Sei sulla pagina 1di 38

NUMEROS GENERADORES

CONCEPTO NUMERO EJE ENTRE EJES

1 2
2 3
3 4
DESMONTE Y DESHIERBE DEL 4 5
TERRENO; INCLUYE: 5 6
1.1 MAQUINARIA, HERRAMIENTAS Y 6 7
MANO DE OBRA.
7 8
8 9
9 10

NUMEROS GENERADORES

CONCEPTO NUMERO EJE ENTRE EJES


DESMONTE Y DESHIERBE DEL TERRENO; 1 16
INCLUYE: MAQUINARIA, HERRAMIENTAS Y
MANO DE OBRA.

NUMEROS GENERADORES

CONCEPTO NUMERO EJE ENTRE EJES


DEMOLICION DE CARPETA ASFALTICA; 1 16
INCLUYE: ROTOMARTILLO, MANO DE OBRA,
ACARREO MANUAL DE ESCOMBRO Y
MAQUINARIA.
DEMOLICION DE CARPETA ASFALTICA;
INCLUYE: ROTOMARTILLO, MANO DE OBRA,
ACARREO MANUAL DE ESCOMBRO Y
MAQUINARIA.

NUMEROS GENERADORES

CONCEPTO NUMERO EJE ENTRE EJES


TRAZO Y NIVELACION PARA LINEA DE 1 2
ALCANTARILLADO; INCLUYE: EQUIPO
TOPOGRAFICO Y TECNICO ESPECIALIZADO, 2 3
MATERIALES Y TODO LO NECESARIO PARA SU 3 4
CORRECTA EJECUCIÓN. 4 5
5 6
6 7
7 8
8 9
9 10
10 11
11 12
12 13
13 14
14 15
15 5
INTERCONEXIONES
2
3
4
5
6
7
8
9
12
13
14
16 1
NUMEROS GENERADORES

CONCEPTO NUMERO EJE ENTRE EJES


EXCAVACION CON MAQUINARIA PESADA EN 1 2
MATERIAL TIPO II; INCLUYE: MAQUINARIA,
HERRAMIENTA Y MANO DE OBRA. 2 3
3 4
4 5
5 6
6 7
7 8
8 9
9 10
10 11
11 12
12 13
13 14
14 15
15 5
INTERCONEXIONES
2
3
4
5
6
7
8
9
12
13
14

NUMEROS GENERADORES
CONCEPTO NUMERO EJE ENTRE EJES

PLANTILLA DE ARENA
PARA SOPORTE DE
TUBERIA; INCLUYE:
MANO DE OBRA,
MATERIALES, ACARREO
DE ARENA, TENDIDO Y
AFINE A NIVEL
ESPECIFICADO.
PLANTILLA DE ARENA
PARA SOPORTE DE
TUBERIA; INCLUYE:
MANO DE OBRA,
MATERIALES, ACARREO
DE ARENA, TENDIDO Y
AFINE A NIVEL
ESPECIFICADO.

INTERCONEXIONES
2
3
4
5
6
7
8
9
12
13
14

CONTRATISTA: LUIS EDGARDO RODRIGUEZ AMADOR


PERIODO DE ESTIMACION
NOMBRE DE LA OBRA RED DE DRENAJE
NUMEROS GENERADORES
ENTRE EJES
CONCEPTO NUMERO EJE
RELLENO COMPACTADO AL 95% DE LA PRUEBA 1
PROCTOR CON MATERIAL PRODUCTO DE LA
EXCAVACION; INCLUYE: RELLENO A CAPAS DE 2
20 CMS, HOMOGENIZADO Y APISONADO CON 3
BAILARINA. 4
5
6
7
8
9
10
11
12
13
14
15
16
INTERCONEXIONES
2
3
4
5
6
7
8
9
12
13
14

1
2
3
4
5
6
7
8
9
11
12
13
14
5

CONTRATISTA: LUIS EDGARDO RODRIGUEZ AMADOR


PERIODO DE ESTIMACION
NOMBRE DE LA OBRA RED DE DRENAJE
NUMEROS GENERADORES
ENTRE EJES
CONCEPTO NUMERO EJE
CARGA Y ACARREO DEL MATERIAL PRODUCTO 1
DE EXCAVACION Y DEMOLICIONES AL 1ER KM.;
INCLUYE: MAQUINARIA PARA CARGA, CAMIÓN 2
VOLTEO. 3
4
5
INCLUYE: MAQUINARIA PARA CARGA, CAMIÓN
VOLTEO.

