DATOS NECESARIOS PARA EL CALCULO DE FLETES
FLETE CON VEHICULO
INSUMOS
ORIGEN - DESTINO Prec. U.
MATERIALES CHACHAPOYAS-LEVANTO Y MAINO 0.30
AGREGADOS 0.00
TUBERIAS 0.00
3915
1607
1016
RELACION DE INSUMOS BASE
1511 239
352
1127 Instalación de postes de madera de eucalipto con base de b 50 und 5.205 3.597 4
1127C
1260 CIMIENTOS CORRIDOS 1:10 C-H + 30% PIEDRA GRAND 25 m3 282 37.705 8
1260C
1263 CONCRETO EN FALSO PISO MEZCLA 1:8 C-H, E=4" 120 m2 39.154 9.988 9
1263C
1264 VEREDA DE CONCRETO F'C=140 kg/cm2, ACABADO 1.50 200 m2 36.958 10.231 8
1264C
1277 TARRAJEO DE MURO ACABADO PULIDO C:A 1:5, e=1.5 c 10 m2 30.835 21.116 7
1277C
1300 SALIDA PARA CENTRO DE LUZ CON INTERRUPTOR SIM 10 Pto 374.85 26.848 11
1300C
1306 CONCRETO f'c=140kg/cm2, ACABADO 1.50 cm PARA PAT 200 m2 40.176 10.231 8
1306C
1317 SALIDA DE AGUA FRÍA, TUBERÍA PVC C-10 O 1/2" 6 Pto 88.297 44.745 8
1317C
1325 TUBERÍA PERFORADA DE PVC UF NTP-ISO 4435 DIAM.= 150 m 24.114 2.816 7
1325C
1334 CONCRETO F'C=140 kg/cm2, ACABADO 1.50 cm PARA P 200 m2 36.958 10.231 8
1334C
ad de hoyos efectuados
ntre planta y planta y 3 m entre hileras, en un sistema de tres bolillo, empleando un promedio de 1100 plantas por hectárea.
ramente la tierra para evitar que existan sacos aire entre la planta y el terreno definitivo y para dar también mayor estabilidad a la plant
ntones al terreno definitivo, los cuales serán transportados en cajas de madera aserrada de 0.50 m x 0.35m, se empleará fletes de acé
ida será el millar
ad de plantones distribuidos en campo definitivo
e caseta para el Almacén será global (glb).
cluye acá todos los factores que intervienen en esta partida.
eliminación de basura y elementos sueltos y livianos que incluye quema de basura y transporte de desperdicios fuera de la obra.
rio por metro cuadrado y dicho construirá la compensación total por la mano de obra, materiales y herramientas necesarias para el trab
or m2, cuyos precios unitarios se encuentran definidos en el presupuesto. El Supervisor velará por que ella se ejecute permanentemen
relleno, son relativamente de poca altura y podrá ejecutarse a mano o con maquinaria._x000D_
e complementa con un apisonado de terreno, este deberá efectuarse por capas de un espesor determinado para asegurar su mejor co
área
á al de terreno
precio a nivelar
unitario indicándose
por metro cubico yen el metrado
dicho la altura promedio
pago constituirá de corte total
la compensación y relleno,
por laasí como
mano de la clase
obra de material. necesarias par
y herramientas
á al precio unitario por metro cubico y dicho pago constituirá la compensación total por la mano de obra y herramientas necesarias par
á ser convenientemente nivelado de acuerdo en lo especificado en los planos._x000D_
la excavación se obtendrá multiplicando el ancho de la zanja por la altura promedio, luego multiplicando esta sección transversal, así
á al precio unitario por metro cubico y dicho pago constituirá la compensación total por la mano de obra y herramientas necesarias par
una zona se limpiará la superficie del terreno, el material de relleno estará libre de material orgánico y de cualquier otro material comp
o unitario del presupuesto, por metro cuadrado ejecutado y aprobado por la supervisión, entendiéndose que dicho precio y pago const
ón, sobre la nivelación de declive general indicado en los planos, siempre existe una diferencia entre el nivel de terreno en esa etapa y
área efectiva por cortar o rellenar comprendida entre los elementos de fundación.
á al precio unitario por metro cuadrado y dicho pago constituirá la compensación total por la mano de obra y herramientas necesarias p
olumen de relleno. La unidad comprende el esparcimiento del material, agua para la compactación, la compactación propiamente dich
es, será igual al volumen de excavación, menos el volumen de concreto que ocupa el cimiento de fundación.
ón, sobre la nivelación de declive general indicado en los planos, siempre existe una diferencia entre el nivel de terreno en esa etapa y
área
á al efectiva por cortar
precio unitario por o rellenar
metro comprendida
cuadrado y dichoentre
pago los elementos
constituirá de fundación. total por la mano de obra y herramientas necesarias p
la compensación
ón, sobre la nivelación de declive general indicado en los planos, siempre existe una diferencia entre el nivel de terreno en esa etapa y
á al precio unitario por metro cuadrado y dicho pago constituirá la compensación total por la mano de obra y herramientas necesarias p
te proveniente de las excavaciones y desperdicios de obra se trasladarán aun lugar fuera de la obra, no mayor a 30 m, todo el transpo
l material excedente de excavaciones, será igual al coeficiente de esponjamiento del material multiplicado por la diferencia entre el volu
á al precio unitario por metro cubico y dicho pago constituirá la compensación total por la mano de obra y herramientas necesarias par
área efectiva de solado constituida por el producto de largo por su ancho. Se deberá especificar el espesor.
á al precio unitario por metro cuadrado y dicho pago constituirá la compensación total por la mano de obra y herramientas necesarias p
era que se apoya directamente en el terreno. Donde no se especifique otra cimentación para los muros de albañilería se construirán ci
tal de concreto sumando el volumen de cada uno de sus tramos, el volumen de un tramo es igual al producto del ancho por la altura y
á al precio unitario por metro cúbico y dicho pago constituirá la compensación total por la mano de obra y herramientas necesarias par
o agua limpia de buena calidad, libre de impureza que pueda dañar el concreto; se humedecerá las zanjas antes de llenar los cimiento
ros cúbicos
or m3 (m3) trabajados,
de concreto, aprobados
cuyos precios porse
unitarios elencuentran
Supervisor. definidos en el presupuesto. El Supervisor velará por que ella se ejecute dura
pto seca, de buena calidad, dando la forma, medidas y alineamiento que se indican en el plano de cimentación._x000D_
tal del encofrado (y desencofrado) de obtiene sumando las áreas encofrados por tramos. El área de cada tramo se obtiene multiplican
á al precio unitario por metro cuadrado y dicho pago constituirá la compensación total por la mano de obra y herramientas necesarias p
do el área de la sección transversal de la losa por el espesor de la misma, medida desde el filo interior del sardinel.
co (m3) y se valorizará de acuerdo a los metrados de obra ejecutados satisfactoriamente de acuerdo con la presente especificación y a
stencia del concreto por diseño de mezcla o incorporación de aditivos, el tiempo de permanencia del encofrado podrá ser menor previa
uto del volumen de concreto, se calculará multiplicando el área de la base por su altura.
á al precio unitario por metro cúbico y dicho pago constituirá la compensación total por la mano de obra y herramientas necesarias par
de refuerzo de acuerdo al diámetro y medidas consideradas en lo planos, debe usarse varillas corrugadas de grado 60 de esfuerzos a
kilogramo de acero colocando en las zapatas de acuerdo a las medidas específicas en los planos.
á al precio unitario por Kilogramo y dicho pago constituirá la compensación total por la mano de obra y herramientas necesarias para e
a al precio unitario por metro cúbico y dicho pago constituirá la compensación total por la mano de obra y herramientas necesarias par
ofrado será la suma de todas las áreas por encofrar de las columnas, el área de encofrado de cada columna se obtendrá multiplicando
a al precio unitario por metro cuadrado y dicho pago constituirá la compensación total por la mano de obra y herramientas necesarias p
edelas
refuerzo d acuerdo
armaduras viene aalser
diámetro
el pesoy de
medidas
todas consideradas
la varillas que en lo planos,
llevan debe usarse
las columnas, varillas
escribos y secorrugadas
incluirá las de grado 60dedelas
longitudes esfuerzos al
barras que
á al precio unitario por Kilogramo y dicho pago constituirá la compensación total por la mano de obra y herramientas necesarias para e
fc=210kg/cm² y cemento Portland tipo I, colocándose este concreto en las vigas previamente encofradas de acuerdo a las dimensione
al del concreto de las vigas será la suma de los volúmenes individuales. El volumen de cada viga será igual al producto de su sección
a al precio unitario por metro Cúbico y dicho pago constituirá la compensación total por la mano de obra, materiales, equipo y herramie
frado de las vigas de acuerdo a medidas y niveles que se especifican en los planos._x000D_
l encofrado (y desencofrado) será la suma de las áreas individuales. El área de encofrado de cada viga se obtendrá multiplicando el pe
a al precio unitario por metro cuadrado y dicho pago constituirá la compensación total por la mano de obra, materiales y herramientas n
a longitud de las barras que van empotradas en los apoyos de cada viga._x000D_
rio por Kg. Y dicho pago constituirá la compensación total por la mano de obra como materiales y herramientas necesarias para ejecuta
rificación de los ladrillos, tanto más resistirán a los agentes exteriores en muros caravista._x000D_
ida será metro cuadrado (m2)._x000D_
io unitario correspondiente de acuerdo a la unidad de medición y constituirá compensación completa por los trabajos descritos incluyen
uministro, transporte, almacenaje, manipuleo y todo imprevistos en general con la finalidad de completar la partida.
l tipo C, y se desarrollará según las especificaciones técnicas indicadas en los planos. Conexiones metálicas (planchas de acero de 3m
dida es el número de unidades armadas por día. La cantidad de unidades según lo avanzado en obra, lo cual deberá ser refrendado p
al avance realizado en obra, el cual contempla todos los costos de mano de obra, materiales, herramientas, transporte, y demás insum
nes técnicas indicadas anteriormente._x000D_
rado
da se (p2). La cantidad
pagarán al haber de pies cuadrados
realizado según
la medición lo avanzado
en pies en del
cuadrados obra, lo cual
área deberá
techada por ser refrendada
el costo unitariopor
delelPresupuesto
Supervisor. y al verificar la c
al precio unitario del contrato, el cual contempla todos los costos de mano de obra, materiales, herramientas, transporte, y demás insu
stituidos por una sola capa de mortero para aplicada en dos capas. En la primera llamada “pañeteo” se proyecta simplemente el morte
á al precio unitario por metro cuadrado y dicho pago constituirá la compensación total por la mano de obra, materiales y herramientas n
el total sumando el área efectivamente tarrajeada por columnas. El área de cada una de ellas será igual al perímetro de su sección mu
an al precio unitario por metro cuadrado y dicho pago constituirá la compensación total por la mano de la obra, materiales y herramient
o de vigas de concreto. La superficie por vestir de la viga, es la que queda visible bajo la losa._x000D_
el área total sumando el área efectivamente tarrajeada por viga. El área de cada una será igual al perímetro de la sección, visible bajo l
á al precio unitario por metro cuadrado y dicho pago constituirá la compensación total por la mano de obra, materiales y herramientas n
os derrames serán perfectamente rectos, tonto horizontales como verticales. Las aristas de los derrames expuestas a impactos serán c
ngitud efectiva del perímetro del derrame._x000D_
a al precio unitario por metro lineal y dicho pago constituirá la compensación total por la mano de obra, materiales y herramientas nece
uara al precio unitario por metro cuadrado y dicho pago constituirá la compensación total por la mano de obra, materiales y herramienta
hos de sujeción y tornillos especiales directamente sobre la estructura. Para el proyecto será fijado en estructuras de maderas como s
rea trabajada._x000D_
uara al precio unitario por metro cuadrado y dicho pago constituirá la compensación total por la mano de obra, materiales y herramienta
l área de piso es el mismo que el de contrapiso.
á al precio unitario por metro cuadrado y dicho pago constituirá la compensación total por la mano de obra, materiales y herramientas n
entos del techo tengan un mismo nivel y estén perfectamente rectos._x000D_
rea neta ejecutada sin descontar luces o huecos de áreas menores de 0.50m².
