Item Reff.
Description Quantity Unit Rate Amount Remarks
No. Code
Hire and labour charges for shuttering with centering and necessary staging upto 4
m using approved stout props and thick hard wood planks of approved thickness
I/36;
7 with required bracing for concrete slabs, beams and columns, lintels curved or
P-42 To execute
straight including fitting, fixing and striking out after completion of works (upto
RCC Work.
roof of ground floor)
I/36(a); 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-
7.1 252.91 Sqm. 321.00 81184.11
P-42 Charge.
Reinforcement for reinforced concrete work in all sorts of structures including
distribution bars, stirrups, binders etc initial straightening and removal of loose rust
I/40;
8 (if necessary), cutting to requisite length, hooking and bending to correct shape,
P-43 To Reinforce
placing in proper position and binding with 16 gauge black annealed wire at every
the Controlled
intersection, complete as per drawing and direction.
C.C-M20
For works in foundation and upto roof of ground floor/upto 4 m
I/40(a)(i)
8.1 Tor steel/Mild Steel 4.26 M.T 58103.00 247518.78
P-44
SAIL/ TATA/RINL
Total= 598821.24
Say. 5,98,821.00
(Rupees Five Lakh Ninty Eight Thousand Eight Hundred Twenty One Only.)