Sei sulla pagina 1di 194

t

KL-Block, Sarita Vihar,


Delhi

i l S i

Environmental Consultant
100 Bedded Hospital
At KL-Block, Sarita Vihar, DelhiLa FORM 1

CONTENTS

SI. NO. DESCRIPTION PAGE NO.


I Basic Information 1
II Activity 3
III Environmental Sensitivity 14

Directorate of Health Services


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1

FORM- I

S. No. Item Details


1. Name of the project/s 100 Bedded Hospital
2. S. No. in the schedule 8 (a)
(Building & Construction Project)
3. Proposed capacity/area/length/tonnage to be Plot Area = 6,318.72 m2
handled/command area/lease area/number of Proposed FAR = 12,578.89 m2
wells to be drilled Built Up Area = 22,437.87m2
4. New/Expansion/Modernization New
5. Existing Capacity/Area etc. NA
6. Category of Project i.e. ‘A’ or ‘B’ Category B
7. Does it attract the general condition? If yes, No
please specify.
8. Does it attract the specific condition? If yes, No
please specify.
9. Location Plot/Survey/Khasra No.
Village KL-Block
Tehsil Sarita Vihar
District South East Delhi
State Delhi
10. Nearest railway station/airport along with Okhla Railway Station, (4.0 km, NW)
distance in kms Tuglakabad Railway station (3.7 km,
SW)
Jasola Metro Station (1.4 km, WNW)
Indira Gandhi International Airport
(20.0 km, W)
(Source of information:- Google Earth)
11. Nearest Town, city, District Headquarters Nearest City: New Delhi (12.0 km,
along with distance in kms. NNW)
12. Village Panchayats, Zilla Parishad, South Delhi Municipal Corporation
Municipal Corporation, Local body
(complete postal addresses with telephone
nos. to be given)
13. Name of applicant Directorate of Health Services

14. Registered Address Directorate of Health Services


Swasthaya Sewa Nideshalaya Bhawan
F-17, Karkardooma, Shahdara, Delhi-
110032 (Hospital Cell)

Directorate of Health Services 1


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1

15. Address for correspondence :


Name Dr. Arun Banerjee
Designation (Owner/Partner/CEO) Chief Medical Officer
Address Directorate of Health Services
Swasthaya Sewa Nideshalaya Bhawan
F-17, Karkardooma, Shahdara, Delhi-
(Hospital Cell)
Pin Code 110032
Telephone No. 011-22382268
Fax No. 011-22306396
E-mail cmohcdhs.delhi@nic.in
16. Details of Alternative Sites examined, if any. No
Location of these sites should be shown on a
toposheet.
17. Interlinked Projects No
18. Whether separate application of interlinked No
project has been submitted?
19. If yes, date of submission Not Applicable
20. If no, reason Not Applicable
21. Whether the proposal involves approval/ No
clearance under: if yes, details of the same
and their status to be given.
(a)The forest (Conservation) act, 1980?
(b) The wildlife (Protection) act, 1972?
(C) The C.R.Z Notification, 1991?
22. Whether there is any Government 1. NBC Guidelines
Order/Policy relevant/relating to the site? 2. Building Bye laws by Delhi
Development Authority

23. Forest land involved (hectares) No


24. Whether there is any litigation pending No
against the project and /or land in which the
project is propose to be set up?
(a) Name of the Court
(b) Case No.
(c) Orders/directions of the Court, if any and
its relevance with the proposed project.

Directorate of Health Services 2


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1

(II) Activity

1. Construction, operation or decommissioning of the Project involving actions,


which will cause physical changes in the locality (topography, land use, changes
in water bodies, etc.)

Details thereof (with approximate


S. No. Information/Checklist confirmation Yes/No quantities /rates, wherever possible)
with source of information data
1.1 Permanent or temporary change in land No Planned project is hospital project. Delhi
use, land cover or topography including development authority has allotted land
increase in intensity of land use (with on lease to DDA for development of
respect to local land use plan) hospital
1.2 Clearance of existing land, vegetation No Construction of project does not require
and buildings? any clearance of existing Land,
Vegetation & Building.
1.3 Creation of new land uses? No Project site is currently an open land and
Delhi development authority has allotted
land on lease to DDA for development of
hospital
1.4 Pre-construction investigations e.g. bore Yes Soil testing has been done during detailed
houses, soil testing? engineering study.
1.5 Construction works? Yes All construction activities will be
confined within the project premises;
there will be no physical changes outside
the project boundary.
1.6 Demolition works? No Demolition is not required.
1.7 Temporary sites used for construction No All the construction activity including
works or housing of construction stocking of raw materials will be confined
workers? within the project site only. No temporary
labor hutments are proposed. Local labors
from nearby area will be hired. Sanitation
facilities will be developed at site.
1.8 Above ground buildings, structures or Yes Excavation will be carried out for
earthworks including linear structures, foundation of buildings and basements.
cut and fill or excavations Total excavated quantity of earth material
will be approx. 33289.45 m3. Excavated
soil will be used in backfilling and other
area development activities and surplus
shall be disposed off to designated site.
1.9 Underground works including mining or No No underground works including mining/
tunneling? tunneling is required except excavation of
earth for foundation & basements.

Directorate of Health Services 3


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1

1.10 Reclamation works? No No reclamation work required.


1.11 Dredging? No No dredging required.
1.12 Offshore structures? No No offshore structures required.
1.13 Production and manufacturing No No production/manufacturing process is
processes? involved. Planned project is hospital
project & do not involve production &
manufacturing
1.14 Facilities for storage of goods or Yes Raw material will be stored at site in a
materials? covered area. Cement will be separately
stored under cover in bales. Sand will be
stacked neatly under tarpaulin cover.
Bricks and steel will be laid in open.
1.15 Facilities for treatment or disposal of Yes Solid Waste:
solid waste or liquid effluents? Solid waste generated from the project
will be in the form of:

Construction Waste:
Left over cement and mortars, cement
concrete blocks, aggregate, sand and
other inorganic material will be recycled
and reused as granular subbase (GSB)
layer of pavement. Earth rendered
surplus from the excavation will be
utilized in the embankment works or
disposed to designated sites.

Municipal Solid Waste


The solid waste generated from project
will be municipal & bio-medical waste.
Municipal waste of approx. 519 kg/day
and bio-medical waste of approx. 130.0
kg/day will be generated. Solid wastes
generated will be collected & segregated
at site in different color bins. Municipal
waste will be handed over to local
agency of Municipal Corporation Delhi
for disposal & Bio-medical waste will be
handed over to authorized vendor.

E-Waste:
E-waste from project site will consist of
discarded computers and equipment. E-
waste generated shall be managed as per
E-waste (Management & Handling)

Directorate of Health Services 4


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1

Rules, 2011. This waste will be collected


& stored in a room. It will be sold
periodically to authorized vendor.

Liquid effluents:
During construction phase, sewage will
be treated in septic tanks & soak pits.
Approx 90 KLD of sewage will be
generated & it will be treated in STP of
110 KLD. Approx. 12 KLD of lab
effluent will be generated & that will be
treated in ETP of 15 KLD. Treated water
from STP will be used for flushing,
horticulture & HVAC cooling. Treated
water from ETP will be used for HVAC
cooling.
1.16 Facilities for long term housing of No No such facility is proposed in the
operational workers? project.
1.17 New road, rail or sea traffic during Yes Traffic of approx 15-20 trucks per week
construction or operation? will be generated during construction
phase & traffic of max. 252 ECS is
expected to be generated during operation
phase.
1.18 New road, rail, air waterborne or other No Project site lies in the Sarita Vihar which
transport infrastructure including new or is a well developed housing colony in
altered routes and stations, ports, airports South Delhi area. Infrastructures like
etc? roads, metro, drinking water facility,
sewers are well developed in area. Project
site connects to NH-2 through local
roads. Thus no new transport
infrastructure is required to be built.
1.19 Closure or diversion of existing No All project activities will be confined to
transport routes or infrastructure leading project site. No diversion or closure of
to changes in traffic movements? existing traffic routes shall be done.
Movement of vehicles shall be planned
during non-peak hours.
1.20 New or diverted transmission lines or No There will not be any new/diverted
pipelines? transmission lines or pipelines around the
proposed project.
1.21 Impoundment, damming, culverting, No No impoundment, damming, culverting,
realignment or other changes to the realignment or other changes to the
hydrology of watercourses or aquifers? hydrology of surface watercourses is
proposed.
1.22 Stream crossings? No There are no streams running across the

Directorate of Health Services 5


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1

site.
1.23 Abstraction or transfers of water form Yes During construction phase, 50 ML of
ground or surface waters? water will be required which will be
taken from Okhla STP and through DJB
tankers. During operation phase, water
supply will be provided by Delhi Jal
Board. About 118 KLD of fresh water
will be required during operation phase of
the project.
1.24 Changes in water bodies or the land Yes Runoff will increase due to increased
surface affecting drainage or run-off? paved surface. However, increased runoff
will be managed by well-designed
rainwater harvesting system & storm
water management plan.
1.25 Transport of personnel or materials for Yes During the construction phase, about 15-
construction, operation or 20 trucks are estimated per week.
decommissioning? Adequate parking space within the
project site for loading and unloading of
materials will be provided.
Parking space for 253 ECS is proposed to
be provided for accommodating vehicles
expected during operation phase of the
project.
1.26 Long-term dismantling or No No Long term dismantling or
decommissioning or restoration works? decommissioning or restoration works
will be involved.
1.27 Ongoing activity during No None
decommissioning which could have an
impact on the environment?
1.28 Influx of people to an area in either No It is a hospital project & no influx of
temporarily or permanently? people in the area is involved.
1.29 Introduction of alien species? No The landscaping will be carried out with
mainly local/native species with a few
ornamental varieties of flora that are well
suited to the local conditions. No alien
species will be introduced.
1.30 Loss of native species or genetic No There will be no significant impact on the
diversity? native species or genetic diversity.
1.31 Any other actions? No Not Applicable.

Directorate of Health Services 6


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1

2. Use of Natural resources for construction or operation of the Project (such as land,
water, materials or energy, especially any resources which are non-renewable or in short
supply):

Details thereof (with approximate


S.
Information/checklist confirmation Yes/No quantities/rates, wherever possible)
No.
with source of information data
2.1 Land especially undeveloped or No Delhi Development Authority has allotted
agricultural land (ha) land to Directorate of Health Services on
lease for development of hospital
2.2 Water (expected source & competing Yes During construction phase, 50 ML of
users) unit: KLD water will be required which will be
taken from Okhla CSTP and through DJB
tankers. During operation phase, water
supply will be provided by Delhi Jal
Board. About 118 KLD of fresh water
will be required during operation phase of
the project. Total water requirement
during operation phase is 218.0 KLD.
2.3 Minerals (MT) Yes Minerals such as sand and aggregates will
be required during the construction phase.
2.4 Construction material – stone, aggregates, Yes All materials for construction will be
and / soil (expected source – MT) arranged through select suppliers.
2.5 Forests and timber (source – MT) Yes Minimal use of timber will be made.
Most of the joinery work will be done in
Aluminium and steel.
2.6 Energy including electricity and fuels Yes The total demand load is estimated at
(source, competing users) Unit: fuel (MT), 2306.3 kVA. Power will be supplied by
energy (MW) BSES. There is provision of DG sets of
total 3030 kVA (3 X 1010 kVA) for
uninterrupted power supply to the
hospital during power failure. DG sets
will be equipped with acoustic enclosure
and adequate stack height for proper
dispersion to control noise & air
pollution.
2.7 Any other natural resources (use No Not Applicable
appropriate standard units)

Directorate of Health Services 7


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1

3. Use, storage, transport, handling or production of substances or materials, which


could be harmful to human health or the environment or raise concerns about actual or
perceived risks to human health.

Details thereof (with approximate


S. No. Information/Checklist confirmation Yes/No quantities/rates, wherever possible)
with source of information data
3.1 Use of substances or materials, which are Yes Diesel for DG sets will be stored in
hazardous (as per MSIHC rules) to drums in earmarked locations. It shall
human health or the environment (flora, also be handled as per The Manufacture,
fauna, and water supplies) Storage and Import of Hazardous
Chemical Rules, 1989 and Material
Safety Data Sheet.
3.2 Changes in occurrence of disease or No Suitable drainage and waste management
affect disease vectors (e.g. insect or measures (with frequent spray of
water borne diseases) insecticides etc.) will be adopted in both
the construction and operational phase
such that there will be no stagnation of
water or accumulation of waste. This will
effectively restrict the reproduction and
growth of disease vectors.
3.3 Affect the welfare of people e.g. by Yes Project development will lead to better
changing living conditions? quality of life as it will improve health
care facility in the area. It will reduce
burden on other government hospital.
Also employment opportunity for skilled,
semi-skilled & unskilled people will be
generated.
3.4 Vulnerable groups of people who could No Impacts of this type are not expected.
be affected by the project e.g. hospital
patients, children, the elderly etc.
3.5 Any other causes No Not Applicable

Directorate of Health Services 8


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1

4. Production of solid wastes during construction or operation or decommissioning


(MT/month)

Details thereof (with approximate


S. No. Information/Checklist confirmation Yes/No quantities/rates, wherever possible)
with source of information data
4.1 Spoil, overburden or mine wastes No No such spoil, overburden or mine wastes
will be generated.
4.2 Municipal waste (domestic and or Yes Solid waste will comprise of municipal &
commercial wastes) bio-medical waste. Municipal waste
estimated to be generated is 519 kg/day &
bio-medical waste is estimated to be 130
kg/day.
4.3 Hazardous wastes (as per Hazardous Yes Hazardous wastes along with other
Waste Management Rules) wastes in the project will be used oil
from DG sets, which is classified as per
The Hazardous Waste Category 5.1 as
per The Hazardous Wastes (Management
& Handling) Rules, 1989 and
amendments till date.
Used oil from DG sets will be stored in
HDPE drums in isolated covered facility.
This used oil will be sold to authorized
recyclers. Suitable care will be taken so
that spills/leaks of used oil from storage
are avoided.
4.4 Other industrial process wastes No Not applicable
4.5 Surplus product No Not applicable
4.6 Sewage sludge or other sludge from Yes Sludge generated from the STP plant will
effluent treatment be dried and later will be used as manure
for green belt development.
Sludge from ETP will be sent for disposal
to landfill site.
4.7 Construction or demolition wastes Yes Construction waste will consist of excess
earth and construction debris along with
cement bags, steel in bits and pieces,
insulating and packaging materials etc.
Recyclable waste construction materials
will be sold to recyclers. Unusable and
excess construction debris will be
disposed at designated places in tune with
the local norms.
4.8 Redundant machinery or equipment No Redundant machinery will not be
generated.

Directorate of Health Services 9


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1

4.9 Contaminated soils or other materials No Contaminated soils or other materials will
not be generated.
4.10 Agricultural wastes Yes Landscape wastes of 0.49 kg/day will be
generated.
4.11 Other solid wastes No Not Applicable

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr).

Details thereof (with approximate


S. No. Information/Checklist confirmation Yes/No quantities/rates, wherever possible)
with source of information data
5.1 Emissions from combustion of fossil Yes Project does not involve air emission
fuels from stationary or mobile sources from any other source except operation of
DG sets during power failure and
vehicular traffic.
5.2 Emissions from production processes No No production processes involved.
Hence, there will be no such emissions.
5.3 Emissions from materials handling Yes
including storage or transport

5.4 Emissions from construction activities Yes This will be restricted to the construction
including plant and equipment phase and the construction site only.
5.5 Dust or odors from handling of materials Yes Dust is anticipated during loading and
including construction materials, sewage unloading of construction material and
and waste excavation of upper earth surface. These
will however be temporary in nature,
which will be controlled by providing
water sprinklers. Tarpaulin cover will be
provided on stored loose materials to
reduce the dust emission.
5.6 Emissions from incineration of waste No No incineration of wastes will be carried
out at project site.
5.7 Emissions from burning of waste in open No Open burning of biomass/other material
air (e.g. slash materials, construction will be prohibited on site.
debris)
5.8 Emissions from any other sources No Not Applicable

Directorate of Health Services 10


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

Details thereof (with approximate


S. No. Information/Checklist confirmation Yes/No quantities/ rates, wherever possible)
with source of information data
6.1 From operation of equipment e.g. Yes Source of noise in the operational phase
engines, ventilation plant, crushers will be from backup DG sets (which will
be in operation only during power failure)
and pumps & motors. All the machinery
will be of highest standard of reputed
make and will comply with standard i.e.
The DG set room will be provided with
acoustic enclosure to have minimum 25
dB(A) insertion loss or for meeting the
ambient noise standard whichever is on
higher side as per E (P) Act, GSR 371 (E)
and its amendments. Therefore, no
significant impact due to operation of
machinery is anticipated.
6.2 From industrial or similar processes No No industrial processes is involved in
proposed project
6.3 From construction or demolition Yes Due to various construction activities,
there will be short-term noise impacts in
the immediate vicinity of the project site.
The construction activities will include the
following noise generating activities:
Concreting, mixing & operation of
DG sets.
Construction plant and heavy vehicle
movement.
6.4 From blasting or piling No No blasting or mechanized piling will be
done.
6.5 From construction or operational Yes Some noise will be generated from
traffic vehicular movement in the construction
and operational phase but that will be
mitigated with green belt.
6.6 From lighting or cooling systems No No significant noise impact will result
from lighting or cooling systems.
6.7 From any other sources No Not Applicable

Directorate of Health Services 11


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1

7. Risks of contamination of land or water from releases of pollutants into the ground or
into sewers, surface waters, groundwater, coastal waters or the sea:

Details thereof (with approximate


S. No. Information/Checklist confirmation Yes/No quantities/rates, wherever possible)
with source of information data
7.1 From handling, storage, use or spillage of No No Hazardous material shall be used. E-
hazardous materials Waste like battery, green CFL, Rejected
computers, laptops, electrical equipment
etc. shall be generated. This waste will
be stored at site and will be sold to
authorized vendors for disposal.
7.2 From discharge of sewage or other No It is a zero discharge project and no
effluents to water or the land (expected waste water or sewage will be
mode and place of Discharge) discharged outside the project site.
Sewage of 90 KLD will be generated &
lab effluent of 12 KLD will be generated
that will be treated in STP of 110 KLD
and ETP of 15 KLD. Treated water from
STP, i.e. 88 KLD will be used for
flushing, HVAC cooling & landscaping.
Treated water from ETP will be used for
HVAC cooling.
7.3 By deposition of pollutants emitted to air No DG Sets will be provided with stacks of
into the land or into water adequate height. Hence dispersion will
be achieved and avoid deposition of
pollutants in significant concentrations at
any single location.
7.4 From any other sources No Not Applicable
7.5 Is there a risk of long term build up of No Not Applicable
pollutants in the environment from these
sources?

