RAJAWALI PLACE PROJECT

REBAR TOTAL PER BASEMENT - 1 SHOP DRAWING FINAL CHECK QS POSCO


DESCRIPTION DIAMETER
No. FLOOR / ZONE UNIT TOTAL
ELEMENT TYPE D10 D13 D16 D19 D22 D25 D29 D32

RESIDENCE
1 CO. STARTER BAR kg - - - - - - - - -
COLUMN
2 CO. VERTICAL BAR kg - 2,799 52,777 1,920 10,194 2,220 28,341 - 98,251
3 SW. STARTER BAR kg - - - - - - - - -
SHEAR WALL
4 SW. VERTICAL BAR kg - 86,360 25,383 2,916 - 50,371 34,469 - 199,499
5 RE. STARTER BAR kg - - - - - - - - -
RESIDENCE RETAINING WALL
6 RE. VERTICAL BAR kg - - - - - - - - -
BASEMENT -1
7 SLAB kg 4,830 88,099 5,349 4,166 2,801 19,922 3,923 - 129,090
9 DROP PANEL kg - - - - - - - - -
FLAT SLAB
10 BAND BEAM & Z REBAR kg 14,131 19,368 768 1,057 - - - - 35,324
11 Chair Bar kg - 3,058 - - - - - - 3,058
12 BEAM & GIRDER BEAM kg 3,416 5,682 1,464 6,446 1,142 9,826 - 2,006 29,982

SUB TOTAL RESIDENCE kg 22,377 205,366 85,741 16,505 14,137 82,339 66,733 2,006 495,204

LINK HOTEL

1 CO. STARTER BAR kg - - - - - - - - -


COLUMN
2 CO. VERTICAL BAR kg - 4,667 - - 2,677 495 - - 7,839
5 RE. STARTER BAR kg - - - - - - - - -
RETAINING WALL
6 RE. VERTICAL BAR kg - - - - - - - - -
LINK-HOTEL
7 SLAB kg 370 25,601 38 - - - - - 26,009
BASEMENT -1
8 DROP PANEL kg - - - - - - - - -
FLAT SLAB
8 BAND BEAM & Z REBAR kg 2,031 3,518 - - - - - - 5,549
8 Chair Bar kg - 811 - - - - - - 811
9 BEAM & GIRDER BEAM kg 1,359 3,727 6 149 - 1,818 - 13,079 20,138

SUB TOTAL HOTEL - LINK kg 3,760 38,324 44 149 2,677 2,313 - 13,079 60,346

OFFICE

1 CO. STARTER BAR kg -


COLUMN
2 CO. VERTICAL BAR kg -
3 SW. STARTER BAR kg -
SHEAR WALL
4 SW. VERTICAL BAR kg -

OFFICE
BASEMENT -1
5 OFFICE RE. STARTER BAR kg -
RETAINING WALL
6 BASEMENT -1 RE. VERTICAL BAR kg -
7 SLAB kg -
8 FLAT SLAB DROP PANEL kg -
8 BAND BEAM & Z REBAR kg -
9 BEAM & GIRDER BEAM kg -

SUB TOTAL OFFICE kg - - - - - - - - -

GRAND TOTAL BASEMENT 1 kg 26,137 243,690 85,785 16,654 16,814 84,652 66,733 15,085 555,550
RAJAWALI PLACE PROJECT
REBAR TOTAL PER BASEMENT - 2 SHOP DRAWING ACTUAL
DESCRIPTION DIAMETER
No. FLOOR / ZONE UNIT TOTAL
ELEMENT TYPE D10 D13 D16 D19 D22 D25 D29 D32

RESIDENCE
1 CO. STARTER BAR kg - 247 10,492 - 7,168 1,465 8,777 - 28,149
COLUMN
2 CO. VERTICAL BAR kg - 1,752 23,360 - 7,664 154 13,750 - 46,680
3 SW. STARTER BAR kg - 3,058 2,578 713 - 10,529 2,239 - 19,117
SHEAR WALL
4 SW. VERTICAL BAR kg - 16,059 3,039 - - 8,487 1,525 - 29,110
5 RE. STARTER BAR kg - 6,530 8,768 1,268 4,270 - - - 20,836
RETAINING WALL
6 RESIDENCE RE. VERTICAL BAR kg 1,073 16,921 1,640 - 9,084 - - - 28,718
7 BASEMENT -2 SLAB kg 1,541 52,329 6,256 77,652 3,523 12,061 476 - 153,838
7 Temporary Slab kg - - 1,368 - - - - - 1,368
FLAT SLAB
8 DROP PANEL kg - 735 239 48,669 1,117 - - - 50,760
8 BAND BEAM & Z REBAR kg 20,965 4,723 821 10,447 - - - - 36,955
9 BEAM kg 2,369 1,576 1,017 4,132 697 2,155 - 2,006 13,951
BEAM & GIRDER
10 Cap Beam kg 9,720 532 - - 9,989 - - - 20,241

SUB TOTAL RESIDENCE kg 35,667 104,462 59,578 142,881 43,511 34,851 26,767 2,006 449,723

LINK - HOTEL

37 CO. STARTER BAR Kg -


COLUMN
38 CO. VERTICAL BAR Kg -
39 SW. STARTER BAR Kg -
SHEAR WALL
40 SW. VERTICAL BAR Kg -
41 RE. STARTER BAR Kg -
LINK-HOTEL RETAINING WALL
42 RE. VERTICAL BAR Kg -
BASEMENT 2
43 SLAB Kg -
44 FLAT SLAB DROP PANEL Kg -
44 BAND BEAM & Z REBAR kg -
45 BEAM Kg -
BEAM & GIRDER
46 Cap Beam Kg -

SUB TOTAL LINK kg - - - - - - - - -

OFFICE
-
37 CO. STARTER BAR Kg -
COLUMN
38 CO. VERTICAL BAR Kg -
39 SW. STARTER BAR Kg -
SHEAR WALL
40 SW. VERTICAL BAR Kg -
41 RE. STARTER BAR Kg -
OFFICE RETAINING WALL
42 RE. VERTICAL BAR Kg -
BASEMENT 2
43 SLAB Kg -
44 FLAT SLAB DROP PANEL Kg -
44 BAND BEAM & Z REBAR kg -
45 BEAM Kg -
BEAM & GIRDER
46 Cap Beam Kg -

SUB TOTAL OFFICE kg - - - - - - - - -


SECTION E-E

1 SECTION E-E kg -

O-B2 OFFICE AND HOTEL INTERFACE (15-DEC-2018)

SUB TOTAL SECTION E-E kg - - - - - - - - -

GRAND TOTAL BASEMENT 2 kg 35,667 104,462 59,578 142,881 43,511 34,851 26,767 2,006 449,723

RAJAWALI PLACE PROJECT

REBAR TOTAL PER BASEMENT - 3 SHOP DRAWING FINAL CHECK QS POSCO


DESCRIPTION DIAMETER
No. FLOOR UNIT TOTAL
ELEMENT TYPE D10 D13 D16 D19 D22 D25 D29 D32
RESIDENCE
1 CO. STARTER BAR kg -
COLUMN
2 CO. VERTICAL BAR kg -
3 SW. STARTER BAR kg -
SHEAR WALL
4 SW. VERTICAL BAR kg -
5 RETAINING RE. STARTER BAR kg -
6 RESIDENCE WALL RE. VERTICAL BAR kg -
BASEMENT -3
7 SLAB kg -

8 DROP PANEL kg -
FLAT SLAB

9 BAND BEAM & Z REBAR kg -

10 BEAM & GIRDER BEAM kg -


11 BEAM & GIRDER STRUT BEAM kg -

GRAND TOTAL RESIDENCE kg - - - - - - - - -

LINK HOTEL
1 CO. STARTER BAR kg -
COLUMN
2 CO. VERTICAL BAR kg -
3 SW. STARTER BAR kg -
SHEAR WALL
4 SW. VERTICAL BAR kg -
5 RETAINING RE. STARTER BAR kg -
6 LINK-HOTEL WALL RE. VERTICAL BAR kg -
(B3)
7 SLAB kg -

FLAT SLAB
LINK-HOTEL
(B3)

8 DROP PANEL kg -
FLAT SLAB

8 BAND BEAM & Z REBAR kg -

9 BEAM & GIRDER BEAM kg -

GRAND TOTAL LINK kg - - - - - - - - -

OFFICE -
37 CO. STARTER BAR Kg -
COLUMN (B3-B1)
38 CO. VERTICAL BAR Kg -
39 SW. STARTER BAR Kg -
SHEAR WALL
40 SW. VERTICAL BAR Kg -
41 RE. STARTER BAR Kg -
RETAINING WALL
42 RE. VERTICAL BAR Kg -
OFFICE
43 BASEMENT 3 SLAB Kg -
44 DROP PANEL Kg -
FLAT SLAB
44 BAND BEAM & Z REBAR kg -

45 BEAM Kg -
BEAM & GIRDER
46 Cap Beam Kg -

GRAND TOTAL OFFICE kg - - - - - - - - -

GRAND TOTAL BASEMENT 3 kg - - - - - - - - -

RAJAWALI PLACE PROJECT


REBAR TOTAL PER BASEMENT - 4 SHOP DRAWING FINAL CHECK QS POSCO
DESCRIPTION DIAMETER
No. FLOOR UNIT TOTAL
ELEMENT TYPE 10 13 16 19 22 25 29 32

RESIDENCE

1 CO. STARTER BAR kg -


COLUMN
2 CO. VERTICAL BAR kg -
3 SW. STARTER BAR kg -
SHEAR WALL
4 SW. VERTICAL BAR kg -
5 RESIDENCE RETAINING RE. STARTER BAR kg -
6 BASEMENT -4 WALL RE. VERTICAL BAR kg -
RESIDENCE
BASEMENT -4

7 SLAB kg -
FLAT SLAB
8 BAND BEAM kg -
9 BEAM kg -
BEAM & GIRDER
10 STRUT BEAM kg -
8 RAMP SLAB kg 1,572 - - - - - - - 1,572
RAMP
8 RAMP BEAM kg - - - - - - - - -

SUB TOTAL RESIDENCE kg - - - - - - - - -


LINK HOTEL

37 CO. STARTER BAR kg -


COLUMN
38 CO. VERTICAL BAR kg -
39 SW. STARTER BAR kg -
SHEAR WALL
40 SW. VERTICAL BAR kg -
LINK-HOTEL
41 RETAINING RE. STARTER BAR kg -
BASEMENT 4
42 WALL RE. VERTICAL BAR kg -
43 SLAB kg -
FLAT SLAB
44 BAND BEAM kg -
45 BEAM & GIRDER BEAM kg -

SUB TOTAL HOTEL - LINK kg - - - - - - - - -

OFFICE
-
37 CO. STARTER BAR Kg -
COLUMN (B3-B1)
38 CO. VERTICAL BAR Kg -
39 SW. STARTER BAR Kg -
SHEAR WALL
40 SW. VERTICAL BAR Kg -
41 RE. STARTER BAR Kg -
OFFICE RETAINING WALL
42 RE. VERTICAL BAR Kg -
BASEMENT 4
43 SLAB Kg -
44 FLAT SLAB DROP PANEL Kg -
44 BAND BEAM & Z REBAR kg -
45 BEAM Kg -
BEAM & GIRDER
46 Cap Beam Kg -

SUB TOTAL OFFICE kg - - - - - - - - -

GRAND TOTAL BASEMENT 4 kg - - - - - - - - -


RAJAWALI PLACE PROJECT
REBAR TOTAL PER BASEMENT - 5 SHOP DRAWING FINAL CHECK QS POSCO
DESCRIPTION DIAMETER
No. FLOOR UNIT TOTAL
ELEMENT TYPE D10 D13 D16 D19 D22 D25 D29 D32

RESIDENCE

1 CO. STARTER BAR kg - 717 21,297 - 3,649 3,896 16,783 - 46,342


COLUMN
2 CO. VERTICAL BAR kg - 933 32,288 - 3,133 3,811 10,688 - 50,852
3 SW. STARTER BAR kg - 51,200 13,177 3,537 - 33,305 24,260 - 125,479
SHEAR WALL
4 SW. VERTICAL BAR kg - 19,521 6,088 1,251 - 7,659 8,554 - 43,072
5 RESIDENCE SUMP PIT kg 37 1,366 2,801 900 998 4,325 10,811 516 21,754
5 BASEMENT 5 SUMP PIT COVER kg 116 404 - 74 - 513 - - 1,107
6 PILE CAP kg - 676 - - - 36,646 4,405 - 41,727
FOUNDATION
7 BASEMENT 5 SLAB kg 78 1,821 3,656 28,141 19,649 144,399 206,446 13,492 417,682
8 MAT kg - 4,520 1,482 2,445 72,307 202,688 130,792 1,348,419 1,762,653
9 CHAIR kg - 1,219 - - - 80,741 - - 81,960
8 PERIMETER WALL kg - 2,941 - - - - - - 2,941
8 RAMP SLAB kg 1,572 6,164 - - - - - - 7,736
RAMP
8 RAMP BEAM kg 588 1,816 - 616 3,914 1,484 - - 8,418

SUB TOTAL RESIDENCE kg 2,391 93,298 80,789 36,964 103,650 519,466 412,739 1,362,427 2,611,723

LINK HOTEL

1 CO. STARTER BAR kg - 482 1,049 - 1,237 485 - - 3,253


COLUMN
2 CO. VERTICAL BAR kg - 1,073 2,004 - 1,157 375 - - 4,609
5 SUMP PIT kg - 378 - 718 - 2,990 1,403 - 5,489
PART-3
5 (LINK-HOTEL) SUMP PIT COVER kg 13 52 - 18 22 - - - 105
BASEMENT 5
6 FOUNDATION PILE CAP kg - 372 - - - 9,701 2,582 2,302 14,957
7 RAFT/MAT kg 4 246 158 - 18 137,483 12,772 11,485 162,166
8 CHAIR kg - - - - - 2,734 - - 2,734
8 PERIMETER WALL kg - 1,671 - - - - - - 1,671

SUB TOTAL LINK - HOTEL kg 17 4,274 3,211 736 2,434 153,768 16,757 13,787 194,984

OFFICE

1 CO. STARTER BAR kg - 11,601 - - - 4,234 6,130 8,531 30,496


COLUMN
2 CO. VERTICAL BAR kg - 19,002 - - - 7,011 6,293 7,536 39,841
3 SW. STARTER BAR kg - 2,739 9,080 - - 4,705 - 23,737 40,261
SHEAR WALL
SHEAR WALL
4 SW. VERTICAL BAR kg - 4,402 12,901 - - 4,186 - 17,794 39,283
5 STARTER RAMP kg - 232 - - - 2,770 6,130 3,560 12,692
5 STAIR STARTER BAR kg 3 37 14 - - - - - 54
OFFICE
5 BASEMENT 5 TANK WALL kg - 670 389 - - 3,250 - - 4,309
5 SUMP PIT kg - - 280 - 550 5,920 25,330 14,760 46,840
6 PILE CAP kg - - - - - - - - -
7 FOUNDATION RAFT/MAT kg - 12,000 15,838 34,527 44,977 216,078 366,545 733,660 1,423,625
8 CHAIR kg - - - - - 81,043 - - 81,043
8 PERIMETER WALL kg - 3,361 - - - - - - 3,361

SUB TOTAL LINK - OFFICE kg 3 54,044 38,502 34,527 45,527 329,196 410,428 809,578 1,721,805

GRAND TOTAL BASEMENT 5 kg 2,411 96,487 77,005 69,054 91,054 654,158 814,725 1,610,624 3,415,518
Monitoring Delivery Rebar Order 24/09/2018

Type Diameter Standard 1 Stock Delivery Weight


No Bundle (Bundle)
(mm) (btg) Office Residence Length 1pcs (m)
1 10 200 13 18 12 0.62 7.44
2 13 160 7 3 12 1.04 12.48
3 16 110 26 16 12 1.58 18.96
4 19 70 3 14 12 2.23 26.76
5 22 60 8 10 12 2.98 35.76
6 25 40 15 17 12 3.85 46.2
7 29 30 10 18 12 5.04 60.48
8 32 30 9 11 12 6.31 75.72

SUMMARY TOTAL (KG)


Total (kg)

Office Residence
19,344 26,784
13,978 5,990
54,226 33,370
5,620 26,225
17,165 21,456
27,720 31,416
18,144 32,659
20,444 24,988
176,640 202,888
379,528
REBAR DELIVERY
Tot. Pcs = 363523
Tot. Tonase = 9,582.41
P10 D10 D13 D16 D19 D22 D25 D29 D32 D25 8M D29 8M D32 8M D32 10M
BjPT 24 BjTS40 BjTS40 BjTS40 BjTS40 BjTS40 BjTS40 BjTS40 BjTS40 BJTS40 BJTS40 BJTS40 BJTS40
No. DATE D.N.NUMBER
PCS KG PCS KG PCS KG PCS KG PCS KG PCS KG PCS KG PCS KG PCS KG PCS KG PCS KG PCS KG PCS KG
1486 10996.4 47864 354193.6 139165 1736779 42918 813725 17451 466989 13874 496134 31774 1467959 18251 1134482 26091 1975610.5 6795 209286 3489 144584.2 10678 539025.4 3687 232649.7
238 6-Jul-18 18/MS3/SJ00007982 301 9270.8 230 11610.4 90 5679
239 10-Jul-18 0128/PI/CBS.HANWA/III/2018 4054 29999.6 280 3494.4
240 10-Jul-18 0128/PI/CBS.HANWA/III/2018 1583 30014 51 3170.16
241 10-Jul-18 0128/PI/CBS.HANWA/III/2018 1724 21516 190 11810.4
242 10-Jul-18 0128/PI/CBS.HANWA/III/2018 4006 49995
243 17-Jul-18 DR.RM/18/01758(09037) 600 7488 1318 24989
244 17-Jul-18 DR.RM/18/01759(09038) 4409 55024
245 17-Jul-18 DR.RM/18/01757(09036) 3378 24997.2 600 7488
246 19-Jul-18 DR.RM/18/01824(09256) 799 9971.52 1582 29995 220 10164
247 19-Jul-18 DR.RM/18/01823(09253) 4054 29999.6 1605 20030.4
248 19-Jul-18 DR.RM/18/01825(09258) 105 4851 396 29985.1
249 21-Jul-18 DR.RM/18/01864(09372) 419 14983 325 15015 241 14981
250 23-Jul-18 DR.RM/18/01874(09419) 561 15012 264 9441 380 17556
251 23-Jul-18 DR.RM/18/01875(09420) 269 12428 483 30023
252 25-Jul-18 RB-A18038(087/V/JKT/2018) 4212 52566
253 25-Jul-18 RB-A 18006-ALL 4350 54288
254 25-Jul-18 RB-A 18006-ALL 2027 14999.8 458 5715.84 1755 33275
255 25-Jul-18 RB-A18038(087/V/JKT/2018) 4054 29999.6
256 25-Jul-18 RB-A18038(087/V/JKT/2018) 3000 37440 419 14983
257 25-Jul-18 DR=RM/18/01917(09550) 2200 41712
RAJAWALI PLACE PROJECT REBAR QUANTITY CONCRETE QUANTITY FORMWORKS QUANTITY

REBAR SHOP DWG. QTY LS-F Shop DWG POSCO Shop DWG Rebar Deviation LS-F Shop DWG POSCO Shop DWG Concrete Deviation LS-F Shop DWG POSCO Shop DWG Formwork Deviation
SUB-STRUCTURE (B5~L1 HORIZONTAL) 8/21/2018 9/22/2018 9/22/2018

DESCRIPTION TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL


No TOTAL TOTAL TOTAL
(kg) REMARK KG REMARK KG REMARK M³ REMARK M³ REMARK M³ REMARK M² REMARK M² REMARK M² REMARK
DRAWING NAME ZONING
1,000

I- RESIDENCE + LINK
I-1 GF 1 (RESIDENCE)
1 SLAB ALL - 109,283 109,283 918 918 5,072 5,072
2 BEAM ALL 31,137 393,759 362,622 631 631 2,427 2,427
3 COLUMN & SHEAR WALL ALL 120,368 120,368 - -
4 STAIRCASE ALL 2,110 2,110 10 10 -
5 RAMP ALL - - - -
SUB TOTAL (RESIDENCE) 31,137 625,520 594,383 - 1,558 1,558 - 7,499 7,499

I-2 BASEMENT 1 (RESIDENCE)

1 SLAB + DROP PANEL ALL 195,972 Final Clarificate Will Be 195,972 - 1,357 1,357 - -
2 BEAM ALL 50,685 50,120 (565) 104 104 - -
3 COLUMN & SHEAR WALL ALL 23,914 306,274 282,360 725 725 - -
4 RETAINING WALL ALL 42,773 39,473 (3,300) 377 377 - -
5 STAIRCASE ALL - 2,919 2,919 9 9 - -
6 RAMP ALL - 19,126 19,126 100 100 - -
SUB TOTAL (RESIDENCE) 313,344 613,884 300,540 - 2,671 2,671 - - -

I-3 BASEMENT 2 (RESIDENCE) 613,884 87,490 87,490 - 9,768 - 88,343

1 SLAB + DROP PANEL + Temp Flat slab ALL 304,242 306,183 1,941 1,707 1,707 - -
2 BEAM & CAP BEAM ALL 43,908 43,114 (794) 403 403 - -
3 COLUMN & SHEAR WALL ALL 183,485 134,914 (48,571) 457 457 - -
4 RETAINING WALL ALL 66,373 68,112 1,739 931 931 - -
5 STAIRCASE ALL - 2,919 2,919 9 9 - -
6 RAMP ALL - 16,154 16,154 85 85 - -
SUB TOTAL (RESIDENCE) 598,008 571,396 (26,612) - 3,592 3,592 - - -

I-4 BASEMENT 3 (RESIDENCE)

1 SLAB + DROP PANEL A+B+C+D+E 188,058 195,566 7,508 1,321 1,321 - -


2 BEAM+temp Strut beam A+B+C+D+E 22,475 19,676 (2,799) 97 97 - -
3 COLUMN & SHEAR WALL A+B+C+D+E 254,981 167,909 (87,073) 449 449 - -
4 STAIRCASE ALL 1,146 2,919 1,773 9 9 - -
5 RAMP ALL 15,719 16,212 493 90 90 - -
SUB TOTAL (RESIDENCE) 482,379 402,282 (80,097) - 1,965 1,965 - - -

I-5 BASEMENT 4 (RESIDENCE)

1 SLAB + DROP PANEL ALL 177,643 180,008 2,365 1,321 1,321 - -


2 BEAM+temp Strut beam ALL 21,708 19,676 (2,032) 97 97 - -
3 COLUMN & SHEAR WALL ALL 124,880 159,996 35,116 449 449 - -
4 STAIRCASE ALL 1,508 2,919 1,411 9 9 - -
5 RAMP ALL 16,356 15,388 (968) 90 90 - -
SUB TOTAL (RESIDENCE) 342,095 377,987 35,892 - 1,965 1,965 - - -

I-6 BASEMENT 5 (RESIDENCE)

1 MAT FOUNDATION ALL 2,506,777 2,515,275 8,498 10,315 10,315 - -


2 COLUMN & SHEAR WALL ALL 377,760 273,607 (104,153) 441 441 - -
3 STAIRCASE ALL 1,475 2,919 1,444 9 9 - -
4 RAMP ALL 13,807 13,448 (359) 88 88 - -
- - -

SUB TOTAL (RESIDENCE) 2,899,819 2,805,249 (94,570) - 10,852 10,852 - - -


RAJAWALI PLACE PROJECT REBAR QUANTITY CONCRETE QUANTITY FORMWORKS QUANTITY

REBAR SHOP DWG. QTY LS-F Shop DWG POSCO Shop DWG Rebar Deviation LS-F Shop DWG POSCO Shop DWG Concrete Deviation LS-F Shop DWG POSCO Shop DWG Formwork Deviation
SUB-STRUCTURE (B5~L1 HORIZONTAL) 8/21/2018 9/22/2018 9/22/2018

DESCRIPTION TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL


No TOTAL TOTAL TOTAL
(kg) REMARK KG REMARK KG REMARK M³ REMARK M³ REMARK M³ REMARK M² REMARK M² REMARK M² REMARK
DRAWING NAME ZONING
1,000

II- OFFICE
II-1 GROUNDFLOOR (OFFICE)

1 SLAB ALL - 57,295 57,295 644 644 -


2 BEAM ALL - 45,250 45,250 99 99 -
3 COLUMN & SHEAR WALL ALL - 90,812 90,812 - -
4 STAIRCASE ALL - 889 889 7 7 -
SUB TOTAL (OFFICE) - 194,246 194,246 749 749 -

II-2 BASEMENT 1MZ (OFFICE)

1 SLAB ALL 99,676 Final Clarificate Will Be 82,555 (17,121) 775 775 - -
2 BEAM ALL 36,524 Final Clarificate Will Be 36,524 - 69 69 - -
3 COLUMN & SHEAR WALL ALL 1,038 Only 2 Column Zone 2 108,416 107,378 273 273 - -
4 RETAINING WALL ALL - 33,474 33,474 125 125 - -
5 RAMP ALL - 15,943 15,943 71 71 - -
6 STAIRCASE ALL - 1,160 1,160 7 7 - -

SUB TOTAL (OFFICE) 137,238 278,072 140,834 - 1,320 1,320 - - -

II-3 BASEMENT 1 (OFFICE)

1 SLAB ALL 82,555 Final Clarificate Will Be 82,555 - 653 653 - -


2 BEAM ALL 13,896 Final Clarificate Will Be 13,896 - 52 52 - -
3 COLUMN & SHEAR WALL ALL 202,083 B1 - GF 108,416 (93,667) 274 274 - -
4 RETAINING WALL ALL 28,860 33,474 4,614 145 145 - -
5 RAMP ALL 10,276 15,943 5,667 60 60 - -
6 STAIRCASE ALL - 1,160 1,160 7 7 - -
SUB TOTAL (OFFICE) 337,670 255,444 (82,226) - 1,192 1,192 - - -

II-4 BASEMENT 2 (OFFICE)

1 SLAB + DROP PANEL ALL 81,604 74,439 (7,165) 602 602 - -


2 BEAM + CAP BEAM ALL 5,072 33,486 28,413 48 48 - -
3 COLUMN & SHEAR WALL ALL 30,438 108,416 77,978 279 279 - -
4 RETAINING WALL ALL 87,143 30,589 (56,554) 381 381 - -
5 RAMP ALL 10,229 12,965 2,736 60 60 - -
6 STAIRCASE ALL 813 1,160 347 7 7 - -
SUB TOTAL (OFFICE) 215,300 261,055 45,755 - 1,376 1,376 - - -
II-5 BASEMENT 3 (OFFICE)
1 SLAB + DROP PANEL ALL 74,130 74,439 309 602 602 - -
2 BEAM ALL 5,072 23,842 18,769 48 48 - -
3 COLUMN & SHEAR WALL ALL 164,927 77,978 (86,949) 231 231 - -
4 RAMP ALL 9,724 12,965 3,241 60 60 - -
5 STAIRCASE ALL 813 1,160 347 7 7 - -
SUB TOTAL (OFFICE) 254,667 190,384 (64,283) - 947 947 - - -
II-6 BASEMENT 4 (OFFICE)
1 SLAB + DROP PANEL ALL 63,617 74,439 10,822 602 602 - -
2 BEAM ALL 8,597 23,842 15,245 48 48 - -
3 COLUMN & SHEAR WALL ALL - 80,549 80,549 231 231 - -
4 STAIRCASE ALL 813 1,160 347 7 7 - -
5 RAMP ALL 9,724 12,965 3,241 60 60 - -
SUB TOTAL (OFFICE) 82,751 192,954 110,203 - 947 947 - - -
II-7 BASEMENT 5 (OFFICE)
1 MAT FOUNDATION ALL 1,502,250 1,556,288 54,038 7,677 7,677 - -
2 COLUMN & SHEAR WALL + PERIMETER WALL ALL 302,244 154,667 (147,577) 231 231 - -
4 STAIRCASE ALL 810 1,160 350 7 7 - -
5 RAMP ALL 8,219 12,527 4,308 60 60 - -
SUB TOTAL (OFFICE) 1,813,523 1,724,641 - 7,975 7,975 - - -
(88,882)

LSF Shop Dwg Posco Shop Dwg Deviation LSF Shop Dwg Posco Shop Dwg Deviation LSF Shop Dwg Posco Shop Dwg Deviation
TOTAL RESIDENCE +OFFICE 7,507,930 ( NOT COMPLETE) 8,493,113 985,183 - 37,111 37,111 - 7,499 7,499

