Sei sulla pagina 1di 11

Gas & Steam Turbine Directory

Turbine Directory Contents


Gas Turbine Technical flow 32 rebuilding 34
level 32 repair 34
Specifications 20 pressure 32 Filter services and maintenance 34
temperature 32
Gas turbine inlet cooling 34
Steam Turbine Technical Inspection equipment 32
design/engineering 34
Instruments, measuring 32
Specifications 28 Insulation 32 maintenance/repair 34
Leak detection 32 Gas turbines 34
Products 30 Lube-oil systems 32 blade repair 34
Actuators 30 Lubricants 32 installation 34
Air cleaners, dryers and filters 30 Microturbines 32 maintenance 34
Air conditioning and refrigeration 30 Monitoring equipment 32 overhauling 35
Air heaters and preheaters 30 combustion control 32
rebuilding 35
Air pollution monitors and CEMS 30 continuous emission monitoring equipment 32
Alignment and balancing equipment 30 emissions 32 servicing 35
Bearings 30 temperature 32 Gear repair 35
Borescopes, videoscopes, fiberscopes 30 general 32 Generators 35
Burners and ignition systems 30 Nitrogen oxide control systems 32 design 35
Castings 30 Noise measurement and control 33 maintenance 35
Coatings/lining materials 30 Oil 33
rebuilding 35
Cogeneration systems 30 cleaning systems 33
conditioning equipment 33 repair 35
Combined cycles 30
Combustion 30 oil/water separators 33 rewinding 35
air flow measurement 30 Piping 33 Heat exchangers 35
control and optimization systems 30 Pressure monitoring, measuring 33 coil upgrading 35
pressure monitoring 30 Pumps 33 retubing 35
systems and burners 30 Reheaters 33 tube cleaning 35
Compressors 30 Remote monitoring 33 tube plugging 35
air 30 Safety equipment 33
gas 30 Heat recovery/HRSGs 35
Seals 33
Computer-aided design and Sensors 33 Inspection services 35
engineering 30 Spray nozzles 33 Instrumentation and control systems 35
Condenser tubes 30 Steam generators 33 calibration 35
Condensers 30 Steam turbines 33 maintenance 35
Controllers 30 Steam turbine parts, components and Life extension services 35
airflow 30 accessories 34
energy management 30 Lube oil 35
Superheaters 34
meters and instruments 30 Maintenance services 35
Test equipment 34
temperature monitoring 30 Mechanical failure analysis 35
Torque conversion 34
Control panels and consoles 30 Metal fabricating and machining 35
Turbomachinery controls 34
Control systems 30
Valve actuators 34 Monitoring 35
Corrosion prevention products 31
Valves 34 Outage services 35
Couplings 31
Vibration 34 Pumps and compressors 35
Dampers 31
analysis 34 overhauling 35
Desuperheaters 31
control 34
Detection systems, flame 31 rebuilding 35
monitoring 34
Diagnostic systems 31 repair 35
Wear resistant coatings and parts 34
Drives 31 Repair services, general 35
dampers 31
electronic 31 Services 34 Steam generators, maintenance
fluid 31 Aftermarket parts and services 34 and repair 35
mechanical 31 Air compressors, overhaul Steam generators, nuclear 35
variable speed 31 and repair 34 Steam turbines 35
other 31 Air pollution control services 34 aligning 35
Ducts 31 Alignment/balancing 34
blade repair 35
Fans 31 Bearings 34
Calibration 34 installation 35
Filters and filtration systems 31
Gas turbine inlet cooling 31 Cogeneration 34 maintenance 35
Gas turbines 31 Combustion diagnostics and testing 34 overhauling 35
Gas turbine parts, components and Condensers 34 rebuilding 35
accessories 32 cleaning 34 Valves 35
Gasification systems 32 repair 34 reconditioning 35
Gears 32 retubing 34
repairing 35
Generators 32 Control system design and
testing 35
Heat exchangers 32 maintenance 34
Heat recovery systems/HRSGs 32 Corrosion control and monitoring 34 Vibration control 35
Heaters 32 Fans 34 balancing 35
Indicators 32 maintenance 34 monitoring 35

www.PowerEngineeringInt.com Power Engineering International April 2014 19

1404PEI_19 19 4/8/14 10:24 AM


Gas Turbine Technical Specifcations

Gross
Net output Net output Heat rate Gross Net effciency Frequency
Manufacturer Model output Shaft speed (rpm)
(CC) MW (SC) MW (kJ/kWh) effciency (%) (CC) (%) (Hz)
(MW)

GT24 230.7 664 9000 40.0 58.4 60 3600

GT26 326 467 8933 40.3 59.5 50 3000

Alstom

GT13E2 202.7 281 9474 38.0 53.5 50 3000

GT11N2 113.6 345 10,811 33.3 51.3 50 3610

GT11N2 115.4 349 10,619 33.9 51.8 60 3600

AE64.3A 75 111.7 73.5 10,028 35.90 53.75 50/60 3000/3600


AE94.2 185.3 277.4 181 9939 36.22 54.57 50 3000
Ansaldo Energia
AE94.2K 170 Case by case Case by case 9863 36.50 Case by case 50 3000
AE94.3A 310 456.4 304 9045 39.80 58.86 50 3000