Directorate of Health Services 12


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1

8. Risk of accidents during construction or operation of the Project, which could affect
human health or the environment

Details thereof (with approximate


S. No. Information/Checklist confirmation Yes/No quantities/rates, wherever possible)
with source of information data

8.1 From explosions, spillages, fires, etc. Yes To deal with any fire related accident,
from storage, handling, use or production fire fighting facility of single handed
of hazardous substances hydrant valve, long hose reel, and
portable fire extinguisher will be
provided at site.
8.2 From any other causes No Not Applicable

8.3 Could the project be affected by natural Yes The project falls under seismic active
disasters causing environmental damage Zone IV indicating high damage risk
(e.g. floods, earthquakes, landslides, zone. The buildings will be designed as
cloudburst etc.) earthquake resistant and comply with the
required IS specifications.

9. Factors which should be considered (such as consequential development) which could


lead to environmental effects or the potential for cumulative impacts with other
existing or planned activities in the locality

Details thereof (with approximate


S. No. Information/Checklist confirmation Yes/No quantities/rates, wherever possible)
with source of information data
9.1 Lead to development of supporting. Delhi development Authority has
utilities, ancillary development or allotted project site to DHS for
development stimulated by the project development of hospital.
which could have impact on the
environment e.g.:
• Supporting infrastructure (roads, power
supply, waste or waste water treatment,
etc.)
• Housing development No No

• Extractive industries No No

• Supply industries No No

• Other Yes Hospital


9.2 Lead to after-use of the site, which could No Not Anticipated
have an impact on the environment
9.3 Set a precedent for later developments Yes The project will improve health care

Directorate of Health Services 13


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1

facility in the area. This will improve


standard of living of people in the area
and also will lead to development of
ancillary industry.
9.4 Have cumulative effects due to proximity No Not Applicable
to other existing or planned projects with
similar effects

(III) Environmental Sensitivity

Name/ Aerial distance (within 15 km)


S. No. Areas Identity Proposed project location
boundary
1 Areas protected under international Tughlakabad 2.8 km, WSW
conventions, national or local Reserved Forest
legislation for their ecological, Jahapana Reserved 5.3 km, W
landscape, cultural or other related Forest
value Kalindi Bird 2.0 km, NE
Sanctury
Hauz Khaz Forest 7.0 km, NW
Asola Wildlife 5.6 km, SW
Sanctuary
Sanjay Van 11.6 km, W
Central Ridge 13.5 km, NW
Reserve Forest
11.0 km, W
Aravalli Bio-
Diversity park
2 Areas which are important or Tughlakabad 2.8 km, WSW
sensitive for ecological reasons - Reserved Forest
Wetlands, watercourses or other Jahapana Reserved 5.3 km, W
water bodies, coastal zone, Forest
biospheres, mountains, forests Kalindi Bird 2.0 km, NE
Sanctury
Hauz Khaz Forest 7.0 km, NW
Asola Wildlife 5.6 km, SW
Sanctuary
Sanjay Van 11.6 km, W
Central Ridge 13.5 km, NW
Reserve Forest
11.0 km, W
Aravalli Bio-
Diversity park
1.6 km, NE
River Yamuna

Directorate of Health Services 14


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1

3 Areas used by protected, important Tughlakabad 2.8 km, WSW


or sensitive species of flora or Reserved Forest
fauna for breeding, nesting, Jahapana Reserved 5.3 km, W
foraging, resting, over wintering, Forest
migration Kalindi Bird 2.0 km, NE
Sanctury
Hauz Khaz Forest 7.0 km, NW
Asola Wildlife 5.6 km, SW
Sanctuary
Sanjay Van 11.6 km, W
13.5 km, NW
Central Ridge
Reserve Forest
11.0 km, W
Aravalli Bio-
Diversity park
1.6 km, NE
River Yamuna
4 Inland, coastal, marine or Ground water The depth of groundwater level
underground waters of the district is 50-70mbgl.
5 State, National boundaries UP-Delhi border 2.5 km in East direction from
project site
6 Routes or facilities used by the NH-2 1.3 km, West
public for access to recreation or Okhla Railway Station 4.0 km, NW
other tourist, pilgrim areas Tuglakabad Railway 3.7 km, SW
Station
Jasola Metro Station 1.4 km, WNW
Indira Gandhi 20.0 km, West
International Airport
Adilabad Fort 4.8 km, SW
Ghiyasudin Tuglaq 4.5 km, SW
Tomb
Qutub Minar 11.3 km, W
7 Defense installations Airforce Station 5.0 km, SW
8 Densely populated or built-up area Madanpur Khadar 300 m, SE
village
Saibabad 1.2 km, SW
Jasola 400m, North
Shaheen Bagh 700 m, NE
New Delhi 12.0 km, NNW
9 Areas occupied by sensitive man- Delhi ENT Hospital 500 m, NW
made land uses (hospitals, Apollo Hospital 1.4 km, NW
schools, places of worship, Asia Pacific Institute 500 m, NW
community facilities) of Management
Rai University 2.0 km, SW
Meer public School 1.7 km, S
10 Areas containing important, high Ground water The depth of groundwater level

Directorate of Health Services 15


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1

quality or scarce resources. of the district is 50-70mbgl.


(ground water resources, surface
resources, forestry, agriculture,
fisheries, tourism, minerals)
11 Areas already subjected to pollution Nazafgarh Drain Industrial areas of Anand Parvat,
or environmental damage. (those Basin, Delhi Naraina, Okhla & Wazirpur.
where existing legal environmental
standards are exceeded)
12 Areas susceptible to natural hazard Earthquakes The site falls under the zone IV
which could cause the project to as per the Seismic Zone Map of
present environmental problems India and is thus prone to high
(earthquakes, subsidence, damage risk zone. Adequate
landslides, erosion, flooding or measures will be taken during the
extreme or adverse climatic construction of the proposed
conditions) project.

(IV) Terms of Reference for EIA studies Not Applicable

Directorate of Health Services 16


100 Beded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1

DECLARATION

I hereby given undertaking that the data and information given in the application and enclosures
are true to the best of my knowledge and belief and I am aware that if any part of the data and
information submitted is found to be false or misleading at any stage, the project will be rejected
and clearance give, if any to the project will be revoked at our risk and cost.

Date: 05.12.2014
S. K. Sharma
Place: Delhi Authorized Signatory
Directorate of Health Services
Govt. of NCT of Delhi

Directorate of Health Services 17


t

KL-Block, Sarita Vihar,


Delhi

i l S i

Environmental Consultant
100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1A

CONTENTS

SI.NO. DESCRIPTION PAGE NO.


1. Land Environment 1
2. Water Environment 6
3. Vegetation 14
4. Fauna 16
5. Air Environment 16
6. Aesthetics 19
7. Socio-Economic Aspects 20
8. Building Materials 22
9. Energy Conservation 24
10. Environment Management Plan 30

Directorate of Health Services


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1A

FORM IA
CHECK LIST OF ENVIRONMENTAL IMPACTS
(Project proponents are required to provide full information and wherever necessary attach
explanatory notes with the Form and submit along with proposed environmental management
plan & monitoring program)

SECTION 1- LAND ENVIRONMENT

(Attach panoramic view of the project site and the vicinity)

1.1 Will the existing land use get significantly altered from the project that is consistent with the
surroundings? (Proposed land use must conform to the approved Master Plan/Development Plan
of the area. Change of land use, if any and the statutory approval from the competent authority
are submitted). Attach Maps of (i) site location, (ii) surrounding features of the proposed site
(within 500 meters) and (iii) the site (indicating levels & contours) to appropriate scales. If not
available attach only conceptual plans.
Proposed project “100 bedded hospital is planned to be developed by Directorate of Health Service,
Govt. of Delhi for the health care & welfare of society. Proposed project site is located at KL-Block,
Sarita Vihar, Delhi. Geographical co-ordinates of the project site are 28°32.254'N & 77°17.869'E. Delhi
development Authority has allotted the land to Directorate of Health Services to construct hospital.
The work shall be executed through PWD, Delhi. Land documents for the project site are attached as
Annexure I. Google image showing location of project site & its surroundings within 500 m, 2 km and
10 km are attached as Annexure II (a, b &c) respectively. Site plan for the project site is attached as
Annexure III. Conceptual plans for the project are attached as:
Dual Plumbing Layout- Annexure IV
Storm Water Drainage Layout & Diagram of Rain water Harvesting pit- Annexure VI a & b
Car Parking & Traffic Circulation Plan- Annexure VII a, b & c
Site layout showing electrical substation & DG set location- Annexure IX
Green Belt Development Plan- Annexure X
Elevation & Section Plan- Annexure XI a & b
Fire Fighting & Evacuation Plan- Annexure XII a, b, c & d
Floor plans and terrace plans- Annexure XIII a-h

Directorate of Health Services 1


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1A

1.2 List out all the major project requirements in terms of the land area, built up area, water
consumption, power requirement, connectivity, community facilities, parking needs etc.
 LAND REQUIREMENT
Total plot area for development of proposed project is 6318.72 sq m. Statement of area detailing the
propose development is given below in Table 1 below.
Table 1: Area Statement
S. Particulars Area (m2)
No.
1. Total Plot Area 6318.72
2. Permissible ground Coverage (30% of plot area) 1895.4
3. Proposed Ground Coverage (29.6% of plot area) 1869.21
4. Permissible FAR (200% of plot area) 12637.44
5. Proposed FAR (199.07% of plot area) 12578.89
6. Non-FAR Area at Floors 1622.96
7. Services 62.87
8. Stilt 247.09
9. Basement 7926.06
Basement 1 3963.03
Basement 2 3963.03
10. Built-up Area 22437.87
11. Open Parking Area 253.00
12. Landscape Area (31.13%) 1966.82
13. Height of the building 29.865 m
*FAR = Floor Area Ratio

 WATER REQUIREMENT
During construction phase water supply will be taken from Okhla CSTP and through DJB tankers.
During operation phase, water will be taken from Delhi Jal Board. Total water requirement is
approx. 218 KLD, out of which domestic water requirement is 79.0 KLD. Fresh water requirement
for the project is approx. 118.0 KLD.
 POWER REQUIREMENT
Maximum power demand for the project is calculated to be 1845 KW (2306.3 kVA). 2 transformers of
capacity 1500 kVA are proposed to be provided. Power supply will be taken from BSES.

Directorate of Health Services 2


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1A

Power Back Up
DG sets of total capacity 3030 kVA (3 X 1010 kVA) will be provided to provide uninterrupted power
supply during power failure
 CONNECTIVITY
Project site is accessible and is well connected via network of rail & road. Local roads connect project
site to NH-2 which is at 1.3 km in west direction from project site. Nearest Railway Station are Okhla
Railway station and Tuglakabad Railway station at distance of 4.0 km, in NW direction & 3.7 km in
SW direction from project site respectively. Site is well connected by Metro Rail. Jasola metro station
is at 1.4 km in WNW direction. Indira Gandhi International Airport is at 20 km in West direction from
project site.
 PARKING FACILITIES
Car parking of 253 ECS will be provided as per DDA norms in basements, stilt & ground. Parking
space of 135 sq m is provided in stilt area for two-wheelers.

1.3 What are the likely impacts of the proposed activity on the existing facilities adjacent to
the proposed site? (Such as open spaces, community facilities, details of the existing land use and
disturbance to the local ecology).
To improve health care facilities in the area, Directorate of Health Services (DHS) has planned to
develop proposed “100 bedded hospital”. This will significantly improve health services in the area &
will reduce the burden on the other near-by government hospitals. This will improve the living standard
of people. People of the area have to spend lesser time & money for travelling to hospital & waiting in
queue. Land has been allotted by DDA to DHS for development of the hospital. Currently project site is
an open land with few weeds growing at the project site and development of project does not involve
clearance of vegetation. There is no negative impact anticipated due to development of project on
existing land use, community facility & ecology.

1.4 Will there be any significant land disturbance resulting in erosion, subsidence &
instability? (Detail of soil type slope analysis, vulnerability to subsidence, seismicity etc may be
given).
Project site is a flat land with elevation of site varying from average elevation of 212-214 above msl.
Due to plain topography site is not susceptible to erosion. Unpaved open space will be planted with

Directorate of Health Services 3


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1A

trees, shrubs, herbs or grasses to prevent soil erosion. Soil quality analysis of the project site is carried
out & soil quality report for the project is attached as Annexure XIV. As per the seismic zone map
prepared by BIS in 2000, Delhi falls in Zone IV area thus project site is highly vulnerable to
earthquake. Earthquake hazard vulnerability of the site is taken in consideration & building is designed
accordingly as per NBC, 2005.

1.5 Will the proposal involve alteration of natural drainage system? (Give details on a contour
map showing the natural drainage near the project site).
The project does not intersect any natural drainage route. No perennial or non-perennial drainage
system is found to exist within the project area or being obstructed by the project. Surroundings
comprise an urbanized stretch. Well planned storm water drainage has been designed to take care of
internal storm water drainage. Thus, no impact on the natural drainage system is anticipated. Site layout
showing proposed storm water drainage system is attached as Annexure VI (a).

1.6 What are the quantities of earthwork involved in the construction activity-cutting, filling,
reclamation etc. (Give details of the quantities of earthwork involved, transport of fill materials
from outside the site etc?)
Excavation will be carried out for foundation & basements. Quantity of soil to be excavated is estimated
to be approx. 33289.45 cu. m. Excavated top soil will be used for landscaping purpose. Part of
remaining soil will be used for filling and leveling of site and the balance shall be disposed to low lying
areas designated by PWD.

1.7 Give details regarding water supply, waste handling etc. during the construction period.
Water requirement during construction phase will be met from Okhla STP and through DJB tankers.
Water required for construction purpose of the project is 50 ML. Waste water generated during the
construction phase will be approx. 7 KLD (assuming 150 workers) and waste water will be treated &
disposed off in septic tanks followed by soak pits. Waste handling during the construction phase will be
done by the site contractor whose responsibility lies with collection and storage of construction and
demolition waste generated on the site. Construction debris will be stored in covered yards.
Construction debris will be segregated into re-usable & discarded waste. Re-usable waste will be used
within the project site to the extent possible. Discarded waste will be sent to the designated site of

Directorate of Health Services 4


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1A

Municipal Corporation, Delhi on payment basis. Solid waste management plan during construction
phase is given in Table 2 below:
Table 2: Solid Waste Management during Construction Phase
S. No. Solid waste Solid waste Management
1. Waste materials like MS Material would be segregated. Recyclable material will be
Rods, bricks, concrete, sold to authorize dealers. Rest will be used within project
broken tiles, wood pieces, site for filling & leveling purpose. Remaining will be sent
cement bags etc. for disposal through government authorized vendors.
Cement bags will be used for covering of loose materials.
2. Excavated Soil Top soil will be stored in covered areas and will be later
used for landscaping purpose. Remaining soil will be used
for back filling & leveling of site. Un-used soil will be
disposed off to designated sites of PWD.
3. Domestic waste Will be handed over to local authority, responsible for
waste management in the area. The PWD has made
provision for maintenance for 5 yrs. By the construction
Agency.

1.8 Will the low lying areas & wetlands get altered? (Provide details of how low lying and
wetlands are getting modified from the proposed activity).
No. The site area is a flat land and the surroundings are characterized by an urbanized stretch. Project
site is neither a low lying area nor wetland.

1.9 Whether construction debris & waste during construction cause health hazard? (Give
quantities of various types of wastes generated during construction including the construction
labor and the means of disposal).
Waste expected to be generated & its management plan during construction phase is given in Table 2
above. No health hazard is expected to be caused by construction debris & waste as it will be managed
properly. Additionally health & safety of construction worker will be taken care of by taking following
measures:
1. Providing personal protective equipment like ear plugs, face masks, helmets, safety
jackets & gloves

Directorate of Health Services 5


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1A

2. Appointment of safety officers at site


3. Regular inspection & maintenance of the construction machinery
4. Construction activities will be restricted to day time
5. Provision of adequate lightning during night time
6. Cautionary notices to be displayed at required places
7. Regular clearing off site to remove the debris
8. Availability of medical officer & first-aid facility at construction site
9. Tie-up with near-by hospital to attend emergency case, if any

SECTION 2- WATER ENVIRONMENT


2.1 Give the total quantity of water requirement for the project with the breakup of requirements for
various uses. How will the water requirement be met? State the sources & quantities and furnish a water
balance statement.
During construction phase water supply will be taken from Okhla CSTP and partly through DJB
tankers. During operation phase, water will be taken from Delhi Jal Board. Total water requirement is
approx. 218 KLD, out of which domestic water requirement is 79.0 KLD. Fresh water requirement for
the project is approx. 118.0 KLD. Daily water requirement calculation is given below in Table 3 (a) &
(b). Water balance diagram is shown below in Figure 1 & 2.
Table 3 (a): Calculations for Daily Water Demand
S. Water Fresh Recycled
Per capita Req.
No. Category Capacity Requirement Water water
(LPCD)
(KLD) Demand Demand
A Domestic
1 110
In-patient (100+10) 340 37.4 26.4 11.0
2 Out-patient/Visitors 2000 15 30.0 12.0 18.0
3 Staff 135 45 6.1 2.7 3.4
4 Guest 40 135 5.4 3.6 1.8
78.9 44.7 34.18
Total Domestic water Req. (1+2+3+4) Say 79.0 Say 45.0 Say 34.0

Directorate of Health Services 6


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1A

B Pathology -- -- 15.0 15.0 --


C CSSD -- -- 5.0 5.0 --
D Mortuary -- -- 15.0 15.0 --
E Landscape 0.49 Acres 25 KLD/Acres 12.0 -- 12.0
F HVAC Cooling* 550 Tr 7 l/Tr/hr 92.0 38.0 54.0
Total Water Requirement (A+B+C+D+E+F) 218.0 118.0 100.0
*HVAC Operational for 24 hours
Table 3 (b): Waste Water Calculations
Category Quantity (KLD)
Sewage Generated (100% flushing, CSSD & 90.0
Mortuary + 80% other domestic water
requirement)
Effluent from pathology laboratory 12.0
Capacity of STP 110
Capacity of ETP 15
Recovered Water from STP (98% of Waste 88.0
Water)
Flushing 34.0
Landscaping 12.0
HVAC Cooling 42.0

Recovered Water from ETP (@98%) ~12.0


HVAC Cooling 12.0

Directorate of Health Services 7


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1A

Total Fresh Water Fresh Water for @ 80% Waste Water Generated
118.0 KLD Drinking, Bathing, (90 KLD)
45 KLD STP Capacity110 KLD
Cleaning & Other Use
(45.0 KLD) (STP efficiency @ 98 %)

Flushing Water @ 100%


(34.0 KLD) 34.0 KLD

15.0 KLD @ 100%


Mortuary
(15.0 KLD)

5.0 KLD CSSD @ 100%


(5.0KLD)

Waste Water Generated


15.0 KLD @ 80 (12 KLD)
Pathology
ETP Capacity12 KLD
(15.0 KLD)
(ETP efficiency @ 100 %)

Landscape 12.0 KLD


(12.0 KLD)

42.0 KLD
38.0 KLD HVAC
(92.0 KLD) 12.0 KLD

Fresh water
Waste water
Recycled Water

Figure 1: Water balance Diagram During Dry Season

Directorate of Health Services 8


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1A

Total Fresh Water Fresh Water For @ 80% Waste Water Generated
106.0 KLD Drinking, Bathing, (90 KLD)
45 KLD STP Capacity110 KLD
Cleaning & Other Use
(45.0 KLD) (STP efficiency @ 98 %)

Flushing Water @ 100%


(34.0 KLD) 34.0 KLD

15.0 KLD @ 100%


Mortuary
(15.0 KLD)

5.0 KLD CSSD @ 100%


(5.0KLD)

Waste Water Generated


15.0 KLD @ 80% (12 KLD)
Pathology
ETP Capacity12 KLD
(15.0 KLD)
(ETP efficiency @ 100 %)

54.0 KLD
26.0 KLD HVAC
(92.0 KLD) 12.0 KLD

Fresh water
Waste water
Recycled Water

Figure 2: Water Balance Diagram during Monsoon Season

Directorate of Health Services 9


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1A

2.2 What is the quality of water required, in case, the supply is not from a municipal source?
(Provide physical, chemical, Biological characteristics with class of water quality).
Total water requirement for the project is 218 KLD. However, freshwater requirement is 118 KLD
during dry season & 106 KLD during monsoon, which will be provided by Delhi Jal Board.

