ITEM DESCRIPCION UM CANT. LARGO ANCHO ALTO PARCIAL TOTAL

01.00.00 MEJORAMIENTO DE PISTAS CON PAVIMENTO RIGIDO

01.01.00 OBRAS PROVISIONALES


01.01.01 CONSTRUCCIONES PROVISIONALES
CARTEL DE OBRA IMPRESIÓN DE BANNER DE 3.60 m X 2.40 m
01.01.01.01 und 1.00
(SOPORTE DE MADERA)
1.00 1.00
01.01.01.02 ALQUILER DE LOCAL PARA LA OBRA mes 2.00
2.00 2.00
01.01.01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPO GLB 1.00 1.00 1.00

01.01.02 INSTALACIONES PROVISIONALES


01.01.02.01 AGUA PARA LA OBRA 1.00
pto 1.00 1.00 1.00
01.02.00 TRABAJOS PRELIMINARES
01.02.01 LIMPIEZA DE TERRENO 872.92
01.02.01.01 LIMPIEZA MANUAL DE TERRENO NORMAL m2
PASAJE SANTA INES CALZADA - PAÑO 01 1.00 area 9.97 9.97
PAÑO 02 1.00 area 10.35 10.35
PAÑO 03 1.00 area 9.62 9.62
PAÑO 04 1.00 area 10.02 10.02
PAÑO 05, 07, 09, 11, 13 5.00 area 9.61 48.07
PAÑO 06, 08, 10, 12, 14 5.00 area 9.60 48.00
PAÑO 15 1.00 area 7.55 7.55
PAÑO 16 1.00 area 7.54 7.54
PAÑO 17 1.00 area 8.57 8.57
PAÑO 18 1.00 area 7.78 7.78
PAÑO 19 1.00 area 8.44 8.44
PAÑO 20 1.00 area 7.53 7.53
PAÑO 21, 23, 25, 27 4.00 area 9.62 38.48
PAÑO 22, 24, 26, 28 4.00 area 9.60 38.40
PAÑO 29 1.00 area 8.98 8.98
PAÑO30 1.00 area 8.96 8.96
PAÑO 31 1.00 area 8.07 8.07
PAÑO 32 1.00 area 8.74 8.74
PAÑO 33 1.00 area 8.74 8.74
PAÑO 34 1.00 area 9.27 9.27
PAÑO 35 1.00 area 9.62 9.62
PAÑO 36 1.00 area 9.60 9.60
PAÑO 37 1.00 area 9.62 9.62
PAÑO 38 1.00 area 9.60 9.60
PAÑO 39 1.00 area 9.62 9.62
PAÑO 40 1.00 area 9.60 9.60
PAÑO 41 1.00 area 9.62 9.62
PAÑO 42 1.00 area 9.60 9.60
PAÑO 43 1.00 area 9.62 9.62
PAÑO 44 1.00 area 9.60 9.60
PAÑO 45 1.00 area 9.62 9.62
PAÑO 46 1.00 area 9.60 9.60
PAÑO 47 1.00 area 9.62 9.62
PAÑO 48 1.00 area 9.60 9.60
PAÑO 49 1.00 area 9.62 9.62
PAÑO 50 1.00 area 9.60 9.60
PAÑO 51 1.00 area 9.73 9.73
PAÑO 52 1.00 3.00 9.60 28.79
PAÑO 53 1.00 area 9.62 9.62
PAÑO 54 1.00 area 9.60 9.60
PAÑO 55 1.00 area 9.62 9.62
PAÑO 56 1.00 3.00 9.60 28.80
PAÑO 57 1.00 area 9.62 9.62
PAÑO 58 1.00 area 9.60 9.60
PAÑO 59 1.00 area 5.45 5.45
PAÑO 60 1.00 area 4.91 4.91
PAÑO 61 1.00 3.00 2.60 7.80
PAÑO 62 1.00 area 9.06 9.06
PAÑO 63 1.00 area 9.24 9.24
PAÑO 64 1.00 area 8.78 8.78
PAÑO 65 1.00 area 1.80 1.80
PAÑO 66 1.00 area 7.10 7.10
PAÑO 67 1.00 area 9.00 9.00
PAÑO 68 1.00 area 7.65 7.65
PAÑO 69 1.00 area 8.29 8.29
PAÑO 70 1.00 area 9.00 9.00
HOJA DE METRAD OS

"MEJORAMIENTO DE PISTAS Y CONSTRUCCION DE VEREDAS Y ESCALINATAS EN EL PASAJE SANTA INES DISTRITO Y PROVINCIA DE CHANCHAMAYO
PROYECTO SNIP Nº 220651

UBICACIÓN :PASAJE SANTA INES - LA MERCED CHANCHAMAYO


FECHA : FEBRERO 2014

ITEM DESCRIPCION UM CANT. LARGO ANCHO ALTO PARCIAL TOTAL

PAÑO 71 1.00 area 7.65 7.65


PASAJE SANTA INES ESTACIONAMIENTO - E01 1.00 area 4.24 4.24
E02, E03, E04, E05 4.00 area 6.24 24.96
E06 1.00 area 4.90 4.90
E07 1.00 area 5.98 5.98
E08 1.00 area 5.94 5.94
E09, E10, E11, E12 4.00 area 6.21 24.84
E13 1.00 area 5.80 5.80
E14 1.00 area 4.84 4.84
E15 1.00 area 5.37 5.37
E16 1.00 area 6.24 6.24
E17 1.00 area 6.24 6.24
E18 1.00 area 6.24 6.24
E19 1.00 area 6.23 6.23
E20 1.00 area 6.24 6.24
E21 1.00 area 6.24 6.24
E22 1.00 area 6.14 6.14
E23 1.00 area 1.52 1.52
B1 1.00 area 30.35 30.35
B2 1.00 area 32.75 32.75
01.02.02 TRAZO, NIVELES Y REPLANTEOS 126.87
TRAZO Y REPLANTEO EN TERRENO NORMAL CON EQUIPO -
01.02.02.01 ml
OBRAS LONGITUDINAL-PRELIMINAR
Pasaje Santa Ines PISTA 0+00-0+92 ml 1.00 92.00 92.00
Pasaje Santa Ines ESCALINATA 0+92-0+126.87 ml 1.00 34.87 34.87

TRAZO Y REPLANTEO EN TERRENO NORMAL CON EQUIPO -


01.02.02.02 ml 126.87
OBRAS LONGITUDINAL-DURANTE EL PROCESO
Pasaje Santa Ines PISTA 0+00-0+92 ml 1.00 92.00 92.00
Pasaje Santa Ines ESCALINATA 0+92-0+126.87 ml 1.00 34.87 34.87
01.02.03 DEMOLICIONES
01.02.03.01 DEMOLICIÓN DE MURO DE LADRILLO m2 44.88
VIENDAS EN PROPIEDAD DE LITIGIO m2 1.00 AREA 9.21 9.21
m2 1.00 AREA 15.16 15.16
m3 1.00 AREA 20.51 20.51

01.02.03.02 DEMOLICIÓN DE VEREDA E=0.15 M m2 124.25


LADO DERECHA PROGRESIVA 0+010 - 0+040 m2 1.00 AREA PLANO 36.02 36.02
LADO DERECHA PROGRESIVA 0+060 1.00 AREA PLANO 7.75 7.75
LADO IZQUIERDO PROGRESIVA 0+018 - 0+048 1.00 AREA PLANO 80.48 80.48

01.02.03.03 ELIMINACIÓN DE DESMONTE (ALINEAMIENTO) M3 108.39


DE VIVIENDAS M3 1.00 AREA 44.88 2.00 89.75
DE VEREDA M3 1.00 AREA 124.25 0.15 18.64
01.03.00 MOVIMIENTO DE TIERRAS
01.03.01 EXPLANACION
CORTE DE TERRENO A NIVEL SUB RASANTE CON EQUIPO
01.03.01.01 m3 396.69
PESADO
Según
PAVIMENTO RIGIDO 396.69 396.69
Explanaciones

01.03.01.02 PERFILADO Y COMPACTADO CON MAQUINARIA m2 872.92


PASAJE SANTA INES CALZADA - PAÑO 01 1.00 area 9.97 9.97
PAÑO 02 1.00 area 10.35 10.35
PAÑO 03 1.00 area 9.62 9.62
PAÑO 04 1.00 area 10.02 10.02
PAÑO 05, 07, 09, 11, 13 5.00 area 9.61 48.07
PAÑO 06, 08, 10, 12, 14 5.00 area 9.60 48.00
PAÑO 15 1.00 area 7.55 7.55
PAÑO 16 1.00 area 7.54 7.54
PAÑO 17 1.00 area 8.57 8.57
PAÑO 18 1.00 area 7.78 7.78
PAÑO 19 1.00 area 8.44 8.44
PAÑO 20 1.00 area 7.53 7.53
PAÑO 21, 23, 25, 27 4.00 area 9.62 38.48
PAÑO 22, 24, 26, 28 4.00 area 9.60 38.40
PAÑO 29 1.00 area 8.98 8.98
PAÑO30 1.00 area 8.96 8.96
PAÑO 31 1.00 area 8.07 8.07
PAÑO 32 1.00 area 8.74 8.74
PAÑO 33 1.00 area 8.74 8.74
PAÑO 34 1.00 area 9.27 9.27
PAÑO 35 1.00 area 9.62 9.62
HOJA DE METRAD OS

"MEJORAMIENTO DE PISTAS Y CONSTRUCCION DE VEREDAS Y ESCALINATAS EN EL PASAJE SANTA INES DISTRITO Y PROVINCIA DE CHANCHAMAYO
PROYECTO SNIP Nº 220651

