Sei sulla pagina 1di 13

Inlet Control Valves from MTTS

Control Conditions Description

(CCs)

Inlet Pressure [barg]


Outlet Pressure [barg]
Flow Rate [m3 /day]
Flow Rate [m3 /h]
level of water Taif overflow structure / Terminal tanks
Control Valve Center line Level (masl)
Delta Z (m)
Static Head pressure (RoX9.81XDelta Z) (Barg)
Piping & Fitting Pressure drop from Taif Terminal up to
CV (upstream the CV) (Barg) - 1.5 KM - 56"
P1 ( CV upstream Pressure ) - (Bar g)
New Strategic Tanks Inlet Pipe Level (masl)
Control Valve Center line Level (masl)
Delta Z (m)
Delta P due to head difference (Barg)
Piping & Fitting Pressure drop down stream the CV
(Barg) - 1000 m - 60"
Pressure drop Across the C.V
P2 ( CV down-stream Pressure ) - (Bar g)
Pressure drop Across the C.V

Cv value at fully open position (IBG Assumption)


Max pressure drop Across the CV
Sqrt (h/10)
Flow rate
Cv (Control Valve)

Cv value at fully open position (IBG Assumption)


66000

m3/hr
gpm

PSI
Bar
Head (mlc)

Tender Requirement of max. 1 m Head Loss in CV


Max pressure drop Across the CV
Sqrt (h/10)
Flow rate
Cv (Control Valve) [gpm]/[psi]0.5

mlc
bar
psi
Tender Requirement of max. 1 m
Head Loss in CV
Design Flow: Max. = 351'000.00 Design Flow: Max. = 351'000.00
m3/day m3/day
New Strategic Tanks Water Level: New Strategic Tanks Water Level:
Required Min. = 1746.9 masl Required Min. = 1727.6 masl
MTTS Overflow Structure Level: Taif Terminal Level:
= 1754 masl = 1746masl
Control Valve Centerline Level: 1726 Control Valve Centerline Level:
masl 1726 masl
CC 1 CC 2

2.5 1.8
2.4 0.5
351'000 351'000
7312.5 7312.5
1754 1746
1726 1726
28 20
2.7468 1.962
0.13 0.13
2.62 1.83
1746.9 1727.6
1726 1726
20.9 1.6
2.05029 0.15696
0.24 0.24
0.0981 9.5062499448
2.39 9.90
Tender Requirement of max. 1 m
5 m assumed
Head Loss in CV

Top inlet Bottom inlet

9.5062499448 9.5062499448
0.9749999972 0.9749999972
64350 64350
66,000 66,000

[gpm]/[psi]0.5 [gpm]/[psi]0.5

14625 14625
64350 64350

9.5062499448 9.5062499448
0.6551516158 0.6551516158
6.5515161577 6.5515161577

1.451 1.451
0.3809199391 0.3809199391
64350 64350
168,933 168,933

1 1
0.1 0.1
1.451 1.451
Design Flow: Min. = 35'100.00 Design Flow: Min. = 35'100.00
m3/day m3/day
New Strategic Tanks Water Level: New Strategic Tanks Water Level:
Required Min. = 1746.9 masl Required Min. = 1227.6 masl
MTTS Overflow Structure Level: Taif Terminal Level:
= 1754 masl = 1746masl
Control Valve Centerline Level: 1726 Control Valve Centerline Level: 1726
masl masl

CC 3 CC 4

2.7 2
2.2 1.9
35'100 35'100
731 731
1754 1746
1726 1726
28 20
2.7468 1.962
0.00153 0.00153
2.75 1.96
1746.9 1727.6
1726 1726
20.9 1.6
2.05029 0.15696
0.00268 0.00268
0.4905 0.3
2.54 0.46
5 m assumed 5 m assumed

Top inlet Bottom inlet

0.0049102531 0.0049102531
0.0221590908 0.0221590908
1462.5 1462.5
66,000 66,000

[gpm]/[psi]0.5 [gpm]/[psi]0.5

1462 1462
6432.8 6432.8

0.0049102531 0.0049102531
0.0003384048 0.0003384048
0.0033840476 0.0033840476

0.0007494847 0.0007494847
0.0086572783 0.0086572783
1462.5 1462.5
168,933 168,933
Inlet Control Valves from MTTS