2.3 How much of water requirement can be met from the recycling of treated wastewater?
(Give the details of quantities, sources and usage)
It is expected that the project will generate approx. 90 KLD of sewage & 12 KLD of lab effluent will be
generated. Sewage generated will be treated in the STP provided of capacity 110 KLD & lab effluent
will be treated in ETP of 15 KLD capacity to be provided within the project site. It is expected to
recover 88 KLD of water from STP & 12 KLD of water from ETP which can be re-used for flushing,
horticulture & HVAC cooling. ETP treated water will be used only for HVAC cooling purpose.

2.4 Will there be diversion of water from other users? (Please assess the impacts of the project
on other existing uses and quantities of consumption).
No, there will be no diversion of water from other sources. Water during operation phase will be
supplied by Delhi Jal Board.

2.5 What is the incremental pollution load from wastewater generated from the proposed
activity? (Give details of the quantities and composition of wastewater generated from the
proposed activity)
It is expected that the project will generate approx. 90 KLD of sewage & 12 KLD of lab effluent.
Sewage will be treated in STP of capacity 110 KLD and effluent from lab will be treated in ETP of
capacity 15 KLD. 88 KLD of treated water from STP will be used for flushing, horticulture & HVAC
cooling, whereas 12 KLD of treated water from ETP will be used for HVAC cooling only.
Characteristics of waste water & treated water are given in Table 4 & 5 below.
Table 4 Characteristics of Waste water
Flow m3 / day 90 for STP
12 for ETP
pH - 6.5 – 7.5
BOD mg / l 300 – 400
COD mg / l 600 – 800

Directorate of Health Services 10


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1A

O & G / ABS mg / l 50 – 100


Suspended Solids mg / l 200 – 450

Table 5 Characteristics of Treated Effluent


PH 6.0-8.5
BOD mg / l <5
COD mg / l < 10
TSS mg / l < 10
Oil& Grease mg / l NIL

2.6 Give details of the water requirements met from water harvesting? Furnish details of the
facilities created.
Storm water harvesting system will be provided within the project site as per CPCB guideline on
Rainwater Harvesting & Artificial Ground water Recharge. Storm water from roof-top & surface will
be collected via storm water drainage network and will be led into recharge pits proposed to be
provided at various locations. Storm water drainage will be designed in line of existing drainage pattern
and considering the natural flow direction of water. First flushing system will be provided to prevent
water from first rain to enter the ground as it is believed to contain several impurities. Rain water
harvesting system is designed considering maximum peak hourly rainfall (90 mm/hr). Thus pits are
designed to capture the maximum possible rainfall which could occur. De-silting chamber is provided
with each RWH pit. Oil trap is provided to remove oil & grease, if any in the storm water. Periodic
cleaning & maintenance of RWH system will be done. Calculation for storm water system designing is
given in Table 6. Plan showing storm water drainage & location of RWH pits is attached as Annexure
VI (a). Schematic diagram of Rain Water Harvesting pit as per CGWB is given in Figure 3.
Table 6: Calculations for storm water load
S. No. Catchment Area of Run-off Peak Run-off
Catchment Coff. Hourly collected
(sq m) Rainfall (cu m)
(m/hr)
1 Roof-Top
1869.21 0.9 0.09 151.4
2 Green area
1966.82 0.1 0.09 17.70
3 Paved Area
2482.69 0.7 0.09 156.41

Directorate of Health Services 11


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1A

Total Run-off 325.51


Taking Retention of 15 min, run-off load is 81.37
De-silting Chamber (2 X 1 X 2 m) 4.0
Size of RWH Pit (radius- 1.5m , depth 5 m) 35.325
Total Storage volume 39.325
No. of Pits Required 2.06

Total 2 Nos. of Rain Water Harvesting pits are being proposed for artificial rain water recharge within
the project premises. RCC pipes are also provided to carry storm water run-off from RWH pits to
municipal drain, if any.

Figure 3: Schematic Diagram of Rain Water Harvesting Pit

2.7 What would be the impact of the land use changes occurring due to the project on the
runoff characteristics (quantitative as well as qualitative) of the area in the post construction
phase on a long term basis? Would it aggravate the problems of flooding or water logging in any
way?

Directorate of Health Services 12


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1A

Project will include paved areas and thus the runoff from the project site is expected to increase due to
reduced infiltration. However, increased runoff will not cause flooding or water logging as a well
designed storm water drainage will be provided at project site. Storm water runoff will be collected into
rainwater harvesting pits through storm water drains and will be used for groundwater recharging.

2.8 What are the impacts of the proposal on the ground water? (will there be tapping of
ground water; give the details of ground water table, recharging capacity and approvals obtained
from competent authority, if any)
No adverse impact is anticipated on ground water as no ground water will be extracted during operation
& construction phase of the project. Water will be supplied by Delhi Jal Board tankers during
operational phase & from Okhla STP during construction phase. Additional to this rainwater harvesting
pits are provided which will help in ground water augmentation. RWH pits provided are filter packed to
prevent ground water pollution due to recharging. Best practices for water conservation will be
implemented like usage of water conservation fixtures, dual plumbing water supply system etc.

2.9 What precautions/ measures have been proposed to check the surface run-off, as well as
uncontrolled flow of water into any water body?
Storm drainage network will be provided at the site for collection of storm water. Storm water collected
will be used for ground water recharging through 2 Nos. of RWH pits proposed to be provided at the
site.

2.10 How is the storm water from within the site managed? (State the provisions made to avoid
flooding of the area, details of the drainage facilities provided along with a site layout indication
contour levels).
Most of the storm water produced on site will be harvested for ground water recharge. Thus proper
management of this resource is must to ensure that it is free of contamination. Detailed Storm Water
Management Plan will be developed which will consider the sources of storm water. The plan will
incorporate best management practices which will include the following:
Regular inspection and cleaning of storm drains.
Installation of clarifiers or Oil/Water separators/traps system of adequate capacity around
parking areas as per requirement.

Directorate of Health Services 13


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1A

Shall avoid application of pesticides and herbicides before wet season.


Conducting routine inspections to ensure cleanliness.
Preparation of spill response plans, particularly for fuel and oil storage areas.
Provision of silt traps in storm water drains.
Good housekeeping in the above areas.
Plan showing storm water drainage & location of RWH pits is attached as Annexure VI (a). Diagram
of RWH pit is attached as Annexure VI (b).

2.11 Will the deployment of construction laborers particularly in the peak period lead to
unsanitary conditions around the project site (Justify with proper explanation).
Common toilets will be constructed on site during construction phase and the waste water arising from
the project is to be disposed conforming to Delhi pollution Control Committee Norms.
Daily cleaning of the site will be carried out. Dustbins will be provided at project site for collection of
waste generated. Collected solid waste will be handed over to local authority responsible for waste
management in that area. Drinking water & bathing facility will be provided at site for construction
workers. These practices will help maintaining sanitary conditions at the project site during
construction phase.

2.12 What on-site facilities are provided for the collection, treatment & safe disposal of
sewage? (Give details of the quantities of wastewater generation, treatment capacities with
technology & facilities for recycling and disposal).
STP of capacity 110 KLD & ETP of 15 KLD is proposed to be provided at the project site for treatment
of sewage & lab effluent expected to be generated during operation phase. Expected sewage & lab
effluent generation is 90 KLD & 12 KLD. Sewage & wastewater generated will be treated till tertiary
level & treated water will be re-used for flushing, HVAC cooling & horticulture purpose. ETP treated
water will be used only for HVAC cooling.

2.13 Give details of dual plumbing system if treated waste used for flushing of toilets or any
other use.

Directorate of Health Services 14


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1A

Dual plumbing system for re-usage of treated water from ETP & STP will be provided. Treated water
from STP will be used for flushing, cooling & horticulture purpose & ETP treated water will be used for
HVAC cooling thereby significantly reducing fresh water demand.

3. VEGETATION
3.1 Is there any threat of the project to the biodiversity? (Give a description of the local
ecosystem with its unique features, if any).
Project site does not support any significant vegetation. Only weeds are present at the project site. Thus
no adverse impact is anticipated on bio-diversity of the region due to project development. 31.13% of
plot area is reserved, i.e. 1966.82 sq. m. of area is proposed to be put under green cover which
comprises of trees, shrubs & herbs. This will help in improving the ecology of the area.

3.2 Will the construction involve extensive clearing or modification of vegetation? (Provide a
detailed account of the trees & vegetation affected by the project)
The project site does not support any significant vegetation thus no clearance of vegetation is required.
It is proposed to develop a peripheral greenbelt consisting of native plant species to enhance the
aesthetic value of the region and also provide an excellent habitat for various faunal groups. Evergreen
tall and ornamental trees and ornamental shrubs have been proposed to be planted inside the premises.

3.3 What are the measures proposed to be taken to minimize the likely impacts on important
site – features (Give details of proposal for tree plantation, landscaping creation of water bodies
etc along with a layout plan to an appropriate scale?)
Total area measuring 1966.82 m2 i.e. 31.13 % of the plot area is proposed to be put under green cover.
Evergreen trees, ornamental trees, ornamental shrubs have been proposed to be planted inside the
premises. Only native species will be planted. Proper aftercare and monitoring of developed green areas
will be done. Trees to be planted at project site in Table 7.
Table 7: Trees to be planted
S. No. Species Common Name Type
1. Azadirachta indica Neem Tree
2. Jacranda Mimosifooolia Neeli gulmohar Tree

Directorate of Health Services 15


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1A

3. Thevetia peruviana Yellow oleander Tree


4. Plumeria alba Whitefirangipani Tree
5. Plumeria rubra Firangipani Tree
6. Cassia fistula Amaltas Tree
7. ` Alstonia scholaris Saptaparni Tree
8. Delonix regia Gulmohar Tree
9. Erythrina variegate Indian Coral Tree Tree
10. Lagerstroemia Thorellii Pride of India Tree
11. Terminalia arjuna Arjun Tree Tree
12. Polyalthiya longifolia Ashoka tree Tree
13. Bougainvillea glabra Bougainvillea Shrub
14. Ficus religiosa Peepal Tree
15. Combretum indicum Rangoon Creeper Creeper
16. Vernonia elaeagnifolia Curtain creeper Creeper
17. Clerodendrum inereme Shrub Bleeding heart

4. FAUNA
4.1 Is there likely to be any displacement of fauna both terrestrial and aquatic or creation of
barriers for their movement? Provide the details.
No, existing land use around the site is urban and does not provide a habitat for wild species. Peripheral
greenbelt wherever possible will be developed which will provide an excellent habitat for the native
fauna.

4.2 Any direct or indirect impacts on the avifauna of the area? Provide details.
Project will not have any direct or indirect impacts on the avifauna of the area.

4.3 Prescribe measures such as corridors, fish ladders etc. to mitigate adverse impacts on
fauna.
Not applicable

Directorate of Health Services 16


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1A

5. AIR ENVIRONMENT
5.1 Will the project increase atmospheric concentration of gases & result in heat islands?
(Give details of background air quality levels with predicted values based on dispersion models
taking into account the increased traffic generation as a result of the proposed construction).
Project development will not cause any significant increase in atmospheric pollutants & formation of
heat island. It is a hospital project & sources of pollution during operation phase will be vehicular
movement & DG set operation. Green belt will be provided around the project site to the extent
possible, which will act as settling surface for dust and thus will significantly reduce dust levels from
air. DG sets will be provided with stack such that it is 6 m higher than the highest building. These
stacks will aid release of gases at a height such that it will not have significant impact on Ground Level
Concentration of various gases. Construction is a temporary and short term phase, thus impact on air
quality during construction phase is also temporary. Measures will be taken to reduce air pollutant
generation during construction phase also.
Project site is an open land with few weeds growing on it, after development of building heat reflection
from site will increase but green belt & lawns are proposed to be provided which will absorb the
reflected heat and thus neutralize the effect.
Ambient air quality at project site is given attached as Annexure XV.

5.2 What are the impacts on generation of dust, smoke, odorous fumes or other hazardous
gases? Give details in relation to all the meteorological parameters.
Ambient air quality for the project site is given in point no 5.1 above. There will not be generation of
any smoke, odorous fumes & hazardous gases, either during construction or operation phase. Dust
generation is anticipated to occur while loading & unloading of construction material, debris &
construction activities and vehicular movement during construction phase. During operation phase dust
generation will result from vehicular movement. Dust generation will be controlled by taking following
measures.
Covering the scaffolding
Clearance of grass or weeds only from activity area
Water sprinkling on unpaved surfaces/open areas
Washing wheels of vehicles

Directorate of Health Services 17


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1A

Storage of construction material, excavated soil & debris in covered sheds


Regular cleaning of site
Development of green belt during operation phase
No open land will be left without vegetation cover & roads will be paved.
Taking above measures, dust generation can be minimized thus negligible impact is anticipated. D.G.
sets are proposed to be provided at project site and will be functional during power failure. Emission of
SO2 & NOx will be there from DG sets but stack of appropriate height will be provided to discharge the
exhaust gases so that there will be minimal impact on GLC.

5.3 Will the proposal create shortage of parking space for vehicles? Furnish details of the
present level of transport infrastructure and measures proposed for improvement including the
traffic management at the entry and exit to the project site.
Adequate provision will be made for car/vehicle parking at the project site. As per building
development bye-laws of Delhi Development Authority (DDA), parking requirement for hospitals is 2
ECS/100 sq. m. of floor area. FAR proposed for project is 12578.89 sq m. thus parking required is 252
ECS. Parking provided is given below in Table 8.
Table 8: Parking Provided
S. No. Parking Total Area Parking Area Area per No. of ECS
(sq. m.) for four ECS (sq. m.)
wheelers (sq.
m.)
1. Basement 1 3963.03 2848.0 32 89
2. Basement 2 3963.03 2528.0 32 149
(stack parking) (2240+288)
3. Stilt 247.09 112.0 28 4
4. Open Parking 253.00 253.0 23 11
Total parking provided 253 ECS
Car parking of 253 ECS will be provided. Addition to this parking space of 135 sq. m. will be provided
in stilt for two wheelers parking. Car Parking & Traffic circulation Plan is attached as Annexure VII a,
b & c.

5.4 Provide details of the movement patterns with internal roads, bicycle tracks, pedestrian
pathways, footpaths etc, with areas under each category.
Internal roads of adequate width, footpaths/pedestrian pathways have been well planned for the project.

Directorate of Health Services 18


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1A

5.5 Will there be significant increase in traffic noise & vibrations? Give details of the sources
and the measures proposed for mitigation of the above.
Construction activities & increase traffic movement at project site will contribute to noise level in the
area but no significant rise in noise level & vibrations is anticipated. Project site is surrounded by
residential area and is along NH-2. Following measures are proposed to minimize the noise generation
& its impact on the environment.
Construction activity will be restricted to day hours
Usage of machinery and equipment complying to the noise standards
Regular servicing and maintenance of vehicles
Prohibiting honking at project site
Provision of speed breakers at project site to restrict the speed of vehicles
Provision of pedestrian path to encourage walking
Development of green belt around project site wherever possible which will act as noise buffer.

5.6 What will be the impact of D.G. sets and other equipment on noise levels and vibration in
ambient air quality around the project site? Provide details.
D.G. sets will be operational during power failure during both construction & operation phase.
Operation of D.G. sets leads to generation of noise & emission of gases like SO2 & NOx. If not
managed this may lead to noise & air pollution. DG sets to be used will be enclosed in acoustic
enclosures and will be provided with stack of height as per CPCB norms so that exhaust gases can be
discharged at appropriate height minimizing impact on GLC of various gases in air. Also low sulphur
diesel will be used as fuel to minimize the SO2 generation. Green belt will be provided during operation
phase which will help in reducing the noise and dust levels at project site.

6. AESTHETICS
6.1 Will the proposed construction in any way result in the obstruction of a view, scenic
amenity or landscapes? Are these considerations taken into account by the proponents?
Site lies in an urbanized settlement and is well planned. Thus, no obstruction of view or scenic beauty
or landscape is anticipated. Furthermore, the construction will be planned in such a way that the
organized open spaces and landscaped areas will render the area aesthetically appealing.

Directorate of Health Services 19


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1A

6.2 Will there be any adverse impacts from new constructions on the existing structures?
What are the considerations taken into account?
No impacts anticipated.

6.3. Whether there are any local considerations of urban form & urban design influencing the
design criteria? They may be explicitly spelt out.
Project will follow norms as per Delhi Development Authority. All norms on Ground Coverage, FAR,
Height, Setbacks, Fire Safety Requirements, Structural Design and other parameters will be strictly
adhered to.

6.4 Are there any anthropological or archaeological sites or artifacts nearby? State if any
other significant features in the vicinity of the site have been considered?
No site of anthropological or archaeological importance exists within 2 km area of project site.
Adilabad fort is at distance of 4.8 km in SW direction, Ghiyasudin Tuglaq Tomb is at 4.5 km in SW
direction and Qutub Minar is at 11.3 km in west direction from project site. Project development will
not obstruct the view of these sites.

7. SOCIO-ECONOMIC ASPECTS

7.1 Will the proposal result in any changes to the demographic structure of local population?
Provide the details.
No such changes anticipated as proposed project is a hospital project.
Construction phase: Local people will preferable be employed for construction works. Approx.150
worker will be employed during construction phase. Construction phase is temporary & thus will not
involve change in demographic structure of local population
Operation phase: Project involves development of hospital thus there will be no migration or
emigration of people is involved due to project development.

Directorate of Health Services 20


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1A

7.2 Give details of the existing social infrastructure around the project.

Delhi Development Authority has given land on lease to DHS for development of hospital. Surrounding
area is well developed and also social infrastructure like roads, hospitals, markets etc are present in
near-by area. Details on existing social infrastructure are given in Table 9.

