TIPO RESISTENCIA
CONCRETO PSI CEMENTO ARENA TRITURADO AGUA
KG M3 M3 LITROS
SALARIO MINIMO
FACTORES ALBAÑILERIA INSTALACIONES
AA BB
AA+10%
11075.81875 %
SUELDO ANUAL CON SUBSIDIO DE TRANSPORTE 10,433,436.00 10433436
HORAS CALENDARIO ANUALES 2,920.00
HORAS LABORALES ANUALES 2,504.00
HORAS HABILES ANUALES 2,344.00
VALOR HORA CALENDARIO 3,400.31 100.00
VALOR HORA LABORAL 3,965.21 116.61
VALOR HORA HABIL 4,235.88 124.57
TRANSPORTE 88,211.00
SALARIO UN MINIMO DOS MINIMOS CUADRILLA
% PRESTACIONES Y APORTES 170% 170% 170%
MENSUAL $ 869,453 $ 1,563,645
DIA $ 28,982 $ 52,122
A 17%
I 3%
U 5%
PRESTACIONES 1.70
CUADRILLAS 2018
RIO MINIMO
PINTURA CARPINTERIA CABLEADO COMISIÓN
CC DD EE TOPOGRÁFICA
AA+15% AA+20% AA+30%
COMISIÓN TOPOGRÁFICA
MES DIA
TOPÓGRAFO $ 2,300,000 $ 76,667
CADENERO PRIMERO $ 1,388,211 $ 46,274
SUBCONTRATOS CADENERO SEGUNDO $ 988,211 $ 32,940
170% TOTAL MENSUAL $ 4,676,422 $ 155,881
LISTADO DE INSUMOS
INSUMO
EQUIPO
HERRAMIENTA MENOR (10%)
BULDOZER D68 CATERPILAR
CARGADOR
CHAFON MADERA
COMPACTADOR MECANICO RANA
COMPRESOR 1 MARTILLO
COMPRESOR 2 MARTILLOS
EQUIPO DE LOCALIZACION GPS
ESTACION TOTAL
HERRAMIENTA MENOR (5%)
MEZCLADORA 1 BULTO - COMBUSTIBLE
PARAL TELESCOPICO
RETROEXCAVADORA
SECCION DE ANDAMIOS
SECCION DE ANDAMIOS
VIBRADOR DE AGUJA PARA CONCRETO - COMBUSTIBLE
EQUIPO DE SOLDADURA INVERSOR
MATERIALES
ACCESORIO PRESION BUJE ROSCADO PAVCO 1.1/2"X1/2"
ACCESORIO ELECTRICO ADAPTADOR TERMINAL CONDUIT PAVCO 1"
ACCESORIO ELECTRICO ADAPTADOR TERMINAL CONDUIT PAVCO 1/2"
ACCESORIO ELECTRICO ADAPTADOR TERMINAL CONDUIT PAVCO 3/4"
ACCESORIO ELECTRICO BOQUILLA GALVANIZADA 3/4
ACCESORIO ELECTRICO CAPACETE EMT 1"
ACCESORIO ELECTRICO CURVA 90 CONDUIT PAVCO 1"
ACCESORIO ELECTRICO UNION EMT 3/4 ACERO
ACCESORIO PRESION ADAPTADOR HEMBRA PAVCO 1/2"
ACCESORIO PRESION ADAPTADOR HEMBRA ROSCA METALICA PAVCO 1/2"
ACCESORIO PRESION ADAPTADOR MACHO PAVCO 1/2"
ACCESORIO PRESION ADAPTADOR MACHO PAVCO 2"
ACCESORIO PRESION CHEQUE CORTINA GRIVAL 1/2"
ACCESORIO PRESION CHEQUE HORIZONTAL GRIVAL 1/2"
ACCESORIO PRESION CHEQUE VERTICAL HELBERT 1.1/2" - 150 PSI
ACCESORIO PRESION CODO 90 PAVCO 1"
ACCESORIO PRESION CODO 90 PAVCO 1.1/2"
ACCESORIO PRESION CODO 90 PAVCO 1/2"
ACCESORIO PRESION CODO 90 PAVCO 2"
ACCESORIO PRESION CODO 90 PAVCO 2"
ACCESORIO PRESION CODO 90 PAVCO 2.1/2"
ACCESORIO PRESION CODO 90 PAVCO 3/4"
ACCESORIO PRESION CPVC CODO 90 PAVCO 1/2"
ACCESORIO PRESION CPVC CODO 90 PAVCO 3/4"
ACCESORIO PRESION CPVC TEE PAVCO 1/2"
ACCESORIO PRESION CPVC TEE PAVCO 3/4"
ACCESORIO PRESION FLANCHE H.M. ADAP.TANQUE AGUA 2”
ACCESORIO PRESION NIPLE ROSCASO PAVCO 1/2"
ACCESORIO PRESION TAPON ROSCADO PAVCO 1/2"
ACCESORIO PRESION TAPON SOLDADO PAVCO 1/2"
ACCESORIO PRESION TEE ROSCADO X SOLDADO PAVCO 1/2"
ACCESORIO PRESION TEE SOLDADO PAVCO 1"
ACCESORIO PRESION TEE SOLDADO PAVCO 1.1/2"
ACCESORIO PRESION TEE SOLDADO PAVCO 1/2"
ACCESORIO PRESION TEE SOLDADO PAVCO 2"
ACCESORIO PRESION TEE SOLDADO PAVCO 2.1/2"
ACCESORIO PRESION TEE SOLDADO PAVCO 3/4"
ACCESORIO PRESION TRANSICION CPVC-METAL PAVCO 1/2"
ACCESORIO PRESION UNION UNIVERSAL GALVANIZADA 1"
ACCESORIO PRESION UNION UNIVERSAL GALVANIZADA 3/4"
ACCESORIO PRESION UNION UNIVERSAL PVC PAVCO 1/2"
ACCESORIO PRESION VALVULA BOLA GRIVAL 2” MANIJA LARGA
ACCESORIO PRESION VALVULA BOLA PVC GRIVAL 1/2” LISA SOLDABLE
ACCESORIO PRESION VALVULA BOLA PVC GRIVAL 1” LISA SOLDABLE
ACCESORIO PRESION VALVULA BOLA ROSCA GRIVAL 1/2” MANIJA LARGA
ACCESORIO PRESION VALVULA BOLA ROSCA GRIVAL 1” MANIJA LARGA
ACCESORIO PRESION VALVULA BOLA ROSCADA GRIVAL 3/4" MANIJA LARGA
ACCESORIO SANITARIA CODO 45 PAVCO 3" CXC
ACCESORIO SANITARIA CODO 90 PAVCO 2" CXC
ACCESORIO SANITARIA CODO 90 PAVCO 3" CXC
ACCESORIO SANITARIA CODO 90 PAVCO 4" CXC
ACCESORIO SANITARIA CODO 90 PAVCO 6" CXC
ACCESORIO SANITARIA SIFON 135º PAVCO 3" CXC
ACCESORIO SANITARIA SIFON 135º PAVCO 4"
ACCESORIO SANITARIA TAPON DE PRUEBA PAVCO 2"
ACCESORIO SANITARIA TAPON DE PRUEBA PAVCO 3"
ACCESORIO SANITARIA TAPON DE PRUEBA PAVCO 4"