UBICACIÓN :PASAJE SANTA INES - LA MERCED CHANCHAMAYO


FECHA : FEBRERO 2014

ITEM DESCRIPCION UM CANT. LARGO ANCHO ALTO PARCIAL TOTAL

PAÑO 36 1.00 area 9.60 9.60


PAÑO 37 1.00 area 9.62 9.62
PAÑO 38 1.00 area 9.60 9.60
PAÑO 39 1.00 area 9.62 9.62
PAÑO 40 1.00 area 9.60 9.60
PAÑO 41 1.00 area 9.62 9.62
PAÑO 42 1.00 area 9.60 9.60
PAÑO 43 1.00 area 9.62 9.62
PAÑO 44 1.00 area 9.60 9.60
PAÑO 45 1.00 area 9.62 9.62
PAÑO 46 1.00 area 9.60 9.60
PAÑO 47 1.00 area 9.62 9.62
PAÑO 48 1.00 area 9.60 9.60
PAÑO 49 1.00 area 9.62 9.62
PAÑO 50 1.00 area 9.60 9.60
PAÑO 51 1.00 area 9.73 9.73
PAÑO 52 1.00 3.00 9.60 28.79
PAÑO 53 1.00 area 9.62 9.62
PAÑO 54 1.00 area 9.60 9.60
PAÑO 55 1.00 area 9.62 9.62
PAÑO 56 1.00 3.00 9.60 28.80
PAÑO 57 1.00 area 9.62 9.62
PAÑO 58 1.00 area 9.60 9.60
PAÑO 59 1.00 area 5.45 5.45
PAÑO 60 1.00 area 4.91 4.91
PAÑO 61 1.00 3.00 2.60 7.80
PAÑO 62 1.00 area 9.06 9.06
PAÑO 63 1.00 area 9.24 9.24
PAÑO 64 1.00 area 8.78 8.78
PAÑO 65 1.00 area 1.80 1.80
PAÑO 66 1.00 area 7.10 7.10
PAÑO 67 1.00 area 9.00 9.00
PAÑO 68 1.00 area 7.65 7.65
PAÑO 69 1.00 area 8.29 8.29
PAÑO 70 1.00 area 9.00 9.00
PAÑO 71 1.00 area 7.65 7.65
PASAJE SANTA INES ESTACIONAMIENTO - E01 1.00 area 4.24 4.24
E02, E03, E04, E05 4.00 area 6.24 24.96
E06 1.00 area 4.90 4.90
E07 1.00 area 5.98 5.98
E08 1.00 area 5.94 5.94
E09, E10, E11, E12 4.00 area 6.21 24.84
E13 1.00 area 5.80 5.80
E14 1.00 area 4.84 4.84
E15 1.00 area 5.37 5.37
E16 1.00 area 6.24 6.24
E17 1.00 area 6.24 6.24
E18 1.00 area 6.24 6.24
E19 1.00 area 6.23 6.23
E20 1.00 area 6.24 6.24
E21 1.00 area 6.24 6.24
E22 1.00 area 6.14 6.14
E23 1.00 area 1.52 1.52
B1 1.00 area 30.35 30.35
B2 1.00 area 32.75 32.75
01.03.02 RELLENO
RELLENO COMPACTADO C/ MAT. PRESTAMO INC. PLANCHA
01.03.02.01 Vol (explanaciones) f. reduccion f. desperdicio 0.27
COMP.
Ver Metrado de Explanaciones (Rellenos) m3 1.00 0.17 1.20 1.30 0.27

01.03.03 ELIMINACION DE MATERIALES


ELIMINACIÓN DE MAT.EXCED.C/VOLQUETE DE 6 M3 CARGUIO
01.03.03.02 m3 1.00 vol 396.42 396.42 396.42
MANUAL D<= 5KM

01.04.00 MEJORAMIENTO DE LA SUB RASANTE m2

RELLENO CON AFIRMADO Y/O MATERIAL GRANULAR E=6" INC.


01.04.01 m2 872.92
COMPACTACIÓN EQUIPO PESADO (INC CONFORMACION)

PASAJE SANTA INES - PAÑO 01 1.00 area 9.97 9.97

PAÑO 02 1.00 area 10.35 10.35

PAÑO 03 1.00 area 9.62 9.62


HOJA DE METRAD OS

"MEJORAMIENTO DE PISTAS Y CONSTRUCCION DE VEREDAS Y ESCALINATAS EN EL PASAJE SANTA INES DISTRITO Y PROVINCIA DE CHANCHAMAYO
PROYECTO SNIP Nº 220651

UBICACIÓN :PASAJE SANTA INES - LA MERCED CHANCHAMAYO


FECHA : FEBRERO 2014

ITEM DESCRIPCION UM CANT. LARGO ANCHO ALTO PARCIAL TOTAL

PAÑO 04 1.00 area 10.02 10.02

PAÑO 05, 07, 09, 11, 13 5.00 area 9.61 48.07

PAÑO 06, 08, 10, 12, 14 5.00 area 9.60 48.00

PAÑO 15 1.00 area 7.55 7.55

PAÑO 16 1.00 area 7.54 7.54

PAÑO 17 1.00 area 8.57 8.57

PAÑO 18 1.00 area 7.78 7.78

PAÑO 19 1.00 area 8.44 8.44

PAÑO 20 1.00 area 7.53 7.53

PAÑO 21, 23, 25, 27 4.00 area 9.62 38.48

PAÑO 22, 24, 26, 28 4.00 area 9.60 38.40

PAÑO 29 1.00 area 8.98 8.98


PAÑO30 1.00 area 8.96 8.96
PAÑO 31 1.00 area 8.07 8.07
PAÑO 32 1.00 area 8.74 8.74
PAÑO 33 1.00 area 8.74 8.74
PAÑO 34 1.00 area 9.27 9.27
PAÑO 35 1.00 area 9.62 9.62
PAÑO 36 1.00 area 9.60 9.60
PAÑO 37 1.00 area 9.62 9.62
PAÑO 38 1.00 area 9.60 9.60
PAÑO 39 1.00 area 9.62 9.62
PAÑO 40 1.00 area 9.60 9.60
PAÑO 41 1.00 area 9.62 9.62
PAÑO 42 1.00 area 9.60 9.60
PAÑO 43 1.00 area 9.62 9.62
PAÑO 44 1.00 area 9.60 9.60
PAÑO 45 1.00 area 9.62 9.62
PAÑO 46 1.00 area 9.60 9.60
PAÑO 47 1.00 area 9.62 9.62
PAÑO 48 1.00 area 9.60 9.60
PAÑO 49 1.00 area 9.62 9.62
PAÑO 50 1.00 area 9.60 9.60
PAÑO 51 1.00 area 9.73 9.73
PAÑO 52 1.00 3.00 9.60 28.79
PAÑO 53 1.00 area 9.62 9.62
PAÑO 54 1.00 area 9.60 9.60
PAÑO 55 1.00 area 9.62 9.62
PAÑO 56 1.00 3.00 9.60 28.80
PAÑO 57 1.00 area 9.62 9.62
PAÑO 58 1.00 area 9.60 9.60
PAÑO 59 1.00 area 5.45 5.45
PAÑO 60 1.00 area 4.91 4.91
PAÑO 61 1.00 3.00 2.60 7.80
PAÑO 62 1.00 area 9.06 9.06
PAÑO 63 1.00 area 9.24 9.24
PAÑO 64 1.00 area 8.78 8.78
PAÑO 65 1.00 area 1.80 1.80
PAÑO 66 1.00 area 7.10 7.10
PAÑO 67 1.00 area 9.00 9.00
PAÑO 68 1.00 area 7.65 7.65
PAÑO 69 1.00 area 8.29 8.29
PAÑO 70 1.00 area 9.00 9.00
PAÑO 71 1.00 area 7.65 7.65
0.00
PASAJE SANTA INES ESTACIONAMIENTO - E01 1.00 area 4.24 4.24
E02, E03, E04, E05 4.00 area 6.24 24.96
E06 1.00 area 4.90 4.90
E07 1.00 area 5.98 5.98
E08 1.00 area 5.94 5.94
E09, E10, E11, E12 4.00 area 6.21 24.84
E13 1.00 area 5.80 5.80
E14 1.00 area 4.84 4.84
E15 1.00 area 5.37 5.37
E16 1.00 area 6.24 6.24
E17 1.00 area 6.24 6.24
HOJA DE METRAD OS

"MEJORAMIENTO DE PISTAS Y CONSTRUCCION DE VEREDAS Y ESCALINATAS EN EL PASAJE SANTA INES DISTRITO Y PROVINCIA DE CHANCHAMAYO
PROYECTO SNIP Nº 220651

UBICACIÓN :PASAJE SANTA INES - LA MERCED CHANCHAMAYO


FECHA : FEBRERO 2014

ITEM DESCRIPCION UM CANT. LARGO ANCHO ALTO PARCIAL TOTAL

E18 1.00 area 6.24 6.24


E19 1.00 area 6.23 6.23
E20 1.00 area 6.24 6.24
E21 1.00 area 6.24 6.24
E22 1.00 area 6.14 6.14
E23 1.00 area 1.52 1.52
B1 1.00 area 30.35 30.35
B2 1.00 area 32.75 32.75

01.05.00 SUB BASE GRANULAR

RELLENO CON A FIRMADO Y/O MATERIAL GRANULAR E=8"


01.05.01 m2 872.92
INC. COMPACTACIÓN EQUIPO PESADO (INC CONFORMACION)