á al precio unitario por plancha y dicho pago constituirá la compensación total de la mano de obra., materiales y herramientas necesari
vierten el agua desde el techo, por lo que fluye hacia los aleros o canalones que se la llevarán. La alineación correcta y la instalación d
a al precio unitario por metro cuadrado y dicho pago constituirá la compensación total por el costo de la unidad, indicado en el presupu
ransito, sino el paso de la luz y ventilación, se considera por m² de unidad, como elemento integral, incluyendo el marco de divisiones,
to debe contarse la cantidad de m² de área de vano._x000D_
a al precio unitario por m² y dicho pago constituirá la compensación total por el costo de cada m² de ventana, indicado en el presupues
os (bisagras, etc.). Para las puertas y ventanas de madera y carpintería metálica, destinadas a facilitar el movimiento de la hojas y dar
a al precio unitario por cada unidad a utilizar en obra y dicho pago constituirá la compensación total por el costo de cada m² de ventana
segurar el cierre
to se contara de puertas,
el número ventanas,a etc.
de unidades Se utilizara cerradura o chapa tipo forte de los golpes.
utilizar_x000D_
a al precio unitario por pieza o unidad por dicho pago constituirá la compensación total por la mano de obra, materiales y herramientas
a al precio unitario por pieza o unidad por dicho pago constituirá la compensación total por la mano de obra, materiales y herramientas
a al precio unitario por pie cuadrado y dicho pago constituirá la compensación total por el costo de cada pie cuadrado de vidrio semido
efectuara midiendo las aéreas netas de las paredes y restando el área de los vanos de puertas, ventanas._x000D_
a al precio unitario por metro cuadrado y dicho pago se constituirá la compensación total por la mano de obra, materiales y herramienta
o con el agua o similar, se aplicara pintura al látex la que debe resistir las mas adversas condiciones climáticas, sin perder color por ac
aefectuara
al precio midiendo el área
unitario por metroneta a pintar.
cuadrado y dicho pago constituirá la compensación total por la mano de obra, materiales y herramientas
n los planos y el presupuesto.
zado de
pago al natural provistas
la partida de las
serán por perforaciones
unidad colocada, necesarias para dar indicadas
en las dimensiones paso a losen
dados en cada
los planos y elsalida indicada.
presupuesto._x000D_
iente para ofrecer un espacio libre para el alojamiento de los conductores de por lo menos 10 cm. En todos sus lados. Las cajas se fab
_x000D_
pago de la partida serán por unidad colocada, en las especificaciones indicadas en los planos y el presupuesto.
iente de
pago para ofrecer serán
la partida un espacio libre para
por unidad el alojamiento
colocada, de los conductores
en las especificaciones de poren
indicadas lo los
menos 10 ycm.
planos En todos sus lados. Las cajas se fab
el presupuesto._x000D_
pago de la partida serán por kit colocado, en las especificaciones indicadas en los planos y el presupuesto._x000D_
n acabado final libre de huellas y otras marcas, las bruñas deben ser nítidas según el diseño, sólo así se podrá dar por aprobada la pa
s cuadrado (m2); las losas se medirán por la superficie a la vista, sin considerar el sardinel._x000D_
do el área de la sección transversal de la losa por el espesor de la misma, medida desde el filo interior del sardinel.
drado (m2) y se valorizará de acuerdo a los metrados de obra ejecutados satisfactoriamente de acuerdo con la presente especificación
volumen de una columna igual al producto de la sección transversal por la altura y luego se sumaran los volúmenes de todas las colum
a al precio unitario por metro cúbico y dicho pago constituirá la compensación total por la mano de obra y herramientas necesarias par
al del concreto de las vigas será la suma de los volúmenes individuales. El volumen de cada viga será igual al producto de su sección
a al precio unitario por metro Cúbico y dicho pago constituirá la compensación total por la mano de obra, materiales, equipo y herramie
l tipo C, y se desarrollará según las especificaciones técnicas indicadas en los planos. Conexiones metálicas (planchas de acero de 3m
al avance realizado en obra, el cual contempla todos los costos de mano de obra, materiales, herramientas, transporte, y demás insum
stituidos por una sola capa de mortero mas impermeabilizante, para ser aplicada en dos capas. En la primera llamada “pañeteo” se pr
todas las áreas netas a vestir o revocar por consiguiente se descontaran lo vanos o aberturas._x000D_
á al precio unitario por metro cuadrado y dicho pago constituirá la compensación total por la mano de obra, materiales y herramientas n
kg/cm² y cemento Portland tipo I, colocándose este concreto en las vigas previamente encofradas de acuerdo a las dimensiones y nive
al del concreto de las vigas será la suma de los volúmenes individuales. El volumen de cada viga será igual al producto de su sección
a al precio unitario por metro Cúbico y dicho pago constituirá la compensación total por la mano de obra, materiales, equipo y herramie
Tubería de PVC, con tapa roscada y dispositivo de fácil operación según NTN ITINTEC 26:05-007._x000D_
alación del inodoro de tanque bajo y alto con sus accesorios (tornillos de fijación de 2”, tarugos de plástico, platinas de fierro galvanizad
(unidad)_x000D_
da y precio unitario definido en el presupuesto, y previa aprobación del supervisor quien velará por su correcta colocación en obra
da y precio unitario definido en elpresupuesto y previa aprobación del supervisor quien velará por suncorrecta ejecución.
por "Pto” y precio unitario definido en el presupuesto y previa aprobación del supervisor quien velará por la correcta instalación y ejecu
nce en las líneas de succión señaladas en los planos._x000D_
” (unidad)._x000D_
dad “Und” y precio unitario definido en el presupuesto y previa aprobación del supervisor quien velará por la correcta._x000D_
án variar según la marca de los aparatos o planos correspondientes todas las salidas de desagüe y ventilación y todos los puntos de la
(punto)_x000D_
“PVC” y accesorios se hará por punto “Pto” y precio unitario definido en el presupuesto y previa aprobación del supervisor quien velará
(punto)_x000D_
“PVC” y accesorios se hará por punto “Pto” y precio unitario definido en el presupuesto y previa aprobación del supervisor quien velará
án variar según la marca de los aparatos o planos correspondientes todas las salidas de desagüe y ventilación y todos los puntos de la
(punto)_x000D_
“PVC” y accesorios se hará por punto “Pto” y precio unitario definido en el presupuesto y previa aprobación del supervisor quien velará
erán deconcreto armado f'c=175kg/cm2 según diseño indicado en losplanos. Así mismo deberán llevar agarraderas con varillas de 3/8"
á por "Und" y precio unitario definido en el presupuesto y previa aprobación del supervisor quien velará por la correcta instalación en ob
ón de tuberías será en metro lineal (m.) y aprobado por el Ingeniero Supervisor de acuerdo a lo especificado. _x000D_
dad de m. de tubería instalada por el costo unitario del presupuesto base, entendiéndose que dicho precio y pago constituirá compensa
por los precios del costo unitario indicado en los análisis de costos unitarios.
por los precios del costo unitario indicado en los análisis de costos unitarios.
es por metro
vance linealen
ejecutado, (m2). Se hará uncon
coordinación análisis previo de cantidad de personal, vehículos y equipos necesarios para la compactación del á
la Supervisión._x000D_
ipos, herramientas e imprevistos necesarios para completar el trabajo de esta partida
relleno efectuado._x000D_
por los precios del costo unitario indicado en los análisis de costos.
do el área de la sección transversal de la losa por el espesor de la misma, medida desde el filo interior del sardinel.
co (m3) y se valorizará de acuerdo a los metrados de obra ejecutados satisfactoriamente de acuerdo con la presente especificación y a
stituidos por una sola capa de mortero para aplicada en dos capas. En la primera llamada “pañeteo” se proyecta simplemente el morte
á al precio unitario por metro cuadrado y dicho pago constituirá la compensación total por la mano de obra, materiales y herramientas n
la excavación se obtendrá multiplicando el ancho de la zanja por la altura promedio, luego multiplicando esta sección transversal, así
á al precio unitario por metro cubico y dicho pago constituirá la compensación total por la mano de obra y herramientas necesarias par
pto seca, de buena calidad, dando la forma, medidas y alineamiento que se indican en el plano de cimentación._x000D_
tal del encofrado (y desencofrado) de obtiene sumando las áreas encofrados por tramos. El área de cada tramo se obtiene multiplican
á al precio unitario por metro cuadrado y dicho pago constituirá la compensación total por la mano de obra y herramientas necesarias p
materiales cercano a la obra (punto de descarga) se dispondrá de personal para realizar el transporte, hasta el frente de trabajo o hasta
ado en el presupuesto de obra, dicho pago representa compensación integral para todas las operaciones de flete, mano de obra, así co
ateriales necesarios para la ejecución de la obra, personal obrero y equipos livianos de transporte (carretillas buggis, etc.), que se usara
_
materiales cercano a la obra (punto de descarga) se dispondrá de personal para realizar el transporte, hasta el frente de trabajo. El carg
ajo realizada.
or de Actividades y Actores” se hará por unidad de medida "mes” y precio unitario definido en_x000D_
d del coordinador, quien velará por la correcta ejecución del servicio requerido.
kg/cm² y cemento Portland tipo I, colocándose este concreto en los hoyos hechos para el soporte de los pluviómetros, previamente en
al del concreto de las vigas será la suma de los volúmenes individuales. El volumen de cada viga será igual al producto de su sección
a al precio unitario por metro Cúbico y dicho pago constituirá la compensación total por la mano de obra, materiales, equipo y herramie
sza
cuando compruebees:
de la plataforma que se ha realizado
kilómetro a satisfacción
(km) aproximado la Limpieza
al primer decimal,de la plataforma,
cualquiera fuerecumpliendo
el ancho la con esta especificación
plataforma, y que como
o la correspondiente al Inr
gará al precio unitario del contrato o al cumplimiento del Indicador de Conservación o del Indicador de Nivel de Servicio, por todo trabaj
según el precio de contrato o el cumplimiento del Indicador de Conservación o el Indicador de Nivel de Servicio, por trabajo aprobado s
s cuando compruebe que se ha realizado a satisfacción la Limpieza de Cunetas y que como resultado las cunetas estén completament
según el precio de contrato por trabajo o al cumplimiento del Indicador de Conservación o del Indicador de Nivel de Servicio aprobado
s cuando compruebe que se ha realizado a satisfacción la Remoción de Derrumbes cumpliendo con esta especificación y que el mater
n de Derrumbes será el metro cúbico (m³), aproximado al metro cúbico completo u horas de trabajo (horas – hombre) y/o pago de maq
ará al precio unitario del contrato o al cumplimiento del Indicador de Conservación o del Indicador de Nivel de Servicio por todo trabajo
pagará según el precio de contrato o al cumplimiento del Indicador de Conservación o del Indicador de Nivel de Servicio por trabajo ap
100% libre de plagas_x000D_
es en papel cuche, full color, tamaño A3, los cuales erán diseñados por el equipo técnico del proyecto.
ida es el millar
ada millar impreso de afiches
uche, full color, tamaño A2. Estos calendarios indicarán las principales fechas del calendario ambiental, haciendo énfasis en la semana
ida será el millar.
llar impreso de calendarios.
camente a la plantación, cuyo objetivo es mantenerlo libre de malezas para su crecimiento. Se utilizara se utilizara jornales y herramien
da será el m2
de m2 ejecutados, previa conformidad del área usuaria
visivos alusivos a la prevención y control de incendios forestales en la ACP Tilacancha; la difusión televisiva se hará a través de las tele
ida será el mes._x000D_
ón, edición, musicalización, voz en off, tomas aéreas, locaciones a designar y difusión del spot publicitario por mes._x000D_
dio y excursiones de los estudiantes de primaria y secundaria para fortalecer la educación forestal, reconocer el valor de los servicios e
artida será Global.
se hará una vez finalizado cada una de las pasantías.
uir la posibilidad que se desarrolle un incendio de grandes proporciones, mediante la realización de acciones operativas orientada a tod
ida es la CONSULTORÍA
consultoría, previa conformidad del área usuaria
olor con diseños ambientales y de sensibilización en el manejo y conservación de los bosques y los recursos hídricos._x000D_
os guardabosques, la cual se realizará como mínimo 1 vez al año, y tendrá una duración de 1 día (medio día de teoría y medio día de
mentación de un Plan de Comunicaciones (PC), con la finalidad de mejorar la gestión articuladora de los actores de la microcuenca Tila
ida es la CONSULTORÍA
consultoría, previa conformidad del área usuaria
e crece a ambos lados de la carretera que impida la visibilidad en el camino, de manera que facilite el libre tránsito vehicular. Aproxima
mpieza de maleza.
ales para incentivar un fuste largo y una copa adecuada para evitar el exceso de sombra._x000D_
da será el m2
de m2 ejecutados, previa conformidad del área usuaria
limpieza de las franjas para una posterior hoyación.
rio por hectárea y dicho construirá la compensación total por la mano de obra, materiales y herramientas necesarias para el trabajo de
ado en el presupuesto del proyecto, dicho pago representa compensación integral para todas las operaciones de flete, mano de obra, a
, el Residente deberá comunicar este hecho al Supervisor, de modo que apruebe la _x000D_
ndo de la zapata deberá estar en terreno duro y estable, cuya consistencia deberá ser aprobada por el Supervisor.