Table 9: Surroundings of the Project Site


Near-by Residential Area Madanpur Khadar Village (300 m, SE)
Village Saidabad (1.2 km, SW)
Jasola (400m, N)
Shaheen Bagh (700 m, NE)
Nearest City New Delhi (12.0 km, NNW)
Nearest Industrial Area Okhla Industrial Area (1.6 km, W)
Nearest School Meer public School (1.7 km, S)
Nearest College Asia Pacific Institute of Management (500 m, NW)
Rai University (2.0 km, SW)
Nearest Hospital Delhi ENT Hospital (500 m, NW)
Apollo Hospital (1.4 km, NW)
Near-by Common Facilities Okhla STP (1.2 km, NNE)
Near-by Recreational facilities Jasola District park (1.0 km, NE)
Kalindikunj Park (1.4 km, NE)
Sarita Vihar District Plan (1.2 km, SW)

7.3 Will the project cause adverse effects on local communities, disturbance to sacred sites or
other cultural values? What are the safeguards proposed?
No adverse impacts are anticipated due to project development on local community or sacred sites as
project is surrounded by an urbanized stretch and all project activities are confined to project site only.
No place of cultural and archaeological importance is present within 2 km of the project site. Measures
will be taken to control air, water, soil & noise pollution to minimize negative impact of project
development on the environment & society. Environment management plan has been drafted detailing
safeguards proposed for environmental management and is given in Section 10 of this report. Project is

Directorate of Health Services 21


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1A

for the betterment of society. This is a government hospital which will improve health care facility in
the area. Development of project will lead to improvement in health condition of people. More people
especially poor people will have an access to medical facility. This will reduce the burden on existing
government hospital and will save time & travelling cost of near-by residents.

8. BUILDING MATERIALS

8.1 May involve the use of building materials with high embodied energy. Are the
construction materials produced with energy efficient processes? (Give details of energy
conservation measures in the selection of building materials and their energy efficiency)
Materials with low & medium embodied energy will also be used for construction purpose. Materials
like fly ash bricks, AAC Blocks & cement, sun dried pavers, concrete, tiles, FRP doors, gypsum etc.
will be used for construction purpose.

8.2 Transport and handling of materials during construction may results in pollution, noise
and public nuisance. What measures are taken to minimize the impacts?
Mitigation Measures for Air Pollution during Construction Stage:
• Construction materials & vehicles carrying construction material will be suitably covered with
tarpaulin cover etc during transportation.
• Water sprinkling will be done on unpaved roads where dust generation is anticipated.
• Raw material storage and handling yard will be enclosed from all sides.
• To minimize the occupational health hazard, proper personal protective gears i.e. mask will be
provided to the workers working in the dust prone areas.
Mitigation Measures for Noise Pollution during Construction Stage:
• Administrative as well as engineering control of noise will be implemented.
• Isolation of noise generation sources and temporal differentiation of noise generating activities will
ensure minimum noise at receiver‟s end.
• To prevent any occupational hazard, earmuff / earplug will be given to the workers working around
construction plant & machinery emitting high noise levels.
• Construction activity will be restricted to day time. Careful planning of machinery operation and
scheduling of operations will be done to minimise such impact

Directorate of Health Services 22


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1A

8.3 Are recycled materials used in roads and structures? State the extent of savings achieved?
Yes. Fly ash bricks and cement will be used for building roads & structure.

8.4 Give detail of the methods of collection, segregation & disposal of the garbage generated
during the operation phases of the project.
During operation phase, waste will comprise of both municipal & bio-medical waste as it is a hospital
project. Municipal waste will comprises of domestic & landscape waste Municipal waste expected to
generate from the project is estimated to be approx. 519 kg per day (@1.5 kg for patients, 0.5 kg per
capita per day for the guests, 0.15 kg per capita per day for the visitor, 0.25 kg per capita per day for the
students & staff members, whereas 1 kg/acres/day is considered for landscape wastes). Approx. 130
kg/day of bio-medical waste generation is expected.
Waste Segregation, Collection & Disposal
1. Different color bins will be provided in each section & floor for collection of different type
of waste. Three color bins will be provided in wards (green, red & blue) for collection of
food waste, medical waste like bandages, medicine covers, soiled waste etc and sharps
separately. Visual message for usage of different bins for different purpose indicating its
significance will be placed for awareness in all the sections. In pathology lab, Operation
Theater, mortuary, pathology lab, medicine room, plaster room different color bins will be
provided for collection of different waste as given below in Table 10.
Table 10: Bio-medical Waste Collection System
Color Code Waste Category Treatment
Yellow Human anatomical waste, animal waste, Incineration
Micro biology waste & bio-technology Deep Burial
waste, soiled waste
Red Microbiology & Biotechnology waste, Autoclave
soiled waste, solid waste (other than Microwaving
sharp) Chemical treatment
Blue/White Waste Sharp Autoclave
Microwaving
Chemical treatment
Black Discarded medicines & Cytotoxic waste, Chemically treated
Chemical waste Disposal in secured landfill
Returning back to vendors

Directorate of Health Services 23


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1A

2. Waste will be collected at common place regularly from the localized collection points.
Food waste, landscape waste & other municipal waste will be handed over to Municipal
Corporation, Delhi. STP sludge will be used as manure for landscape area.
3. Recyclable waste like plastics, paper, thermocol, glass etc will be collected & sold to
authorized vendors.
4. Bio-Medical waste along with ETP sludge will be collected in Bio-medical waste storage
room & will be handed over to authorized vendors for treatment & safe disposal.
5. Trolleys with bins will be provided for transportation of bio-medical waste from generation
points to storage points to protect waste handler from direct exposure.
6. E-waste generated will be stored separately & will be sold to authorized vendors
periodically

9. ENERGY CONSERVATION
9.1 Give details of the power requirements, source and supply, backup source etc. What is the
energy consumption assumed per square foot of built-up area? How have you tried to minimize
energy consumption?
Maximum power demand for the project is calculated to be 1845 KW (2306.3 kVA). Two Nos.
transformers of capacity 1500 kVA are proposed to be provided. Power supply will be taken from
BSES. Electrical system is designed as per following standards:
National Building Code of India – 2005
National fire Codes 2000
Relevant Bureau of Indian Standard
Indian Electricity Supply Rules & Act
Power Back-up
DG sets of total capacity 3030 kVA (3 X 1010 kVA) will be provided to provide uninterrupted power
supply during power failure. DG sets are open to air & will be provided with acoustic enclosure.
Effective measures have been incorporated to minimize the energy consumption in following
manners:

Directorate of Health Services 24


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1A

1. Provision of AAC block for filler walls and partition walls: It provides insulation thus prevents
heat exchange from building & reduce heating & cooling loads. It is a light weight material thus
easy to transport saves fuel & thus reduces emission.
2. E-glass to be used for curtain & window glazing for minimizing radiation.
3. False ceiling for reducing A.C loading & Calcium silicate tiles will be used for false ceiling
which has excellent insulation properties with thermal conductivity of 0.043/W/M0K
4. FRP (fiber reinforced plastic) doors have been used for wet areas thus minimum usage of wood.
FRP is low embodied energy product, light weighted, low maintenance requiring & longer life.
5. Low VOC content paint used for wall finishes & door finishes.
6. Thermal insulation layering under deck to the roof terrace.
7. Use of ACP cladding for external finish will improve thermal insulation.
8. Solar heating system for Hot water.
9. Provision of Solar lights for lighting on streets & common areas.
10. Use of PPR & CPVC pipes for water supply
11. Venetian blinds for protection from direct Sun.
12. Energy efficient florescent lamp, T-5 lamps, CFL will be used for internal lightning within the
project site
13. 50 % external light can be switched „off‟ after 11 pm, when the movement is drastically reduced.
Table 11: Energy Saving Calculations
Description Energy Saving
(kVA)
Energy Saved by using CFL for Lightning in common/open areas 0.8
Energy Saved by using Solar lights for Lightning in common/open areas 1.6
Energy Saved by using CFL for internal lightning 10.1
Energy Saved by using Solar Water Heaters 37.1
Energy Saved 49.1
Total Energy consumed 2306.3
Percentage of Energy Saved (%) 2.1%
Percentage energy saved due to building design & material 10%
Total Percentage energy saved 12.1%

9.2 What type and capacity of power backup do you plan to provide?
DG sets of total capacity 3030 kVA (3 X 1010 kVA) will be provided to provide uninterrupted power
supply during power failure. DG sets are open to air & will be provided with acoustic enclosure.

Directorate of Health Services 25


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1A

9.3 What are the characteristics of the glass you plan to use? Provide specifications of its
characteristics related to both short wave and long wave radiation?
Glass is not proposed to be used as wall material. However some glass will be used for curtain glazing
in Front elevation as well as for window glazing is e-glass and its U-value is 3 to 3.3 W/sq.m and solar
factor 0.29. R value of the e-glass is 27% and 9% external and internal respectively.

9.4 What passive solar architectural features are being used in the building? Illustrate the
applications made in the project.
Layout of buildings has been done as per the sun path analysis so that the design cuts off direct
radiations of critical hours which are specific to the orientation. Passive solar design refers to use of the
sun‟s energy for the heating and cooling of living spaces. E-glass will be provided for curtain &
window glazing to minimize the radiation. Building is designed in a way that sunlight is used for
insolation during day time by providing adequate fenestration.

9.5 Does the layout of street & building maximize the potential for solar energy devices? Have
you considered the use of street lighting, emergency lighting and solar hot water systems for use
in the building complex? Substantiate with details.
Yes, Glass is used for curtain & window glazing which will allow solar light to enter the building. Solar
lights are provided for street & lights. Solar water heating systems will be provided.

9.6 Is the shading effectively used to reduce cooling/heating lands? What principles have been
used to maximize the shading of walls on the East and the West and the Roof? How much energy
saving has been effected?
Building material like AAC blocks, calcium silicate false ceiling, e-glass for curtain & window glazing,
venetian blinds, thermal insulation layering under deck to the roof terrace etc will be provided for
insulation in the building. This will minimize the cooling load. Energy savings of approx 12.1 % will
be achieved by using energy efficient lightning & building material.

9.7 Do the structures use energy-efficient space conditioning, lightening and mechanical
systems? Provide technical details. Provide details of the transformers and motor efficiencies,

Directorate of Health Services 26


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1A

lightening intensity and air conditioning load assumption? Are you using CFC and HCFC free
chillers? Provide specifications.
Yes, to increase energy efficiency, CFL lamps and T-5 lamps are proposed to be used for internal
lightning purpose. Solar heaters will be used for hot water to reduce load requirement. Solar street
lights & CFL will be used to minimize energy consumption for open area. Chillers are provided only
for intense care unit, diagnostic centre, CSSD and other required places. In rest of the building
ventilation is mechanical through fans & exhaust fans. Chillers used will be CFC & HCFC free.
Notices will be displayed everywhere for saving energy.

9.8 What are the likely effects of the building activity in altering the micro-climates? Provide
a self assessment on likely impacts of the proposed construction on creation of heat island &
inversion effects?
Heat emissions from the project may be from the following sources:
Heat absorbed from the paved and concrete structures
Heat increase due to increased vehicle use
However, the heat generated will not be significant and will be dissipated in the greens and open areas
provided within the project area.

9.9 What are the thermal characteristics of the building envelope? (a) Roof (b) external walls
and (c) fenestration? Give details of the material used and the U value or the R values of the
individual components.
Roofs: Intensity of solar radiation is more on horizontal surfaces, i.e. roofs of the buildings.
Conductance of heat from the roof is very high and this may result in high discomfort in the naturally
ventilated space below. Reinforced Concrete slab 125 mm thick, screed 120 mm( brick coba and
thermal insulation layer underneath roof slab) will be provided to cut down air-conditioning load of the
immediate lower floor

Walls: Walls will be plastered both sides, AAC blocks and Fal-G bricks will be used as wall material.
This will provide insulation to the structure. E-glass will be used for curtain & window glazing. The R-
Value for the major building components used is given below in Table 12.

Directorate of Health Services 27


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1A

Table 12: R-Value of Construction Materials


S.No Component R value (Fm2s/Btus-1)
1 230 mm AAC block/Fal-G bricks for 2.00
walls
2 12/15 mm cement plaster 0.32
3 125 mm Concrete roof slab 1.04
4 Water proofing course on terrace 0.45
(brick coba)

9.10 What precautions & safety measures are proposed against fire hazards?
Furnish details of emergency plans.
Disaster Management Plan
• Disaster Management Plan will be developed to reduce the impact of disasters like earthquake,
fire etc. and to encourage recovery.
• Disaster management will be drafted to manage both man-made & natural hazard
• A disaster management cell would be established which will take care of post disaster scenario.
• It would be a volunteer kind of set-up and professionals can also be hired in case of eventuality.
• Training will be given to staff & contractors about disaster management and handling
• Emergency evacuation plan will be provided in common areas
• Safety guidelines will be provided in & outside elevators

Management & Prevention of Fire hazard

The entire fire safety installation shall be compliant with the most stringent codes / standard for the
entire hospital to ensure the highest safety standard and uniformity of system. Further, before property
is opened to public, the fire protection shall be fully operated and tested under simulated conditions to
demonstrate compliance with the most stringent standards, codes and guidelines. Fire-fighting system
will be provided keeping in view guidelines of the following:

National Building Code Sept 2005: Part IV for Fire Protection


Local Bye-Laws.

Directorate of Health Services 28


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1A

Relevant BIS codes: Specifically IS: 3044, IS: 5290 and IS: 5312, IS: 908 and IS:2190, IS:
3844, IS: 15105.
NFPA & TAC Manual (for reference and guideline).
Consultation with local Chief Fire Officer.

Building is proposed to be provided with fire protection arrangements such as hose reel, hose, wet riser,
automatic sprinkler system in entire building, manual call points, automatic fire detection system in
entire buildings, underground water storage tank, overhead water tank, fire pumps, potable fire
extinguishers, exit signs, P.A. System, Yard Hydrants, Fireman‟s lift grounding switch, cautionary
notices in lifts & restricted areas in case of fire, display of fire evacuation plan, D.G. set,
Compartmentalization, refuse area at 7th Floor (meeting NBC requirement, 2005-part IV) and fire
control room from fire safety point of view. NOC from Delhi Fire Services has been obtained & copy
of same is attached as Annexure XVI.

Management & Prevention of Earthquake hazard

During Construction Phase


To ensure safety of the building from Seismic Load the Design of the building will be done in accordance to
Section 1, Part 6 of NBC 2005. Buildings will be designed keeping in consideration that structures should
possess strength to withstand minor earthquakes which occur frequently, without damage; resist moderate
earthquake without significant structural damage; and aims to withstand major earthquakes without collapse.
Earthquake resistant building materials will be used for construction of structures e.g. RCC.
Walls will be made up of lighter material like AAC blocks to reduce the weight of the building
In concrete floors, spans will be reduced with secondary beams so as to reduce the thickness of slab and
thus reduces the dead weight.
Ductility provisions shall be made in structural detailing.
Bolting. Brace or anchor for high & heavy objects shall be used.
Strong latches or bolts on cabinets will be installed.
During Operation Phase
Staff will be given training to handle emergency situations
Charts detailing Do‟s & Don‟t during earthquake will be displayed in every room
First aid facility will be available at all the time
Fire-extinguishers are provided to deal with fires induced due to earthquake

Directorate of Health Services 29


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1A

9.11 If you are using glass as wall materials, provide details and specifications including
emissivity and thermal characteristics.
Glass will not be used as wall material. E-glass will be used for curtain & window glazing.

9.12 What is the rate of air infiltration in to the building? Provide details of how you are
mitigating the effects of infiltration.
HAVC will be provided in hospital block for ventilation, cooling, heating & air-conditioning purpose &
will be managed as per ASHRAE, 2010. Parts of building with mechanical ventilation system adequate
nos. of windows & shaft will be provided. Infiltration will be reduced by providing proper building
envelope and air retarders.

9.13 To what extent the non–conventional energy technologies are utilized in the overall energy
consumption? Provide details of the renewable energy technologies used.
Various measures have been taken to reduce energy consumption for the project and approx. 12.1% of
total energy required will be conserved. Details are given in point no. 9.1 above. Non-conventional
source of energy, i.e. solar energy is proposed to be used. Solar street lights and solar water will be
provided at the project site. Low embodied construction material & energy efficient building material
are being used to further reduce the energy requirement.

10. ENVIRONMENT MANAGEMENT PLAN


Environment Management Plan (EMP) would consist of all mitigation measures for each component of
the environment due to the activities increased during the construction, operation and the entire life
cycle to minimize adverse environmental impacts resulting from the activities of the project. It would
also delineate the environmental monitoring plan for compliance of various environmental regulations.
It will state the steps to be taken in case of emergency such as accidents at the sites including fire. The
detailed EMP for the project is given below.
10.1 Environmental Management Plan
Environment Management Plan (EMP) is a site specific plan developed to ensure that the project is
implemented in an environmental sustainable manner where all contractors and subcontractors,
including consultants, understand the potential environmental risks arising from the project and take
appropriate actions to properly manage that risk. EMP also ensures that the project implementation is

Directorate of Health Services 30


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1A

carried out in accordance with the design by taking appropriate mitigation actions to reduce adverse
environmental impacts during its life cycle. Plan outlines existing and potential problems that may
adversely impact the environment and recommends corrective measures where required. Also, plan
outlines roles and responsibility of the key personnel and contractors who will be in-charge of the
responsibilities to manage the project site.

10.1.1 EMP is generally


Prepared in accordance with rules and requirements of the MoEF and CPCB/ SPCB
To ensure that the component of facility are operated in accordance with the design
A process that confirms proper operation through supervision and monitoring
A system that addresses public complaints during construction and operation of the facilities
and
A plan that ensures remedial measures is implemented immediately.
Key benefits of the EMP are that it offers means of managing its environmental performance thereby
allowing it to contribute to improved environmental quality. The other benefits include cost control and
improved relations with the stakeholders.
EMP includes four major elements:
Commitment & Policy: The management will strive to provide and implement the
Environmental Management Plan that incorporates all issues related to air, water, land and
noise.
Planning: This includes identification of environmental impacts, legal requirements and setting
environmental objectives.
Implementation: This comprises of resources available to the developers, accountability of
contractors, training of operational staff associated with environmental control facilities and
documentation of measures to be taken.
Measurement & Evaluation: This includes monitoring, counteractive actions and record
keeping.
It is suggested that as part of the EMP, a monitoring committee would be formed comprising of the site
in-charge/coordinator, environmental group representative and project implementation team

Directorate of Health Services 31


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1A

representative. The committee‟s role would be to ensure proper operation and management of the EMP
including the regulatory compliance.
The components of the environmental management plan, potential impacts arising, out of the project
and remediation measures are summarized below in Table 13.

