Sei sulla pagina 1di 17

Repair method Approximate cost Preference rank

- #REF! #REF! #REF!


#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
Drilled shaft pier #REF! #REF!
Shear Keys backfilled with CLSM/Cemen #REF! #REF!
Constructability Issues
Approximate cost
$12.00

$10.00

$8.00

$6.00

$4.00

$2.00

$0.00
F! F! F! F! er en
t
#R
E
#R
E
#R
E
#R
E pi
af em
sh /C
d S M
i lle CL
Dr i th
w
d
lle
c kf
ba
s
ey
rK
ea
Sh
er en
t
pi
af em
sh /C
M
ed CL
S
i th
w
d
lle
c kf
ba
s
ey
rK
ea
Micropiles
Drilled shaft pier

Length of the pier 35.0 ft


Diameter 3.0 ft
Length (longitudinal) #REF! ft
Pier row spacing (span) 15 ft
Width of the pavement 35 ft
No. of rows #REF!
Spacing b/w piers in a row 8 ft
Volume of concrete/ pier 247.4 cu.ft
No. of piers/ row 4
No. of piers- total #REF!
Slab thickness 1.5 ft
Conc. Volume (pier) #REF! cu. Ft
Concrete volume (slab) #REF! cu. Ft

Consider Micropiles if we have this cost data


Drilled shaft pier
Work Description
Drilling and concreting
Hauling and stockpile
Reinforced Concrete Slab, concrete
Road demolition

Micropiles

surface finishing
740

720

700
0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 160.0

have this cost data

Unit price Units Total Quantities Units


371.0 $/ FT #REF! FT
9 $/ CYD #REF! CYD
120.00 $/ CYD #REF! CYD
4 $/SF #REF! SF

81.90 $/FT
120.0 140.0 160.0

#REF!

Amount References
#REF! http://www.eng.usf.edu/~gmullins/courses/Insitu/Drilled%20Shafs/Chapter%20Drilled%20Sh
#REF! #REF!
#REF! #REF!
#REF! https://www.familyhandyman.com/masonry/pouring-concrete/how-to-estimate-a-concrete-o
#REF! Road demolition: https://home.costhelper.com/asphalt-removal.html
https://www.codot.gov/business/eema/documents/2010/2010FINALCONST.txt

concrete https://www.concretenetwork.com/concrete-prices.html
/Chapter%20Drilled%20Shafs%20071703.pdf

w-to-estimate-a-concrete-order/

NALCONST.txt
G El 738
B El 705
0 100
Chart Title

0 100 200 300 400 500 600 700 8


600 700 800 900
Shear Keys backfilled with CLSM/Cement

Cross-sectional area 880 ft2


Width of the shear key 4.0 ft
C/C shear key spacing 8 ft
Length (longitudinal) #REF! ft
No. of shear keys #REF!
Volume of shear key fill 3520 ft3 10 % waste
143.4 cyd
Volume of soil excavated from shear key 4048 ft3 15 % increase
Excavation 149.9 cyd
Excavation for work pad
Excavation for work pad-area 300 ft2
Space required for the excavator 8 ft
volume per shear key 2400 cft
88.9 cyd

Backfill on top
Thickness 2 ft
Area 80 ft2
total volume #REF! cft

Restoration of subgrade #REF! cyd


740

720

% increase

700
0 20 40

Work Description Unit price Units Total Quantities Units Amount


Excavation 18.21 $/ CYD #REF! CYD #REF!
work pad 18.21 $/ CYD #REF! CYD #REF!
Volume of concrete 120.00 $/ CYD #REF! CYD #REF!
Backfill on top 18.21 $/ CYD #REF! CYD #REF!
Subgrade restoration 19.21 $/ CYD #REF! CYD #REF!

#REF!
0 20 40 60 80 100 120 140 160

#REF!

#REF!

h 14
a 20
b 42.5

```
h 20
a 20
b 42.5
140 160

20'

437.5
14'
42.5'' Area 437.5

Total=
Area 625

20'

20'
1062.5 ft2
3520 ft3

Potrebbero piacerti anche