6
7
8
9
10
11
12
13
14
15
16
INTERCONEXIONES
2
3
4
5
6
7
8
9
12
13
14

1
2
3
4
5
6
7
8
9
11
12
13
14
3

CONTRATISTA: LUIS EDGARDO RODRIGUEZ AMADOR


PERIODO DE ESTIMACION
NOMBRE DE LA OBRA RED DE DRENAJE
NUMEROS GENERADORES
ENTRE EJES
CONCEPTO NUMERO EJE
SUMINISTRO E INSTALACION DE TUBOS P.V.C. 1
SANITARIO PARA ALCANTARILLADO DE 8" DE
DIAMETRO; INCLUYE: EL TENDIDO Y 2
ACOMODO DE LA TUBERÍA, MANO DE OBRA Y 3
MATERIAL. 4
5
6
7
8
9
10
11
12
13
14
15
INTERCONEXIONES
2
3
4
5
6
7
8
9
12
13
14

CONTRATISTA: LUIS EDGARDO RODRIGUEZ AMADOR


PERIODO DE ESTIMACION
NOMBRE DE LA OBRA RED DE DRENAJE
NUMEROS GENERADORES
ENTRE EJES
CONCEPTO NUMERO EJE
SUMINISTRO Y COLOCACION DE SILLETA PARA 1
DESCARGA SANITARIA; INCLUYE: ACARREO DE
SILLETA A LUGAR DE COLOCACION,TRATO 2
DELICADO DEL MATERIAL, MANO DE OBRA Y 3
MATERIAL. 4
5
6
DELICADO DEL MATERIAL, MANO DE OBRA Y
MATERIAL.

7
8
9
10
11
12
13
14
15

CONTRATISTA: LUIS EDGARDO RODRIGUEZ AMADOR


PERIODO DE ESTIMACION
NOMBRE DE LA OBRA RED DE DRENAJE
NUMEROS GENERADORES
ENTRE EJES
CONCEPTO NUMERO EJE
SUMINISTRO Y COLOCACION DE CODO DE 90 X 1
6" PARA DESCARGA SANITARIA; INCLUYE:
ACARREO DE PZA AL LUGAR DE COLOCACION , 2
MANO DE OBRA Y MATERIAL NECESARIO . 3
4
5
6
7
8
9
10
11
12
13
14
15

CONTRATISTA: LUIS EDGARDO RODRIGUEZ AMADOR


PERIODO DE ESTIMACION
NOMBRE DE LA OBRA RED DE DRENAJE
NUMEROS GENERADORES
ENTRE EJES
CONCEPTO NUMERO EJE
SUMINISTRO E INSTALACION DE TUBOS DE 1
P.V.C. SANITARIO PARA DESCARGA SANITARIA
DE 6 " DE DIAMETRO; INCLUYE: EL TEDIDO, 2
ACOMODO DE LA TUBERÍA,ACARREO Y 3
COLOCACION DE LA PIEZA EN EL LUGAR 4
ESPECIFICADO, MANO DE OBRA Y MATERIALES
NECESARIOS. 5
DE 6 " DE DIAMETRO; INCLUYE: EL TEDIDO,
ACOMODO DE LA TUBERÍA,ACARREO Y
COLOCACION DE LA PIEZA EN EL LUGAR
ESPECIFICADO, MANO DE OBRA Y MATERIALES
NECESARIOS.
6
7
8
9
11
12
13
14
15

CONTRATISTA: LUIS EDGARDO RODRIGUEZ AMADOR


PERIODO DE ESTIMACION
NOMBRE DE LA OBRA RED DE DRENAJE
NUMEROS GENERADORES
ENTRE EJES
CONCEPTO NUMERO EJE
CONSTRUCCION DE POZO DE VISITA DE 1.0 A 2
1.5 MTS DE ALTURA; INCLUYE: CUÑAS PARA SU
ELABORACION, JUNTA DE LAS CUÑAS, MANO 3
DE OBRA Y HERRAMIENTA NECESARIA PARA SU 4
CORRECTA EJECUCION. 6
7
8
9
11
12
13
14