DIFFERENCE 985,183

NOTE : LS QTY NOT COMPLETE

QTY POSCO Shop Dwg Kg 8,493,113


QTY LOGISTIK Cut Of Date 21 Sept 2018 kg 9,945,937
QTY Stock Rebar Kg 379,528
QTY Scrap Rebar ( estimtion 3 % ) Kg 298,378

kg 774,918
RAJAWALI PLACE PROJECT

REBAR TOTAL PER GROUND FLOOR 1 SHOP DRAWING ACTUAL


DESCRIPTION DIAMETER
LAST NUMBER DRAWING SUBMITTAL
No. FLOOR / ZONE UNIT TOTAL
ELEMENT TYPE D10 D13 D16 D19 D22 D25 D29 D32 POSCO - PKN (STATUS APPROVE)

RESIDENCE
1 COLUMN CO. VERTICAL BAR kg - 401 6,683 - 1,869 3,365 5,870 - 18,188
4 SHEAR WALL SW. VERTICAL BAR kg 39,138 12,365 2,574 15,746 19,418 89,241
RESIDENCE GROUND FLAT SLAB
7 SLAB kg 85,530 85,530
FLOOR 1
9 BEAM & GIRDER BEAM kg 166,897 349,755
11 STAIRCASE STAIR SLAB kg 228 742 176 1,146

SUB TOTAL RESIDENCE GF kg 85,758 40,281 19,224 169,471 1,869 19,111 25,288 - 361,002

LINK HOTEL

37 COLUMN CO. VERTICAL BAR Kg - 5,667 - - 6,677 595 - - 12,939 RPP-PKN-SD-ST-R-010

43 LINK-HOTEL FLAT SLAB SLAB Kg 23,754 23,754


GROUND FLOOR 1
45 BEAM & GIRDER BEAM Kg 44,004 44,004
11 STAIRCASE STAIR kg 374 478 112 964

SUB TOTAL LINK HOTEL GF kg 24,128 6,145 112 44,004 6,677 595 - - 81,660

OFFICE

38 COLUMN CO. VERTICAL BAR Kg - 19,699 - - - 9,685 4,657 16,063 50,104 RPP-PKN-SD-ST-R-072 Rev 0
40 SHEAR WALL SW. VERTICAL BAR Kg - 9,753 8,424 - - 4,689 - 17,842 40,708
43 OFFICE FLAT SLAB SLAB Kg 57,295 57,295
GROUND FLOOR 1
45 BEAM & GIRDER BEAM Kg 14,108 5,979 1,737 17,343 3,709 2,374 45,250 RATIO FORCON R.2
11 STAIRCASE STAIR kg 195 547 147 889
-

SUB TOTAL OFFICE GF kg 71,598 35,978 10,308 17,343 3,709 16,748 4,657 33,904 194,246

GRAND TOTAL GROUND FLOOR 1 kg 181,483 82,404 29,644 230,818 12,255 36,454 29,945 33,904 636,908

REBAR TOTAL PER BASEMENT - 1 MEZZ SHOP DRAWING ACTUAL


DESCRIPTION DIAMETER
No. FLOOR / ZONE UNIT TOTAL LAST NUMBER DRAWING SUBMITTAL
ELEMENT TYPE D10 D13 D16 D19 D22 D25 D29 D32 POSCO - PKN (STATUS APPROVE)

38 COLUMN CO. VERTICAL BAR Kg - 26,621 - - - 13,089 6,293 21,707 67,709 RPP-PKN-SD-ST-R-072 Rev 0
40 SHEAR WALL SW. VERTICAL BAR Kg - 9,753 8,424 - - 4,689 - 17,842 40,708
42 RETAINING WALL RE. VERTICAL BAR Kg 146 4,953 480 - 2,659 13,237 8,360 587 30,421
42 TRANSFER WALL RE. VERTICAL BAR Kg 168 2,885 3,053
43 SLAB Kg 129 17,787 326 1,542 3,851 18,298 3,750 45,684
OFFICE
44 FLAT SLAB DROP PANEL Kg - 9,517 154 7,041 - - - - 16,712
BASEMENT 1 MEZZ
44 BAND BEAM & Z REBAR kg 12,043 - 12,043 FINAL RESULT VO RFI-ST-014 ZONE C&E
45 BEAM & GIRDER BEAM Kg 2,955 5,461 723 1,204 787 15,642 - 9,752 36,524 FINAL CLARIFICATION with lsf
11 RAMP SLAB kg 3,049 4,309 821 - - - - - 8,179
RAMP B1 - GF 1
12 RAMP BEAM kg 542 1,675 - 568 3,610 1,369 - - 7,764
11 STAIRCASE STAIR kg 286 687 187 1,160
-

SUB TOTAL OFFICE BASEMENT 1 MEZZ kg 19,318 80,763 11,115 13,240 10,907 66,323 14,653 53,637 269,956

GRAND TOTAL BASEMENT 1 MEZZ kg 19,318 80,763 11,115 13,240 10,907 66,323 14,653 53,637 269,956

REBAR TOTAL PER BASEMENT - 1 SHOP DRAWING ACTUAL

GRAND TOTAL BASEMENT 1 kg 49,248 388,198 104,477 24,206 40,884 125,709 81,386 55,220 869,328

REBAR TOTAL PER BASEMENT - 2 SHOP DRAWING ACTUAL

GRAND TOTAL BASEMENT 2 kg 69,089 230,023 75,336 175,514 80,115 111,514 41,420 49,441 832,451
REBAR TOTAL PER BASEMENT - 3 SHOP DRAWING ACTUAL

GRAND TOTAL BASEMENT 3 kg 45,965 261,091 71,876 35,141 30,135 77,467 40,615 30,376 592,666

REBAR TOTAL PER BASEMENT - 4 SHOP DRAWING ACTUAL

GRAND TOTAL BASEMENT 4 kg 43,525 251,815 69,323 34,748 25,769 78,053 37,334 30,376 570,941

REBAR TOTAL PER BASEMENT - 5 SHOP DRAWING ACTUAL

GRAND TOTAL BASEMENT 5 kg 6,316 161,356 119,391 73,742 150,696 1,001,229 834,881 2,182,279 4,529,890
RAJAWALI PLACE PROJECT
REBAR TOTAL PER GROUND FLOOR 2 SHOP DRAWING FINAL CHECK QS POSCO
DESCRIPTION DIAMETER
No. FLOOR / ZONE UNIT TOTAL
ELEMENT TYPE D10 D13 D16 D19 D22 D25 D29 D32

RESIDENCE
1 COLUMN CO. VERTICAL BAR kg 29,094 818 6,495 12,250 48,656
1 SHEAR WALL SW. VERTICAL BAR kg 9,903 7,607 682 8,980 1,465 28,637
2 ZONE 6 FLAT SLAB SLAB kg -
3 Chair Bar kg -
4 BEAM & GIRDER BEAM kg -
1 COLUMN CO. VERTICAL BAR kg - - 29,094 - 818 6,495 12,250 - 48,656
2 SHEAR WALL SW. VERTICAL BAR kg - 9,903 7,607 682 - 8,980 1,465 - 28,637
7 SLAB kg -
9 RESIDENCE DROP PANEL kg -
FLAT SLAB
10 GROUND FLOOR 2 BAND BEAM & Z REBAR kg -
11 Chair Bar kg -
12 BEAM & GIRDER BEAM kg -
12 COUPLING BEAM BEAM kg -

SUB TOTAL kg - 9,903 36,701 682 818 15,475 13,715 - 77,293

RAJAWALI PLACE PROJECT


REBAR TOTAL PER GROUND FLOOR 1 SHOP DRAWING FINAL CHECK QS POSCO
DESCRIPTION DIAMETER
No. FLOOR / ZONE UNIT TOTAL
ELEMENT TYPE D10 D13 D16 D19 D22 D25 D29 D32

RESIDENCE
1 COLUMN CO. VERTICAL BAR kg -
2 RE. STARTER BAR kg -
RETAINING WALL
4 ZONE 1 RE. VERTICAL BAR kg -
5 FLAT SLAB SLAB kg 8,911 11,360 4,261 24,532
6 BEAM & GIRDER BEAM kg 3,475 4,419 4,528 14,423 26,845
7 COLUMN CO. VERTICAL BAR kg -
8 RE. STARTER BAR kg -
RETAINING WALL
9 ZONE 2 RE. VERTICAL BAR kg -
ZONE 2
10 FLAT SLAB SLAB kg 8,197 11,083 1,877 21,157
11 BEAM & GIRDER BEAM kg 6,034 625 700 9,901 8,198 25,458
12 COLUMN CO. VERTICAL BAR kg -
13 RE. STARTER BAR kg -
RETAINING WALL
14 ZONE 3 RE. VERTICAL BAR kg -
15 FLAT SLAB SLAB kg 8,117 8,604 1,382 316 18,419
16 BEAM & GIRDER BEAM kg 4,736 3,485 549 770 5,496 16,826 31,862
17 COLUMN CO. VERTICAL BAR kg -
18 SW. STARTER BAR kg -
SHEAR WALL
19 SW. VERTICAL BAR kg -
20 ZONE 4 RE. STARTER BAR kg -
RETAINING WALL
21 RE. VERTICAL BAR kg -
22 FLAT SLAB SLAB kg 9,435 11,794 478 759 22,466
23 BEAM & GIRDER BEAM kg 4,949 2,368 - - 5,742 18,078 31,137
24 COLUMN CO. VERTICAL BAR kg 29,094 818 6,495 12,250 48,656
25 SHEAR WALL SW. VERTICAL BAR kg 9,903 7,607 682 8,980 1,465 28,637
26 RE. STARTER BAR kg -
ZONE 6 RETAINING WALL
27 RE. VERTICAL BAR kg -
28 FLAT SLAB SLAB kg -
29 BEAM & GIRDER BEAM kg -
1 CO. STARTER BAR kg - - - - - - - - -
COLUMN
2 CO. VERTICAL BAR kg - - 29,094 - 818 6,495 12,250 - 48,656
3 SW. STARTER BAR kg - - - - - - - - -
SHEAR WALL
4 SW. VERTICAL BAR kg - 9,903 7,607 682 - 8,980 1,465 - 28,637
RESIDENCE
5 RE. STARTER BAR kg - - - - - - - - -
GROUND FLOOR 1 RETAINING WALL
6 RE. VERTICAL BAR kg - - - - - - - - -
7 FLAT SLAB SLAB kg 34,660 42,841 7,998 1,075 - - - - 86,574
12 BEAM & GIRDER BEAM kg 19,194 10,897 1,249 770 25,667 57,525 - - 115,302
12 COUPLING BEAM BEAM kg 148 2,028 883 1,060 12,639 16,758

SUB TOTAL kg 54,002 65,669 46,831 2,527 26,485 74,060 13,715 12,639 295,927

LINK HOTEL

1 CO. STARTER BAR kg -


COLUMN
2 CO. VERTICAL BAR kg -
3 RE. STARTER BAR kg -
RETAINING WALL

ZONE 7
RETAINING WALL
4 RE. VERTICAL BAR kg -
5 ZONE 7 SLAB kg -
6 DROP PANEL kg -
FLAT SLAB
7 BAND BEAM & Z REBAR kg -
8 Chair Bar kg -
8 BEAM & GIRDER BEAM kg -
1 CO. STARTER BAR kg - - - - - - - - -
COLUMN
2 CO. VERTICAL BAR kg - - - - - - - - -
5 RE. STARTER BAR kg - - - - - - - - -
RETAINING WALL
6 RE. VERTICAL BAR kg - - - - - - - - -
LINK-HOTEL
7 SLAB kg - - - - - - - - -
GROUND FLOOR 1
8 FLAT SLAB DROP PANEL kg - - - - - - - - -
8 BAND BEAM & Z REBAR kg - - - - - - - - -
9 Chair Bar kg - - - - - - - - -
9 BEAM & GIRDER BEAM kg - - - - - - - - -

SUB TOTAL kg - - - - - - - - -
OFFICE

1 CO. STARTER BAR kg -


COLUMN
2 CO. VERTICAL BAR kg -
5 RE. STARTER BAR kg -
RETAINING WALL
6 RE. VERTICAL BAR kg -
OFFICE GROUND
7 SLAB kg -
FLOOR 1
8 FLAT SLAB DROP PANEL kg -
8 BAND BEAM & Z REBAR kg -
9 Chair Bar kg -
9 BEAM & GIRDER BEAM kg -

SUB TOTAL kg - - - - - - - - -
RAJAWALI PLACE PROJECT
REBAR TOTAL PER BASEMENT - 1 SHOP DRAWING FINAL CHECK QS POSCO
DESCRIPTION DIAMETER
No. FLOOR / ZONE UNIT TOTAL
ELEMENT TYPE D10 D13 D16 D19 D22 D25 D29 D32

RESIDENCE
1 COLUMN CO. VERTICAL BAR kg 4,294 1,610 5,904
2 RE. STARTER BAR kg -
RETAINING WALL
4 RE. VERTICAL BAR kg -
5 SLAB kg 596 9,809 138 377 10,920
ZONE 1
6 FLAT SLAB DROP PANEL kg -
7 BAND BEAM & Z REBAR kg 943 1,684 2,627
8 Chair Bar kg 312 312
9 BEAM & GIRDER BEAM kg 592 360 2,090 460 69 3,571
10 COLUMN CO. VERTICAL BAR kg 400 3,611 1,648 5,659
11 SW. STARTER BAR kg -
SHEAR WALL
12 SW. VERTICAL BAR kg -
13 RE. STARTER BAR kg -
RETAINING WALL
14 RE. VERTICAL BAR kg -
ZONE 2
15 SLAB kg 615 14,794 478 522 2,406 18,815
16 DROP PANEL kg -
FLAT SLAB
17 BAND BEAM & Z REBAR kg 1,742 2,810 4,552
18 Chair Bar kg 437 437
19 BEAM & GIRDER BEAM kg 303 331 568 1,202
20 COLUMN CO. VERTICAL BAR kg 498 4,185 1,920 6,603
21 SW. STARTER BAR kg -
SHEAR WALL
22 SW. VERTICAL BAR kg -
23 RE. STARTER BAR kg -
RETAINING WALL
24 RE. VERTICAL BAR kg -
ZONE 3
25 SLAB kg 370 17,418 417 676 934 1,298 1,112 22,225
26 DROP PANEL kg -
FLAT SLAB
27 BAND BEAM & Z REBAR kg 1,681 2,243 238 4,162
28 Chair Bar kg 749 749
28 BEAM & GIRDER BEAM kg -
29 COLUMN CO. VERTICAL BAR kg 1,901 5,412 4,339 11,652
30 SW. STARTER BAR kg -
SHEAR WALL
30 SW. VERTICAL BAR kg -

ZONE 4
31 RE. STARTER BAR kg -
RETAINING WALL
32 RE. VERTICAL BAR kg -
ZONE 4
33 SLAB kg 990 13,663 1,480 388 2,386 18,907
34 FLAT SLAB DROP PANEL kg -
35 BAND BEAM & Z REBAR kg 1,986 2,896 4,882
36 Chair Bar kg 374 374
36 BEAM & GIRDER BEAM kg 678 1,258 477 111 2,524
12 CO. VERTICAL BAR kg 18,205 1,277 1,110 12,029 32,621
13 SW. STARTER BAR kg -
SHEAR WALL
14 SW. VERTICAL BAR kg 43,846 12,625 1,458 25,431 16,611 99,971
15 RE. STARTER BAR kg -
RETAINING WALL
16 RE. VERTICAL BAR kg -
ZONE 5
17 SLAB kg 1,139 17,597 1,492 1,334 1,222 14,152 36,936
18 FLAT SLAB DROP PANEL kg -
19 BAND BEAM & Z REBAR kg 4,189 5,381 394 417 10,381
20 Chair Bar kg 624 624
20 BEAM & GIRDER BEAM kg 950 500 1,089 1,556 104 547 1,370 6,116
22 CO. VERTICAL BAR kg 17,070 1,320 1,110 16,312 35,812
23 SW. STARTER BAR kg -
SHEAR WALL
24 SW. VERTICAL BAR kg 42,514 12,758 1,458 24,940 17,858 99,528
25 RE. STARTER BAR kg -
RETAINING WALL
26 RE. VERTICAL BAR kg -
ZONE 6
27 SLAB kg 1,120 14,818 1,344 1,257 645 1,678 425 21,287
28 FLAT SLAB DROP PANEL kg -
29 BAND BEAM & Z REBAR kg 3,590 4,354 374 402 8,720
30 Chair Bar kg 562 562
30 BEAM & GIRDER BEAM kg 893 4,822 375 1,211 101 8,531 636 16,569
1 CO. STARTER BAR kg - - - - - - - - -
COLUMN
2 CO. VERTICAL BAR kg - 2,799 52,777 1,920 10,194 2,220 28,341 - 98,251
2 COLUMN SEPARATE COLUMN kg 176 509 685
3 SW. STARTER BAR kg - - - - - - - - -
SHEAR WALL
4 SW. VERTICAL BAR kg - 86,360 25,383 2,916 - 50,371 34,469 - 199,499
5 RE. STARTER BAR kg - - - - - - - - -
RETAINING WALL
6 RESIDENCE RE. VERTICAL BAR kg - - - - - - - - -
7 BASEMENT -1 SLAB kg 4,830 88,099 5,349 4,166 2,801 19,922 3,923 - 129,090
9 DROP PANEL kg - - - - - - - - -
FLAT SLAB
10 BAND BEAM & Z REBAR kg 14,131 19,368 768 1,057 - - - - 35,324
11 Chair Bar kg - 3,058 - - - - - - 3,058
12 BEAM & GIRDER BEAM kg 3,416 5,682 1,464 6,446 1,142 9,826 - 2,006 29,982
11 RAMP SLAB kg 1,028 3,900 4,928
RAMP
12 RAMP BEAM kg 336 1,083 - 487 2,404 325 4,635

SUB TOTAL kg 23,917 210,349 86,250 16,992 16,541 82,664 66,733 2,006 505,452
LINK HOTEL

1 CO. STARTER BAR kg -


COLUMN
2 CO. VERTICAL BAR kg 4,667 2,677 495 7,839
3 RE. STARTER BAR kg -
RETAINING WALL
4 RE. VERTICAL BAR kg -
5 ZONE 7 SLAB kg 370 25,601 38 26,009
6 DROP PANEL kg -
FLAT SLAB
7 BAND BEAM & Z REBAR kg 2,031 3,518 5,549
8 Chair Bar kg 811 811
8 BEAM & GIRDER BEAM kg 1,359 3,727 6 149 1,818 13,079 20,138
1 CO. STARTER BAR kg - - - - - - - - -
COLUMN
2 CO. VERTICAL BAR kg - 4,667 - - 2,677 495 - - 7,839
5 RE. STARTER BAR kg - - - - - - - - -
RETAINING WALL
6 RE. VERTICAL BAR kg - - - - - - - - -
LINK-HOTEL
7 SLAB kg 370 25,601 38 - - - - - 26,009
BASEMENT -1
8 FLAT SLAB DROP PANEL kg - - - - - - - - -
8 BAND BEAM & Z REBAR kg 2,031 3,518 - - - - - - 5,549
9 Chair Bar kg - 811 - - - - - - 811
9 BEAM & GIRDER BEAM kg 1,359 3,727 6 149 - 1,818 - 13,079 20,138

SUB TOTAL kg 3,760 38,324 44 149 2,677 2,313 - 13,079 60,346

OFFICE

1 CO. STARTER BAR kg -


COLUMN
2 CO. VERTICAL BAR kg 26,621 13,089 6,293 21,707 67,709
5 RE. STARTER BAR kg -
RETAINING WALL
6 RE. VERTICAL BAR kg 9,753 8,424 4,689 17,842 40,708
OFFICE
7 SLAB kg -
BASEMENT -1
8 FLAT SLAB DROP PANEL kg -
8 BAND BEAM & Z REBAR kg -
9 Chair Bar kg -
9 BEAM & GIRDER BEAM kg -

SUB TOTAL kg - 36,374 8,424 - - 17,778 6,293 39,548 108,416


RAJAWALI PLACE PROJECT
REBAR TOTAL PER BASEMENT - 2 SHOP DRAWING ACTUAL
DESCRIPTION DIAMETER
No. FLOOR / ZONE UNIT TOTAL
ELEMENT TYPE D10 D13 D16 D19 D22 D25 D29 D32

RESIDENCE
1 CO. STARTER BAR kg - - 5,478 - 507 - 3,765 - 9,750
COLUMN
2 CO. VERTICAL BAR kg - 365 8,905 - 2,391 154 6,859 - 18,674
3 SW. STARTER BAR kg - - - - - - - - -
SHEAR WALL
4 SW. VERTICAL BAR kg - - - - - - - - -
5 RE. STARTER BAR kg - 982 - - 2,191 - - - 3,173
RETAINING WALL
6 RE. VERTICAL BAR kg - - - - - - - - -
RS-ZONE-A
7 SLAB kg - 8,605 3,349 15,760 - 2,474 - - 30,188
8 FLAT SLAB DROP PANEL kg 700 - 13,436 1,117 - - - 15,253
9 BAND BEAM & Z REBAR kg 3,699 - 2,484 - - - - 6,183
10 BEAM kg 417 71 - 501 643 - - 1,632
BEAM & GIRDER
11 Cap Beam kg 2,599 152 - - 2,744 - - - 5,495
12 Temporary Slab Temporary Slab - - 1,368 - - - - - 1,368
11 CO. STARTER BAR kg - 119 1,393 - 2,081 - 632 - 4,225
COLUMN
12 CO. VERTICAL BAR kg - 795 2,896 - 2,361 - 475 - 6,527
13 SW. STARTER BAR kg - 2,760 666 - - 3,300 920 - 7,646
SHEAR WALL
14 SW. VERTICAL BAR kg - 16,059 3,039 - - 8,487 1,525 - 29,110
15 RE. STARTER BAR kg - 1,479 2,548 570 1,024 - - - 5,621
RETAINING WALL
16 RS-ZONE-B RE. VERTICAL BAR kg - - - - - - - - -
16 SLAB kg - 7,320 317 11,910 755 - - - 20,302
17 FLAT SLAB DROP PANEL kg - - 6,923 - - - - 6,923
18 BAND BEAM & Z REBAR kg 3,172 2,481 - - - - 5,653
19 BEAM kg 197 103 - 684 246 - - - 1,230
BEAM & GIRDER
20 Cap Beam kg 2,705 153 - - 2,778 - - - 5,636
21 CO. STARTER BAR kg - - 623 - 1,612 202 - - 2,437
COLUMN
22 CO. VERTICAL BAR kg - - - - - - - - -
23 SW. STARTER BAR kg - - 1,737 713 - 6,327 1,319 - 10,096
SHEAR WALL
24 SW. VERTICAL BAR kg - - - - - - - - -
25 RE. STARTER BAR kg - 1,383 1,166 - 1,055 - - - 3,604
RETAINING WALL
26 RS-ZONE-C RE. VERTICAL BAR kg - - - - - - - - -
27 SLAB kg 214 9,591 269 16,149 915 4,912 - - 32,050
27 FLAT SLAB DROP PANEL kg - - - 13,359 - - - - 13,359
RS-ZONE-C

FLAT SLAB
28 BAND BEAM & Z REBAR kg 3,719 414 1,197 - - - - 5,331
29 BEAM kg 398 47 - 1,133 131 1,709
BEAM & GIRDER
30 Cap Beam kg 1,577 93 - - 1,894 - - - 3,564
31 CO. STARTER BAR kg - 128 2,998 - 2,968 1,263 4,380 - 11,737
COLUMN
32 CO. VERTICAL BAR kg - 592 11,559 - 2,912 - 6,416 - 21,479
33 SW. STARTER BAR kg - 298 175 - - 902 - - 1,375
SHEAR WALL
34 SW. VERTICAL BAR kg - - - - - - - - -
35 RE. STARTER BAR kg - 2,686 5,054 698 - - - - 8,438
RETAINING WALL
36 RS-ZONE-D RE. VERTICAL BAR kg - - - - - - - - -
37 SLAB kg 144 13,710 991 33,613 952 3,975 476 - 53,861
37 FLAT SLAB DROP PANEL kg - 35 239 14,951 - - - - 15,225
38 BAND BEAM & Z REBAR kg 7,326 4,284 - - - - 11,610
39 BEAM kg 326 - 123 532 114 - - - 1,095
BEAM & GIRDER
40 Cap Beam kg 2,839 134 - - 2,573 - - - 5,546
41 CO. STARTER BAR kg -
COLUMN
42 CO. VERTICAL BAR kg -
43 SW. STARTER BAR kg -
SHEAR WALL
44 SW. VERTICAL BAR kg -
45 SLAB kg 1,183 13,103 1,330 220 901 700 17,437
CORE AREA
46 DROP PANEL kg -
FLAT SLAB
47 BAND BEAM & Z REBAR kg 3,049 4,309 821 8,179
48 Chair Bar kg 527 527
49 BEAM kg 1,031 1,355 894 1,282 206 1,512 2,006 8,286
BEAM & GIRDER
50 Cap Beam kg -

1 CO. STARTER BAR kg - 247 10,492 - 7,168 1,465 8,777 - 28,149


COLUMN
2 CO. VERTICAL BAR kg - 1,752 23,360 - 7,664 154 13,750 - 46,680
3 SW. STARTER BAR kg - 3,058 2,578 713 - 10,529 2,239 - 19,117
SHEAR WALL
4 SW. VERTICAL BAR kg - 16,059 3,039 - - 8,487 1,525 - 29,110
5 RE. STARTER BAR kg - 6,530 8,768 1,268 4,270 - - - 20,836
RETAINING WALL
6 RE. VERTICAL BAR kg 1,073 16,921 1,640 9,084 - - - 28,718
7 RESIDENCE SLAB kg 1,541 52,329 6,256 77,652 3,523 12,061 476 - 153,838
7 BASEMENT -2 Temporary Slab kg - - 1,368 - - - - - 1,368
FLAT SLAB
8 DROP PANEL kg - 735 239 48,669 1,117 - - - 50,760
8 BAND BEAM & Z REBAR kg 20,965 4,723 821 10,447 - - - - 36,955
9 BEAM kg 2,369 1,576 1,017 4,132 697 2,155 - 2,006 13,951
BEAM & GIRDER
10 Cap Beam kg 9,720 532 - - 9,989 - - - 20,241
11 RAMP SLAB kg 786 3,082 3,868
RAMP
RAMP
12 RAMP BEAM kg 294 908 308 1,957 742 4,209

SUB TOTAL kg 36,747 108,452 59,578 143,189 45,468 35,593 26,767 2,006 457,800
LINK HOTEL

37 CO. STARTER BAR Kg - 640 340 - 2,742 485 - - 4,207


COLUMN
38 CO. VERTICAL BAR Kg - 3,369 - - 3,737 545 - - 7,651
39 SW. STARTER BAR Kg - - - - - - - - -
SHEAR WALL
40 SW. VERTICAL BAR Kg - - - - - - - - -
41 RE. STARTER BAR Kg - 1,766 2,219 - 2,289 - - - 6,274
RETAINING WALL
42 LINK-HOTEL RE. VERTICAL BAR Kg -
43 BASEMENT 2 SLAB Kg 122 16,839 309 1,460 3,646 17,322 - 3,550 43,248
44 FLAT SLAB DROP PANEL Kg - 7,974 129 5,899 - - - - 14,002
44 BAND BEAM & Z REBAR kg 4,194 467 1,350 - - - - 6,011
45 BEAM Kg 181 33 - 394 608
BEAM & GIRDER
46 Cap Beam Kg 3,878 229 - - 4,207 - - - 8,314
47 STAIRCASE STAIRCASE kg 74 320 126 520

SUB TOTAL kg 8,450 31,637 3,123 9,104 16,621 18,352 - 3,550 90,836

OFFICE

37 CO. STARTER BAR Kg -


COLUMN
38 CO. VERTICAL BAR Kg 26,621 13,089 6,293 21,707 67,709
39 SW. STARTER BAR Kg -
SHEAR WALL
40 SW. VERTICAL BAR Kg 9,753 8,424 4,689 17,842 40,708
42 OFFICE RETAINING WALL RE. VERTICAL BAR Kg 314 4,953 480 2,659 13,237 8,360 587 30,589
43 BASEMENT 2 SLAB Kg -
44 FLAT SLAB DROP PANEL Kg -
44 BAND BEAM & Z REBAR kg 12,043 12,043
45 BEAM Kg -
BEAM & GIRDER
46 Cap Beam Kg -