ACCESORIO SANITARIA UNION PAVCO 2"
ACCESORIO SANITARIA UNION PAVCO 3"
ACCESORIO SANITARIA UNION PAVCO 4"
ACCESORIO SANITARIA UNION PAVCO 6"
ACCESORIO SANITARIA YEE PAVCO 2"
ACCESORIO SANITARIA YEE PAVCO 3"
ACCESORIO SANITARIA YEE PAVCO 4"
ACCESORIO SANITARIA YEE PAVCO 6"
ACERO BARRA CORRUGADA ø= 1" Fy: 420 MPA
ACERO BARRA CORRUGADA ø= 1/2" Fy: 420 MPA
ACERO BARRA CORRUGADA ø= 1/4" Fy: 240 MPA
ACERO BARRA CORRUGADA ø= 3/4" Fy: 420 MPA
ACERO BARRA CORRUGADA ø= 3/8" Fy: 420 MPA
ACERO BARRA CORRUGADA ø= 5/8" Fy: 420 MPA
ACERO BARRA CUADRADA 9MM
ACERO BARRA CUADRADA L= 1/2"
ACOPLE PLASTICO GRIFLEX 55 CM
ACOPLE PLASTICO PARA LAVAMANOS 40 CM
ACPM IBAGUE 2018
ADOQUÍN 20 X 10 X 6CM PEATONAL TRAFICO LIVIANO
ADOQUÍN 20 X 10 X 8CM VEHICULAR TRAFICO PESADO
ADOQUIN EN CONCRETO 10 x 20 x 6 CM DECOBLOCK
ADOQUIN EN CONCRETO 10 x 20 x 8 CM DECOBLOCK
AGUA
ALAMBRE CU THW 8 AWG
ALAMBRE NEGRO CAL. 18
ALAMBRE Nº 12 DESNUDO PROCABLES
ALAMBRE PUA CAL.14 - 350 M
ALAMBRE TELEFONICO 2X18 AWG DOBLE CHAQUETA
ALAMBRE TW Nº 10 NEGRO PROCABLES
ALAMBRE TW Nº 12 BLANCO PROCABLES
ALAMBRE TW Nº 12 NEGRO PROCABLES
ALAMBRE TW Nº 14 AMARILLO PROCABLES
ALAMBRE TW Nº 14 AZUL PROCABLES
ALAMBRE TW Nº 14 VERDE PROCABLES
ANGULO GALVANIZADO 0.2X0.25 2.44M
ARENA BLANCA
ARENA DE PEÑA
ARENA DE TRITURACION
ARENA NEGRA
BANDA METALICA SOPORTE PARA TUBO APRETADO 2"
BANDA METALICA SOPORTE PARA TUBO APRETADO 3"
BANDA METALICA SOPORTE PARA TUBO APRETADO 4"
BANDA METALICA SOPORTE PARA TUBO APRETADO 6"
BARNIZ BARNEX CAOBA
BARNIZ BRILLANTE EXTERIOR
BASE GRANULAR NORMA INVIAS
BISAGRA COBRE CABEZA PLANA 3 1/2”
BISAGRA COBRE NUDO 2 1/2”
BISAGRA GATO OMEGA 3"
BISAGRA PUERTA 3"
BLOQUE #4 TRADICIONAL 9X23X32 CM
BLOQUE #5 ESTANDAR 12X20X30CM
BLOQUE #5 SANTAFE 11.5X23X33CM
BLOQUE LISO CONCRETO #10 9X19X39 CM
BLOQUE LISO CONCRETO #20 19X19X39 CM
BLOQUELON SANTAFE 80X8X23 CM
BOQUILLA
BRIDA SANITARIA 4"
BROCHA PROFESIONAL 4"
CABALLETE ARTICULADO ONDULADO ALA INFERIOR ETERNIT
CABALLETE ARTICULADO ONDULADO ALA INFERIOR TEJA ESPAÑOLA
CABALLETE ARTICULADO ONDULADO ALA SUPERIOR ETERNIT
CABALLETE ARTICULADO ONDULADO ALA SUPERIOR TEJA ESPAÑOLA
CABALLETE FIJO ETERNIT
CABALLETE FIJO TEJA ESPAÑOLA 1.34 mts
CABALLETE FIJO TEJA TERMOACUSTICA
CABALLETE TECHOLINE 2,00M X 0,53M
CABLE COAXIAL
CABLE Nº 8 AMARILLO THHN PROCABLES
CABLE Nº 8 AZUL THHN PROCABLES
CABLE Nº 8 NEGRO THHN PROCABLES
CAJA DOBLE CONDUIT PAVCO 10X10
CAJA GALVANIZADA 10X10 CAL. 20
CAJA GALVANIZADA 5800 2X4 CAL. 20 PARA INTERRUPTORES
CAJA GALVANIZADA OCTAGONAL CAL. 20 PARA SALIDAS LUMINARIAS
CAJA METALICA TACO 12 CIRCUITOS CON PUERTA
CAJA METALICA TACO 4 CIRCUITOS
CAJA METALICA TACO 6 CIRCUITOS
CAJA METALICA TACO 8 CIRCUITOS CON PUERTA
CAJA OCTOGONAL CONDUIT PAVCO
CAJA SENCILLA CONDUIT 2X4 PVC
CAL HIDRATADA
CANAL B6 X 2.44M CAL. 26 (DRYWALL - SUPERBOARD)
CANAL B9 X 2.44M CAL. 26 (DRYWALL - SUPERBOARD)
CANALETA 43 ETERNIT X 6 M
CANALETA 90 ETERNIT X 6 M
CAOLIN COLOMBIA
CARGA FULMINANTE (CARGA+TIRO) 5/16" 1"
CEMENTO BLANCO
CEMENTO BLANCO
CEMENTO GRIS
CERRADURA DE SOBREPONER SOLDAR DERECHA 50MM SCHLAGE
CHAPA POMO LINEA ELITE ALCOBA
CINTA AISLANTE SUPER 33 20MT
CINTA PAPEL 150M
CINTA TEFLON 1/2" X 10 METROS
CONCRETO PREMEZCLADO 2000 PSI
CONCRETO PREMEZCLADO 2500 PSI
CONCRETO PREMEZCLADO 3000 PSI
CONCRETO PREMEZCLADO 3500 PSI
CONCRETO PREMEZCLADO 4000 PSI
CONCRETO PREMEZCLADO 4500 PSI
CORDON DETONANTE
DESCOLDATOC (DESMOLDANTE DE CONCRETO)
DILATACIONES EN BRONCE
DISCO DIAMANTADO 7” TURBO
DISTANCIADORES CLIP MORTERO PINZA 1/2
DISTANCIADORES CLIP MORTERO PINZA 1/4
ESMALTE DOMESTICO BLANCO MATE PINTUCO
ESMALTE SUPERSINTET PINTUCO
ESTUCOR ESTUCO LISTO
EXPLISIVO 75% INDUGEL
EXPLOSIVO ANFO
FLANCHE METALICO 25 X 240 CM CAL 26
FLOTADOR GRIFERIA TANQUE HELBERT 1/2"
FLOTADOR GRIFERIA TANQUE HELBERT 1/2" ECONOMICO 100 PSI
FLUXOMETRO ORINAL PUSH EMPOTRADO GRIVAL
FORMALETA EN MADERA
FORMALETA METALICA INCLUYE ACCESORIOS
FORMALETA PARA ENTREPISOS (M2)
FULMINANTES
GANCHO CORREA MADERA C90
GANCHO TEJA ETERNIT 55MM
