Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
NECESSITIES:
Low in building coverage.
More No. of users in a Business
Center having less coverage.
Planning an IBS.
Check for the Coverage in the building.
Make Floor plan.
Plan different type of antennas according to
need.
Prepare Routing Diagram.
Prepare Link Budget.
Accordingly plan Ultra or Metro Site.
After Integration do Walk Test.
Floor Plan.
Cable Routing.