Directorate of Health Services 32


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1A

TABLE 13: SUMMARY OF POTENTIAL IMPACTS AND REMEDIAL MEASURES


S. Environment Potential Potential Source of Controls Through Impact Remedial Measures
No. al Impacts Impact EMP & Design Evaluation
components
1. Ground Water Ground Water Construction Phase Waste water will be No significant Waste water arising
Quality Contamination Waste water
managed to achieve impact as majority from the project is to be
generated zero discharge and to of labors would be disposed conforming to
from
temporary labor maintain hygienic locally deployed Delhi pollution Control
tents. condition at site Committee Norms
Operation Phase No untreated water No negative STP will be installed to
Discharge from will be discharged impact on ground manage waste water
the project siteoutside project site water quality Treated water will be
envisaged. recycled and re-used for
flushing, horticulture &
HVAC cooling
2. Ground Water Ground Water Construction Phase No water ponding No impact Water will be taken from
Quantity Depletion No impact as will be allowed at site Okhla CSTP & through
ground water will DJB tankers.
not be used
Operation Phase Water management No Impact Using water efficiently
No impact, as will be practiced to Re-cycle & Re-use of
ground water will conserve water water
not be used. Use of Water Efficient
Water will be fixtures like flow regulators
provided by & dual flushing cisterns
Delhi Jal Board Provision of RWH pits
to collect rain water for
ground water recharge.
3. Surface Water Surface water Construction Phase Water & waste Measures will be Silt traps and diversion
Quality contamination Surface runoff water management will taken to restrict ditches will be constructed
from site during be carried out at the site the run-off from to control surface run-off

Directorate of Health Services 33


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1A

construction to control water site. during site development


activity. pollution Curing will be done by
spraying water to reduce
run-off
Operation Phase No untreated water No negative Treated water will be
Discharge from will be discharged impact on ground recycled and re-used for
Project Site outside project site water quality flushing, horticulture &
envisaged. HVAC cooling
4. Air Quality Dust Emissions Construction Phase Suitable control Dust generation Water sprinklers will be
(PM) Construction measures will be will be temporary provided
activities adopted for reducing and will settle fast Regular sweeping of
Vehicular the PM level in the air due to dust construction site
movement as per air pollution suppression Construction material &
control plan. techniques. debris carrying vehicles
Impact will be will be covered.
restricted to small
area.
SO , NO and Construction Phase Rapid on-site Impact will be for Regular monitoring of
CO Vehicular exhaust construction short duration emissions and control
Running D.G. set measures will be taken to
(back up) reduce the emission levels.
Use of low sulfur diesel
Regular maintenance and
servicing of vehicles.
Emissions of Operation Phase Suitable control Not significant. Stack height of DG as per
PM, SO , NOx Vehicular measures will be Regular CPCB standards
and CO movement adopted for reducing monitoring of air Use of low sulfur diesel
Vehicular exhaust emissions quality will be Traffic management
Running D.G. set carried out to Providing Footpath
(back up) maintain air Developing Green belt
quality All vehicles will carry
PUC

Directorate of Health Services 34


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1A

5. Noise Construction phase Noise Management Impact will be Provision of Noise


Environment Construction by adopting suitable temporary and shields
Activities measures. will be restricted DG sets will be provided
Operation of to small area. with acoustic enclosures
Machinery Construction activities
Operation of involving high level noise
DG sets generation will be
restricted to day time
Provision of ear muffs to
workers
Traffic Management at
site to prevent honking
Use of machinery of
modern make, meeting the
noise standards
Operation Phase Noise Management Not Significant. Development of green
Noise from by adopting suitable belt
vehicular measures DG sets will be provided
movement with acoustic enclosure
Noise from DG DG sets will be placed in
set operation a room to reduce noise
level
Proper traffic
management &
circulation.
Honking will be
prohibited in the premises
All vehicles will carry
PUC

Directorate of Health Services 35


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1A

6. Land Soil Construction Phase By controlling soil No significant Construction debris will
Environment contamination Disposal of erosion and impact. be used for leveling or
construction maintaining soil Impact will be will be sent to landfill for
debris quality by periodic restricted to disposal
Spillage of oil soil quality project site Proper work
or paints monitoring management to avoid
Excavation of spillage
soil Excavated soil will be
re-used for landscaping in
project area.
Silt traps and dykes will
be develop
Operation Phase Solid waste Since solid waste MSW Management
Municipal solid management as per is handled by the Rules, 2000 by the
waste MSW Rules, 2000. authorized authorized agency.
agency, waste
dumping will not
be practiced thus
impact is not
significant.
Used oil generated will
Used oil from Negligible be disposed as per norms
D.G. set impact. to authorized vendors
7. Biological Displacement Construction Phase Important No significant No clearing of trees
Environment of Flora and Site species of trees, if any, vegetation exist
Fauna on site Development will be identified and at project site so
during marked and will be no tree felling
construction merged with landscape involved.
plan

Directorate of Health Services 36


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1A

Operation Phase Development of Positive Impact Green belt will be


Site Green Belt developed along periphery
Development Avenue plantation will
be carried out
Proper after care &
maintenance will be done
8. Socio- Population Construction Phase Generation of Positive Impact Generation of
Economic displacement Construction employment for local employment for skilled,
Environment activities may people especially unskilled and semiskilled
lead to labor people
temporary Development of an area
relocation due to improved
infrastructure
Employment preferably
to be given to local people
Operation Phase Generation of Positive impact
Site operation employment for
skilled, unskilled &
semi-skilled people
in the hospital
Betterment of Health
Care Facility in the
area
9. Traffic Increase in Construction Phase Proper Traffic Impact will only Provision of adequate
Pattern traffic Import of Management & be for short time parking space
construction circulation (construction Proper traffic circulation
material at site phase) system at site
Export of Proper signage system
construction Restrict hours of
debris from material transport
project site
Operation Phase Proper Traffic Not Significant Provision of adequate

Directorate of Health Services 37


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1A

Vehicles of Management & as project site is parking space


staff, visitors & circulation well connected Proper traffic circulation
out-patients via network of system at site
roads Informatory & directive
Sign boards will be
provided
Provision of pedestrian
path to encourage parking

Directorate of Health Services 38


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1A

10.2 ENVIRONMENT MANAGEMENT PLAN


An Environmental Management Plan (EMP) will be required to mitigate the predicted adverse
environmental impacts during construction and operation phase of the project and these are
discussed in later subsections.

10.2.1 EMP for Air Environment


Construction Phase
To mitigate the impacts of PM during the construction phase of the project, the following
measures are recommended for implementation:
A dust control plan
Procedural changes to construction activities
Dust Control Plan
Most cost-effective dust suppressant is water and water is easily available on construction
site. Water can be sprinkled using water trucks, handled sprayers and automatic sprinkler
systems. Furthermore, incoming loads could be covered to avoid loss of material in
transport, especially if material is transported off-site.
Procedural Changes to Construction Activities
Idle time reduction: Construction equipment is commonly left idle while the operators
are on break or waiting for the completion of another task. Emission from idle equipment
tends to be high, since catalytic converters cools down, thus reducing the efficiency of
hydrocarbon and carbon monoxide oxidation. Existing idle control technologies
comprises of power saving mode, which automatically off the engine at preset time and
reduces emissions, without intervention from the operators.
Improved Maintenance: Significant emission reductions can be achieved through
regular equipment maintenance. Contractors will be asked to provide maintenance
records for their fleet as part of the contract bid, and at regular intervals throughout the
life of the contract. Incentive provisions will be established to encourage contractors to
comply with regular maintenance requirements.
Reduction of On-Site Construction Time: Rapid on-site construction would reduce the
duration of traffic interference and therefore, will reduce emissions from traffic delay.

Directorate of Health Services 39


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1A

Operation Phase
To mitigate the impacts of pollutants from DG set and vehicular traffic during the operational
phase of the Project, following measures are recommended for implementation:
DG set emission control measures
Vehicular emission controls and alternatives
Greenbelt development
Diesel Generator Set Emission Control Measures
Adequate stack height will be provided to disperse the air pollutants generated from the
operation of DG set to dilute the pollutants concentration within the immediate vicinity.
Hence no additional emission control measures have been suggested.
Vehicle Emission Controls and Alternatives
Vehicles will be generally having “PUC” certificate. Adequate parking will be provided
to accommodate vehicles. Proper traffic management and circulation will be practiced.
Adequate signage will be provided. Footpaths and pedestrian ways would be provided at
the site to encourage non-polluting methods of transportation. Car-pooling will be
encouraged to reduce traffic & air emission load
Greenbelt Development
Thick green belt will be provided along periphery wherever feasible. This will act as
buffer to control noise & emission levels. Avenue plantation will also be provided along
with organized greens at the site. Both tolerant & resistant species will be provided to
maintain air quality.

10.2.2 EMP FOR NOISE ENVIRONMENT


Construction Phase
Measures will be taken to reduce noise levels at the project site. They are as follows:
1) Time of Operation: Construction activities involving generation of high noise level will
be restricted to day hours
2) Job Rotation and Hearing Protection: Workers employed in high noise areas will be
employed on shift basis. Hearing protection such as earplugs/muffs will be provided to
those working very close to the noise generating machinery.
3) Provision of noise shields in high level noise generation area

Directorate of Health Services 40


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1A

4) DG sets will be equipped with acoustic enclosure


5) Regular monitoring of noise level at the site
6) Usage of machinery of modern make which comply with noise level generation standards
Operation Phase
To mitigate impacts of noise during operational phase following measures will be adopted
1) DG set room will be provided with acoustic enclosure to have minimum 25 dB(A)
insertion loss or for meeting the ambient noise standard whichever is on higher side as
per E (P) Act, GSR 371 (E) and its amendments
2) Green belt will be developed along periphery wherever feasible. This will act as noise
buffer
3) Honking will be prohibited within premises
4) Shall restrict speed of vehicles within project site
5) All vehicles will carry PUC

10.2.3 EMP FOR WATER ENVIRONMENT


Construction Phase
To prevent degradation and to maintain the quality of the water source, adequate control
measures have been proposed. To check the surface run-off as well as uncontrolled flow of water
into any water body check dams with silt basins are proposed. Following management measures
are suggested to protect the water source being polluted during the construction phase:
Avoid excavation during monsoon season
Care would be taken to avoid soil erosion
Common toilets will be constructed on site during construction phase and the waste
water arising from the project is to be disposed conforming to Delhi pollution Control
Committee Norms.
Any area with loose debris within the site will be planted
To prevent surface and ground water contamination by oil and grease, leak-proof
containers would be used for storage and transportation of oil and grease.

Directorate of Health Services 41


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1A

Floors of oil and grease handling area would be kept effectively impervious. Any
wash off from the oil and grease handling area or workshop will be drained through
imperious drains
Proper drainage will be provided for storm water management
Water will be sprayed for curing to reduce run-off
All stacking and loading area will be provided with proper garland drains, equipped
with baffles, to prevent run off from the site, to enter into any water body.
Operation Phase
During operation phase of the project, water conservation and development measures will be
taken, including all possible potential for rain water harvesting. Following measures will be
adopted:
Water source development.
Minimizing water consumption.
Recycle & Re-use of water
Water Source Development
Water source development shall be practiced by installation of scientifically designed Rain
Water Harvesting system. Rainwater harvesting promotes self-sufficiency and fosters an
appreciation for water as a resource.
Minimizing Water Consumption
Water will be used efficiently. Water conservation fixtures like Dual flow cistern, flow
regulators etc. will be used to reduce water demand.
Awareness regarding water conservation will be created by placing notices near water
areas.
Proper leak detection system
Usage of pruning water will be avoided for cleaning and horticulture purpose
Usage of treated water to meet flushing and secondary water demand
Drip-irrigation system & low angle sprinklers will be used for horticulture purpose
Recycle & Re-use of water
To promote reuse of waste water and development of closed loop system for waste water
segregation. Two wastewater schemes are suggested, namely:

Directorate of Health Services 42


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1A

1) Storm Water Harvest: To augment ground water level


2) Waste water recycling.: To meet flushing, landscaping & HVAC cooling demand
Waste Water Treatment Scheme
It is expected that the project will generate approx. 90 KLD of sewage & 12 KLD of lab effluent.
Sewage will be treated in STP of capacity 110 KLD and effluent from lab will be treated in ETP
of capacity 15 KLD. 88 KLD of treated water from STP will be used for flushing, horticulture &
HVAC cooling, whereas 12 KLD of treated water from ETP will be used for HVAC cooling
only.
Storm Water Management
Most of the storm water produced on site will be harvested for ground water recharge. Thus
proper management of this resource is a must to ensure that it is free from contamination.
Contamination of Storm Water is possible from the following sources:
Diesel and oil spills in the diesel power generator and fuel storage area
Waste spills in the solid waste storage area
Oil spills and leaks in vehicle parking lots
Silts from soil erosion in gardens
A detailed storm water management plan will be developed which will consider the possible
impacts from above sources. The plan will incorporate best management practices which will
include following:
Regular inspection and cleaning of storm drains
Clarifiers or oil/separators will be installed in all the parking areas. Oil / grease separators
installed around parking areas and garages will be sized according to peak flow
guidelines. Both clarifiers and oil/water separators will be periodically pumped in order
to keep discharges within limits
Covered waste storage areas
Avoid application of pesticides and herbicides before wet season
Secondary containment and dykes in fuel/oil storage facilities
Conducting routine inspection to ensure cleanliness
Provision of slit traps in storm water drains
Good housekeeping in the above areas

Directorate of Health Services 43


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1A

10.2.4 EMP FOR LAND ENVIRONMENT


Construction Phase
Waste generated from construction activity includes construction debris, biomass from land
clearing activities, waste from the temporary make shift tents for the labors and hazardous waste.
Following section discuss the management of each type of waste. Besides waste generation,
management of the topsoil is an important area for which management measures are required.
Construction Debris
Construction debris is bulky and heavy and re-utilization and recycling is an important strategy
for management of such waste. As concrete and masonry constitute the majority of waste
generated, recycling of this waste by conversion to aggregate can offer benefits of reduced
landfill space and reduced extraction of raw material for new construction activity. This is
particularly applicable to the project site as the construction is to be completed in a phased
manner.

Metal scrap from structural steel, piping, concrete reinforcement and sheet metal work will be
removed from the site by construction contractors. Recyclable wastes such as plastics, glass fiber
insulation, roofing etc. will be sold to recyclers.
Hazardous waste
Construction sites are sources of many toxic substances such as paints, solvents wood
preservatives, pesticides, adhesives and sealants. Hazardous waste generated during construction
phase will be stored in sealed containers and disposed off as per The Hazardous Wastes
(Management, Handling & Trans-boundary Movement) Rules, 2008.
Some management practices to be developed are:
Herbicides and pesticide will not be over applied (small-scale applications) and not
applied prior to rain
Paintbrushes and equipment for water and oil based paints will be cleaned within a
contained area and will not be allowed to contaminate site soils, water courses or
drainage systems
Provision of adequate hazardous waste storage facilities. Hazardous waste collection
containers will be located as per safety norms and designated hazardous waste
storage areas will be away from storm drains or watercourses

Directorate of Health Services 44


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1A

Segregation of potentially hazardous waste from non-hazardous construction site


debris
Well labeled all hazardous waste containers with the waste being stored and the date
of generation
Instruct employees and subcontractors in identification of hazardous and solid waste
Even with careful management, some of these substances are released into air, soil and water and
many are hazardous to workers. With these reasons, the best choice is to avoid their use as much
as possible by using low-toxicity substitutes and low VOC (Volatile Organic Compound)
materials.
Waste from Temporary Makes Shift Tents for Labors
Domestic waste generated by labor mainly comprise of household domestic waste, which will be
managed by the contractor of the site. Wastewater generated will be treated in septic tank & soak
pits.
Top Soil Management
To minimize disruption of soil and for conservation of top soil, contractor will keep the top soil
cover separately and stockpile it. After the construction activity is over, top soil will be utilized
for landscaping activity. Other measures, which would be followed to prevent soil erosion and
contamination include:
Maximize use of organic fertilizer for landscaping and green belt development
To prevent soil contamination by oil/grease, leaf proof containers would be used for
storage and transportation of oil/grease and wash off from the oil/grease handling area
will be drained through impervious drains and treated appropriately before disposal
Removal of as little vegetation as possible during the development and re-vegetation of
bare areas after the project.
Working in a small area at a point of time (phase wise construction)
Construction of erosion prevention troughs/berms.

Operational Phase
Philosophy of solid waste management at the project site will be to encouraging the four R‟s of
waste i.e. Reduction, Reuse, Recycling and Recovery (materials & energy). Environmental

Directorate of Health Services 45


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1A

Management Plan for the solid waste focuses on three major components during the life cycle of
the waste management system i.e., collection and transportation, treatment or disposal and
closure and post-closure care of treatment/disposal facility.
Waste Management
During the collection stage, solid waste of the project will be segregated into
biodegradable waste and non-biodegradable. Biodegradable waste and non
biodegradable waste will be collected in separate bins. Biodegradable waste will be
converted to manure by organic convertor. Recyclable wastes will be sent off to
government authorized agencies. Proper guidelines for segregation, collection and
storage will be prepared as per MSW Rules, 2000.
To minimize littering and odour, waste will be stored in well-designed containers/ bins
that will be located at strategic locations to minimize disturbance in traffic flow
Care would be taken such that the collection vehicles are well maintained and generate
minimum noise and emissions. During transportation of the waste, it will be covered to
avoid littering.
E-waste will be collected & will be sold to authorized vendors
10.2.5 EMP FOR ECOLOGICAL ENVIRONMENT
Construction Stage
Restriction of construction activities to defined project site
No trees will be cut for construction purpose
Along with the construction work, peripheral green belt would be developed with
suggested native plant species
Operation Stage
Total area measuring 1966.82 m2 i.e. 31.13 % of the plot area is proposed to be put under green
cover. Evergreen trees, ornamental trees, ornamental shrubs have been proposed to be planted
inside the premises. Only native species will be planted. Proper aftercare and monitoring of
developed green area will be done. Trees proposed to be planted are given in Table 14.

Directorate of Health Services 46


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1A

Table 14: List of Trees to be planted

S. No. Species Common Name Type


1. Azadirachta indica Neem Tree
2. Jacranda Mimosifooolia Neeli gulmohar Tree
3. Thevetia peruviana Yellow oleander Tree
4. Plumeria alba Whitefirangipani Tree
5. Plumeria rubra Firangipani Tree
6. Cassia fistula Amaltas Tree
7. ` Alstonia scholaris Saptaparni Tree
8. Delonix regia Gulmohar Tree
9. Erythrina variegate Indian Coral Tree Tree
10. Lagerstroemia Thorellii Pride of India Tree
11. Terminalia arjuna Arjun Tree Tree
12. Polyalthiya longifolia Ashoka tree Tree
13. Bougainvillea glabra Bougainvillea Shrub
14. Ficus religiosa Peepal Tree
15. Combretum indicum Rangoon Creeper Creeper
16. Vernonia elaeagnifolia Curtain creeper Creeper
17. Clerodendrum inereme Shrub Bleeding heart

Green Belt Development Plan


The plantation matrix adopted for the green belt development includes pit of 0.3 m × 0.3 m size
with a spacing of 2 m x 2 m. In addition, earth filling and manure may also be required for the
proper nutritional balance and nourishment of the sapling. It is also recommended that the
plantation has to be taken up randomly and the landscaping aspects would be taken into
consideration.
Multi-layered plantation comprising of medium height trees (7 m to 10 m) and shrubs (5 m
height) are proposed for the green belt. In addition creepers will be planted along the boundary
wall to enhance its insulation capacity.