GRANIPLAST BLANCO
GRANITO TRAVERTINO Nº3
GRAPA B-1/2" X 10000 UNIDADES SENCO
GRAVILLA
GRIFERIA LAVAMANOS SENCILLA GRIVAL
GRIFERIA LAVAPLATOS MEZCLADOR GRIVAL
GRIFERIA PARA DUCHA SENCILLA GRIVAL PISCIS
GUARDAESCOBA EN MADERA
GUARDAESCOBA EN PVC
INTERRUPTOR DOBLE SOBREPONER DUE AVE
INTERRUPTOR SENCILLO BLANCO EXE
INTERRUPTOR SENCILLO CONMUTABLE LUMINEX
JUEGO ACCESORIOS ASTRO BLANCO CORONA
JUEGO DE (2) ESTRUCTURAS MULTIPLE MOVIBLE, (MICROFUTBOL - BALONCESTO)
LADRILLO COMUN RECOCIDO 20X10X6 CM
LADRILLO ESTRUCTURAL 8X12X24
LADRILLO PORTANTE PRENSADO SANTAFE 29X14.5X9 CM
LADRILLO PRENSADO LIVIANO SANTAFE 24.5X12X6 CM
LADRILLO PRENSADO MACIZO SANTAFE 24.5X12X5.5 CM
LADRILLO REJILLA 24X12X6 CM
LADRILLO TOLETE COMUN RECOCIDO 24X12X6 CM
LAMINA DRYWALL 1/2" SUPERCLAST 1.22X2.44
LAMINA DURACUSTIC 0.61X1.22M FIBERGLASS
LAMINA ICOPOR 1X1M E:1OMM
LAMINA SUPERBOARD 1/2" SUPERLAMINA 1.22X2.44
LAVADERO 70 X 55 X 22 CM GRANITO PULIDO
LAVAMANOS COLGAR ACUACER CORONA BLANCO
LAVAMANOS COLGAR ACUACER CORONA COLOR
LAVAPLATOS PARA EMPOTRAR 1 POCETA 45X49 CM ACERO INOXIDABLE SOCODA
LAVAPLATOS PARA EMPOTRAR 1 POCETA 62X48 CM ACERO INOXIDABLE SOCODA
LAVAPLATOS PARA SOBREPONER 1 POCETA 100X50X15 CM ACERO INOXIDABLE GRIVAL
LIJA DE AGUA 150 ABRACOL
LIJA TELA 120 PABMERIL CARBORUNDUN (27.5CM X 22.5CM)
LIJA TELA 180 PREMIER CARBORUNDUN
LIMPIADOR PVC PAVCO 1/4 GALON
LLAVE JARDIN PESADA GRIVAL SATIN
LLAVE JARDIN SATIN
LONA PLASTICA PARA CASETON
MADERA CORREDOR ɸ: 8 A 10CM (3M) EUCALIPTO
MADERA DURMIENTE 4CMX4CM X 3.0M ORD.
MADERA ESTERILLA DE GUADUA PARA CASETONES EN PLACAS ALIGERADAS
MADERA GUADUA
MADERA LISTON ORDINARIO
MADERA MEDIO CERCO 8CMX8CM
MADERA PLANCHON 18X4X2,9
MADERA REPISA ORDINARIO 3M
MADERA ROLLIZA E: 0.20M
MADERA TABLA BURRA CEDRO MACHO 0.28
MADERA TABLA BURRA ORDINARIO 0.30
MADERA TABLA CHAPA 10X2.0CM X 2.9M ORD.
MADERA TABLA CHAPA 30X1.8-2CM X 2.9M ORD.
MADERA VARA DE CLAVO ɸ: 6 A 8CM (3M) EUCALIPTO
MADERA VIGA 0.15X0.15M
MADERA VIGA 0.20X0.20M
MALLA ELECTROSOLDADA DIAMETRO: 5 MM SEPARACION 15 X 15 CMS
MALLA EN NYLON CAL. 4 PARA CANCHA DE TENIS . INCLUYE GUAYA
MALLA EN NYLON CAL. 5 PARA CANCHA DE VOLEIBOL. INCLUYE GUAYA
MALLA EN NYLON CAL. 5 PARA PORTERIA DE FUTBOL
MALLA EN NYLON CAL. 5 PARA PORTERIA DE MICROFUTBOL
MALLA METALICA CON VENA
MANIJA GATO PARA VENTANA 2693
MARMOLINA PARA FACHADAS
MARMOLINA PARA PISOS
MASILLA SUPERMASTICO 5 GALONES
MATERIALES CONCRETO 1500 PSI
MATERIALES CONCRETO 2000 PSI
MATERIALES CONCRETO 2500 PSI
MATERIALES CONCRETO 3000 PSI
MATERIALES CONCRETO 3500 PSI
MATERIALES MORTERO 1:10
MATERIALES MORTERO 1:2
MATERIALES MORTERO 1:3
MATERIALES MORTERO 1:4
MATERIALES MORTERO 1:5
MATERIALES MORTERO 1:6
MECHA LENTA
METALDECK 2" CAL. 22
METALDECK 3" CAL. 22
METALICO - ANGULO ACERO 1/8" X 1"
METALICO - ANGULO ACERO 3/16" X 1"
METALICO - ANGULO ACERO 3/16" X 2-1/2"
METALICO - CANAL LAMINA GALVANIZADA CAL. 18
METALICO - LAMINA COLD ROLLED 2MX1M 1.85 MM
METALICO - LAMINA COLD ROLLED 2MX1M CAL. 18
METALICO - MALLA ESLABONADA CAL. 10
METALICO - MALLA ESLABONADA CAL. 12
METALICO - PLATINA 1/2 X 1/8 X 6M
METALICO - TUBO ESTRUCTURAL CUADRADO 1"
METALICO - TUBO ESTRUCTURAL REDONDO NEGRO 2" 2.5MM
METALICO - TUBO GALVANIZADO 1"
METALICO - TUBO GALVANIZADO 2"
MINERAL
MORTERO BLANCO (2KG)
OMEGA ROLLADO 2.44M CAL. 26
ORINAL MEDIANO PARA FLUXOMETRO CORONA
ORINAL PETITE CON GRIFERIA TRADICIONAL CORONA
PARAL B6 X 2.44M CAL. 26 (DRYWALL - SUPERBOARD)
PEDESTAL LAVAMANOS ACUACER CORONA BLANCO
PEDESTAL LAVAMANOS ACUACER CORONA COLOR
PEGACOR
PEGAMENTO DE CONTACTO
PEGANTE PARA PISO PVC 4KG
PERFIL CP 150-16N 1,5MM X 150MM X 50MM
PERFIL PLACAFACIL
PERNO 1" CLAVO NORMAL
PIEDRA MEDIA ZONGA
PIEDRA RAJÒN
PINTURA ANTICORROSIVA ROJA
PINTURA EPOXICA BLANCO KOLOR
PIRLAN EN ALUMINIO
PISO CERAMICO 42,5 X 42,5 CM
PISO CERAMICO 45,8 X 45,8 CM EXTERIOR
PISO CERÁMICO DUROPISO 33.8X33.8 CM
PISO DECORPISO
PISO PARED BLANCO 20,5 X 20,5
PISO PORCELANATO 60 X 60
PISO VINISOL 30X30 1,66 TRAFICO RESIDENCIAL