0D_
ntes de los tanques sépticos se realizará previa eliminación de oloresy gases, empleando 1Kg de hipoclorito de calcio al 70%, 1 Kg de
eométrico del cerco; la altura mínima del cerco será de 2.00 m. para locual se utilizará postes de madera eucalipto, grapas y tela de po
aterial extraído del lecho filtrante, a ello se incrementa el porcentaje de esponjamiento (15%) promedio. Para todo tipo de material extr
amiento de protección (Guantes de caucho, botals de PVC, lentes y mascarillas) para el personal que estará en contacto directo con la
on el que debe contar el contratista para poder afrontar algún incidente que se presente en la obra del tipo que tenga que ver con la se
0D_
po de trabajo consiste en aplicar capas sucesivas del material filtrante en la fosa excavada, debiendo obtener finalmente un terreno niv
extraído del pozo percolador y del tanque séptic, el carguío será de manera manual y para el traslado se utilizará un volquete de 8 m3,
ción que debe colocar el contratista el tiempo que dure la ejecución de la obra. Tales como: Cinta de señalización en polietileno, amari
án en el lado opuesto del primero, esto con la finalidad de que, al momento de colocar la planta, se coloque en el hoyo la tierra que cor
o esta sección transversal, así obtenida, por la longitud de la zanja. En los elementos que se crucen se medirá la intersección una sola
y herramientas necesarias para el trabajo de Nivelación, indicado en el presupuesto de la obra.
que dicho precio y pago constituirá compensación total por el equipo, mano de obra, materiales, herramientas e imprevistos necesario
nivel de terreno en esa etapa y el nivel que se requiere para recibir el piso, en consecuencia, se debe efectuar una nivelación final, llam
nivel de terreno en esa etapa y el nivel que se requiere para recibir el piso de la vereda, en consecuencia, se debe efectuar una nivelac
mayor a 30 m, todo el transporte se hará con carretillas y herramientas manuales. Se realizará en forma periódica de tal material que
do por la diferencia entre el volumen de material disponible compactado, menos el volumen necesario para el relleno compactado.
y herramientas necesarias para el trabajo de Nivelación, indicado en el presupuesto de la obra.
njas antes de llenar los cimientos y no se colocará las piedras sin antes haber depositado una capa de concreto de por lo menos 10 cm
ará por que ella se ejecute durante el desarrollo de la obra_x000D_
ntación._x000D_
da tramo se obtiene multiplicando el doble de la altura del sobrecimiento por la longitud del tramo._x000D_
n la presente especificación y aceptados por el Supervisor. Los precios unitarios deben cubrir los costos de materiales, mano de obra,
umna se obtendrá multiplicando el perímetro de contacto efectivo del concreto de la sección transversal de la columna, por la diferencia
bra y herramientas necesarias para el trabajo de Nivelación, indicado en el presupuesto de la obra.
as
as de grado 60dedelas
longitudes esfuerzos a lavan
barras que fluencia de fy = en
empotradas 4200Kg/Cm2.
otros elementos. (Zapatas, vigas, etc.)._x000D_
mientas necesarias para ejecutar el trabajo de habilitación y colocación del acero para vigas, indicado en el presupuesto de la obra.
r los trabajos descritos incluyendo mano de obra, leyes sociales, seguro SCTR o de vida, materiales, equipo y_x000D_
r la partida.
álicas (planchas de acero de 3mm de espesor o lo indicado en planos, pernos, soldadura, etc, preservante para madera, zincromato y
o cual deberá ser refrendado por el Supervisor.
ntas, transporte, y demás insumos e imprevistos necesarios para la ejecución de la partida
elelPresupuesto
Supervisor. y al verificar la correcta ejecución de la construcción con la aprobación del Supervisor. _x000D_
entas, transporte, y demás insumos e imprevistos necesarios para la ejecución de la partida.
proyecta simplemente el mortero sobre el parámetro ejecutado previamente las cintas o maestras encima de las cuales se corre una
bra, materiales y herramientas necesarias para ejecutar el trabajo de tarrajeo exterior de las paredes, indicado en el presupuesto de la
al perímetro de su sección multiplicado por la altura del piso hasta la cota del fondo de la losa, descontando las secciones de viga que
a obra, materiales y herramientas necesarias para ejecutar el trabajo de tarrajeo de las columnas, indicado en el presupuesto de la obr
etro de la sección, visible bajo la losa, multiplicado por la longitud o sea la distancia entre las caras de las columnas o apoyos._x000D_
bra, materiales y herramientas necesarias para ejecutar el trabajo de tarrajeo de las vigas peraltadas, indicado en el presupuesto de la
s expuestas a impactos serán convenientemente boleados._x000D_
materiales y herramientas necesarias para ejecutar el trabajo de vestidura con tarrajeo de puertas, ventanas y vanos, indicado en el pre
e obra, materiales y herramientas necesarias para ejecutar el trabajo, indicado en el presupuesto de la obra.
estructuras de maderas como se especifica en los planos _x000D_
e obra, materiales y herramientas necesarias para ejecutar el trabajo, indicado en el presupuesto de la obra
bra, materiales y herramientas necesarias para ejecutar el trabajo del piso cerámico, indicado en el presupuesto de la obra
eriales y herramientas necesarias para ejecutar el trabajo de cubiertas, indicado en el presupuesto de la obra.
ación correcta y la instalación de la cumbrera es esencial para este proceso. La cumbrera es la línea superior o pico de tu techo y, por c
ateriales y equipo al lugar de la obra. El costo del empotramiento sobre el revoque del parapeto está incluido en este ítem._x000D_
ocación en la edificación._x000D_
l movimiento de la hojas y dar seguridad y conveniente al cierre de ventanas, puertas y elementos similares._x000D_
obra, materiales y herramientas necesarias para ejecutar el trabajo de las cerraduras para puertas indicado en el presupuesto de la obr
obra, materiales y herramientas necesarias para ejecutar el trabajo de las cerraduras para puertas indicado en el presupuesto de la obr
nas._x000D_
obra, materiales y herramientas necesarias para ejecutar el trabajo del pintado de las paredes interiores, indicando en el presupuesto
máticas, sin perder color por acción del tiempo y ser igualmente resistente a la alcalinidad que se encuentre en la superficie de los acab
bra, materiales y herramientas necesarias para ejecutar el trabajo del pintado de los cielos razos, indicando en el presupuesto de la ob
ada.
sto._x000D_
dos sus lados. Las cajas se fabricarán de planchas de acero galvanizado y pintado con una mano de pintura antióxido y dos manos de
dos sus lados. Las cajas se fabricarán de planchas de acero galvanizado y pintado con una mano de pintura antióxido y dos manos de
puesto._x000D_
con la presente especificación y aceptados por el Supervisor. Los precios unitarios deben cubrir los costos de materiales, mano de ob
s volúmenes de todas las columnas, cuando las columnas van endentadas con los muros (Columnas de amarre), se considera el volum
y herramientas necesarias para el trabajo de Nivelación, indicado en el presupuesto de la obra
, materiales, equipo y herramientas necesarias para ejecutar el trabajo de mezclado y vaciado del concreto para vigas, indicado en el
álicas (planchas de acero de 3mm de espesor o lo indicado en planos, pernos, soldadura, etc, preservante para madera, zincromato y
bra, materiales y herramientas necesarias para ejecutar el trabajo de tarrajeo exterior de las paredes, indicado en el presupuesto de la
D_
co, platinas de fierro galvanizado de1/8"x1", 3/16" x 1" y 3/16" x1/2", etc. Los inodoros serán de loza vitrificada blanca, nacional de prim
rrecta ejecución.
or la correcta._x000D_
tilación y todos los puntos de la red de desagüe PVC que estén abiertos serán taponeados provisionalmente con tapones de madera d
ción del supervisor quien velará por la correcta instalación y ejecución en obra._x000D_
ción del supervisor quien velará por la correcta instalación y ejecución en obra.
tilación y todos los puntos de la red de desagüe PVC que estén abiertos serán taponeados provisionalmente con tapones de madera d
ción del supervisor quien velará por la correcta instalación y ejecución en obra._x000D_
agarraderas con varillas de 3/8" de diámetro, las que quedarán enrasadas en la cara superior de la tapa con perfiles metpálicos rellena
cio y pago constituirá compensación total por material, mano de obra y herramientas utilizadas en la ejecución de avance físico de la pa
n la presente especificación y aceptados por el Supervisor. Los precios unitarios deben cubrir los costos de materiales, mano de obra,
proyecta simplemente el mortero sobre el parámetro ejecutado previamente las cintas o maestras encima de las cuales se corre una
bra, materiales y herramientas necesarias para ejecutar el trabajo de tarrajeo exterior de las paredes, indicado en el presupuesto de la
o esta sección transversal, así obtenida, por la longitud de la zanja. En los elementos que se crucen se medirá la intersección una sola
y herramientas necesarias para el trabajo de Nivelación, indicado en el presupuesto de la obra.
ntación._x000D_
da tramo se obtiene multiplicando el doble de la altura del sobrecimiento por la longitud del tramo._x000D_
s de flete, mano de obra, así como otros gastos eventuales que se requieran para terminar los trabajos.
tillas buggis, etc.), que se usaran para el acarreo de materiales a obra, cabe mencionar que se deben tomar las precauciones que el ca
asta el frente de trabajo. El carguío lo podrán efectuar mediante otro medio que exista en el medio local, cualquier sobre costos será re
sta especificación
orma, y que como
o la correspondiente resultado,delaConservación
al Indicador plataforma esté
o alcompletamente limpia
Indicador de Nivel de de basuras,
Servicio, desechos,
según escombros y demás material
el caso._x000D_
ivel de Servicio, por todo trabajo ejecutado satisfactoriamente de acuerdo con la presente especificación y aceptado por parte de la Su
Servicio, por trabajo aprobado satisfactoriamente de acuerdo con la presente especificación y la aceptación por parte de la Supervisión
as cunetas estén completamente limpias y adecuadas para que el flujo del agua sea libre.
de Nivel de Servicio aprobado satisfactoriamente de acuerdo con la presente especificación y la aceptación por parte de la Supervisión
a especificación y que el material producto del derrumbe se haya retirado completamente de la vía y colocado en los sitios de depósito
as – hombre) y/o pago de maquinaria (horas – máquina) o la correspondiente al Indicador de Conservación o al Indicador de Nivel de
vel de Servicio por todo trabajo ejecutado satisfactoriamente de acuerdo con la presente especificación y aceptado por parte de la Sup
Nivel de Servicio por trabajo aprobado satisfactoriamente de acuerdo con la presente especificación y la aceptación por parte de la Sup
siva se hará a través de las televisoras de mayor sintonía en el ámbito local, buscando con esta actividad la sensibilización de los pobl
io por mes._x000D_
nocer el valor de los servicios ecosistémicos que brinda el área de conservación privada Tilacancha.
ones operativas orientada a todos los actores sociales en general y laimplementación de las medidas de prevención, organización, det
ursos hídricos._x000D_
mínimo 1 vez al año, la cual tendrá una duración en promedio de 1 día (medio día de teoría y medio día de práctica).
actores de la microcuenca Tilacancha; CC de Levanto, CC de San Isidro del Maino, EMUSAP SRL, Municipalidad Provincial de Chach
bre tránsito vehicular. Aproximadamente una longitud de 16 Km por 3 m. a ambos lados de la trocha carrozable, haciendo un total de 48
s necesarias para el trabajo de limpieza de terreno o chaleo, indicado en el presupuesto de la obra.
iones de flete, mano de obra, así como otros gastos eventuales que se requieran para terminar los trabajos.
Supervisor.
orito de calcio al 70%, 1 Kg de sulfato de cobre y 1.5 kag de cal viva por m3 de material residual, luego se hará uso de una motobomb
D_
Para todo tipo de material extraído, la eliminación del mismo será a una distancia promedio de 6 km del área de trabajo. _x000D_
po que tenga que ver con la seguridad y salud de los trabajadores de la obra.
e utilizará un volquete de 8 m3, así como la eliminación de los desperdicios de obra como son los residuos tierra, basura, etc.; cuyo vo
ñalización en polietileno, amarillo calibre 4, cebrado negro, texto peligro no pase, ancho 10 cm, presentado en rollos de 200 m
que en el hoyo la tierra que correspondía a los primeros 20 cm. ya que esta tiene mayor cantidad de materia orgánica y posteriormente
medirá la intersección una sola vez.
a, se debe efectuar una nivelación final, llamada interior porque está encerrada entre los elementos de fundación, puede consistir en un
oncreto de por lo menos 10 cm. de espesor. Las piedras deberán quedar completamente rodeadas por la mezcla sin que se tome los e
s de materiales, mano de obra, beneficios sociales, impuestos, tasas y contribuciones, herramientas, y todos los gastos que demande e
el presupuesto de la obra.
uipo y_x000D_
ma de las cuales se corre una regla, se utilizara andamio, luego cuando el pañeteo ha endurecido se aplica la segunda capa, para obte
dicado en el presupuesto de la obra._x000D_
s columnas o apoyos._x000D_
perior o pico de tu techo y, por consiguiente, el primer lugar donde choca el agua con tiempo inclemente. Las tejas estándar están típica
ares._x000D_
do en el presupuesto de la obra._x000D_
do en el presupuesto de la obra.
ntre en la superficie de los acabados, debe soportar el lavado con agua y jabón sin sufrir alteraciones en su acabado._x000D_
ntura antióxido y dos manos de pintura de acabado color gris, dando un espesor total de 150 micrones.
tos de materiales, mano de obra, beneficios sociales, impuestos, tasas y contribuciones, herramientas, y todos los gastos que demand
e las cintas o maestras encima de las cuales se corre una regla, se utilizara andamio, luego cuando el pañeteo ha endurecido se aplic
ficada blanca, nacional de primera calidad con asiento y tapa así como accesorios interiores de plástico pesado irrompible, la manija de
mente con tapones de madera de forma tronco cónica. Estos tapones se instalarán inmediatamente después de terminadas las salidas y
mente con tapones de madera de forma tronco cónica. Estos tapones se instalarán inmediatamente después de terminadas las salidas y
con perfiles metpálicos rellenados conelmismo material de los pisos adyacentes, convenientemente fraguadas, de forma que sea una
cución de avance físico de la partida.
s de materiales, mano de obra, beneficios sociales, impuestos, tasas y contribuciones, herramientas, y todos los gastos que demande e
ma de las cuales se corre una regla, se utilizara andamio, luego cuando el pañeteo ha endurecido se aplica la segunda capa, para obte
dicado en el presupuesto de la obra._x000D_
omar las precauciones que el caso así lo requiera, no se contempla los casos de accidentes de traslados.
s, escombros y demás materiales extraños y que su estado refleje una condición de agradable apariencia estética para el usuario.
so._x000D_
de práctica).
nicipalidad Provincial de Chachapoyas, Municipalidad distrital de Levanto y el Maino, Gobierno Regional Amazonas, Grupo Técnico Tila
ozable, haciendo un total de 48,000 m2. Comprendido entre los sectores denominado Anexo Cachuc y el sector Winche.
se hará uso de una motobomba de 4'' x 13HP con su respectiva manguera de succión
uos tierra, basura, etc.; cuyo volumen será incrementado en magnitud de un volumen más por el esponjamiento del material extraído.
undación, puede consistir en un corte o relleno de poca altura y necesita de un apisonado manual. Se efectuará la compactación del te
odos los gastos que demande el cumplimiento satisfactorio de la partida, incluyendo los imprevistos.
lica la segunda capa, para obtener una superficie plana y acabada.
