RISK ASSESSMENT FORM

Approved by:
Singbuild Construction Pte Ltd
Department:
Process: Construction Works to Glass Works RA Leader: Jeff Jia
Repair works at roof glass skylight RA Member 1:
Process/ Activity Location: at 511 Canberra Road Sembawang Signature:
Mart Khan Arif
RA Member 2: Reference Number:
Original Assessment Date: [hold] Name: Jeff Jia
Hossain Tokon SINGBUILD/RA/Repair sealant
works /01
RA Member 3:
Last Review Date: N/A Designation: Project Manager
Miah MD Sumon

Next Review Date: 18-10-2019 Date: 12-04-2019


Hazard Identification Risk Evaluation Risk Control
Ref Work Activity Hazard Possible Existing Risk Controls S L RPN Additional S L RPN Implementation Due Remarks
Injury / ill Controls Person Date
health

I Transportation and Logistics

Transporting and
 Ensure transported Supervision of
loading / unloading
Traffic Hazard loads are secured;
of materials, loading and
Falling object  Ensure transported

Immediate
equipment, plant and
1 from moving loads are within load 4 1 4 unloading; 3 1 3 Project Manager
and machinery at Injury to
vehicle limits;
the like by lorry, Pre-start briefing to
persons  Keep well within
lorry crane or low
speed limits workers
bed

(Page 1 of 7)

Likelihood/ Rare Remote Occasional Frequent Almost Certain Risk level


Severity (1) (2) (3) (4) (5)
Catastrophic (5) 5 10 15 20 25 Low Risk
Major (4) 4 8 12 16 20
Moderate (3) 3 6 9 12 15 Medium Risk
Minor (2) 2 4 6 8 10
Negligible (1) 1 2 3 4 5 High Risk
Hazard Identification Risk Evaluation Risk Control
Ref Work Activity Hazard Possible Existing Risk Controls S L RPN Additional Controls S L RPN Implementation Due Remarks
Injury/ ill Person Date
health

 Maintain slow speeds


Transporting and
when turning or
loading / unloading Damage to manoeuvring; Project Manager
of materials, Insufficient
 Deploy traffic marshals

Immediate
equipment, plant turning radius property / supervision;
2 / spotters; 4 2 8 3 1 3
and machinery at / collision Project Manager
injury to Pre-start briefing to
 Use further and safer
the like by lorry, with objects
persons detours and/or workers
lorry crane or low
locations if available
bed

Transporting and Adopt proper lifting


loading / unloading  Deploy traffic marshals
Crush, back, procedures;
of materials, and banksmen;
Loading and

Immediate
equipment, plant cut and bruise Usage of proper PPE Ensure adequate

3 Unloading of 3 2 6 2 1 2 Safety Officer
and machinery at like steel-toe boots, supervision;
Material injuries
the like by lorry, heavy gloves, safety
Pre-start briefing to
lorry crane or low glasses etc.
bed workers

(Page 2 of 7)

Likelihood/ Rare Remote Occasional Frequent Almost Certain Risk level


Severity (1) (2) (3) (4) (5)
Catastrophic (5) 5 10 15 20 25 Low Risk
Major (4) 4 8 12 16 20
Moderate (3) 3 6 9 12 15 Medium Risk
Minor (2) 2 4 6 8 10
Negligible (1) 1 2 3 4 5 High Risk
Hazard Identification Risk Evaluation Risk Control
Ref Work Activity Hazard Possible Existing Risk Controls S L RPN Additional Controls S L RPN Implementation Due Remarks
Injury/ ill Person Date
health

Transporting and Adopt proper lifting


loading / unloading Collapse of  Use only trained
procedures;
of materials, equipment operator(s);

Immediate
equipment, plant Lorry crane causing injury Deploy banksmen; Ensure adequate

4 3 2 6 2 1 2 Safety Officer
and machinery at overloading or fatality to  All workers to be supervision;
the like by lorry, person(s) briefed on safe
Pre-start briefing to
lorry crane or low nearby working load
workers
bed
Transporting and Adopt proper lifting
loading / unloading  Use only trained
procedures;
of materials, Serious injury operator(s);
Falling objects

Immediate
equipment, plant or fatality to Deploy banksmen; Ensure adequate

5 while hoisting 4 3 12 3 2 6 Safety officer
and machinery at person(s)  All workers to be
materials supervision;
the like by lorry, nearby briefed on safe
Pre-start briefing to
lorry crane or low working load
workers
bed
Transporting and Adopt proper lifting
loading / unloading Serious injury  Use only trained
procedures;
of materials, operator(s);

Immediate
equipment, plant Lorry crane or fatality to Deploy banksmen; Ensure adequate

6 5 2 10 4 1 4 Safety officer
and machinery at overturning person(s)  All workers to be supervision;
the like by lorry, briefed on safe
nearby Pre-start briefing to
lorry crane or low working load
bed workers

(Page 3 of 7)

Likelihood/ Rare Remote Occasional Frequent Almost Certain Risk level


Severity (1) (2) (3) (4) (5)
Catastrophic (5) 5 10 15 20 25 Low Risk
Major (4) 4 8 12 16 20
Moderate (3) 3 6 9 12 15 Medium Risk
Minor (2) 2 4 6 8 10
Negligible (1) 1 2 3 4 5 High Risk
Hazard Identification Risk Evaluation Risk Control
Ref Work Activity Hazard Possible Existing Risk Controls S L RPN Additional Controls S L RPN Implementation Due Remarks
Injury/ ill Person Date
health