KG2-3G 2 14,100 25.5 50/60 25,500


KG2-3E 1.9 21,000 17.5 50/60 18,800
VECTRA
23.9 9553 37.7 50/60 6200
30G
VECTRA
31.1 8963 40.2 50/60 6200
40G
VECTRA
34.3 8916 40.4 50/60 6200
40G4

Dresser -Rand DR-61G 23.9 9588 37.5 50/60 3600

DR-61GP 31.4 9114 39.5 50/60 3600

DR-61G4 33.9 9104 39.5 50/60 3600

DR-
44.3 8449 42.6 50/60 3600
63GPC
DR-
53.2 8346 43.1 50/60 3930
63GPG

Manufacturer Model Year Net output (MW) Heat rate (Btu/kWh) Net heat rate (kJ/kWh) Net effciency (%) Pressure ratio

6B.03 1978 43.1 10,180 10,740 33.5 12.7


6F.03 2003 79.2 9470 9991 36.0 16.1
7E.03 1984 90 10,060 10,614 33.9 12.8
7F.04 2009 187 8850 9337 38.6 16.2
7F.05 2009 227 8680 9158 39.3 18.4
GE Energy 7HA.01 2012 275 8240 8694 41.4 21.5
(Heavy Duty,
Simple Cycle) 7HA.02 2014 330 8240 8694 41.4 21.5
9E.03 1992 130 9860 10,403 34.6 12.9
9F.03 1996 265 9020 9517 37.8 16.7
9F.05 2003 299 8810 9295 38.7 18.3
9HA.01 2011 397 8220 8673 41.5 21.8
9HA.02 2014 470 8220 8673 41.5 21.8

20 Power Engineering International April 2014 www.PowerEngineeringInt.com

1404PEI_20 20 4/8/14 10:24 AM


Gas Turbine Technical Specifcations

Exhaust Dimensions
Pressure Exhaust mass NOx emissions Start up time
temperature Weight (tonnes) LxWxH Comments
ratio fow (kg/s) (ppmv) (mins)
(ºC) (metres)

CC performance refers to KA24-2 MS


35.4:1 505 597 <25 230 10.7 x 4 x 4.6 (2-on-1 Multishaft confguration CCPP);
Dual fuel burner option available
CC performance refers to KA26-1 SS
35.0:1 692 603 <25 406 12 x 4.9 x 5.5 (1-on-1 Single shaft confguration CCPP);
Dual fuel burner option available
CC performance refers to KA13E2-1 MS (1-
18.2:1 624 501 <25 350 11 x 5.4 x 5.5 on-1 Multishaft confguration CCPP);
Dual fuel burner option available
CC performance refers to KA11N2-2 MS
15.9:1 400 526 <25 190 13.1 x 5.5 x 10.1 (2-on-1 Multishaft confguration CCPP); incl.
gear box, Dual fuel burner option available
CC performance refers to KA11N2-2 MS (2-
15.9:1 400 526 <25 190 9.4 x 5.5 x 10.1 on-1 Multishaft confguration CCPP);
Dual fuel burner option available

16.7 213 574 <25 Case by case 100 12 x 4 x 5


12.0 556 541 <25 Case by case 280 15 x 14 x 9
12.0 540 545 Case by case Case by case 280 15 x 14 x 9 Low BTU Fuels
19.5 750 576 <25 Case by case 360 14 x 7 x 9

7.1 9.5 583 <24 ppm 16 6.7 x 2.1 x 2.7


4.5 15.0 560 60 ppm 0.5 16 6.7 x 2.1 x 2.7
SAC and DLE
18.2 68.7 545 47 7 x 4.1 x 5.6
available
SAC and DLE
21.9 84.4 531 47 7 x 4.1 x 5.6
available
SAC and DLE
23.6 90.1 541 47 7 x 4.1 x 5.6
available
SAC and DLE
18.2 69.5 533 45 7 x 4.1 x 5.6
available
SAC and DLE
22.5 87.3 515 45 7 x 4.1 x 5.6
available
SAC and DLE
23.0 91.6 527 45 7 x 4.1 x 5.6
available
SAC and DLE
27.6 125.7 454 50 7 x 4.1 x 5.6
available
SAC and DLE
31.1 141.4 471 50 7 x 4.1 x 5.6
available

Exhaust
Exhaust fow Turbine speed Approx. weight Dimensions
Frequency (Hz) temperature Comments
(kg/s) (rpm) (tonnes) L x W x H (metres)
(°C)

145 50/60 5163 539 222 24 x 4 x 4 Available in 50 Hz & 60 Hz


214 50/60 5231 592 254 23 x 4 x 5 Available in 50 Hz & 60 Hz
292 60 3600 546 300 20 x 4 x 4
450 60 3600 601 480 24 x 7 x 4
533 60 3600 606 530 24 x 7 x 4
576 60 3600 618 600 25 x 5 x 7
690 60 3600 618 660 27 x 5 x 6
416 50 3000 542 410 21 x 5 x 5
665 50 3000 595 641 28 x 5 x 5
667 50 3000 639 724 28 x 5 x 5
826 50 3000 619 950 30 x 6 x 6
978 50 3000 619 1,050 33 x 6 x 6

www.PowerEngineeringInt.com Power Engineering International April 2014 21

1404PEI_21 21 4/8/14 10:24 AM


Gas Turbine Technical Specifcations

Gross plant output Net plant output Net plant effciency


Manufacturer Model Year Net heat rate (kJ/kWh)
(MW) (MW) (%)