Las tejas estándar están típicamente modificadas para solapar las tejas en ambas caras del techo para sellar la cumbrera._x000D_
su acabado._x000D_
y todos los gastos que demande el cumplimiento satisfactorio de la partida, incluyendo los imprevistos.
pañeteo ha endurecido se aplica la segunda capa, para obtener una superficie plana y acabada._x000D_
pesado irrompible, la manija de accionamiento serácromada al igual que los pernos de anclaje al piso. Su ubicación se muestra en los
ués de terminadas las salidas y permanecerán colocados hasta el momento de instalarse los aparatos sanitarios._x000D_
ués de terminadas las salidas y permanecerán colocados hasta el momento de instalarse los aparatos sanitarios._x000D_
guadas, de forma que sea una sola pieza, el perfil de la tapa con su relleno.
odos los gastos que demande el cumplimiento satisfactorio de la partida, incluyendo los imprevistos.
x000D_
bladores.
el sector Winche.
amiento del material extraído.
mpactación del terreno, con pisones y manteniendo el contenido óptimo de humedad, se colocará una capa de 10cm de espesor como
mpactación del terreno, con pisones y manteniendo el contenido óptimo de humedad, se colocará una capa de 10cm de espesor como
fectuará la compactación del terreno, con pisones y manteniendo el contenido óptimo de humedad, se colocará una capa de 10cm de e
a sellar la cumbrera._x000D_
Su ubicación se muestra en los planos de diseo constructivo del proyecto_x000D_
sanitarios._x000D_
sanitarios._x000D_
capa de 10cm de espesor como mínimo de afirmado después de haber compactado el terreno._x000D_
capa de 10cm de espesor como mínimo de afirmado después de haber compactado el terreno.
olocará una capa de 10cm de espesor como mínimo de afirmado después de haber compactado el terreno._x000D_
eno._x000D_
#N/A #N/A #N/A #N/A #N/A
###
###
### 7 OBRA POR ADMINISTRACION DIRECTA MO MA
### En Soles 0.00 0.00
Insumos Und Cuad./cant.
4 Cantidad
#N/A #N/A
### #N/A
EQ TOTAL
0.00 0.00
P.U. Parcial
#VALUE!
ANALISIS DE COSTOS UNITARIOS DE SUBPARTIDAS
Proyecto
INSTALACIÓN DE UNBIODIGESTOR DE 5000 L DE CAPACIDAD EN EL MIRADOR HUANCAURCO
Lugar DISTRITO: HUANCAS, PROVINCIA: CHACHAPOYAS, REGIÓN AMAZONAS
Elab. Por ING. JHIMMY S.VILCHEZ GUEVARA
Fecha 02 DE MARZO DE 2019
140 de 389
OR HUANCAURCO
P.U. PARCIAL
141 de 389
PLANILLA DE METRADO
Proyecto : INSTALACIÓN DE UNBIODIGESTOR DE 5000 L DE CAPACIDAD EN EL MIRADOR HUANCAURCO
Ubicación: DISTRITO: HUANCAS, PROVINCIA: CHACHAPOYAS, REGIÓN AMAZONAS
4.6400 4.6400
4.6400 4.6400
10.9040 10.9040
7.6300 7.6300
3.2900 3.2900
1.1500 8.7561 8.7561
1.0000 1.0000
1.6900 1.6900
1.6900 1.6900
3.3800 3.3800
5.2000 5.2000
1.1500 3.8870 3.8870
1.0425
0.5200
0.5200
0.0025
19.5600
5.2000
4.4000
5.2000
4.4000
0.3600
8.8000
4.4000
4.4000
1.0000 1.0000
0.9800 0.9800
0.9800 0.9800
0.6370 0.6370
5.6000 5.6000
1.1500 1.1270 1.1270
0.9800 0.9800
0.4844
0.1680
0.1680
0.0980
0.0504
6.4800
1.6800
1.6800
1.2000
1.2000
0.7200
2.4000
1.2000
1.2000
3.1416 3.1416
3.1416 3.1416
6.2832 6.2832
6.2800 6.2800
5.0266 5.0266
1.0000 1.0000
3.2900 3.2900
1.1500 7.2257 7.2257
RELACION DE INSUMOS DEL PROYECTO
Proyecto INSTALACIÓN DE UNBIODIGESTOR DE 5000 L DE CAPACIDAD EN EL MIRADOR HUANCAURCO
Lugar DISTRITO: HUANCAS, PROVINCIA: CHACHAPOYAS, REGIÓN AMAZONAS
Elab. Por ING. JHIMMY S.VILCHEZ GUEVARA
Fecha 02 DE MARZO DE 2019
MIRADOR HUANCAURCO
PARTIDAS
01 BIODIGESTOR AUTOLIMPIABLE CAPACIDAD 3000 L
01.01 OBRAS PRELIMINARES
01.01.01 LIMPIEZA DE TERRENO MANUAL
01.01.02 TRAZO NIVELACIÓN Y REPLANTEO
01.02 MOVIMIENTO DE TIERRAS
01.02.01 EXCAVACIÓN MANUAL EN TERRENO NORMAL
01.02.02 REFINE Y NIVELACIÓN DE FONDOS
01.02.03 RELLENO CON MATERIAL PROPIO
01.02.04 ELIMINACIÓN DE MATERIAL EXCEDENTE HASTA 30 m
01.03 SUMINISTRO E INSTALACIÓN DE BIODIGESTOR AUTOLIMPIABLE
01.03.01 SUMINISTRO E INSTALACIÓN DE BIODIGESTOR AUTOLIMPIABLE DE 50
01.04 CAJA DE CONTROL DE LODOS
01.04.01 OBRAS PRELIMINARES
01.04.01.01 LIMPIEZA DE TERRENO MANUAL
01.04.01.02 TRAZO NIVELACIÓN Y REPLANTEO
01.04.02 MOVIMIENTO DE TIERRAS
01.04.02.01 EXCAVACIÓN MANUAL EN TERRENO NORMAL
01.04.02.02 REFINE Y NIVELACIÓN DE FONDOS
01.04.02.03 ELIMINACIÓN DE MATERIAL EXCEDENTE HASTA 30 m
01.04.03 CONCRETO SIMPLE
01.04.03.01 CONCRETO f'c=175kg/cm2
01.04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL
01.04.04 REVOQUES Y ENLUCIDOS
01.04.04.01 TARRAJEO DE INTERIORES CON IMPERMEABLIZANTE
01.04.05 SUMINISTRO E INSTALACIÓN DE VÁLVULAS
01.04.05.01 VÁLVULA ESFÉRICA DE PVC SAP DIAM.=2"
01.05 CAJA DE DISTRIBUCIÓN DE CAUDALES
01.05.01 OBRAS PRELIMINARES
01.05.01.01 LIMPIEZA DE TERRENO MANUAL
01.05.01.02 TRAZO NIVELACIÓN Y REPLANTEO
01.05.02 MOVIMIENTO DE TIERRAS
01.05.02.01 EXCAVACIÓN MANUAL EN TERRENO NORMAL
01.05.02.02 REFINE Y NIVELACIÓN DE FONDOS
01.05.02.03 ELIMINACIÓN DE MATERIAL EXCEDENTE HASTA 30 m
01.05.03 CONCRETO SIMPLE
01.05.03.01 CONCRETO EN SOLADOS e=10cm, f'c=100kg/cm2
01.05.03.02 CONCRETO f'c=175kg/cm2
01.05.03.03 ENCOFRADO Y DESENCOFRADO NORMAL
01.05.04 REVOQUES Y ENLUCIDOS
01.05.04.01 TARRAJEO DE INTERIORES CON IMPERMEABLIZANTE
01.06 POZO DE PERCOLACIÓN
01.06.01 OBRAS PRELIMINARES
PRESUPUESTO GENERAL DEL PR
Proyecto
INSTALACIÓN DE UNBIODIGESTOR DE 5000 L DE CAPACIDAD EN EL MIRADOR HU
PARTIDAS
01.06.01.01 LIMPIEZA DE TERRENO MANUAL
01.06.01.02 TRAZO NIVELACIÓN Y REPLANTEO
01.06.02 MOVIMIENTO DE TIERRAS
01.06.02.01 EXCAVACIÓN MANUAL EN TERRENO NORMAL
01.06.02.02 REFINE Y NIVELACIÓN DE FONDOS
01.06.02.03 RELLENO CON GRAVA GRUESA DIAM.= 2.5-5cm
01.06.02.04 RELLENO CON GRAVA FINA DE DIAM. 1-2.5
01.06.02.05 RELLENO CON MATERIAL PROPIO CERNIDO
01.06.02.06 ELIMINACIÓN DE MATERIAL EXCEDENTE HASTA 30 m
LIMPIEZA Y MANTENIMIENTO DE TANQUES SÉPTICOS
OBRAS PROVISIONALES
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS
CERCO PROVISIONAL DE SEGURIDAD DE OBRA
SEÑALIZACION TEMPORAL DE SEGURIDAD
TRABAJOS PRELIMINARES
INERTIZACIÓN Y ELIMINACIÓN DE GASES EMPLEANDO SUSTANCIAS
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS PARA DEPÓSITO DE MATERIAL EXTRAIDO
RELLENO CON MATERIAL PROPIO
OBRAS DE MANTENIMIENTO
EXTRACCIÓN DE MATERIAL RESIDUAL DE TANQUE SÉPTICO
TRASLADO DE MAT. EXTRAIDO C/MAQUINARIA
COSTO DIRECTO
GASTOS GENERALES (10% CD)
UTILIDAD (10% CD)
SUB TOTAL
IMPUESTO (IGV 18%)
MONTO REFERENCIAL DE OBRA (VR)
GASTOS DE SUPERVISION (6% VR)
MONTO TOTAL DEL PROYECTO
NOTA: El presupuesto f
Sistemas RW7pro
N AMAZONAS
N AMAZONAS
m3 9.960 0.00
m3 146.400 0.00
m3 14.688 0.00
m3 11.520 0.00
m3 9.375 0.00
12 649.34
1 264.93
1 264.93
15 179.20
2 732.26
17 911.46
1 074.69
18 986.15
COEF.
ESP.