SUB TOTAL kg 12,357 41,326 8,904 - 2,659 31,014 14,653 40,135 151,048

GRAND TOTAL BASEMENT 2 kg 45,197 140,089 62,701 152,292 62,089 53,945 26,767 5,556 548,636

RAJAWALI PLACE PROJECT


REBAR TOTAL PER BASEMENT - 3
DESCRIPTION DIAMETER
No. FLOOR UNIT TOTAL
ELEMENT TYPE D10 D13 D16 D19 D22 D25 D29 D32

RESIDENCE
1 CO. STARTER BAR kg - 90 1,782 - 119 1,036 2,219 - 5,246
COLUMN
2 CO. VERTICAL BAR kg - 173 7,651 - 115 130 3,584 - 11,653
7 SLAB kg 3,216 77 142 - - - - 3,435
RS-ZONE-A
8 FLAT SLAB DROP PANEL kg 1,817 1,242 77 142 - - - - 3,278
8 BAND BEAM & Z REBAR kg 2,244 1,671 202 159 4,277
9 BEAM BEAM kg 340 48 - 651 242 526 - - 1,807
10 CO. STARTER BAR kg - 71 664 - 591 318 - - 1,644
COLUMN
11 CO. VERTICAL BAR kg - 155 2,520 - 501 270 - - 3,446
12 SW. STARTER BAR kg - 1,820 454 - - 4,092 980 - 7,346
SHEAR WALL
13 SW. VERTICAL BAR kg - 7,412 1,533 - - 3,274 474 - 12,693
RS-ZONE-B
16 SLAB kg 2,913 - - - - 2,913
17 FLAT SLAB DROP PANEL kg 114 10,858 841 550 247 1,318 - - 13,929
8 BAND BEAM & Z REBAR kg 1,871 1,605 284 18 3,777
18 BEAM & GIRDER BEAM kg 292 168 - 942 277 - - - 1,679
19 CO. STARTER BAR kg - 94 1,404 - 702 1,040 519 - 3,759
COLUMN
20 CO. VERTICAL BAR kg - 170 4,787 - 573 832 622 - 6,984
21 SW. STARTER BAR kg - 2,490 684 - - 6,392 992 - 10,558
SHEAR WALL
22 SW. VERTICAL BAR kg - 10,345 2,067 - - 5,114 - - 17,526
RS-ZONE-C
25 SLAB kg 170 24,274 890 1,195 1,409 1,601 - - 29,539
26 FLAT SLAB DROP PANEL kg - 2,538 - - - - - - 2,538
8 BAND BEAM & Z REBAR kg 3,547 2,695 417 156 6,816
27 BEAM & GIRDER BEAM kg 574 46 125 1,290 148 - - - 2,183
28 CO. STARTER BAR kg - 146 2,833 - 457 971 3,132 - 7,539
COLUMN
29 CO. VERTICAL BAR kg - 325 10,525 - 373 777 4,007 - 16,007
34 SLAB kg 156 24,467 1,038 998 - 1,913 3,731 - 32,303
RS-ZONE-D
35 FLAT SLAB DROP PANEL kg 1,136 169 394 - - - - 1,699
8 BAND BEAM & Z REBAR kg 2,647 2,397 417 18 5,479
36 BEAM & GIRDER BEAM kg 215 102 - 524 94 - - - 935
37 STRUT BEAM BEAM & GIRDER STRUT BEAM kg - 1,310 - - 5,628 - - - 6,938
38 COLUMN B3-B2 CO. VERTICAL BAR kg 13,850 2,407 1,359 5,370 22,986
39 SW. VERTICAL BAR kg 39,138 12,365 2,574 15,746 19,418 89,241
40 SLAB kg 1,193 13,279 1,330 220 901 700 17,623
41 CORE AREA DROP PANEL kg -
FLAT SLAB
CORE AREA
FLAT SLAB
42 BAND BEAM & Z REBAR kg 3,049 4,309 821 8,179
43 Chair Bar kg 527 527
44 BEAM & GIRDER BEAM kg 1,327 1,280 206 1,530 1,249 7,660

1 CO. STARTER BAR kg - 401 6,683 - 1,869 3,365 5,870 - 18,188


COLUMN
2 CO. VERTICAL BAR kg - 823 39,333 - 3,969 3,368 13,583 - 61,076
3 SW. STARTER BAR kg - 4,310 1,138 - - 10,484 1,972 - 17,904
SHEAR WALL
4 SW. VERTICAL BAR kg - 56,895 15,965 2,574 - 24,134 19,892 - 119,460
7 BASEMENT -3 SLAB kg 1,519 68,149 3,336 2,555 2,310 4,214 3,731 - 85,813
8 FLAT SLAB DROP PANEL kg 1,931 15,773 1,087 1,087 247 1,318 - - 21,443
9 BAND BEAM & Z REBAR kg 13,358 12,678 2,140 351 - - - - 28,528
9 Chair Bar kg - 527 - - - - - - 527
10 BEAM & GIRDER BEAM kg 1,421 1,691 125 4,687 967 2,056 - 1,249 12,196
11 BEAM & GIRDER STRUT BEAM kg - 1,310 - - 5,628 - - - 6,938

GRAND TOTAL RESIDENCE kg 18,229 162,557 69,807 11,254 14,990 48,939 45,048 1,249 372,073

LINK HOTEL

1 CO. STARTER BAR kg - 340 642 - 1,312 486 - - 2,780


COLUMN
2 CO. VERTICAL BAR kg - 1,145 2,006 - 1,075 388 - - 4,614
3 SW. STARTER BAR kg - - - - - - - - -
SHEAR WALL
4 SW. VERTICAL BAR kg - - - - - - - - -
5 RE. STARTER BAR kg - - - - - - - - -
LINK-HOTEL (B3) RETAINING
6 WALL RE. VERTICAL BAR kg - - - - - - - -
7 SLAB kg - 14,879 71 105 - - - - 15,055
8 FLAT SLAB DROP PANEL kg - 5,660 - - - - - 5,660
8 BAND BEAM & Z REBAR kg 3,469 1,058 86 - 4,613
LINK-HOTEL (B3)

9 BEAM & GIRDER BEAM kg 186 - - 356 - - - - 542

GRAND TOTAL LINK kg 3,655 23,082 2,805 461 2,387 874 - - 33,264

OFFICE
162,830
37 CO. STARTER BAR Kg -
COLUMN (B3-B1)
38 CO. VERTICAL BAR Kg 16,432 7,011 6,293 7,536 37,271
39 SW. STARTER BAR Kg -
SHEAR WALL
40 SW. VERTICAL BAR Kg 9,753 8,424 4,689 17,842 40,708
41 RE. STARTER BAR Kg -
RETAINING WALL
42 OFFICE B3 RE. VERTICAL BAR Kg -
43 SLAB Kg -
44 FLAT SLAB DROP PANEL Kg -
44 BAND BEAM & Z REBAR kg 12,043 12,043
45 BEAM Kg -
BEAM & GIRDER
46 Cap Beam Kg -
11 RAMP SLAB kg 2,890 94 2,984
RAMP
12 RAMP BEAM kg 900 1,556 1,772 1,444 5,672

SUB TOTAL kg 15,833 26,279 8,424 1,556 1,772 13,144 6,293 25,377 98,677

SECTION E-E

1 SECTION E-E kg 3,145 - - 2,327 4,172 9,644


O-B2 OFFICE AND HOTEL INTERFACE (15-DEC-2018)

GRAND TOTAL kg - 3,145 - - 2,327 4,172 - - 9,644

GRAND TOTAL BASEMENT 3 kg 21,885 188,784 72,612 11,715 19,704 53,985 45,048 1,249 414,982

RAJAWALI PLACE PROJECT


REBAR TOTAL PER BASEMENT - 4
DESCRIPTION DIAMETER
No. FLOOR UNIT TOTAL
ELEMENT TYPE 10 13 16 19 22 25 29 32

RESIDENCE
1 CO. STARTER BAR kg - 99 1,701 - 113 779 2,219 - 4,911
COLUMN
2 CO. VERTICAL BAR kg - 220 6,996 - 96 259 2,663 - 10,234
3 SW. STARTER BAR kg - - - - - - - - -
SHEAR WALL
4 SW. VERTICAL BAR kg - - - - - - - - -
5 RS-ZONE-A RE. STARTER BAR kg - - - - - - - - -
RETAINING
6 WALL RE. VERTICAL BAR kg - - - - - - - - -
7 SLAB kg 168 19,443 792 889 539 3,698 - - 25,529
FLAT SLAB
8 BAND BEAM kg 2,244 3,160 178 222 - - - - 5,804
9 BEAM BEAM kg 340 48 - 651 242 526 - - 1,807
10 CO. STARTER BAR kg - 71 678 - 564 314 - - 1,627
COLUMN
11 CO. VERTICAL BAR kg - 165 2,475 - 508 129 - - 3,277
12 SW. STARTER BAR kg - 1,578 430 - - 3,844 684 - 6,536
SHEAR WALL
13 SW. VERTICAL BAR kg - 7,704 1,519 - - 3,135 821 - 13,179
14 RS-ZONE-B RETAINING RE. STARTER BAR kg - - - - - - - - -
15 WALL RE. VERTICAL BAR kg - - - - - - - - -
16 SLAB kg 168 12,463 1,125 568 247 1,318 - - 15,889
FLAT SLAB
17 BAND BEAM kg 1,817 2,913 - - - - - - 4,730
18 BEAM & GIRDER BEAM kg 292 168 - 942 277 - - - 1,679
19 CO. STARTER BAR kg - 94 1,384 - 576 1,006 519 - 3,579
COLUMN
20 CO. VERTICAL BAR kg - 201 4,874 - 562 724 - - 6,361

21 SW. STARTER BAR kg - 2,521 684 - - 6,085 684 - 9,974


SHEAR WALL
22 RS-ZONE-C SW. VERTICAL BAR kg - 9,144 1,781 - - 5,131 - - 16,056
23 RETAINING RE. STARTER BAR kg - - - - - - - - -
24 WALL RE. VERTICAL BAR kg - - - - - - - - -
25 SLAB kg 170 24,274 1,307 1,351 1,409 1,601 - - 30,112
FLAT SLAB
26 BAND BEAM kg 3,547 5,233 - - - - - - 8,780
27 BEAM & GIRDER BEAM kg 574 46 125 1,290 148 - - - 2,183
28 CO. STARTER BAR kg - 146 2,908 - 426 927 3,132 - 7,539
COLUMN
29 CO. VERTICAL BAR kg - 285 10,720 - 366 647 3,758 - 15,776
30 SW. STARTER BAR kg - - - - - - - - -
SHEAR WALL
31 SW. VERTICAL BAR kg - - - - - - - - -

32 RE. STARTER BAR kg - - - - - - - - -


RS-ZONE-D RETAINING
WALL
33 RE. VERTICAL BAR kg - - - - - - - - -

34 SLAB kg 169 24,467 1,455 998 - 1,913 3,731 - 32,733


FLAT SLAB
RS-ZONE-D

FLAT SLAB
35 BAND BEAM kg 2,634 3,533 169 412 - - - - 6,748

36 BEAM & GIRDER BEAM kg 215 102 - 524 94 - - - 935

37 BEAM & GIRDER STRUT BEAM kg - 1,310 - - 5,628 - - - 6,938

28 CO. STARTER BAR kg -


COLUMN B4-B3
29 CO. VERTICAL BAR kg 6,717 1,170 662 2,614 11,162
30 SW. STARTER BAR kg -
SHEAR WALL B4-B3
31 SW. VERTICAL BAR kg 19,521 6,088 1,251 7,659 8,554 43,072
34 CORE AREA SLAB kg 1,196 12,389 1,225 220 901 700 16,631
35 FLAT SLAB BAND BEAM kg 3,049 4,309 821 8,179
35 Chair Bar kg 527 527

36 BEAM & GIRDER BEAM kg -

1 CO. STARTER BAR kg - 410 6,671 - 1,679 3,026 5,870 - 17,656


COLUMN
2 CO. VERTICAL BAR kg - 871 31,782 - 2,702 2,421 9,035 - 46,810
3 SW. STARTER BAR kg - 4,099 1,114 - - 9,929 1,368 - 16,510
SHEAR WALL
4 SW. VERTICAL BAR kg - 36,369 9,388 1,251 - 15,925 9,375 - 72,307
BASEMENT -4
7 SLAB kg 1,871 93,036 5,904 4,026 3,096 9,230 3,731 - 120,894
FLAT SLAB
8 BAND BEAM kg 13,291 19,148 1,168 634 - - - - 34,241
9 BEAM kg 1,421 364 125 3,407 761 526 - - 6,604
BEAM & GIRDER
9 STRUT BEAM kg - 1,310 - - 5,628 - - - 6,938
11 RAMP SLAB kg 1,572 6,164 7,736
RAMP
12 RAMP BEAM kg 588 1,816 616 3,914 1,484 8,418

GRAND TOTAL TON 18,743 163,587 56,152 9,934 17,780 42,540 29,379 - 338,114
LINK HOTEL 3,868

37 CO. STARTER BAR kg - 376 524 - 1,104 480 - - 2,484


COLUMN
38 CO. VERTICAL BAR kg - 1,096 1,888 - 1,110 135 - - 4,229
39 SW. STARTER BAR kg - - - - - - - - -
SHEAR WALL
40 SW. VERTICAL BAR kg - - - - - - - - -
LINK-HOTEL
41 RETAINING RE. STARTER BAR kg - - - - - - - - -
BASEMENT 4
42 WALL RE. VERTICAL BAR kg - - - - - - - - -
43 SLAB kg - 14,879 157 105 - - - - 15,141
FLAT SLAB
44 BAND BEAM kg 3,014 6,718 - - - - - - 9,732
45 BEAM & GIRDER BEAM kg 186 - - 356 - - - - 542

GRAND TOTAL TON 3,200 23,069 2,569 461 2,214 615 - - 32,128

OFFICE
-
37 CO. STARTER BAR Kg -
COLUMN
38 CO. VERTICAL BAR Kg - 19,002 - - - 7,011 6,293 7,536 39,841
39 SW. STARTER BAR Kg -
SHEAR WALL
40 SW. VERTICAL BAR Kg -
41 RE. STARTER BAR Kg -
RETAINING WALL
42 RE. VERTICAL BAR Kg -
OFFICE BASEMENT
43 SLAB Kg -
4
44 FLAT SLAB DROP PANEL Kg -
44 BAND BEAM & Z REBAR kg 12,043 12,043
45 BEAM Kg -
BEAM & GIRDER
46 Cap Beam Kg -
11 RAMP SLAB kg 2,890 94 2,984
RAMP
12 RAMP BEAM kg 900 1,556 1,772 1,444 5,672

SUB TOTAL kg 15,833 19,096 - 1,556 1,772 8,455 6,293 7,536 60,540

RAJAWALI PLACE PROJECT


REBAR TOTAL PER MAT FOUNDATION BASEMENT - 5
DESCRIPTION DIAMETER
No. FLOOR UNIT TOTAL
ELEMENT TYPE D10 D13 D16 D19 D22 D25 D29 D32

RESIDENCE
1 CO. STARTER BAR kg - 250 2,762 - 752 1,133 - - 4,897

COLUMN

2 CO. VERTICAL BAR kg - 380 9,624 - 1,049 1,401 2,863 - 15,317

3 PART-1 SW. STARTER BAR kg - - -


(ZONE A + B)
BASEMENT 5 SHEAR WALL
4 SW. VERTICAL BAR kg - - - - - - - - -

5 SUMP PIT kg - 1,090 1,688 616 902 2,338 6,162 - 12,796


6 PILE CAP kg - - - - - 17,181 1,468 - 18,649
FOUNDATION
7 BASEMENT 5 SLAB kg - 1,260 1,023 15,391 11,840 48,623 95,506 8,243 181,886
8 CHAIR kg - 1,219 - - - 6,650 - - 7,869
9 CO. STARTER BAR kg - 233 2,374 - 1,182 1,295 - - 5,084

COLUMN
10 CO. VERTICAL BAR kg - 553 15,947 914 1,748 5,211 24,373

11 PART-2 SW. STARTER BAR kg - - - - - - - - -


(ZONE C + D) SHEAR WALL
12 BASEMENT 5 SW. VERTICAL BAR kg - - - - - -
13 SUMP PIT kg 37 276 1,113 284 96 1,987 4,649 516 8,958
14 PILE CAP kg - 676 - - - 19,465 2,937 - 23,078
FOUNDATION
15 BASEMENT 5 SLAB kg 78 561 2,633 12,750 7,809 95,776 110,940 5,249 235,796
16 CHAIR kg - - - - - - - - -
17 CO. STARTER BAR kg - 234 16,161 - 1,715 1,468 16,783 - 36,361
COLUMN B5-B4
18 CO. VERTICAL BAR kg 6,717 1,170 662 2,614 11,162
19 CORE AREA (MAT SW. STARTER BAR kg - 51,200 13,177 3,537 - 33,305 24,260 - 125,479
FOUNDATION) SHEAR WALL B5-B4
20 BASEMENT 5 SW. VERTICAL BAR kg 19,521 6,088 1,251 7,659 8,554 43,072
23 MAT kg - 4,520 1,482 2,445 72,307 202,688 130,792 1,348,419 1,762,653
FOUNDATION
24 CHAIR kg - - - - - 74,091 - - 74,091

1 CO. STARTER BAR kg - 717 21,297 - 3,649 3,896 16,783 - 46,342


COLUMN
2 CO. VERTICAL BAR kg - 933 32,288 - 3,133 3,811 10,688 - 50,852
3 SW. STARTER BAR kg - 51,200 13,177 3,537 - 33,305 24,260 - 125,479
SHEAR WALL
4 SW. VERTICAL BAR kg - 19,521 6,088 1,251 - 7,659 8,554 - 43,072
5 TOTAL SUMP PIT kg 37 1,366 2,801 900 998 4,325 10,811 516 21,754
RESIDENCE
5 BASEMENT 5 SUMP PIT COVER kg 116 404 74 513 1,107
6 PILE CAP kg - 676 - - - 36,646 4,405 - 41,727
FOUNDATION
TOTAL
RESIDENCE
BASEMENT 5

FOUNDATION
7 BASEMENT 5 SLAB kg 78 1,821 3,656 28,141 19,649 144,399 206,446 13,492 417,682
7 MAT kg - 4,520 1,482 2,445 72,307 202,688 130,792 1,348,419 1,762,653
8 CHAIR kg - 1,219 - - - 80,741 - - 81,960
7 PERIMETER WALL kg 2,941 2,941
11 RAMP SLAB kg 1,572 6,164 7,736
RAMP
12 RAMP BEAM kg 588 1,816 616 3,914 1,484 8,418

GRAND TOTAL TON 2,391 93,298 80,789 36,964 103,650 519,466 412,739 1,362,427 2,611,723
LINK HOTEL
1 CO. STARTER BAR kg 482 1,049 1,237 485 3,253
COLUMN
2 CO. VERTICAL BAR kg 1,073 2,004 1,157 375 4,609
5 SUMP PIT kg 378 718 2,990 1,403 5,489
PART-3
5 (LINK-HOTEL) SUMP PIT COVER kg 13 52 18 22 105
BASEMENT 5
6 FOUNDATION PILE CAP kg 372 9,701 2,582 2,302 14,957
7 RAFT/MAT kg 4 246 158 18 137,483 12,772 11,485 162,166
8 CHAIR kg 2,734 2,734
9 PERIMETER WALL kg 1,671 1,671

GRAND TOTAL kg 17 4,274 3,211 736 2,434 153,768 16,757 13,787 194,984

OFFICE 0

1 COLUMN CO. STARTER BAR kg 2,341 1,464 4,971 8,776


3 SW. STARTER BAR kg 2,739 9,080 4,705 23,737 40,261
SHEAR WALL
4 SW. VERTICAL BAR kg - 4,402 12,901 4,186 17,794 39,283
12 STAIR STAIR STARTER BAR kg 3 37 14 54
CORE AREA
12 TANKWALL TANK WALL kg 670 389 3,250 4,309
BASEMENT 5
5 SUMP PIT kg -
6 PILE CAP kg -
FOUNDATION
7 RAFT/MAT kg 12,000 10,000 12,960 51,650 110,000 597,000 793,610
8 CHAIR kg 25,900 25,900
9 COLUMN CO. STARTER BAR kg 9,260 2,770 6,130 3,560 21,720
12 RAMP STARTER RAMP kg 232 232
13 MAT FOUND THK SUMP PIT kg 280 - 550 5,920 25,330 14,760 46,840
14 2.5 M BASEMENT 5 PILE CAP kg -
FOUNDATION
15 RAFT/MAT kg 5,838 34,527 32,017 164,428 256,545 136,660 630,015
16 CHAIR kg 55,143 55,143

1 CO. STARTER BAR kg - 11,601 - - - 4,234 6,130 8,531 30,496


COLUMN
2 CO. VERTICAL BAR kg - 19,002 - - - 7,011 6,293 7,536 39,841
3 SW. STARTER BAR kg - 2,739 9,080 - - 4,705 - 23,737 40,261
SHEAR WALL
4 SW. VERTICAL BAR kg - 4,402 12,901 - - 4,186 - 17,794 39,283
5 STARTER RAMP kg - 232 - - - 2,770 6,130 3,560 12,692
TOTAL
6 OFFICE STAIR STARTER BAR kg 3 37 14 - - - - - 54
BASEMENT 5
7 TANK WALL kg - 670 389 - - 3,250 - - 4,309
8 SUMP PIT kg - - 280 - 550 5,920 25,330 14,760 46,840
9 PILE CAP kg - - - - - - - - -
FOUNDATION
TOTAL
OFFICE
BASEMENT 5

FOUNDATION
10 RAFT/MAT kg - 12,000 15,838 34,527 44,977 216,078 366,545 733,660 1,423,625
11 CHAIR kg - - - - - 81,043 - - 81,043
12 PERIMETER WALL kg 3,361 3,361
11 RAMP SLAB kg 2,890 94 2,984
RAMP
12 RAMP BEAM kg 1,514 1,320 1,330 1,070 5,234

GRAND TOTAL kg 4,407 54,138 38,502 35,847 46,857 330,266 410,428 809,578 1,730,022
TOTAL REBAR PROGRESS (BILL 2.3)
1 CO. STARTER BAR kg - 1,775 45,143 - 14,365 11,752 37,300 - 110,335
COLUMN
2 CO. VERTICAL BAR kg - 7,178 179,540 1,920 27,662 11,973 75,396 - 303,669
3 SW. STARTER BAR kg - 62,667 18,007 4,250 - 64,247 29,839 - 179,010
SHEAR WALL
4 SW. VERTICAL BAR kg - 215,204 59,863 7,991 - 106,575 73,815 - 463,448
5 RE. STARTER BAR kg #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
RETAINING WALL
6 RE. VERTICAL BAR kg #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
RESIDENCE
7 SLAB kg 9,761 301,613 20,845 88,399 11,730 45,427 11,861 - 489,635
SUSPENDED SLAB
8 TEMPORARY SLAB (Zone A) kg 1,368 1,368
9 DROP PANEL DROP PANEL kg 63,676 72,425 6,223 62,245 1,364 1,318 - - 207,251
10 BEAM kg 8,627 9,313 2,731 18,672 3,567 14,563 - 5,261 62,733
11 BEAM & GIRDER STRUT BEAM kg - 2,620 - - 11,256 - - - 13,876
11 CAPING BEAM kg 9,720 532 - - 9,989 - - - 20,241
12 CO. STARTER BAR kg - 1,838 2,555 - 6,395 1,936 - - 12,724
COLUMN
13 CO. VERTICAL BAR kg - 4,560 5,143 - 4,767 1,117 - - 15,586
14 SW. STARTER BAR kg #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SHEAR WALL
15 SW. VERTICAL BAR kg #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
16 RE. STARTER BAR kg - - - - - - - - -
RETAINING WALL
17 LINK RE. VERTICAL BAR kg - - - - - - - - -
18 SUSPENDED SLAB SLAB kg 122 46,597 537 1,670 3,646 17,322 - 3,550 73,444
19 DROP PANEL DROP PANEL kg 10,678 21,877 215 7,250 - - - - 40,019
20 BEAM kg 553 33 - 1,106 - - - - 1,692
21 BEAM & GIRDER STRUT BEAM kg -
21 CAPING BEAM kg 3,878 229 - - 4,207 - - - 8,314
22 CO. STARTER BAR kg - 11,601 - - - 4,234 6,130 8,531 30,496
COLUMN
23 CO. VERTICAL BAR kg - 19,002 - - - 7,011 6,293 7,536 39,841
24 SW. STARTER BAR kg - 2,739 9,080 - - 4,705 - 23,737 40,261
SHEAR WALL
25 SW. VERTICAL BAR kg - 4,402 12,901 - - 4,186 - 17,794 39,283
26 RE. STARTER BAR kg -
RETAINING WALL
27 RE. VERTICAL BAR kg -
27 OFFICE STARTER RAMP kg - 232 - - - 2,770 6,130 3,560 12,692
27 STAIR STARTER BAR kg 3 37 14 - - - - - 54
28 SUSPENDED SLAB SLAB kg -
29 DROP PANEL DROP PANEL kg -
30 BEAM kg -
31 BEAM & GIRDER STRUT BEAM kg -
BEAM & GIRDER
31 CAPING BEAM kg -

TOTAL REBAR PROGRESS MAT FOUNDATION (BILL 2.2)


1 SUMP PIT kg 37 1,366 2,801 900 998 4,325 10,811 516 21,754
2 PILE CAP kg - 676 - - - 36,646 4,405 - 41,727
TOTAL
3 FOUNDATION BASEMENT 5 SLAB kg 78 1,821 3,656 28,141 19,649 144,399 206,446 13,492 417,682
RESIDENCE
4 MAT kg - 4,520 1,482 2,445 72,307 202,688 130,792 1,348,419 1,762,653
4 CHAIR kg - 1,219 - - - 80,741 - - 81,960
1 SUMP PIT kg - 378 - 718 - 2,990 1,403 - 5,489
2 PILE CAP kg - 372 - - - 9,701 2,582 2,302 14,957
TOTAL LINK FOUNDATION
3 RAFT/MAT kg 4 246 158 - 18 137,483 12,772 11,485 162,166
4 CHAIR kg - - - - - 2,734 - - 2,734
5 TANK WALL kg - 670 389 - - 3,250 - - 4,309
6 BEAM RAMP STARTER BAR kg 6 94 209 162 471
1 SUMP PIT kg - - 280 - 550 5,920 25,330 14,760 46,840
TOTAL OFFICE FOUNDATION
2 PILE CAP kg - - - - - - - - -
3 RAFT/MAT kg - 12,000 15,838 34,527 44,977 216,078 366,545 733,660 1,423,625
4 CHAIR kg - - - - - 81,043 - - 81,043
LAST NUMBER DRAWING SUBMITTAL POSCO - PKN (STATUS APPROVE)

RPP-PKN-SD-ST-R-112 Rev 01 (LF 1 - LF 2) TOTAL QTY / 2


RPP-PKN-SD-ST-R-112 Rev 01 (LF 1 - LF 2) TOTAL QTY / 2

LAST NUMBER DRAWING SUBMITTAL POSCO - PKN (STATUS APPROVE)

RPP-PKN-SD-ST-R-130 Rev 00 (INCOMING)


RPP-PKN-SD-ST-R-129 Rev 00 (INCOMING)
RPP-PKN-SD-ST-R-113 Rev 00 (INCOMING)
RPP-PKN-SD-ST-R-111 Rev 00 (INCOMING)

RPP-PKN-SD-ST-R-127 Rev 00 (INCOMING)


RPP-PKN-SD-ST-R-120 rev 01 (INCOMING)

RPP-PKN-SD-ST-R-115 Rev 00 (INCOMING)


RPP-PKN-SD-ST-R-099 Rev 00 (INCOMING)
RPP-PKN-SD-ST-R-112 Rev 01 (LF 1 - LF 2) TOTAL QTY / 2
RPP-PKN-SD-ST-R-112 Rev 01 (LF 1 - LF 2) TOTAL QTY / 2

RPP-PKN-SD-ST-R-103 Rev 00 (INCOMING)


LAST NUMBER DRAWING SUBMITTAL POSCO - PKN (STATUS APPROVE)

RPP-PKN-SD-ST-R-102 Rev 00 (INCOMING)

RPP-PKN-SD-ST-R-088 Rev 00 (INCOMING)


DROP PANEL REBAR WAS INCLUDE IN BAND BEAM & Z REBAR
RPP-PKN-SD-ST-R-088 Rev 00 (INCOMING)
RPP-PKN-SD-ST-R-088 Rev 00 (INCOMING)
RPP-PKN-SD-ST-R-087 Rev 00 (INCOMING)
RPP-PKN-SD-ST-R-094 Rev 00 (INCOMING)

RPP-PKN-ST-R-070 REV 1 (INCOMING)


DROP PANEL REBAR WAS INCLUDE IN BAND BEAM & Z REBAR
RPP-PKN-ST-R-070 REV 0 (WAITING COMENT)
RPP-PKN-ST-R-070 REV 0 (WAITING COMENT)
RPP-PKN-SD-ST-R-069 Rev 00 (WAITING COMENT)
RPP-PKN-SD-ST-R-080 Rev 01

RPP-PKN-SD-ST-R-078 Rev 00
DROP PANEL REBAR WAS INCLUDE IN BAND BEAM & Z REBAR
RPP-PKN-SD-ST-R-078 Rev 00
RPP-PKN-SD-ST-R-078 Rev 00
No shop drawing Submittal zone 3 have a Beam
RPP-PKN-SD-ST-R-077 Rev 01
RPP-PKN-SD-ST-R-068 Rev 01
DROP PANEL REBAR WAS INCLUDE IN BAND BEAM & Z REBAR
RPP-PKN-SD-ST-R-068 Rev 01
RPP-PKN-SD-ST-R-068 Rev 01
RPP-PKN-SD-ST-R-075 rev 01
RPP-PKN-SD-ST-R-107 Rev 00