PASAJE SANTA INES - PAÑO 01 1.00 area 9.97 9.97


PAÑO 02 1.00 area 10.35 10.35
PAÑO 03 1.00 area 9.62 9.62
PAÑO 04 1.00 area 10.02 10.02
PAÑO 05, 07, 09, 11, 13 5.00 area 9.61 48.07
PAÑO 06, 08, 10, 12, 14 5.00 area 9.60 48.00
PAÑO 15 1.00 area 7.55 7.55
PAÑO 16 1.00 area 7.54 7.54
PAÑO 17 1.00 area 8.57 8.57
PAÑO 18 1.00 area 7.78 7.78
PAÑO 19 1.00 area 8.44 8.44
PAÑO 20 1.00 area 7.53 7.53
PAÑO 21, 23, 25, 27 4.00 area 9.62 38.48
PAÑO 22, 24, 26, 28 4.00 area 9.60 38.40
PAÑO 29 1.00 area 8.98 8.98
PAÑO30 1.00 area 8.96 8.96
PAÑO 31 1.00 area 8.07 8.07
PAÑO 32 1.00 area 8.74 8.74
PAÑO 33 1.00 area 8.74 8.74
PAÑO 34 1.00 area 9.27 9.27
PAÑO 35 1.00 area 9.62 9.62
PAÑO 36 1.00 area 9.60 9.60
PAÑO 37 1.00 area 9.62 9.62
PAÑO 38 1.00 area 9.60 9.60
PAÑO 39 1.00 area 9.62 9.62
PAÑO 40 1.00 area 9.60 9.60
PAÑO 41 1.00 area 9.62 9.62
PAÑO 42 1.00 area 9.60 9.60
PAÑO 43 1.00 area 9.62 9.62
PAÑO 44 1.00 area 9.60 9.60
PAÑO 45 1.00 area 9.62 9.62
PAÑO 46 1.00 area 9.60 9.60
PAÑO 47 1.00 area 9.62 9.62
PAÑO 48 1.00 area 9.60 9.60
PAÑO 49 1.00 area 9.62 9.62
PAÑO 50 1.00 area 9.60 9.60
PAÑO 51 1.00 area 9.73 9.73
PAÑO 52 1.00 3.00 9.60 28.79
PAÑO 53 1.00 area 9.62 9.62
PAÑO 54 1.00 area 9.60 9.60
PAÑO 55 1.00 area 9.62 9.62
PAÑO 56 1.00 3.00 9.60 28.80
PAÑO 57 1.00 area 9.62 9.62
PAÑO 58 1.00 area 9.60 9.60
PAÑO 59 1.00 area 5.45 5.45
PAÑO 60 1.00 area 4.91 4.91
PAÑO 61 1.00 3.00 2.60 7.80
PAÑO 62 1.00 area 9.06 9.06
PAÑO 63 1.00 area 9.24 9.24
PAÑO 64 1.00 area 8.78 8.78
PAÑO 65 1.00 area 1.80 1.80
HOJA DE METRAD OS

"MEJORAMIENTO DE PISTAS Y CONSTRUCCION DE VEREDAS Y ESCALINATAS EN EL PASAJE SANTA INES DISTRITO Y PROVINCIA DE CHANCHAMAYO
PROYECTO SNIP Nº 220651

UBICACIÓN :PASAJE SANTA INES - LA MERCED CHANCHAMAYO


FECHA : FEBRERO 2014

ITEM DESCRIPCION UM CANT. LARGO ANCHO ALTO PARCIAL TOTAL

PAÑO 66 1.00 area 7.10 7.10


PAÑO 67 1.00 area 9.00 9.00
PAÑO 68 1.00 area 7.65 7.65
PAÑO 69 1.00 area 8.29 8.29
PAÑO 70 1.00 area 9.00 9.00
PAÑO 71 1.00 area 7.65 7.65
PASAJE SANTA INES ESTACIONAMIENTO - E01 1.00 area 4.24 4.24
E02, E03, E04, E05 4.00 area 6.24 24.96
E06 1.00 area 4.90 4.90
E07 1.00 area 5.98 5.98
E08 1.00 area 5.94 5.94
E09, E10, E11, E12 4.00 area 6.21 24.84
E13 1.00 area 5.80 5.80
E14 1.00 area 4.84 4.84
E15 1.00 area 5.37 5.37
E16 1.00 area 6.24 6.24
E17 1.00 area 6.24 6.24
E18 1.00 area 6.24 6.24
E19 1.00 area 6.23 6.23
E20 1.00 area 6.24 6.24
E21 1.00 area 6.24 6.24
E22 1.00 area 6.14 6.14
E23 1.00 area 1.52 1.52
B1 1.00 area 30.35 30.35
B2 1.00 area 32.75 32.75

01.06.00 PAVIMENTO
01.06.01 ENCOFRADO Y DESENCOFRADO PAVIMENTO m2 136.74

Lado Derecho longitudinal de la Via m2 1.00 86.26 0.20 17.25

Lado Izquierdo Longitudinal de la Via m2 1.00 86.85 0.20 17.37

Eje de la calzada m2 1.00 81.51 0.20 16.30

Lado Derecho longitudinal Estacionamiento m2 1.00 80.60 0.20 16.12

Transversales de la calzada m2 1.00 320.23 0.20 64.05

Pje Aguajal m2 1.00 28.24 0.20 5.65

PAVIMENTACIÓN DE CONCRETO F'C=210 KG/CM2 E=0.20M (C:H)


01.06.02 m2 872.92
INC CURADO

PASAJE SANTA INES CALZADA - PAÑO 01 1.00 area 9.97 9.97


PAÑO 02 1.00 area 10.35 10.35
PAÑO 03 1.00 area 9.62 9.62
PAÑO 04 1.00 area 10.02 10.02
PAÑO 05, 07, 09, 11, 13 5.00 area 9.61 48.07
PAÑO 06, 08, 10, 12, 14 5.00 area 9.60 48.00
PAÑO 15 1.00 area 7.55 7.55
PAÑO 16 1.00 area 7.54 7.54
PAÑO 17 1.00 area 8.57 8.57
PAÑO 18 1.00 area 7.78 7.78
PAÑO 19 1.00 area 8.44 8.44
PAÑO 20 1.00 area 7.53 7.53
PAÑO 21, 23, 25, 27 4.00 area 9.62 38.48
PAÑO 22, 24, 26, 28 4.00 area 9.60 38.40
PAÑO 29 1.00 area 8.98 8.98
PAÑO30 1.00 area 8.96 8.96
PAÑO 31 1.00 area 8.07 8.07
PAÑO 32 1.00 area 8.74 8.74
PAÑO 33 1.00 area 8.74 8.74
PAÑO 34 1.00 area 9.27 9.27
HOJA DE METRAD OS

"MEJORAMIENTO DE PISTAS Y CONSTRUCCION DE VEREDAS Y ESCALINATAS EN EL PASAJE SANTA INES DISTRITO Y PROVINCIA DE CHANCHAMAYO
PROYECTO SNIP Nº 220651

UBICACIÓN :PASAJE SANTA INES - LA MERCED CHANCHAMAYO


FECHA : FEBRERO 2014

ITEM DESCRIPCION UM CANT. LARGO ANCHO ALTO PARCIAL TOTAL

PAÑO 35 1.00 area 9.62 9.62


PAÑO 36 1.00 area 9.60 9.60
PAÑO 37 1.00 area 9.62 9.62
PAÑO 38 1.00 area 9.60 9.60
PAÑO 39 1.00 area 9.62 9.62
PAÑO 40 1.00 area 9.60 9.60
PAÑO 41 1.00 area 9.62 9.62
PAÑO 42 1.00 area 9.60 9.60
PAÑO 43 1.00 area 9.62 9.62
PAÑO 44 1.00 area 9.60 9.60
PAÑO 45 1.00 area 9.62 9.62
PAÑO 46 1.00 area 9.60 9.60
PAÑO 47 1.00 area 9.62 9.62
PAÑO 48 1.00 area 9.60 9.60
PAÑO 49 1.00 area 9.62 9.62
PAÑO 50 1.00 area 9.60 9.60
PAÑO 51 1.00 area 9.73 9.73
PAÑO 52 1.00 3.00 9.60 28.79
PAÑO 53 1.00 area 9.62 9.62
PAÑO 54 1.00 area 9.60 9.60
PAÑO 55 1.00 area 9.62 9.62
PAÑO 56 1.00 3.00 9.60 28.80
PAÑO 57 1.00 area 9.62 9.62
PAÑO 58 1.00 area 9.60 9.60
PAÑO 59 1.00 area 5.45 5.45
PAÑO 60 1.00 area 4.91 4.91
PAÑO 61 1.00 3.00 2.60 7.80
PAÑO 62 1.00 area 9.06 9.06
PAÑO 63 1.00 area 9.24 9.24
PAÑO 64 1.00 area 8.78 8.78
PAÑO 65 1.00 area 1.80 1.80
PAÑO 66 1.00 area 7.10 7.10
PAÑO 67 1.00 area 9.00 9.00
PAÑO 68 1.00 area 7.65 7.65
PAÑO 69 1.00 area 8.29 8.29
PAÑO 70 1.00 area 9.00 9.00
PAÑO 71 1.00 area 7.65 7.65
0.00
PASAJE SANTA INES ESTACIONAMIENTO - E01 1.00 area 4.24 4.24
E02, E03, E04, E05 4.00 area 6.24 24.96
E06 1.00 area 4.90 4.90
E07 1.00 area 5.98 5.98
E08 1.00 area 5.94 5.94
E09, E10, E11, E12 4.00 area 6.21 24.84
E13 1.00 area 5.80 5.80
E14 1.00 area 4.84 4.84
E15 1.00 area 5.37 5.37
E16 1.00 area 6.24 6.24
E17 1.00 area 6.24 6.24
E18 1.00 area 6.24 6.24
E19 1.00 area 6.23 6.23
E20 1.00 area 6.24 6.24
E21 1.00 area 6.24 6.24
E22 1.00 area 6.14 6.14
E23 1.00 area 1.52 1.52
B1 1.00 area 30.35 30.35
B2 1.00 area 32.75 32.75
HOJA DE METRAD OS