1x1 6B.03 1987 66 64.8 50.4 7141


2x1 6B.03 1979 133.1 130.9 50.9 7069
1x1 6F.03 1991 120.4 118.4 55 6540
2x1 6F.03 1991 243.1 239.4 55.6 6470
1x1 9E.03 1979 198.1 195 52.1 6911
2x1 9E.03 1979 398.4 392.5 52.7 6837
1x1 9F.03 1994 408 403 58.1 6194
2x1 9F.03 1994 822 811 58.5 6158
1x1 9F.05 2002 461 455 59.5 6055
2x1 9F.05 2002 926 914 59.7 6027
1x1 9HA.01 2011 600 592 61.4 5862
2x1 9HA.01 2011 1195 1181 61.2 5878
1x1 9HA.02 2014 710 701 61.4 5862
GE Energy 2x1 9HA.02 2014 1415 1398 61.2 5878
(Heavy Duty,
1x1 6B.03 1987 66 64.8 50.4 7141
Combined Cycle)
2x1 6B.03 1979 133.1 130.9 50.9 7069
1x1 6F.03 1991 120.4 118.4 55 6540
2x1 6F.03 1991 243.1 239.4 55.6 6470
1x1 7E.03 1977 137.6 135.4 51.1 7048
2x1 7E.03 1979 276.8 272.6 51.4 7007
1x1 7F.04 2009 286 283 58.8 6120
2x1 7F.04 2009 574 567 59 6107
1x1 7F.05 2009 347 343 59.3 6068
2x1 7F.05 2009 697 688 59.5 6054
1x1 7HA.01 2012 410 405 61.1 5892
2x1 7HA.01 2012 823 813 61.2 5878
1x1 7HA.02 2014 492 486 61.1 5892
2x1 7HA.02 2014 987 976 61.2 5878

Gross output Heat rate Gross Frequency


Manufacturer Model Shaft speed (rpm)
(MW) (kJ/kWh) effciency (%) (Hz)

GPB300D 30.1 8977 40.1 50 Gas Generator Rotor 9330 / Power Turbine Rotor 5600
GPB180D 18.4 10,526 34.2 50 9420

Kawasaki Heavy GPB80D 7.8 10,714 33.6 50 13,800


Industries
GPB70D 6.7 12,000 30 50 13,800
GPB17D 1.7 13,382 26.9 50 21,965
GBP06 0.6 18,947 19.4 50 31,376

Gross output Net output Net output Heat rate Gross Net effciency Frequency Shaft speed
Manufacturer Model
(MW) (CC) MW (SC) MW (kJ/kWh) effciency (%) (CC) (%) (Hz) (rpm)

THM1304-10N 10.5 Case by case 10.08 11,840 30.4 Case by case 50/60 9000
THM1304-12N 12.5 Case by case 12.00 11,320 31.8 Case by case 50/60 9000
MAN Diesel & Turbo
MGT6100 6.52 Case by case 6.52 11,250 32.0 Case by case 50/60 1500/1800

Gross output Heat rate Gross effciency


Manufacturer Model Frequency (Hz) Shaft speed (rpm)
(MW) (kJ/kWh) (%)

H-15 17.03 10,409 34.6 50/60 9710


MHPS
H-25(32) 32.3 10,341 34.8 50/60 7280
(Simple Cycle)
H-25(35) 37.69 10,292 35.0 50/60 7280

22 Power Engineering International April 2014 www.PowerEngineeringInt.com

1404PEI_22 22 4/8/14 10:24 AM


Gas Turbine Technical Specifcations

Condenser pressure
Frequency (Hz) Gas turbine power (MW) Steam turbine power (MW) No. & type of gas turbine
(inch Hg)

1.2 50 42.578 23.445 1 x 6B.03


1.2 50 85.156 47.977 2 x 6B.03
1.2 50 78.619 41.742 1 x 6F.03
1.2 50 157.237 85.883 2 x 6F.03
1.2 50 128.650 69.404 1 x 9E.03
1.2 50 257.301 141.073 2 x 9E.03
1.2 50 262.864 145.490 1 x 9F.03
1.2 50 525.728 295.792 2 x 9F.03
1.2 50 297.521 163.576 1 x 9F.05
1.2 50 595.038 330.697 2 x 9F.05
1.2 50 394.472 205.191 1 x 9HA.01
1.2 50 789.352 405.920 2 x 9HA.01
1.2 50 467.008 242.922 1 x 9HA.02
1.2 50 934.497 480.560 2 x 9HA.02
1.2 60 42.578 23.445 1 x 6B.03
1.2 60 85.156 47.977 2 x 6B.03
1.2 60 78.619 41.742 1 x 6F.03
1.2 60 157.237 85.883 2 x 6F.03
1.2 60 89.148 48.466 1 x 7E.03
1.2 60 178.296 98.490 2 x 7E.03
1.2 60 185.903 100.549 1 x 7F.04
1.2 60 371.805 202.666 2 x 7F.04
1.2 60 226.234 121.041 1 x 7F.05
1.2 60 452.468 244.346 2 x 7F.05
1.2 60 273.418 136.782 1 x 7HA.01
1.2 60 546.836 276.028 2 x 7HA.01
1.2 60 328.101 164.138 1 x 7HA.02
1.2 60 656.203 331.233 2 x 7HA.02