PLACA METALICA DE IDENTIFICACION PARA MEDIDORES Y CAJAS ELECTRICAS
PLAFON ROSETA 200W NYLON AVE
PLATINA METALICA 0.10X0.10M
PORTACANDADO GATO SIMPLE 3
PUERTA MADERA BANCOVUER 0.70X2.0M
PUERTA MADERA MELAMINA AMBROSIA 0.65X2.15M
PUNTILLA CON CABEZA 1"
PUNTILLA CON CABEZA 2"
PUNTILLA CON CABEZA 3/4"
RECEBO
REJILLA 3X2 ALUMINIO SIFON COLREJILLAS
REMATES LATERALES CABALLETES
SANITARIO ACUAPLUS CORONA ULTRA BLANCO TANQUE 4.8 LITROS
SANITARIO ACUAPLUS CORONA ULTRA BONE TANQUE 4.8 LITROS
SANITARIO AVANTI PLUS CORONA BLANCO
SERVICIO BOMBEO DE CONCRETO
SIKA 1
SIKA 2
SIKA ANTISOL BLANCO
SIKA TRANSPARENTE 10
SILICONA BLANCA BAÑOS - COCINAS 280 ML
SILICONA TRANSPARENTE SELLADORA
SOLDADURA CPVC PAVCO 1/8 GALON
SOLDADURA ELÉCTRODO 6013 3/32” 68 BARRAS
SOLDADURA PVC PAVCO 1/8 GALON
SUBBASE GRANULAR
SUPLEMENTO GALVANIZADO 10X10 PARA TOMA CORRIENTE
SUPLEMENTO PVC 10X10 PARA TOMA CORRIENTE
TABLETA DE GRES 20 X 20
TABLETA DE GRES 30 X 30
TABLON ZOCALO
TACO LQ 1 POLO 30AMP TORNILLO LEGRANS
TACO MONOPOLAR 30AMP ENCHUFE STARSYS AND
TANQUE PLASTICO CON TAPA ETERNIT 1000 LITROS
TANQUE PLASTICO CON TAPA ETERNIT 250 LITROS
TANQUE PLASTICO CON TAPA ETERNIT 500 LITROS
TEJA DE BARRO 42 X 21
TEJA ESPAÑOLA ETERNIT
TEJA FIBROCEMENTO ONDULADA P7
TEJA FIBROCEMENTO T7 Nº 6
TEJA STANDING SEAM CAL26 E:0,46
TEJA STANDING TIPO SANDWICH AIS. POLIURETANO
TEJA TECHOLINE
TEJA TERMOACUSTICA
TEJA TRASLUCIDA P7 ETERNIT
TEJA TRASLUCIDA TRAPEZOIDAL POLICARBONATO
TELA VERDE 65GR/M2 2.10M ANCHO
THINNER FINO SQ-004 SILQUIN
TIERRA NEGRA
TIMBRE CHICHARRA
TIMBRE PULSADOR BLANCO LUNARES
TINTILLA PARA MADERA CAFÉ
TOMA COAXIAL BLANCO EXE
TOMA CORRIENTE DOBLE LUMINEX BLANCO
TOMA CORRIENTE TRIFILAR 20A CODELCA
TOMA DOBLE POLO A TIERRA BLANCA LUNARE
TOMA TELEFONICA AMERICANA SENCILLA BLANCA LUNARES PRIME
TORNILLO 6 X 1"
TORNILLO 7 X 7/16"
TORNILLO AUTOPERFORANTE PARA METAL
TORNILLO CUBIERTA TECHOLINE
TORNILLO DE CUBIERTA TECHOLINE
TORNILLO EXAGONAL 1/2"X2" INCLUYE TUERCA
TORNILLO FIJADOR ALA
TORNILLO PARA CANALETA
TRITURADO DE 1/2" A 3/4"
TRONILLO AUTOPERFORANTE
TUBO ELECTRICO CONDUIT PAVCO 1 1/2"
TUBO ELECTRICO CONDUIT PAVCO 1"
TUBO ELECTRICO CONDUIT PAVCO 1"
TUBO ELECTRICO CONDUIT PAVCO 1/2"
TUBO ELECTRICO CONDUIT PAVCO 3/4"
TUBO ELECTRICO EMT UL 3/4"
TUBO PRESION CPVC PAVCO 1/2"
TUBO PRESION CPVC PAVCO 3/4"
TUBO PRESION PVC PAVCO 1" RDE 21
TUBO PRESION PVC PAVCO 1.1/2" RDE 21
TUBO PRESION PVC PAVCO 1/2" RDE 9
TUBO PRESION PVC PAVCO 2" RDE 21
TUBO PRESION PVC PAVCO 2.1/2" RDE 21
TUBO PRESION PVC PAVCO 3/4" RDE 11
TUBO SANITARIO PAVCO 2"
TUBO SANITARIO PAVCO 3"
TUBO SANITARIO PAVCO 4"
TUBO SANITARIO PAVCO 6"
TUBO VENTILACION PAVCO 2"
TUBO VENTILACION PAVCO 3"
VARILLA COBRE MACIZA KIT POLO A TIERRA
VIGUETA BASE 4 CAL. 26 2.44M
VINILO INTERVINIR PRO 200
VINILO TIPO 1 EXTRACRIL PARA INTERIORES
VINILO TIPO 2 TITO PABON
YESO MAESTRO
ADOQUIN EN CONCRETO 20X10X6 COLOR GRIS
ADOQUIN EN CONCRETO 20X10X6 COLOR NEGRO
ARENA DE SOPORTE (MEDIA)
ARENA DE SELLO (FINA)
LOSETA CONCRETO LISA 0.40X0.40M E: 0.06M COLOR GRIS
LOSETA CONCRETO LISA 0.40X0.40M E: 0.06M COLOR NEGRO
LOSETA TACTIL GUIA 0.40X0.40M E: 0.06M COLOR GRIS
LOSETA TACTIL ALERTA 0.40X0.40M E: 0.06M COLOR GRIS
SARDINEL CONCRETO PREFABRICADO A10 (50X20X80)
BORDILLO CONCRETO PREFABRICADO A80 (35X20X80)
BORDILLO CONCRETO PREFABRICADO A85 (35X20X80)
TUBO PVC DOBLE PARED (TDP) 4" PAVCO
TUBO PVC DOBLE PARED (TDP) 6" PAVCO
TERMINAL ADAPTADOR CAMPANA PVC 4" PAVCO
TERMINAL ADAPTADOR CAMPANA PVC 6" PAVCO
ARBOL ESPECIE OCOBO ROSADO (TABEBUIA ROSEA) H: 2.5 A 3.0M
ARBOL AROMATICO ESPECIE MIRTO H: 2.0 A 2.5M
ARBOL ESPECIE ACACIA ROBINIA (CAESALPINIA PELTOPHOROIDES) H: 2.0 A 3.0M
ARBUSTO CINTAS (CHLOROPHYTUM COMOSUM)
PASTO CHINO
TIERRA NEGRA ABONADA FERTIL
BANCA DOBLE EN CONCRETO L: 1M. MOBILIARIO URBANO
% $ -
HORA $ 120,000.00
HORA $ 90,000
DIA $ 500
HORA $ 7,500.00
HORA $ 55,000.00
HORA $ 70,000.00
DIA $ 15,000
DIA $ 60,000
% $ -
HORA $ 6,250.00
DIA $ 500.00
HORA $ 120,000
HORA $ 188
DIA $ 1,500