"MEJORAMIENTO DE PISTAS Y CONSTRUCCION DE VEREDAS Y ESCALINATAS EN EL PASAJE SANTA INES DISTRITO Y PROVINCIA DE CHANCHAMAYO
PROYECTO SNIP Nº 220651

UBICACIÓN :PASAJE SANTA INES - LA MERCED CHANCHAMAYO


FECHA : FEBRERO 2014

ITEM DESCRIPCION UM CANT. LARGO ANCHO ALTO PARCIAL TOTAL

JUNTA DE DILATACION EN PAVIMENTOS RIGIDOS CON


01.06.03 m 1.00 683.69
TECNOPOR Y SELLADO CON ASFALTO E= 1", h LOSA

Lado Derecho longitudinal de la Via m 1.00 86.26 86.26


Lado Izquierdo Longitudinal de la Via m 1.00 86.85 86.85
Eje de la calzada m 1.00 81.51 81.51
Lado Derecho longitudinal Estacionamiento m 1.00 80.60 80.60
Transversales de la calzada m 1.00 320.23 320.23
Pje Aguajal m 1.00 28.24 28.24

01.07.00 OBRAS DE ARTE


01.07.01 DRENAJE - CUNETAS
01.07.01.01 CORTE EN TERRENO NORMAL MANUAL m3 30.46
Lado derecho longitudinal 1.00 86.26 0.40 0.40 13.80
Lado Izquierdo longitudinal 1.00 86.85 0.40 0.40 13.90
tranversal inicio de escalinata 1.00 7.65 0.40 0.45 1.38
Pje Aguajal 1.00 8.66 0.40 0.40 1.39

ELIMINACIÓN DE MAT.EXCED.C/VOLQUETE DE 6 M3 CARGUIO


01.07.01.02 m3 1.00 30.46 ESPNJ 1.25 38.07 38.07
MANUAL D<= 5KM

01.07.01.03 CUNETAS - CONCRETO F'C= 175 KG/CM2 (C:H), INC CURADO m3 12.66

Lado derecho longitudinal 1.00 86.26 area 0.07 5.61


Lado Izquierdo longitudinal 1.00 86.85 area 0.07 5.65
tranversal inicio de escalinata 1.00 7.65 area 0.07 0.50
Pje Aguajal 1.00 8.66 area 0.11 0.91

01.07.01.04 JUNTA CON ASFALTO E= 1" m 39.67


Lado derecho longitudinal 28.75 0.60 17.25
Izquierdo longitudinal 28.95 0.60 17.37
2.55 1.30 3.32
2.89 0.60 1.73

01.08.01.05 TARRAJEO DE CUNETA C:A 1.5 e= 1.5 CM m2 115.95


Lado derecho longitudinal 1.00 86.26 0.60 51.76
Izquierdo longitudinal 1.00 86.85 0.60 52.11
cuneta con rejilla 1.00 7.65 0.90 6.89
Pje Aguajal 1.00 8.66 0.60 5.19

01.08.01.06 REJILLA METALICA DE F G° DE 2"X2" m 1.00 3.00 3.00 3.00

01.07.02 SARDINEL
01.07.02.01 CORTE EN TERRENO NORMAL MANUAL m3 30.30
Lado derecho longitudinal 1.00 91.35 0.40 0.40 14.62
Izquierdo longitudinal 1.00 89.37 0.40 0.40 14.30
Pje Aguajal 1.00 8.66 0.40 0.40 1.39
ELIMINACIÓN DE MAT.EXCED.C/VOLQUETE DE 6 M3 CARGUIO
01.07.02.02 m3 1.00 30.30 ESPONJ. 1.25 37.88 37.88
MANUAL D<= 5KM

SARDINEL - CONCRETO F'C= 175 KG/CM2 C/MEZCLADORE


01.07.02.03 m3 17.04
INCL. CURADO
Lado derecho longitudinal 1.00 91.35 0.15 0.60 8.22
Izquierdo longitudinal 1.00 89.37 0.15 0.60 8.04
Pje Aguajal 1.00 8.66 0.15 0.60 0.78

01.07.02.04 SARDINELES - ENCOFRADO Y DESENCOFRADO (H=0.40M ) m2 227.25


Lado derecho longitudinal 2.00 91.35 0.60 109.62
Izquierdo longitudinal 2.00 89.37 0.60 107.24
Pje Aguajal 2.00 8.66 0.60 10.39

01.07.02.05 JUNTA CON ASFALTO E= 1" m 37.88


Lado derecho tranversal 30.45 0.60 18.27
Izquierdo tranversal 29.79 0.60 17.87
Pje Aguajal 2.89 0.60 1.73

01.07.02.06 TARRAJEO DE SARDINEL C:A 1.5 e=1.5 cm m2 113.63


Lado derecho longitudinal 1.00 91.35 0.60 54.81
Izquierdo longitudinal 1.00 89.37 0.60 53.62
HOJA DE METRAD OS

"MEJORAMIENTO DE PISTAS Y CONSTRUCCION DE VEREDAS Y ESCALINATAS EN EL PASAJE SANTA INES DISTRITO Y PROVINCIA DE CHANCHAMAYO
PROYECTO SNIP Nº 220651

UBICACIÓN :PASAJE SANTA INES - LA MERCED CHANCHAMAYO


FECHA : FEBRERO 2014

ITEM DESCRIPCION UM CANT. LARGO ANCHO ALTO PARCIAL TOTAL

Pje Aguajal 1.00 8.66 0.60 5.19

01.07.03 VEREDA
01.07.03.01 CORTE EN TERRENO SEMIRROCOSO MANUAL m3 AREA 53.30
V1 1.00 area 4.89 0.20 0.98
PV2 1.00 area 5.43 0.20 1.09
PV3 1.00 area 9.89 0.20 1.98
PV4 1.00 area 10.47 0.20 2.09
PV5 1.00 area 4.69 0.20 0.94
PV6 1.00 area 2.59 0.20 0.52
PV7 1.00 area 2.55 0.20 0.51
PV8 1.00 area 3.64 0.20 0.73
PV9 1.00 area 3.63 0.20 0.73
PV10 1.00 area 3.62 0.20 0.72
PV11 1.00 area 2.84 0.20 0.57
PV12 1.00 area 3.66 0.20 0.73
PV13 1.00 area 3.66 0.20 0.73
PV14 1.00 area 3.60 0.20 0.72
PV15 1.00 area 3.60 0.20 0.72
PV16 1.00 area 3.60 0.20 0.72
PV17 1.00 area 3.60 0.20 0.72
PV18 1.00 area 3.36 0.20 0.67
PV19 1.00 area 2.64 0.20 0.53
PV20 1.00 area 3.08 0.20 0.62
PV21 1.00 area 4.11 0.20 0.82
PV22 1.00 area 4.49 0.20 0.90
PV23 1.00 area 4.88 0.20 0.98
PV24 1.00 area 5.28 0.20 1.06
PV25 1.00 area 5.50 0.20 1.10
PV26 1.00 area 4.97 0.20 0.99
PV27 1.00 area 4.03 0.20 0.81
PV28 1.00 area 4.22 0.20 0.84
PV29 1.00 area 5.85 0.20 1.17
PV30 1.00 area 7.21 0.20 1.44
PV31 1.00 area 5.39 0.20 1.08
PV32 1.00 area 4.47 0.20 0.89
PV33 1.00 area 5.69 0.20 1.14
PV34 1.00 area 6.80 0.20 1.36
PV35 1.00 area 4.58 0.20 0.92
PV36 1.00 area 3.03 0.20 0.61
PV37 1.00 area 3.60 0.20 0.72
PV38 1.00 area 3.60 0.20 0.72
PV39 1.00 area 3.60 0.20 0.72
PV40 1.00 area 3.60 0.20 0.72
PV41 1.00 area 2.83 0.20 0.57
PV42 1.00 area 2.66 0.20 0.53
PV43 1.00 area 2.66 0.20 0.53
PV44 1.00 area 3.60 0.20 0.72
PV45 1.00 area 3.60 0.20 0.72
PV46 1.00 area 3.60 0.20 0.72
PV47 1.00 area 3.60 0.20 0.72
PV48 1.00 area 3.36 0.20 0.67
PV49 1.00 area 3.38 0.20 0.68
PV50 1.00 area 3.69 0.20 0.74
PV51 1.00 area 3.60 0.20 0.72
PV52 1.00 area 3.60 0.20 0.72
PV53 1.00 area 3.60 0.20 0.72
PV54 1.00 area 3.60 0.20 0.72
PV55 1.00 area 3.60 0.20 0.72
PV56 1.00 area 3.60 0.20 0.72
PV57 1.00 area 3.59 0.20 0.72
PV58 1.00 area 3.60 0.20 0.72
PV59 1.00 area 3.60 0.20 0.72
PV60 1.00 area 3.60 0.20 0.72
PV61 1.00 area 3.60 0.20 0.72
PV62 1.00 area 3.60 0.20 0.72
PV63 1.00 area 2.55 0.20 0.51
PV64 1.00 area 0.65 0.20 0.13
PV65 1.00 area 3.60 0.20 0.72
PV66 1.00 area 3.60 0.20 0.72
NIVELACION Y COMPACTACION DE SUBRASANTE CON EQUIPO
01.07.03.02 m2 AREA 266.48
LIVIANO
HOJA DE METRAD OS