Directorate of Health Services 47


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1A

Parks and gardens maintained for recreational and ornamental purposes will not only improve
the quality of existing ecology at the project site but also will improve the aesthetic value
For Avenue plantation trees shall have following characteristics:
Trees with branching at 7 feet and above
Trees with medium spreading branches to avoid obstruction to the traffic
Fruit trees to shall not be provided.
Selection of Plant Species for Green Belt Development
Selection of plant species for the development depends on various factors such as climate,
elevation and soil. The plants would exhibit the following desirable characteristics in order to be
selected for plantation
1. Species shall be fast growing and providing optimum penetrability
2. Species shall be wind-firm and deep rooted
3. Green belt will be developed
4. Indigenous and locally available species will be planted
5. Species tolerance to air pollutants like SO2 and NO2 shall be preferred
6. Trees/Plants with ability to withstand conditions like inundation and drought
7. Soil improving plants (Nitrogen fixing rapidly decomposable leaf litter)
8. Attractive appearance with good flowering.
9. Sustainable green cover with minimal maintenance.

10.2.6 EMP for Socio-Economic Environment


Construction Stage:
1) Generation of employment for people of local area
2) Employment will be provided to unskilled, skilled and semi-skilled people
3) Construction activity may also lead to generation of indirect temporary employment like
tea-stalls, dhabas etc.
4) Development of employment options like maintenance workers, food related jobs,
chemist within the project site and outside.
5) Development of roads, sewerage facility, water supply by government due to increased
influx of visitors in this area.

Directorate of Health Services 48


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1A

6) Air & noise pollution management measures will be taken to prevent any disturbance to
society
Operation Stage:
1) High living standard facility with all modern facilities at affordable price
2) Employment will be provided to some extent to local people as domestic help & security
maintenance.
3) Development of project will accompany development of new infrastructure and
maintenance of existing.
4) Green belt developed will increase aesthetic value of the place

10.2.7 EMP FOR ENERGY CONSERVATION


Energy conservation program will be implemented through measures taken both on energy
demand and supply.

Supply Energy Conservation Demand

Use energy efficient appliances Reduce consumption


Using energy efficient building
material

Energy Saving Measures


1. Provision of AAC block for filler walls and partition walls: It provides insulation thus
prevents heat exchange from building & reduce heating & cooling loads. It is a light
weight material thus easy to transport saves fuel & thus reduces emission.
2. E-glass to be used for curtain & window glazing for minimizing radiation.
3. False ceiling for reducing A.C loading & Calcium silicate tiles will be used for false
ceiling which has excellent insulation properties with thermal conductivity of
0.043/W/M0K

Directorate of Health Services 49


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1A

4. FRP (fiber reinforced plastic) doors have been used for wet areas thus minimum usage of
wood. FRP is low embodied energy product, light weighted, low maintenance requiring
& longer life.
5. Low VOC content paint used for wall finishes & door finishes.
6. Thermal insulation layering under deck to the roof terrace.
7. Use of ACP cladding for external finish will improve thermal insulation.
8. Solar heating system for Hot water.
9. Provision of Solar lights for lightning on streets & common areas.
10. Use of PPR & CPVC pipes.
11. Venetian blinds for protection from direct Sun.
12. Energy efficient florescent lamp, T-5 lamps, CFL will be used for internal lightning
within the project site
13. 50 % external light can be switched „off‟ after 11 pm, when the movement is drastically
reduced.

10.3 ENVIRONMENTAL MANAGEMENT SYSTEM AND MONITORING PLAN


For effective and consistent functioning of the project, an Environmental Management system
(EMS) would be established at the site. EMS would include the following:
An Environmental management cell.
Environmental Monitoring.
Personnel Training.
Regular Environmental audits and Correction measures.
Documentation – standards operation procedures Environmental Management Plan
and other records.
10.3.1 Environmental Management Cell
Apart from having an Environmental Management Plan, it is also proposed to have a permanent
organizational set up charged with the task of ensuring its effective implementation of mitigation
measures and to conduct environmental monitoring. Duties and responsibilities of Environmental
Management Cell will be as given below:
To implement the environmental management plan.

Directorate of Health Services 50


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1A

To assure regulatory compliance with all relevant rules and regulations.


To ensure regular operation and maintenance of pollution control devices.
To minimize environmental impact of operations as by strict adherence to the EMP.
To initiate environmental monitoring as per approved schedule.
Review and interpretation of monitored results and corrective measures in case monitored
results are above the specified limit.
Maintain documentation of good environmental practices and applicable environmental
laws for a ready reference.
Maintain environmental related records.
Coordination with regulatory agencies, external consultants, monitoring laboratories.
Maintenance of log of public complaints and the action taken.
Hierarchical Structure of Environmental Management Cell
The hierarchical structure of suggested Environmental Management Cell is given in following
Figure 4.

Corporate Site Manager Rep from Corporate


Environmental Division Planning group

Site Environmental Coordinator

Waste water Treatment Plant Operator Greenbelt Dev. Incharge


Figure 4: Environment Management Cell Structure

10.3.2 Environmental Management Budget


Implementation cost for environmental management plan during operation & construction phase
of the project is given below in Tables 15 & 16 below.

Directorate of Health Services 51


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1A

Table 15: EMP budget for Construction Phase


S. No. Activity Capital Cost Annual Recurring Cost
(Lacs) (Lacs)
1. Health & safety of Workers 1.5 3.6
(PPE, safety officers etc)
2. Environmental Monitoring 1.04 2.08

3. Septic Tank & Soak Pit 2.5 0.5


Total 5.04 6.18

Table 16: EMP budget for Operational Phase


S. No. Activity Capacity/ Capital Annual
Area/Nos./parameters Cost Recurring Cost
(Lacs) (Lacs)
1. STP & ETP 110 KLD & 15 KLD 50.00 10.0
2. Landscaping & 1966.82 sq m & 88 Nos. of 20.00 2.5
planting trees Trees to be planted along with
grass & planters
3. Solid waste 519+130 Kg/day 5.5 5.0
Management (Municipal & Bio-medical
waste )
4. RWH Pit 2 Nos. 8.0 0.8
Installation
5. Energy Saving 2.1% using efficient lightning 4.0 0.6

6. Environmental Air, Water, Soil & Noise 1.6 3.2


Monitoring*

Total 89.1 22.1

* Environment monitoring to be carried out twice in year so recurring cost per annum is double
that of onetime cost of environmental monitoring.

10.3.3 Environmental Monitoring


Purpose of environmental monitoring is to evaluate the effectiveness of implementation of
Environmental Management Plan (EMP) by periodic monitoring. Important environmental
parameters within the impact area are selected so that any adverse affects are detected and time
action can be taken. Project proponent will monitor ambient air Quality, Ground Water Quality
and Quantity, and Soil Quality in accordance with an approved monitoring schedule.

Directorate of Health Services 52


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi FORM 1A

Table 17: Environment Monitoring Program


S. Type Locations Parameters Period and Frequency
No.
1. Ambient Air Project Site Criteria Pollutants: Twice in a Year as per
Quality SO2, NO2, PM10 & EIA Notification 2006
PM2.5
2. Groundwater Project site Drinking water Twice in a Year as per
(Portability parameters as per IS EIA Notification 2006
testing) 10500.
3. Ambient Noise Project site dB (A) levels Twice in a Year as per
EIA Notification 2006.
4. Soil quality Project site Organic matter, C.H., Twice in a Year as per
N, Alkalinity, Acidity, EIA Notification 2006
heavy metals and trace
metal, Alkalinity,
Acidity.
5. Waste Hospital Physical and Chemical Daily
Characterization composition
6. Treated water Outlet of BOD, MPN, colioform Daily
STP count, etc.

10.3.4 Awareness and Training


Awareness campaigns for energy conservation, water conservation, cleanliness & disaster
management will be organized for staff & contractors.

10.3.5 Environmental Audits and Corrective Action Plans


To assess whether the implemented EMP is adequate, periodic environmental audits will be
conducted by the project proponent‟s Environmental division. These audits will be followed by
Correction Action Plan (CAP) to correct various issues identified during the audits.

Directorate of Health Services 53


C t a a

KL-Block, Sarita Vihar,


Delhi

i l S i

Environmental Consultant
100 Beded Hospital
At KL-Block, Sarita Vihar, Delhi CONCEPTUAL PLAN

CONTENTS

SI. NO. DESCRIPTION PAGE NO.


1.0 Introduction 1
1.1 Site Location & Surroundings 2
1.2 Connectivity 3
1.3 Area Statement 4
1.4 Estimated Population 4
1.5 Project Cost 4
1.6 Water Requirement 4
1.7 Rain Water Harvesting 9
1.8 Vehicle Parking Facilities 10
1.9 Power Requirement 11
1.10 Solid Waste Generation & Management 11
1.11 Green Area 14
1.12 Materials used for Construction & Their U values 15
1.13 List of Machinery used during construction 15

Directorate of Health Services


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi CONCEPTUAL PLAN

1.0 INTRODUCTION
Directorate of Health Services (DHS) is a major government agency related to health
care delivery in Delhi. It is the largest department under Department of Health and Family
Welfare, Govt. of NCT of Delhi and provides health services at primary & secondary level to
the citizens of Delhi through various types of health outlets, spread all over Delhi viz.
Dispensaries and Health Centers, School Health Clinics and Mobile Health Clinics.
This Directorate not only actively participates in delivery of health care facilities but also
coordinates with other Govt. and Non Government Organizations for health related activities
for the improvement of health of citizens of Delhi. DHS is instrumental in coordination
and implementation of various national and state health programs.
To cope up with the situation regarding need of health outlets, many more health outlets are
being added to existing ones from time to time to meet the health needs and thus has proposed
to develop a “New 100 Bedded Hospital” at KL-Block, Sarita Vihar, Delhi. There are in total
39 hospitals under DHS and the proposed hospital would be an addition to the Health care
services provided by DHS. Organizational chart of DHS is given in Figure 1 below:

Figure 1: Organizational Chart of DHS

Directorate of Health Services 1


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi CONCEPTUAL PLAN

Features of the project are:


1. In-patient services: 100 bedded (10 floating beds)
2. Out-patient & ambulance services
3. Operation Theatre, labor room, Central Sterile Service Department (CSSD) & Diagnostic
services
4. Help desk & Medical record Department
5. Waste water Treatment Facility
6. Rain Water Harvesting Facility

1.1 SITE LOCATION AND SURROUNDINGS


Proposed project site is located at KL-Block, Sarita Vihar, Delhi. Geographical co-ordinates of
the project site are 28°32.254'N & 77°17.869'E. Land has been allotted by Delhi Development
Authority on lease for development of hospital to Directorate of Health Services. Land
documents are attached as Annexure I. Google image showing location of project site &
its surroundings within 500 m, 2 km and 10 km are attached as Annexure II (a, b &c)
respectively. Site plan for the site is attached as Annexure III. Surroundings of the project
site are given in Table 1 below:
Table 1: Surroundings of Project Site
Near-by Residential Area Madanpur Khadar Village (300 m, SE)
Village Saidabad (1.2 km, SW)
Jasola (400m, N)
Shaheen Bagh (700 m, NE)
Nearest City New Delhi (12.0 km, NNW)
Nearest Industrial Area Okhla Industrial Area (1.6 km, W)
Nearest School Meer public School (1.7 km, S)
Nearest College Asia Pacific Institute of Management (500 m, NW)
Rai University (2.0 km, SW)
Nearest Hospital Delhi ENT Hospital (500 m, NW)
Apollo Hospital (1.4 km, NW)
Near-by Common Facilities Okhla STP (1.2 km, NNE)

Directorate of Health Services 2


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi CONCEPTUAL PLAN
Near-by Recreational facilities Jasola District park (1.0 km, NE)
Kalindikunj Park (1.4 km, NE)
Sarita Vihar District Plan (1.2 km, SW)
Near-by Water Body River Yamuna (1.6 km, NE)
Drain (500m, E)

1.2 CONNECTIVITY
Project site is accessible and is well connected via network of rail & road. Local roads connect
project site to NH-2 which is at 1.3 km in west direction from project site. Nearest
Railway Station are Okhla Railway station and Tuglakabad Railway station at distance of 4.0
km, in NW direction & 3.7 km in SW direction from project site respectively. Site is also well
connected by Metro Rail. Jasola metro station is at 1.4 km in WNW direction. Indira
Gandhi International Airport is at 20 km in West direction from project site.

1.3 AREA STATEMENT


Total plot area for development of proposed project is 6318.72 sq m. Statement of area detailing
the propose development is given below in Table 2 below:
Table 2: Area Statement
S. Particulars Area (m2)
No.
1. Total Plot Area 6318.72
2. Permissible ground Coverage (30% of plot area) 1895.4
3. Proposed Ground Coverage (29.6% of plot area) 1869.21
4. Permissible FAR (200% of plot area) 12637.44
5. Proposed FAR (199.07% of plot area) 12578.89
6. Non-FAR Area at Floors 1622.96
7. Services 62.87
8. Stilt 247.09
9. Basement 7926.06
Basement 1 3963.03
Basement 2 3963.03
10. Built-up Area 22437.87
11. Open Parking Area 253.00
12. Landscape Area (31.13%) 1966.82
13. Height of the building 29.865 m
*FAR = Floor Area Ratio

Directorate of Health Services 3


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi CONCEPTUAL PLAN

1.4 ESTIMATED POPULATION


Estimated population at project site is 2285 including patients, staff and visitors. Details of
population are given below in Table 3.
Table 3 Estimated Population for project
S. No. Category Nos./Capacity
1. In-patient 110
2. Out-Patient/Visitors 2000
3. Staff (Administration & Medical) 100
4. Security & Misc. Staff 35
5. Guest 40
Total 2285

1.5 PROJECT COST


Total cost of the project including land & development cost is INR 77.89 Crores
(INR 77,89,35,052). Land cost for the project is INR 1,14, 27,178 and development cost for the
project is INR 76,75,07,874

1.6 WATER REQUIREMENT


During construction phase water supply will be taken from Okhla CSTP. During
operation phase, water will be taken from Delhi Jal Board. Total water requirement is approx.
218 KLD, out of which domestic water requirement is 79.0 KLD. Fresh water requirement for
the project is approx. 118.0 KLD. Daily water requirement calculation is given below in Table 4
(a) & (b):
S. Table 4 (a): Calculations for Daily Water
Water DemandFresh Recycled
Per capita Req.
No. Category Capacity Requirement Water water
(LPCD)
(KLD) Demand Demand
A Domestic
1 110
In-patient (100+10) 340 37.4 26.4 11.0
2 Out-patient/Visitors 2000 15 30.0 12.0 18.0
3 Staff 135 45 6.1 2.7 3.4
4 Guest 40 135 5.4 3.6 1.8

Directorate of Health Services 4


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi CONCEPTUAL PLAN

78.9 44.7 34.18


Total Domestic water Req. (1+2+3+4) Say 79.0 Say 45.0 Say 34.0
B Pathology -- -- 15 15 --
C CSSD -- -- 5 5 --
D Mortuary -- -- 15 15 --
E Landscape 0.49 Acres 25 KLD/Acres 12 -- 12
F HVAC Cooling* 550 Tr 7 l/Tr/hr 92 38 54
Total Water Requirement (A+B+C+D+E+F) 218 118 100
* HVAC Operational for 24 hours
Table 4 (b): Wastewater Calculations
Category Quantity (KLD)
Sewage Generated (100% flushing, CSSD & 90.0
Mortuary + 80% other domestic water
requirement)
Effluent from pathology laboratory 12.0
Capacity of STP 110
Capacity of ETP 15
Recovered Water from STP (98% of Waste 88.0
Water)
Flushing 34.0
Landscaping 12.0
HVAC Cooling 42.0

Recovered Water from ETP (@98%) ~12.0


HVAC Cooling 12.0
Water balance diagram for dry & monsoon season are given below in Figure 2 (a) & (b):
Wastewater Generation & Treatment
It is expected that the project will generate approx. 90 KLD of sewage & 12 KLD of lab
effluent. Sewage will be treated in STP of capacity 110 KLD and effluent from lab will be
treated in ETP of capacity 15 KLD. About 88 KLD of treated water from STP will be
used for flushing, horticulture & HVAC cooling, whereas 12 KLD of treated water from
ETP will be used for

Directorate of Health Services 5


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi CONCEPTUAL PLAN

HVAC cooling only. Dual plumbing plan showing location of STP, ETP, fresh water supply,
recycle water supply and wastewater drains is attached as Annexure IV. Detailed report on
Sewage & lab effluent treatment system is attached as Annexure V.

Total Fresh Water Fresh Water For @ 80 Waste Water Generated


118.0 KLD Drinking, Bathing, (90 KLD)
45 KLD STP Capacity110 KLD
Cleaning & Other Use
(STP efficiency @ 98 %)
(45.0 KLD)

Flushing Water @ 100


(34.0 KLD) 34.0 KLD

15.0 KLD @ 100


Mortuary
(15.0 KLD)

5.0 KLD
CSSD @ 100
(5.0KLD)

Waste Water Generated


15.0 KLD @ 80 (12 KLD)
Pathology
(15.0 KLD) ETP Capacity12 KLD
(ETP efficiency @ 100 %)

12.0 KLD
Landscape
(12.0 KLD)

42.0 KLD
38.0 KLD HVAC
12.0 KLD
(92.0 KLD)
Fresh water
Waste water
Recycled Water

Figure 2 (a): Water Balance Diagram During Dry Season

Directorate of Health Services 6


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi CONCEPTUAL PLAN

Total Fresh Water Fresh Water for @ 80 Waste Water Generated


106.0 KLD Drinking, Bathing, (90 KLD)
45 KLD STP Capacity110 KLD
Cleaning & Other Use
(STP efficiency @ 98 %)
(45.0 KLD)

Flushing Water @ 100


(34.0 KLD) 34.0 KLD

15.0 KLD @ 100


Mortuary
(15.0 KLD)

5.0 KLD
CSSD @ 100
(5.0KLD)

Waste Water Generated


15.0 KLD @ 80 (12 KLD)
Pathology
(15.0 KLD) ETP Capacity12 KLD
(ETP efficiency @ 100 %)

54.0 KLD
26.0 KLD HVAC
(92.0 KLD) 12.0 KLD

Fresh water
Waste water
Recycled Water

Figure 2 (b): Water Balance Diagram during Monsoon Season

1.7 RAIN WATER HARVESTING


Storm water harvesting system will be provided within the project site as per CPCB guideline on
Rainwater Harvesting & Artificial Ground water Recharge. Storm water from roof-top & surface
will be collected via storm water drainage network and will be led into recharge pits proposed to
be provided at various locations. Storm water drainage will be designed in line of existing

Directorate of Health Services 7


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi CONCEPTUAL PLAN

drainage pattern and considering the natural flow direction of water. First flushing system will
be provided to prevent water from first rain to enter the ground as it is believed to contain
several impurities. Rain water harvesting system is designed considering maximum peak hourly
rainfall (90 mm/hr). Thus pits are designed to capture the maximum possible rainfall which
could occur. De-silting chamber is provided with each RWH pit. Oil trap is provided to remove
oil & grease, if any in the storm water. Periodic cleaning & maintenance of RWH system
will be done. Calculation for storm water system designing is given in Table 5. Plan
showing storm water drainage & location of RWH pits and diagram of RWH pit are attached
as Annexure VI a & b. Schematic diagram of Rain Water Harvesting pit as per CGWB is given
in Figure 3.
S. No. Catchment Areafor
Table 5: Calculations ofstormRun-off
water load Peak Run-off
Catchment Coff. Hourly collected
(sq m) Rainfall (cu m)
(m/hr)
1 Roof-Top
1869.21 0.9 0.09 151.4
2 Green area
1966.82 0.1 0.09 17.70
3 Paved Area
2482.69 0.7 0.09 156.41
Total Run-off 325.51
Taking Retention of 15 min, run-off load is 81.37
De-silting Chamber (2 X 1 X 2 m) 4.0
Size of RWH Pit (radius- 1.5m , depth 5 m) 35.325
Total Storage volume 39.325
No. of Pits Required 2.06

Total 2 Nos. of Rain Water Harvesting pits are being proposed for artificial rain water
recharge within the project premises. RCC pipes are also provided to carry storm water
run-off from RWH pits to municipal drain, if any.