Control Conditions Description

(CCs)

Inlet Pressure [barg]


Outlet Pressure [barg]
Flow Rate [m3 /day]
Flow Rate [m3 /h] - 2 x 56"
level of water Taif overflow structure / Terminal tanks
Control Valve Center line Level (masl)
Delta Z (m)
Static Head pressure (RoX9.81XDelta Z) (Barg)
Piping & Fitting Pressure drop from Taif Terminal up to
CV (upstream the CV) (Barg) - 1.5 KM - 56"
P1 ( CV upstream Pressure ) - (Bar g)
New Strategic Tanks Inlet Pipe Level (masl)
Control Valve Center line Level (masl)
Delta Z (m)
Delta P due to head difference (Barg)
Piping & Fitting Pressure drop down stream the CV
(Barg) - 1000 m - 60"
Pressure drop Across the C.V
P2 ( CV down-stream Pressure ) - (Bar g)
Pressure drop Across the C.V

Cv value at fully open position (IBG Assumption)


Max pressure drop Across the CV
Sqrt (h/10)
Flow rate
Cv (Control Valve)

66000

m3/hr
gpm

PSI
Bar
Head (mlc)

Tender Requirement of max. 1 m Head Loss in CV


Max pressure drop Across the CV
Sqrt (h/10)
Flow rate
Cv (Control Valve) [gpm]/[psi]0.5

mlc
bar
psi
Tender Requirement of max. 1 m
Head Loss in CV
Design Flow: Max. = 351'000.00 Design Flow: Max. = 351'000.00
m3/day m3/day
New Strategic Tanks Water Level: New Strategic Tanks Water Level:
Required Min. = 1746.9 masl Required Min. = 1727.6 masl
MTTS Overflow Structure Level: Taif Terminal Level:
= 1754 masl = 1746masl
Control Valve Centerline Level: 1726 Control Valve Centerline Level:
masl 1726 masl
CC 1 CC 2

2.5 1.8
2.4 0.5
351'000 351'000
7312.5 7312.5
1754 1746
1726 1726
28 20
2.7468 1.962
0.13 0.13
2.62 1.83
1746.9 1727.6
1726 1726
20.9 1.6
2.05029 0.15696
0.1 0.1
0.0981 9.5062499448
2.25 9.76
Tender Requirement of max. 1 m
5 m assumed
Head Loss in CV

Top inlet Bottom inlet

9.5062499448 9.5062499448
0.9749999972 0.9749999972
64350 64350
66,000 66,000

[gpm]/[psi]0.5 [gpm]/[psi]0.5

14625 14625
64350 64350

9.5062499448 9.5062499448
0.6551516158 0.6551516158
6.5515161577 6.5515161577

1.451 1.451
0.3809199391 0.3809199391
64350 64350
168,933 168,933
fully open position

1 1
0.1 0.1
1.451 1.451
Design Flow: Min. = 35'100.00 Design Flow: Min. = 35'100.00
m3/day m3/day
New Strategic Tanks Water Level: New Strategic Tanks Water Level:
Required Min. = 1746.9 masl Required Min. = 1227.6 masl
MTTS Overflow Structure Level: Taif Terminal Level:
= 1754 masl = 1746masl
Control Valve Centerline Level: 1726 Control Valve Centerline Level: 1726
masl masl

CC 3 CC 4

2.7 2
2.2 1.9
35'100 35'100
731 731
1754 1746
1726 1726
28 20
2.7468 1.962
0.00153 0.00153
2.75 1.96
1746.9 1727.6
1726 1726
20.9 1.6
2.05029 0.15696
0.00268 0.00268
0.4905 0.3
2.54 0.46
5 m assumed 5 m assumed

Top inlet Bottom inlet

0.0049102531 0.0049102531
0.0221590908 0.0221590908
1462.5 1462.5
66,000 66,000

[gpm]/[psi]0.5 [gpm]/[psi]0.5

1462 1462
6432.8 6432.8

0.0049102531 0.0049102531
0.0003384048 0.0003384048
0.0033840476 0.0033840476

0.0007494847 0.0007494847
0.0086572783 0.0086572783
1462.5 1462.5
168,933 168,933