HORA $ 4,375.00
HORA $ 1,350
UND $ 4,500
UND $ 750
UND $ 200
UND $ 300
UND $ 1,300
UND $ 6,200
UND $ 2,250
UND $ 2,900
UND $ 300
UND $ 16,111
UND $ 900
UND $ 5,400
UND $ 15,900
UND $ 15,900
UND $ 128,900
UND $ 1,100
UND $ 5,700
UND $ 400
UND $ 6,500
UND $ 6,500
UND $ 17,283
UND $ 700
UND $ 770
UND $ 2,150
UND $ 1,200
UND $ 2,800
UND $ 28,800
UND $ 900
UND $ 300
UND $ 300
UND $ 1,300
UND $ 1,700
UND $ 7,000
UND $ 500
UND $ 12,200
UND $ 18,189
UND $ 800
UND $ 1,500
UND $ 12,500
UND $ 7,000
UND $ 2,500
UND $ 86,060
UND $ 6,000
UND $ 10,900
UND $ 17,900
UND $ 43,900
UND $ 25,900
UND $ 4,700
UND $ 1,600
UND $ 3,800
UND $ 6,300
UND $ 61,800
UND $ 5,700
UND $ 12,600
UND $ 1,100
UND $ 1,200
UND $ 2,400
UND $ 1,200
UND $ 2,100
UND $ 3,350
UND $ 17,100
UND $ 3,700
UND $ 7,800
UND $ 13,400
UND $ 70,300
KG $ 2,909
KG $ 2,909
KG $ 2,796
KG $ 2,909
KG $ 2,909
KG $ 2,909
ML $ 1,650
ML $ 4,185
UND $ 3,900
UND $ 3,400
GAL $ 8,830
UND $ 814
UND $ 1,124
UND $ 1,200
UND $ 1,300
LITRO $ 10
ML $ 3,200
KG $ 4,300
ML $ 969
UND $ 133,980
ML $ 1,900
ML $ 1,758
ML $ 1,162
ML $ 1,162
ML $ 679
UND $ 679
ML $ 679
UND $ 2,100
M3 $ 41,600
M3 $ 31,200
M3 $ 62,400
M3 $ 67,600
UND $ 4,200
UND $ 4,907
UND $ 5,416
UND $ 6,231
GAL $ 69,900
GAL $ 56,900
M3 $ 65,825
UND $ 5,300
UND $ 4,200
UND $ 2,500
UND $ 3,100
UND $ 890
UND $ 960
UND $ 1,400
UND $ 1,250
UND $ 2,300
UND $ 3,300
KG $ 4,260
UND $ 37,850
UND $ 15,400
UND $ 22,387
UND $ 24,032
UND $ 22,387
UND $ 24,032
UND $ 31,400
UND $ 23,990
ML $ 19,000
UND $ 36,900
ML $ 950
ML $ 2,800
ML $ 2,800
ML $ 2,800
UND $ 900
UND $ 2,250
UND $ 1,300
UND $ 1,900
UND $ 45,200
UND $ 21,500
UND $ 25,500
UND $ 32,400
UND $ 700
UND $ 500
KG $ 990
UND $ 4,550
UND $ 5,800
M2 $ 49,238
M2 $ 61,400
KG $ 444
UND $ 414
KG $ 1,100
KG $ 1,100
KG $ 450
UND $ 31,900
UND $ 39,900
UND $ 11,900
UND $ 13,400
UND $ 1,300
M3 $ 349,146
M3 $ 360,035
M3 $ 370,923
M3 $ 382,169
M3 $ 393,295
M3 $ 404,243
ML $ 1,425
KG $ 17,100
ML $ 9,000
UND $ 51,900
UND $ 350
UND $ 300
GAL $ 40,900
GAL $ 40,900
KG $ 1,116
LB $ 6,200
KG $ 5,200
ML $ 11,647
UND $ 75,900
UND $ 36,900
UND $ 603,700
M2 $ 13,000
M2 $ 840
DIA $ 200
UND $ 900
UND $ 6,539
UND $ 916
GAL $ 23,725
BTO $ 18,500
UND $ 3
KG $ 350
UND $ 14,900
UND $ 48,900
UND $ 28,900
ML $ 16,585
ML $ 8,400
UND $ 5,700
UND $ 3,600
UND $ 7,100
UND $ 44,900
UND $ 2,360,000
UND $ 350
UND $ 700
UND $ 1,500
UND $ 900
UND $ 1,000
UND $ 540
UND $ 450
UND $ 20,500
UND $ 22,787
UND $ 4,500
UND $ 38,540
UND $ 184,900
UND $ 55,900
UND $ 59,900
UND $ 107,900
UND $ 85,900
UND $ 133,900
UND $ 1,200
UND $ 1,700
UND $ 1,300
UND $ 32,900
UND $ 30,900
UND $ 23,000
M2 $ 1,100
ML $ 2,850
UND $ 5,000
M2 $ 5,500
ML $ 1,880
ML $ 1,680
ML $ 7,200
ML $ 6,270
ML $ 2,150
ML $ 28,800
ML $ 5,500
ML $ 5,500
ML $ 2,000
ML $ 4,500
ML $ 2,500
ML $ 38,000
ML $ 45,000
M2 $ 7,200
UND $ 250,000
UND $ 95,000
UND $ 185,000
UND $ 95,000
M2 $ 4,585
UND $ 2,735
KG $ 300
BTO $ 12,500
UND $ 34,500
M3 $ 194,900
M3 $ 210,428
M3 $ 230,768
M3 $ 248,116
M3 $ 271,632
M3 $ 128,280
M3 $ 317,352
M3 $ 252,044
M3 $ 214,256
M3 $ 187,640
M3 $ 168,950
ML $ 820
M2 $ 32,100
M2 $ 35,950
KG $ 2,850
KG $ 2,850
KG $ 2,850
ML $ 16,800
UND $ 71,500
UND $ 56,000
M2 $ 15,428
M2 $ 9,800
UND $ 6,300
ML $ 3,175
ML $ 14,500
ML $ 11,583
ML $ 21,700
LB $ 11,000
M3 $ 5,450
UND $ 3,200
UND $ 211,900
UND $ 211,900
UND $ 5,150
UND $ 40,900
UND $ 41,900
KG $ 1,000
GL $ 7,800
KG $ 19,725
ML $ 10,800
ML $ 15,500
UND $ 124
M3 $ 62,400
M3
GAL $ 36,900
GAL $ 108,900
ML $ 3,000
M2 $ 25,900
M2 $ 31,700
M2 $ 33,900
M2 $ 27,600
M2 $ 21,200
M2 $ 57,200
M2 $ 25,500
UND $ 12,000
UND $ 1,900
UND $ 30,000
UND $ 19,900
UND $ 99,900
UND $ 94,900
LB $ 3,500
LB $ 2,100
LB $ 3,500
M3 $ 33,855
UND $ 8,100
ML $ 31,500
UND $ 149,900
UND $ 155,900
UND $ 237,900
M3 $ 35,000
KG $ 8,245
KG $ 16,890
KG $ 4,380
GAL $ 47,980
UND $ 13,900
UND $ 13,950
UND $ 37,900
KG $ 9,295
UND $ 30,900
M3 $ 63,635
UND $ 1,633
UND $ 700
M3 $ 31,900
M2 $ 33,900
M2 $ 21,300