RPP-PKN-SD-ST-R-107 Rev 00

RPP-PKN-SD-ST-R-084 Rev 00
DROP PANEL REBAR WAS INCLUDE IN BAND BEAM & Z REBAR
RPP-PKN-SD-ST-R-084 Rev 00
RPP-PKN-SD-ST-R-084 Rev 00
RPP-PKN-SD-ST-R-086 Rev 00
RPP-PKN-SD-ST-R-101 Rev 00

RPP-PKN-SD-ST-R-101 Rev 00

RPP-PKN-SD-ST-R-074 Rev 01
DROP PANEL REBAR WAS INCLUDE IN BAND BEAM & Z REBAR
RPP-PKN-SD-ST-R-074 Rev 01
RPP-PKN-SD-ST-R-074 Rev 01
RPP-PKN-SD-ST-R-079 Rev 01

RPP-PKN-SD-ST-R-108 REV 00

DROP PANEL REBAR WAS INCLUDE IN BAND BEAM & Z REBAR

RPP-PKN-SD-ST-R-122 Rev 00
RPP-PKN-SD-ST-R-122 Rev 00
RPP-PKN-SD-ST-R-100 rev 00

RPP-PKN-SD-ST-R-092 rev 00
DROP PANEL REBAR WAS INCLUDE IN BAND BEAM & Z REBAR
RPP-PKN-SD-ST-R-092 rev 00
RPP-PKN-SD-ST-R-092 rev 00
RPP-PKN-SD-ST-R-096 Rev 00

DROP PANEL REBAR WAS INCLUDE IN BAND BEAM & Z REBAR

No Starter Build From B2 to B1 Bottom


RPP-PKN-SD-ST-O-032 REV 00 + RPP-PKN-SD-ST-O-018 Rev 00
No Starter Build From B2 to B1 Bottom
RPP-PKN-SD-ST-O-032 REV 00 + RPP-PKN-SD-ST-O-018 Rev 00
LAST NUMBER DRAWING SUBMITTAL POSCO - PKN (STATUS APPROVE)

RPP-PKN-SD-ST-R-001 Rev 02
RPP-PKN-SD-ST-R-083 Rev 00

RPP-PKN-SD-ST-R-005

RPP-PKN-SD-ST-R-001 Rev 02
RPP-PKN-SD-ST-R-001 Rev 02
FINAL RESULT VO RFI-ST-014 ZONE A
RPP-PKN-SD-ST-R-001 Rev 02

RPP-PKN-SD-ST-R-001 Rev 02
RPP-PKN-SD-ST-R-003 Rev 01
RPP-PKN-SD-ST-R-066 Rev 00
RPP-PKN-SD-ST-R-003 Rev 01
RPP-PKN-SD-ST-R-066 Rev 00

RPP-PKN-SD-ST-R-003 Rev 01
RPP-PKN-SD-ST-R-003 Rev 01
FINAL RESULT VO RFI-ST-014 ZONE B
RPP-PKN-SD-ST-R-003 Rev 01

RPP-PKN-SD-ST-R-008 Rev 01

RPP-PKN-SD-ST-R-008 Rev 01

RPP-PKN-SD-ST-R-008 Rev 01
RPP-PKN-SD-ST-R-008 Rev 01
FINAL RESULT VO RFI-ST-014 ZONE C & E
RPP-PKN-SD-ST-R-008 Rev 01

RPP-PKN-SD-ST-R-067 Rev 00 (WAITING COMMENT)

FINAL RESULT VO RFI-ST-014 ZONE D

This QTY from B4 Core Area (Will Be Typical)

VO RPP-PKN-SD-ST-R-082 REV 00

RPP-PKN-SD-ST-R-076 Rev 00

RPP-PKN-SD-ST-R-122 Rev 00
RPP-PKN-SD-ST-R-122 Rev 00
RPP-PKN-SD-ST-R-010
RPP-PKN-SD-ST-R-072 Rev 0

RPP-PKN-SD-ST-R-013 REV 03
RPP-PKN-SD-ST-R-008 Rev 01
RPP-PKN-SD-ST-R-008 Rev 01
FINAL RESULT VO RFI-ST-014 ZONE C&E
RPP-PKN-SD-ST-R-008 Rev 01

RPP-PKN-SD-ST-R-116 Rev 00

No Starter Build From B2 to B1 Bottom


RPP-PKN-SD-ST-O-032 REV 00 + RPP-PKN-SD-ST-O-018 Rev 00
No Starter Build From B2 to B1 Bottom
RPP-PKN-SD-ST-O-032 REV 00 + RPP-PKN-SD-ST-O-018 Rev 00
RPP-PKN-SD-ST-O-030 REV 00

RPP-PKN-SD-ST-O-021 REV 00 (WAITING COMENT)


LAST NUMBER DRAWING SUBMITTAL POSCO - PKN (STATUS APPROVE)

RPP-PKN-SD-ST-R-026 rev 00

RPP-PKN-SD-ST-R-025 rev 00

RPP-PKN-SD-ST-R-025 rev 00

RPP-PKN-SD-ST-R-027 Rev 00

RPP-PKN-SD-ST-R-027 Rev 00

RPP-PKN-SD-ST-R-024 Rev 00

ALL ZONE
RPP-PKN-SD-ST-R-064 Rev 00
RPP-PKN-SD-ST-R-064 Rev 00
RPP-PKN-SD-ST-R-063 R.0
RPP-PKN-SD-ST-R-063 R.0
RPP-PKN-SD-ST-R-063 R.0
RPP-PKN-SD-ST-R-048 R.0

RPP-PKN-SD-ST-R-028 Rev 00
No Starter Build From B3 to B2 Bottom
RPP-PKN-SD-ST-O-032 REV 00 + RPP-PKN-SD-ST-O-018 Rev 00
No Starter Build From B3 to B2 Bottom
RPP-PKN-SD-ST-O-032 REV 00 + RPP-PKN-SD-ST-O-018 Rev 00

RPP-PKN-SD-ST-O-019 Rev 00 (WAITING COMMENT)

RPP-PKN-SD-ST-O-025 Rev 00 & RPP-PKN-SD-ST-O-026 Rev 00


RPP-PKN-SD-ST-O-025 Rev 00 & RPP-PKN-SD-ST-O-026 Rev 00

LAST NUMBER DRAWING SUBMITTAL POSCO - PKN (STATUS APPROVE)


-
RPP-PKN-SD-ST-R-033 Rev 00

RPP-PKN-SD-ST-R-018 Rev 00
RPP-PKN-SD-ST-R-018 Rev 00
RPP-PKN-SD-ST-R-018 Rev 00
RPP-PKN-SD-ST-R-020 Rev 00
RPP-PKN-SD-ST-R-033 Rev 00
-
RPP-PKN-SD-ST-R-033 Rev 00

RPP-PKN-SD-ST-R-020 Rev 00
RPP-PKN-SD-ST-R-020 Rev 00
RPP-PKN-SD-ST-R-020 Rev 00
RPP-PKN-SD-ST-R-021 Rev 00

RPP-PKN-SD-ST-R-033 Rev 00

RPP-PKN-SD-ST-R-021 Rev 00

RPP-PKN-SD-ST-R-033 Rev 00

RPP-PKN-SD-ST-R-021 Rev 00
RPP-PKN-SD-ST-R-021 Rev 00
RPP-PKN-SD-ST-R-021 Rev 00
-
RPP-PKN-SD-ST-R-033 Rev 00

RPP-PKN-SD-ST-R-022 Rev 00
RPP-PKN-SD-ST-R-022 Rev 00

RPP-PKN-SD-ST-R-022 Rev 00

RPP-PKN-CAL-005 REV 02

No Starter Bar
RPP-PKN-SD-ST-R-053 Rev 0
No Starter Bar
RPP-PKN-SD-ST-R-053 Rev 0
RPP-PKN-SD-ST-R-047 Rev 0
RPP-PKN-SD-ST-R-047 Rev 0
RPP-PKN-SD-ST-R-047 Rev 0

same with RPP-PKN-SD-ST-R-122 Rev 00 (B2 - B1)


same with RPP-PKN-SD-ST-R-122 Rev 00 (B2 - B1)
RPP-PKN-SD-ST-R-19 Rev 00
RPP-PKN-SD-ST-R-033 Rev 00

RPP-PKN-SD-ST-R-19 Rev 00
RPP-PKN-SD-ST-R-19 Rev 00
RPP-PKN-SD-ST-R-19 Rev 00

No Starter Build From B3 to B2 Bottom


RPP-PKN-SD-ST-O-010 Rev. 00 (QS CHECK)
No Starter Build From B3 to B2 Bottom

RPP-PKN-SD-ST-O-019 Rev 00 (WAITING COMMENT)

RPP-PKN-SD-ST-O-025 Rev 00 & RPP-PKN-SD-ST-O-026 Rev 00


RPP-PKN-SD-ST-O-025 Rev 00 & RPP-PKN-SD-ST-O-026 Rev 00

LAST NUMBER DRAWING SUBMITTAL POSCO - PKN (STATUS APPROVE)


RPP-PKN-SD-ST-R-031 Rev 02 (ZONE A & B )

RPP-PKN-SD-ST-R-039 Rev 02 (ZONE A) & RPP-PKN-SD-ST-R-040 Rev 02 (ZONE B)

RPP-PKN-SD-ST-R-040 Rev 02 (ZONE B)

RPP-PKN-SD-ST-R-031 Rev 02
RPP-PKN-SD-ST-R-031 Rev 02
RPP-PKN-SD-ST-R-031 Rev 02
Not Review in Drawing Submittal
RPP-PKN-SD-ST-R-032 Rev 02

RPP-PKN-SD-ST-R-041 Rev 01 (ZONE C) & RPP-PKN-SD-ST-R-042 Rev 01 (ZONE D)

RPP-PKN-SD-ST-R-041 Rev 01
RPP-PKN-SD-ST-R-032 Rev 02
RPP-PKN-SD-ST-R-032 Rev 02
RPP-PKN-SD-ST-R-032 Rev 02

RPP-PKN-SD-ST-R-036 Rev 01
RPP-PKN-SD-ST-R-053 Rev 0
RPP-PKN-SD-ST-R-036 Rev 01
RPP-PKN-SD-ST-R-053 Rev 0
PROGRES 100%

RPP-PKN-SD-ST-R-059 Rev 01
RPP-PKN-SD-ST-R-110 REV 00 (Calc Base On VO No 31)
same with RPP-PKN-SD-ST-R-122 Rev 00 (B2 - B1)
same with RPP-PKN-SD-ST-R-122 Rev 00 (B2 - B1)
RPP-PKN-SD-ST-R-030 Rev 01
RPP-PKN-SD-ST-R-043 Rev 00
RPP-PKN-SD-ST-R-030 Rev 01
RPP-PKN-SD-ST-R-055 Rev 01
RPP-PKN-SD-ST-R-030 Rev 01
RPP-PKN-SD-ST-R-030 Rev 01
RPP-PKN-SD-ST-R-030 Rev 01
RPP-PKN-SD-ST-R-110 REV 00 (Calc Base On VO No 31)

RPP-PKN-SD-ST-O-005 Rev 01
RPP-PKN-SD-ST-O-005 Rev 01
RPP-PKN-SD-ST-O-010 Rev. 03 (QS CHECK)
RPP-PKN-SD-ST-O-005 Rev 01
RPP-PKN-SD-ST-O-005 Rev 01
RPP-PKN-SD-ST-O-005 Rev 01

RPP-PKN-SD-ST-O-004 Rev 02

RPP-PKN-SD-ST-O-007 Rev 02
RPP-PKN-SD-ST-O-007 Rev 02
RPP-PKN-SD-ST-O-009 Rev 00 (QS CHECK)

RPP-PKN-SD-ST-O-007 Rev 03
RPP-PKN-SD-ST-O-007 Rev 02

RPP-PKN-SD-ST-O-010 Rev. 00 (QS CHECK)


RPP-PKN-SD-ST-R-110 REV 00 (Calc Base On VO No 31)
RPP-PKN-SD-ST-O-025 Rev 00 & RPP-PKN-SD-ST-O-026 Rev 00
RPP-PKN-SD-ST-O-025 Rev 00 & RPP-PKN-SD-ST-O-026 Rev 00
BILL 2.3
BILL 2.3
BILL 2.3
BILL 2.3
BILL 2.3
BILL 2.3
BILL 2.3
BILL 2.3
BILL 2.3
BILL 2.3
BILL 2.3
ADD
BILL 2.3
BILL 2.3
BILL 2.3
BILL 2.3
BILL 2.3
BILL 2.3
BILL 2.3
BILL 2.3
BILL 2.3
BILL 2.3
ADD
BILL 2.3
BILL 2.3
BILL 2.3
BILL 2.3
BILL 2.3
BILL 2.3

BILL 2.3
BILL 2.3
BILL 2.3
BILL 2.3
ADD
NO BASEMENT ITEM / DESCRIPTION
FORCON CALC

F'c 10 Mpa F'c 25 Mpa F'c 30 Mpa F'c 35 Mpa F'c 40 Mpa F'c 45 Mpa F'c 55 Mpa

RESIDENCE APARTEMENT

ROOF STRUCTURE

Suspended roof slab 719.96


Suspended roof beam 549.07

GROUND FLOOR 1 STAIR STRUCTURE

Landing slab 1.96


Staircases 4.35
Columns Stair 0.40
Beams Stair 0.61

BASEMENT STRUCTURE APARTMENT

Lean Concrete
Shear walls 176.61
Shear walls (SW-13, SW-14, SW-15, SW-16) 224.64
Columns 257.09
Basement wall 293.08
Drop panels 162.22
Suspended slabs 935.87
Suspended beam 63.06
Suspended Ramps 70.99
BASEMENT 1 Ramp parapet 26.07
Tank walls (Provisional)
Equipment Foundation pads (Provisional)
MEP Trench Walls (Provisional)

STAIR STRUCTURE

Landing slab 1.80


Staircases 4.00
Columns Stair 0.37
Beams Stair 0.56
BASEMENT STRUCTURE APARTMENT

Lean Concrete
Shear walls 114.06
Shear walls (SW-13, SW-14, SW-15, SW-16) 145.08
Columns 166.04
Basement wall 664.54
Drop panels 489.84
Suspended slabs 1,119.44
Suspended beam 63.06
Suspended Ramps 61.46
BASEMENT 2 Ramp parapet 22.57
Tank walls (Provisional)
Equipment Foundation pads (Provisional)
MEP Trench Walls (Provisional)

STAIR STRUCTURE

Landing slab 1.80


Staircases 4.00
Columns Stair 0.37
Beams Stair 0.56
TEMPORARY SLAB RAMP AREA 12.07
CAPING BEAM 329.57

BASEMENT STRUCTURE APARTMENT

Lean Concrete
Shear walls 114.06
Shear walls (SW-13, SW-14, SW-15, SW-16) 145.08
Columns 166.04
Drop panels 162.22
Suspended slabs 935.87
Suspended beam 63.06
Suspended Ramps 66.85
BASEMENT 3 Ramp parapet 22.57
Tank walls (Provisional)
Equipment Foundation pads (Provisional)
MEP Trench Walls (Provisional)

STAIR STRUCTURE

Landing slab 1.80


Staircases 4.00
Columns Stair 0.37
Beams Stair 0.56
STRUTTING BEAM
BASEMENT STRUCTURE APARTMENT

Lean Concrete
Shear walls 114.06
Shear walls (SW-13, SW-14, SW-15, SW-16) 145.08
Columns 166.04
Drop panels 162.22
Suspended slabs 935.87
Suspended beam 63.06
Suspended Ramps 66.84
BASEMENT 4 Ramp parapet 24.55
Tank walls (Provisional)
Equipment Foundation pads (Provisional)
MEP Trench Walls (Provisional)

STAIR STRUCTURE

Landing slab 1.80


Staircases 4.00
Columns Stair 0.37
Beams Stair 0.56
STRUTTING BEAM

BASEMENT STRUCTURE APARTMENT

Lean Concrete
Shear walls 110.38
Shear walls (SW-13, SW-14, SW-15, SW-16) 140.40
Columns 160.68
Suspended Ramps 64.51
Ramp parapet 23.69
Tank walls (Provisional)
Equipment Foundation pads (Provisional)
BASEMENT 5 MEP Trench Walls (Provisional)

STAIR STRUCTURE

Landing slab 1.80


Staircases 4.00
Columns Stair 0.37
Beams Stair 0.56

SUBSTRUCTURE APARTMENT

Mat foundation 5,964.08


Pile cap 100.22
Basement slab 1,834.82
Slab thickening under lift pits and sump pits (provisional) 1,614.58
LINK HOTEL

ROOF STRUCTURE

Suspended roof slab 184.21


Suspended roof beam 71.20

GROUND FLOOR 1 STAIR STRUCTURE

Landing slab 0.60


Staircases 1.70
Columns Stair
Beams Stair

BASEMENT STRUCTURE HOTEL - LINK

Lean Concrete
Shear walls
Shear walls (SW-13, SW-14, SW-15, SW-16)
Columns 42.21
Basement wall 78.32
Drop panels 49.53
Suspended slabs 173.68
Suspended beam 50.52
Suspended Ramps
BASEMENT 1 Ramp parapet
Tank walls (Provisional)
Equipment Foundation pads (Provisional)
MEP Trench Walls (Provisional)

STAIR STRUCTURE

Landing slab 0.33


Staircases 1.50
Columns Stair
Beams Stair

BASEMENT STRUCTURE HOTEL - LINK

Lean Concrete
Shear walls
Shear walls (SW-13, SW-14, SW-15, SW-16)
Columns 20.91
Basement wall 266.59
Drop panels 60.51
Suspended slabs 172.25
Suspended beam 8.77
Suspended Ramps
BASEMENT 2 Ramp parapet
Tank walls (Provisional)
Equipment Foundation pads (Provisional)
MEP Trench Walls (Provisional)

STAIR STRUCTURE

Landing slab 0.33


Staircases 1.50
Columns Stair
Beams Stair
CAPING BEAM
BASEMENT STRUCTURE HOTEL - LINK

Lean Concrete
Shear walls
Shear walls (SW-13, SW-14, SW-15, SW-16)
Columns 13.75
Drop panels 49.53
Suspended slabs 173.68
Suspended beam 8.77
Suspended Ramps
BASEMENT 3 Ramp parapet
Tank walls (Provisional)
Equipment Foundation pads (Provisional)
MEP Trench Walls (Provisional)

STAIR STRUCTURE

Landing slab 0.33


Staircases 1.50
Columns Stair
Beams Stair

BASEMENT STRUCTURE HOTEL - LINK

Lean Concrete
Shear walls
Shear walls (SW-13, SW-14, SW-15, SW-16)
Columns 13.75
Drop panels 49.53
Suspended slabs 173.68
Suspended beam 8.77
Suspended Ramps
BASEMENT 4 Ramp parapet
Tank walls (Provisional)
Equipment Foundation pads (Provisional)
MEP Trench Walls (Provisional)

STAIR STRUCTURE

Landing slab 0.33


Staircases 1.50
Columns Stair
Beams Stair

BASEMENT STRUCTURE HOTEL - LINK

Lean Concrete
Columns 13.75

BASEMENT 5 STAIR STRUCTURE

Landing slab 0.33


Staircases 1.50
Columns Stair
Beams Stair
SUBSTRUCTURE LINK

Lean Concrete
Pile cap 50.86
Basement slab 726.06
Sump pits (provisional) ADD 24.00

OFFICE

ROOF STRUCTURE

Suspended roof slab 643.9


Suspended roof beam 98.51

GROUND FLOOR 1 STAIR STRUCTURE

Landing slab 2.00


Staircases 3.67
Columns Stair 0.33
Beams Stair 0.50

BASEMENT STRUCTURE OFFICE

Shear walls 101.73


Columns 155.07
Basement wall
Drop panels 109.50
Suspended slabs 492.33
Suspended beam 47.51
Suspended Ramps 71.23
BASEMENT MEZZANINE Ramp parapet
Tank walls (Provisional) 26.67
Equipment Foundation pads (Provisional)
MEP Trench Walls (Provisional)

STAIR STRUCTURE

Landing slab 2.00


Staircases 3.67
Columns Stair 0.33
Beams Stair 0.50
BASEMENT STRUCTURE OFFICE

Shear walls 101.73


Columns 155.07
Basement wall
Drop panels 109.50
Suspended slabs 492.33
Suspended beam 47.51
Suspended Ramps 60.27
BASEMENT 1 Ramp parapet
Tank walls (Provisional) 26.67
Equipment Foundation pads (Provisional)
MEP Trench Walls (Provisional)

STAIR STRUCTURE

Landing slab 2.00


Staircases 3.67
Columns Stair 0.33
Beams Stair 0.50

BASEMENT STRUCTURE OFFICE

Shear walls 114.94


Columns 163.59
Basement wall
Drop panels 109.50
Suspended slabs 492.33
Suspended beam 47.51
Suspended Ramps 60.27
BASEMENT 2 Ramp parapet
Tank walls (Provisional) 26.67
Equipment Foundation pads (Provisional)
MEP Trench Walls (Provisional)

STAIR STRUCTURE

Landing slab 2.00


Staircases 3.67
Columns Stair 0.33
Beams Stair 0.50

BASEMENT STRUCTURE OFFICE

Shear walls 114.94


Columns 116.39
Drop panels 109.50
Suspended slabs 492.33
Suspended beam 47.51
Suspended Ramps 60.27
BASEMENT 3 Ramp parapet
Tank walls (Provisional) 26.67
Equipment Foundation pads (Provisional)
MEP Trench Walls (Provisional)

STAIR STRUCTURE

Landing slab 2.00


Staircases 3.67
Columns Stair 0.33
Beams Stair 0.50

BASEMENT STRUCTURE OFFICE

Shear walls 114.94


Columns 116.39
Drop panels 109.50
Suspended slabs 492.33
Suspended beam 47.51
Suspended Ramps 60.27
BASEMENT 4 Ramp parapet
Tank walls (Provisional) 26.67
Equipment Foundation pads (Provisional)
MEP Trench Walls (Provisional)

STAIR STRUCTURE

Landing slab 2.00


Staircases 3.67
Columns Stair 0.33
Beams Stair 0.50
BASEMENT STRUCTURE OFFICE

Shear walls 114.94


Columns 116.39
Suspended Ramps 60.27
Ramp parapet
Tank walls (Provisional) 26.67
BASEMENT 5 Equipment Foundation pads (Provisional)
MEP Trench Walls (Provisional)

STAIR STRUCTURE

Landing slab 2.00


Staircases 3.67
Columns Stair 0.33
Beams Stair 0.50
SUBSTRUCTURE OFFICE

Mat foundation 7,421.16


Pile cap -
Basement slab -
Slab thickening under lift pits and sump pits (provisional) 255.91
SHOP DRAWING CALC

F'c 10 Mpa F'c 25 Mpa F'c 30 Mpa F'c 35 Mpa F'c 40 Mpa F'c 45 Mpa F'c 55 Mpa

733.70
559.48

1.97
4.38
0.41
0.62

190.14
265.48
240.90
293.08
164.05
971.32
46.41
72.36
27.32

1.82
4.03
0.37
0.57
116.48
149.72
169.35
664.54
497.52
1,136.94
64.23
62.49
22.87

1.82
4.03
0.37

0.57
12.07
329.57

117.24
149.12
168.66
162.22
935.87
63.06
66.85
22.87

1.82
4.03
0.37
0.57
25.10
117.24
149.12
168.66
162.22
935.87
63.06
66.85
22.87

1.82
4.03
0.37

0.57
25.10

114.56
145.72
166.76
64.51
23.69

1.82
4.03
0.37

0.57

5964.08
100.22
1834.82
1614.58
184.21
71.20

0.60
1.70

28.7104
83.43
25.4085
196.492
57.49

0.33
1.50

21.31
266.585465
60.51
172.25
8.77

0.33
1.50
13.89
49.53
173.68
8.77

0.33
1.50

13.885795
49.53
173.68
8.77

0.33
1.50

13.89

0.33
1.5
50.86
726.06
24

643.91063427
98.51

2.00
3.67
0.33
0.50

114.75
158.07
125.43978
121.36815
653.62
68.6774262
71.23

2.00
3.67
0.33
0.50
110.991
163.21
145.28359
121.37
531.52
52.49
60.27

2.00
3.67
0.33
0.50

114.94
163.59
381.27
109.5
492.33
47.51
60.27

26.67

2.00
3.67
0.33
0.50

114.94
116.39
109.5
492.33
47.51
60.27

26.67

2.00
3.67
0.33
0.50

114.94
116.39
109.5
492.33
47.51
60.27

26.67

2.00
3.67
0.33
0.50
114.94
116.39
60.27

26.67

2.00
3.67
0.33
0.50
7421.16
0
0
255.91
QTY

No DESCRIPTION SHOP
FORCON LSF -
BOQ DRAWING
CALC PROGRESS
CALC

BASEMENT STRUCTURE APARTMENT

Vibrated reinforced concrete, f'c 55 MPa as specified


1 Shear walls 616.00 629.18 629.18
Basement 1 ( - 5.400 ) - 1 St Floor (+ 0.600) 176.61 176.61
Basement 2 (- 8.500 ) - Basement 1 ( - 5.400 ) 114.06 114.06
Basement 3 ( - 11.500 ) - Basement 2 (- 8.500 ) 114.06 114.06
Basement 4 ( -14.500 ) - Basement 3 ( - 11.500 ) 114.06 114.06
Basement 5 ( -17.500 ) - Basement 4 ( -14.500 ) 110.38 110.38

2 Shear walls (SW-13, SW-14, SW-15, SW-16) 780.00 800.28 800.28


Basement 1 ( - 5.400 ) - 1 St Floor (+ 0.600) 224.64 224.64
Basement 2 (- 8.500 ) - Basement 1 ( - 5.400 ) 145.08 145.08
Basement 3 ( - 11.500 ) - Basement 2 (- 8.500 ) 145.08 145.08
Basement 4 ( -14.500 ) - Basement 3 ( - 11.500 ) 145.08 145.08
Basement 5 ( -17.500 ) - Basement 4 ( -14.500 ) 140.40 140.40

3 Columns 970.00 915.88 915.88


Basement 1 ( - 5.400 ) - 1 St Floor (+ 0.600) 257.09 257.09
Basement 2 (- 8.500 ) - Basement 1 ( - 5.400 ) 166.04 166.04
Basement 3 ( - 11.500 ) - Basement 2 (- 8.500 ) 166.04 166.04
Basement 4 ( -14.500 ) - Basement 3 ( - 11.500 ) 166.04 166.04
Basement 5 ( -17.500 ) - Basement 4 ( -14.500 ) 160.68 160.68

Vibrated reinforced concrete, f'c 40 MPa as specified


4 Basement wall 864.00 664.54 664.54
Basement 2 ( - 8.500 ) - 1 St Floor (+ 0.600) 664.54 664.54

5 Drop panels 755.00 976.51 976.84


Basement 1 ( - 5.400 ) 162.22 162.22
Basement 2 (- 8.500 ) 489.84 489.84
Basement 3 ( - 11.500 ) 162.22 162.22
Basement 4 ( -14.500 ) 162.22 162.55

6 Suspended slabs 3,914.00 3,927.06 3,927.06


Basement 1 ( - 5.400 ) 935.87 935.87
Basement 2 (- 8.500 ) 1,119.44 1,119.44
Basement 3 ( - 11.500 ) 935.87 935.87
Basement 4 ( -14.500 ) 935.87 935.87
QTY

No DESCRIPTION SHOP
FORCON LSF -
BOQ DRAWING
CALC PROGRESS
CALC
7 Suspended beam 257.00 252.26 252.26
Basement 1 ( - 5.400 ) 63.06 63.06
Basement 2 (- 8.500 ) 63.06 63.06
Basement 3 ( - 11.500 ) 63.06 63.06
Basement 4 ( -14.500 ) 63.06 63.06

8 Suspended Ramps 145.00 196.05 213.85


Basement 1 (- 5.400 ) - GF ( - 0.000 ) 35.49 35.49
Basement 2 (- 8.500 ) - Basement 1 ( - 5.400 ) 61.46 66.05
Basement 3 ( - 11.500 ) - Basement 2 (- 8.500 ) 33.43 37.88
Basement 4 ( -14.500 ) - Basement 3 ( - 11.500 ) 33.42 37.87
Basement 5 ( -17.500 ) - Basement 4 ( -14.500 ) 32.26 36.56

9 Ramp parapet 72.00 72.00 72.00


Basement 1 (- 5.400 ) - GF ( - 0.000 ) 13.03 13.03
Basement 2 (- 8.500 ) - Basement 1 ( - 5.400 ) 22.57 22.57
Basement 3 ( - 11.500 ) - Basement 2 (- 8.500 ) 12.28 12.28
Basement 4 ( -14.500 ) - Basement 3 ( - 11.500 ) 12.27 12.27
Basement 5 ( -17.500 ) - Basement 4 ( -14.500 ) 11.85 11.85

