FIELD QUALITY PLAN
PHASE NO./UNIT NO. :
Item: QP NO:
Fax No: PACKAGE :
Rev. no.
E-mail : SO NO.:
Date:
MAIN-CONTRACTOR:
Page. …..….. of………
SL ACTIVITY / OPERATION CHARACTERISTICS CLASS OF TYPE OF QUANTUM REFERENCE ACCEPTANCE FORMAT REMARKS
NO CHECK # CHECK OF CHECK DOCUMENT NORMS OF
RECORD
1 2 3 4 5 6 7 8 9 D* 10
LEGEND :-
1. D* Records identified with ‘TICK’(p) shall essentially be included by supplier in QA documentation.
2. # Class of check shall be A, B and C
NOTE:- All class of checks shall be ‘H’ (‘Customer Hold Point’) and work shall not proceeded till it is witnessed and cleared in writing by witnessing & accepting authority.
C Main Contractor’s FQA Engineer and Engineer of Executing Any other Engineer authorized by Head of the
Department (nominated by HOD at Site) Project / Station (VP)
ABBREVIATION to be used in column -9 for format of record:-
SR=Site Register, TR=Test Report, TC=Manufacturer’s Test Certificate, LR=Lab Report, LB=Log Book. LS= Log sheet (specify the log sheet no.)
For Erection Sub- Contractor For Main Erection Contractor For APML
Format No CQA/IV/ R2
APPENDIX II
LEGEND FOR FIELD QUALITY PLAN –FQP
(FORMAT No. CQA/ IV/ R2)
Sub-Contractor name and address: Name and full address of Sub-Contractor shall be indicated in " FQP"
a) Item: In the column of ‘Item’: Full name of the item for which FQP is being prepared should be indicated along
with the complete material, type, class, rating, range, size etc. or complete designation / description of the item or as
recommended in the product specification (attach sheet, if required).
Column 2: ACTIVITY / OPEERATION: Name of components/ equipment / system and operations like Site
Receipts Inspection, Storage, Handling, Pre-Erection and Erection shall be indicated.
Column 4: Each Check shall be classified as A, B or C depending upon its criticality in over all integrity of
the equipment
Column 5: Type of Check shall indicate nature of check i.e. visual, measurement, verification, strength,
chemical analysis, NDT etc.
Column 6: 100% Check or sample basis specifying percentage sample to be checked. In case check has to be
performed periodically frequency of testing to be indicated. However the column "6" 'Quantum of Check' can
be sub-divided into 2 or 3 columns to facilitate clarity for a particular set of Contractor / Sub-
Contractor /Manufacturer.
Column 7: Plant standard, IS, DIN, BS, ASME, IEC or other national/international standards, statutory codes,
drawings etc. as per which checks/tests shall be carried out and their acceptance norms shall be indicated.
Column 8: Plant standard, design data, national/international standard or other acceptance norm shall be
indicated.
Column 9 'D': Records shall be identified by AG with Tick marks ( ü) shall be essentially included by -
Contractor in QA documentation.
Column 10: In Remark column any specific Remark shall be written here.
__________________________________________________________________________________________
CQA/IV/R2