ITEM DESCRIPCION UNIDAD CANTIDAD P.UNIT. PARTICIP
GASTO
ACION
80400.00 635.61%
4000.00 31.62%
7500.00 59.29%
948.30 7.50%
3500.00 27.67%
350.00 2.77%
150.00 1.19%
3327.75 26.31%
3422.40 27.06%
420.00 3.32%
12030.00 95.10%
400.00 3.16%
750.00 5.93%
210.00 1.66%
117408.45 928.18%
PRESUPUESTO CON ESPECIFICA DE GASTO POR PA
Proyecto
Lugar
Elab. Por
Fecha
02.06.01 MURO DE LADRILLO KK DE ARCILLA 18 H (0.09x 0.13 x 0.24)AMARRE DE SOGA JUNTA 1.5 cm MORTERO 1:1
2.6.2.3.4.5 Servicios en Costo Directo obras por A.D.
2.6.2.3.4.4 Bienes en Costo Directo obras por A.D.
Especifica de Gasto
1.01 CASETA PARA ALMACEN
2.6.2.3.4.5 Servicios en Costo Directo obras por A.D.
2.6.2.3.4.4 Bienes en Costo Directo obras por A.D.
2.06.01 MURO DE LADRILLO KK DE ARCILLA 18 H (0.09x 0.13 x 0.24)AMARRE DE SOGA JUNTA 1.5 cm MORTERO 1:1:5
2.6.2.3.4.5 Servicios en Costo Directo obras por A.D.
2.6.2.3.4.4 Bienes en Costo Directo obras por A.D.
TO TAL
O POR PARTIDAS
PARCIAL
191.56
1824.67
74.59
2.05
84.85
10.26
8.62
58.59
448.03
13.39
312.06
9.32
41.69
36.10
78.18
38.39
46.67
33.19
666.94
1526.53
567.76
1299.52
753.70
22.48
104.59
473.07
393.59
3125.53
162.70
485.87
79.60
368.24
374.13
348.30
1184.86
303.93
1009.84
95.12
29.84
272.57
1769.37
243.18
547.86
162.44
1226.53
46.23
104.15
19858.16
11550.52
54.65
495.04
26.71
60.17
8258.11
11954.08
MORTERO 1:1:5
1457.31
2883.59
297.92
12440.89
49.60
84.48
2658.59
1470.98
315.30
112.76
453.95
136.87
847.62
83.68
1703.42
2650.80
90.45
85.00
679.85
824.34
445.44
6447.28
100.44
550.61
106.39
574.53
1537.24
6149.63
1435.89
3043.00
34.65
85.05
211.17
201.03
92.31
335.52
445.03
648.51
1127.16
1180.06
942.22
279.44
82.66
89.64
75.03
81.37
113.79
27.08
255.00
36.58
59.40
110.61
134.20
2054.50
179.00
1305.96
53.68
119.62
76.92
273.71
56.40
625.90
134.24
4134.03
138697.42
CALENDARIO DE ADQUISICION DE INSUMOS ANUAL
Proyecto INSTALACIÓN DE UNBIODIGESTOR DE 5000 L DE CAPACIDAD EN EL MIRADOR HUANCAURCO
Lugar DISTRITO: HUANCAS, PROVINCIA: CHACHAPOYAS, REGIÓN AMAZONAS
Elab. Por ING. JHIMMY S.VILCHEZ GUEVARA
Fecha 02 DE MARZO DE 2019
MIRADOR HUANCAURCO
127.52 18.71
153.84 175.84
114.64 108.31 261.39
44.96 13.00 613.63
60.00 45.93
137.36 0.12
3.00 1 366.47
100.00 56.21 41.62
5.00 38.48
5.00 41.80
5.00 86.27
17.70 56.00
8.00 2.00
5.00 40.00
120.00 14.85
120.00 0.66
120.00 12.36
45.00 1.76
1 879.74 2.00
8.00 24.00
3.00 4.00
3.50 560.00
3.20 1 200.00
50.00 2.00
41.30 4.00
1.00 12.00
1.20 8.00
1.00 4.00
37.76 18.79
30.00 24.00
70.80 196.00
25.00 462.71
120.00 16.00
43.00 2.00
60.00 8.00
12.00 8.00
4.72 8.00
3.50 1.80
1.00 13.00
8.00 11.65
5.00 10.56
5.00 53.48
5.00 19.29
8.00 2.00
2.00 4.68
7.00 1.38
1.50 18.91
2.36 2.00
25.00 4.87
1.00 12.00
8.61 12.00
20.00 34.51
3.00 24.00
45.00 4.04
88.50 2.00
5.00 88.29
1.18 124.86
95.00 12.00
5.00 24.20
230.00 4.55
18.50 2.00
120.00 45.86
5.00 185.76
180.00 2.00
15.00 4.00
20.00 2.00
30.00 2.00
3 648.97 2.00
1.18 3 984.82
1.00 250.00
95.00 2.00
2.50 52.24
2.00 53.65
25.00 4.36
25.00 0.04
8.00 2 270.29
4.72 2.38
4.72 2 199.00
3.50 1 054.95
80.00 0.42
1.50 710.00
14.00 1.70
120.00 12.24
120.00 12.03
120.00 1.37
45.00 33.13
33.04 11.70
45.00 5.37
35.40 51.96
108.56 2.80
25.42 17.23
60.00 8.09
12.00 0.62
2.36 0.09
141.60 1.11
17.70 2.00
5.00 2.00
180.00 2.00
53.10 2.00
3.00 0.68
1.50 6.55
32.00 252.00
2.00 1 607.20
15.00 8.00
0.45 95.20
8.00 3.36
35.40 30.00
12.00 14.80
16.00 40.00
15.00 6.83
20.00 3.40
3.50 90.52
15.00 2.00
1.18 686.00
10.00 4.00
25.00 2.00
21.83 2.00
3.50 26.22
12.00 1.24
11.80 1.78
30.00 38.00
650.00 2.00
12.00 30.00
68.50 8.00
17.70 9.74
1 100.00 2.00
54.90 8.00
32 308.25 1.00
60 000.00 1.00
10 500.00 2.00
2 000.00 9.90 8.10
400.00 5.00
14 851.21 1.00
8 414.69 1.00
28.90 8.00
850.00
850.00 4.91 10.06 8.03
29.90 8.00
58.00 8.00
40.00 8.00
48.00 8.00
64.90 8.00
1 693.85 14.00
10.00 60.00
0.80 14 300.00 15 100.00
6 500.00 2.00
7.50 250.00
35.40 0.85
10.62 0.37
24.90 8.00
1.50 250.00
50.00 8.00
270.00 8.00
2 000.00 9.90 8.10
3 000.00 9.90 8.10
6 400.00 0.31
1 600.00 0.20
207.68 2.32
320.00 1.14
236.00 0.06
1.00 377.42 2 820.66
320.00 2.69
28.32 0.27
1 280.00 0.11
440.00 0.71
141.60 1.07
Sistemas RW7pro
PROGRAMACIÓN DE LA EJECUCION FISICA DE LA OBRA
PROYECTO: INSTALACIÓN DE UNBIODIGESTOR DE 5000 L DE CAPACIDAD EN EL MIRADOR HUANCAURC
LUGAR: DISTRITO: HUANCAS, PROVINCIA: CHACHAPOYAS, REGIÓN AMAZONAS
Fecha 02 DE MARZO DE 2019 Plazo (días calendarios):
Costo Directo S/ 12649.34
Unidad de programación:
METR
PRES
PUES
ADO
TO
PAR T I DAS UND
U
AVANCE MENSUAL(%)
PROGRAMADO
AVANCE ACUMULADO(%)
DIAS
CADENA DE
PRECE DENCIA
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
SEPARACION DIAS C.
Inicio DIAS L.
#REF!
#REF!
######
1 1
######
######
######
######
######
#REF!
#REF!
Aug-16
1 1 1 1
######
######
######
######
######
######
#REF!
#REF!
Sep-16
1 1 1 1
######
######
######
######
######
#REF! ######
#REF!
Oct-16
######
1 1 1 1 1
######
######
######
######
######
#REF!
#REF!
Nov-16
1 1 1 1
######
######
######
######
######
######
#REF!
#REF!
Dec-16
1 1 1 1
######
######
######
######
######
######
#REF!
#REF!
Jan-17
1 1 1 1 1
######
######
######
######
1 1
######
#REF!
#REF!
Feb-17
######
#REF!
#REF!
Feb-17
1 1
######
######
######
######
######
######
#REF!
#REF!
Mar-17
1 1 1 1
######
######
######
######
######
######
#REF!
#REF!
Apr-17
######
1 1 1 1 1
######
######
######
######
######
#REF!
#REF!
May-17
1 1 1 1
######
######
######
######
######
######
#REF!
#REF!
Jun-17
1 1 1 1
######
######
######
######
######
######
Jul-17
#REF!
#REF!
######
1 1 1 1 1
######
######
######
######
######
#REF!
#REF!
Aug-17
1 1 1 1
######
######
######
1
######
#REF!
#REF!
Sep-17
######
######
#REF!
#REF!
Sep-17
1 1 1
######
######
######
######
######
######
#REF!
#REF!
Oct-17
1 1 1 1 1
######
######
######
######
######
######
#REF!
#REF!
Nov-17
1 1 1 1
######
######
######
######
######
######
#REF!
#REF!
Dec-17
######
1 1 1 1 1
######
######
######
######
######
#REF!
#REF!
Jan-18
1 1 1 1
######
######
######
######
######
######
#REF!
#REF!
Feb-18
1 1 1 1
######
######
######
######
######
######
#REF!
#REF!
Mar-18
1 1 1 1
######
######
1
######
#REF!
#REF!
Apr-18
######
######
######
#REF!
#REF!
Apr-18
1 1 1 1
######
######
######
######
######
######
#REF!
#REF!
May-18
1 1 1 1
######
######
######
######
######
######
#REF!
#REF!
Jun-18
1 1 1 1
######
######
######
######
######
######
Jul-18
#REF!
#REF!
1 1 1 1 1
######
######
######
######
######
######
#REF!
#REF!
Aug-18
1 1 1 1
######
######
######
######
######
######
#REF!
#REF!
Sep-18
######
1 1 1 1 1
######
######
######
######
######
#REF!
#REF!
Oct-18
1 1 1 1
######
######
######
######
######
######
#REF!
#REF!
Nov-18
1 1 1 1
######
######
######
######
######
######
#REF!
#REF!
Dec-18
######
1 1 1 1 1
######
######
######
######
######
#REF!
#REF!
Jan-19
1 1 1 1
######
######
######
######
######
######
#REF!
#REF!
Feb-19
1 1 1 1
######
######
######
######
######
######
#REF!
#REF!
Mar-19
######
1 1 1 1 1
######
######
######
######
######
#REF!
#REF!
Apr-19
1 1 1 1
######
######
######
######
######
######
#REF!
#REF!
May-19
1 1 1 1
######
#REF!
#REF!
May-19
######
######
######
######
######
#REF!
#REF!
Jun-19
######
1 1 1 1 1
######
######
######
######
######
Jul-19
#REF!
#REF!
1 1 1 1
######
######
######
######
######
######
#REF!
#REF!
Aug-19
1 1 1 1
######
######
######
######
######
######
#REF!
#REF!
Sep-19
1 1 1 1 1
######
######
######
######
######
######
#REF!
#REF!
Oct-19
1 1 1 1
######
######
######
######
######
######
#REF!
#REF!
Nov-19
1 1 1 1
######
######
######
######
######
1 1 1 1
######
#REF!
#REF!