UND $ 24,900
UND $ 13,900
UND $ 272,900
UND $ 109,900
UND $ 189,900
UND $ 850
M2 $ 52,336
M2 $ 20,577
M2 $ 13,650
M2 $ 52,000
M2 $ 109,000
M2 $ 29,935
M2 $ 37,500
M2 $ 26,583
M2 $ 45,250
ML $ 2,318
GAL $ 44,900
M3 $ 72,800
UND $ 14,900
UND $ 5,900
GAL $ 28,000
UND $ 4,900
UND $ 4,500
UND $ 12,900
UND $ 5,900
UND $ 5,900
UND $ 17
UND $ 17
UND $ 210
UND $ 310
UND $ 310
UND $ 3,500
UND $ 180
UND $ 1,150
M3 $ 78,000
UND $ 950
ML $ 5,633
ML $ 2,300
ML $ 2,300
ML $ 800
ML $ 1,166
ML $ 6,966
ML $ 2,970
ML $ 10,300
ML $ 4,300
ML $ 8,300
ML $ 2,333
ML $ 11,700
ML $ 14,543
ML $ 3,483
ML $ 5,285
ML $ 7,900
ML $ 14,633
ML $ 23,791
ML $ 4,816
ML $ 7,633
UND $ 149,900
UND $ 3,200
GAL $ 21,980
GAL $ 37,980
GAL $ 21,998
KG $ 632
UND $ 900
UND $ 1,124
M3 $ 41,600
M3 $ 41,600
UND $ 9,054
UND $ 10,095
UND $ 9,054
UND $ 9,054
UND $ 33,850
UND $ 27,300
UND $ 27,300
ML $ 8,750
ML $ 19,589
UND $ 6,467
UND $ 13,201
UND $ 27,000
UND $ 32,000
UND $ 27,000
UND $ 3,000
M2 $ 10,000
M3 $ 95,000
UND $ 690,103 313 12525
$ 9,419,134.78
$ 10,239,134.78
$ 2,556,908.86
$ 21,480,717.32
$ 71,300,000.00
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA DE
INFRAESTRUCTURA
ITEM: 1.01
CAMPAMENTO 18 M2
UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (5%) % $ 69,592
Sub-Total $ 69,592
II. MATERIALES EN OBRA
Descripción Unidad Precio-Unit. Cantidad Valor-Unit.
BASE GRANULAR NORMA INVIAS M3 $ 65,825 2.34 $ 154,031
BISAGRA GATO OMEGA 3" UND $ 2,500 6.00 $ 15,000
GANCHO TEJA ETERNIT 55MM UND $ 916 28.00 $ 25,648
PORTACANDADO GATO SIMPLE 3 UND $ 19,900 2.00 $ 39,800
PUNTILLA CON CABEZA 2" LB $ 2,100 4.00 $ 8,400
MADERA TABLA CHAPA 30X1.8-2CM X 2.9M ORD. ML $ 4,500 54.90 $ 247,050
TEJA FIBROCEMENTO T7 Nº 6 M2 $ 13,650 19.20 $ 262,080
MADERA VARA DE CLAVO ɸ: 6 A 8CM (3M)
ML $ 2,500 22.00 $ 55,000
EUCALIPTO
Sub-Total $ 807,009
III. TRANSPORTES
Material Distancia (KM) Cantidad (M3) Tarifa/M3-Km Valor-Unit.
Sub-Total 0
Sub-Total $ 584,827
ITEM: 1.02
CAMPAMENTO 9 M3
UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (5%) % $ 31,077
Sub-Total $ 31,077
II. MATERIALES EN OBRA
Descripción Unidad Precio-Unit. Cantidad Valor-Unit.
BASE GRANULAR NORMA INVIAS M3 $ 65,825 1.17 $ 77,015
BISAGRA GATO OMEGA 3" UND $ 2,500 3.00 $ 7,500
GANCHO TEJA ETERNIT 55MM UND $ 916 16.00 $ 14,656
PORTACANDADO GATO SIMPLE 3 UND $ 19,900 2.00 $ 39,800
PUNTILLA CON CABEZA 2" LB $ 2,100 3.00 $ 6,300
MADERA TABLA CHAPA 30X1.8-2CM X 2.9M ORD. ML $ 4,500 10.34 $ 46,530
TEJA FIBROCEMENTO T7 Nº 6 M2 $ 13,650 8.00 $ 109,200
MADERA VARA DE CLAVO ɸ: 6 A 8CM (3M)
ML $ 2,500 4.13 $ 10,325
EUCALIPTO
Sub-Total $ 311,326
III. TRANSPORTES
Material Distancia (KM) Cantidad (M3) Tarifa/M3-Km Valor-Unit.
Sub-Total 0
Sub-Total $ 310,220
ITEM: 1.03
CERCA EN ALAMBRE DE PUA 3 HILOS CAL. 14
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (5%) % $ 482
Sub-Total $ 482
II. MATERIALES EN OBRA
Descripción Unidad Precio-Unit. Cantidad Valor-Unit.
ALAMBRE PUA CAL.14 - 350 M UND $ 133,980 0.01 $ 1,340
PUNTILLA CON CABEZA 2" LB $ 2,100 0.01 $ 21
MADERA VARA DE CLAVO ɸ: 6 A 8CM (3M)
ML $ 2,500 1.59 $ 3,975
EUCALIPTO
Sub-Total $ 5,336
III. TRANSPORTES
Material Distancia (KM) Cantidad (M3) Tarifa/M3-Km Valor-Unit.
Sub-Total 0
Sub-Total $ 4,309
ITEM: 1.04
CERCA EN TABLA
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (5%) % $ 1,462
Sub-Total $ 1,462
II. MATERIALES EN OBRA
Descripción Unidad Precio-Unit. Cantidad Valor-Unit.
MADERA TABLA CHAPA 30X1.8-2CM X 2.9M ORD. ML $ 4,500 3.40 $ 15,300
Sub-Total 0
Sub-Total $ 6,894
ITEM: 1.05
CERCA EN TELA VERDE H = 2.10 M
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (5%) % $ 372
Sub-Total $ 372
II. MATERIALES EN OBRA
Descripción Unidad Precio-Unit. Cantidad Valor-Unit.
MADERA DURMIENTE 4CMX4CM X 3.0M ORD. UND $ 5,000 0.33 $ 1,650
TELA VERDE 65GR/M2 2.10M ANCHO ML $ 2,318 1.00 $ 2,318
PUNTILLA CON CABEZA 1" LB $ 3,500 0.01 $ 35
Sub-Total $ 4,003
III. TRANSPORTES
Material Distancia (KM) Cantidad (M3) Tarifa/M3-Km Valor-Unit.