"MEJORAMIENTO DE PISTAS Y CONSTRUCCION DE VEREDAS Y ESCALINATAS EN EL PASAJE SANTA INES DISTRITO Y PROVINCIA DE CHANCHAMAYO
PROYECTO SNIP Nº 220651

UBICACIÓN :PASAJE SANTA INES - LA MERCED CHANCHAMAYO


FECHA : FEBRERO 2014

ITEM DESCRIPCION UM CANT. LARGO ANCHO ALTO PARCIAL TOTAL

PV1 1.00 area 4.89 4.89


PV2 1.00 area 5.43 5.43
PV3 1.00 area 9.89 9.89
PV4 1.00 area 10.47 10.47
PV5 1.00 area 4.69 4.69
PV6 1.00 area 2.59 2.59
PV7 1.00 area 2.55 2.55
PV8 1.00 area 3.64 3.64
PV9 1.00 area 3.63 3.63
PV10 1.00 area 3.62 3.62
PV11 1.00 area 2.84 2.84
PV12 1.00 area 3.66 3.66
PV13 1.00 area 3.66 3.66
PV14 1.00 area 3.60 3.60
PV15 1.00 area 3.60 3.60
PV16 1.00 area 3.60 3.60
PV17 1.00 area 3.60 3.60
PV18 1.00 area 3.36 3.36
PV19 1.00 area 2.64 2.64
PV20 1.00 area 3.08 3.08
PV21 1.00 area 4.11 4.11
PV22 1.00 area 4.49 4.49
PV23 1.00 area 4.88 4.88
PV24 1.00 area 5.28 5.28
PV25 1.00 area 5.50 5.50
PV26 1.00 area 4.97 4.97
PV27 1.00 area 4.03 4.03
PV28 1.00 area 4.22 4.22
PV29 1.00 area 5.85 5.85
PV30 1.00 area 7.21 7.21
PV31 1.00 area 5.39 5.39
PV32 1.00 area 4.47 4.47
PV33 1.00 area 5.69 5.69
PV34 1.00 area 6.80 6.80
PV35 1.00 area 4.58 4.58
PV36 1.00 area 3.03 3.03
PV37 1.00 area 3.60 3.60
PV38 1.00 area 3.60 3.60
PV39 1.00 area 3.60 3.60
PV40 1.00 area 3.60 3.60
PV41 1.00 area 2.83 2.83
PV42 1.00 area 2.66 2.66
PV43 1.00 area 2.66 2.66
PV44 1.00 area 3.60 3.60
PV45 1.00 area 3.60 3.60
PV46 1.00 area 3.60 3.60
PV47 1.00 area 3.60 3.60
PV48 1.00 area 3.36 3.36
PV49 1.00 area 3.38 3.38
PV50 1.00 area 3.69 3.69
PV51 1.00 area 3.60 3.60
PV52 1.00 area 3.60 3.60
PV53 1.00 area 3.60 3.60
PV54 1.00 area 3.60 3.60
PV55 1.00 area 3.60 3.60
PV56 1.00 area 3.60 3.60
PV57 1.00 area 3.59 3.59
PV58 1.00 area 3.60 3.60
PV59 1.00 area 3.60 3.60
PV60 1.00 area 3.60 3.60
PV61 1.00 area 3.60 3.60
PV62 1.00 area 3.60 3.60
PV63 1.00 area 2.55 2.55
PV64 1.00 area 0.65 0.65
PV65 1.00 area 3.60 3.60
PV66 1.00 area 3.60 3.60

RELLENO CON AFIRMADO Y/O MATERIAL GRANULAR E=4" INC.


01.07.03.03 m2 Area 266.48
COMPACTACIÓN MANUAL
PV1 1.00 area 4.89 4.89
PV2 1.00 area 5.43 5.43
PV3 1.00 area 9.89 9.89
HOJA DE METRAD OS

"MEJORAMIENTO DE PISTAS Y CONSTRUCCION DE VEREDAS Y ESCALINATAS EN EL PASAJE SANTA INES DISTRITO Y PROVINCIA DE CHANCHAMAYO
PROYECTO SNIP Nº 220651

UBICACIÓN :PASAJE SANTA INES - LA MERCED CHANCHAMAYO


FECHA : FEBRERO 2014

ITEM DESCRIPCION UM CANT. LARGO ANCHO ALTO PARCIAL TOTAL

PV4 1.00 area 10.47 10.47


PV5 1.00 area 4.69 4.69
PV6 1.00 area 2.59 2.59
PV7 1.00 area 2.55 2.55
PV8 1.00 area 3.64 3.64
PV9 1.00 area 3.63 3.63
PV10 1.00 area 3.62 3.62
PV11 1.00 area 2.84 2.84
PV12 1.00 area 3.66 3.66
PV13 1.00 area 3.66 3.66
PV14 1.00 area 3.60 3.60
PV15 1.00 area 3.60 3.60
PV16 1.00 area 3.60 3.60
PV17 1.00 area 3.60 3.60
PV18 1.00 area 3.36 3.36
PV19 1.00 area 2.64 2.64
PV20 1.00 area 3.08 3.08
PV21 1.00 area 4.11 4.11
PV22 1.00 area 4.49 4.49
PV23 1.00 area 4.88 4.88
PV24 1.00 area 5.28 5.28
PV25 1.00 area 5.50 5.50
PV26 1.00 area 4.97 4.97
PV27 1.00 area 4.03 4.03
PV28 1.00 area 4.22 4.22
PV29 1.00 area 5.85 5.85
PV30 1.00 area 7.21 7.21
PV31 1.00 area 5.39 5.39
PV32 1.00 area 4.47 4.47
PV33 1.00 area 5.69 5.69
PV34 1.00 area 6.80 6.80
PV35 1.00 area 4.58 4.58
PV36 1.00 area 3.03 3.03
PV37 1.00 area 3.60 3.60
PV38 1.00 area 3.60 3.60
PV39 1.00 area 3.60 3.60
PV40 1.00 area 3.60 3.60
PV41 1.00 area 2.83 2.83
PV42 1.00 area 2.66 2.66
PV43 1.00 area 2.66 2.66
PV44 1.00 area 3.60 3.60
PV45 1.00 area 3.60 3.60
PV46 1.00 area 3.60 3.60
PV47 1.00 area 3.60 3.60
PV48 1.00 area 3.36 3.36
PV49 1.00 area 3.38 3.38
PV50 1.00 area 3.69 3.69
PV51 1.00 area 3.60 3.60
PV52 1.00 area 3.60 3.60
PV53 1.00 area 3.60 3.60
PV54 1.00 area 3.60 3.60
PV55 1.00 area 3.60 3.60
PV56 1.00 area 3.60 3.60
PV57 1.00 area 3.59 3.59
PV58 1.00 area 3.60 3.60
PV59 1.00 area 3.60 3.60
PV60 1.00 area 3.60 3.60
PV61 1.00 area 3.60 3.60
PV62 1.00 area 3.60 3.60
PV63 1.00 area 2.55 2.55
PV64 1.00 area 0.65 0.65
PV65 1.00 area 3.60 3.60
PV66 1.00 area 3.60 3.60

ELIMINACIÓN DE MAT.EXCED.C/VOLQUETE DE 6 M3 CARGUIO


01.08.03.04 m3 1.00 53.30 ESPONJ 1.25 66.62 66.62
MANUAL D<= 5KM

VEREDA MORTERO FC=175 KG/CM2 E=0.10M INCLUIDO


01.08.03.05 m2 1.00 AREA 266.48 266.48 266.48
ACABADO Y BRUÑADO
HOJA DE METRAD OS

"MEJORAMIENTO DE PISTAS Y CONSTRUCCION DE VEREDAS Y ESCALINATAS EN EL PASAJE SANTA INES DISTRITO Y PROVINCIA DE CHANCHAMAYO
PROYECTO SNIP Nº 220651

UBICACIÓN :PASAJE SANTA INES - LA MERCED CHANCHAMAYO


FECHA : FEBRERO 2014

ITEM DESCRIPCION UM CANT. LARGO ANCHO ALTO PARCIAL TOTAL

01.08.03.06 ENCOFRADO Y DESENCOFRADO DE VEREDA m2 7.56


30.00 1.20 0.10 3.60
30.00 1.20 0.10 3.60
3.00 1.20 0.10 0.36

01.08.03.07 JUNTA CON ASFALTO E= 1" m 265.13


Longitudinal 1.00 91.35 91.35
Longitudinal 1.00 89.37 89.37
Longitudinal 1.00 8.66 8.66
Lado derecho Transversal 30.45 1.20 36.54
Lado Izquierdo Tranversal 29.79 1.20 35.75
Pje Aguajal 2.89 1.20 3.46
01.07.04 RAMPAS
01.07.04.01 CONCRETO DE F'C=175 KG/CM2 m2 5.00 1.00 0.90 4.50 4.50