10 Tank walls (Provisional) 406.00 398.26 -


Basement 1 ( - 5.400 )

11 Equipment Foundation pads (Provisional) 100.00 -


Basement 1 ( - 5.400 )

12 MEP Trench Walls (Provisional) 10.00 -


13 Caping Beam - 329.57
Temporary Slab Ramp Area Zone A 12.07
ADDITIONAL WORK (ERI/RPP/SD-STR)

ROOF STRUCTURE

Vibrated reinforced concrete, f'c 40 MPa as specified

14 Suspended roof slab 598.00 -


Ground Floor (- 0.00)

15 Suspended roof beam 386.00 -


Ground Floor (- 0.00)

STAIR STRUCTURE
Vibrated reinforced concrete, f'c 40 MPa as specified 1.67
16 Landing slab 10.00 -
Basement 1 (- 5.400 ) - GF ( - 0.000 )
QTY

No DESCRIPTION SHOP
FORCON LSF -
BOQ DRAWING
CALC PROGRESS
CALC
Basement 2 (- 8.500 ) - Basement 1 ( - 5.400 )
Basement 3 ( - 11.500 ) - Basement 2 (- 8.500 )
Basement 4 ( -14.500 ) - Basement 3 ( - 11.500 )
Basement 5 ( -17.500 ) - Basement 4 ( -14.500 )
3.67
17 Staircases 22.00
Basement 1 (- 5.400 ) - GF ( - 0.000 )
Basement 2 (- 8.500 ) - Basement 1 ( - 5.400 )
Basement 3 ( - 11.500 ) - Basement 2 (- 8.500 )
Basement 4 ( -14.500 ) - Basement 3 ( - 11.500 )
Basement 5 ( -17.500 ) - Basement 4 ( -14.500 )
0.33
18 Columns 2.00
Basement 1 (- 5.400 ) - GF ( - 0.000 )
Basement 2 (- 8.500 ) - Basement 1 ( - 5.400 )
Basement 3 ( - 11.500 ) - Basement 2 (- 8.500 )
Basement 4 ( -14.500 ) - Basement 3 ( - 11.500 )
Basement 5 ( -17.500 ) - Basement 4 ( -14.500 )
0.50
19 Beams 3.00
Basement 1 (- 5.400 ) - GF ( - 0.000 )
Basement 2 (- 8.500 ) - Basement 1 ( - 5.400 )
Basement 3 ( - 11.500 ) - Basement 2 (- 8.500 )
Basement 4 ( -14.500 ) - Basement 3 ( - 11.500 )
Basement 5 ( -17.500 ) - Basement 4 ( -14.500 )
QTY

No DESCRIPTION SHOP
FORCON LSF -
BOQ DRAWING
CALC PROGRESS
CALC

BASEMENT STRUCTURE LINK - HOTEL

Vibrated reinforced concrete, f'c 55 MPa as specified


1 Columns 131.00 104.37 104.37
Basement 1 ( - 5.400 ) - 1 St Floor (+ 0.600) 42.21 42.21
Basement 2 (- 8.500 ) - Basement 1 ( - 5.400 ) 20.91 20.91
Basement 3 ( - 11.500 ) - Basement 2 (- 8.500 ) 13.75 13.75
Basement 4 ( -14.500 ) - Basement 3 ( - 11.500 ) 13.75 13.75
Basement 5 ( -17.500 ) - Basement 4 ( -14.500 ) 13.75 13.75

Vibrated reinforced concrete, f'c 40 MPa as specified


2 Basement wall 269.00 266.59 172.76
Basement 2 ( - 8.500 ) - 1 St Floor (+ 0.600) 266.59 172.76

3 Drop panels 99.00 209.11 209.11


Basement 1 ( - 5.400 ) 49.53 49.53
Basement 2 (- 8.500 ) 60.51 60.51
Basement 3 ( - 11.500 ) 49.53 49.53
Basement 4 ( -14.500 ) 49.53 49.53

4 Suspended slabs 726.00 693.28 693.28


Basement 1 ( - 5.400 ) 173.68 173.68
Basement 2 (- 8.500 ) 172.25 172.25
Basement 3 ( - 11.500 ) 173.68 173.68
Basement 4 ( -14.500 ) 173.68 173.68

5 Suspended beam 15.00 35.08 35.08


Basement 1 ( - 5.400 ) 8.77 8.77
Basement 2 (- 8.500 ) 8.77 8.77
Basement 3 ( - 11.500 ) 8.77 8.77
Basement 4 ( -14.500 ) 8.77 8.77

ROOF STRUCTURE

Vibrated reinforced concrete, f'c 40 MPa as specified

6 Suspended roof slab 44.00 -


Ground Floor (- 0.00)

7 Suspended roof beam 29.00 -


Ground Floor (- 0.00)

STAIR STRUCTURE
Vibrated reinforced concrete, f'c 40 MPa as specified 0.33
8 Landing slab 2.00 -
Basement 1 (- 5.400 ) - GF ( - 0.000 )
QTY

No DESCRIPTION SHOP
FORCON LSF -
BOQ DRAWING
CALC PROGRESS
CALC
Basement 2 (- 8.500 ) - Basement 1 ( - 5.400 )
Basement 3 ( - 11.500 ) - Basement 2 (- 8.500 )
Basement 4 ( -14.500 ) - Basement 3 ( - 11.500 )
Basement 5 ( -17.500 ) - Basement 4 ( -14.500 )
1.50
17 Staircases 9.00
Basement 1 (- 5.400 ) - GF ( - 0.000 )
Basement 2 (- 8.500 ) - Basement 1 ( - 5.400 )
Basement 3 ( - 11.500 ) - Basement 2 (- 8.500 )
Basement 4 ( -14.500 ) - Basement 3 ( - 11.500 )
Basement 5 ( -17.500 ) - Basement 4 ( -14.500 )

BASEMENT STRUCTURE OFFICE

Vibrated reinforced concrete, f'c 55 MPa as specified


1 Shear walls 662.00 663.21 663.21
Basement 1 Mezz Floor (- 2.560) - Ground Floor 1 (+ 0.000) 101.73 101.73
Basement 1 ( - 5.400 ) - 1 Mezz Floor (- 2.560) 101.73 101.73
Basement 2 (- 8.500 ) - Basement 1 ( - 5.400 ) 114.94 114.94
Basement 3 ( - 11.500 ) - Basement 2 (- 8.500 ) 114.94 114.94
Basement 4 ( -14.500 ) - Basement 3 ( - 11.500 ) 114.94 114.94
Basement 5 ( -17.500 ) - Basement 4 ( -14.500 ) 114.94 114.94

2 Columns 857.00 822.89 822.89


Basement 1 Mezz Floor (- 2.560) - Ground Floor 1 (+ 0.000) 155.07 155.07
Basement 1 ( - 5.400 ) - 1 Mezz Floor (- 2.560) 155.07 155.07
Basement 2 (- 8.500 ) - Basement 1 ( - 5.400 ) 163.59 163.59
Basement 3 ( - 11.500 ) - Basement 2 (- 8.500 ) 116.39 116.39
Basement 4 ( -14.500 ) - Basement 3 ( - 11.500 ) 116.39 116.39
Basement 5 ( -17.500 ) - Basement 4 ( -14.500 ) 116.39 116.39

Vibrated reinforced concrete, f'c 40 MPa as specified


3 Basement wall 592.00
Basement 2 ( - 8.500 ) - 1 St Floor (+ 0.000)

4 Drop panels 340.00 547.50 547.50


Basement 1 Mezz Floor (- 2.560) 109.50 109.50
Basement 1 ( - 5.400 ) 109.50 109.50
Basement 2 (- 8.500 ) 109.50 109.50
Basement 3 ( - 11.500 ) 109.50 109.50
Basement 4 ( -14.500 ) 109.50 109.50

5 Suspended slabs 2,301.00 2,461.65 2,461.65


Basement 1 Mezz Floor (- 2.560) 492.33 492.33
QTY

No DESCRIPTION SHOP
FORCON LSF -
BOQ DRAWING
CALC PROGRESS
CALC
Basement 1 ( - 5.400 ) 492.33 492.33
Basement 2 (- 8.500 ) 492.33 492.33
Basement 3 ( - 11.500 ) 492.33 492.33
Basement 4 ( -14.500 ) 492.33 492.33

6 Suspended beam 409.00 237.55 237.55


Basement 1 Mezz Floor (- 2.560) 47.51 47.51
Basement 1 ( - 5.400 ) 47.51 47.51
Basement 2 (- 8.500 ) 47.51 47.51
Basement 3 ( - 11.500 ) 47.51 47.51
Basement 4 ( -14.500 ) 47.51 47.51

7 Suspended Ramps 140.00 - -


Basement 1 Mezz Floor (- 2.560) - Ground Floor 1 (+ 0.000)
Basement 1 ( - 5.400 ) - 1 Mezz Floor (- 2.560)
Basement 2 (- 8.500 ) - Basement 1 ( - 5.400 )
Basement 3 ( - 11.500 ) - Basement 2 (- 8.500 )
Basement 4 ( -14.500 ) - Basement 3 ( - 11.500 )
Basement 5 ( -17.500 ) - Basement 4 ( -14.500 )
QTY

No DESCRIPTION SHOP
FORCON LSF -
BOQ DRAWING
CALC PROGRESS
CALC
8 Ramp parapet 62.00 - -
Basement 1 Mezz Floor (- 2.560) - Ground Floor 1 (+ 0.000)
Basement 1 ( - 5.400 ) - 1 Mezz Floor (- 2.560)
Basement 2 (- 8.500 ) - Basement 1 ( - 5.400 )
Basement 3 ( - 11.500 ) - Basement 2 (- 8.500 )
Basement 4 ( -14.500 ) - Basement 3 ( - 11.500 )
Basement 5 ( -17.500 ) - Basement 4 ( -14.500 )

9 Tank walls (Provisional) 204.00 160.02 -


Basement 1 Mezz Floor (- 2.560) - Ground Floor 1 (+ 0.000) 26.67
Basement 1 ( - 5.400 ) - 1 Mezz Floor (- 2.560) 26.67
Basement 2 (- 8.500 ) - Basement 1 ( - 5.400 ) 26.67
Basement 3 ( - 11.500 ) - Basement 2 (- 8.500 ) 26.67
Basement 4 ( -14.500 ) - Basement 3 ( - 11.500 ) 26.67
Basement 5 ( -17.500 ) - Basement 4 ( -14.500 ) 26.67

10 Equipment Foundation pads (Provisional) 100.00 -


Basement 1 ( - 5.400 )

11 MEP Trench Walls (Provisional) 10.00 -

ROOF STRUCTURE

Vibrated reinforced concrete, f'c 40 MPa as specified

12 Suspended roof slab 280.00 -


Ground Floor (- 0.00)

13 Suspended roof beam 97.00 -


Ground Floor (- 0.00)

STAIR STRUCTURE
Vibrated reinforced concrete, f'c 40 MPa as specified 2.00
14 Landing slab 12.00 - -
Basement 1 ( - 5.400 ) - 1 Mezz Floor (- 2.560)
Basement 2 (- 8.500 ) - Basement 1 ( - 5.400 )
Basement 3 ( - 11.500 ) - Basement 2 (- 8.500 )
Basement 4 ( -14.500 ) - Basement 3 ( - 11.500 )
Basement 5 ( -17.500 ) - Basement 4 ( -14.500 )
3.67
15 Staircases 22.00 - -
Basement 1 ( - 5.400 ) - 1 Mezz Floor (- 2.560)
Basement 2 (- 8.500 ) - Basement 1 ( - 5.400 )
Basement 3 ( - 11.500 ) - Basement 2 (- 8.500 )
Basement 4 ( -14.500 ) - Basement 3 ( - 11.500 )
QTY

No DESCRIPTION SHOP
FORCON LSF -
BOQ DRAWING
CALC PROGRESS
CALC
Basement 5 ( -17.500 ) - Basement 4 ( -14.500 )
0.33
16 Columns 2.00 - -
Basement 1 ( - 5.400 ) - 1 Mezz Floor (- 2.560)
Basement 2 (- 8.500 ) - Basement 1 ( - 5.400 )
Basement 3 ( - 11.500 ) - Basement 2 (- 8.500 )
Basement 4 ( -14.500 ) - Basement 3 ( - 11.500 )
Basement 5 ( -17.500 ) - Basement 4 ( -14.500 )
0.50
QTY

No DESCRIPTION SHOP
FORCON LSF -
BOQ DRAWING
CALC PROGRESS
CALC
17 Beams 3.00 - -
Basement 1 ( - 5.400 ) - 1 Mezz Floor (- 2.560)
Basement 2 (- 8.500 ) - Basement 1 ( - 5.400 )
Basement 3 ( - 11.500 ) - Basement 2 (- 8.500 )
Basement 4 ( -14.500 ) - Basement 3 ( - 11.500 )
Basement 5 ( -17.500 ) - Basement 4 ( -14.500 )

SUBSTRUCTURE APARTMENT

Vibrated reinforced concrete, f'c 40 MPa as specified


1 Mat foundation 6,036.00 5,964.08
Basement 5 ( -17.500 ) 5,964.08

2 Pile cap 97.00 100.22


Basement 5 ( -17.500 ) 100.22

3 Basement slab 1,839.00 1,834.82


Basement 5 ( -17.500 ) 1,834.82

4 Slab thickening under lift pits and sump pits (provisional) 75.00 1,614.58
Basement 5 ( -17.500 ) 1,614.58

SUBSTRUCTURE LINK

Vibrated reinforced concrete, f'c 40 MPa as specified


1 Pile cap 38.00 50.86
Basement 5 ( -17.500 ) 50.86

2 Basement slab 627.00 726.06


Basement 5 ( -17.500 ) 726.06

3 Sump pits (provisional) 24.00


Basement 5 ( -17.500 ) 24.00

SUBSTRUCTURE OFFICE

1 Mat foundation 7,462.00 7,421.16


Basement 5 ( -17.500 ) 7,421.16

2 Pile cap 13.00 -


Basement 5 ( -17.500 ) -

3 Basement slab 160.00 -


Basement 5 ( -17.500 ) -

4 Slab thickening under lift pits and sump pits (provisional) 75.00 255.91
Basement 5 ( -17.500 ) 255.91
QTY
Actual On Site
Suplier (Pioner)
(From QC & Logistic
Monitoring )
QTY
Actual On Site
Suplier (Pioner)
(From QC & Logistic
Monitoring )
QTY
Actual On Site
Suplier (Pioner)
(From QC & Logistic
Monitoring )
QTY
Actual On Site
Suplier (Pioner)
(From QC & Logistic
Monitoring )
QTY
Actual On Site
Suplier (Pioner)
(From QC & Logistic
Monitoring )
QTY
Actual On Site
Suplier (Pioner)
(From QC & Logistic
Monitoring )
QTY
Actual On Site
Suplier (Pioner)
(From QC & Logistic
Monitoring )
QTY
Actual On Site
Suplier (Pioner)
(From QC & Logistic
Monitoring )
QTY
Actual On Site
Suplier (Pioner)
(From QC & Logistic
Monitoring )
Volume

No Location
FORCON
BOQ QS CALC LS
CALC

Basement 2 (Residence + Link)


1 Drop Panel 1,071.32 1,061.54
2 Slab 492.02 486.68
3 Suspended beam 4.53 165.00
4 Suspended ramps
5 Ramp parapet
6 Tank walls (Provisional)
7 Equipment Foundation pads (Provisional)
8 MEP Trench Walls (Provisional)
9 Caping Beam 267.65 334.39
10 Temporary Ramp 12.07
11 ADDITIONAL WORK (ERI/RPP/SD-STR) 141.00
12 LOSE 59.02
SUB TOTAL CONCRETE - - 2,047.60 2,047.60
SUB TOTAL For (Progres) - - 1,976.51

Basement 3 (Residence + Link)


1 Drop Panel 192.50 189.50
2 Slab 923.48 917.60
3 Suspended beam 14.27 58.90
4 Suspended ramps
5 Ramp parapet
6 Tank walls (Provisional)
7 Equipment Foundation pads (Provisional)
8 MEP Trench Walls (Provisional)
9 Temporary Strutting Beam (Ramp Area) 25.10
10 LOSE 73.08 73.08
SUB TOTAL CONCRETE - - 1,228.43 1,239.08
SUB TOTAL For (Progres) - - 1,130.25
Volume

No Location
FORCON
BOQ QS CALC LS
CALC

Basement 4 (Residence + Link)


1 Drop Panel 192.13
2 Slab 923.48
3 Suspended beam 14.77
4 Suspended ramps
5 Ramp parapet
6 Tank walls (Provisional)
7 Equipment Foundation pads (Provisional)
8 MEP Trench Walls (Provisional)
9 Temporary Strutting Beam (Ramp Area) 25.10
10 LOSE 93.00
SUB TOTAL CONCRETE - - 1,248.48 -
SUB TOTAL For (Progres) - - 1,130.38
Volume

Actual On Site (From Suplier


QC & Logistic) (Pioner)

2,051.00 1,957.00

2,051.00 1,957.00

1,238.50

1,238.50 -
Volume

Actual On Site (From Suplier


QC & Logistic) (Pioner)

1,259.00

1,259.00 -
QTY MONITORING CONCRETE

ZONE RESIDENCE

No Description Strength BASE ON BOQ CONTRACT


A B C

BOQ BOQ BOQ BASE ON BASE ON BASE ON


QTY QTY SHOP SHOP SHOP
QTY DRAWING DRAWING DRAWING
RESIDENCE LINK OFFICE CALC CALC CALC

BASEMENT STRUCTURE APARTMENT

Vibrated reinforced concrete, f'c 55 MPa as


A specified

1 Shear walls F'c 55 Mpa 154.00 - 165.50


2 Shear walls (SW-13, SW-14, SW-15, SW-16) 195.00 -
3 Columns 242.50 32.75 214.25
Vibrated reinforced concrete, f'c 40 MPa as
B specified
1 Basement wall 216.00 67.25 148.00
2 Drop panels 188.75 24.75 85.00
3 Suspended slabs 978.50 181.50 575.25
4 Suspended beam F'c 40 Mpa B1 64.25 3.75 102.25
5 Suspended ramps 36.25 - 35.00
6 Ramp parapet 18.00 - 15.50
7 Tank walls (Provisional) 101.50 - 51.00
8 Equipment Foundation pads (Provisional) 25.00 - 25.00
9 MEP Trench Walls (Provisional) 2.50 - 2.50
12 Caping Beam
13 Temporary Ramp
14 ADDITIONAL WORK (ERI/RPP/SD-STR)
QTY MONITORING CONCRETE

ZONE RESIDENCE

No Description Strength BASE ON BOQ CONTRACT


A B C

BOQ BOQ BOQ BASE ON BASE ON BASE ON


QTY QTY SHOP SHOP SHOP
QTY DRAWING DRAWING DRAWING
RESIDENCE LINK OFFICE CALC CALC CALC

C ROOF STRUCTURE
Vibrated reinforced concrete, f'c 40 MPa as
specified F'c 40 Mpa
1 Suspended roof slab 149.50 11.00 70.00
2 Suspended roof beam 96.50 7.25 24.25

D STAIR STRUCTURE B1
Vibrated reinforced concrete, f'c 40 MPa as
specified F'c 40 Mpa
1 Landing slab 2.50 0.50 3.00
1 Staircases 5.50 2.25 5.50
1 Columns 0.50 - 0.50
2 Beams 0.75 - 0.75

Sub Total (B1) 2,477.50 331.00 1,523.25 - - -


QTY MONITORING CONCRETE

ZONE RESIDENCE

No Description Strength BASE ON BOQ CONTRACT


A B C

BOQ BOQ BOQ BASE ON BASE ON BASE ON


QTY QTY SHOP SHOP SHOP
QTY DRAWING DRAWING DRAWING
RESIDENCE LINK OFFICE CALC CALC CALC

BASEMENT STRUCTURE APARTMENT

Vibrated reinforced concrete, f'c 55 MPa as


A specified

1 Shear walls F'c 55 Mpa 154.00 - 165.50


2 Shear walls (SW-13, SW-14, SW-15, SW-16) 195.00 -
3 Columns 242.50 32.75 214.25
Vibrated reinforced concrete, f'c 40 MPa as
B specified
1 Basement wall 216.00 67.25 148.00
2 Drop panels 188.75 24.75 85.00 92.03 72.97 95.92
3 Suspended slabs 978.50 181.50 575.25 186.77 153.56 212.18
4 Suspended beam F'c 40 Mpa B2 64.25 3.75 102.25 0.59 0.51 1.92
5 Suspended ramps 36.25 35.00
6 Ramp parapet 18.00 15.50
7 Tank walls (Provisional) 101.50 51.00
8 Equipment Foundation pads (Provisional) 25.00 25.00
9 MEP Trench Walls (Provisional) 2.50 2.50
12 Caping Beam 38.18 35.59 53.58
13 Temporary Ramp 12.07
14 ADDITIONAL WORK (ERI/RPP/SD-STR) 4.95 42.65 15.85
QTY MONITORING CONCRETE

ZONE RESIDENCE

No Description Strength BASE ON BOQ CONTRACT


A B C

BOQ BOQ BOQ BASE ON BASE ON BASE ON


QTY QTY SHOP SHOP SHOP
QTY DRAWING DRAWING DRAWING
RESIDENCE LINK OFFICE CALC CALC CALC

C ROOF STRUCTURE
Vibrated reinforced concrete, f'c 40 MPa as
specified F'c 40 Mpa
1 Suspended roof slab 149.50 11.00 70.00
2 Suspended roof beam 96.50 7.25 24.25

D STAIR STRUCTURE B2
Vibrated reinforced concrete, f'c 40 MPa as
specified F'c 40 Mpa
1 Landing slab 2.50 0.50 3.00
1 Staircases 5.50 2.25 5.50
1 Columns 0.50 0.50
2 Beams 0.75 0.75

Sub Total (B2) 2,477.50 331.00 1,523.25 334.59 305.28 379.44


QTY MONITORING CONCRETE

ZONE RESIDENCE

No Description Strength BASE ON BOQ CONTRACT


A B C

BOQ BOQ BOQ BASE ON BASE ON BASE ON


QTY QTY SHOP SHOP SHOP
QTY DRAWING DRAWING DRAWING
RESIDENCE LINK OFFICE CALC CALC CALC

BASEMENT STRUCTURE APARTMENT

Vibrated reinforced concrete, f'c 55 MPa as


A specified

1 Shear walls F'c 55 Mpa 154.00 - 165.50


2 Shear walls (SW-13, SW-14, SW-15, SW-16) 195.00 -
3 Columns 242.50 32.75 214.25
Vibrated reinforced concrete, f'c 40 MPa as
B specified
1 Basement wall 216.00 67.25 148.00
2 Drop panels 188.75 24.75 85.00 30.87 26.63 47.03
3 Suspended slabs 978.50 181.50 575.25 155.48 129.13 239.22
4 Suspended beam F'c 40 Mpa B3 64.25 3.75 102.25 2.84 3.01 5.27
5 Suspended ramps 36.25 35.00
6 Ramp parapet 18.00 15.50
7 Tank walls (Provisional) 101.50 51.00
8 Equipment Foundation pads (Provisional) 25.00 25.00
9 MEP Trench Walls (Provisional) 2.50 2.50
12 Strutting Beam (Ramp Area) 5.96 8.00 6.68

C ROOF STRUCTURE
QTY MONITORING CONCRETE

ZONE RESIDENCE

No Description Strength BASE ON BOQ CONTRACT


A B C

BOQ BOQ BOQ BASE ON BASE ON BASE ON


QTY QTY SHOP SHOP SHOP
QTY DRAWING DRAWING DRAWING
RESIDENCE LINK OFFICE CALC CALC CALC

Vibrated reinforced concrete, f'c 40 MPa as


specified F'c 40 Mpa
1 Suspended roof slab 149.50 11.00 70.00
2 Suspended roof beam 96.50 7.25 24.25

D STAIR STRUCTURE B3
Vibrated reinforced concrete, f'c 40 MPa as
specified F'c 40 Mpa
1 Landing slab 2.50 0.50 3.00
1 Staircases 5.50 2.25 5.50
1 Columns 0.50 0.50
2 Beams 0.75 0.75

Sub Total (B3) 2,477.50 331.00 1,523.25 195.15 166.77 298.20


QTY MONITORING CONCRETE

ZONE RESIDENCE

No Description Strength BASE ON BOQ CONTRACT


A B C

BOQ BOQ BOQ BASE ON BASE ON BASE ON


QTY QTY SHOP SHOP SHOP
QTY DRAWING DRAWING DRAWING
RESIDENCE LINK OFFICE CALC CALC CALC

BASEMENT STRUCTURE APARTMENT

Vibrated reinforced concrete, f'c 55 MPa as


A specified

1 Shear walls F'c 55 Mpa 154.00 - 165.50


2 Shear walls (SW-13, SW-14, SW-15, SW-16) 195.00 -
3 Columns 242.50 32.75 214.25
Vibrated reinforced concrete, f'c 40 MPa as
B specified
1 Basement wall 216.00 67.25 148.00
2 Drop panels 188.75 24.75 85.00 30.87 26.63 46.66
3 Suspended slabs 978.50 181.50 575.25 155.48 129.13 239.22
4 Suspended beam F'c 40 Mpa B4 64.25 3.75 102.25 2.84 3.01 5.37
5 Suspended ramps 36.25 35.00
6 Ramp parapet 18.00 15.50
7 Tank walls (Provisional) 101.50 51.00
8 Equipment Foundation pads (Provisional) 25.00 25.00
9 MEP Trench Walls (Provisional) 2.50 2.50
12 Strutting Beam (Ramp Area) 5.96 8.00 6.68

C ROOF STRUCTURE
Vibrated reinforced concrete, f'c 40 MPa as
specified F'c 40 Mpa
QTY MONITORING CONCRETE

ZONE RESIDENCE

No Description Strength BASE ON BOQ CONTRACT


A B C

BOQ BOQ BOQ BASE ON BASE ON BASE ON


QTY QTY SHOP SHOP SHOP
QTY DRAWING DRAWING DRAWING
RESIDENCE LINK OFFICE CALC CALC CALC

1 Suspended roof slab 149.50 11.00 70.00


2 Suspended roof beam 96.50 7.25 24.25

D STAIR STRUCTURE B4
Vibrated reinforced concrete, f'c 40 MPa as
specified F'c 40 Mpa
1 Landing slab 2.50 0.50 3.00
1 Staircases 5.50 2.25 5.50
1 Columns 0.50 0.50
2 Beams 0.75 0.75

Sub Total (B4) 2,477.50 331.00 1,523.25 195.15 166.77 297.93


QTY MONITORING CONCRETE

ZONE RESIDENCE ZONE LINK ZONE LINK TOTAL


TOTAL
ACTUAL E ACTUAL
(RS)
D F E (LINK)
E1 E2

BASE ON BASE ON BASE ON BASE ON


BASE ON SHOP
SHOP SHOP SHOP SHOP
DRAWING
DRAWING DRAWING DRAWING DRAWING
CALC
CALC CALC CALC CALC

- -
- -
- -

- -
- -
- -
- -
- -
- -
- -
- -
- -
QTY MONITORING CONCRETE

ZONE RESIDENCE ZONE LINK ZONE LINK TOTAL


TOTAL
ACTUAL E ACTUAL
(RS)
D F E (LINK)
E1 E2

BASE ON BASE ON BASE ON BASE ON


BASE ON SHOP
SHOP SHOP SHOP SHOP
DRAWING
DRAWING DRAWING DRAWING DRAWING
CALC
CALC CALC CALC CALC

- -
- -

- -
- -
- -
- -
- - - - - - -
QTY MONITORING CONCRETE

ZONE RESIDENCE ZONE LINK ZONE LINK TOTAL


TOTAL
ACTUAL E ACTUAL
(RS)
D F E (LINK)
E1 E2

BASE ON BASE ON BASE ON BASE ON


BASE ON SHOP
SHOP SHOP SHOP SHOP
DRAWING
DRAWING DRAWING DRAWING DRAWING
CALC
CALC CALC CALC CALC

- -
- -
- -

- -
167.68 428.60 55.14 8.28 63.42 63.42
342.58 895.09 151.55 24.68 176.23 176.23
0.33 3.35 1.18 - 1.18 1.18
- -
- -
- -
- -
- -
72.45 199.80 34.95 32.90 67.85 67.85
12.07 -
63.24 126.69 6.87 7.44 14.31 14.31
QTY MONITORING CONCRETE