Sub-Total 0
Sub-Total $ 3,447
ITEM: 1.06
DESMONTE APARATOS SANITARIOS
UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 2,068.13
Sub-Total $ -
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.20 $ 20,681
Sub-Total $ 20,681.33
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 3,867.41
IMPREVISTOS 3.00% $ 682.48
UTILIDAD 5.00% $ 1,137.47
Sub-Total $ 5,687
ITEM: 1.07
DESMONTE CIELO RASO CON SU ESTRUCTURA
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 659.46
Sub-Total $ -
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.35 $ 6,032
Sub-Total $ 6,032.06
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 1,137.56
IMPREVISTOS 3.00% $ 200.75
UTILIDAD 5.00% $ 334.58
Sub-Total $ 1,673
ITEM: 1.08
DESMONTE CUBIERTA ASBESTO CEMENTO
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 764.38
Sub-Total $ -
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.40 $ 6,894
Sub-Total $ 6,893.78
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 1,301.89
IMPREVISTOS 3.00% $ 229.74
UTILIDAD 5.00% $ 382.91
Sub-Total $ 1,915
ITEM: 1.09
DESMONTE MARCO Y PUERTA
UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 861.72
Sub-Total $ -
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.50 $ 8,617
Sub-Total $ 8,617.22
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 1,611.42
IMPREVISTOS 3.00% $ 284.37
UTILIDAD 5.00% $ 473.95
Sub-Total $ 2,370
ITEM: 1.10
DESMONTE TEJA DE BARRO
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 764.38
Sub-Total $ -
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.40 $ 6,894
Sub-Total $ 6,893.78
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 1,301.89
IMPREVISTOS 3.00% $ 229.74
UTILIDAD 5.00% $ 382.91
Sub-Total $ 1,915
ITEM: 1.11
DESMONTE TEJA DE ZINC
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 655.71
Sub-Total $ -
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.35 $ 6,032
Sub-Total $ 6,032.06
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 1,136.92
IMPREVISTOS 3.00% $ 200.63
UTILIDAD 5.00% $ 334.39
Sub-Total $ 1,672
ITEM: 1.12
DESMONTE VENTANAS
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 775.55
Sub-Total $ -
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.45 $ 7,755
Sub-Total $ 7,755.50
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 1,450.28
IMPREVISTOS 3.00% $ 255.93
UTILIDAD 5.00% $ 426.55
Sub-Total $ 2,133
ITEM: 1.13
LOCALIZACION Y REPLANTEO APARATO TOPOGRAFICO
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 846.50
Sub-Total $ 605
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
COMISION DE TOPOGRAFIA $ 19,485 1.70 $ 33,125 0.04 $ 1,325
Sub-Total $ 1,324.99
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 472.00
IMPREVISTOS 3.00% $ 83.29
UTILIDAD 5.00% $ 138.82
Sub-Total $ 694
ITEM: 1.14
LOCALIZACION Y REPLANTEO ARTESANAL
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 94.99
Sub-Total $ 521
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.08 $ 1,379
Sub-Total $ 1,378.76
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 339.11
IMPREVISTOS 3.00% $ 59.84
UTILIDAD 5.00% $ 99.74
Sub-Total $ 499
Precio unitario total aproximado al peso $ 2,493
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 1.15
ROCERIA Y LIMPIEZA
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 137.88
Sub-Total $ -
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.08 $ 1,379
Sub-Total $ 1,378.76
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 257.83
IMPREVISTOS 3.00% $ 45.50
UTILIDAD 5.00% $ 75.83
Sub-Total $ 379
ITEM: 2.01
DEMOLICION CIMIENTOS ENTERRADOS
UNIDAD: M3
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 140,000.00
Sub-Total $ -
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 2.00 $ 34,469
Sub-Total $ 34,468.89
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 29,659.71
IMPREVISTOS 3.00% $ 5,234.07
UTILIDAD 5.00% $ 8,723.44
Sub-Total $ 43,617
ITEM: 2.02
DEMOLICION ESTRUCTURA CONCRETO CICLOPEO
UNIDAD: M3
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 112,000.00
Sub-Total $ -
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.60 $ 27,575
Sub-Total $ 27,575.11
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 23,727.77
IMPREVISTOS 3.00% $ 4,187.25
UTILIDAD 5.00% $ 6,978.76
Sub-Total $ 34,894
ITEM: 2.03
DEMOLICION MURO DOBLE E=0.25 M
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,206.41
Sub-Total $ -
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.70 $ 12,064
Sub-Total $ 12,064.11
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 2,255.99
IMPREVISTOS 3.00% $ 398.12
UTILIDAD 5.00% $ 663.53
Sub-Total $ 3,318
ITEM: 2.04
DEMOLICION MURO SENCILLO E= 0.15 M
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 896.19
Sub-Total $ -
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.52 $ 8,962
Sub-Total $ 8,961.91
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 1,675.88
IMPREVISTOS 3.00% $ 295.74
UTILIDAD 5.00% $ 492.91
Sub-Total $ 2,465
ITEM: 2.05
DEMOLICION PLACA ALIGERADA E= 0.25M
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 21,000.00
Sub-Total $ -
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.30 $ 5,170
Sub-Total $ 5,170.33
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 4,448.96
IMPREVISTOS 3.00% $ 785.11
UTILIDAD 5.00% $ 1,308.52
Sub-Total $ 6,543
ITEM: 2.06
DEMOLICION PLACA ALIGERADA E= 0.45 M
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 28,000.00
Sub-Total $ -
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.40 $ 6,894
Sub-Total $ 6,893.78
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 5,931.94
IMPREVISTOS 3.00% $ 1,046.81
UTILIDAD 5.00% $ 1,744.69
Sub-Total $ 8,723
ITEM: 2.07
DEMOLICION PLACA MACIZA E= 0.30 M ENTREPISO
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 52,500.00
Sub-Total $ -
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.75 $ 12,926
Sub-Total $ 12,925.83
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 11,122.39
IMPREVISTOS 3.00% $ 1,962.77
UTILIDAD 5.00% $ 3,271.29
Sub-Total $ 16,356
ITEM: 2.08
DEMOLICION PLACA MACIZA E=0.15 M ENTREPISO
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 28,000.00
Sub-Total $ -
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.40 $ 6,894
Sub-Total $ 6,893.78
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 5,931.94
IMPREVISTOS 3.00% $ 1,046.81
UTILIDAD 5.00% $ 1,744.69
Sub-Total $ 8,723
ITEM: 2.09
DEMOLICION PLACAS PISO CONCRETO 0.10 M - 0.12M
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 12,600.00
Sub-Total $ -
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.18 $ 3,102
Sub-Total $ 3,102.20
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 2,669.37
IMPREVISTOS 3.00% $ 471.07
UTILIDAD 5.00% $ 785.11
Sub-Total $ 3,926
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 147,000.00
Sub-Total $ -
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 2.10 $ 36,192
Sub-Total $ 36,192.33
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 31,142.70
IMPREVISTOS 3.00% $ 5,495.77
UTILIDAD 5.00% $ 9,159.62
Sub-Total $ 45,798
ITEM: 2.11
DESMONTE ENCHAPE PARED
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 430.86
Sub-Total $ -
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.25 $ 4,309
Sub-Total $ 4,308.61
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 805.71