Turbine inlet Exhaust NOx Dimensions


Exhaust mass Start up time Weight
Pressure ratio temperature temperature emissions LxWxH Comments
fow (kg/s) (mins) (tonnes)
(ºC) (ºC) (ppmv) (metres)

24.5 1270 87.2 470 15 15 250 22 x 7.1 x 13.8 Two shaft gas turbine
18.3 1250 59.8 542 15 15 190 18 x 4.9 x 9.8 Single shaft gas turbine

15.9 1160 27.3 523 15 6.6 75 14.5 x 3.5 x 8.1 Single shaft gas turbine

15.9 1160 27.0 513 25 6.6 75 14.5 x 3.5 x 8.2 Single shaft gas turbine
10.5 1035 8 521 9 60 seconds. 35 8.4 x 2.75 x 6.3 Single shaft gas turbine
8.5 <1035 5.05 474 36 60 seconds. 15 6.3 x 2.2 x 5.8 Single shaft gas turbine

Turbine inlet Dimensions


Exhaust mass NOx emissions
Pressure ratio temperature Exhaust temperature (ºC) Weight (tonnes) LxWxH Comments
fow (kg/s) (ppmv)
(ºC) (metres)

10 46.5 490 <25 @ 70-100% load Case by case 77 16 x 3 x 5 incl. generator


11 49.1 515 <25 @ 70-100% load Case by case 77 16 x 4 x 6 incl. generator

28.0 465 <15 @ 50-100% load Case by case

Pressure ratio Exhaust mass fow (kg/s) Exhaust temperature (ºC) Weight (tonnes) Dimensions L x W x H (metres)

14.8 53.3 556 200 20 x 6 x 11


14.8 96.6 562 300 18 x 10 x 14
17.3 112.1 556 409 24 x 10 x 14

www.PowerEngineeringInt.com Power Engineering International April 2014 23

1404PEI_23 23 4/8/14 10:24 AM


Gas Turbine Technical Specifcations

Gross output Heat rate Gross effciency


Manufacturer Model Frequency (Hz) Shaft speed (rpm)
(MW) (kJ/kWh) (%)

H-25(42) 42.03 9667 37.2 50/60 7280


H-80 112.44 9421 38.2 50 3000
H-80 110.61 9585 37.6 60 3600
MF-61 5.925 12,566 28.7 50/60 13,800
MF-111 14.57 11,627 31 50/60 9660
MFT-8 26.78 9306 38.7 50/60 5000
MF-221 30 11,258 32 50/60 7200
M701DA 144.09 10,351 34.8 50 3000
M701F4 324.3 9028 39.9 50 3000
MHPS
M701G2 334 9106 39.5 50 3000
(Simple Cycle) M701F5 359 9000 40 50 3000
M701JAC 445 < 8784 > 41 50 3000
M701J 470 8784 41.0 50 3000
M501DA 113.95 10319 34.9 60 3600
M501F3 185.4 9739 37 60 3600
M501G1 267.5 9211 39.1 60 3600
M501GAC 276 9047 39.8 60 3600
M501JAC 310 < 8784 > 41 60 3600
M501J 327 8784 41 60 3600

Manufacturer Model Gross output (MW) Heat rate (kJ/kWh)

1x1 H-25(32) 47.9 7080


1x1 H-25(32) 96.7 7013
1x1 H-25(35) 55.59 7071
2x1 H-25(35) 112.18 7007
1x1 H-25(42) 59.93 6889
2x1 H-25(42) 120.76 6825
1080 H-80 160.64 6660
2080 H-80 329.78 6494
1080 H-80 159.61 6691
2080 H-80 327.62 6519
MPCP1(M701) 214.49 7000
MPCP2(M701) 430.58 6974
MPCP3(M701) 650.97 6974
MPCP1(M701F4) 482.3 6000
MPCP2(M701F4) 967.6 5981
MPCP1(M701G) 506.3 6071
MHPS
MPCP2(M701G) 1016 6051
(Combined Cycle)
MPCP1(M701F5) 530 5902
MPCP2(M701F5) 1063.3 5883
MPCP1(M701JAC) 675 < 5902
MPCP1(M701J) 687 5835
MPCP1(M501) 169.2 7000
MPCP2(M501) 339.9 6974
MPCP3(M501) 511.75 6974
MPCP1(M501F) 287.8 6305
MPCP2(M501F) 577.600 6283
MPCP1(M501G) 402.000 6165
MPCP2(M501G) 806.7 6144
MPCP1(M501GAC) 414.8 6051
MPCP2(M501GAC) 830.9 6041
MPCP1(M501JAC) 450 < 5902
MPCP1(M501J) 475 5854
MPCP2(M501J) 952.9 5835

