Sei sulla pagina 1di 2

ROOMS PRESSURIZED CALCULATION

Project : THIEN UNG WELLHEAD PLATFORM


Room No.: Central control room

Description: The catculation indicated tha make-up air required for this area
50 Pa to prevent the dust, gas and fume.

1. Room Data
Area 51.8 (m2)
Height 2.6 (m)
Room Rressure Required 50.0 (Pa)
Leakage Area (See calculation in table below) (cm2)

2. Air Change Required - AC


3. Exhaust Rate - (m3/h)
4. Toilet Exhaust Rate - (m3/h)
4. Filter Capacity - (m3/h)
Filter Qty.
5. Volumetric airflow rate (leakage rate)
Q = 0.839*A* (∆p)^0.5 = 0.116 (m3/s)
419.14 (m3/h)
Safety Factor 5% 20.957 (m3/h)

Total Fresh Air 440.09 (m3/h)


122.25 (l/s)

Reference:
1) 2001 ASHRAE Handbook - HVAC Fundamentais, Chapter 26 - Ventilation and Infiltration
1) 2007 ASHRAE Handbook - HVAC Applications, Chapter 52 - Fire and Smoke Management
2) Cleanroom Design, W. Whyte

Calculation of Building Effective Air Leakage Area

Size
Component Description Qty
(m2)

Single, not weatherstripped 1 1.89


Door
Double, not weatherstripped 1 3.78
Wall 1 85.00
Roof 1 51.80
Floor 1 51.80

SUMMARY
(See calculation in table below) (cm2)

116.43 (l/s)
5.82 (l/s)

A per unit A
(refer Table 1) (cm2)

12.0 22.7
7.00 26.5
0.78 66.3
0.78 40.4
0.78 40.4

196.2

Potrebbero piacerti anche