CONTRATISTA: LUIS EDGARDO RODRIGUEZ AMADOR


PERIODO DE ESTIMACION
NOMBRE DE LA OBRA RED DE DRENAJE
NUMEROS GENERADORES
ENTRE EJES
CONCEPTO NUMERO EJE
CONSTRUCCION DE POZO DE VISITA DE 1.5 A 1
2.0 MTS; INCLUYE: CUÑAS PARA SU
ELABORACION, JUNTEADO CON MORTERO 5
CEMENTO ARENA EN PROPORCIÓN 1:3,
PULIDO INTERIOR, PARRILLA DE FONDO DE 15
CM DE ESPESOR ARMADA CON VARILLA DEL #3
@15 CMS EN AS, ELABORACIÓN DE MEDIA
CAÑA, CONCRETO HECHO EN OBRA F'C= 150
KG/CM2, ESCALONES A BASE DE VARILLA #5 DE
60 CMS DE DESARROLLO COLOCADO @ 20
CMS, EL BROCAL DE 90 CMS DE DIAMETRO
COLOCADO CON CADENA PERIMETRAL DE 15 X
20 CMS ARMADA CON 4 VARILLAS DEL #3 Y
ANILLOS DEL #2 @ 15 CMS COLADA CON
CONCRETO F'C= 150 KG/CM2, MANO DE OBRA
Y HERRAMIENTA NECESARIA PARA SU
CORRECTA EJECUCION.
CAÑA, CONCRETO HECHO EN OBRA F'C= 150
KG/CM2, ESCALONES A BASE DE VARILLA #5 DE
60 CMS DE DESARROLLO COLOCADO @ 20
CMS, EL BROCAL DE 90 CMS DE DIAMETRO
COLOCADO CON CADENA PERIMETRAL DE 15 X
20 CMS ARMADA CON 4 VARILLAS DEL #3 Y
ANILLOS DEL #2 @ 15 CMS COLADA CON
CONCRETO F'C= 150 KG/CM2, MANO DE OBRA
Y HERRAMIENTA NECESARIA PARA SU
CORRECTA EJECUCION.
CONTRATISTA: LUIS EDGARDO RODRIGUEZ AMADOR
PERIODO DE ESTIMACION
NOMBRE DE LA OBRA RED DE DRENAJE
NUMEROS GENERADORES
ENTRE EJES
CONCEPTO NUMERO EJE
INTERCONEXION A POZO DE VISITA EXISTENTE; 1
INCLUYE: CEMENTO ARENA PARA EL RESANE,
PERFORACION CON ROTOMARTILLO A 2
DIAMETRO DE TUBO Y MANO DE OBRA. 3
4
5
6
7
8
9
10
11
12
13
14
15

CONTRATISTA: LUIS EDGARDO RODRIGUEZ AMADOR


PERIODO DE ESTIMACION
NOMBRE DE LA OBRA RED DE DRENAJE
NUMEROS GENERADORES
ENTRE EJES
CONCEPTO NUMERO EJE
REPOSICION DE PAVIMENTO ASFALTICO DE 8 1
CMS DE ESPESOR; INCLUYE: CARPETA
ASFALTICA, RIEGO DE SELLO, RIEGO DE
IMPREGNACIÓN, MAQUINARIA PARA SU
CORRECTA EJECUCION Y NIVELACION DE
TERRENO.
ENTRE EJES
CONCEPTO NUMERO EJE
LIMPIEZA FINAL DE LA OBRA; INCLUYE: 1
RECOLECCION DE BASURA, ACARREO A UN
LUGAR ESPECIFICO, MANO DE OBRA Y 2
HERRAMIENTA NECESARIA PARA SU 3
EJECUCION. 4
5
6
7
8
9
INTERCONEXIONES
2
3
4
5
6
7
8
9
12
13
14
16
ADORES

FECHA:
LARGO ANCHO ALTO PZA TOTAL

51.38 18 924.84
63.7 18 1146.60
53.91 18 970.38
55.97 18 1007.46
53.15 18 956.70
53.45 18 962.10
54.94 18 988.92
54.61 18 982.98
63.61 18 1144.98
TOTAL 9084.96

ADORES

LARGO ANCHO ALTO PZA TOTAL

14.32 0.75 0.08 0.86

TOTAL 0.8592

ADORES

LARGO ANCHO ALTO PZA TOTAL

14.32 0.75 0.08 0.86


TOTAL 0.8592

ADORES

LARGO ANCHO ALTO PZA TOTAL

51.38 51.38
63.7 63.70
53.91 53.91
55.97 55.97
53.15 53.15
53.45 53.45
54.94 54.94
54.61 54.61
63.61 63.61
10.2 10.20
117.23 117.23
54.4 54.40
49.8 49.80
58.46 58.46
12.87 12.87

12 12.00
12 12.00
12 12.00
12 12.00
12 12.00
12 12.00
12 12.00
12 12.00
12 12.00
12 12.00
12 12.00
14.32 14.32
TOTAL 954.00

ADORES

LARGO ANCHO ALTO PZA TOTAL

51.38 0.75 1.63


PZA TOTAL
63.7 0.75 1.5
53.91 0.75 1.5 62.81
55.97 0.75 1.63 71.66
53.15 0.75 1.63 60.65
53.45 0.75 1.5 68.42
54.94 0.75 1.5 64.98
54.61 0.75 1.5 60.13
63.61 0.75 1.5 61.81
10.2 0.75 1.5 61.44
117.23 0.75 1.38 71.56
54.4 0.75 1.38 11.48
49.8 0.75 1.5 121.33
58.46 0.75 1.38 56.30
12.87 0.75 1.5 56.03
60.51
12 0.75 1.5 14.48
12 0.75 1.5
12 0.75 1.5 13.50
12 0.75 1.75 13.50
12 0.75 1.5 13.50
12 0.75 1.5 15.75
12 0.75 1.5 13.50
12 0.75 1.5 13.50
12 0.75 1.25 13.50
12 0.75 1.5 13.50
12 0.75 1.5 11.25
13.50
13.50
TOTAL 1052.08