01.07.05 TAPA DE CONCRETO PARA DISCAPACITADOS


01.07.05.01 CONCRETO DE F'C=175 KG/CM2 m3 4.00 0.90 0.40 0.10 0.14 0.14
01.07.05.02 ENCOFRADO Y DESCENCOFRADO m2 4.00 0.90 0.40 1.44 1.44
01.07.05.03 ACERO fy=4,200 kg/cm2. Kg nv l cant f 12.65
ACERO de Ø1/2" 4.00 0.80 2.00 1.02 6.53
ACERO de Ø1/2" 4.00 0.30 5.00 1.02 6.12

01.07.06 PINTURA TRAFICO


01.07.06.01 PINTURA TRAFICO P/PAVIMENTO RIGIDO M2 20.41
Eje de Via 1.00 81.51 0.10 8.15
Señalizacion 7.00 3.00 0.45 9.45
1.00 AREA 1.18 1.18
1.00 AREA 1.64 1.64
01.07.06.02 PINTURA EN SARDINEL DE VEREDA M2 108.97
Lado Derecho longitudinal de la Via 1.00 86.26 0.60 51.76
Lado Izquierdo Longitudinal de la Via 1.00 86.85 0.60 52.11
1.00 8.51 0.60 5.11
01.08.00 OTROS
01.08.01 CONEXIONES DOMICILIARIAS AGUA
CONEXIÓN Y EMPALME A RED DE AGUA HASTA D=2" INCLUYE
01.08.01.01 pto 7.00
ACCESORIOS
Re Conexion de Agua potable 7.00 7.00

ENCIMADO DE CAJAS DOMICILIARIAS DE AGUA Y DESAGUE


01.08.01.02 Und 12.00
PARA CONSTRUCCION DE VEREDAS
12.00 12.00
01.08.02 DESAGUE
ENCIMADO DE BUZON DE CONCRETO EXISTENTE ᵩ
01.08.02.01 MAX.=1.50M PARA ADECUACION A APVIMENTO POSTERIOR H Und 3.00
max=40 cm
3.00 3.00
02.00.00 ESCALINATAS
02.01.00 OBRAS PRELIMINARES
LIMPIAZA MANUAL DE TERRENO CON PRESENCIA DE
02.01.01 m2 304.00
MALEZAS Y VEGETACION
1.00 38.00 8.00 304.00

02.01.02 TRAZO Y REPLANTEO EN TERRENO NORMAL CON EQUIPO m2 304.00


1.00 38.00 8.00 304.00

02.02.00 MOVIMIENTO DE TIERRAS


02.02.01 CORTE SEGÚN CUADRO DE EXPLANACIONES m3 185.74
1.00 185.74 185.74

RELLENO COMPACTADO C/MAT. PROPIO INCL. PLANCHA


02.02.02 m3 141.83
COMPACTADORA
1.00 141.83 141.83
02.03.00 TRATAMIENTO PARA SUB BASE
NIVELACION Y COMPACTACION DE SUB RASANTE CON EQUIPO
02.03.01 m2 304.00
LIVIANO
1.00 38.00 8.00 304.00
RELLENO CON AFIRMADO Y/O MATERIAL GRANULAR E=8"
02.03.02 m2 152.00
INCL. COMPACTACION CON EQUIPO LIVIANO
1.00 38.00 4.00 152.00
EXTRACCION Y ACOPIO DE AFIRMADO EN CANTERA
02.03.03 m3 22.80
(SELECCIONADO)

Area metrado verera con factor de reduccion de 10% y f. desperdicio 20% 1.00 VOLUM 152.00 0.10 22.80
HOJA DE METRAD OS

"MEJORAMIENTO DE PISTAS Y CONSTRUCCION DE VEREDAS Y ESCALINATAS EN EL PASAJE SANTA INES DISTRITO Y PROVINCIA DE CHANCHAMAYO
PROYECTO SNIP Nº 220651

UBICACIÓN :PASAJE SANTA INES - LA MERCED CHANCHAMAYO


FECHA : FEBRERO 2014

ITEM DESCRIPCION UM CANT. LARGO ANCHO ALTO PARCIAL TOTAL

CARGUIO Y TRANSP. MATERIALES Y/O AGREGADO A


02.03.04 m3 1.00 22.80 22.80 22.80
OBRA(D=10KM) INCL. VOLQUETE 6 M3 MANUAL
02.04.00 MURO DE CONCRETO CICLOPEO
02.04.01 MURO- TRAZO Y REPLANTEO EN TERRENO INCLINADO m2 4.60
Muro tipo 01 H= 3.5m 1.00 2.30 2.00 4.60

MURO- EXCAVACION PARA ZAPATA EN TERRENO TIPO


02.04.02 m3 9.48
CASCAJO Y PIEDRA
m3 1.00 AREA 2.06 2.30 4.74
1.00 AREA 2.06 2.30 4.74
MURO- ELIMINACIÓN DE MAT.EXCED.C/VOLQUETE DE 6 M3
02.04.03 m3 11.37
CARGUIO MANUAL D<= 5KM
1.00 vol= 9.48 1.20 11.37

02.04.04 MURO DE CONTENCION ENCOFRADO Y DESENCOFRADO m2 33.21


2.00 3.72 2.30 17.11
2.00 3.50 2.30 16.10

MURO CONTENCION CON CONCRETO CICLOPEO C:H 1:8 +


02.04.05 m3 19.49
25%PM
AREA
2.00 4.24 2.30 19.49

02.05.00 MURO DE CONCRETO ARMADO

02.05.01 TRAZO Y REPLANTEO EN TERRENO INCLINADO m2 22.45


Muro tipo 01 H= 3.5m 2.00 4.88 2.30 22.45

EXCAVACION PARA ZAPATA EN TERRENO TIPO CASCAJO Y


02.05.02 m3 6.02
PIEDRA
M-01 Gradas lado Izquierdo m3 2.00 AREA 0.41 4.88 4.01
M-01 Gradas lado derecho 1.00 AREA 0.41 4.88 2.01

ELIMINACIÓN DE MAT.EXCED.C/VOLQUETE DE 6 M3 CARGUIO


02.05.03 m3 7.22
MANUAL D<= 5KM
1.00 vol= 6.02 1.20 7.22

02.05.04 MURO DE CONTENCION ENCOFRADO Y DESENCOFRADO m2 25.54


M-01 Gradas m2 5.00 AREA 5.11 25.54
02.05.05 SOLADO DE CONCRETO SIMPLE m2 20.93
3.00 4.65 1.50 20.93
02.05.06 MURO DE CONCRETO F'c=175 Kg/Cm2 m3 11.43
Concreto en zapatas m3 3.00 4.65 1.50 0.40 8.37
Concreto en muro 3.00 AREA 5.11 0.20 3.06
02.05.07 ACERO fy=4,200 kg/cm2. Kg nv l cant f 646.52
acero de 1/2" en zapatas longitudinal 3.00 4.55 8.00 1.02 111.38
acero de 1/2" en zapatas transversales 3.00 1.40 23.00 1.02 98.53
acero de 1/2" en muro h=2.50
vertical 3.00 3.05 12.00 1.02 112.00
vertical 3.00 1.54 12.00 1.02 56.55
HOJA DE METRAD OS

"MEJORAMIENTO DE PISTAS Y CONSTRUCCION DE VEREDAS Y ESCALINATAS EN EL PASAJE SANTA INES DISTRITO Y PROVINCIA DE CHANCHAMAYO
PROYECTO SNIP Nº 220651

UBICACIÓN :PASAJE SANTA INES - LA MERCED CHANCHAMAYO


FECHA : FEBRERO 2014

ITEM DESCRIPCION UM CANT. LARGO ANCHO ALTO PARCIAL TOTAL

horizontal 3.00 2.30 13.00 1.02 91.49


acero de 1/2" en muro h=1.50
vertical 3.00 2.08 13.00 1.02 82.74
vertical 3.00 0.82 13.00 1.02 32.62
horizontal 3.00 2.50 8.00 1.02 61.20
02.05.08 TARRAJEO DE MURO TIPO 2 C:A 1.5 e=1.5 cm m2 10.22
2.00 AREA 5.11 10.22

02.06.00 SARDINELES EN ESCALINATA


02.06.01 TRAZO Y REPLANTEO DE SARDINEL M 152.00
4.00 38.00 152.00

EXCAVACION PARA SARDINEL EN TERRENO TIPO CASCAJO Y


02.06.02 m3 18.04
PIEDRA
Lado Derecho 1.00 37.55 0.40 0.40 6.01
Lado Izquierdo 1.00 25.06 0.40 0.40 4.01
medio lado derecho 1.00 25.06 0.40 0.40 4.01
medio lado izquierdo 1.00 25.06 0.40 0.40 4.01

ENCOFRADO Y DESENCOFRADO DE SARDINEL DE LA


02.06.03 M2 45.09
ESCALINATA
Lado Derecho 1.00 37.55 0.40 15.02
Lado Izquierdo 1.00 25.06 0.40 10.02
medio lado derecho 1.00 25.06 0.40 10.02
medio lado izquierdo 1.00 25.06 0.40 10.02

CIMIENTO DE SARDINEL DE CONCRETO CICLOPEO C:H 1:8 +


02.06.04 m3 18.04
25%PM
1.00 37.55 0.40 0.40 6.01
1.00 25.06 0.40 0.40 4.01
1.00 25.06 0.40 0.40 4.01
1.00 25.06 0.40 0.40 4.01
02.06.05 SARDINEL DE CONCRETO FC=175 KG/CM2 m3 10.15
1.00 37.55 0.60 0.15 3.38
1.00 25.06 0.60 0.15 2.26
1.00 25.06 0.60 0.15 2.26
1.00 25.06 0.60 0.15 2.26
02.06.06 TARRAJEO DE SARDINEL C:A 1.5 e=1.5 cm m2 84.55
Lado Derecho 1.00 37.55 0.75 28.16
Lado Izquierdo 1.00 25.06 0.75 18.80
medio lado derecho 1.00 25.06 0.75 18.80
medio lado izquierdo 1.00 25.06 0.75 18.80
02.07.00 CUNETAS EN ESCALINATA
02.07.01 TRAZO Y REPLANTEO DE SARDINEL M 76.00
2.00 38.00 76.00
02.07.02 CUNETA DE CONCRETO FC=140 FC=140 KG/CM2 m3 2.63
2.00 AREA 0.04 37.60 2.63