ZONE RESIDENCE ZONE LINK ZONE LINK TOTAL


TOTAL
ACTUAL E ACTUAL
(RS)
D F E (LINK)
E1 E2

BASE ON BASE ON BASE ON BASE ON


BASE ON SHOP
SHOP SHOP SHOP SHOP
DRAWING
DRAWING DRAWING DRAWING DRAWING
CALC
CALC CALC CALC CALC

- -
- -

- -
- -
- -
- -
646.28 - 1,665.59 249.69 73.30 322.99 322.99
QTY MONITORING CONCRETE

ZONE RESIDENCE ZONE LINK ZONE LINK TOTAL


TOTAL
ACTUAL E ACTUAL
(RS)
D F E (LINK)
E1 E2

BASE ON BASE ON BASE ON BASE ON


BASE ON SHOP
SHOP SHOP SHOP SHOP
DRAWING
DRAWING DRAWING DRAWING DRAWING
CALC
CALC CALC CALC CALC

- -
- -
- -

- -
35.97 140.50 52.00 52.00
225.97 749.80 173.68 173.68
2.04 13.16 1.11 1.11
- -
- -
- -
- -
- -
4.46 25.10
QTY MONITORING CONCRETE

ZONE RESIDENCE ZONE LINK ZONE LINK TOTAL


TOTAL
ACTUAL E ACTUAL
(RS)
D F E (LINK)
E1 E2

BASE ON BASE ON BASE ON BASE ON


BASE ON SHOP
SHOP SHOP SHOP SHOP
DRAWING
DRAWING DRAWING DRAWING DRAWING
CALC
CALC CALC CALC CALC

- -
- -

- -
- -
- -
- -
268.44 - 928.56 - - 226.79 226.79
QTY MONITORING CONCRETE

ZONE RESIDENCE ZONE LINK ZONE LINK TOTAL


TOTAL
ACTUAL E ACTUAL
(RS)
D F E (LINK)
E1 E2

BASE ON BASE ON BASE ON BASE ON


BASE ON SHOP
SHOP SHOP SHOP SHOP
DRAWING
DRAWING DRAWING DRAWING DRAWING
CALC
CALC CALC CALC CALC

- -
- -
- -

- -
35.97 140.13 52.00 52.00
225.97 749.80 173.68 173.68
2.25 13.47 1.30 1.30
- -
- -
- -
- -
- -
4.46 25.10
QTY MONITORING CONCRETE

ZONE RESIDENCE ZONE LINK ZONE LINK TOTAL


TOTAL
ACTUAL E ACTUAL
(RS)
D F E (LINK)
E1 E2

BASE ON BASE ON BASE ON BASE ON


BASE ON SHOP
SHOP SHOP SHOP SHOP
DRAWING
DRAWING DRAWING DRAWING DRAWING
CALC
CALC CALC CALC CALC

- -
- -

- -
- -
- -
- -
268.65 - 928.50 - - 226.98 226.98
RESIDENCE CONCRETE CALCULATION SKETCHUP (ACTUAL) BASEMENT 2

ZONE A ZONE B
No No
Item Dimension Length QTY TOTAL Item Dimension Length QTY TOTAL
1 Drop panels t = 250 mm 92.03 92.03 1 Drop panels t = 250 mm 72.97 72.97
2 slabs t = 300 mm 186.77 186.77 2 slabs t = 300 mm 153.56 153.56
3 Beam 0.59 3 Beam 0.51
B2- 176 (300x550)0 0
B2- 173 (300x550)0 0 B2- 173 (300x550)0 0
G8-10 (500x600)50 9.32 0.24
G13-118 (600x600)50 11.6667 0.350 G13-118 (600x600)50 17.00 0.51
4 Caping Beam 38.18 4 Caping Beam 35.59
CB R1 - ( RA - RN) 800x800 24.91 15.942 ` CB R1 - ( RA - RG) 800x800 23.69 15.16
CB RS - ( R1 - R3) 800x800 17.99 11.516 CB RA R1 - R7.4 800x800 31.92 20.43
CB RS R4 - R11.6 800x800 16.75 10.720 Additional Work (ERI)
5 Temporary Ramp 12.07 5 Caping Beam (Actual Condition) 42.65
6 Additional Work (ERI) CB R1 - ( RA - RG) 900x900 23.69 (19.19)
Caping Beam (Actual Condition) 4.95 CB RA R1 - R7.4 1370x1320 31.92 (59.05)
CB R1 - ( RA - RN) (24.73 m) 850x850 24.91 (18.01)
CB RS - ( R1 - R3) 850x850 17.99 (13.01)
CB RS R4 - R11.6 850x850 16.75 (12.11)
334.59 305.28

No
ZONE C1 No
ZONE C2
Item Dimension Length QTY TOTAL Item Dimension Length QTY TOTAL
1 Drop panels t = 250 mm 79.22 79.22 1 Drop panels t = 250 mm 16.7 16.7
2 slabs t = 300 mm 175.73 175.73 2 slabs t = 300 mm 36.45 36.45
3 Beam 1.92 3 Beam 0
B2- 176 (300x550)0 0.00
B2- 173 (300x550)250 4.5 0.34 B2- 173 (300x550)0 0

G13-118 (600x600)50 22.92 1.58


4 Caping Beam 19.66 4 Caping Beam
CB RS R4 - R11.6 800x800 27.73 17.75 CB R14 - (RK-RQ) 1200X1000 14.7 17.64 17.64
CB R11.6 - (RS - T) 800x800 2.99 1.91 CB RQ - (A3 - A4) 1000X1000 6.975 6.975 6.98
CB A4 RQ - DH 1000X1000 9.3 9.3 9.30
5 Additional Work (ERI)
Caping Beam Actual Condition 10.215
CB R14 - (RK-RQ) 1800X1000 14.7 (26.46)
CB RQ - (A3 - A4) 1200X1000 6.975 (8.37)
Additional Caping Beam Joint Ex Hotel 800X700 10.5 5.63 5.63
276.5347 102.91
No
ZONE D1 No
ZONE D2
Item Dimension Length QTY TOTAL Item Dimension Length QTY TOTAL
1 Drop panels t = 250 mm 137.76 137.76 1 Drop panels t = 250 mm 29.92 29.92
2 slabs t = 300 mm 279.04 279.04 2 slabs t = 300 mm 63.54 63.54
3 Beam 0.33 3 Beam 0
B2- 173 (300x550)0 0.00
G25-1 (500x400)0 B2- 173 (300x550)50 0
G13-118 (600x600)50 11 0.33

4 Caping Beam 4 Caping Beam 50.248


CB R1 / R.74-R.14 800x800 34.6864 22.20 22.20 CB RA / R13 - R14 800x800 6.90 4.41
5 Additional Work (ERI) CB R14. RA ~ RB-RC.4 1200x1000 7.40 8.88
Caping Beam (Actual Condition) CB R14 / RA - RK 1200x1000 30.79 36.95
CB R1 / R.74-R.14 1370x1350 34.6864 (58.62) 36.42 5 Additional Work (ERI)
Caping Beam (Actual Condition) 26.82
CB RA / R13 - R14 1370X1350 6.90 (12.76)
CB R14. RA ~ RB-RC.4 1200x1000 7.40 (8.88)
CB R14 / RA - RK 1800x1000 30.79 (55.43)
475.75 170.53

LINK CONCRETE CALCULATION SKETCHUP (ACTUAL) BASEMENT 2


No
ZONE E1 No
ZONE E2
Item Dimension Length QTY TOTAL Item Dimension Length QTY TOTAL
1 Drop panels t = 150 mm 55.14 55.14 1 Drop panels t = 150 mm 8.28 8.28
2 slabs t = 250 mm 151.55 151.55 2 slabs t = 250 mm 24.68 24.68
3 Beam 1.18 3 Beam 0
G-22 (350x700)300 0.770
G-23 (300x500)100 0.170
B-6 (300x500)100 0.190
B-7 (300x500)100 0.050
4 Caping Beam 34.95 4 Caping Beam 32.9
CB R11.6 - (RS - T) 800x800 31.39 20.09 CB A4 RQ - DH 800x800 32.9
CB R11.6 - A.32 800x800 23.22 14.86
5 Additional Work (ERI) Additional Caping Beam Joint Ex Hotel 7.44 7.44
Caping Beam (Actual Condition) 6.867
CB R11.6 - (RS - T) 900X850 31.39 (24.17)
CB R11.6 - A.32 900X850 23.22 (17.65)
249.69 73.3
RESIDENCE CONCRETE CALCULATION (ACTUAL) BASEMENT 3

ZONE A ZONE B
No No
Item Dimension Length Area QTY TOTAL Item Dimension Length Area QTY
1 Drop panels t = 150 mm 205.8 30.87 30.87 1 Drop panels t = 150 mm 177.5 26.63
2 slabs t = 250 mm 621.89 155.48 155.48 2 slabs t = 250 mm 516.5 129.13
3 Beam 2.84 3 Beam
B2-173 (300X500)100 7.67 0.23 B2-173 (300X500)250 3.47 0.26
BR-2 (300X600)200 3.33 0.2 G13-118 (600X600)200 16.75 2.01
G13-118 (600X600)200 11.58 1.39 BR-2 (300X600)200 2.50 0.15
G8-10 (500X600)200 9.10 0.910 B2-177 (300X500)100 4.33 0.13
B2-176 (300X500)100 3.67 0.11 BR-1 (300X700)300 5.11 0.46

4 Temporary Strutting Beam 5.96 4 Temporary Strutting Beam


1. ST - B (400X400) 9.38 1.500 1. ST - B (400X400) 14.31 2.290
2. ST- C (400X600) 18.56 4.455 2. ST- C (400X600) 23.79 5.71

5 LOSE 5 LOSE
Bucket Problem 1.15 Lose Casting (Use Pipe)
Cilinder 0.53 Cilinder
Test slump 1.85 Test slump
Stasionary+pipe 1.20 Stasionary+pipe
Top (Blockout) 2.19 Top (Blockout)
TOTAL FOR B3 ZONE A (BASE ON SHOP DRAWING) 195.15 TOTAL FOR B3 ZONE B (BASE ON SHOP DRAWING)
ACTUAL (ISSUE FROM QUC & LOGISTIC) 196.00 ACTUAL (ISSUE FROM QUC & LOGISTIC)
LOSE 6.92 LOSE
TOTAL CONCRETE ZONE A 202.92 TOTAL CONCRETE ZONE B

No
ZONE C No
ZONE D
Item Dimension Length Area QTY TOTAL Item Dimension Length Area QTY
1 Drop panels t = 150 mm 313.533 47.03 47.03 1 Drop panels t = 150 mm 239.8 35.97
2 slabs t = 250 mm 956.88 239.22 239.22 2 slabs t = 250 mm 903.88 225.97
3 Beam 5.27 3 Beam
G13-118 (600X600)200 30.17 3.62 BR-2 (300X600)200 4.00 0.24
BR-2 (300X600)200 1.83 0.11 G13-188 (600X600)200 10.83 1.3
G-25 (500X400) 2.00 0.40 B2-173 (300X500)100 13.00 0.39
B2-173 (300X500)100 32.67 0.98 B2-177 (300X500)100 3.67 0.11
B2-176 (300X500)100 4.00 0.12
B1-17 (250X500)100 1.60 0.04 4 Temporary Strutting Beam
4 Temporary Strutting Beam 6.68 1. ST - B (400X400) 7.50 1.200
1. ST - B (400X400) 11.63 1.86 2. ST- C (400X600) 13.58 3.26
2. ST- C (400X600) 20.08 4.82
5 LOSE
5 LOSE Lose Casting (Use Pipe)
Lose Casting (Use Pipe) 2.00 Cilinder
Cilinder 0.53 Test slump
Test slump 2.90 Stasionary
Stasionary+pipe 2.00 Top
Top (Blockout) 4.33 Over calculation
Baching Plant Problem 15.00 Baching Plant Problem
TOTAL FOR B3 ZONE C (BASE ON SHOP DRAWING) 298.20 TOTAL FOR B3 ZONE D (BASE ON SHOP DRAWING)
ACTUAL (ISSUE FROM QUC & LOGISTIC) 313.00 ACTUAL (ISSUE FROM QUC & LOGISTIC)
LOSE 26.76 LOSE
TOTAL CONCRETE ZONE C 339.76 TOTAL CONCRETE ZONE D

LINK CONCRETE CALCULATION SKETCHUP (ACTUAL) BASEMENT 3


No
ZONE E No
ZONE F (VOID RESIDENCE)
Item Dimension Length Area QTY TOTAL Item Dimension Length Area QTY
1 Drop panels t = 150 mm 346.667 52 52.00 1 Drop panels t = 150 mm 463.8667 69.58
2 slabs t = 250 mm 694.72 173.68 173.68 2 slabs t = 250 mm 847.92 211.98
3 Beam 1.11 3 Beam
G22 (350X700)300 7.14 0.75 B1 - 2 (250X400) 2.40 0.24
G-23 (300X500)100 4.00 0.120 B1 - 27 (250X400) 23.40 2.340
B6 (300X500)100 6.33 0.190 B2-172 (300X500) 17.73 2.660
B7 (300X500)100 1.67 0.050 B2-173 (300X500) 35.13 5.270
5 LOSE B2-174 (300X500) 3.73 0.56
Cilinder 0.53 B2-175 (300X500) 6.13 0.92
Test slump 2.38 G17 - 42 (700X700) 10.90 5.34
Stasionary 2.00 G25 - 1 (500X400) 19.20 3.84
Top 3.94 G26 - 1 (900X700) 6.83 2.39
Over calculation 2.00 G26 - 2 (900X700) 6.66 2.33

TOTAL FOR B3 ZONE E (BASE ON SHOP DRAWING) 237.63 TOTAL FOR B3 ZONE F (BASE ON SHOP DRAWING)
ACTUAL (ISSUE FROM QUC & LOGISTIC) 252.00 ACTUAL (ISSUE FROM QUC & LOGISTIC)
LOSE 10.84 LOSE
TOTAL CONCRETE ZONE E 262.84 TOTAL CONCRETE ZONE F
CALCULATION (ACTUAL) BASEMENT 3

ZONE B
TOTAL
26.63
129.13
3.01

8.00

2.30
0.53
1.58
1.94
-
166.77
179.00
6.35
185.35

ZONE D
TOTAL
35.97
225.97
2.04
4.46
2.00
0.53
2.77
2.00
6.91
2.00
6.00
270.44
291.00
22.21
313.21

ATION SKETCHUP (ACTUAL) BASEMENT 3


ZONE F (VOID RESIDENCE)
TOTAL
69.58
211.98
11.99

293.55
252.00
-
252.00
RESIDENCE CONCRETE CALCULATION (ACTUAL) BASEMENT 4

ZONE A ZONE B
No No
Item Dimension Length Area QTY TOTAL Item Dimension Length Area QTY
1 Drop panels t = 150 mm 205.80 30.87 30.87 1 Drop panels t = 150 mm 177.5 26.63
2 slabs t = 250 mm 621.92 155.48 155.48 2 slabs t = 250 mm 516.5 129.13
3 Beam 2.84 3 Beam
B2-173 (300X500)100 7.67 0.23 B2-173 (300X500)250 3.47 0.26
BR-2 (300X600)200 3.33 0.2 G13-118 (600X600)200 16.75 2.01
G13-118 (600X600)200 11.58 1.39 BR-2 (300X600)200 2.50 0.15
G8-10 (500X600)200 9.10 0.910 B2-177 (300X500)100 4.33 0.13
B2-176 (300X500)100 3.67 0.11 BR-1 (300X700)300 5.11 0.46

4 Temporary Strutting Beam 5.96 4 Temporary Strutting Beam


1. ST - B (400X400) 9.38 1.500 1. ST - B (400X400) 14.31 2.290
2. ST- C (400X600) 18.56 4.455 2. ST- C (400X600) 23.79 5.71

5 LOSE 5 LOSE
Bucket Problem Lose Casting (Use Pipe)
Cilinder Cilinder
Test slump Test slump
Stasionary+pipe Stasionary+pipe
Top (Blockout) Top (Blockout)
TOTAL FOR B4 ZONE A (BASE ON SHOP DRAWING) 195.15 TOTAL FOR B4 ZONE B (BASE ON SHOP DRAWING)
ACTUAL (ISSUE FROM QUC & LOGISTIC) 207.50 ACTUAL (ISSUE FROM QUC & LOGISTIC)
LOSE - LOSE
TOTAL CONCRETE ZONE A 207.50 TOTAL CONCRETE ZONE B
12.36

No
ZONE C No
ZONE D
Item Dimension Length Area QTY TOTAL Item Dimension Length Area QTY
1 Drop panels t = 150 mm 311.067 46.66 46.66 1 Drop panels t = 150 mm 239.8 35.97
2 slabs t = 250 mm 956.88 239.22 239.22 2 slabs t = 250 mm 903.88 225.97
3 Beam 5.37 3 Beam
G13-118 (600X600)200 29.75 3.57 BR-2 (300X600)200 4.00 0.24
BR-2 (300X600)200 1.83 0.11 G13-188 (600X600)200 12.50 1.5
G-25 (500X400) 2.00 0.40 B2-173 (300X500)100 13.00 0.39
B2-173 (300X500)100 37.33 1.12 B2-177 (300X500)100 4.00 0.12
B2-176 (300X500)100 4.00 0.12
B1-17 (250X500)100 2.00 0.05 4
4 Temporary Strutting Beam 6.68 1. ST - B (400X400) 7.50 1.200
1. ST - B (400X400) 11.63 1.86 2. ST- C (400X600) 13.58 3.26
2. ST- C (400X600) 20.08 4.82
5 LOSE
5 LOSE Lose Casting (Use Pipe)
Lose Casting (Use Pipe) Cilinder
Cilinder Test slump
Test slump Stasionary
Stasionary+pipe Top
Top (Blockout) Over calculation
Baching Plant Problem Baching Plant Problem
TOTAL FOR B4 ZONE C (BASE ON SHOP DRAWING) 297.93 TOTAL FOR B4 ZONE D (BASE ON SHOP DRAWING)
ACTUAL (ISSUE FROM QUC & LOGISTIC) 337.50 ACTUAL (ISSUE FROM QUC & LOGISTIC)
LOSE - LOSE
TOTAL CONCRETE ZONE C 337.50 TOTAL CONCRETE ZONE D
39.57

LINK CONCRETE CALCULATION SKETCHUP (ACTUAL) BASEMENT 4


No
ZONE E No
ZONE F (VOID RESIDENCE)
Item Dimension Length Area QTY TOTAL Item Dimension Length Area QTY
1 Drop panels t = 150 mm 346.67 52 52.00 1 Drop panels t = 150 mm 463.8667 69.58
2 slabs t = 250 mm 694.72 173.68 173.68 2 slabs t = 250 mm 847.92 211.98
3 Beam 1.30 3 Beam
G22 (350X700)300 8.95 0.94 B1 - 2 (250X400) 2.40 0.24
G-23 (300X500)100 4.00 0.120 B1 - 27 (250X400) 23.40 2.34
B6 (300X500)100 6.33 0.190 B2-172 (300X500) 17.73 2.66
B7 (300X500)100 1.67 0.050 B2-173 (300X500) 35.13 5.27
5 LOSE B2-174 (300X500) 3.73 0.56
Cilinder B2-175 (300X500) 6.13 0.92
Test slump G17 - 42 (700X700) 10.90 5.34
Stasionary G25 - 1 (500X400) 19.20 3.84
Top G26 - 1 (900X700) 3.79 2.39
Over calculation G26 - 2 (900X700) 3.70 2.33

TOTAL FOR B4 ZONE E (BASE ON SHOP DRAWING) 226.98 TOTAL FOR B4 ZONE F (BASE ON SHOP DRAWING)
ACTUAL (ISSUE FROM QUC & LOGISTIC) 258.00 ACTUAL (ISSUE FROM QUC & LOGISTIC)
LOSE - LOSE
TOTAL CONCRETE ZONE E 258.00 TOTAL CONCRETE ZONE F

31.02
103.53
CALCULATION (ACTUAL) BASEMENT 4

ZONE B
TOTAL
26.63
129.13
3.01

8.00

-
166.77
172.00
-
172.00
5.23
ZONE D
TOTAL
35.97
225.97
2.25
4.46
268.65
284.00
-
284.00
15.35

ATION SKETCHUP (ACTUAL) BASEMENT 4


ZONE F (VOID RESIDENCE)
TOTAL
69.58
211.98
25.89

307.45

-
-
0
Summary Quantity B2

No. Description Zone

Concrete
Zone A A Beam
Cap Beam
Slab
Drop

Zone B B Beam
Cap Beam
Slab
Drop

Zone C-1 C-1 Beam


Cap Beam
Slab
Drop

Zone D-1 D-1 Beam


Cap Beam
Slab
Drop

Zone C-2 C-2 Beam


Cap Beam
Slab
Drop

Zone D-2 D-2 Beam


Cap Beam
Slab
Drop

Zone Link Link-1 Beam


Cap Beam
Slab
Drop
Zone Link Link-2 Beam
Cap Beam
Slab
Drop

RESIDENCE
Beam
Cap Beam
Slab
Drop
LINK
Beam
Cap Beam
Slab
Drop
Total Concrete B2 RESIDENCE + LINK
Beam
Cap Beam
Slab
Drop

Total CONCRETE B2

Summary Quantity B3

No. Description Zone

3 Concrete fc'40
Zone A A Beam
Slab
Drop
Lose

Zone B B Beam
Slab
Drop
Lose

Zone C C Beam
Slab
Drop
Lose

Zone D D Beam
Slab
Drop
Lose

Zone E E Beam
Slab
Drop
Lose

Total Concrete B2 Beam


Slab
Drop
Lose

Total B3

West wall
Section A-A
Section E-E
Cap Beam Office

Total Additional

Total All

Summary Quantity B4

No. Description Zone

2 Concrete fc'40
Zone A A Beam
Slab
Drop
cilinder & test slump

Zone B B Beam
Slab
Drop
cilinder & test slump

Zone C-1 C Beam


Slab
Drop
cilinder & test slump

Zone C-2 C Beam


Slab
Drop
cilinder & test slump

Zone D-1 D Beam


Slab
Drop
cilinder & test slump

Zone D-2 D Beam


Slab
Drop
cilinder & test slump

Total Concrete B4 Beam


Slab
Drop
cilinder & test slump

Total B4
Total B4 RESIDENCE (PROGRESS)

Zone E-1 E Slab


Drop

cilinder & test slump

Zone E-2 E Slab


Drop
Beam
cilinder & test slump

Total Concrete B4 Beam


Slab
Drop
cilinder & test slump

Total B4
Total B4 LINK (PROGRESS)

Total B4
Q't Sub Q't Unit

5 m3 fc'40
45 m3 fc'40
196 m3 fc'40
88 m3 fc'40

7 m3 fc'40
75 m3 fc'40
153 m3 fc'40
71 m3 fc'40

9 m3 fc'40
24 m3 fc'40
153 m3 fc'40
107 m3 fc'40

5 m3 fc'40
56 m3 fc'40
273 m3 fc'40
95 m3 fc'40

- m3 fc'40
32 m3 fc'40
28 m3 fc'40
24 m3 fc'40

29 m3 fc'40
85 m3 fc'40
58 m3 fc'40
32 m3 fc'40

m3 fc'40
56 m3 fc'40
173 m3 fc'40
57 m3 fc'40
m3 fc'40
72 m3 fc'40
28 m3 fc'40
13 m3 fc'40

RESIDENCE
55.10 m3 fc'40
315.73 m3 fc'40
860.74 m3 fc'40
416.63 m3 fc'40
LINK
- m3 fc'40
128.55 m3 fc'40
200.79 m3 fc'40
70.05 m3 fc'40
RESIDENCE + LINK
55.1 m3 fc'40
444.3 m3 fc'40
1,061.5 m3 fc'40
486.7 m3 fc'40

2,047.6 m3 fc'40

Q't Sub Q't Unit

11.1 m3 fc'40
154.3 m3 fc'40
30.7 m3 fc'40
6.9 m3 fc'40

16.5 m3 fc'40
128.1 m3 fc'40
27.5 m3 fc'40
7.4 m3 fc'40

17.6 m3 fc'40
222.3 m3 fc'40
46.5 m3 fc'40
26.8 m3 fc'40

9.8 m3 fc'40
224.7 m3 fc'40
35.6 m3 fc'40
21.2 m3 fc'40

3.9 m3 fc'40
188.2 m3 fc'40
49.2 m3 fc'40
10.8 m3 fc'40

59.0 m3 fc'40
917.6 m3 fc'40
189.4 m3 fc'40
73.1

1239.1 m3 fc'40

98.2 m3 fc'40
14.0 m3 fc'40
70.0 m3 fc'40
31.5 m3 fc'40

213.7 m3 fc'40

1452.8 m3 fc'40

Q't Sub Q't Unit

9.03 m3 fc'40
157.20 m3 fc'40
28.68 m3 fc'40
2.51 m3 fc'40

5.96 m3 fc'40
124.64 m3 fc'40
24.56 m3 fc'40
2.11 m3 fc'40

13.64 m3 fc'40
207.30 m3 fc'40
34.18 m3 fc'40
3.43 m3 fc'40

0.94 m3 fc'40
41.94 m3 fc'40
18.79 m3 fc'40
1.01 m3 fc'40

8.06 m3 fc'40
187.52 m3 fc'40
17.51 m3 fc'40
3.30 m3 fc'40

0.64 m3 fc'40
42.93 m3 fc'40
10.39 m3 fc'40
0.88 m3 fc'40

38.27 m3 fc'40
761.53 m3 fc'40
134.12 m3 fc'40
13.24 m3 fc'40

947.16 m3 fc'40
933.92 m3 fc'40

123.01 m3 fc'40
28.80 m3 fc'40

2.90 m3 fc'40

63.50 m3 fc'40
27.37 m3 fc'40
1.63 m3 fc'40
2.73 m3 fc'40

1.63 m3 fc'40
186.51 m3 fc'40
56.17 m3 fc'40
5.63 m3 fc'40

m3 fc'40
244.30 m3 fc'40

1178.22
QTY MONITORING FORMWORK

RESIDENCE ZONING
No. Description Item Unit Base On BOQ Contract
A B C

BOQ
BOQ
Location
RESIDENCE
LI NK
BASEMENT STRUCTURE APARTMENT

A Supply and install formwork as specified


1 Sides of shear walls m2 462 -
2 Shear walls (SW-13, SW-14, SW-15, SW-16) m2 544 -
3 Sides of columns m2 988 202
4 Sides of Basement wall m2 902 280
5 Soffits of suspended slabs and drop panels m2 3,815 719

6 Edges of suspended slabs and ramps 100 to 300 mm


deep m B1 606 77

7 Sides of drop panels m2 164 26


8 Sides and soffits of suspended beams m2 153 14
9 Soffits of suspended ramps m2 242 -
10 Sides of ramp parapet m2 90 -
11 Sides of tank walls (Provisional) m2 677 -

12 Sides of equipment foundation pads (Provisional) m2 125 -

12 Sides of MEP trench walls (Provisional) m2 15 -


13 Caping Beam (Actual Condition) m2 - -
14 Temporary Slab In Ramp Zone A m2 - -

ROOF STRUCTURE
Supply and install formwork as specified

1 Soffits of roof slab m2 B1 837 62.75


QTY MONITORING FORMWORK

RESIDENCE ZONING
No. Description Item Unit Base On BOQ Contract
A B C
2 Sides and soffits of roof beam m2 604 48.75
Edges of suspended slabs and ramps 100 to 300 mm
3 m 113 40
deep

C STAIR STRUCTURE

Supply and install formwork as specified


1 Soffit of landing m2 17 4
2 Sloping soffit of staircases m2 25 9

3 Outer string of staircases including cutting to profile


of treads and risers, 350mm high m B1 17 6

4 To riser not exceeding 175 mm high m 81 31


5 Sides of columns m2 4 -
6 Sides and soffits of beams m2 4 -

total 10,482 1,520 - - -

BOQ RPP-PKN- RPP-PKN-SD- RPP-PKN-


BOQ
Location SD-ST-R- ST-R-003 Rev SD-ST-R-008
RESIDENCE
LI NK 001 Rev 02 01 Rev 01

BASEMENT STRUCTURE APARTMENT

A Supply and install formwork as specified


1 Sides of shear walls m2 462 -
2 Shear walls (SW-13, SW-14, SW-15, SW-16) m2 544 -
3 Sides of columns m2 988 202
4 Sides of Basement wall m2 902 280
5 Soffits of suspended slabs and drop panels m2 3,815 719 607.54 498.56 692.52

6 Edges of suspended slabs and ramps 100 to 300 mm


deep m B2 606 77 80.00 64.70 92.60
QTY MONITORING FORMWORK

RESIDENCE ZONING
No. Description Item Unit Base On BOQ Contract
A B C
7 Sides of drop panels m2 164 26 46.82 44.65 53.25
8 Sides and soffits of suspended beams m2 153 14 22.81 16.51 38.63
9 Soffits of suspended ramps m2 242 -
10 Sides of ramp parapet m2 90 -
11 Sides of tank walls (Provisional) m2 677 -