24 Power Engineering International April 2014 www.PowerEngineeringInt.com

1404PEI_24 24 4/8/14 10:24 AM


Gas Turbine Technical Specifcations

Dimensions
Pressure ratio Exhaust mass fow (kg/s) Exhaust temperature (ºC) Weight (tonnes)
L x W x H (metres)

17.3 111 556 409 24 x 10 x 14


19.3 308 538 563 37 x 12 x 15
19.2 307 545 563 37 x 12 x 15
15 27 496 10 3.7 x 2.5 x 3.1
15 54 530 22 5.5 x 2.8 x 2.5
21 86 463 7 7.1 x 2.5 x 2.5
15 107 532 50 7.7 x 3.7 x 3.4
14 440 542 200 12.5 x 5.2 x 5.2
18 712 591 419 17.4 x 5.8 x 5.8
21 737 587 420 18.3 x 6.1 x 6.1
21 712 610 481 17.4 x 5.8 x 5.8
23 861 615
23 861 637 561 18.3 x 7.1 x 7.1
14 346 542 145 11.6 x 5.8 x 4.3
16 458 613 195 14.1 x 4.6 x 4.6
20 598 600 334 15.3 x 5.5 x 5.5
20 598 617 271 15.3 x 5.5 x 5.5
23 598 612 318 15.3 x 5.5 x 5.5
23 598 635 318 15.3 x 5.5 x 5.5

Frequency (Hz) Condensate Pressure (inch Hg) Gas turbine power (MW)

50/60 1.2 31.1


50/60 1.2 62.2
50/60 1.2 36.4
50/60 1.2 72.8
50/60 1.2 40.6
50/60 1.2 81.2
50 1.2 109.5
50 1.2 218.4
60 1.2 108
60 1.2 214.6
50 1.5 142.1
50 1.5 284.2
50 1.5 426.3
50 1.5 319.9
50 1.5 639.8
50 1.5 325.7
50 1.5 651.4
50 1.5 354
50 1.5 708
50 1.5 445
50 1.5 463
60 1.5 112.1
60 1.5 224.2
60 1.5 336.3
60 1.5 182.7
60 1.5 365.4
60 1.5 264.4
60 1.5 528.8
60 1.5 273.6
60 1.5 547.2
60 1.5 310
60 1.5 322
60 1.5 644

www.PowerEngineeringInt.com Power Engineering International April 2014 25

1404PEI_25 25 4/8/14 10:24 AM


Gas Turbine Technical Specifcations

Gross output Net output Net output Heat rate Gross


Manufacturer Model
(MW) (CC) MW (SC) MW (kJ/kWh) effciency (%)

FT8® MOBILEPAC® 25.4 25.2 LHV Gross HR 10,370 kJ/kWh 34.9

FT8® SWIFTPAC® 30 41.1 30.1 LHV Plant Net HR 7333 kJ/kWh


PW Power Systems FT8® SWIFTPAC® 60 83.1 60.5 LHV Plant Net HR 7257 kJ/kWh
FT4000™ SWIFTPAC® 60 83.9 67.6 LHV Plant Net HR 7250 kJ/kWh
FT4000™ SWIFTPAC® 120 169.0 136.2 LHV Plant Net HR 7193 kJ/kWh

Gross
Gross output Net output Net output Heat rate Net effciency Frequency Shaft speed
Manufacturer Model effciency
(MW) (CC) MW (SC) MW (kJ/kWh) (CC) (%) (Hz) (rpm)
(%)

RB211-G62 DLE 37.7 26.7 12 7175 50.2 50/60 4800


RB211-GT62 DLE 39.7 28.6 12.2 7005 51.4 50/60 4800
RB211-GT61 DLE 42.6 31.1 12.59 6820 52.8 50/60 4850
Trent 60 DLE 65.3 50.7 15.82 6718 53.6 50 3000
Trent 60 DLE 78.3 50.7 29.3 6936 51.9 50 3000
Trent 60 DLE ISI 77.6 61.9 17.1 6736 53.4 50 3000
Trent 60 DLE ISI 94.1 61.9 34.2 6992 51.5 50 3000
Trent 60 WLE 81.2 64.4 18.2 6998 51.4 50 3000
Trent 60 WLE 107.2 64.4 45.3 7339 49 50 3000
Trent 60 WLE ISI 82.8 66 18.4 7022 51.2 50 3000
Rolls-Royce
Trent 60 WLE ISI 109.5 66 46.2 7355 48.9 50 3000
Trent 60 DLE 66.4 51.6 16 6725 53.5 60 3600
Trent 60 DLE 79.6 51.6 29.7 6945 51.8 60 3600
Trent 60 DLE ISI 75.4 60.2 16.6 6727 53.5 60 3600
Trent 60 DLE ISI 90.8 60.2 32.6 6969 51.6 60 3600
Trent 60 WLE 77.9 61.7 17.6 6998 51.4 60 3600
Trent 60 WLE 102.4 61.7 43.1 7340 49 60 3600
Trent 60 WLE ISI 80.3 64 17.7 7093 50.7 60 3600