Directorate of Health Services 8


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi CONCEPTUAL PLAN

Figure 3: Schematic Diagram of Rain Water Harvesting Pit


1.8 VEHICLE PARKING FACILITIES
Adequate parking is provided to accommodate the expected vehicles during operation phase of
the project. Parking is provided in accordance to Delhi Development Authority norms.
Parking Required:
As per building development bye-laws of Delhi Development Authority (DDA),
parking requirement for hospitals is 2 ECS/100 sq. m. of floor area. FAR proposed for
project is 12578.89 sq m. thus parking required is 252 ECS. Parking provided is given below in
Table 6.
S. No. Parking Total 6:
Table Area Parking
Parking Area
Provided Area per No. of ECS
(sq. m.) for four ECS (sq. m.)
wheelers (sq.
m.)
1. Basement 1 3963.03 2848.0 32 89
2. Basement 2(stack) 3963.03 2528.0 32 149
(2240+288)
3. Stilt 247.09 112.0 28 4
4. Open Parking 253.00 253.0 23 11
Total parking provided 253 ECS

Directorate of Health Services 9


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi CONCEPTUAL PLAN

Car parking of 253 ECS will be provided. Addition to this parking space of 135 sq. m. will
be provided in stilt for two wheelers parking. Car Parking & Traffic circulation Plan is
attached as Annexure VII a, b & c.

1.9 POWER REQUIREMENT


Maximum power demand for the project is calculated to be 1845 KW (2306.3 kVA).
2 transformers of capacity 1500 kVA are proposed to be provided. Power supply will be
taken from BSES. Electrical system is designed as per following standards:
National Building Code of India – 2005
National fire Codes 2000
Relevant Bureau of Indian Standard
Indian Electricity Supply Rules & Act
Details of D.G Sets
DG sets of total capacity 3030 kVA (3 X 1010 kVA) will be provided to provide
uninterrupted power supply during power failure. DG sets are open to air & will be provided
with acoustic enclosure. Power Load & DG set requirement calculation sheet is attached as
Annexure VIII. Site layout showing electrical substations & DG set location is attached as
Annexure IX.

1.10 SOLID WASTE GENERATION AND MANAGEMENT


Solid waste would be generated both during construction as well as during operation phase.
Solid waste expected to be generated during construction phase will comprise of excavated
materials, used bags, bricks, concrete, MS rods, tiles, wood etc. Table 7 details the
solid waste management plan during construction phase

S. No. Solid
Tablewaste
7: Solid Waste Management Solid waste
during Management
Construction Phase
1. Waste materials like MS Material would be segregated. Recyclable material
Rods, bricks, concrete, will be sold to authorize dealers. Rest will be used
broken tiles, wood pieces, within project site for filling & leveling purpose.
cement bags etc. Remaining will be sent for disposal through
government authorized vendors. Cement bags will be
used for road making.
2. Excavated Soil Top soil will be stored in covered areas and will be

Directorate of Health Services 10


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi CONCEPTUAL PLAN
later used for landscaping purpose. Remaining soil
will be used for back filling & leveling of site. Un-
used soil will be disposed off to designated side
through authorized vendors on payment basis.

During operation phase, waste will comprise of both municipal & bio-medical waste as it is a
hospital project. Municipal waste will comprises of domestic & landscape waste Municipal
waste expected to generate from the project is estimated to be approx. 519 kg per day (@1.5
kg for patients, 0.5 kg per capita per day for the guests, 0.15 kg per capita per day for the
visitor, 0.25 kg per capita per day for the students & staff members, whereas 1
kg/acres/day is considered for landscape wastes). Approx. 130 kg/day of bio-medical
waste generation is expected. Estimations for solid waste generation during operation phase
are given in Table 8. Approx 130 kg of Bio-medical waste is also expected to be generated as it
is a hospital project.
S. Category Capacity
Table (Nos.)/Area
8: Calculation WasteGeneration Waste generated
of Solid Waste
No. Generation (kg/day)
(Kg/day/capita)
1. Inpatients 110 1.5 kg/person 165.0
2. Outpatients/visitors 2000 0.15 kg/person 300.0
3. Staff 135 0.25 kg/person 33.75
4. Guests 40 0.5 kg/acre 20.0
5. Landscape Waste 0.486 acres 1 kg/acres 0.49
Total Municipal waste generation 519.24
Say 519 kg/day
Bio-Medical Waste (@255 of hospital waste) 129.8
Say 130.0 kg/day

(Source: For Waste Collection, Chapter 3, Table 3.6, Page no. 49, & Bio-Medical waste Chapter 7, page 148
of Central Public Health & Environment Engineering Organization, Ministry of Urban Development,
(Government of India, May 2000))
 Waste Segregation, Collection & Disposal
1. Different color bins will be provided in each section & floor for collection of different
type of waste. Three color bins will be provided in wards (green, red & blue) for
collection of food waste, medical waste like bandages, medicine covers, soiled waste
etc and sharps separately. Visual message for usage of different bins for different
purpose indicating its significance will be placed for awareness in all the sections. In

Directorate of Health Services 11


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi CONCEPTUAL PLAN

pathology lab, Operation Theater, mortuary, pathology lab, medicine room,


plaster room different color bins will be provided for collection of different waste
as given below in Table 9.
Table 9: Bio-medical Waste Collection System
Color Code Waste Category Treatment
Yellow Human anatomical waste, animal waste, Incineration
Micro biology waste & bio-technology Deep Burial
waste, soiled waste
Red Microbiology & Biotechnology waste, Autoclave
soiled waste, solid waste (other than Microwaving
sharp) Chemical treatment
Blue/White Waste Sharp Autoclave
Microwaving
Chemical treatment
Black Discarded medicines & Cytotoxic waste, Chemically treated
Chemical waste Disposal in secured landfill
Returning back to vendors

2. Waste will be collected at common place regularly from the localized collection
points. Food waste, landscape waste & other municipal waste will be handed over to
Municipal Corporation, Delhi. STP sludge will be used as manure for landscape area.
3. Recyclable waste like plastics, paper, thermocol, glass etc will be collected & sold to
authorized vendors.
4. Bio-Medical waste along with ETP sludge will be collected in Bio-medical
waste storage room & will be handed over to authorized vendors for treatment
& safe disposal.
5. Trolleys with bins will be provided for transportation of bio-medical waste from
generation points to storage points to protect waste handler from direct exposure.
6. E-waste generated will be stored separately & will be sold to authorized vendors
periodically
1.11 GREEN AREA
Total area measuring 1966.82 m2 i.e. 31.13 % of the plot area is proposed to be put under green
cover. Evergreen trees, ornamental trees & shrubs have been proposed to be planted inside the
premises. Proper aftercare and monitoring of developed green belt will be done. Trees to be

Directorate of Health Services 12


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi CONCEPTUAL PLAN

planted are given in Table 10. Green belt development plan is attached as Annexure X. Total 88
Nos. of trees are proposed to be planted along with grass, creepers & planters.
Table 10: Trees to be planted
S. No. Species Common Name Type
1. Azadirachta indica Neem Tree
2. Jacranda Mimosifooolia Neeli gulmohar Tree
3. Thevetia peruviana Yellow oleander Tree
4. Plumeria alba Whitefirangipani Tree
5. Plumeria rubra Firangipani Tree
6. Cassia fistula Amaltas Tree
7. ` Alstonia scholaris Saptaparni Tree
8. Delonix regia Gulmohar Tree
9. Erythrina variegate Indian Coral Tree Tree
10. Lagerstroemia Thorellii Pride of India Tree
11. Terminalia arjuna Arjun Tree Tree
12. Polyalthiya longifolia Ashoka tree Tree
13. Bougainvillea glabra Bougainvillea Shrub
14. Ficus religiosa Peepal Tree
15. Combretum indicum Rangoon Creeper Creeper
16. Vernonia elaeagnifolia Curtain creeper Creeper
17. Clerodendrum inereme Shrub Bleeding heart

1.12 MATERIALS USED FOR CONSTRUCTION


Table 11 below lists the construction material
Table 11: List of Construction Materials
S. No. Type of Construction
1. Walls:
a Brick: (Fly-ash bricks-Fal G)
b Plastered both side - 114 mm
c Plastrered both sides -228 mm
d Autoclaved Aerated Concrete blocks-230 mm (AAC blocks)
e Autoclaved Aerated Concrete blocks-150 mm (AAC blocks)

Directorate of Health Services 13


100 Bedded Hospital
At KL-Block, Sarita Vihar, Delhi CONCEPTUAL PLAN

f Tiles or slates on Boarding and felt with plaster ceiling


2. Roofs Flat:
a Reinforced Concrete slab, 120 mm, secreed 120 mm= brick coba and thermal
insulation layer underneath roof slab
3. Floors:
a Concrete on stilt floor hardcore fill
b Vitrified /Ceramic tile finish
c Kota stone /Granite
4. Windows: Aluminum
5. Exposure all sides
6. Single glazing using e-glass

LIST OF MACHINERY USED DURING CONSTRUCTION


Dumper
Concrete mixer with hopper
Excavator
Concrete Batching Plant
Cranes
Road roller
Bulldozer
Tower Cranes
Hoist
Labor Lifts
Concrete pressure pumps
Mobile transit mixer

Directorate of Health Services 14


LIST OF ANNEXURE
ANNEXURE NO. ANNEXURE
ANNEXURE I Land documents
ANNEXURE II a Google map showing location of project site & surroundings
within 500 m
ANNEXURE II b Google map showing location of project site & surroundings
within 2 km
ANNEXURE II c Google map showing location of project site & surroundings
within 10 km
ANNEXURE III Site Plan
ANNEXURE IV Dual plumbing layout
ANNEXURE V Detailed report on sewage & lab effluent treatment
ANNEXURE VI a Storm water drainage plan and location of RWH Pits
ANNEXURE VI b Diagram of rain water harvesting pits
ANNEXURE VII a Surface parking & traffic circulation plan
ANNEXURE VII b Basement 1 parking & traffic circulation plan
ANNEXURE VII c Basement 2 parking & traffic circulation plan
ANNEXURE VIII Power load & DG set requirement calculation
ANNEXURE IX Site layout showing electrical substation & DG set location
ANNEXURE X Green Belt Development Plan
ANNEXURE XI a Elevation Plan
ANNEXURE XI b Section
ANNEXURE XII a Fire fighting plan-site layout
ANNEXURE XII b Fire fighting plan-basement 1
ANNEXURE XII c Fire fighting plan-basement 2
ANNEXURE XII d Fire evacuation plan
ANNEXURE XIII a-h Floor & terrace plan
ANNEXURE XIV Soil quality report
ANNEXURE XV Ambient air quality report
ANNEXURE XVI NOC from Fire Department
ANNEXURE XVII DUAC Approval
ANNEXURE XVIII Approval from Airport Authority of India
ANNEXURE XIX Approval from MCD
ANNEXURE XX Correspondence with DPCC
ANNEXURE XXI Shortcoming reply submitted to DPCC
ANNEXURE I- LAND DOCUMENTS
ANNEXURE II A- GOOGLE MAP SHOWING PROJECT SITE AND SURROUNDINGS WITHIN 500 M
ANNEXURE II B- GOOGLE MAP SHOWING PROJECT SITE AND SURROUNDINGS WITHIN 2 KM
ANNEXURE II C- GOOGLE MAP SHOWING PROJECT SITE AND SURROUNDINGS WITHIN 10 KM
ANNEXURE III- SITE PLAN
ANNEXURE IV- DUAL PLUMBING PLAN
ANNEXURE V- SEWAGE & EFFLUENT
TREATMENT SCHEME
ANNEXURE IV- STORM WATER PLAN
ANNEXURE VII A-SURFACE PARKING & TRAFFIC CIRCULATION PLAN
ANNEXURE VII B- BASEMENT 1 PARKING & TRAFFIC CIRCULATION PLAN
ANNEXURE VII B- BASEMENT 2 PARKING & TRAFFIC CIRCULATION PLAN
ANNEXURE VIII- LOAD CALCULATIONS
Power Load & D.G. Sets Requirement Calculations

LOAD ON TRANSFORMER LOAD ON DG SETS


Total
Total Total Nos. Total
S. Load Total
Description Area in of Maximum Load Maximum
No. in Load in D.F. D.F.
Sq. Feet Equipment Demand in Demand
KW KW
KW

I. PART-A (HOSPITAL BLOCK-1)

1.0 SECOND BASEMENT:- 41619.68

i) Lighting Load 41619.68 0.002 83.24 0.7 58.3 83.24 0.7 58.3
ii) Power Load 41619.68 0.002 83.24 0.2 16.6
Total Load of Second Basement 74.9 58.3

2.0 FIRST BASEMENT:- 41210.8

i) Lighting Load 41210.8 0.002 82.42 0.9 74.2 82.42 0.9 74.2
ii) Power Load 41210.8 0.002 82.42 0.2 16.5
Total Load of First Basement 90.7 74.2

3.0 GROUND FLOOR:- 16430.52

i) Lighting Load 16430.52 0.002 32.86 0.9 29.6 32.86 0.9 29.6
ii) Power Load 16430.52 0.002 32.86 0.3 9.9
iii) Computer Load 47 0.15 7.05 0.9 6.3 7.05 0.9 6.3
iv) 1 No Minor O.T. Room 4.00 1.0 4.0 4.00 1.0 4.0
v) Autoclave 12.00 1.0 12.0 12.00 1.0 12.0
vi) Laundary 40.00 0.9 36.0 40.00 0.9 36.0
Total Load of Ground Floor 97.8 87.9

4.0 FIRST FLOOR:- 14858.484

i) Lighting Load 14858.484 0.002 29.72 0.9 26.7 29.72 0.9 26.7
ii) Power Load 14858.484 0.002 29.72 0.3 8.9
iii) Computer Load 32 0.15 4.80 0.9 4.3 4.80 0.9 4.3
iv) 2 Nos. Minor O.T. Room 8.00 1.0 8.0 8.00 1.0 8.0
v) Audiometry 4.00 1.0 4.0 4.00 1.0 4.0
Total Load of First Floor 52.0 43.1

5.0 SECOND FLOOR:- 14858.484

i) Lighting Load 14858.484 0.002 29.72 0.9 26.7 29.72 0.9 26.7
ii) Power Load 14858.484 0.002 29.72 0.3 8.9
iii) Computer Load 22 0.15 3.30 0.9 3.0 3.30 0.9 3.0
iv) 1 No. Maternity OT 6.00 1.0 6.0 6.00 1.0 6.0
v) Autoclave 12.00 1.0 12.0 12.00 1.0 12.0
vi) Immunization 3.00 1.0 3.0 3.00 1.0 3.0
vii) Ultrasound 2.00 1.0 2.0 2.00 1.0 2.0
Total Load Of Second Floor 61.6 52.7

6.0 THIRD FLOOR:- 14858.484

i) Lighting Load 14858.484 0.002 29.72 0.9 26.7 29.72 0.9 26.7
ii) Power Load 14858.484 0.002 29.72 0.3 8.9
iii) Computer Load 43 0.15 6.45 0.9 5.8 6.45 0.9 5.8
iv) Pathology & Pathologist 12.00 1.0 12.0 12.00 1.0 12.0
v) Hematology (2 Nos.) 12.00 1.0 12.0 12.00 1.0 12.0
vi) Biochemistry (2 Nos.) 12.00 1.0 12.0 12.00 1.0 12.0
vii) Wax Therapy 5.00 1.0 5.0 5.00 1.0 5.0
viii) Tread Mill / Gym 2.00 1.0 2.0 2.00 1.0 2.0
ix) Electro Therapy 40.00 1.0 40.0 40.00 1.0 40.0
x) Histopath (2 Nos.) 8.00 1.0 8.0 8.00 1.0 8.0
xi) Microbiology (2 Nos.) 8.00 1.0 8.0 8.00 1.0 8.0
xii) X-Ray Room (2 Nos.) 30.00 0.9 27.0 30.00 0.9 27.0
xiii) Server Load 5.00 1.0 5.0 5.00 1.0 5.0
Total Load of Third Floor 172.5 163.6

7.0 FOURTH FLOOR:- 14481.884

i) Lighting Load 14481.884 0.002 28.96 0.9 26.1 28.96 0.9 26.1
ii) Power Load 14481.884 0.002 28.96 0.3 8.7
iii) Computer Load 53 0.15 7.95 0.9 7.2 7.95 0.9 7.2
Total Load of Fourth Floor 41.9 33.2

8.0 FIFTH FLOOR:- 14389.348

i) Lighting Load 14389.348 0.002 28.78 0.9 25.9 28.78 0.9 25.9
ii) Power Load 14389.348 0.002 28.78 0.3 8.6
iii) Computer Load 10 0.15 1.50 0.9 1.4 1.50 0.9 1.4
Total Load of Fifth Floor 35.9 27.3

9.0 SIXTH FLOOR:- 14389.348


i) Lighting Load 14389.348 0.002 28.78 0.9 25.9 28.78 0.9 25.9
ii) Power Load 14389.348 0.002 28.78 0.3 8.6
iii) Computer Load 24 0.15 3.60 0.9 3.2 3.60 0.9 3.2
iv) 2 Nos. ICUs 12.00 1.0 12.0 12.00 1.0 12.0
v) Gynecology 6.00 1.0 6.0 6.00 1.0 6.0
Total Load of Sixth Floor 55.8 47.1