II Glazing Working

(Page 4 of 7)

Likelihood/ Rare Remote Occasional Frequent Almost Certain Risk level


Severity (1) (2) (3) (4) (5)
Catastrophic (5) 5 10 15 20 25 Low Risk
Major (4) 4 8 12 16 20
Moderate (3) 3 6 9 12 15 Medium Risk
Minor (2) 2 4 6 8 10
Negligible (1) 1 2 3 4 5 High Risk
Hazard Identification Risk Evaluation Risk Control
Ref Work Activity Hazard Possible Existing Risk Controls S L RPN Additional Controls S L RPN Implementation Due Remarks
Injury/ ill Person Date
health

 Usage of PPE eg. hard hats,

boots, gloves etc;

 Wear prescription lenses, if


Pre-start induction
required, and seatbelt; verify

that all equipment on vehicle with method of


Motor vehicle
Serious injury is secured properly;
accident; work briefing to all
person(s)  Inspect ladder before used.
debris; Ladder
nearby; Use ladder of proper height. workers and
collapsing;
Transport; Lacerations, Make sure ladder is properly
slipping/ visitors; All workers
unloading; Using fractures & assembled and locked and

Immediate
falling from
1 stepladder; Using impact standing on level ground. Do 4 3 12 to be trained in 3 2 6 Safety officer;
ladder;
scaffolding; injuries due to not exceed weight limit for
Scaffolding emergency rescue;
coming into ladder. Don’t stand on top of
collapsing;
contract with ladder or on top rung. Have All workers to be
slipping/
panel and co-worker hold ladder.
falling from trained in use of
broken glass  Verify that scaffolding is
scaffolding;
properly assembled and emergency rescue
wheels locked. Used safety
equipment;
rails properly.

(Page 5 of 7)

Likelihood/ Rare Remote Occasional Frequent Almost Certain Risk level


Severity (1) (2) (3) (4) (5)
Catastrophic (5) 5 10 15 20 25 Low Risk
Major (4) 4 8 12 16 20
Moderate (3) 3 6 9 12 15 Medium Risk
Minor (2) 2 4 6 8 10
Negligible (1) 1 2 3 4 5 High Risk
Hazard Identification Risk Evaluation Risk Control
Ref Work Activity Hazard Possible Existing Risk Controls S L RPN Additional Controls S L RPN Implementation Due Remarks
Injury/ ill Person Date
health

 Glazing are marked with

pictograms or similar to

make them more visible;

 Covered glass edge or sharp

corner to prevent glass Pre-start induction


broken
with method of
 A safe working area is
Pedestrians Serious injury
cordoned off around the work briefing to all
knocking over person(s)
work at height equipment
ladder; nearby; workers and
and signage is used as
dropping Lacerations,
Working in area of appropriate; visitors; All workers
tools or glass fractures &

Immediate
high pedestrian  Secure area with tape and
2 on impact 4 3 12 to be trained in 3 2 6 Safety officer;
traffic; cones before beginning
pedestrians; injuries due to
Disposing of glass; work. Have public safety emergency rescue;
Cut/ injuries coming into
present to keep pedestrians
to others by contract with All workers to be
away from work;
contacting panel and
 Dispose of glass in dumpster trained in use of
broken glass broken glass
so that no one is cut
emergency rescue
accidentally;

 No person allowed to work equipment;


alone;

 Resuscitation notice to be

displayed adjacent to work

area

(Page 6 of 7)

Likelihood/ Rare Remote Occasional Frequent Almost Certain Risk level


Severity (1) (2) (3) (4) (5)
Catastrophic (5) 5 10 15 20 25 Low Risk
Major (4) 4 8 12 16 20
Moderate (3) 3 6 9 12 15 Medium Risk
Minor (2) 2 4 6 8 10
Negligible (1) 1 2 3 4 5 High Risk
Hazard Identification Risk Evaluation Risk Control
Ref Work Activity Hazard Possible Existing Risk Controls S L RPN Additional Controls S L RPN Implementation Due Remarks
Injury/ ill Person Date
health

IV Working at Heights

Usage of PPE and


 Usage of approved A-

Immediate
Working at Heights Falling from Minor bodily
1 Frame ladder & steel 2 1 2 body harness and 1 1 1 Safety Officer
(< 2m) height injury
scaffolding
lifelines

Serious bodily

Immediate
Working at Heights Falling from Usage of approved Trainer operator to

2 injury / 3 1 3 2 1 2 Safety Officer
(>2m) height aluminium scaffolding install scaffolding
fatality

(Page 7 of 7)

Likelihood/ Rare Remote Occasional Frequent Almost Certain Risk level


Severity (1) (2) (3) (4) (5)
Catastrophic (5) 5 10 15 20 25 Low Risk
Major (4) 4 8 12 16 20
Moderate (3) 3 6 9 12 15 Medium Risk
Minor (2) 2 4 6 8 10
Negligible (1) 1 2 3 4 5 High Risk