MANAGEMENT OF CHANGE
Page: 1 of 5
DOCUMENT
Date effective: 25-01-2019
MOC# _________________________________
GM Central Engineering
GM Plant
SOC Chairman
Required:
PSSR PLCC Both
Engro Foods Limited Document code: FT/HSE/012
Revision: 3.0
MANAGEMENT OF CHANGE
Page: 2 of 5
DOCUMENT
Date effective: 25-01-2019
Process Engineering
Manager
Production Manager
Admin Manager
Engineering Manager
Utility Manager
Manager FGWH
HSE Manager
SOC Chairman
Engro Foods Limited Document code: FT/HSE/012
Revision: 3.0
MANAGEMENT OF CHANGE
Page: 3 of 5
DOCUMENT
Date effective: 25-01-2019
SUBJECT:
To provide the Off-loading Facility for 25kg bags for consumer filling at powder plant Commented [SM1]:
PROPOSAL:
Existing loading dock of powder is not sufficient for incoming and outgoing materials of powder plant,
because of loading of finish product and offloading of raw material handling is not possible when both
powder plant and consumer filling on production.
Offloading facility to be provided for Incoming material for consumer filling and powder plant as per
attached layout.
Relocation of auto door.
Shed to be provided as per layout with good ventilation, bird and rain protection.
Fans and lights to be provided as per area.
Rain/drain water removal arrangements.
SAFETY CONSIDERATIONS:
1- During the modification all safety measures will be followed.
2- Use of PPE’s (Face mask, chemical gloves, goggles while performing the test
3- Test will be carries out as per standard operating procedure.
4- MSDS available of site during flooring and paint job.
3 Job evaluation sheet (Base Risk) for any job / activity that will be
carried out during execution.
4 Job evaluation sheet (Base Risk) for any job / activity that is being
introduced permanently after this modification.