10.0 SEVENTH FLOOR:- 14389.348

i) Lighting Load 14389.348 0.002 28.78 0.9 25.9 28.78 0.9 25.9
ii) Power Load 14389.348 0.002 28.78 0.3 8.6
iii) Computer Load 9 0.15 1.35 0.9 1.2 1.35 0.9 1.2
iv) 4 Nos. OTs 24.00 1.0 24.0 24.00 1.0 24.0
v) Post Oprative Ward 6.00 1.0 6.0 6.00 1.0 6.0
Total Load of Seventh Floor 65.7 57.1

11.0 Terrace 5.00 1.0 5.0 5.00 1.0 5.0

12.0 Common Area Load for Hospital

i) AC Load (Chiller Load) (2 Nos. @


200 KW each) 2 200.0 400.00 1.0 400.0 200.00 1.0 200.0
ii) AC Pump Load 156.00 1.0 156.0 46.80 1.0 46.8
ii) AHU's and FCU Load 175.00 0.9 157.5 52.50 0.9 47.3
iii) Ventilation Load 150.00 0.9 135.0 45.00 0.9 40.5
iv) Lift Load 5 10.0 50.00 0.9 45.0 50.00 0.9 45.0
v) Plumbing Pump Load 124.00 0.6 74.4 124.00 0.6 74.4
vi) ETP Load 40.00 0.7 28.0 40.00 0.7 28.0
vii) Fire Fighting Load 146.00 10.0 146.00 10.0
viii) External Lighting Load 15.00 1.0 15.0 15.00 1.0 15.0
Total Load of Common Area for 1020.9 507.0
Hospital

Total Load of Part A (Hospital


Block)
1774.7 1156.4

II. PART-B (HOSPITAL BLOCK-2)

13.0 FIRST FLOOR:- 2431.76

i) Lighting Load 2431.76 0.001 2.43 0.9 2.2 2.43 0.9 2.2
ii) Power Load 2431.76 0.001 2.43 0.2 0.5
iii) Computer Load 2 0.15 0.30 0.9 0.3 0.30 0.9 0.3
iv) Kitchen Load 5.00 1.0 5.0
v) Pantry Load 3.00 1.0 3.0
Total Load of First Floor 10.9 2.5

14.0 SECOND FLOOR:- 2431.76

i) Lighting Load 2431.76 0.001 2.43 0.9 2.2 2.43 0.9 2.2
ii) Power Load 2431.76 0.001 2.43 0.2 0.5
iii) Computer Load 5 0.15 0.75 0.9 0.7 0.75 0.9 0.7
iv) Pantry Load 3.00 1.0 3.0
Total Load of Second Floor 6.3 2.9

15.0 THIRD FLOOR:- 2431.76


i) Lighting Load 2431.76 0.001 2.43 0.9 2.2 2.43 0.9 2.2
ii) Power Load 2431.76 0.001 2.43 0.2 0.5
iii) Pantry Load 3.00 1.0 3.0
Total Load of Third Floor 5.7 2.2

16.0 FOURTH FLOOR:- 2431.76

i) Lighting Load 2431.76 0.001 2.43 0.9 2.2 2.43 0.9 2.2
ii) Power Load 2431.76 0.001 2.43 0.2 0.5
iii) Pantry Load 3.00 1.0 3.0
Total Load of Fourth Floor 5.7 2.2

17.0 FIFTH FLOOR:- 2431.76

i) Lighting Load 2431.76 0.001 2.43 0.9 2.2 2.43 0.9 2.2
ii) Power Load 2431.76 0.001 2.43 0.2 0.5
Total Load of Fifth Floor 2.7 2.2

18.0 SIXTH FLOOR:- 2431.76

i) Lighting Load 2431.76 0.001 2.43 0.9 2.2 2.43 0.9 2.2
ii) Power Load 2431.76 0.001 2.43 0.2 0.5
iii) Computer Load 3 0.15 0.45 1.0 0.5 0.45 1.0 0.5
iv) Autoclave (2 Nos.) 24.00 1.0 24.0 24.00 1.0 24.0
Total Load of Sixth Floor 27.1 26.6

19.0 SEVENTH FLOOR:- 2431.76

i) Lighting Load 2431.76 0.001 2.43 0.9 2.2 2.43 0.9 2.2
ii) Power Load 2431.76 0.001 2.43 0.2 0.5
Total Load of Sixth Floor 2.7 2.2

19.0 Terrace 2.00 1.0 2.0 2.00 1.0 2.0

20.0 COMMON AREA LOAD

i) Lift Load 1 7500.0 7.50 1.0 7.5 7.50 1.0 7.5


Total Load of Common Area for
Residential Block
7.5 7.5

Total Load of Part B (Residential


Block) 70.6 50.2

Total Maximum Demand 1845.27 1206.59

Say 1845.0 1207.0

Selection of Transformer: Selection of D.G. Set:

Maximum Demand Load in KW 1845.0 Maximum Demand Load in KW 1207.0


Power Factor 0.9 Power Factor 0.8
Maximum Demand load in KVA 2050.0 Maximum Demand Load in KVA 1508.8
Overall Diversity @ 80% 1207.0

Transformer Loading @ 90% in KVA 2277.8 D.G. Set Loading @ 80% in KVA 1508.8
Say 2278.0 Say 1509.0
The required Transformer Capacity 2 x 1500 KVA The required D.G. Set Capacity 2 x 750 KVA
ANNEXURE IX-ELECTRICAL LAYOUT
ANNEXURE X- LANDSCAPE PLAN
ANNEXURE XI A- ELEVATION PLAN
ANNEXURE XI B-SECTION PLAN
ANNEXURE XII A- FIRE FIGHTING PLAN-SITE LAYOUT
ANNEXURE XII B- FIRE FIGHTING PLAN- BASEMENT-I
ANNEXURE XII C- FIRE-FIGHTING PLAN-BASEMENT-II
ANNEXURE XII D- FIRE EVACUATION PLAN
ANNEXURE XIII A- GROUND FLOOR PLAN
ANNEXURE XIII B- FIRST FLOOR PLAN
ANNEXURE XIII C- SECOND FLOOR PLAN
ANNEXURE XIII D- THIRD FLOOR PLAN
ANNEXURE XIII E- FOURTH FLOOR PLAN
ANNEXURE XIII F- FIFTH FLOOR PLAN
ANNEXURE XIII G- SIXTH FLOOR PLAN
ANNEXURE XIII H- SEVENTH FLOOR PLAN
ANNEXURE XIII I- TERRACE FLOOR PLAN
ANNEXURE XIV- SOIL QUALITY REPORT
ANNEXURE XIV- AMBIENT AIR REPORT
ANNEXURE XVI- FIRE NOC
ANNEXURE XVII-DUAC APPROVAL
ANNEXURE XVIII-NOC FROM AAI
ANNEXURE XIX-APPROVAL FROM MCD
ANNEXURE XX

PROPOSAL SUBMISSION RECEIVING FROM SEIAA, DELHI (DPCC)


SEAC (DPCC) MEETING NOTICE
MINUTES OF MEETING OF 67TH SEAC MEETING (DPCC)
ANNEXURE XXI- SHORTCOMING REPLY SUBMITTED TO SEAC, DELHI (DPCC)
ANNEXURE I- LANDSCAPE PLAN
ANNEXURE II- GREEN BELT DEVELOPMENT
III FLOOR PLAN
ANNEXURE III- LAB REPORTS (REVISED MONITORING)
SITE VISIT

Front Side Back Side

Left Side Right Side


REVISED ENVIRONMENTAL BUDGET DURING CONSTRUCTION &
OPERATION PHASE

Environmental Budget During Construction Phase

S. No. Activity Capital Cost Annual Recurring Cost


(Lacs) (Lacs)
1. Health & safety of Workers 1.5 3.6
(PPE, safety officers etc)
2. Environmental Monitoring 1.04 2.08

3. Septic Tank & Soak Pit 2.5 0.5


Total 5.04 6.18

Environmental Budget During Operation Phase

S. No. Activity Capacity/ Capital Annual


Area/Nos./parameters Cost Recurring Cost
(Lacs) (Lacs)
1. STP & ETP 110 KLD & 15 KLD 50.00 10.0
2. Landscaping & 1966.82 sq m & 88 Nos. of 20.00 2.5
planting trees Trees to be planted along with
grass & planters
3. Solid waste 519+130 Kg/day 5.5 5.0
Management (Municipal & Bio-medical
waste )
4. RWH Pit 2 Nos. 8.0 0.8
Installation
5. Energy Saving 2.1% using efficient lightning 4.0 0.6

6. Environmental Air, Water, Soil & Noise 1.6 3.2


Monitoring*

Total 89.1 22.1


Power Load & D.G. Sets Requirement Calculations

LOAD ON TRANSFORMER LOAD ON DG SETS


Total
Total Total Nos. Total
S. Load Total
Description Area in of Maximum Load Maximum
No. in Load in D.F. D.F.
Sq. Feet Equipment Demand in Demand
KW KW
KW

I. PART-A (HOSPITAL BLOCK-1)

1.0 SECOND BASEMENT:- 41619.68

i) Lighting Load 41619.68 0.002 83.24 0.7 58.3 83.24 0.7 58.3
ii) Power Load 41619.68 0.002 83.24 0.2 16.6
Total Load of Second Basement 74.9 58.3

2.0 FIRST BASEMENT:- 41210.8

i) Lighting Load 41210.8 0.002 82.42 0.9 74.2 82.42 0.9 74.2
ii) Power Load 41210.8 0.002 82.42 0.2 16.5
Total Load of First Basement 90.7 74.2

3.0 GROUND FLOOR:- 16430.52

i) Lighting Load 16430.52 0.002 32.86 0.9 29.6 32.86 0.9 29.6
ii) Power Load 16430.52 0.002 32.86 0.3 9.9
iii) Computer Load 47 0.15 7.05 0.9 6.3 7.05 0.9 6.3
iv) 1 No Minor O.T. Room 4.00 1.0 4.0 4.00 1.0 4.0
v) Autoclave 12.00 1.0 12.0 12.00 1.0 12.0
vi) Laundary 40.00 0.9 36.0 40.00 0.9 36.0
Total Load of Ground Floor 97.8 87.9

4.0 FIRST FLOOR:- 14858.484

i) Lighting Load 14858.484 0.002 29.72 0.9 26.7 29.72 0.9 26.7
ii) Power Load 14858.484 0.002 29.72 0.3 8.9
iii) Computer Load 32 0.15 4.80 0.9 4.3 4.80 0.9 4.3
iv) 2 Nos. Minor O.T. Room 8.00 1.0 8.0 8.00 1.0 8.0
v) Audiometry 4.00 1.0 4.0 4.00 1.0 4.0
Total Load of First Floor 52.0 43.1

5.0 SECOND FLOOR:- 14858.484

i) Lighting Load 14858.484 0.002 29.72 0.9 26.7 29.72 0.9 26.7
ii) Power Load 14858.484 0.002 29.72 0.3 8.9
iii) Computer Load 22 0.15 3.30 0.9 3.0 3.30 0.9 3.0
iv) 1 No. Maternity OT 6.00 1.0 6.0 6.00 1.0 6.0
v) Autoclave 12.00 1.0 12.0 12.00 1.0 12.0
vi) Immunization 3.00 1.0 3.0 3.00 1.0 3.0
vii) Ultrasound 2.00 1.0 2.0 2.00 1.0 2.0
Total Load Of Second Floor 61.6 52.7

6.0 THIRD FLOOR:- 14858.484

i) Lighting Load 14858.484 0.002 29.72 0.9 26.7 29.72 0.9 26.7
ii) Power Load 14858.484 0.002 29.72 0.3 8.9
iii) Computer Load 43 0.15 6.45 0.9 5.8 6.45 0.9 5.8
iv) Pathology & Pathologist 12.00 1.0 12.0 12.00 1.0 12.0
v) Hematology (2 Nos.) 12.00 1.0 12.0 12.00 1.0 12.0
vi) Biochemistry (2 Nos.) 12.00 1.0 12.0 12.00 1.0 12.0
vii) Wax Therapy 5.00 1.0 5.0 5.00 1.0 5.0
viii) Tread Mill / Gym 2.00 1.0 2.0 2.00 1.0 2.0
ix) Electro Therapy 40.00 1.0 40.0 40.00 1.0 40.0
x) Histopath (2 Nos.) 8.00 1.0 8.0 8.00 1.0 8.0
xi) Microbiology (2 Nos.) 8.00 1.0 8.0 8.00 1.0 8.0
xii) X-Ray Room (2 Nos.) 30.00 0.9 27.0 30.00 0.9 27.0
xiii) Server Load 5.00 1.0 5.0 5.00 1.0 5.0
Total Load of Third Floor 172.5 163.6

7.0 FOURTH FLOOR:- 14481.884

i) Lighting Load 14481.884 0.002 28.96 0.9 26.1 28.96 0.9 26.1
ii) Power Load 14481.884 0.002 28.96 0.3 8.7
iii) Computer Load 53 0.15 7.95 0.9 7.2 7.95 0.9 7.2
Total Load of Fourth Floor 41.9 33.2

8.0 FIFTH FLOOR:- 14389.348

i) Lighting Load 14389.348 0.002 28.78 0.9 25.9 28.78 0.9 25.9
ii) Power Load 14389.348 0.002 28.78 0.3 8.6
iii) Computer Load 10 0.15 1.50 0.9 1.4 1.50 0.9 1.4
Total Load of Fifth Floor 35.9 27.3

9.0 SIXTH FLOOR:- 14389.348


i) Lighting Load 14389.348 0.002 28.78 0.9 25.9 28.78 0.9 25.9
ii) Power Load 14389.348 0.002 28.78 0.3 8.6
iii) Computer Load 24 0.15 3.60 0.9 3.2 3.60 0.9 3.2
iv) 2 Nos. ICUs 12.00 1.0 12.0 12.00 1.0 12.0
v) Gynecology 6.00 1.0 6.0 6.00 1.0 6.0
Total Load of Sixth Floor 55.8 47.1

10.0 SEVENTH FLOOR:- 14389.348

i) Lighting Load 14389.348 0.002 28.78 0.9 25.9 28.78 0.9 25.9
ii) Power Load 14389.348 0.002 28.78 0.3 8.6
iii) Computer Load 9 0.15 1.35 0.9 1.2 1.35 0.9 1.2
iv) 4 Nos. OTs 24.00 1.0 24.0 24.00 1.0 24.0
v) Post Oprative Ward 6.00 1.0 6.0 6.00 1.0 6.0
Total Load of Seventh Floor 65.7 57.1

11.0 Terrace 5.00 1.0 5.0 5.00 1.0 5.0

12.0 Common Area Load for Hospital

i) AC Load (Chiller Load) (2 Nos. @


200 KW each) 2 200.0 400.00 1.0 400.0 200.00 1.0 200.0
ii) AC Pump Load 156.00 1.0 156.0 46.80 1.0 46.8
ii) AHU's and FCU Load 175.00 0.9 157.5 52.50 0.9 47.3
iii) Ventilation Load 150.00 0.9 135.0 45.00 0.9 40.5
iv) Lift Load 5 10.0 50.00 0.9 45.0 50.00 0.9 45.0
v) Plumbing Pump Load 124.00 0.6 74.4 124.00 0.6 74.4
vi) ETP Load 40.00 0.7 28.0 40.00 0.7 28.0
vii) Fire Fighting Load 146.00 10.0 146.00 10.0
viii) External Lighting Load 15.00 1.0 15.0 15.00 1.0 15.0
Total Load of Common Area for 1020.9 507.0
Hospital

Total Load of Part A (Hospital


Block)
1774.7 1156.4

II. PART-B (HOSPITAL BLOCK-2)

13.0 FIRST FLOOR:- 2431.76

i) Lighting Load 2431.76 0.001 2.43 0.9 2.2 2.43 0.9 2.2
ii) Power Load 2431.76 0.001 2.43 0.2 0.5
iii) Computer Load 2 0.15 0.30 0.9 0.3 0.30 0.9 0.3
iv) Kitchen Load 5.00 1.0 5.0
v) Pantry Load 3.00 1.0 3.0
Total Load of First Floor 10.9 2.5

14.0 SECOND FLOOR:- 2431.76

i) Lighting Load 2431.76 0.001 2.43 0.9 2.2 2.43 0.9 2.2
ii) Power Load 2431.76 0.001 2.43 0.2 0.5
iii) Computer Load 5 0.15 0.75 0.9 0.7 0.75 0.9 0.7
iv) Pantry Load 3.00 1.0 3.0
Total Load of Second Floor 6.3 2.9

15.0 THIRD FLOOR:- 2431.76


i) Lighting Load 2431.76 0.001 2.43 0.9 2.2 2.43 0.9 2.2
ii) Power Load 2431.76 0.001 2.43 0.2 0.5
iii) Pantry Load 3.00 1.0 3.0
Total Load of Third Floor 5.7 2.2

16.0 FOURTH FLOOR:- 2431.76

i) Lighting Load 2431.76 0.001 2.43 0.9 2.2 2.43 0.9 2.2
ii) Power Load 2431.76 0.001 2.43 0.2 0.5
iii) Pantry Load 3.00 1.0 3.0
Total Load of Fourth Floor 5.7 2.2

17.0 FIFTH FLOOR:- 2431.76

i) Lighting Load 2431.76 0.001 2.43 0.9 2.2 2.43 0.9 2.2
ii) Power Load 2431.76 0.001 2.43 0.2 0.5
Total Load of Fifth Floor 2.7 2.2

18.0 SIXTH FLOOR:- 2431.76

i) Lighting Load 2431.76 0.001 2.43 0.9 2.2 2.43 0.9 2.2
ii) Power Load 2431.76 0.001 2.43 0.2 0.5
iii) Computer Load 3 0.15 0.45 1.0 0.5 0.45 1.0 0.5
iv) Autoclave (2 Nos.) 24.00 1.0 24.0 24.00 1.0 24.0
Total Load of Sixth Floor 27.1 26.6

19.0 SEVENTH FLOOR:- 2431.76

i) Lighting Load 2431.76 0.001 2.43 0.9 2.2 2.43 0.9 2.2
ii) Power Load 2431.76 0.001 2.43 0.2 0.5
Total Load of Sixth Floor 2.7 2.2

19.0 Terrace 2.00 1.0 2.0 2.00 1.0 2.0

20.0 COMMON AREA LOAD

i) Lift Load 1 7500.0 7.50 1.0 7.5 7.50 1.0 7.5


Total Load of Common Area for
Residential Block
7.5 7.5

Total Load of Part B (Residential


Block) 70.6 50.2

Total Maximum Demand 1845.27 1206.59

Say 1845.0 1207.0

Selection of Transformer: Selection of D.G. Set:

Maximum Demand Load in KW 1845.0 Maximum Demand Load in KW 1207.0


Power Factor 0.9 Power Factor 0.8
Maximum Demand load in KVA 2050.0 Maximum Demand Load in KVA 1508.8
Overall Diversity @ 80% 1207.0

Transformer Loading @ 90% in KVA 2277.8 D.G. Set Loading @ 80% in KVA 1508.8
Say 2278.0 Say 1509.0
The required Transformer Capacity 2 x 1500 KVA The required D.G. Set Capacity 2 x 750 KVA