SCHEDULE OF QUANTITIES

Estimate Based on PWD Schudule 2017 (Building Works)


Name of Work: Construction of Culvert of size 3.75 x 1.50 x 4.50 m. on Chhandar to Panchal PMGSY Road, at 12th Km., Sonamukhi, Bankura, West Bengal.
Item Reff.
Description Quantity Unit Rate Amount Remarks
No. Code
Surface Dressing of the ground in any kind of soil including removing vegetation
I/1; For cleaning
1 inequalities not exceeding 15 cm depth and disposal of the rubbish within a lead 48.60 Sqm. 10.00 486.00
P-01 the ground
upto 75 m as directed.
Earth work in excavation of foundation trenches or drains, in all sorts of soil
(including mixed soil but excluding laterite or sandstone) including removing,
I/2;
2 spreading or stacking the spoils within a lead of 75 m. as directed. The item includes To excavate
P-01
necessary trimming the sides of trenches, levelling, dressing and ramming the the ground as
bottom, bailing out water as required complete. per design
I/2(b); Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but
2.1 96.60 % Cum. 19238.00 18583.91
P-01 not requiring shoring.
A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as
directed and consolidating the same by thorough saturation with water, ramming
I/4; For filling the
3 complete including the cost of supply of sand. (payment to be made on 9.82 % Cum. 37521.00 3684.56
P-02 base of culvert
measurement of
finished quantity)
I/7(a) Brick work with 1st class bricks in cement mortar (1:4)
4 Guard walls
P-15 In foundation and plinth 8.85 Cum. 4742.00 41966.70
Controlled Cement concrete with well graded stone chips (20 mm graded nominal
size) excluding shuttering and reinforcement with complete design of concrete as
per IS : 456 and relevant special publications, submission of job mix formula after
preliminary mix design after testing of concrete cubes as per direction of Engineer- For
I/5; in charge. Consumption of cement will not be less than 300 Kg of cement with Super Concreteing
5
P-24 plasticiser per cubic meter of controlled concrete but actual consumption will be the Culvert
determined on the basis of preliminary test and job mix foumula. In ground floor with (1:1.5:3)
and foundation. M20 grade
[using concrete mixture] RMC Concrete
M 20 Grade
I/5 (i);
5.1 Pakur Variety 37.54 Cum. 4209.00 158005.86
P-24
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (6mm nominal size)
6 I/33; excluding shuttering and reinforcement,if any, in gound floor as per relevant IS In the bases of
P-41 codes. the culvert
6.1 Pakur variety 9.82 Cum. 4826.00 47391.32

page-1
Item Reff.
Description Quantity Unit Rate Amount Remarks
No. Code
Hire and labour charges for shuttering with centering and necessary staging upto 4
m using approved stout props and thick hard wood planks of approved thickness
I/36;
7 with required bracing for concrete slabs, beams and columns, lintels curved or
P-42 To execute
straight including fitting, fixing and striking out after completion of works (upto
RCC Work.
roof of ground floor)
I/36(a); 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-
7.1 252.91 Sqm. 321.00 81184.11
P-42 Charge.
Reinforcement for reinforced concrete work in all sorts of structures including
distribution bars, stirrups, binders etc initial straightening and removal of loose rust
I/40;
8 (if necessary), cutting to requisite length, hooking and bending to correct shape,
P-43 To Reinforce
placing in proper position and binding with 16 gauge black annealed wire at every
the Controlled
intersection, complete as per drawing and direction.
C.C-M20
For works in foundation and upto roof of ground floor/upto 4 m
I/40(a)(i)
8.1 Tor steel/Mild Steel 4.26 M.T 58103.00 247518.78
P-44
SAIL/ TATA/RINL
Total= 598821.24
Say. 5,98,821.00

(Rupees Five Lakh Ninty Eight Thousand Eight Hundred Twenty One Only.)

ASSISTANT ENGINEER EXECUTIVE ENGINEER