INTRODUCTION:
The J&K RTI Act, 2009 as passed by the Jammu and Kashmir
State Legislature received the assent of the Governor on 20 th March, 2009.
The Act provides for securing access to the information under the control of
Public Authorities in order to promote transparency and accountability.
1) PROJECT SECTION
Deal with implementation of Hydro Electric projects in the state.
2) Gazetted Section
This section deals with service matters (NDCs & retirement Notifictions only) of
Gazetted cadre of PDD.
3) Non-Gazetted Section
This section deals with the service matters referrd by the concerned HODs of Non-
Gazetted Officials, SRO 43 cases, appointments of Junior Engineers, Regularizations
of Services of daily wagers, Migrant substitutes, Adhoc, Contractual and litigation
cases related to Non-Gazetted cadre of Power Development Department etc.
4) GENERAL SECTION:
This sections with CoS meetings, Communications received from
Government of India as wel as from excelleny, the Governor of J&K, Question of the
Parliamentary Affairs and Rajya Sabha/J&K Legislature Business, dispatch/receipt
sections of Power Development Department.
This branch deals with DPC/PSC cases, updating of recruitments rules, preparation of
seniority lists, vigilance clearance and departmental enquiries of gazette cadre of
Power Development Department.
PIO AND IST APELLANT AUTHORITY
Profile
Profile
Planning and Designing has become important and continuous activity. Old
Equipments and Systems are being replaced by the new. In fact Planning and
Design activities are influenced by the following:-
In order to take care of the above Electric Planning and Design Wing was
established to ensure efficient and continuous supply of electricity is made
available to consumers on Wide geographical area at lowest cost and at
specified voltage and frequency i.e. Providing of Quality Power.
Electric Planning and Design (EP&D) Wing is one of the premier wings of
Power Development Department Government of Jammu and Kashmir
responsible for perspective planning of infrastructure development in the
State based on actual and future demand and availability of power besides
Procurement of material/equipment for whole of the State. All key Materials
as mentioned below used in Transmission of Electric Power above 66KV levels
i.e. 132KV and 220KV level are procured through this wing as per the desired
technical specification like.
This wing is also responsible for scrutinizing cost data on yearly basis,
framed by Executive wings of Deptt. Viz. EM&RE wings and S&O wings.
This wing follows BIS IED CBIP CEA standards and specifications ensuring
thereby procurement of world class quality equipment material at
optimum cost and time. This wing also acts as technical consultants to
other wings of PDD where ever difficulty in technical matters including
designs is experienced by them.
PROFILE.
Project wing.
PROFILE.
S.
Name Deg.
No
1 Dheeraj Gupta IAS Prpl Secy.
2 Mahesh Dass Dir.(Finance)
3 Rakesh Jamwal Dir.(P&S)
4 Naresh Kumar Addl.Secy.
5 Narinder Khajuria Addl.Secy.
6 Qazi Sarwar Addl.Secy.
7 Sheikh Gul Ayaz Secy.Tech.
8 Shakti Kumar Pathak OSD
9 Kuldip Kumar Sapolia Dy.Secy.
10 Tahir Ajaz Dy.Secy.
11 Bilal Mukhtar Dar U.Secy
12 Suhal Muzaffar PLO
13 Umesh Shrma U.Secy
14 Rajni Bhat U.Secy
15 Mudassir Yaqoob Zargar Asstt.Dir.
16 Rakash Kumar Shrma Pvt.Secy.
17 Javid Ahmad Wani AAO
18 Imtayaz Ahmad Shah AAO
19 Pardeep Singh Sambyal SO
20 Raj Kumar SO
21 Baby Parvez SO
22 Shakeel Ahmad Gani Sts.Off.
23 Ramesh Kumar Sr.Steno
24 Ashok Kumar Sr.Steno
25 Nisar Ahmad Bhat Sr.Steno
26 Manzoor Ahmad Wantoo Accountant
27 Romesh Kumar Hd.Asstt.
28 Sunil Dutt Hd.Asstt.
29 Antima Kachroo Hd.Asstt.
30 Sheraz Ahmad Hd.Asstt.
31 Bharat Bhushan Hd.Asstt.
32 Pawan Kumar Hd.Asstt.
33 Hira Lal Koul Hd.Asstt.
34 Kulbir Singh Hd.Asstt.
35 Irfan Mahmood Hd.Asstt.
36 Baljinder Singh Sr.Asstt.
37 Asgar Ali Com.oprt
38 Yasmeen Jan Sr.Asstt.
39 Mis Irfat Jan Sr.Asstt.
40 Gh.Nabi Mir J.S.A
41 Jasbinder Singh Jr.Asstt.
42 Ashok Kumar Daftria
43 Thakur Das Jamadar-II
44 Gulshan Kumar Jamadar-II
45 Bilal Ahmad Jamadar-II
46 Mirza Iqbal Hussain Orderly
47 Mrs Rubina Orderly
48 Narinder Singh Orderly
49 Mukesh Kumar Orderly
50 Achal Khokhar Orderly
51 Rajesh Chowdhary Orderly
52 Bashir Ahmad S.E
53 Rakesh Sharma AEE
54 Fayaz Ahmad AEE
55 Amit Gupta J.E
56 Ankush Sharma J.E
57 Joginder Kumar PRO
58 Vishal Singh APRO
59 Mushtaq Ahmad APRO
Attendance of Govt Employees in PDD
for the month of September, 2017