Dec-19
1 1 1 1 1 1 1 1 1 1 1 1 1 1
Dec-19 Jan-20 Feb-20 Mar-20 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
SNL
SL
DNL
DL
18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
CALENDARIO VALORIZADO DE OBRA AN
Proyecto
Lugar
Elab. Por
Fecha
Costo Directo
PA
6000.00%
5000.00%
4000.00%
PA
3000.00%
2000.00%
1000.00%
0.00%
Inicio Años 01 Años 02 Años 03 Años 04 Años 05
3000.00%
2000.00%
1000.00%
0.00%
Inicio Años 01 Años 02 Años 03 Años 04 Años 05
Sistemas RW7pro
CAURCO
68.43
68.43
27.37
12.06
8.4
18.61
34.9
3.81
34.9
29.71
49.35
18.61
10.44
1.77
11.78
34.9
29.71
38.5
3.71
139.19
2.34
195.54
26.57
0.97
245.43
15.35
60.78
7
8
130.39
19.32
12.9
60.2
66.67
3.54
34.9
116
11.9
23.8
7.28
11.38
9
3
3
11.38
130.39
70.21
19.32
12.9
7.28
11.38
4.87
5
4
1
1
5
1
6.84
6.84
2.05
1.91
3.19
4.76
4.76
3.82
3.19
1.6
0.38
5.12
2.56
2.2
3.2
0.35
41.74
4.7
0.14
27.85
1.63
10.38
2
4
31.21
1.81
5.4
2.56
10
1.4
0.24
3
1
1
31.21
2.8
0.48
1
1
0.19
13.59
1.32
1
1
1
1
4
1
1
2
1
1
1.29
1.29
2.18
4.02
1.15
2.83
0.64
0.64
0.19
0.8
0.25
0.12
1.78
0.72
0.49
0.49
0.32
0.7
0.41
0.49
0.19
2.76
1.34
11
11
8.25
20
1.65
1.1
4.29
1.43
20
11
1
68.43
68.43
13.69
12.06
8.4
18.61
34.9
3.81
34.9
29.71
49.35
18.61
10.44
1.77
11.78
34.9
29.71
38.5
3.71
139.19
2.34
195.54
26.57
0.97
245.43
15.35
60.78
7
8
130.39
19.32
12.9
57
66.67
3.54
34.9
116
11.9
23.8
7.28
11.38
9
3
3
13.6
130.39
70.21
19.32
12.9
7.28
11.38
4.87
5
4
1
1
5
1
6.84
6.84
2.05
1.91
3.19
4.76
4.76
3.82
3.19
1.6
0.38
5.12
2.56
2.2
3.2
0.35
41.74
4.7
0.14
27.85
1.63
10.38
2
4
31.21
1.81
5.4
2.56
10
1.4
0.24
3
1
1
31.21
2.8
0.48
1
1
0.19
13.59
1.32
1
1
1
1
4
1
1
2
1
1
1.29
1.29
2.18
4.02
1.15
2.83
0.64
0.64
0.19
0.8
0.25
0.12
1.78
0.72
0.49
0.49
0.32
0.7
0.41
0.49
0.19
2.76
1.34
11
11
8.25
20
1.65
1.1
4.29
1.43
20
11
1
1
1
14
9.9 8.1
9.9 8.1
2
2
5
1
15.1
38
15.1
13
15.1
15.1
15.1
15.1
15.1
130000
19200
16
51.1
5300
1
9.9 8.1
2
1
0.32
0.32
0.32
1
Sistemas RW7pro
PROGRAMACIÓN DE LA EJECUCION FISICA DE LA OBRA
PROYECTO: INSTALACIÓN DE UNBIODIGESTOR DE 5000 L DE CAPACIDAD EN EL MIRADOR HUANCAURCO
LUGAR: DISTRITO: HUANCAS, PROVINCIA: CHACHAPOYAS, REGIÓN AMAZONAS
Fecha 02 DE MARZO DE 2019 Plazo (días calendarios):
Costo Directo S/ 12649.34
Unidad de programación:
CUADRIL
METRA
PRESU
PUEST
DO
PAR T I DAS UND
LA
O
Err:509
Err:509
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
Err:509
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
Err:509
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
Err:509
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
Err:509
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
Err:509
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
Err:509
Err:509
### 01.01.01 LIMPIEZA DE TERRENO MANUAL m2 4.64 5.19 0.039
### 01.01.02 TRAZO NIVELACIÓN Y REPLANTEO m2 4.64 8.49 0.003
Err:509
### 01.02.01 EXCAVACIÓN MANUAL EN TERRENO NORMAL m3 10.904 367.87 3.115
### 01.02.02 REFINE Y NIVELACIÓN DE FONDOS m 7.63 7.52 0.064
### 01.02.03 RELLENO CON MATERIAL PROPIO m3 3.29 48.32 0.137
### 01.02.04 ELIMINACIÓN DE MATERIAL EXCEDENTE HASTA 30 m m3 8.7561 172.31 1.459
Err:509
### 01.03.01 SUMINISTRO E INSTALACIÓN DE BIODIGESTOR AUTOLIMUnd 1 7985.58 1
Err:509
Err:509
### 01.04.01 LIMPIEZA DE TERRENO MANUAL m2 1.69 1.89 0.014
### 01.04.01 TRAZO NIVELACIÓN Y REPLANTEO m2 1.69 3.09 0.001
Err:509
### 01.04.02 EXCAVACIÓN MANUAL EN TERRENO NORMAL m3 3.38 114.03 0.966
### 01.04.02 REFINE Y NIVELACIÓN DE FONDOS m 5.2 5.12 0.043
### 01.04.02 ELIMINACIÓN DE MATERIAL EXCEDENTE HASTA 30 m m3 3.887 76.49 0.648
Err:509
### 01.04.03 CONCRETO f'c=175kg/cm2 m3 1.0425 476.31 0.052
### 01.04.03 ENCOFRADO Y DESENCOFRADO NORMAL m2 19.56 570.47 1.087
Err:509
### 01.04.04 TARRAJEO DE INTERIORES CON IMPERMEABLIZANTE m2 8.8 385.37 0.587
Err:509
### 01.04.05 VÁLVULA ESFÉRICA DE PVC SAP DIAM.=2" Und 1 56.5 0.125
Err:509
Err:509
### 01.05.01 LIMPIEZA DE TERRENO MANUAL m2 0.98 1.1 0.008
### 01.05.01 TRAZO NIVELACIÓN Y REPLANTEO m2 0.98 1.79 0.001
Err:509
### 01.05.02 EXCAVACIÓN MANUAL EN TERRENO NORMAL m3 0.637 21.49 0.182
### 01.05.02 REFINE Y NIVELACIÓN DE FONDOS m 5.6 5.52 0.047
### 01.05.02 ELIMINACIÓN DE MATERIAL EXCEDENTE HASTA 30 m m3 1.127 22.18 0.188
Err:509
### 01.05.03 CONCRETO EN SOLADOS e=10cm, f'c=100kg/cm2 m2 0.98 25.33 0.005
### 01.05.03 CONCRETO f'c=175kg/cm2 m3 0.4844 221.32 0.024
### 01.05.03 ENCOFRADO Y DESENCOFRADO NORMAL m2 6.48 188.99 0.36
Err:509
### 01.05.04 TARRAJEO DE INTERIORES CON IMPERMEABLIZANTE m2 2.4 105.1 0.16
Err:509
Err:509
### 01.06.01 LIMPIEZA DE TERRENO MANUAL m2 3.1416 3.51 0.026
### 01.06.01 TRAZO NIVELACIÓN Y REPLANTEO m2 3.1416 5.75 0.002
Err:509
### 01.06.02 EXCAVACIÓN MANUAL EN TERRENO NORMAL m3 6.2832 211.98 1.795
### 01.06.02 REFINE Y NIVELACIÓN DE FONDOS m 6.28 6.19 0.052
### 01.06.02 RELLENO CON GRAVA GRUESA DIAM.= 2.5-5cm m3 5.0266 961 0.503
### 01.06.02 RELLENO CON GRAVA FINA DE DIAM. 1-2.5 m3 1 280.54 0.125
### 01.06.02 RELLENO CON MATERIAL PROPIO CERNIDO m3 3.29 160.81 0.411
### 01.06.02 ELIMINACIÓN DE MATERIAL EXCEDENTE HASTA 30 m m3 7.2257 142.19 1.204
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
Err:509
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
Err:509
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
### Err:509 Err:509 Err:509Err:509 Err:509 ###
Err:509
### Err:509 Err:509 Err:509Err:509 Err:509 ###
AVANCE MENSUAL(%)
PROGRAMADO
AVANCE ACUMULADO(%)
CADENA DE
PRECE DENCIA MES
26 May
27 May
27 Aug
26 Sep
26 Nov
27 Dec
27 Aug
25 Feb
27 Mar
24 Feb
27 Mar
26 Jan
26 Jun
26 Jan
26 Jun
26 Apr
26 Oct
25 Apr
SEPARACION
26 Jul
26 Jul
Inicio DIAS L.
3 10CC+1016 Err:509
1 19CC Err:509
1 23 Err:509
1 24 Err:509
3 27 Err:509
2 28CC Err:509
1 29 Err:509
1 31 Err:509
1 32 Err:509
1 34 Err:509
1 35 Err:509
4 34CC Err:509
1 31 Err:509
1 31 Err:509
1 43CC+1 Err:509
1 43 Err:509
1 45CC+1 Err:509
1 48CC+2 Err:509
2 48 Err:509
1 41 Err:509
1 53 Err:509
1 54 Err:509
1 56 Err:509
3 57 Err:509
1 58 Err:509
1 60 Err:509
2 61 Err:509
3 62CC+3 Err:509
1 64 Err:509
1 66 Err:509
8 67 Err:509
2 70 Err:509
2 71CC Err:509
2 72 Err:509
4 67 Err:509
1 75 Err:509
1 76 Err:509
2 67 Err:509
1 80 Err:509
1 81 Err:509
2 76 Err:509
2 84CC Err:509
1 84CC Err:509
1 84CC Err:509
1 85CC Err:509
1 89CC Err:509
2 91 Err:509
2 93 Err:509
1 93CC Err:509
1 95CC Err:509
1 96 Err:509
1 97CC Err:509
1 66CC Err:509
1 99 Err:509
1 101CC Err:509
1 102CC Err:509
1 103CC Err:509
1 104CC Err:509
1 105 Err:509
1 23CC Err:509
1 110 Err:509
1 111 Err:509
1 114 Err:509
1 115 Err:509
1 117 Err:509
1 118 Err:509
1 120CC Err:509
1 117 Err:509
1 125CC Err:509
1 127 Err:509
1 129CC Err:509
1 129CC Err:509
1 132CC Err:509
1 133CC Err:509
1 134 Err:509
1 137CC Err:509
1 138CC Err:509
1 139 Err:509
1 141CC Err:509
1 141CC Err:509
1 143 Err:509
1 145 Err:509
1 145CC Err:509
2 145 Err:509
1 151 Err:509
1 152CC Err:509
1 153CC+1 Err:509
1 148 Err:509
1 157 Err:509
1 159CC Err:509
1 160CC Err:509
1 162CC Err:509
1 163CC Err:509
1 164 Err:509
1 166CC Err:509
1 167CC Err:509
1 168 Err:509
1 170CC Err:509
1 168 Err:509
1 174CC Err:509
1 175CC Err:509
1 175CC Err:509
1 177CC Err:509
1 179CC Err:509
1 180CC Err:509
1 181 Err:509
1 183CC Err:509
1 184CC Err:509
1 186CC Err:509
1 187CC Err:509
1 188CC Err:509
1 189 Err:509
1 193CC Err:509
1 194CC Err:509
1 196CC Err:509
1 197CC Err:509
1 198CC Err:509
1 199 Err:509
1 193CC Err:509
1 204 Err:509
1 205 Err:509
1 207CC Err:509
1 207CC Err:509
1 209 Err:509
1 211CC Err:509
1 212 Err:509
1 214CC Err:509
1 204CC Err:509
1 219CC Err:509
1 220 Err:509
1 222CC Err:509
1 223CC Err:509
1 211CC Err:509
1 226CC Err:509
1 227CC Err:509
1 228 Err:509
1 230 Err:509
1 233 Err:509
1 234 Err:509
1 236 Err:509
1 237CC Err:509
1 238CC Err:509
1 239CC Err:509
1 240CC Err:509
1 237 Err:509
1 243CC Err:509
3 10CC+1016 Err:509
1 247CC Err:509
1 251 Err:509
1 252 Err:509
3 255 Err:509
2 256 Err:509
1 257 Err:509
1 259 Err:509
1 260 Err:509
1 262 Err:509
1 263 Err:509
4 262CC Err:509
1 259 Err:509
1 259 Err:509
1 271CC+1 Err:509
1 271 Err:509
1 273CC+1 Err:509
1 276CC+2 Err:509
2 276 Err:509
1 269 Err:509
1 281 Err:509
1 282 Err:509
1 284 Err:509
3 285 Err:509
1 286 Err:509
1 288 Err:509
2 289 Err:509
3 290CC+3 Err:509
1 292 Err:509
1 294 Err:509
8 295 Err:509
2 298 Err:509
2 299CC Err:509
2 300 Err:509
4 295 Err:509
1 303 Err:509
1 304 Err:509
2 295 Err:509
1 308 Err:509
1 309 Err:509
2 304 Err:509
2 312CC Err:509
1 312CC Err:509
1 312CC Err:509
1 313CC Err:509
1 317CC Err:509
2 319 Err:509
2 321 Err:509
1 321CC Err:509
1 323CC Err:509
1 324 Err:509
1 325CC Err:509
1 294CC Err:509
1 327 Err:509
1 329CC Err:509
1 330CC Err:509
1 331CC Err:509
1 332CC Err:509
1 333 Err:509
1 251CC Err:509
1 338 Err:509
1 339 Err:509
1 342 Err:509
1 343 Err:509
1 345 Err:509
1 346 Err:509
1 348 Err:509
1 345 Err:509
1 353CC Err:509
1 355 Err:509
1 357CC Err:509
1 357CC Err:509
1 360CC Err:509
1 361CC Err:509
1 362 Err:509
1 365CC Err:509
1 366CC Err:509
1 367 Err:509
1 369CC Err:509
1 369CC Err:509
1 371 Err:509
1 373 Err:509
1 373CC Err:509
2 373 Err:509
1 379 Err:509
1 380CC Err:509
1 381CC+1 Err:509
1 376 Err:509
1 385 Err:509
1 387CC Err:509
1 388CC Err:509
1 390CC Err:509
1 391CC Err:509
1 392 Err:509
1 394CC Err:509
1 395CC Err:509
1 396 Err:509
1 396CC Err:509
1 396 Err:509
1 402CC Err:509
1 403CC Err:509
1 404CC Err:509
1 405CC Err:509
1 407CC Err:509
1 408CC Err:509
1 409 Err:509
1 411CC Err:509
1 412CC Err:509
1 414CC Err:509
1 415CC Err:509
1 416CC Err:509
1 417 1
1 421CC 1
1 422CC 1
1 424CC 1
1 425CC 1
1 426CC 1
1 427 1
1 421CC 1
1 432 1
1 433 1
1 435CC 1
1 435CC 1
1 437 1
1 439CC 1
1 440 1
1 442CC 1
1 432CC 1
1 447CC 1
1 448 1
1 450CC 1
1 451CC 1
1 439CC 1
1 454CC 1
1 455CC 1
1 456 1
1 458 1
1 461 1
1 462 1
1 464 1
1 465CC 1
1 466CC 1
1 467CC 1
1 468CC 1
1 465 Err:509
1 471CC Err:509
30 10CC+730 Err:509
45 10CC+871 Err:509
471 10CC+912 Err:509
471 481CC Err:509
5 10CC+556 Err:509
5 483CC Err:509
5 10CC+991 2S15,2S15 Err:509
1 10CC+1060 Err:509
15 10CC+873 Err:509
1 489CC+15 Err:509
3 490CC Err:509
6 491CC Err:509
5 492 Err:509
5 493CC Err:509
5 493 Err:509
5 495 Err:509
5 496 Err:509
10 10CC+757 Err:509
5 10CC+730 Err:509
3 500 Err:509
5 501 Err:509
11 502 Err:509
35 10CC+723 Err:509
471 482CC Err:509
1 10CC+751 Err:509
2 10CC+688 Err:509
2 10CC+991 Err:509
1 517 Err:509
1 518 Err:509
1 519 Err:509
1 520CC Err:509
45 10CC+651 Err:509
Err:509 Err:509
Err:509 Err:509
27 May
27 May
26 May
26 Sep
26 Nov
26 Dec
27 Aug
25 Sep
26 Nov
26 Dec
27 Aug
25 Sep
26 Nov
26 Dec
24 Feb
27 Mar
24 Feb
26 Mar
25 Feb
26 Mar
27 Jan
26 Jun
27 Jan
25 Jun
27 Jan
26 Jun
26 Oct
25 Apr
27 Oct
26 Apr
27 Oct
26 Apr
26 Jul
27 Jul
24 25 27 26 26 26 26 27 25 27 27 25 27 26 26 27 25 26 26 26 26
24 25 27 26 26 26 26 27 25 27 27 25 27 26 26 27 25 26 26 26 26
1
1
1
3
2
1
1
1
1
1
1
1
1
1
2
1
1
1
1
3
1
1
2
1
1
8
2
2
2
4
1
2
1
1
2
2
1
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
3
1
1
1
3
2
1
1
1
1
1
1
1
1
1
2
1
1
1
1
3
1
1
2
2 1
1
1
8
2
2
2
4
1
2
1
1