ADORES
LARGO ANCHO ALTO PZA TOTAL

1 2 51.38 4.78
ANCHO ALTO
2 3 63.7 4.04
3 4 53.91 0.75 0.1 4.20
4 5 55.97 0.75 0.1 3.99
5 6 53.15 0.75 0.1 4.01
6 7 53.45 0.75 0.1 4.12
7 8 54.94 0.75 0.1 4.10
8 9 54.61 0.75 0.1 4.77
9 10 63.61 0.75 0.1 0.77
10 11 10.2 0.75 0.1 8.79
11 12 117.23 0.75 0.1 4.08
12 13 54.4 0.75 0.1 3.74
13 14 49.8 0.75 0.1 4.38
14 15 58.46 0.75 0.1 0.97
15 5 12.87 0.75 0.1 0.00
0.75 0.1 0.90
12 0.75 0.1 0.90
12 0.90
12 0.75 0.1 0.90
12 0.75 0.1 0.90
12 0.75 0.1 0.90
12 0.75 0.1 0.90
12 0.75 0.1 0.90
12 0.75 0.1 0.90
12 0.75 0.1 0.90
12 0.75 0.1 0.90
12 0.75 0.1 TOTAL 66.62
0.75 0.1
0.75 0.1
FECHA: 07/12/2018
ESTIMACION No.

TOTAL
ENTRE EJES
LARGO ANCHO
57.29
2 51.38 0.75 65.15
ALTO AREA DEL TUBO
3 63.7 0.75 54.86
4 53.91 0.75 1.53 1.67 62.41
5 55.97 0.75 1.4 1.74 59.27
6 53.15 0.75 1.4 1.75 54.39
7 53.45 0.75 1.53 1.82 55.91
8 54.94 0.75 1.53 1.72 55.57
9 54.61 0.75 1.4 1.73 64.73
10 63.61 0.75 1.4 1.78 10.38
11 10.2 0.75 1.4 1.77 108.74
12 117.23 0.75 1.4 2.06 50.46
13 54.4 0.75 1.4 0.33 50.68
14 49.8 0.75 1.28 3.8 54.22
15 58.46 0.75 1.28 1.76 14.06
5 12.87 0.75 1.4 1.61 18.12 836.2301
1 14.32 0.75 1.28 1.9
1.5 0.42 12.22
12 0.75 1.73 0.46 12.22
12 0.75 12.22
12 0.75 1.4 0.384 12.22
12 0.75 1.4 0.384 12.22
12 0.75 1.4 0.384 12.22
12 0.75 1.4 0.384 12.22
12 0.75 1.4 0.384 12.22
12 0.75 1.4 0.384 12.22
12 0.75 1.4 0.384 12.22
12 0.75 1.4 0.384 12.22
12 0.75 1.4 0.384 970.61
1.4 0.384 9.45
2 6 0.75 1.4 0.384 6.30
3 6 0.75 TOTAL 6.30
4 6 0.75 0.42 5 5.67
5 6 0.75 0.35 4 5.67
6 6 0.75 0.35 4 4.73
7 6 0.75 0.42 3 3.15
8 6 0.75 0.42 3 4.73
9 6 0.75 0.35 3 9.45
10 6 0.75 0.35 2 1.80
12 6 0.75 0.35 3 3.60
13 6 0.75 0.35 6 4.73
14 6 0.75 0.2 2 0.90
15 6 0.75 0.2 4 3.15
15 6 0.75 0.35 3
0.2 1 1040.22
0.35 2

FECHA: 07/12/2018 TOTAL


ESTIMACION No.

TOTAL
ENTRE EJES
LARGO ANCHO
1.64
2 51.38 0.032 2.04
ALTO PZA
3 63.7 0.032 1.73
4 53.91 0.032 1.79
5 55.97 0.032 1.70
6 53.15 0.032 1.71
7 53.45 0.032 1.76
8 54.94 0.032 1.75
9 54.61 0.032 2.04
10 63.61 0.032 0.33
11 10.2 0.032 3.75
12 117.23 0.032 1.74
13 54.4 0.032 1.59
14 49.8 0.032 1.87
15 58.46 0.032 0.41
5 12.87 0.032 0.46
1 14.32 0.032
0.38
12 0.032 0.38
12 0.032 0.38
12 0.032 0.38
12 0.032 0.38
12 0.032 0.38
12 0.032 0.38
12 0.032 0.38
12 0.032 0.38
12 0.032 0.38
12 0.032 0.38
12 0.032
0.54
2 6 0.018 0.43
3 6 0.018 0.43
4 6 0.018 5 0.32
5 6 0.018 4 0.32
6 6 0.018 4 0.32
7 6 0.018 3 0.22
8 6 0.018 3 0.32
9 6 0.018 3 0.65
10 6 0.018 2 0.22
12 6 0.018 3 0.43
13 6 0.018 6 0.32
14 6 0.018 2 0.11
15 6 0.018 4 0.22
15 6 0.018 3
1
2 35.39

