14 487.9
4. All India Annual per Capita consumption of Electricity Since 2006
Realization(paise/unit)
cost of supply
Year Only
(paise/unit) Including Agriculture
Agriculture
2004-05 254 209 75.68
2005-06 260 221 76.36
2006-07 276 227 74.23
2007-08 293 239 77.27
2008-09 340 263 87.13
2009-10 355 268 88.70
2010-11 378 301 115.12
Source:- PFC Reports on the performance of State Power Utilities
31
6. Growth Of Rural Ectrification & Pumpsets Energisation.
7.Status of Hydro Schemes Cleared by the CEA during April 2014 to May 2014
Nil
Page 32