2
2
1
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
10
24 6
14 24 7
23 26 27 25 27 27 25 27 26 26 27 25 26 26 26 26
23 26 27 25 27 27 25 27 26 26 27 25 26 26 26 26
5
5
2 13
1
12 3
1
3
6
5
5
5
5
5
10
5
3
5
11
4 27 4
23 26 27 25 27 27 25 27 26 26 27 25 26 26 26 26
2
1
1
1
1
24 21
27 26
27 26
26 Sep
27 Oct
25 Nov
27 Dec
26 Jan
24 Feb
27 Mar
26 Apr
26 May
26 Jun
2021
27 Jul
26 Aug
26 Sep
26 Oct
26 Nov
27 Dec
26 Jan
24 Feb
27 Mar
26 Apr
26 May
26 Jun
2022
26 Jul
27 Aug
26 Sep
26 Oct
26 Nov
27 Dec
26 Jan
24 Feb
27 Mar
4 5 4 4 5 4 5 4 4 4 5 4 4 5 4 5 4 4 5 4 4 4 5 4 5 4 4 5 4 4 5 4 4 5
25 Apr
2023
27 26 3
27 26 3
27 26 3
2023
26 Jul
27 Aug
26 Sep
26 Oct
26 Nov
26 Dec
27 Jan
25 Feb
26 Mar
26 Apr
27 May
25 Jun
2024
27 Jul
27 Aug
25 Sep
27 Oct
26 Nov
26 Dec
27 Jan
24 Feb
26 Mar
26 Apr
27 May
25 Jun
2025
27 Jul
26 Aug
26 Sep
27 Oct
25 Nov
27 Dec
27 Jan
4 4 5 4 4 5 4 5 4 4 5 4 4 5 4 4 5 4 4 5 4 4 5 4 4 5 4 5 4 4 5 4 4 4
24 Feb
2
Err:509 Err:509 Err:509 Er
Err:509 Err:509 Err:509 Er
26 Mar
26 Apr
26 May
26 Jun
2026
27 Jul
26 Aug
26 Sep
27 Oct
25 Nov
27 Dec
26 Jan
24 Feb
27 Mar
26 Apr
26 May
26 Jun
2027
27 Jul
26 Aug
26 Sep
26 Oct
26 Nov
27 Dec
26 Jan
25 Feb
27 Mar
25 Apr
27 May
26 Jun
2028
26 Jul
27 Aug
26 Sep
26 Oct
26 Nov
5 4 5 4 4 5 4 4 5 4 5 4 4 4 5 4 4 5 4 5 4 4 5 4 4 5 4 4 5 4 4 5 4 5
26 Dec
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
27 Jan
24 Feb
27 Mar
25 Apr
27 May
26 Jun
2029
26 Jul
27 Aug
25 Sep
27 Oct
26 Nov
26 Dec
27 Jan
24 Feb
26 Mar
26 Apr
27 May
25 Jun
2030
27 Jul
27 Aug
25 Sep
27 Oct
26 Nov
26 Dec
27 Jan
24 Feb
26 Mar
26 Apr
27 May
25 Jun
2031
27 Jul
26 Aug
26 Sep
4 4 4 5 4 4 5 4 5 4 4 5 4 4 5 4 4 5 4 4 5 4 4 5 4 4 5 4 4 5 4 5 4 4
27 Oct
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
1
25 Nov
27 Dec
27 Jan
24 Feb
27 Mar
26 Apr
26 May
26 Jun
2032
27 Jul
26 Aug
26 Sep
26 Oct
26 Nov
27 Dec
26 Jan
24 Feb
27 Mar
26 Apr
26 May
26 Jun
2033
26 Jul
27 Aug
26 Sep
26 Oct
26 Nov
27 Dec
26 Jan
24 Feb
27 Mar
25 Apr
27 May
26 Jun
2034
26 Jul
5 4 4 5 4 4 5 4 4 5 4 5 4 4 5 4 4 4 5 4 5 4 4 5 4 4 5 4 4 5 4 4 5 4
27 Aug
09 Err:509 Err:509 Err:509
09 Err:509 Err:509 Err:509
2034
26 Sep
26 Oct
26 Nov
26 Dec
27 Jan
24 Feb
27 Mar
25 Apr
27 May
26 Jun
2035
26 Jul
27 Aug
25 Sep
27 Oct
26 Nov
26 Dec
27 Jan
25 Feb
26 Mar
26 Apr
27 May
25 Jun
2036
27 Jul
26 Aug
26 Sep
27 Oct
25 Nov
27 Dec
27 Jan
24 Feb
26 Mar
26 Apr
26 May
4 5 4 5 4 4 4 5 4 4 5 4 5 4 4 5 4 4 5 4 4 5 4 5 4 4 5 4 4 4 5 4 5 4
26 Jun
2037
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
4 5 4 4 5 4 5 4 4 4 5 4 4 5 4 5 4 4 5 4 4 4 5 4 5 4 4 5 4 4
2037 2038 2039 1 2 3 4
26 May
26 May
26 Aug
26 Sep
25 Nov
27 Dec
26 Aug
26 Sep
26 Nov
27 Dec
27 Aug
26 Sep
26 Nov
27 Dec
24 Feb
27 Mar
24 Feb
27 Mar
26 Jan
26 Jun
26 Jan
26 Jun
27 Oct
26 Apr
26 Oct
26 Apr
26 Oct
27 Jul
27 Jul
26 Jul
############
0 0 0 0
0 0 0 0
0 0 0 0
############
############
############
0 0 0 0
0 0 0 0
############
0 0 0 0
0 0 0 0
0 0 0 0
############
############
0 0 0 0
0 0 0 0
############
############
############
0 0 0 0
############
############
0 0 0 0
############
############
############
0 0 0 0
############
0 0 0 0
0 0 0 0
############
0 0 0 0
############
0 0 0 0
############
############
0 0 0 0
############
############
############
0 0 0 0
0 0 0 0
############
############
0 0 0 0
############
############
############
0 0 0 0
############
############
############
0 0 0 0
############
0 0 0 0
############
############
0 0 0 0
0 0 0 0
############
############
############
############
0 0 0 0
############
############
0 0 0 0
############
0 0 0 0
############
############
############
0 0 0 0
############
############
0 0 0 0
############
############
############
0 0 0 0
############
0 0 0 0
############
############
############
############
############
############
############
0 0 0 0
############
############
############
############
############
############
0 0 0 0
0 0 0 0
0 0 0 0
############
############
0 0 0 0
0 0 0 0
############
############
0 0 0 0
############
############
0 0 0 0
############
0 0 0 0
############
0 0 0 0
0 0 0 0
############
0 0 0 0
############
0 0 0 0
############
############
0 0 0 0
############
############
############
0 0 0 0
0 0 0 0
############
############
############
0 0 0 0
############
############
############
0 0 0 0
############
0 0 0 0
############
############
0 0 0 0
0 0 0 0
############
############
############
0 0 0 0
############
0 0 0 0
############
0 0 0 0
############
############
0 0 0 0
############
############
############
0 0 0 0
############
############
############
0 0 0 0
############
############
0 0 0 0
0 0 0 0
############
############
############
############
0 0 0 0
############
############
############
0 0 0 0
############
############
0 0 0 0
############
############
############
############
0 0 0 0
0 0 0 0
0 0 0 0
############
############
0 0 0 0
############
############
############
############
0 0 0 0
############
0 0 0 0
0 0 0 0
############
############
0 0 0 0
############
############
############
0 0 0 0
############
############
0 0 0 0
############
0 0 0 0
############
0 0 0 0
0 0 0 0
############
############
0 0 0 0
############
############
############
0 0 0 0
############
############
############
0 0 0 0
############
0 0 0 0
0 0 0 0
############
############
0 0 0 0
############
############
############
############
############
############
0 0 0 0
############
0 0 0 0
############
0 0 0 0
############
0 0 0 0
0 0 0 0
0 0 0 0
############
############
0 0 0 0
0 0 0 0
############
############
############
0 0 0 0
############
############
0 0 0 0
############
############
############
0 0 0 0
############
0 0 0 0
0 0 0 0
############
0 0 0 0
############
0 0 0 0
############
############
0 0 0 0
############
############
############
0 0 0 0
0 0 0 0
############
############
0 0 0 0
############
############
############
0 0 0 0
############
############
############
0 0 0 0
############
0 0 0 0
############
############
0 0 0 0
0 0 0 0
############
############
############
############
0 0 0 0
############
############
0 0 0 0
############
0 0 0 0
############
############
############
0 0 0 0
############
############
0 0 0 0
############
############
############
0 0 0 0
############
0 0 0 0
############
############
############
############
############
############
############
0 0 0 0
############
############
############
############
############
############
0 0 0 0
0 0 0 0
0 0 0 0
############
############
0 0 0 0
0 0 0 0
############
############
0 0 0 0
############
############
0 0 0 0
############
0 0 0 0
############
0 0 0 0
0 0 0 0
############
0 0 0 0
############
0 0 0 0
############
############
0 0 0 0
############
############
############
0 0 0 0
0 0 0 0
############
############
############
0 0 0 0
############
############
############
0 0 0 0
############
0 0 0 0
############
############
0 0 0 0
0 0 0 0
############
############
############
0 0 0 0
############
0 0 0 0
############
0 0 0 0
############
############
0 0 0 0
############
############
############
0 0 0 0
############
############
############
0 0 0 0
############
############
0 0 0 0
0 0 0 0
############
############
############
############
0 0 0 0
############
############
############
0 0 0 0
############
############
0 0 0 0
############
############
############
############
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 1
0 0 0 1
0 0 0 0
0 0 0 1
0 0 0 1
0 0 0 1
0 0 0 1
0 0 0 0
0 0 0 1
0 0 0 0
0 0 0 0
0 0 0 1
0 0 0 1
0 0 0 0
0 0 0 1
0 0 0 1
0 0 0 1
0 0 0 0
0 0 0 1
0 0 0 1
0 0 0 0
0 0 0 1
0 0 0 0
0 0 0 1
0 0 0 0
0 0 0 0
0 0 0 1
0 0 0 1
0 0 0 0
0 0 0 1
0 0 0 1
0 0 0 1
0 0 0 0
0 0 0 1
0 0 0 1
0 0 0 1
0 0 0 0
0 0 0 1
0 0 0 0
0 0 0 0
0 0 0 1
0 0 0 1
0 0 0 0
0 0 0 1
0 0 0 1
0 0 0 1
0 0 0 1
0 0 0 1
0 0 0 1
0 0 0 0
############
0 0 0 0
############
0 0 0 0
############
############
0 0 0 0
0 0 0 0
############
############
############
############
############
############
############
############
0 0 0 0
0 0 0 0
############
############
############
############
############
############
############
############
############
############
0 0 0 0
############
############
############
############
0 0 0 0
0 0 0 0
0 0 0 0
############
############
0 0 0 0
0 0 0 0
############
0 0 0 0
0 0 0 0
0 0 0 0
############
0 0 0 0
############
############
############
############
############
0 0 0 0
############
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
############################################################
############################################################
############################################################
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
############################################################
############################################################
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
############################################################
############################################################
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
############################################################
############################################################
############################################################
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
############################################################
############################################################
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
############################################################
############################################################
############################################################
############################################################
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
############################################################
############################################################
############################################################
############################################################
############################################################
############################################################
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
############################################################
############################################################
############################################################
############################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
############################################################
Sistemas RW7pro
DETERMINACION DE LA FORMULA POLINOMICA
Proyecto : INSTALACIÓN DE UNBIODIGESTOR DE 5000 L DE CAPACIDAD EN EL MIRADOR
HUANCAURCO
Lugar : DISTRITO: HUANCAS, PROVINCIA: CHACHAPOYAS, REGIÓN AMAZONAS
Elab. Por: ING. JHIMMY S.VILCHEZ GUEVARA
Fecha : 02 DE MARZO DE 2019
AGRUPACION PRELIMINAR
CONFORMACION DE MONOMIOS
COEF. SIMB. % COEF.
