B LALIT BHAWAN
LA1 Approach RE Wall
1 Wall Concreting Cum 15.00 0.00 0.00 15.00 0.00 -15.00
2 Wall Reinforcement MT 1.00 0.00 0.00 1.00 0.00 -1.00
3 Crash Barrier Rmt 20.00 0.00 0.00 20.00 0.00 -20.00
RA2 Approach RE Wall
1 Raft Reinforcement MT 4.00 0.00 0.00 4.00 0.00 -4.00
2 Raft Concreting Cum 60.00 0.00 0.00 60.00 0.00 -60.00
3 Wall Reinforcement MT 4.00 0.00 0.00 4.00 0.00 -4.00
4 Wall Concreting Cum 40.00 0.00 0.00 40.00 0.00 -40.00
5 Crash Barrier Rmt 35.00 0.00 0.00 35.00 0.00 -35.00
R02 Deck Slab
1 Crash Barrier Rmt 100.00 0.00 0.00 100.00 0.00 -100.00
C DRP
R18-P2 Pile Cap
1 Pile Cap Reinforcement MT 60.00 0.00 0.00 60.00 0.00 -60.00
2 Pile Cap Concreting Cum 420.00 0.00 0.00 420.00 0.00 -420.00
R18-A2 Approach RE Wall
1 PCC MT 20.00 8.00 8.00 20.00 8.00 -12.00
2 Raft Reinforcement MT 3.00 0.00 0.00 3.00 0.00 -3.00
3 Raft Concreting Cum 50.00 0.00 0.00 50.00 0.00 -50.00
4 Wall Concreting Cum 50.00 0.00 0.00 50.00 0.00 -50.00
5 Wall Reinforcement MT 3.00 0.00 0.00 3.00 0.00 -3.00
Underpass [R17]
1 PCC Cum 50.00 0.00 0.00 50.00 0.00 -50.00
2 Pile Integrity Test Nos 30.00 0.00 0.00 30.00 0.00 -30.00
3 Raft Waterproofing Sqm 550.00 0.00 0.00 550.00 0.00 -550.00
4 Raft Reinforcement MT 50.00 0.00 0.00 50.00 0.00 -50.00
5 Raft Concreting Cum 333.50 0.00 0.00 333.50 0.00 -333.50
6 Wall Reinforcement MT 30.00 0.00 0.00 30.00 0.00 -30.00
7 Wall Concreting Cum 100.00 0.00 0.00 100.00 0.00 -100.00
8 Crash Barrier Rmt 60.00 0.00 0.00 60.00 0.00 -60.00
D ROAD WORKS
PQC
1 Earth Work Cum 1500.00 600.00 600.00 600.00 1500.00 600.00 -900.00
2 Sand Filling Cum 750.00 0.00 0.00 750.00 0.00 -750.00
3 GSB Cum 337.50 0.00 0.00 337.50 0.00 -337.50
4 R06 DLC Cum 225.00 0.00 0.00 225.00 0.00 -225.00
5 R06 PQC Cum 450.00 0.00 0.00 450.00 0.00 -450.00
E DRAIN WORKS
1 3 Cell Drain Casting Nos 144.00 0.00 0.00 144.00 0.00 -144.00
2 3 Cell Drain R/f Nos 144.00 0.00 0.00 144.00 0.00 -144.00
3 3 Cell Drain Slab Casting Nos 100.00 6.00 16.00 16.00 100.00 16.00 -84.00
4 3 Cell Drain Slab R/f Nos 100.00 6.00 16.00 16.00 100.00 16.00 -84.00
5 3 Cell Drain Erection Nos 144.00 0.00 0.00 144.00 0.00 -144.00
6 3 Cell Slab Erection Nos 50.00 0.00 0.00 50.00 0.00 -50.00
7 Load Bearing Drain R/f Cum 20.00 3.00 3.00 20.00 3.00 -17.00
8 Load Bearing Drain Concrete Cum 90.00 13.00 13.00 90.00 13.00 -77.00
9 3 Cell Load Bearing Slab-1200 W Nos 100.00 0.00 0.00 100.00 0.00 -100.00
10 3 Cell Load Bearing Slab-1700 W Nos 100.00 0.00 0.00 100.00 0.00 -100.00
11 3 Cell Load Bearing Slab-1100 W Nos 100.00 0.00 0.00 100.00 0.00 -100.00
12 R04/R06 Drain PCC Cum 30.00 0.00 0.00 30.00 0.00 -30.00
13 Road Widening Drain PCC Cum 30.00 0.00 0.00 30.00 0.00 -30.00