02.07.03 ENCOFRADO Y DESENCOFRADO DE CUNETAS DE ESCALINTA m2 16.54

2.00 37.60 0.22 16.54


TUBERIA DE PVC DE 4" PARA DRENAJE EN MURO DE
02.07.04 m 10.00
CONTENCION
4 2.50 10.00
02.08.00 GRADERIAS DE LA ESCALINATA
02.08.01 TRAZO Y REPLANTEO DE ESCALINATA m2 150.40
1.00 37.60 4.00 150.40
02.08.02 ENCOFRADO Y DESENCOFRADO DE GRADAS m2 121.19
Dos lados Longitudinales de la grada 2.00 37.94 0.29 22.01
tranversales de las gradas 114.00 3.00 0.29 99.18

CONCRETO CIMIENTO Fc=175 KG/CM2 EN GRADAS DE LA


02.08.03 m3 0.85
ESCALINATA
1.00 3.00 0.40 0.71 0.85

02.08.04 CONCRETO Fc=175 KG/CM2 EN GRADAS DE LA ESCALINATA m3 24.60

1.00 37.94 3.00 0.15 17.07


114.00 AREA 0.02 3.00 7.52
02.08.05 TARREJEO DE GRADAS CON MEZCLA C:A 1:5 E=1.5 CM m2 157.86
Cotrapaso de peldaño 114.00 3.00 0.16 54.72
Paso de peldaño 110.00 3.00 0.28 92.40
Paso de peldaño 01 1.00 3.00 0.39 1.17
Paso de peldaño descanso 1.00 3.00 1.20 3.60
Paso de peldaño 1.00 3.00 0.50 1.50
Paso de peldaño 1.00 3.00 1.49 4.47
HOJA DE METRAD OS

"MEJORAMIENTO DE PISTAS Y CONSTRUCCION DE VEREDAS Y ESCALINATAS EN EL PASAJE SANTA INES DISTRITO Y PROVINCIA DE CHANCHAMAYO
PROYECTO SNIP Nº 220651

UBICACIÓN :PASAJE SANTA INES - LA MERCED CHANCHAMAYO


FECHA : FEBRERO 2014

ITEM DESCRIPCION UM CANT. LARGO ANCHO ALTO PARCIAL TOTAL

02.09.00 DESCANSO EN LA ESCALINATA


RELLENO CON MATERIAL PROPIO COMPACTACION CON
02.09.01 m3 20.67
EQUIPO LIVIANO
2.00 AREA 4.49 2.30 20.67
RELLENO CON A FIRMADO Y/O MATERIAL GRANULAR E=8"
02.09.02 m2 17.56
INC. COMPACTACIÓN EQUIPO LIVIANO
1.00 4.56 1.84 8.39
1.00 4.56 2.01 9.17

02.09.03 CONCRETO FC = 175 KG/CM2 PARA DESCANSO m3 2.63


1.00 4.56 1.84 0.15 1.26
1.00 4.56 2.01 0.15 1.37
02.09.04 PISO TERMINADO CON CEMENTO PULIDO EN DESCANSO m2 17.56
1.00 4.56 1.84 8.39
1.00 4.56 2.01 9.17
02.10.00 BANCAS EN DESCANSO
02.10.01 TRAZO Y REPLANTEO 2.85
Bancas de concreto Armado 2 AREA 1.24 2.49
02.10.02 EXCAVACION DE ZANJA PARA BANCAS 1.26
Bancas de concreto Armado 2 0.60 0.30 0.36

ELIMINACIÓN DE MAT.EXCED.C/VOLQUETE DE 6 M3 CARGUIO


02.10.03 m3 factor 0.90
MANUAL D<= 5KM
1.00 Volumen 0.72 1.25 0.90

BANCAS - CONCRETO F'c= 175 kg/cm2 CON MEZCLA INCL.


02.10.04 m3 2.00 0.70
CURADO
Cimiento de Bancas
Bancas de concreto Armado m3 3 0.50 0.30 0.30 0.27
Muros de sostenimiento para losa de Banca
Bancas de concreto Armado m3 3 0.50 0.15 0.35 0.16
Losa de Bancas
Bancas de concreto Armado m3 1 area= 1.36 0.10 0.27

02.10.05 BANCAS-LOSA MACIZA-ENCOFRADO Y DESENCOFRADO m2 2.00 6.74


Muros de sostenimiento para losa de Banca m2 3 perimetro= 1.30 0.35 2.73
Losa de Bancas m2 1 area= 1.36 2.72
Perimetro de losa de Banca m2 1 perimetro= 6.44 0.10 1.29

02.10.06 BANCAS-ACERO DE REFUERZO Fy=4200 KG/CM2 Kg 37.63


Muros de sostenimiento para losa de Banca Kg
Fe Ø=3/8" @ .25 verticales Kg 2 18.00 0.85 0.56 17.14
Losa de Bancas
Fe Ø=3/8" @ .14 Longitudinal Kg 2 4.00 3.00 0.56 13.44
Fe Ø=3/8" @ .13 Transversal Kg 2 15.00 0.42 0.56 7.06

02.10.07 BANCAS-TARRAJEO EN MUROS MORTERO C:A 1:5 E=1.5 CM 2.00 6.40

Muros de sostenimiento para losa de Banca m2 3 perimetro= 1.30 0.35 2.73


Losa de Bancas superior m2 1 area= 1.24 2.48
Perimetro de losa de Banca m2 1.00 perimetro= 5.97 0.10 1.19

02.10.08 BARANDA DE F G° DE 2" ml 62.80


Perimetro del descanso 2 8.80 3.00 52.80
2 1.00 5.00 10.00

02.11.00 TRATAMIENTO PAISAJISTICO


TIERRA DE CHACRA PARA RELLENO EN AREAS VERDES
02.11.01 m3 31.01
MATERIAL DE PRESTAMO
2.00 26.50 1.95 0.30 31.01

EXTENDIDO Y NIVELACION DE TIERRA DE CHACRA PARA


02.11.02 m2 103.35
SEMBRADO DE GRASS
2.00 26.50 1.95 103.35

02.12.00 SEMBRADO DE AREAS VERDES


SEMBRADO DE GRASS INCL. PREPARACION DE TERRENO CON
02.12.01 m2 103.35
FERTILIZANTE
2.00 26.50 1.95 103.35
02.12.02 RIEGO DE GRASS CON MANGUERA m2 103.35
2.00 26.50 1.95 103.35
02.13.00 PLANTACION

02.13.01 EXCAVACION DE HOYOS PARA PLANTACION DE ARBOLES 1.28


HOJA DE METRAD OS

"MEJORAMIENTO DE PISTAS Y CONSTRUCCION DE VEREDAS Y ESCALINATAS EN EL PASAJE SANTA INES DISTRITO Y PROVINCIA DE CHANCHAMAYO
PROYECTO SNIP Nº 220651

UBICACIÓN :PASAJE SANTA INES - LA MERCED CHANCHAMAYO


FECHA : FEBRERO 2014

ITEM DESCRIPCION UM CANT. LARGO ANCHO ALTO PARCIAL TOTAL

m3 16.00 0.40 0.50 0.40 1.28


02.13.02 SIEMBRA DE PLANTAS ORNAMENTALES
Und 6.00 6.00 6.00
02.13.03 RIEGO DE PLANTONES

3.00 VARIOS
ACCESORIOS DE LIMPIEZA PUBLICA INCL. INSTALACION DE
3.01 und 5.00 5.00 5.00
TACHO DE BASURA

3.02 SEÑALIZACION EN OBRA DURANTE EJECUCION m. 1.00 280.00 280.00 280.00

03.03 PRUEBA Y ENSAYOS


03.03.01 ENSAYO PROCTOR (COMPACTACION DE SUELO) und 1.00 3.00 3.00 3.00

03.03.02 ENSAYO DENSIDAD DE CAMPO und 1.00 5.00 5.00 5.00

03.03.04 PRUEBA DE RESISTENCIA A LA COMPRESION DEL CONCRETO und 1.00 9.00 9.00 9.00

03.03.05 PRUEBA DE DISEÑO DE MEZCLAS DE CONCRETO und 1.00 2.00 2.00 2.00
03.04 FLETE TERRESTRE GLB
03.04.01 FLETE TERRESTRE GLB 1.00 1.00 1.00

04.00.00 MITIGACION AMBIENTAL


04.01.00 ACONDICIONAMIENTO DE BOTADERO GLB 1.00 1.00 1.00
PLANILLA DE METRADOS

Proyecto "MEJORAMIENTO DE PISTAS Y CONSTRUCCION DE VEREDAS Y ESCALINATAS EN EL PASAJE SANTA INES DISTRITO Y
PROVINCIA DE CHANCHAMAYO SNIP Nº 220651
Distrito : HUANDO
Lugar :PASAJE SANTA INES - LA MERCED CHANCHAMAYO Fecha : Agosto - 2013