Trent 60 WLE ISI 105.7 64 44.2 7404 48.6 60 3600

SGT-200 7.68 10,776 33.4 50/60


SGT-300 7.90 11,773 30.6 50/60
SGT-400 12.90 10,355 34.8 50/60
SGT-400 14.33 10,178 35.4 50/60
SGT-500 19.06 10,690 33.7 50/60
SGT-600 24.48 10,720 33.6 50/60
SGT-700 32.82 9675 37.2 50/60

Siemens AG SGT-750 37.03 9120 39.5 50/60


Energy Sector SGT-800 47.50 9557 37.7 50/60
SGT-800 50.50 9407 38.3 50/60
SGT5-2000E 172 10,190 35.3 50 3000
SGT5-4000F 307 9001 40 50 3000
SGT5-8000H 375 8999 40 50 3000
SGT6-2000E 114 10,496 34.3 60 3600
SGT6-5000F 232 9278 38.8 60 3600
SGT6-8000H 274 8999 40 60 3600

26 Power Engineering International April 2014 www.PowerEngineeringInt.com

1404PEI_26 26 4/8/14 10:24 AM


Gas Turbine Technical Specifcations

Shaft speed Exhaust mass fow Exhaust NOx emissions


Net effciency (CC) (%) Frequency (Hz) Pressure ratio
(rpm) (kg/s) temperature (ºC) (ppmv)

50/60 19.9 88 469 25

Net Effciency LHV = 49.1 50/60 21.3 91 490 25


Net Effciency LHV = 49.6 50/60 21.3 182 490 25
Net Effciency LHV = 49.6 50/60 36.2 176 431 25
Net Effciency LHV = 50 50/60 36.2 351 431 25

Turbine inlet Exhaust Start


Exhaust mass NOx emissions Weight Dimensions
Pressure ratio temperature temperature up time Comments
fow (kg/s) (ppmv) (tonnes) L x W x H (metres)
(ºC) (ºC) (mins)

20.35 90.4 25 18.5 x 4 x 5 2P unfred


21.39 94.1 25 18.5 x 4 x 5 2P unfred
21.29 92.4 25 18.5 x 4 x 5 2P unfred
33.81 152.2 25 26.52 x 4.57 x 18.9 2P unfred
33.81 152.2 25 26.52 x 4.57 x 18.9 2P fred to 1112°F (600°C)
38.73 174.1 25 29.56 x 4.57 x 18.9 2P ISI unfred
38.73 174.1 25 29.56 x 4.57 x 18.9 2P ISI fred to 1112°F (600°C)
38.9 176.3 25 26.52 x 4.57 x 18.9 2P unfred
38.9 176.3 25 26.52 x 4.57 x 18.9 1P fred to 1300°F (704°C)
39.43 178.9 25 29.56 x 4.57 x 18.9 2P ISI unfred
39.43 178.9 25 29.56 x 4.57 x 18.9 1P ISI fred to 1300°F (704°C)
34.1 153.3 25 26.52 x 4.57 x 18.9 2P unfred
34.1 153.3 25 26.52 x 4.57 x 18.9 2P fred to 1112°F (600°C)
37.99 166.2 25 29.56 x 4.57 x 18.9 2P ISI unfred
37.99 166.2 25 29.56 x 4.57 x 18.9 2P ISI fred to 1112°F (600°C)
36.87 167 25 26.52 x 4.57 x 18.9 2P unfred
36.87 167 25 26.52 x 4.57 x 18.9 1P fred to 1300°F (704°C)
37.81 178.1 25 29.56 x 4.57 x 18.9 2P ISI unfred

37.81 178.1 25 29.56 x 4.57 x 18.9 1P ISI fred to 1300°F (704°C)

12.3 29.5 493 ≤ 25


13.7 30.2 542 ≤ 15
16.8 39.4 555 ≤ 15
18.9 44.3 539 ≤ 15
13.0 97.9 369 ≤ 42 150,139 21.3 x 4 x 3.7
14.0 81.3 543. ≤ 25 122,924 19.2 x 4.6 x 4
18.7 95.0 533 ≤ 15 143,789 19.2 x 4.6 x 4
23.8 114.2 458.5 ≤ 15
20.4 132.8 541 ≤ 15 171,900 17 x 4.5 x 4
21.1 134.2 553 ≤ 15 171,900 17 x 4.5 x 4
12.1 531.0 537 216,000 14 x 12.5 x 8.5
18.8 723.0 579 312,000 11 x 4.9 x 4.9
19.2 829.0 627 390,000 13.1 x 4.9 x 4.9
12.1 367.0 537 163,000 11.6 x 10.4 x 7
18.9 551.0 593 193,000 10.1 x 4 x 4
19.5 604.0 617 286,000 11 x 4.3 x 4.3

www.PowerEngineeringInt.com Power Engineering International April 2014 27

1404PEI_27 27 4/8/14 10:24 AM


Steam Turbine Technical Specifcations

Inlet
Power rating Shaft speed Inlet temp. Gas fow rate
OEM Model Type/Application Dimensions LxWxH (metres) pressure
(MW) (rpm) (oC) (m3/h)
(bar)

3.6 x 14 (30 MW turbine


CCPP/Biomass/Industrial applications/
+ generator, typical)
GRT Waste-to-Energy (WtE)/CSP/Conventional 5–65 4200–11,000 540 125 n/a
4.7 x 20 (60 MW turbine +
power plants/Geothermal
generator, typical)