12 Sides of equipment foundation pads (Provisional) m2 125 -

13 Sides of MEP trench walls (Provisional) m2 15 -


13 Caping Beam (Actual Condition) m2 193 - 26.35 52.82 46.85
14 Temporary Slab In Ramp Zone A m2 41 - 41.38

B ROOF STRUCTURE
Supply and install formwork as specified

1 Soffits of roof slab m2 B2 837 62.75


2 Sides and soffits of roof beam m2 604 48.75
Edges of suspended slabs and ramps 100 to 300 mm
3 m 113 40
deep

C STAIR STRUCTURE

Supply and install formwork as specified


1 Soffit of landing m2 17 4
2 Sloping soffit of staircases m2 25 9

3 Outer string of staircases including cutting to profile


of treads and risers, 350mm high m B2 17 6

4 To riser not exceeding 175 mm high m 81 31


5 Sides of columns m2 4 -
6 Sides and soffits of beams m2 4 -
QTY MONITORING FORMWORK

RESIDENCE ZONING
No. Description Item Unit Base On BOQ Contract
A B C

total 10,717 1,520 824.90 677.24 923.85


QTY MONITORING FORMWORK

RESIDENCE ZONING
No. Description Item Unit Base On BOQ Contract
A B C

BOQ RPP-PKN- RPP-PKN-SD- RPP-PKN-


BOQ
Location SD-ST-R- ST-R-012 Rev SD-ST-R-014
RESIDENCE 001 Rev 02 01 Rev 01
LI NK
BASEMENT STRUCTURE APARTMENT

A Supply and install formwork as specified


1 Sides of shear walls m2 462 -
2 Shear walls (SW-13, SW-14, SW-15, SW-16) m2 544 -
3 Sides of columns m2 988 202
4 Sides of Basement wall m2 902 280
5 Soffits of suspended slabs and drop panels m2 3,815 719 606.08 499.46 1,004.65

6 Edges of suspended slabs and ramps 100 to 300 mm


deep m B3 606 77 89.36 70.80 126.56

7 Sides of drop panels m2 164 26 24.19 24.73 43.39


8 Sides and soffits of suspended beams m2 153 14 28.88 28.89 45.45
9 Soffits of suspended ramps m2 242 -
10 Sides of ramp parapet m2 90 -
11 Sides of tank walls (Provisional) m2 677 -

12 Sides of equipment foundation pads (Provisional) m2 125 -

12 Sides of MEP trench walls (Provisional) m2 15 -


13 Strutting Beam ( Ramp Area ) m2 138 - 30.09 45.11 37.74

B ROOF STRUCTURE
Supply and install formwork as specified

1 Soffits of roof slab m2 B3 837 62.75


2 Sides and soffits of roof beam m2 604 48.75
QTY MONITORING FORMWORK

RESIDENCE ZONING
No. Description Item Unit Base On BOQ Contract
A B C
Edges of suspended slabs and ramps 100 to 300 mm
3 m 113 40
deep

C STAIR STRUCTURE

Supply and install formwork as specified


1 Soffit of landing m2 17 4
2 Sloping soffit of staircases m2 25 9

3 Outer string of staircases including cutting to profile


of treads and risers, 350mm high m B3 17 6

4 To riser not exceeding 175 mm high m 81 31


5 Sides of columns m2 4 -
6 Sides and soffits of beams m2 4 -

total 10,620 1,520 778.60 668.99 1,257.79

BOQ
BOQ
Location - - -
RESIDENCE
LI NK
BASEMENT STRUCTURE APARTMENT

A Supply and install formwork as specified


1 Sides of shear walls m2 462 -
2 Shear walls (SW-13, SW-14, SW-15, SW-16) m2 544 -
3 Sides of columns m2 988 202
4 Sides of Basement wall m2 902 280
5 Soffits of suspended slabs and drop panels m2 3,815 719 606.08 499.46 1,004.65

6 Edges of suspended slabs and ramps 100 to 300 mm


deep m B4 606 77 89.36 70.80 126.56

7 Sides of drop panels m2 164 26 24.19 24.73 43.39


QTY MONITORING FORMWORK

RESIDENCE ZONING
No. Description Item Unit Base On BOQ Contract
A B C
8 Sides and soffits of suspended beams m2 153 14 28.88 28.89 45.45
9 Soffits of suspended ramps m2 242 -
10 Sides of ramp parapet m2 90 -
11 Sides of tank walls (Provisional) m2 677 -

12 Sides of equipment foundation pads (Provisional) m2 125 -

12 Sides of MEP trench walls (Provisional) m2 15 -


13 Strutting Beam ( Ramp Area ) m2 138 - 30.09 45.11 37.74

Add Formwork Caping Beam


14 m2 327 103 66.45 60.16 65.18
(Not Include Payment 1) (Height 1.3 m)

B ROOF STRUCTURE
Supply and install formwork as specified

1 Soffits of roof slab m2 B4 837 62.75


2 Sides and soffits of roof beam m2 604 48.75
Edges of suspended slabs and ramps 100 to 300 mm
3 m 113 40
deep

C STAIR STRUCTURE

Supply and install formwork as specified


1 Soffit of landing m2 17 4
2 Sloping soffit of staircases m2 25 9

3 Outer string of staircases including cutting to profile


of treads and risers, 350mm high m B4 17 6

4 To riser not exceeding 175 mm high m 81 31


5 Sides of columns m2 4 -
6 Sides and soffits of beams m2 4 -
QTY MONITORING FORMWORK

RESIDENCE ZONING
No. Description Item Unit Base On BOQ Contract
A B C

total 10,947 1,623 845.05 729.15 1,322.97


ITORING FORMWORK
LINK TOTAL
RESIDENCE ZONING TOTAL
ACTUAL ZONE ACTUAL
(RS)
D F E (LINK)

- -
- -
- -
- -
- - -

- - -

- -
- -
- -
- -
- -

- -

- -
- -
- -
###

###
- -
ITORING FORMWORK
LINK TOTAL
RESIDENCE ZONING TOTAL
ACTUAL ZONE ACTUAL
(RS)
D F E (LINK)
- -

- -

###

###
- -
- -

- -

- -
- -
- -
- - - - -

RPP-PKN- RPP-PKN-
SD-ST-R-007 - SD-ST-R-008
Rev 01 Rev 01

- -
- -
- -
- -
1,138.64 2,937.26 713.52 713.52

103.70 341.00 45.36 45.36


ITORING FORMWORK
LINK TOTAL
RESIDENCE ZONING TOTAL
ACTUAL ZONE ACTUAL
(RS)
D F E (LINK)
95.02 239.74 25.71 25.71
31.12 109.07 20.42 20.42
- -
- -
- -

- -

- -
67.36 193.38 65.11 65.11
41.38 -
###

###
- -
- -

- -

###

###
- -
- -

- -

- -
- -
- -
ITORING FORMWORK
LINK TOTAL
RESIDENCE ZONING TOTAL
ACTUAL ZONE ACTUAL
(RS)
D F E (LINK)
1,435.84 - 3,861.83 870.12 870.12
ITORING FORMWORK
LINK TOTAL
RESIDENCE ZONING TOTAL
ACTUAL ZONE ACTUAL
(RS)
D F E (LINK)
RPP-PKN- RPP-PKN-
SD-ST-R-015 - SD-ST-R-014
Rev 01 Rev 00

- -
- -
- -
- -
898.46 3,008.65 688.00 688.00

73.12 359.84 27.20 27.20

33.85 126.16 26.17 26.17


20.12 123.34 13.37 13.37
- -
- -
- -

- -

- -
25.34 138.28 -
###

###
- -
- -
ITORING FORMWORK
LINK TOTAL
RESIDENCE ZONING TOTAL
ACTUAL ZONE ACTUAL
(RS)
D F E (LINK)
- -

###

###
- -
- -

- -

- -
- -
- -
1,050.89 - 3,756.27 754.74 754.74

- - -

- -
- -
- -
- -
898.46 3,008.65 688.00 688.00

73.12 359.84 27.20 27.20

33.85 126.16 26.17 26.17


ITORING FORMWORK
LINK TOTAL
RESIDENCE ZONING TOTAL
ACTUAL ZONE ACTUAL
(RS)
D F E (LINK)
20.12 123.34 13.37 13.37
- -
- -
- -

- -

- -
25.34 138.28 -

85.04 276.83 103.18 103.18

###

###
- -
- -

- -

###

###
- -
- -

- -

- -
- -
- -
ITORING FORMWORK
LINK TOTAL
RESIDENCE ZONING TOTAL
ACTUAL ZONE ACTUAL
(RS)
D F E (LINK)
1,135.93 - 4,033.10 857.92 857.92
RAJAWALI PLACE PROJECT
BASEMENT 2 REBAR QTY.
DESCRIPTION BAR SIZE (mm)
No
DRAWING NAME ZONING D10 D13 D16 D19 D22 D25

BASEMENT 2 (RESIDENCE)
I SLAB 22.602 65.670 5.604 142.838 7.385 28.683
I-1 R-B2-01 SLAB REV-1
I-1-1 DROP PANEL 2.799 6.920
ZONE-B
I-1-2 SLAB 7.332 0.318 11.897 0.755
I-2 R-B2-02 SLAB REV-1
I-2-1 DROP PANEL 7.421 0.035 0.239 19.270
ZONE-D
I-2-2 SLAB 0.153 13.713 0.991 33.613 0.952 3.975
I-3 R-B2-03 SLAB REV-1
I-3-1 DROP PANEL 5.596 0.348 15.156
ZONE-C
I-3-2 SLAB 0.419 9.591 0.269 16.149 0.915 4.912
I-4 R-B2-04 SLAB REV-1
I-4-1 DROP PANEL 3.810 0.700 15.920 1.117
ZONE-A
I-4-2 SLAB 8.605 3.349 15.760 2.474
I-5 R-B2-03 SLAB REV-1
I-5-1 DROP PANEL 2.164 8.507 0.129 6.693
ZONE-E
I-5-2 SLAB 0.240 16.839 0.309 1.460 3.646 17.322

II BEAM & GIRDER 15.277 0.811 0.123 3.913 14.809 0.689


II-1 R-B2-01 BEAM REV-0
II-1-1 BEAM ZONE-B 0.281 1.001
II-2 R-B2-02 BEAM REV-1
II-2-1 BEAM ZONE-D 0.326 0.123 0.532 0.114
II-3 R-B2-03 BEAM REV-0
II-3-1 BEAM ZONE-C 0.511 0.049 1.292 0.268
II-4 R-B2-04 BEAM REV-0
II-4-1 BEAM ZONE-A 0.375 0.777 0.232 0.536
II-5 R-B2-05 CAP BEAM REV-0
II-5-1 BEAM ALL ZONE 13.598 0.762 14.195
II-6 R-B2-03 BEAM REV-0
II-6-1 BEAM ZONE-E 0.186 0.311 0.153

III COLUMN & SHEAR WALL 0.000 5.679 12.486 0.000 10.208 12.533
III-1 R-B2-01 COLUMN & SHEAR WALL STARTER BAR REV-2
III-1-1 COLUMN 5.577 0.732 0.101
ZONE-A
III-1-2 SHEAR WALL
III-2 R-B2-02 COLUMN & SHEAR WALL STARTER BAR REV-1
III-2-1 COLUMN 0.119 1.394 2.081
ZONE-B
III-2-2 SHEAR WALL 2.762 0.666 3.301
III-3 R-B2-03 COLUMN & SHEAR WALL STARTER BAR REV-1
III-3-1 COLUMN 0.128 2.998 2.968 1.263
ZONE-D
III-3-2 SHEAR WALL 0.298 0.175 0.902
III-4 R-B2-04 COLUMN & SHEAR WALL STARTER BAR REV-2
III-4-1 COLUMN 0.104 0.623 1.983 0.202
ZONE-C
III-4-2 SHEAR WALL 1.734 0.713 6.279
III-5 R-B2-04 COLUMN & SHEAR WALL STARTER BAR REV-2
III-5-1 COLUMN 0.534 0.340 2.444 0.485
ZONE-E
III-5-2 SHEAR WALL
III-6 R-B2-05 COLUMN & SHEAR WALL REBAR REV-0
III-6-1 COLUMN
ZONE-B
III-6-2 SHEAR WALL
III-7 R-B2-06 COLUMN & SHEAR WALL REBAR REV-0
III-7-1 COLUMN
ZONE-A
III-7-2 SHEAR WALL
III-8 R-B2-07 COLUMN & SHEAR WALL REBAR REV-0
III-8-1 COLUMN
ZONE-C
III-8-2 SHEAR WALL
III-9 R-B2-08 COLUMN & SHEAR WALL REBAR REV-0
III-9-1 COLUMN
ZONE-D
III-9-2 SHEAR WALL
III-10 R-B2-07 COLUMN & SHEAR WALL REBAR REV-0
III-10-1 COLUMN
ZONE-E
III-10-2 SHEAR WALL

IV BASEMENT WALL 1.506 30.782 12.976 1.140 19.969 0.000


IV-1 R-B2-01 RETAINING WALL STARTER BAR REV-1
IV-1-1 RETAINING WALL ZONE-A 1.046 2.191
IV-2 R-B2-02 RETAINING WALL STARTER BAR REV-2
IV-2-1 RETAINING WALL ZONE-B 1.922 2.548 0.570 1.896
IV-3 R-B2-03 RETAINING WALL STARTER BAR REV-1
IV-3-1 RETAINING WALL ZONE-D 3.245 4.967 0.570 1.039
IV-4 R-B2-04 RETAINING WALL STARTER BAR REV-0
IV-4-1 RETAINING WALL ZONE-C 1.383 1.166 1.055
IV-5 R-B2-04 RETAINING WALL STARTER BAR REV-0
IV-5-1 RETAINING WALL ZONE-E 1.766 2.219 2.289
IV-6 R-B2-05 EXTRA BUNDWALL (CONNECTION NEW & EXISTING)
IV-6-1 BUDD WALL SECTION E-E 0.148
IV-7-1 R-B2-06 RETAINING WALL REBAR REV-0
IV-7-1 RETAINING WALL ALL ZONE 1.358 21.420 2.076 11.499
TOTAL GRAND REMARK
(TON) TOTAL (TON)
D29 D32

4.026 0.000 276.808 276.808


0.000
9.719
30.021
20.302
0.000
26.965
80.838
0.476 53.873
0.000
21.100
53.355
32.255
0.000
21.547
51.735
30.188
0.000
3.550 21.043
60.859
39.816
0.000
0.000 0.000 35.622 35.622
0.000
1.282 1.282
0.000
1.095 1.095
0.000
2.120 2.120
0.000
1.920 1.920
0.000
28.555 28.555
0.000
0.650 0.650

11.016 0.000 51.922 51.922

3.765 10.175
10.175
0.000

0.632 4.226
11.875
0.920 7.649

4.380 11.737
13.112
1.375

2.912
12.957
1.319 10.045

3.803
3.803
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.000 0.000 66.373 66.373

3.237 3.237

6.936 6.936

9.821 9.821

3.604 3.604

6.274 6.274

0.148 0.148

36.353 36.353
Quantity Calculation Shee
Concrete Grade

No Description Location Sub-Total (m3) Floor Grid Type Length Width Height Area Qty Quantity Formular Unit Lean
fc'30 fc'40 fc'50 fc'10
150 mm

4 Basement 4

Basement 4 Zone A ( 207.5 m3 ) B4


26-Jan-18 Zone A Beam G13-118 14.600 0.600 0.600 1 14.6*0.6*0.6*1 m3 5.26
trim Slab G13-118 14.600 0.600 0.350 m3 (3.07)
Beam B2-176 4.400 0.300 0.500 1 4.4*0.3*0.5*1 m3 0.66
trim Slab B2-176 4.400 0.300 0.250 m3 (0.33)
BEAM
Beam B2-173 8.800 0.300 0.500 1 8.8*0.3*0.5*1 m3 1.32
trim Slab B2-173 8.800 0.300 0.250 m3 (0.66)
Beam ST-C 400x600 18.563 0.400 0.600 1 18.563*0.4*0.6 m3 4.46
Beam ST-B 400x600 8.700 0.400 0.400 1 8.7*0.4*0.4 m3 1.39
Drop DA1 0.150 74.1 1 74.1*0.15*1 m3 11.12 11.12
DA2 0.150 57.8 1 57.8*0.15*1 m3 8.67 8.67
197.4 DA3 0.150 14.8 1 14.8*0.15*1 m3 2.22 2.22
DA4 0.150 14.8 1 14.8*0.15*1 m3 2.22 2.22
DA5 0.150 15.0 1 15*0.15*1 m3 2.25 2.25
DROP
PANEL DA6 0.150 7.0 1 7*0.15*1 m3 1.05 1.05
DA7 0.150 7.0 1 7*0.15*1 m3 1.05 1.05
DA8 0.150 7.3 1 7.3*0.15*1 m3 1.09 1.09
DA9 0.150 7.3 2 7.3*0.15*1 m4 2.18 2.18
trim Drop m3 (3.18)
Panel
slab 0.250 628.8 1 628.8*0.25*1 m3 157.20
Cilinder 0.53
Test slump 1.98

Basement 4 Zone B ( 172m3) B4 Beam G13-118 20.400 0.600 0.600 1 20.4*0.6*0.6*1 m3 7.34
30-Jan-18 trim Slab G13-118 20.400 0.600 0.350 m3 (4.28)
BEAM Beam B2-173 8.400 0.300 0.500 1 8.4*0.3*0.5 m3 1.26
trim Slab B2-173 8.400 0.300 0.250 m3 (0.63)
Beam ST-B 400x601 14.200 0.400 0.400 1 14.2*0.4*0.4 m3 2.27
DB2 0.150 14.8 1 14.8*0.15*1 m3 2.22 2.22
DB3 0.150 19.2 1 19.2*0.15*1 m3 2.88 2.88
DB4 0.150 7.1 1 7.1*0.15*1 m3 1.07 1.07
DB5 0.150 20.7 1 20.7*0.15*1 m3 3.11 3.11
154
DROP DB6 0.150 70.6 1 70.6*0.15*1 m3 10.59 10.59
PANEL DB7 0.150 9.0 1 9*0.15*1 m3 1.35 1.35
DB8 0.150 9.0 1 9*0.15*1 m3 1.35 1.35
DB9 0.150 9.0 2 9*0.15*2 m4 2.69 2.69
trim Drop m3 (3.69)
Panel
SLAB Slab 0.250 513.3 1 513.3*0.25*1 m3 124.64
Cilinder 0.53
LOSE
Test slump 1.58

171of198
Quantity Calculation Shee
Concrete Grade

No Description Location Sub-Total (m3) Floor Grid Type Length Width Height Area Qty Quantity Formular Unit Lean
fc'30 fc'40 fc'50 fc'10
150 mm

B2 Remain (3m3) DB3 5.000 1.500 0.400 1 5*1.5*0.4*1 m3 3.00 3.00


3
9-Feb-18

Basement 4 Zone C-1 (270m3) B4 Beam G13-118 25.500 0.600 0.600 1 25.5*0.6*0.6 m3 9.18
8-Feb-18 trim Slab G13-118 25.500 0.600 0.350 m3 (5.36)
Beam B2-173 11.500 0.300 0.500 1 11.5*0.3*0.5 m3 1.73
trim Slab B2-173 11.500 0.300 0.250 m3 (0.86)
Beam B2-176 4.500 0.300 0.500 1 4.5*0.3*0.5*1 m3 0.68
trim Slab B2-176 4.500 0.300 0.250 m3 (0.34)
Beam G25-1 2.000 0.400 0.600 1 2*0.4*0.6*1 m3 0.48
trim Slab G25-1 2.000 0.400 0.350 m3 (0.28)
Zone C Beam ST-C 400x600 26.813 0.400 0.600 1 26.813*0.4*0.6 m3 6.44
Beam ST-B 400x601 12.400 0.400 0.400 1 12.4*0.4*0.4 m3 1.98
258.6 Drop DC1a 0.150 143.8 1 143*0.15*1 m3 21.57 21.57
DC2 0.150 9.0 1 9*0.15*1 m3 1.35 1.35
DC3 0.150 20.7 1 20.7*0.15*1 m3 3.11 3.11
DC4 0.150 20.7 1 20.7*0.15*1 m3 3.11 3.11
DC5 0.150 20.7 1 20.7*0.15*1 m3 3.11 3.11
DC6 0.150 49.8 1 49.8*0.15*1 m3 7.15 7.47
trim Drop m3 (5.23)
Panel
Slab 0.250 829.2 1 829.2*0.25*1 m3 207.30
Cilinder 0.53
Test slump 2.90

Basement 4 Zone D-1 (228m3) B4 Beam G113-118 12.900 0.600 0.600 1 12.9*0.6*0.6*1 m3 4.64
2-Feb-18 trim Slab G113-118 12.900 0.600 0.350 m3 (2.71)
Zone D Beam B2-173 8.500 0.300 0.500 1 8.5*0.3*0.5*1 m3 1.28
trim Slab B2-173 8.500 0.300 0.250 m3 (0.64)
Beam B2-177 4.400 0.300 0.500 1 4.4*0.3*0.5*1 m3 0.66
trim Slab B2-177 4.400 0.300 0.250 m3 (0.33)
Beam ST-C 400x600 16.500 0.400 0.600 1 16.5*0.4*0.6 m3 3.96
Beam ST-B 400x601 7.500 0.400 0.400 1 7.5*0.4*0.4 m3 1.20
Drop DD1 0.150 47.5 1 47.5*0.15*1 m3 7.13 7.13
DD2 0.150 15.6 1 15.6*0.15*1 m3 2.34 2.34
216 DD3 0.150 15.6 1 15.6*0.15*1 m3 2.34 2.34
DD5 0.150 15.0 1 15*0.15*1 m3 2.25 2.25
DD6 0.150 10.2 1 10.2*0.15*1 m3 1.53 1.53
DD7 0.150 7.3 1 7.3*0.15*1 m3 1.09 1.09
DD9 0.150 29.6 1 29.6*0.15*3 m3 4.45 4.45
DD10 0.150 29.6 1 29.6*0.15*4 m3 4.45 4.45
trim Drop m3 (8.06)
Panel
Slab 0.250 750.1 1 750.1*0.25*1 m3 187.52

172of198
Quantity Calculation Shee
Concrete Grade

No Description Location Sub-Total (m3) Floor Grid Type Length Width Height Area Qty Quantity Formular Unit Lean
fc'30 fc'40 fc'50 fc'10
150 mm

Cilinder 0.53
Test slump 2.77

Basement 4 Zone D-2 Slab 0.250 171.7 1 171.7*0.25*1 m3 42.93


(9 February 2018) DD4 0.150 43.9 1 43.9*0.15*1 m3 6.58 6.58
54.84
DD8 0.150 14.8 1 14.8*0.15*2 m3 2.22 2.22
DD11 0.150 14.8 1 14.8*0.15*5 m3 2.22 2.22
trim Drop m3 (0.64)
Panel
Beam B2-173 8.500 0.300 0.500 1 8.5*0.3*0.5*1 m3 1.28
trim Slab B2-173 8.500 0.300 0.250 m3 (0.64)
Cilinder 0.35
Test slump 0.53

Basement 4 Zone C-2 62.68 Slab 0.250 167.8 1 167.8*0.25*1 m3 41.94


(14 Feb 2018 ) Drop DC1b 0.150 81.7 1 81.7*0.15*1 m3 12.26 12.26
DC7 0.150 49.8 1 49.8*0.15*1 m3 7.47 7.47
trim Drop m3 (0.94)
Panel
Beam B2-173 12.500 0.300 0.500 1 12.5*0.3*0.5 m3 1.88
trim Slab B2-173 12.500 0.300 0.250 m3 (0.94)
Cilinder 0.35
Test slump 0.66

Basement 4 Zone E-1(159m3) B4 Drop DL1 0.150 64.0 1 64*0.15*1 m3 9.60 9.60
(12 Feb 2018 ) DL2 0.150 64.0 1 64*0.15*1 m3 9.60 9.60
DL3 0.150 64.0 1 64*0.15*1 m3 9.60 9.60
155
Slab 0.250 492.02 1 492.02.9*0.25*1 m3 123.01
Cilinder 0.53
Test slump 2.38

Basement 4 Zone E-2(99m3) B4 Slab 0.250 254.00 1 254*0.25*1 m3 63.50


(13 Feb 2018 ) DL4 0.150 188.7 1 188.7*0.15*1 m3 28.31 28.31
95.22 trim Drop m3 (0.95)
Panel
Beam 350x700 10.800 0.350 0.700 1 10.8*0.35*0.7*1 m3 2.65
trim Slab 350x700 10.800 0.350 0.450 m3 (1.70)
Beam G23-4 2.200 0.350 0.700 1 2.2*0.35*0.7*1 m3 0.54
trim Slab G23-4 2.200 0.350 0.450 m3 (0.35)
Beam G23-9 5.600 0.350 0.700 1 5.6*0.35*0.7*1 m3 1.37
trim Slab G23-9 5.600 0.350 0.450 m3 (0.88)

173of198
Quantity Calculation Shee
Concrete Grade

No Description Location Sub-Total (m3) Floor Grid Type Length Width Height Area Qty Quantity Formular Unit Lean
fc'30 fc'40 fc'50 fc'10
150 mm

Cilinder 0.35
Test slump 2.38

5 Basement 5

Raft Foundation B5 Slab P

Part -1
(Residence) Thk Slab Lean Concrete 831.4 1 m2 831.4
=900mm 1st
861.16

Sump Pit 1 Lean Concrete 3.800 3.200 12.2 1 m2 12.2


Sump Pit 2 Lean Concrete 5.500 3.200 17.6 1 m2 17.6
Pile Cap Pile Cap Lean Concrete 2.400 2.400 5.8 11 m2 63.4

Raft Foundation
(Residence)

Part -2
1,061.56 Slab 2nd Lean Concrete 1037.2 1 m3 1037.2
Thk=900mm

Sump Pit 3 Lean Concrete 3.800 3.200 12.2 1 m3 12.2


Sump Pit 4 Lean Concrete 3.800 3.200 12.2 1 m3 12.2
Pile Cap Pile Cap Lean Concrete 2.400 2.400 5.8 15 m2 86.4

Pit Lift B5 Slab Lean Concrete 151.6 1 151.6*1 m3 151.6


272.92 5th
( Residence ) Drop Lean Concrete 121.3 1 121.3*1 m3 121.3

Pit Lift Neck B5 Slab Lean Concrete 424.0 1 424*1 m3 424.0


424.04 4th
( Residence )

Raft Foundation B5 Slab Lean Concrete 1607.1 1 1607.1*1 m3 1607.1


3th
Thk=3000
( Residence ) 1,736.22
Lean Concrete 32.000 0.700 4.3000 0.5 1 32*4.3*0.6*0.5*1*1.3 m3 62.6
Lean Concrete 34.000 0.700 4.3000 0.5 1 34*4.3*0.6*0.5*1*1.3 m3 66.5
Lean Concrete 56.000 0.700 2.3000 0.5 1 56*2.3*0.6*0.5*1*1.3 m3 58.6
Lean Concrete 14.500 0.700 2.0000 0.5 1 14.5*2*0.6*0.5*1*1.3 m3 13.2
Lean Concrete 14.160 0.700 2.0000 0.5 1 14.16*2*0.6*0.5*1*1.3 m3 12.9
Lean Concrete 66.300 0.700 0.6000 0.5 1 66.3*0.6*0.6*0.5*1*1.3 m3 18.1

16.6
Basement 5 Raft Foundation B5 Drop Lean Concrete 3.000 3.000 6 3*3*6 m3 54.0
Link Thk=900mm Drop Lean Concrete 3.000 6.325 1 3*6.325*1 m3 19.0
Link Drop Lean Concrete 3.000 6.527 1 3*6.527*1 m3 19.6
Drop Lean Concrete 8.650 4.138 1 8.65*4.138*1 m3 35.8
Slab Lean Concrete 796.3 1 796.3*1 m3 796.3

965.34 1st 174of198


Quantity Calculation Shee
Concrete Grade

No Description Location Sub-Total (m3) Floor Grid Type Length Width Height Area Qty Quantity Formular Unit Lean
fc'30 fc'40 fc'50 fc'10
150 mm

Drop Lean Concrete 13.600 0.500 0.6000 0.5 6 13.6*0.5*0.6*0.5*6 m3 12.2


965.34 1st
Drop Lean Concrete 18.650 0.500 0.6000 0.5 1 18.65*0.5*0.6*0.5*1 m3 2.8
Drop Lean Concrete 19.054 0.500 0.6000 0.5 1 19.054*0.5*0.6*0.5*1 m3 2.9
Drop Lean Concrete 25.576 0.500 0.6000 0.5 1 25.576*0.5*0.6*0.5*1 m3 3.8

Sump Pit 5 Lean Concrete 4.300 4.400 1 4.3*4.4*1 m3 18.9

Basement 5 Raft Foundation B5 Slab Lean Concrete 1369.5 1 1369.5*1 m3 1369.5


Office Thk=2500mm

1,923.19 1st
Raft Foundation Slab Lean Concrete 102.6 1 102.6*1 m3 102.6
Thk=3050mm Slab Lean Concrete 375.0 1 375*1 m3 375.0
Slab Lean Concrete 76.1 1 76.1*1 m3 76.1