FECHA: 07/12/2018 TOTAL


ESTIMACION No.
TOTAL
ENTRE EJES
LARGO ANCHO
51.38
2 51.38 63.70
ALTO PZA
3 63.7 53.91
4 53.91 1 55.97
5 55.97 1 53.15
6 53.15 1 53.45
7 53.45 1 54.94
8 54.94 1 54.61
9 54.61 1 63.61
10 63.61 1 10.20
11 10.2 1 117.23
12 117.23 1 54.40
13 54.4 1 49.80
14 49.8 1 58.46
15 58.46 1 12.87
5 12.87 1 0.00
1 12.00
12 1 12.00
12 12.00
12 1 12.00
12 1 12.00
12 1 12.00
12 1 12.00
12 1 12.00
12 1 12.00
12 1 12.00
12 1 12.00
12 1 939.68
1
1
TOTAL
FECHA: 07/12/2018
ESTIMACION No.

TOTAL
ENTRE EJES
LARGO ANCHO
5.00
2 4.00
ALTO PZA
3 4.00
4 5 3.00
5 4 3.00
6 4 3.00
7 3 2.00
8 3 3.00
9 3 6.00
10 2 2.00
11 3 4.00
12 6 3.00
13 2 1.00
14 4 2.00
15 3 1.00
5 1 46.00
2
1
FECHA: 07/12/2018 TOTAL
ESTIMACION No.

TOTAL
ENTRE EJES
LARGO ANCHO
5.00
2 4.00
ALTO PZA
3 4.00
4 5 3.00
5 4 3.00
6 4 3.00
7 3 2.00
8 3 3.00
9 3 6.00
10 2 2.00
11 3 4.00
12 6 3.00
13 2 1.00
14 4 2.00
15 3 1.00
5 1 46.00
2
1
FECHA: 07/12/2018 TOTAL
ESTIMACION No.

TOTAL
ENTRE EJES
LARGO ANCHO
30.00
2 6 24.00
ALTO PZA
3 6 24.00
4 6 5 18.00
5 6 4 18.00
6 6 4 18.00
7 6 3 12.00
8 6 3 18.00
9 6 3 36.00
10 6 2 12.00
12 6 3 24.00
13 6 6 18.00
14 6 2 6.00
15 6 4 28.00
5 14 3 286.00
1
2
FECHA: 07/12/2018 TOTAL
ESTIMACION No.

TOTAL
ENTRE EJES
LARGO ANCHO
1.00
1.00
ALTO PZA
1.00
1 1.00
1 1.00
1 1.00
1 1.00
1 1.00
1 1.00
1 1.00
1 1.00
1 11.00
1
1
FECHA: 07/12/2018 TOTAL
ESTIMACION No.

TOTAL
ENTRE EJES
LARGO ANCHO
1.00
1.00
ALTO PZA

1
1

2.00
TOTAL

FECHA: 07/12/2018
ESTIMACION No.

TOTAL
ENTRE EJES
LARGO ANCHO
3.00
3.00
ALTO PZA
3.00
3 3.00
3 4.00
3 3.00
3 3.00
4 3.00
3 3.00
3 3.00
3 2.00
3 3.00
3 3.00
2 3.00
3 2.00
3
3 44.00
2

FECHA: 07/12/2018 TOTAL


ESTIMACION No.

TOTAL
ENTRE EJES
LARGO ANCHO
0.86
16 14.32 0.75
ALTO PZA

0.08

0.86
TOTAL
TOTAL
ENTRE EJES
LARGO ANCHO
924.84
2 51.38 18 1146.60
ALTO PZA
3 63.7 18 970.38
4 53.91 18 1007.46
5 55.97 18 797.25
6 53.15 15 801.75
7 53.45 15 824.10
8 54.94 15 819.15
9 54.61 15 954.15
10 63.61 15
108.00
12 9 108.00
12 9 108.00
12 9 108.00
12 9 108.00
12 9 108.00
12 9 108.00
12 9 108.00
12 9 108.00
12 9 108.00
12 9 108.00
12 9 257.76
1 14.32 18
9691.44

TOTAL
ANÁLISIS DE PRECIOS UNITARIOS

CONCEPTO 1.1
DESCRIPCIÓN DESMONTE Y DESHIERBE DEL TERRENO. INCLUYE: MAQUINARIA, HERRAMIENTA

MANO DE OBRA
DESCRIPCIÓN UNIDAD COSTO
M001 4 peones Jor
Cuadrilla No. 1 $1,459.56

EQUIPO Y HERRAMIENTA
DESCRIPCIÓN UNIDAD COSTO
Herramienta menor %
%M01 $6.90

MATERIALES
DESCRIPCIÓN UNIDAD COSTO
BN-01 Bolsas negras Kg $34.00

18.00%

6.00%

0.00%

CONCEPTO 1.2
DEMOLICIÓN DE CARPETA ASFÁLTICA. INCLUYE: ROTOMARTILLO, MANO DE O
DESCRIPCIÓN ESCOMBRO Y MAQUINARIA.