CCPP/Biomass/Industrial applications/
MT WtE/CSP/Conventional power plants/ 50–100+ 3000–3600 Depending on confguration 565 140 n/a
Geothermal

COMAX Cogneration applications 100–400 3000–3600 Depending on confguration 565 140  n/a

STF15C Combined-cycle power plants 100–250 3000–3600 Depending on confguration 565/565 165/15  n/a

STF30C Combined-cycle power plants 150–400 3000–3600 Depending on confguration 585/585 185/45  n/a

Alstom
STF25 Steam power plants 100–350 3000–3600 Depending on confguration 540/540 540/540  n/a

STF40 Steam power plants 250–700 3000–3600 Depending on confguration 600/620 300/65  n/a

STF60 Steam power plants 500–900 3000–3600 Depending on confguration 600/620 300/65  n/a

STF100 Steam power plants 700–1200 3000–3600 Depending on confguration 600/620 300/65  n/a

Adaptable to
STN series Nuclear applications (full-speed) 100–800 3000–3600 Depending on confguration 250–290 42–75
any reactor

ARABELLE™ Adaptable to
Nuclear applications (full-speed) 800–1300 1500–1800 Depending on confguration 250–290 42–75
1000 any reactor

ARABELLE™ Adaptable to
Nuclear applications (full-speed) 1300–1900 1500–1800 Depending on confguration 250–290 42–75
1700 any reactor

MT10 Combined cycle 40–250 50/60 Hz applicable 1-cylinder Non re-heat

MT20 Combined cycle 150–350 50/60 Hz applicable 2-cylinder Non re-heat


Ansaldo
Energia MT15 Combined cycle, Fossil, Solar 90–300 50/60 Hz applicable 2-cylinder Re-heat

RT30 Combined cycle, Fossil 150–400 50/60 Hz applicable 3 to 4 cylinder Re-heat

RT70 Fossil 400–1000 50/60 Hz applicable 4 to 5 cylinder Re-heat

A200 Combined cycle 70–220 3000 Up to 538 Up to 103 Up to 750

D200 Combined cycle 180–330 3000 Up to 538 Up to 103 Up to 1090

A450 Combined cycle 150–290 3000 Up to 600 Up to 131 Up to 750

D400 Combined cycle 230–440 3000 Up to 600 Up to 131 Up to 940

A650 Combined cycle 150–300 3000 Up to 600 Up to 166 Up to 750

D600 Combined cycle 230–550 3000 Up to 600 Up to 166 Up to 1090

D650 Combined cycle 230–550 3000 Up to 600 Up to 166 Up to 1090


GE Energy
A200 Combined cycle 50–200 3600 Up to 538 Up to 103 Up to 750

D200 Combined cycle 120–300 3600 Up to 538 Up to 103 Up to 1090

A450 Combined cycle 100–250 3600 Up to 600 Up to 131 Up to 750

D400 Combined cycle 180–400 3600 Up to 600 Up to 131 Up to 940

A650 Combined cycle 100–260 3600 Up to 600 Up to 166 Up to 750

D600 Combined cycle 180–500 3600 Up to 600 Up to 166 Up to 1090

D650 Combined cycle 180–500 3600 Up to 600 Up to 166 Up to 1090

Standard Power generation 2–160 50/60 Hz 540 140

Low-pressure Saturated
Power generation 5–90 50/60 Hz 1–20
turbines steam

Air turbines CAES (compressed air energy storage) 25–90 50/60 Hz 540 140

Combined heat and power (CHP)generation


MARC 1 2–4 50 Hz 450 65
for Renewable energy and WtE
MAN Diesel
& Turbo
MARC 2 CHP generation for reneable energy and WtE 5–10 50 Hz 520 90

MARC 4 CHP generation for reneable energy and WtE 8–20 50 Hz 520 120

MARC 6 CHP generation for reneable energy and WtE 16–40 50 Hz 530 120

28 Power Engineering International April 2014 www.PowerEngineeringInt.com

1404PEI_28 28 4/8/14 10:24 AM


Steam Turbine Technical Specifcations

Inlet Gas
Power rating Shaft speed Inlet pressure
OEM Model Type/Application Dimensions LxWxH (metres) temp. fow rate
(MW) (rpm) (bar)
(oC) (m3/h)

Condensing turbine with steam reheat for


ITT-30/40-2,9 30/40 3000 9.8 x 5.3 x 4.3 410 2.9 220
industrial purposes and district heating/TPP

Condensing turbine with steam reheat for


ITT-65/75-130/13 65/75 3000 14.3 x 5.3 x 4.2 555 12.8 400
industrial purposes and district heating/TPP

P-50/60-130 Backpresure turbine / TPP 50/60 3000 8.9 x 3.6 x 4.6 555 12.8 490

ITT-90/100- Condensing turbine with steam reheat for


91 3000 14.8 x 6.5 x 4 555 12.8 470
130/13-1M industrial purposes and district heating/TPP