N°M N° IU IU ELEMENTO INICIAL AGRUP. INCID. ACUM.
1 1 47 Mano de obra (incluido leyes sociales) 0.323 J 100.00 0.323
2 2 43 Madera nacional para encofrado y carpintería 0.202 M 100.00 0.202
3 3 02 Acero de construcción liso 0.104 AH 75.91 0.137
4 38 Hormigón 0.033 AH 24.09
4 5 49 Maquinaria y equipo importado 0.044 MAA 66.67 0.066
6 05 Agregado grueso 0.011 MAA 16.67
7 04 Agregado fino 0.011 MAA 16.67
5 8 21 Cemento portlan tipo I 0.043 CDB 62.32 0.069
9 30 Dólar mas inflación mercado USA 0.014 CDB 20.29
10 17 Bloque y ladrillo 0.012 CDB 17.39
6 11 37 Herramienta manual 0.035 HTA 37.23 0.094
12 72 Tubería de PVC para agua 0.032 HTA 34.04
13 07 Alambre y cable tipo TW y THW 0.027 HTA 28.72
7 14 39 Indice General de Precios al Consumidor 0.109 G 100.00 0.109
TOTAL 1.000 1.000
FORMULA POLINOMICA:
Orden.
Monom
.
1
2
3
3
4
4
4
5
5
5
6
6
6
7
HTAr Gr
0.094 ---------- + 0.109 ----------
HTAo Go
CALCULO DEL FLETE
Proyecto : INSTALACIÓN DE UNBIODIGESTOR DE 5000 L DE CAPACIDAD EN EL MIRADOR
HUANCAURCO
Lugar : DISTRITO: HUANCAS, PROVINCIA: CHACHAPOYAS, REGIÓN AMAZONAS
Elab.Por : ING. JHIMMY S.VILCHEZ GUEVARA
Fecha : 02 DE MARZO DE 2019
Descripción Monto(S/.)
Flete Rural 8 414.69
Flete Terrestre 14 851.21
TOTAL 23 265.90
Sistemas RW7pro
DAD EN EL MIRADOR
PESO U.(kg)
8.95
0.12
1.00
30.00
42.50
1.00
1.00
1.00
1.00
1.00
12.00
4.46
3.80
4.46
20.00
8.40
0.51
1.51
0.51
0.54
0.10
12.00
TOTAL
PESO U.(kg)
1800.00
1800.00
1800.00
1600.00
1800.00
1800.00
1600.00
1000.00
1650.00
1650.00
POYAS-LEVANTO Y MAINO
Parcial
14 851.21
14 851.21
TRANCA-OBRA (TIOPUCRO)
RANCA - OBRA(TIOPUCRO)
Parcial
919.78
898.76
6 596.15
8 414.69
PRESUPUESTO ANALITICO
Proyecto INSTALACIÓN DE UNBIODIGESTOR DE 5000 L DE CAPACIDAD EN EL MIRADOR
HUANCAURCO
METRADO
CUADRILLA
PUESTO
PRESU
PAR T I DAS UND
AVANCE DIARIO(%)
PROGRAMADO
AVANCE ACUMULADO(%)
CA DE LA OBRA
ADOR HUANCAURCO
Inicio: 3/4/2019
o (días calendarios): 68 59 días laborables 2
Fin: 5/10/2019 ### ### ###
ad de programación: DIAS SL
DNL D D
04/03/19
05/03/19
06/03/19
07/03/19
08/03/19
09/03/19
10/03/19
12/03/19
13/03/19
14/03/19
15/03/19
16/03/19
17/03/19
18/03/19
19/03/19
20/03/19
21/03/19
22/03/19
23/03/19
11/03/19
DIAS
CADENA DE
PRECE DENCIA
SEPARACION FECHA
D
24/03/19
25/03/19
26/03/19
27/03/19
28/03/19
29/03/19
30/03/19
###
D
31/03/19
01/04/19
02/04/19
03/04/19
04/04/19
05/04/19
06/04/19
###
07/04/19
08/04/19
09/04/19
10/04/19
11/04/19
12/04/19
13/04/19
###
14/04/19
15/04/19
16/04/19
17/04/19
18/04/19
19/04/19
20/04/19
###
21/04/19
22/04/19
23/04/19
24/04/19
25/04/19
26/04/19
27/04/19
###
D
28/04/19
29/04/19
30/04/19
01/05/19
02/05/19
03/05/19
04/05/19
###
05/05/19
06/05/19
07/05/19
08/05/19
09/05/19
10/05/19
11/05/19
###
12/05/19
13/05/19
14/05/19
15/05/19
16/05/19
17/05/19
18/05/19
D
19/05/19
20/05/19
21/05/19
22/05/19
23/05/19
24/05/19
25/05/19
D
26/05/19
27/05/19
28/05/19
29/05/19
30/05/19
31/05/19
01/06/19
D
02/06/19
03/06/19
04/06/19
05/06/19
06/06/19
07/06/19
08/06/19
D
09/06/19
10/06/19
11/06/19
12/06/19
13/06/19
14/06/19
15/06/19
D
16/06/19
17/06/19
18/06/19
19/06/19
20/06/19
21/06/19
22/06/19
D
23/06/19
24/06/19
25/06/19
26/06/19
27/06/19
28/06/19
29/06/19
D
30/06/19
01/07/19
02/07/19
03/07/19
04/07/19
05/07/19
06/07/19
D
07/07/19
08/07/19
09/07/19
10/07/19
11/07/19
12/07/19
13/07/19
D
14/07/19
15/07/19
16/07/19
17/07/19
18/07/19
19/07/19
20/07/19
D
21/07/19
22/07/19
23/07/19
24/07/19
25/07/19
26/07/19
27/07/19
D
28/07/19
29/07/19
30/07/19
31/07/19
01/08/19
02/08/19
03/08/19
D
04/08/19
05/08/19
06/08/19
07/08/19
08/08/19
09/08/19
10/08/19
D
11/08/19
12/08/19
13/08/19
14/08/19
15/08/19
16/08/19
17/08/19
D
18/08/19
19/08/19
20/08/19
21/08/19
22/08/19
23/08/19
24/08/19
D
25/08/19
26/08/19
27/08/19
28/08/19
29/08/19
30/08/19
31/08/19
D
01/09/19
02/09/19
03/09/19
04/09/19
05/09/19
06/09/19
07/09/19
D
08/09/19
09/09/19
10/09/19
11/09/19
12/09/19
13/09/19
14/09/19
D
15/09/19
16/09/19
17/09/19
18/09/19
19/09/19
20/09/19
21/09/19
D
22/09/19
23/09/19
24/09/19
25/09/19
26/09/19
27/09/19
28/09/19
D
29/09/19
30/09/19
01/10/19
02/10/19
03/10/19
04/10/19
05/10/19
D
06/10/19
07/10/19
08/10/19
09/10/19
10/10/19
11/10/19
12/10/19
D
13/10/19
14/10/19
15/10/19
16/10/19
17/10/19
18/10/19
19/10/19
D
20/10/19
21/10/19
22/10/19
23/10/19
24/10/19
25/10/19
26/10/19
D
27/10/19
28/10/19
29/10/19
30/10/19
31/10/19
01/11/19
02/11/19
D
03/11/19
04/11/19
05/11/19
06/11/19
07/11/19
08/11/19
09/11/19
D
10/11/19
11/11/19
12/11/19
13/11/19
14/11/19
15/11/19
16/11/19
D
17/11/19
18/11/19
19/11/19
20/11/19
21/11/19
22/11/19
23/11/19
D
24/11/19
25/11/19
26/11/19
27/11/19
28/11/19
29/11/19
30/11/19
D
01/12/19
02/12/19
03/12/19
04/12/19
05/12/19
06/12/19
07/12/19
D
08/12/19
09/12/19
10/12/19
11/12/19
12/12/19
13/12/19
14/12/19
D
15/12/19
16/12/19
17/12/19
18/12/19
19/12/19
20/12/19
21/12/19
D
22/12/19
23/12/19
24/12/19
25/12/19
26/12/19
27/12/19
28/12/19 D
29/12/19
30/12/19
31/12/19
01/01/20
02/01/20
03/01/20
04/01/20
D
05/01/20
06/01/20
07/01/20
08/01/20
09/01/20
10/01/20
11/01/20
D
12/01/20
13/01/20
14/01/20
15/01/20
16/01/20
17/01/20
18/01/20
D
19/01/20
20/01/20
21/01/20
22/01/20
23/01/20
24/01/20
25/01/20
D
26/01/20
27/01/20
28/01/20
29/01/20
30/01/20
31/01/20
01/02/20 D
02/02/20
03/02/20
04/02/20
05/02/20
06/02/20
07/02/20
08/02/20
D
09/02/20
10/02/20
11/02/20
12/02/20
13/02/20
14/02/20
15/02/20
D
16/02/20
17/02/20
18/02/20
19/02/20
20/02/20
21/02/20
22/02/20
D
23/02/20
24/02/20
25/02/20
26/02/20
27/02/20
28/02/20
29/02/20
D
01/03/20
02/03/20
03/03/20
SL
DL
SNL
DNL
AVANCE FISICO DE OBRA VALO
MES :
PRESUPUESTO BASE
P A R T I D A S UND.
METR. C.U.
O DE OBRA VALORIZADO Nº …….
R HUANCAURCO
FECHA DE INICIO DE PLAZO
PLAZO DE EJECUCION
FECHA DE TERMINO PROGR.
PARCIAL
METR. VALORIZADO METR. VALORIZADO METR. VALORIZADO %
DURACION EN DIAS
SALDOS
AVANCES
PROGR
SALDO
METR. VALORIZADO AMADO ANTE ACTU ACUMU %
RIOR AL LADO
CALCULO DEL COEFICIENTE "K" PARA EL REAJUSTE
Proyecto :
INSTALACIÓN DE UNBIODIGESTOR DE 5000 L DE CAPACIDAD EN EL MIRADOR HUANCAURCO
:
Lugar DISTRITO: HUANCAS, PROVINCIA: CHACHAPOYAS, REGIÓN AMAZONAS
INDICES UNIFICADOS
SIMB. % COEF. SIN PONDERAR PONDERADOS
N° IU ELEMENTO AGRUP. INCID. ACUM. Oct-13 Jan-14 Feb-14 Oct-13
1 47 Mano de obra (incluido leyes sociales) J 100.000 0.381 497.55 498.10 498.10 497.55
2 72 Tubería de PVC para agua T 100.000 0.090 356.58 370.19 376.37 356.58
3 4 Agregado fino AM 65.620 0.128 754.16 754.16 764.34 691.05
4 43 Madera nacional para encofrado y carpintería AM 34.380 570.60 572.02 577.63
5 21 Cemento Portlan tipo I CAB 33.630 0.113 339.42 339.42 339.42 479.53
6 3 Acero de construcción corrugado CAB 41.070 468.45 474.67 473.60
7 17 Bloque y ladrillo CAB 25.300 683.76 682.87 684.31
8 32 Flete terrestre F 100.000 0.033 455.86 455.19 455.19 455.86
9 39 Indice General de Precios al Consumidor G 100.000 0.255 392.43 393.46 395.83 392.43
TOTAL 1.000 K=
ADOR HUANCAURCO
S UNIFICADOS
PONDERADOS
Jan-14 Feb-14
498.10 498.10
370.19 376.37
691.54 700.15
481.86 481.78
455.19 455.19
393.46 395.83
1.005 1.010
CUADRO RESUMEN DE VALORIZACIONES Y REAJUSTES
POR CANCELAR
D EN EL MIRADOR HUANCAURCO
ARANTIAS
MONTO
FACTURADO
(S/.)
MF
166107.30
153572.69
0.00
0.00
319679.99
38138.65
CUADRO RESUMEN DE LIQUIDACION FINAL DE OBRA
OBRA
INSTALACIÓN DE UNBIODIGESTOR DE 5000 L DE CAPACIDAD EN EL MIRADOR HUANCAURCO
LUGAR DISTRITO: HUANCAS, PROVINCIA: CHACHAPOYAS, REGIÓN AMAZONAS
8. MONTO NETO FACTURABLE SIN I.G.V. (5+6+7) 303 376.66 270 915.25
SALDOS POR
PAGAR
(S/.)
30 101.70
2 359.71
32 461.41
0.00
32 461.41
0.00
0.00
32 461.41
30 101.70
0.00
32 461.41
5 843.07
38 304.48