MANO DE OBRA
CLAVE DESCRIPCIÓN UNIDAD COSTO
M001 2 peones Jor
Cuadrilla No. 2 $729.78
EQUIPO Y HERRAMIENTA
CLAVE DESCRIPCIÓN UNIDAD COSTO
RTMA-01 Rotomartillo Hor $450.00
%M01 Herramienta menor % $55.22

MATERIALES
CLAVE DESCRIPCIÓN UNIDAD COSTO
AG-01 Agua M3 $21.00

18.00%

6.00%

0.00%

CONCEPTO
DESCRIPCIÓN 1.3
TRAZO Y NIVELACIÓN PARA LÍNEA DE ALCANTARILLADO; INCLUYE: EQUIPO
ESPECIALIZADO, MATERIALES Y TODO LO NECESARIO PARA SU CORR
MANO DE OBRA

CLAVE DESCRIPCIÓN UNIDAD COSTO


M001 4 peones Jor $729.73
Cuadrilla No. 3 Jor
Topográfo $840.10

EQUIPO Y HERRAMIENTA
CLAVE DESCRIPCIÓN UNIDAD COSTO
Herramienta menor % $1,669.34
%M01

MATERIALES
CLAVE DESCRIPCIÓN UNIDAD COSTO
EM-01 Estacas de madera Kg $34.00
CA-01 Cal Kg $34.00
PRECIOS UNITARIOS

FECHA:

O. INCLUYE: MAQUINARIA, HERRAMIENTAS Y MANO DE OBRA


UNIDAD �^2

RENDIMIENTO FSC IMPORTE

0.0030 1.5763 $6.90


$6.90

RENDIMIENTO IMPORTE

0.0300 $0.21
$0.21

RENDIMIENTO IMPORTE
0.005 $0.17
$0.17

(CD) COSTO DIRECTO $7.28


(CI) INDIRECTOS $1.31
$8.59
(U) UTILIDAD $0.52
$9.10
(CA) CARGOS ADICIONALES $0.00
9.10

CA. INCLUYE: ROTOMARTILLO, MANO DE OBRA, ACARREO MANUAL DE


ESCOMBRO Y MAQUINARIA.
UNIDAD �^3

RENDIMIENTO FSR IMPORTE

0.048 1.5763 $55.22


$55.22
RENDIMIENTO IMPORTE
0.1 $45.00
0.03 $1.66
$46.66

RENDIMIENTO IMPORTE
0.1 $2.10
$2.10

(CD) COSTO DIRECTO $103.97


(CI) INDIRECTOS $18.72
$122.69
(U) UTILIDAD $7.36
$130.05
(CA) CARGOS ADICIONALES $0.00
130.05

A DE ALCANTARILLADO; INCLUYE: EQUIPO TOPOGRÁFICO Y TÉCNICO


ALES Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.
UNIDAD �^2

RENDIMIENTO FSC IMPORTE


0.3 1.5763 $345.08
1 1.5763 $1,324.25
$1,669.34

RENDIMIENTO IMPORTE
0.03 $50.08
$50.08

RENDIMIENTO IMPORTE
0.008 $0.27
0.008 $0.27

$0.27
SECRETARÍA DE COMUNICACIONES Y TRANSPORTES Número: (2 Número de proce
Objeto de los trabajos:

1 Unidad Administrativa Responsabel de la Contratación)

ANÁLISIS, CÁLCULO E INTEGRACIÓN DEL FACTOR


Categoría: (6 Categoría del trabajador) $ 10,000.00

CLAVES
DESCRIPCIÓN OPERACIÓN
OPERATIVAS
I. DÍAS REALMENTE PAGADOS EN E
DCAL I.1.- Días calendario, se incluye la parte proporcional del año bisiesto a cada año 1/4=0.25
DAGI 1.2.- Días aguinaldo. 15 días como mínimo
PVAC 1.3.- Días de prima vacacional. Se considera el 25% de 6 días
Tp TOTAL DE DÍAS PAGADOS EN EL PERÍODO ANUAL=DCAL+DAGI+PVAC
FSBC FACTOR DE SALARIO BASE DE COTIZACIÓN= Días realmente pagados /Días Calenda
II. DÍAS NO TRABAJADOS EN EL PER
DDOM II.1.-Séptimo día.- Total de días domingo del período anual
DVAC II.2.-Vacaciones. Por Ley corresponden 6 días hábiles para el año de servicio
DFEO II.3.-Festivos oficiales
1 de enero
5 de febrero
21 de marzo
1 de mayo
16 de septiembre
20 de noviembre
25 de diciembre
1o. de diciembre, parte proporcional cada 6 años