P-85-8,8/0,2 Backpresure turbine /TPP 85 3000 9.5 x 3.6 x 2.43 535 8.8 450

Condensing turbine with steam extraction for


KT-115-8,8 115 3000 14.4 x 5.6 x 2.9 500 8.8 446
district heating / TPP

K-210-130-8 Condensing turbine /TPP 210 3000 19 x 6.5 x 5.5 540 12.8 640

K-255-162-2 Condensing turbine /TPP 255 3000 22.7x 11.4 x 6.8 540 15.9 700

K-165-130 Condensing turbine /TPP 165 3000 14.6 x 7.6 x 5.8 540 12.8 480

K-225-12,8-3 Condensing turbine /TPP 225 3000 20 x 8.5 x 5.7 540 12.8 540

K-168-107 Condensing turbine /TPP 167 3000 17.1 x 8.5 x 5.7 525 10.5 442
Power K-110-6,5 Condensing turbine / CCP 110/114 3000 16.4 x 8.5 x 5.7 497 6.5 309.3
Machines
OJSC T-110-140 Condensing turbine/TPP 110/123 3000 17.2 x 5 x 5.2 535 13.7 326

T-120-12,8 Condensing turbine /TPP 120 3000 14.9 x 5.9 x 5.1 565 12.8 470

T-125/150-7,4 Condensing turbine / CCP 125 3000 16.6 x 8.5 x 5.7 500 7.4 525

T-130/160-12,8 Condensing turbine /TPP 130/160 3000 15.3 x 8.5 x 5.5 555 12.8 500

T-150-7,7 Extraction turbine / CCP 150/160 3000 17 x 8.5 x 5.7 510 7.7 309.3

T-185/210-16,0-P Extraction turbine / TPP 186/210 3000 23.6 x 9.6 x 6.1 558 16 576

K-300-170-1P Condensing turbine /NPP 300/310 3000 24.7 x 11.4 x 6.9 540 16.7 960

K-330-23,5 Condensing turbine /TPP 330 3000 21.2 x 8.9 x 6.1 540 23.5 1050

K-800-130/3000 Condensing turbine /TPP 885 3000 41.6 x 11.4 x 6.9 485 12.8 3180

K-660-247 Condensing turbine /TPP 660/686 3000 36.5 x 9.8 x 6 537 24.3 2023.8

K1000-60/300 Condensing turbine /NPP 1030 3000 51.8 x 11.4 x 6.9 274.3 5.88 5870

K-1000-60/3000-2 Condensing turbine /NPP 995 3000 41.8 x 11.4 x 6.9 274.3 5.88 5980

K-1000-60/3000-3 Condensing turbine /NPP 1014 3000 33.8 x 16.3 x 7.8 274.3 5.88 5980

K -1200-6,8/50 Condensing turbine /NPP 1200 3000 53 x 11.4 x 6.9 505 6.8 4793

Up to
SST-040 Up to 0.3 2.5 x 1.5 x 2 Up to 400 Up to 40
15,000

SST-050 Up to 0.750 1 x 1 x 1.3

SST-060 Up to 6 1.5 x 2.5 x 2.5 Up to 131

SST-100 Up to 8.5 Up to 7500 8 x 3.7 x 3.4 Up to 480 Up to 65

SST-110 Up to 7 6 x 2.8 x 3.2 Up to 131

SST-111 Up to 12 9x4x4 Up to 530 Up to 131

SST-150 Up to 20 Up to 13300 12 x 4 x 5 Up to 505 Up to 103

SST-200 Up to 10 4 x 2 x 2.5 Up to 520 Up to 110


Siemens AG
SST-300 Up to 50 Up to 12000 12 x 4 x 5 Up to 520 Up to 120
Energy Sector
SST-400 Up to 65 3000–8000 18 x 8.5 x 5.5 Up to 540 Up to 140

SST-500 Up to 100 Up to 15000 19 x 6 x 5 Up to 400 Up to 30

SST-600 Up to 150 3000–18,000 19 x 6 x 5 Up to 565 Up to 165

SST-700 Up to 175 3000–13,200 22 x 15 x 6 Up to 585 Up to 165

SST-800 Up to 250 3000–3600 20 x 8.5 x 6 Up to 565 Up to 170

SST-900 Up to 250 3000–3600 20 x 11 x 10 Up to 585 Up to 165

SST-6000 300–1200 Up to 600 Up to 300

SST-5000 120–750 Up to 600 Up to 190

SST-3000 90–250 Up to 565 Up to 177

8000, 50/60 Hz
SKODA MTD20 Single-casing/Fossil, CCPP, Renewables Up to 35 Up to 540 Up to 140
applicable

6500, 50/60 Hz
SKODA MTD25 Single-casing/Fossil, CCPP, Renewables Up to 45 Up to 540 Up to 140
applicable
Doosan Skoda
5500, 50/60 Hz
SKODA MTD30 Single-casing/Fossil, CCPP, Renewables Up to 60 Up to 540 Up to 140
applicable

3000/3600, 50/60 Hz
SKODA MTD40 Single-casing/Fossil, CCPP, Renewables Up to 200 Up to 580 Up to 165
applicable

www.PowerEngineeringInt.com Power Engineering International April 2014 29

1404PEI_29 29 4/8/14 10:24 AM

Potrebbero piacerti anche