Pit Lift Part -1 Slab Lean Concrete 322.3 1 102.6*1 m3 322.3


455.79 2nd
Pit Lift Part -2 Slab Lean Concrete 133.5 1 375*1 m3 133.5

Sump Pit 6 Lean Concrete 7.000 4.800 1 4.3*4.4*1 m3 33.6


Sump Pit 7 Lean Concrete 7.000 4.800 1 4.3*4.4*1 m4 33.6
134.40
Sump Pit 8 Lean Concrete 7.000 4.800 1 4.3*4.4*1 m3 33.6
Sump Pit 9 Lean Concrete 7.000 4.800 1 4.3*4.4*1 m3 33.6

Basement 5 Raft Foundation B5 Drop 4.800 2.400 0.6000 1 4.8*2.4*0.6*1 m3 6.9


(Residence) Part-3 Drop 2.400 2.400 0.6000 5 2.4*2.4*0.6*5 m3 17.3
( Residence ) Slab 0.9000 563.5 1 0.9*563.51 m3 497.1
Note 2-Apr-18
Sumpit A&B
6-7 April 2018 Sump Pit 1 B5 Slab 5.800 4.000 0.9500 1 5.8*4*0.9*1 m3 22.0
( Residence ) Wall 5.800 1.100 2.5500 1 5.8*1.1*2.55*1 m3 16.3
630 3th
Part-3 Residence 2-Apr-18 Wall 5.800 0.900 2.5500 1 5.8*0.9*2.55*1 m3 13.3
10-Apr-18 Wall 2.000 0.900 2.5500 3 2*0.9*2.55*3 m3 13.8

14+23+594=631m3 Sump Pit 2 B5 Slab 4.000 3.800 0.9500 1 4*3.8*0.9*1 m3 14.4


( Residence ) Wall 3.800 1.100 2.5500 1 3.8*1.1*2.55*1 m3 10.7
2-Apr-18 Wall 3.800 0.900 2.5500 1 3.8*0.9*2.55*1 m3 8.7

175of198
630 3th
Quantity Calculation Shee
Concrete Grade

No Description Location Sub-Total (m3) Floor Grid Type Length Width Height Area Qty Quantity Formular Unit Lean
fc'30 fc'40 fc'50 fc'10
150 mm

Wall 2.000 0.900 2.5500 2 2*0.9*2.55*2 m3 9.2

Note Raft Foundation B5 Drop 2.400 2.400 0.6000 9 2.4*2.4*0.6*9 m3 31.1


Sumpit C Part -1 Slab 0.9000 654.0 1 0.9*654*1 m3 588.6
26-Mar-18 ( Residence )
Part-1 Residence
30-Mar-18 663 1st
Sump Pit 3 B5 Slab 4.000 3.800 0.9500 1 4*3.8*0.9*1 m3 14.4
14+652=666m3 ( Residence ) Wall 3.800 1.100 2.5500 1 3.8*1.1*2.55*1 m3 10.7
Wall 3.800 0.900 2.5500 1 3.8*0.9*2.55*1 m3 8.7
Wall 2.000 0.900 2.5500 2 2*0.9*2.55*2 m3 9.2

Note Raft Foundation B5 Drop 15.000 2.400 0.6000 1 17*2.4*0.6*1 m3 21.6


Sumpit D Part-2 Drop 2.400 2.400 0.6000 8 2.4*2.4*0.6*8 m3 27.6
2-Apr-18 ( Residence ) Slab 0.9000 692.5 1 0.9*692.5*1 m3 618.9
Part-1 Residence
4-Apr-18
711 2nd

14+697=711m3 Sump Pit 4 B5 Slab 4.000 3.800 0.9500 1 4*3.8*0.9*1 m3 14.4


( Residence ) Wall 3.800 1.100 2.5500 1 3.8*1.1*2.55*1 m3 10.7
Wall 3.800 0.900 2.5500 1 3.8*0.9*2.55*1 m3 8.7
704.4 Wall 2.000 0.900 2.5500 2 2*0.9*2.55*2 m3 9.2

16-May-18 Pit Lift B5 Slab 2.4000 272.9 1 2.4*272.9*1 m3 655.0


727.79 4th
707m3 ( Residence ) Drop 0.6000 121.3 1 0.6*121.3*1 m3 72.8

Pit Lift Neck 891.26 B5 5th Slab 2.0000 445.6 1 2*445.6*1 m3 891.3
( Residence )

Raft Foundation B5 Slab 3.0000 2052.7 1 3*2052.7*1 m3 6158.1


6,325.28 6th
( Residence ) Slab 0.9000 185.8 1 0.9*185.79*1 m3 167.2

Basement 5 Raft Foundation B5 Drop 2.400 2.400 0.6000 6 2.4*2.4*0.6*6 m3 20.7


(Link) Link Drop 2.400 5.725 0.6000 1 2.4*5.725*0.6*1 m3 8.2
16-Apr-18 Drop 2.400 5.927 0.6000 1 2.4*5.927*0.6*1 m3 8.5
716m3 Drop 8.050 2.700 0.6000 1 2.4*3.538*0.6*1 m3 13.0
Slab 0.9000 729.8 1 729*0.9*1 m3 656.8
748.41 1st

Sump Pit 5 Slab 4.000 3.800 0.9500 1 4*3.8*0.9*1 m3 14.4


( Link ) Wall 3.800 0.900 2.5500 1 3.8*1.1*2.55*1 m3 8.7
13-Apr-18 Wall 3.800 0.900 2.5500 1 3.8*0.9*2.55*1 m3 8.7
Wall 2.000 0.900 2.5500 2 2*0.9*2.55*2 m3 9.2

176of198
Quantity Calculation Shee
Concrete Grade

No Description Location Sub-Total (m3) Floor Grid Type Length Width Height Area Qty Quantity Formular Unit Lean
fc'30 fc'40 fc'50 fc'10
150 mm

Basement 5 Sump Pit 6 B5 3th Slab 7.000 4.800 2.7000 1 7*4.8*2.7 m3 90.7
( Office ) ( Office )

Sump Pit 7 B5 Slab 7.000 4.800 2.7000 1 7*4.8*2.7 m3 90.7


( Office )

Sump Pit 8 B5 Slab 7.000 4.800 2.7000 1 7*4.8*2.7 m3 90.7


6,617.61
( Office )

( Office ) B5 Drop 0.6500 102.6 1 0.65*102.6 m3 66.7


Drop 0.6500 375.0 1 0.65*375*1 m3 243.7
Drop 0.6500 76.1 1 0.65*76.1*1 m3 49.5

Raft Foundation B5 Slab 2.5000 2378.9 1 2.5*2378.9*1 m3 5947.2


Slab 0.9000 42.6 1 2.5*2378.9*1 m3 38.3

Pit Lift -1 Pit Lift ( Office ) -1 B5 Slab 2.5500 322.3 1 3.05*322.3*1 m3 821.9
1st
3-Apr-18 Drop 0.9500 40.0 1 0.95*40*1 m3 38.0
874
877m3 Drop 0.6000 17.0 1 0.6*17*1 m3 10.2
Drop 0.5000 8.0 1 0.5*8*1 m3 4.0

Pit Lift -2 Pit Lift ( Office )-2 348.07 B5 Slab 2.5500 133.5 1 2.4*133.5*1 m3 340.4
2nd
13-Apr-18 Slab 0.6000 12.8 1 0.6*12.8*1 m3 7.7
366m3

Additional
Indopora

Residence KP18 108.16 B5 Drop m3 4.6


KP19 m3 10.4
KP20 m3 5.7
KP21 m3 12.7
KP2 m3 3.7
KP4 m3 4.7
KP16 m3 3.5

177of198
Quantity Calculation Shee
Concrete Grade

No Description Location Sub-Total (m3) Floor Grid Type Length Width Height Area Qty Quantity Formular Unit Lean
fc'30 fc'40 fc'50 fc'10
150 mm

KP3 m3 4.8
KP28 m3 12.9
KP35 m3 9.4
KP1 m3 9.5
KP29 m3 5.2

KP 15 m3 4.6
KP9 m3 6.8
KP14 m3 6.4
KP14a m3 3.5

KP 26-Mar-18 m3 7.0
KP 3-Apr-18 m3 21.0
KP 5-Apr-18 m3 12.0
KP 7-Apr-18 m3 10.0
KP 13-Apr-18 m3 12.0

BP residence 23-Apr-18 m3 13.0


BP48,75,85 residence 24-Apr-18 m3 10.5
BP11,221,236 25-Apr-18 m3 12.5
Rsdn&office

BP 104,140,103,107 29-Apr-18 m3 25.0


Residence

KP 26-Mar-18 11.0
KP 9-Apr-18 5.0
KP 11-Apr-18 48.0
KP 12-Apr-18 15.0
KP 13-Apr-18 16.0

KP 50 Residence 16-Apr-18 12.0


KP 40,44 Residence 25-Apr-18 24.0
KP59,BP66 27-Apr-18 12.0

178of198
Quantity Calculation Shee
Concrete Grade

No Description Location Sub-Total (m3) Floor Grid Type Length Width Height Area Qty Quantity Formular Unit Lean
fc'30 fc'40 fc'50 fc'10
150 mm

Office BP192 B5 Drop m3 2.12


BP193 m3 2.12
BP198 m3 1.59
BP201 m3 1.06
BP190 m3 2.65
BP198 m3 1.76
BP257 m3 2.21
BP256 m3 2.65
BP259 m3 2.65
BP311 m3 3.09
BP301 m3 6.17
BP254 m3 9.52

BP293 m3 1.8
BP295 m3 2.2
BP272 m3 2.1
BP214 m3 2.6
BP218 m3 2.2
BP219 m3 1.9
BP221 m3 2.2
BP222 m3 2.2
BP224 m3 1.6
BP321 m3 2.2
BP320 m3 2.2
BP324 m3 2.1
BP243 m3 4.4
BP321 m3 5.3
BP Area office m3 19.0
BP321,BP243 ( again ) m3 3.3

Column B5
RESIDENCE
Part-1 C61/CR18 B5 0.680 0.830 2.600 1 0.68*0.83*2.6*1 m3 1.47
0.300 0.400 0.830 0.500 2 0.3*0.4*0.83*0.5*2 m3 0.10

C1/CR22 1.025 0.840 2.600 1 1.025*0.84*2.6*1 m3 2.24


0.300 0.400 1.025 0.500 2 0.3*0.4*1.025*0.5*2 m3 0.12

C2/CR22 1.025 0.840 2.600 1 1.025*0.84*2.6*1 m3 2.24


0.300 0.400 1.025 0.500 2 0.3*0.4*1.025*0.5*2 m3 0.12

C3/CR22 1.035 1.210 2.600 1 1.035*1.21*2.6*1 m3 3.26


0.300 0.400 1.210 0.500 2 0.3*0.4*1.21*0.5*2 m3 0.15

179of198
Quantity Calculation Shee
Concrete Grade

No Description Location Sub-Total (m3) Floor Grid Type Length Width Height Area Qty Quantity Formular Unit Lean
fc'30 fc'40 fc'50 fc'10
150 mm

C56/CR18 1.040 1.000 2.600 1 1.04*1*2.6*1 m3 2.70


0.300 0.400 1.040 0.500 2 0.3*0.4*1.04*0.5*2 m3 0.12

C57/CR22 0.665 0.840 2.600 1 0.665*0.84*2.6*1 m3 1.45


0.300 0.400 0.840 0.500 2 0.3*0.4*0.84*0.5*2 m3 0.10

C58/CR18 0.700 0.910 2.600 1 0.7*0.91*2.6*1 m3 1.66


0.300 0.400 0.910 0.500 2 0.3*0.4*0.91*0.5*2 m3 0.11

C59/CR18 0.600 0.800 2.600 1 0.6*0.8*2.6*1 m3 1.25


0.300 0.400 0.800 0.500 2 0.3*0.4*0.8*0.5*2 m3 0.10

C60/CR18 0.955 1.140 2.600 1 0.955*1.14*2.6*1 m3 2.83


0.300 0.400 1.140 0.500 2 0.3*0.4*1.14*0.5*2 m3 0.14

Part-2 C43/CR22 1.110 0.880 2.600 1 1.11*0.88*2.6*1 m3 2.54


0.300 0.400 1.110 0.500 2 0.3*0.4*1.11*0.5*2 m3 0.13

C50/CR22 1.000 0.800 2.600 1 1*0.8*2.6*1 m3 2.08


0.300 0.400 1.000 0.5 2 0.3*0.4*1*0.5*2 m3 0.12

C62/CR18 0.670 0.800 2.600 1 0.67*0.8*2.6*1 m3 1.39


0.300 0.400 0.800 0.500 2 0.3*0.4*0.8*0.5*2 m3 0.10

C34/CR18 0.900 0.680 2.600 1 0.9*0.68*2.6*1 m3 1.59


0.300 0.400 0.900 0.500 2 0.3*0.4*0.9*0.5*2 m3 0.11

C35/CR22 0.870 1.020 2.600 1 0.87*1.02*2.6*1 m3 2.31


0.300 0.400 1.020 0.500 2 0.3*0.4*1.02*0.5*2 m3 0.12

C40/CR22 1.115 0.875 2.600 1 1.115*0.875*2.6*1 m3 2.54


0.300 0.400 1.115 0.500 2 0.3*0.4*1.115*0.5*2 m3 0.13

C20/CR22 1.080 1.000 2.600 1 1.08*1*2.6*1 m3 2.81


0.300 0.400 1.080 0.500 2 0.3*0.4*1.08*0.5*2 m3 0.13

C30/CR18 1.200 1.000 2.600 1 1.2*1*2.6*1 m3 3.12


0.300 0.400 1.200 0.500 2 0.3*0.4*1.2*0.5*2 m3 0.14

C31/CR22 1.055 0.880 2.600 1 1.055*0.88*2.6*1 m3 2.41


0.300 0.400 1.055 0.500 2 0.3*0.4*1.055*0.5*2 m3 0.13

C32/CR22 1.055 0.870 2.600 1 1.055*0.87*2.6*1 m3 2.39


0.300 0.400 1.055 0.500 2 0.3*0.4*1.055*0.5*2 m3 0.13

C33/CR18 0.940 0.650 2.600 1 0.94*0.65*2.6*1 m3 1.59

180of198
Quantity Calculation Shee
Concrete Grade

No Description Location Sub-Total (m3) Floor Grid Type Length Width Height Area Qty Quantity Formular Unit Lean
fc'30 fc'40 fc'50 fc'10
150 mm

0.300 0.400 0.940 0.500 2 0.3*0.4*0.94*0.5*2 m3 0.11

Part-3 C8/CR22 1.040 0.820 2.600 1 1.04*0.82*2.6*1 m3 2.22


0.300 0.400 1.040 0.500 2 0.3*0.4*1.04*0.5*2 m3 0.12

C10/CR22 1.000 0.800 2.600 1 1*0.8*2.6*1 m3 2.08


0.300 0.400 1.000 0.500 2 0.3*0.4*1*0.5*2 m3 0.12

C12/CR22 1.100 0.850 2.600 1 1.1*0.85*2.6*1 m3 2.43


0.300 0.400 1.000 0.500 2 0.3*0.4*1*0.5*2 m3 0.12

C14/CR22 0.850 1.035 2.600 1 0.85*1.035*2.6*1 m3 2.29


0.300 0.400 1.035 0.500 2 0.3*0.4*1.035*0.5*2 m3 0.12

C15/CR18 0.830 0.650 2.600 1 0.83*0.65*2.6*1 m3 1.40


0.300 0.400 0.830 0.500 2 0.3*0.4*0.83*0.5*2 m3 0.10

C25/CR18 0.800 0.600 2.600 1 0.6*0.8*2.6*1 m3 1.25


0.300 0.400 0.800 0.500 2 0.3*0.4*0.8*0.5*2 m3 0.10

C17/CR18 0.920 0.800 2.600 1 0.92*0.8*2.6*1 m3 1.91


0.300 0.400 0.920 0.500 2 0.3*0.4*0.92*0.5*2 m3 0.11

C18/CR18 0.800 0.830 2.600 1 0.8*0.83*2.6*1 m3 1.73


0.300 0.400 0.830 0.500 2 0.3*0.4*0.83*0.5*2 m3 0.10

C19/CR18 0.800 0.850 2.600 1 0.8*0.85*2.6*1 m3 1.77


0.300 0.400 0.850 0.500 2 0.3*0.4*0.85*0.5*2 m3 0.10

Link C67/CH1 0.600 0.600 2.600 1 0.6*0.6*2.6*1 m3 0.94


0.300 0.400 0.600 0.500 2 0.3*0.4*0.6*0.5*2 m3 0.07

C68/CH3 0.900 1.020 2.600 1 0.9*1.02*2.6*1 m3 2.39


0.300 0.400 1.020 0.500 2 0.3*0.4*1.02*0.5*2 m3 0.12

C71/CH2 0.800 0.675 2.600 1 0.8*0.675*2.6*1 m3 1.40


0.300 0.400 0.800 0.500 2 0.3*0.4*0.8*0.5*2 m3 0.10

C72/CH2 0.800 0.660 2.600 1 0.66*0.8*2.6*1 m3 1.37


0.300 0.400 0.800 0.500 2 0.3*0.4*0.8*0.5*2 m3 0.10

C73/CH2 0.800 0.695 2.600 1 0.695*0.8*2.6*1 m3 1.45


0.300 0.400 0.800 0.500 2 0.3*0.4*0.8*0.5*2 m3 0.10

C74/CH1 0.840 0.670 2.600 1 0.67*0.84*2.6*1 m3 1.46


0.300 0.400 0.840 0.500 2 0.3*0.4*0.84*0.5*2 m3 0.10

181of198
Quantity Calculation Shee
Concrete Grade

No Description Location Sub-Total (m3) Floor Grid Type Length Width Height Area Qty Quantity Formular Unit Lean
fc'30 fc'40 fc'50 fc'10
150 mm

C77/CH1 0.600 0.600 2.600 1 0.6*0.6*2.6*1 m3 0.94


0.300 0.400 0.600 0.500 2 0.3*0.4*0.6*0.5*2 m3 0.07

C78/CH2 0.800 0.670 2.600 1 0.67*0.8*2.6*1 m3 1.39


0.300 0.400 0.800 0.500 2 0.3*0.4*0.8*0.5*2 m3 0.10

C79/CH1 0.600 0.600 2.600 1 0.6*0.6*2.6*1 m3 0.94


0.300 0.400 0.600 0.500 2 0.3*0.4*0.6*0.5*2 m3 0.07

C80/CH2 0.830 0.720 2.600 1 0.72*0.83*2.6*1 m3 1.55


0.300 0.400 0.840 0.500 2 0.3*0.4*0.83*0.5*2 m3 0.10

C82/CH1 0.600 0.600 2.600 1 0.6*0.6*2.6*1 m3 0.94


0.300 0.400 0.600 0.500 2 0.3*0.4*0.6*0.5*2 m3 0.07

C83/CO19 0.800 0.800 2.600 1 0.6*0.6*2.6*1 m3 1.66


0.300 0.400 0.800 0.500 2 0.3*0.4*0.6*0.5*2 m3 0.10

SUB- TOTAL BASEMENT 4 Err:504 #REF! #REF! Err:504 Err:504

182of198
alculation Sheet Concrete

Suspended Basement slab Sloping slab Super Structure Beam Core wall Lining wall Ramp wall Tank wall
Others Remark
Column
Stair Ramp Slab Capping
240 mm 250 mm 300 mm 900 mm 550 mm 200 mm 260 mm Slab 200 mm 250 mm 400 mm 350 mm 200 mm 250 mm 450 mm
case Slab Beam beam

-
5.26
-
0.66
-
1.32
-
4.46
1.39

157.20

7.34
-
1.26
-
2.27

128.33

183of198
alculation Sheet Concrete

Suspended Basement slab Sloping slab Super Structure Beam Core wall Lining wall Ramp wall Tank wall
Others Remark
Column
Stair Ramp Slab Capping
240 mm 250 mm 300 mm 900 mm 550 mm 200 mm 260 mm Slab 200 mm 250 mm 400 mm 350 mm 200 mm 250 mm 450 mm
case Slab Beam beam

9.18
-
1.73
-
0.68
-
0.48
-
6.44
1.98

207.30

4.64
-
1.28
-
0.66
-
3.96
1.20

187.52

184of198
alculation Sheet Concrete

Suspended Basement slab Sloping slab Super Structure Beam Core wall Lining wall Ramp wall Tank wall
Others Remark
Column
Stair Ramp Slab Capping
240 mm 250 mm 300 mm 900 mm 550 mm 200 mm 260 mm Slab 200 mm 250 mm 400 mm 350 mm 200 mm 250 mm 450 mm
case Slab Beam beam

42.93

1.28
-

41.94

1.88
-

123.01

63.50

2.65
-
0.54
-
1.37
-

185of198
alculation Sheet Concrete

Suspended Basement slab Sloping slab Super Structure Beam Core wall Lining wall Ramp wall Tank wall
Others Remark
Column
Stair Ramp Slab Capping
240 mm 250 mm 300 mm 900 mm 550 mm 200 mm 260 mm Slab 200 mm 250 mm 400 mm 350 mm 200 mm 250 mm 450 mm
case Slab Beam beam

-
-
-
-
-

186of198
alculation Sheet Concrete

Suspended Basement slab Sloping slab Super Structure Beam Core wall Lining wall Ramp wall Tank wall
Others Remark
Column
Stair Ramp Slab Capping
240 mm 250 mm 300 mm 900 mm 550 mm 200 mm 260 mm Slab 200 mm 250 mm 400 mm 350 mm 200 mm 250 mm 450 mm
case Slab Beam beam
24.48
5.60
5.72
7.67

-
-
-

-
-

6.91
17.28
507.18

22.04
16.27
13.31
13.77

14.44
10.66
8.72

187of198
alculation Sheet Concrete

Suspended Basement slab Sloping slab Super Structure Beam Core wall Lining wall Ramp wall Tank wall
Others Remark
Column
Stair Ramp Slab Capping
240 mm 250 mm 300 mm 900 mm 550 mm 200 mm 260 mm Slab 200 mm 250 mm 400 mm 350 mm 200 mm 250 mm 450 mm
case Slab Beam beam
9.18

31.10
588.64

14.44
10.66
8.72
9.18

21.60
27.65
623.27

14.44
10.66
8.72
9.18

655.02
72.78

891.26

6,158.07
167.21

20.74
8.24
8.53
13.04
656.79

14.44
8.72
8.72
9.18

188of198
alculation Sheet Concrete

Suspended Basement slab Sloping slab Super Structure Beam Core wall Lining wall Ramp wall Tank wall
Others Remark
Column
Stair Ramp Slab Capping
240 mm 250 mm 300 mm 900 mm 550 mm 200 mm 260 mm Slab 200 mm 250 mm 400 mm 350 mm 200 mm 250 mm 450 mm
case Slab Beam beam

90.72
-
-
-

90.72
-
-
-

90.72
-
-
-

66.69
243.75
49.48

5,947.21
38.31

821.86
38.00
10.20
4.00

340.41
7.66

4.61
10.40
5.70
12.67
3.65
4.71
3.46

189of198
alculation Sheet Concrete

Suspended Basement slab Sloping slab Super Structure Beam Core wall Lining wall Ramp wall Tank wall
Others Remark
Column
Stair Ramp Slab Capping
240 mm 250 mm 300 mm 900 mm 550 mm 200 mm 260 mm Slab 200 mm 250 mm 400 mm 350 mm 200 mm 250 mm 450 mm
case Slab Beam beam
4.80
12.86
9.35
9.52
5.18

4.61
6.79
6.39
3.46

190of198
alculation Sheet Concrete

Suspended Basement slab Sloping slab Super Structure Beam Core wall Lining wall Ramp wall Tank wall
Others Remark
Column
Stair Ramp Slab Capping
240 mm 250 mm 300 mm 900 mm 550 mm 200 mm 260 mm Slab 200 mm 250 mm 400 mm 350 mm 200 mm 250 mm 450 mm
case Slab Beam beam

2.12
2.12
1.59
1.06
2.65
1.76
2.21
2.65
2.65
3.09
6.17
9.52

1.47
0.10

2.24
0.12

2.24
0.12

3.26
0.15

191of198
alculation Sheet Concrete

Suspended Basement slab Sloping slab Super Structure Beam Core wall Lining wall Ramp wall Tank wall
Others Remark
Column
Stair Ramp Slab Capping
240 mm 250 mm 300 mm 900 mm 550 mm 200 mm 260 mm Slab 200 mm 250 mm 400 mm 350 mm 200 mm 250 mm 450 mm
case Slab Beam beam

2.70
0.12

1.45
0.10

1.66
0.11

1.25
0.10

2.83
0.14

2.54
0.13

2.08
0.12

1.39
0.10

1.59
0.11

2.31
0.12

2.54
0.13

2.81
0.13

3.12
0.14

2.41
0.13

2.39
0.13

1.59

192of198
alculation Sheet Concrete

Suspended Basement slab Sloping slab Super Structure Beam Core wall Lining wall Ramp wall Tank wall
Others Remark
Column
Stair Ramp Slab Capping
240 mm 250 mm 300 mm 900 mm 550 mm 200 mm 260 mm Slab 200 mm 250 mm 400 mm 350 mm 200 mm 250 mm 450 mm
case Slab Beam beam
0.11

2.22
0.12

2.08
0.12

2.43
0.12

2.29
0.12

1.40
0.10

1.25
0.10

1.91
0.11

1.73
0.10

1.77
0.10

0.94
0.07

2.39
0.12

1.40
0.10

1.37
0.10

1.45
0.10

1.46
0.10

193of198
alculation Sheet Concrete

Suspended Basement slab Sloping slab Super Structure Beam Core wall Lining wall Ramp wall Tank wall
Others Remark
Column
Stair Ramp Slab Capping
240 mm 250 mm 300 mm 900 mm 550 mm 200 mm 260 mm Slab 200 mm 250 mm 400 mm 350 mm 200 mm 250 mm 450 mm
case Slab Beam beam
0.94
0.07

1.39
0.10

0.94
0.07

1.55
0.10

0.94
0.07

1.66
0.10

#REF! #REF! #REF! 18,739.69 Err:504 Err:504 #REF! ### #REF! Err:504 Err:504 Err:504 Err:504 Err:504 #REF! Err:504 Err:504 #REF! Err:504 Err:504 Err:504 Err:504 Err:504

194of198
Quantity Start Rebar from D-Wall by Hilti

LENGTH (m) Total Rebar


weigth
No. Rebar Q't Unit Rebar Length
(10 X DIA) Total (m) (Kg) /m'
Lapping

1 Basement 1

D19 8 EA 0.19 0.75 0.94 7.52 2.223

2 Basement 2

D13 95 EA 0.13 0.52 0.65 61.75 1.04


D16 36 EA 0.16 0.64 0.8 28.80 1.578
D19 292 EA 0.19 0.75 0.94 274.48 2.223
D22 2 EA 0.22 1.09 1.31 2.62 2.985
D25 183 EA 0.25 1.24 1.49 272.67 3.853

3 Basement 3
D10 10 EA 0.1 0.4 0.5 5.00 0.617
D13 1,951 EA 0.13 0.52 0.65 1,268 1.04
D16 12 EA 0.16 0.64 0.8 9.60 1.578
D19 64 EA 0.19 0.75 0.94 60.16 2.223
D22 340 EA 0.22 1.09 1.31 445.40 2.985
D25 86 EA 0.25 1.24 1.49 128.14 3.853
D29 26 EA 0.29 1.44 1.73 44.98 5.185

4 Basement 4
D10 10 EA 0.1 0.4 0.5 5.00 0.617
D13 2,106 EA 0.13 0.52 0.65 1,368.9 1.04
D16 20 EA 0.16 0.64 0.8 16.00 1.578
D19 101 EA 0.19 0.75 0.94 94.94 2.223
D22 226 EA 0.22 1.09 1.31 296.06 2.985
D25 48 EA 0.25 1.24 1.49 71.52 3.853
D29 26 EA 0.29 1.44 1.73 44.98 5.185

5 Bridge

D19 8 EA 0.19 0.75 0.94 7.52 2.223

TOTAL= 1+ 2+ 2+ 3+ 4+ 5
D10 20 EA
D13 4152 EA
D16 68 EA
D19 473 EA
D22 568 EA
D25 317 EA
D29 52 EA

TOTAL Q'TY

NOTE
ALL REBAR QUANTITIES IS ACCORT TO NUMBER/SIZE OF HILTI SIZE
ti

Volume
Remark
( Kg )

16.72

64.22
45.45
610.17
7.82
1,050.60

3.09
1,318.88
15.15
133.74
1,329.52
493.72
233.22

3.09
1,423.66
25.25
211.05
883.74
275.57
233.22

16.72

6.17
2,806.75
85.84
988.39
2,221.08
1,819.89
466.44

8,394.56