DNLA TOTAL DÍAS NO LABORADOS AL AÑO


III. DÍAS REALMENTE LABORADOS EN
DCAL III.1.- Días calendario
DNLA III.2.- Menos días no laborados en el periódo anual
TI TOTAL DE DÍAS REALMENTE LABORADOS EN EL PERIÓDO ANUAL=DC-DNLA
FBSR FACTOR BASE DE SALARIO REAL=FACTOR DE DÍAS PAGADOS ENTRE DÍAS EFECTIV
IV. OBLIGACIONES OBRERO PATRONALES PO
DATOS BÁSICOS
SMG Salario Mínimo General Diario en el D.F. vigente
SB Salario Base de la Categoría SB*12/365
SB/SMG Salario nominal veces del D.F.
FSBC FACTOR DE SALARIO BASE DE COTIZACIÓN= Días realmente pagados /Días Calenda
SBC Salario base de cotización = FSBC*Salario nominal veces D.F.
SBC-3 Excedente 3 veces Salario Mínimo General (Distrito Federal) = SBC-3

IV.1.- Enfermedad y maternidad (26)


IV.1.1.- Cuota fija (26)
IV.1.2.- Aplicación IMSS al Excedente de 3 Sal. Mín-=EXC (26)
IV.1.3.- Prestaciones en dinero (26)
IV.2.- Prestaciones en especie gastos médicos pensionados (26)
IV.3.- Invalidez y Vida (26)
IV.4.- Cesantía en edad avanzada y vejez (26)
IV.5.- Riesgo de Trabajo (Se usa el asignado por el IMSS (26)
IV.6.- Cuota Guardería (26)

IV:7.- Cuota INFONAVIT (26)


IV.8.- Cuota SAR (26)
IV.9.- Impuesto nómina local (26)
SP SUMA PRESTACIONES
Ps Factor de prestaciones: Ps= SP/ SBC
Ps*FBSR

FASAR FACTOR DE SALARIO REAL = Ps * FBSR+ FBSR

LFT= Ley Federal del Trabajo


LSS= Ley del Seguro Social
LINFONAVIT= Ley del Instituto del Fondo Nacional para la Vivienda de los Trabajadores
Formato número:
(2 Número de procedimiento de contratación) Fecha: (4 Fecha)
(3 Objeto de los trabajos) Hoja: (5 Número de hoja)

GRACIÓN DEL FACTOR DE SALARIO REAL


SBM : (7 Salario base mensual) por mes

VALOR FUNDAMENTO

MENTE PAGADOS EN EL PERÍODO ANUAL


o a cada año 1/4=0.25 (8) 365.2500
(9) 15.0000 Art. 87 LFT
(10) 1.5000 Art. 80 LFT
GI+PVAC (11) 381.7500
agados /Días Calendario=Tp/DCAL (12) 1.04517454
ABAJADOS EN EL PERÍODO ANUAL (DNLA)
(13) 52.0000 Art. 69 LFT
servicio (14) 6.0000 Art. 76-79 LFT
(15) 7.1667
1.0000 Art. 74 LFT
1.0000 Art. 74 LFT
1.0000 Art. 74 LFT
1.0000 Art. 74 LFT
1.0000 Art. 74 LFT
1.0000 Art. 74 LFT
1.0000 Art. 74 LFT
0.1667 Art. 74 LFT

(18) 65.1667
ENTE LABORADOS EN EL PERÍODO ANUAL
(8) 365.2500
(18) 65.1667
UAL=DC-DNLA (19) 300.0833
ENTRE DÍAS EFECTIVOS TRABAJADOS= Tp/TI
(20) 1.2721
ERO PATRONALES POR IMSS, INFONAVIT Y NÓMINA

(21) 62.33
(22) 328.77
(23) 5.2747
agados /Días Calendario= Tp/DCAL (12) 1.04517
(24) 5.5129477435
(25) 2.5129477435

Cuotas
Total de
Patronales Trabajador Factor
Cuotas

20.400% 20.400% 0.204000 Art. 106 LSS


1.100% 0.400% 1.500% 0.037694 Art. 106 LSS
0.700% 0.250% 0.950% 0.052373 Art. 107 LSS
1.050% 0.375% 1.425% 0.078560 Art. 25 LSS
1.750% 0.625% 2.375% 0.130933 Art. 147 LSS
3.150% 1.125% 4.275% 0.235679 Art. 168 fracción II LSS
0.500% 0.500% 0.027565 Arts. 71 a 73 LSS
1.000% 1.000% 0.055129 Arts. 211
Art. 29 y 212 LSS
fracción II

5.000% 5.000% 0.275647 LINFONAVIT


2.000% 2.000% 0.110259 Art. 168 LSS
2.000% 2.000% 0.110259
1.318097
(28) 0.239091
(29) 0.304159