Largo Ancho Alto Perimetro


Item Descripción Cant. Parcial Total Unid.
(m) (m) (m) (m)
05.00.00 MURO DE CONCRETO SIMPLE
05.01.01 Limpieza manual de Terreno con presencia de Maleza y Vegetación 96.38 M2
Muro tipo 01 H= 3.5m 1.00 14.50 2.00 29.00
Muro tipo 02 H=4m 1.00 23.46 2.00 46.92
Muro tipo 03 H= 2.5m 1.00 6.20 1.30 8.06
Muro tipo 04 H= 1m 1.00 17.71 0.70 12.40

05.01.01 Trazo y replanteo en terreno normal con equipo 96.38 M2


Muro tipo 01 H= 3.5m 1.00 14.50 2.00 29.00
Muro tipo 02 H=4m 1.00 23.46 2.00 46.92
Muro tipo 03 H= 2.5m 1.00 6.20 1.30 8.06
Muro tipo 04 H= 1m 1.00 17.71 0.70 12.40

05.02.01 Excavación de Zanjas y/o Zapatas Hmáx <= 2.00m en Terreno Normal 133.66 M3
Muro tipo 01 H= 3.5m 1.00 14.50 area 3.13 45.39
Muro tipo 02 H=4m 1.00 23.46 area 2.87 67.33
Muro tipo 03 H= 2.5m 1.00 6.20 area 1.95 12.09
Muro tipo 03 H= 1m 1.00 17.71 area 0.50 8.86

05.02.02 Extracción y Acopio de Afirmado en cantera (Seleccionado) 173.63 M3


Relleno con Material de Prestamo Seleccionado (Muro tipo 01) 1.00 Area Cad = 4.16 14.50 60.32
Relleno con Material de Prestamo Seleccionado (Muro tipo 02) 1.00 Area Cad = 4.83 23.46 113.31

05.02.02 Carguio y Transp.Materiales y/o Agregados a Obra (D>1Km) Inc.Volquete 6 M3 173.63 M3


Relleno con Material de Prestamo Seleccionado (Muro tipo 01) 1.00 Area Cad = 4.16 14.50 60.32
Relleno con Material de Prestamo Seleccionado (Muro tipo 02) 1.00 Area Cad = 4.83 23.46 113.31

05.02.03 Relleno compactado c/mat. Prestamo Inc. Plancha comp. 173.63 M3


Relleno con Material de Prestamo Seleccionado (Muro tipo 01) 1.00 Area Cad = 4.16 14.50 60.32
Relleno con Material de Prestamo Seleccionado (Muro tipo 02) 1.00 Area Cad = 4.83 23.46 113.31

05.02.03 Acarreo de Material excedente para ser utilizado en Rellenos 50m<D<100m 133.66 M3
material de excavacion 1.00 133.66 133.66

Eliminación de Mat.Exced.C/Volquete de 6 m3 carguio manual d<= 5Km 133.66 M3


material de acarreo 1.00 133.66 133.66

Muro de Contención - Encofrado y desencofrado 446.15 M2


Muro tipo 01 H= 3.5m
Cimentacion de muro 2.00 14.50 0.50 14.50
Tapas laterales 2.00 2.00 0.50 2.00
Cara Interior Vertical 1.00 14.50 3.72 53.94
Cara exterior Vertical 1.00 14.50 3.50 50.75
Tapas laterales 2.00 area 4.24 8.48

Muro tipo 02 H= 4m
Cimentacion de muro 2.00 23.46 0.50 23.46
Tapas laterales 2.00 2.00 0.50 2.00
Cara Interior Vertical 1.00 23.46 4.00 93.84
Cara exterior Vertical 1.00 23.46 4.19 98.30
Tapas laterales 2.00 area 4.70 9.40

Muro tipo 03 H= 2.50 m


Cimentacion de muro 2.00 6.20 0.40 4.96
Tapas laterales 2.00 1.30 0.40 1.04
Cara Interior Vertical 1.00 6.20 2.50 15.50
Cara exterior Vertical 1.00 6.20 2.58 16.00
Tapas laterales 2.00 area 2.08 4.16
Muro tipo 04 H= 1.00 m
Cimentacion de muro 2.00 17.71 0.30 10.63
Tapas laterales 2.00 0.70 0.30 0.42
Cara Interior Vertical 1.00 17.71 1.00 17.71
Cara exterior Vertical 1.00 17.71 1.01 17.89
Tapas laterales 2.00 area 0.59 1.18

Muro de Contención - Concreto Ciclopeo C:H 1:8 + 25% PM 195.09 M3


Muro tipo 01 H= 3.5m
Cimentacion de muro 1.00 14.50 2.00 0.50 14.50
Parte elevacion de muro 1.00 14.50 Area 3.24 46.98

Muro tipo 02 H= 4m
Cimentacion de muro 1.00 23.46 2.00 0.50 23.46
Parte elevacion de muro 1.00 23.46 Area 3.70 86.80

Muro tipo 03 H= 2.50 m


Cimentacion de muro 1.00 6.20 1.30 0.40 3.22
Parte elevacion de muro 1.00 6.20 area 1.56 9.67

Muro tipo 04 H= 1.00 m


Cimentacion de muro 1.00 17.71 0.70 0.30 3.72
Parte elevacion de muro 1.00 17.71 area 0.38 6.73
14

3.542
HOJA DE METRADOS
PROYECTO "MEJORAMIENTO DE PISTAS Y CONSTRUCCION DE VEREDAS Y ESCALINATAS EN EL PASAJE SANTA INES DISTRITO Y PROVINCIA DE CHANCHAMAYO SNIP Nº
220651

Respon. : MUNICIPALIDAD PROVINCIAL DE CHANCHAMAYO Provincia : CHANCHAMAYO


Fecha : FEBRERO - 2014 Distrito : CHANCHAMAYO
Calle : PASAJE SANTA INES Localidad : LA MERCED

METRADO DE EXPLANACIONES DEL PAVIMENTO

AREA M2 VOLUMEN M3 VOLUMEN DE CORTE


PROGRESIVA DIST. MATERIAL ROCA ROCA TOTAL
CORTE RELLENO CORTE RELLENO % % %
SUELTO BLANDA FIJA
0+0 0.00 0.00 0 - 100 0 100
0+20 6.86 0.00 20.00 68.61 0 - 100 68.61 0 - 100
0+40 6.00 0.00 20.00 128.64 0.02 0 - 100 128.64 0 - 100
0+60 5.35 0.00 20.00 113.56 0.02 0 - 100 113.56 0 - 100
0+80 3.24 0.01 20.00 85.88 0.13 0 - 100 85.88 0 - 100
SUB TOTAL 396.69 0.17 - 396.69 -

METRADO DE EXPLANACIONES DEL ESCALINATA

AREA M2 VOLUMEN M3 VOLUMEN DE CORTE


PROGRESIVA DIST. MATERIAL ROCA ROCA TOTAL
CORTE RELLENO CORTE RELLENO % % %
SUELTO BLANDA FIJA
0+80 3.24 0.01 0 - 100 0 100
0+100 0.95 7.09 20.00 41.91 71.02 0 - 100 41.91 0 - 100
0+120 13.43 0.00 20.00 143.84 70.93 0 - 100 143.84 0 - 100
SUB TOTAL 185.74 141.83 - 185.74 -
HOJA DE METRADOS
PROYECTO "MEJORAMIENTO DE PISTAS Y CONSTRUCCION DE VEREDAS Y ESCALINATAS EN EL PASAJE SANTA INES DISTRITO Y PROV
220651

Respon. : MUNICIPALIDAD PROVINCIAL DE CHANCHAMAYO Provincia :


Fecha : FEBRERO - 2014 Distrito :
Calle : PASAJE SANTA INES Localidad :

METRADO DE EXPLANACIONES DEL PAVIMENTO

AREA M2 VOLUMEN M3 VOLUMEN DE CORTE


PROGRESIVA DIST. MATERIAL
CORTE RELLENO CORTE RELLENO % %
SUELTO
0+0 0.00 0.00 0 - 100
0+20 6.86 0.00 20.00 68.61 0 - 100
0+40 6.00 0.00 20.00 128.64 0.02 0 - 100
0+60 5.35 0.00 20.00 113.56 0.02 0 - 100
0+80 3.24 0.01 20.00 85.88 0.13 0 - 100
0+100 0.95 7.09 20.00 41.90 71.02 0 - 100
0+120 13.43 0.00 20.00 143.83 70.93 0 - 100
SUB TOTAL 582.41 142.01 -

METRADO DE EXPLANACIONES DEL ESCALINATA

AREA M2 VOLUMEN M3 VOLUMEN DE CORTE


PROGRESIVA DIST. MATERIAL
CORTE RELLENO CORTE RELLENO % %
SUELTO
0+80 0.00 0.00 0 - 100
0+100 0.95 7.09 20.00 9.55 70.89 0 - 100
0+120 13.43 0.00 20.00 143.84 70.93 0 - 100
SUB TOTAL 153.38 141.70 -
ANTA INES DISTRITO Y PROVINCIA DE CHANCHAMAYO SNIP Nº

CHANCHAMAYO
CHANCHAMAYO
LA MERCED

TO

VOLUMEN DE CORTE
ROCA ROCA TOTAL
%
BLANDA FIJA
0 100
68.61 0 - 100
128.64 0 - 100
113.56 0 - 100
85.88 0 - 100
41.90 0 - 100
143.83 0 - 100
582.41 -

TA

VOLUMEN DE CORTE
ROCA ROCA TOTAL
%
BLANDA FIJA
0 100
9.55 0 - 100
143.84 0 - 100
153.38 -