(30) 1.576306

Atentamente

(31 Nombre del representante legal del licitante)


(32 Cargo del representante legal del licitante)

MP-200-PR02-P01-F50
DICIEMBRE 2013
1869.9 3365.82 1495.92

1.7437762
2100 3661.93 70.00

1561.93

1.6841179
3000 5052.3537 100.00
2052.3537

1.7079805
2500 4269.9512 83.33
1769.9512
1.3369699

1.6244687
6000 9746.812 200.00
3746.812
FACTOR DE SALARIO REAL

DATOS BÁSICOS
DICAL Días calendario Anualizado
DIAGI Días de aguinaldo al año
PRIVAC Días por prima vacacional
Prima dominical
Días equivalentes a horas extras al año
TP TOTAL DE DÍAS REALMENTE PAGADOS AL AÑO
DIDOM Descanso semanal (Séptimo día)
DIVAC Vacaciones
DIFEO Descanso obligatorio (Festivos por Ley)
DIPEC Días perdidos por condiciones de clima
DIPCO Días por costumbre
DIPEN Días por permisos y enfermedad no profesional
DISIN Días por condiciones sindicales anuales
DINLA DIAS NO LABORADOS AL AÑO
TI TOTAL DE DÍAS LABORADOS AL AÑO (DICAL-DINLA)
FSI FACTOR DE SALARIO INTEGRADO (TP/TI)

CONCEPTO % DIAS
IMSS

ENFERMEDAD Y
MATERNIDAD 1.425
INVALIDEZ Y
CENSATIVA 2.375
GUARDERIA 1.000

CENSATIVA Y
EDAD
AVANZADA 4.275
RIESGO DE
TRABAJO 7.588
AFORE 2
INFONAVIT 5

IMPUESTO
SOBRE NOMINA 3
PRIMA
VACACIONAL 25
AGUINALDO 4.109 15
PRIMA DE
ANTIGÜEDAD 3.28 12
DIAS FESTIVOS
(LEY) 2.054 7.5
DOMINGOS 14.246 52
DIAS
COSTUMBRE 1.643 6

DIAS
CLIMATOLOGIC
OS 0.821 3
VACACIONES 1.643 6
FSR 79.459
SALARIO BASE APORTACIÓN DEL
CATEOGORÍAS IMSS ($)

PEÓN $364.89 51.19


365.00 AYUDANTE GRAL $364.89 64.42
15.00 OFICIAL PLOMERO $385.71 87.70
1.50 OFICIAL ALBAÑIL $428.57 95.93
0.00 OPERADOR EQ. LIGERO $271.43 65.81
0.00 TOPÓGRAFO $750.00 65.81
SUMA 381.50
52
6
7
4
3
2
0
SUMA 74.00
291.00
1.31
OBLIGACIÓN DE
APORTACIÓN DE OBRERO FSR
INFONAVIT ($) PATRONAL

10.08 0.3039 1.7094


13.81 0.2832 1.6823
20.16 0.2675 1.6617
22.4 0.2641 1.6572
14.19 0.2819 1.6806
14.19 0.2597 1.6515
RELACIÓN DE CUADRILLAS

FECHA:

M001 CUADRILLA NO. 1

MO-01 Peón Jor 1.00 $364.89


MO-01 Peón Jor 1.00 $364.89
MO-01 Peón Jor 1.00 $364.89
MO-01 Peón Jor 1.00 $364.89

%
HM-01 Herramienta menor 0.03 $1,459.56
TOTAL DE SALARIO

M002 CUADRILLA NO. 2

MO-01 Peón Jor 1.00 $364.89


MO-01 Peón Jor 1.00 $364.89
%
HM-01 Herramienta menor 0.03 $729.78
TOTAL DE SALARIO

M003 CUADRILLA NO. 3

MO-01 Peón Jor 1.00 $364.89


MO-01 Peón Jor 1.00 $364.89
MO-01 Peón Jor 1.00 $364.89
MO-01 Peón Jor 1.00 $364.89
MO-20 Topógrafo Jor 1.00 $840.10
%
HM-01 Herramienta menor 0.03 $2,299.66
TOTAL DE SALARIO
FECHA:

$364.89
$364.89
$364.89
$364.89

43.7868
$1,459.56

$364.89
$364.89

21.8934
$751.67

$364.89
$364.89
$364.89
$364.89
$840.10

68.9898
$1,934.77
RELACIÓN DE MANO DE OBRA

FECHA:

CLAVE DESCRIPCIÓN UNIDAD SALARIO BASE


MO-01 Peón Jor $364.89
AG-01 Ayudante Gral Jor $364.89
OP-01 Oficial Plomero Jor $385.71
OA-01 Oficial Albañil Jor $483.34
OEL-01 Operador Equipo ligero Jor $300.00
TO-01 Topógrafo Jor $840.10