IMPREVISTOS 3.00% $ 142.18
UTILIDAD 5.00% $ 236.97
Sub-Total $ 1,185
ITEM: 2.12
LEVANTADA ENCHAPE PISOS
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 482.56
Sub-Total $ -
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.28 $ 4,826
Sub-Total $ 4,825.64
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 902.40
IMPREVISTOS 3.00% $ 159.25
UTILIDAD 5.00% $ 265.41
Sub-Total $ 1,327
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 6,000.00
Sub-Total $ -
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
VOLQUETA 7M3 16.00 1.00 $ 1,000 16,000
SERVICIO DE ESCOMBRERA 1.00 $ 3,571 3,571
Sub-Total $ 19,571.00
Sub-Total $ -
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 4,347.07
IMPREVISTOS 3.00% $ 767.13
UTILIDAD 5.00% $ 1,278.55
Sub-Total $ 6,393
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 6,000.00
Sub-Total $ -
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
VOLQUETA 7M3 24.00 1.00 $ 1,000 24,000
SERVICIO DE ESCOMBRERA 1.00 $ 3,571 3,571
Sub-Total $ 27,571
Sub-Total $ -
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 5,707.07
IMPREVISTOS 3.00% $ 1,007.13
UTILIDAD 5.00% $ 1,678.55
Sub-Total $ 8,393
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 6,000.00
Sub-Total $ -
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
VOLQUETA 7M3 8.00 1.00 $ 1,000 8,000
SERVICIO DE ESCOMBRERA 1.00 $ 3,571 3,571
Sub-Total $ 11,571
Sub-Total $ -
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 2,987.07
IMPREVISTOS 3.00% $ 527.13
UTILIDAD 5.00% $ 878.55
Sub-Total $ 4,393
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 307.93
Sub-Total $ -
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
VOLQUETA 7M3 10.50 1.00 $ 1,000 10,500
SERVICIO DE ESCOMBRERA 1.00 $ 3,571 3,571
Sub-Total $ 14,071.00
Sub-Total $ 6,158.63
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 3,491.38
IMPREVISTOS 3.00% $ 616.13
UTILIDAD 5.00% $ 1,026.88
Sub-Total $ 5,134
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 307.93
Sub-Total $ -
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
VOLQUETA 7M3 15.50 1.00 $ 1,000 15,500
SERVICIO DE ESCOMBRERA 1.00 $ 3,571 3,571
Sub-Total $ 19,071.00
Sub-Total $ 6,158.63
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 4,341.38
IMPREVISTOS 3.00% $ 766.13
UTILIDAD 5.00% $ 1,276.88
Sub-Total $ 6,384
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 307.93
Sub-Total $ -
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
VOLQUETA 7M3 5.50 1.00 $ 1,000 5,500
SERVICIO DE ESCOMBRERA 1.00 $ 3,571 3,571
Sub-Total $ 9,071.00
Sub-Total $ 6,158.63
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 2,641.38
IMPREVISTOS 3.00% $ 466.13
UTILIDAD 5.00% $ 776.88
Sub-Total $ 3,884
ITEM: 3.07
DESCAPOTE A MAQUINA E: 0.20 M
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,200.00
Sub-Total $ -
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
Sub-Total $ -
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 204.00
IMPREVISTOS 3.00% $ 36.00
UTILIDAD 5.00% $ 60.00
Sub-Total $ 300
ITEM: 3.08
DESCAPOTE MANUAL E: 0.20 M
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 153.97
Sub-Total $ -
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
AYUDANTE AA $ 3,623 1.70 $ 6,159 0.50 $ 3,079
Sub-Total $ 3,079.31
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 549.66
IMPREVISTOS 3.00% $ 97.00
UTILIDAD 5.00% $ 161.66
Sub-Total $ 808
ITEM: 3.09
EXCAVACION MANUAL EN MATERIAL COMUN 0 A 2 MTS
UNIDAD: M3
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,034.07
Sub-Total $ -
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.20 $ 20,681
Sub-Total $ 20,681.33
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 3,691.62
IMPREVISTOS 3.00% $ 651.46
UTILIDAD 5.00% $ 1,085.77
Sub-Total $ 5,429
ITEM: 3.10
EXCAVACION MANUAL EN CONGLOMERADO 0 A 2MTS
UNIDAD: M3
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,378.76
Sub-Total $ -
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.60 $ 27,575
Sub-Total $ 27,575.11
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 4,922.16
IMPREVISTOS 3.00% $ 868.62
UTILIDAD 5.00% $ 1,447.69
Sub-Total $ 7,238
ITEM: 3.11
EXCAVACION EN ROCA 0 A 2 MTS
UNIDAD: M3
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 5,515.02
Sub-Total $ -
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 3.20 $ 55,150
Sub-Total $ 55,150.22
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 10,313.09
IMPREVISTOS 3.00% $ 1,819.96
UTILIDAD 5.00% $ 3,033.26
Sub-Total $ 15,166
ITEM: 3.12
EXCAVACION MANUAL ROCA CON EXPLOSIVO 0 A 2M
UNIDAD: M3
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 18,801.86
Sub-Total $ 7,433
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 2.50 $ 43,086
Sub-Total $ 43,086.11
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 11,784.48
IMPREVISTOS 3.00% $ 2,079.61
UTILIDAD 5.00% $ 3,466.02
Sub-Total $ 17,330
ITEM: 3.13
RELLENO DE EXCAVACION CON MATERIAL LOCAL COMPACTADO
UNIDAD: M3
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 6,517.03
Sub-Total $ -
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.60 $ 10,341
Sub-Total $ 10,340.67
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 2,865.81
IMPREVISTOS 3.00% $ 505.73
UTILIDAD 5.00% $ 842.88
Sub-Total $ 4,214
ITEM: 3.14
RELLENO GRAVILLA FINA 1/2”
UNIDAD: M3
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 603.21
Sub-Total $ 84,240
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.70 $ 12,064
Sub-Total $ 12,064.11
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 16,474.24
IMPREVISTOS 3.00% $ 2,907.22
UTILIDAD 5.00% $ 4,845.37
Sub-Total $ 24,227
ITEM: 3.15
RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE
UNIDAD: M3
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 3,078.21
Sub-Total $ 44,012
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.70 $ 12,064
Sub-Total $ 12,064.11
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 10,056.15
IMPREVISTOS 3.00% $ 1,774.61
UTILIDAD 5.00% $ 2,957.69
Sub-Total $ 14,788
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 3,078.21
Sub-Total $ 85,573
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.70 $ 12,064
Sub-Total $ 12,064.11
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 17,121.52
IMPREVISTOS 3.00% $ 3,021.44
UTILIDAD 5.00% $ 5,035.74
Sub-Total $ 25,179
ITEM: 3.17
RELLENO ARENA
UNIDAD: M3
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 517.03
Sub-Total $ 32,760
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.60 $ 10,341
Sub-Total $ 10,340.67
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 7,415.01
IMPREVISTOS 3.00% $ 1,308.53
UTILIDAD 5.00% $ 2,180.88
Sub-Total $ 10,904
ITEM: 4.01
CONCRETO 1500 PSI
UNIDAD: M3
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 7,973.44
Sub-Total $ 204,645
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.00 $ 17,234
Sub-Total $ 17,234.44
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 39,074.99
IMPREVISTOS 3.00% $ 6,895.59
UTILIDAD 5.00% $ 11,492.64
Sub-Total $ 57,463
ITEM: 4.02
CONCRETO 2000 PSI
UNIDAD: M3
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 7,973.44
Sub-Total $ 220,949
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.00 $ 17,234
Sub-Total $ 17,234.44
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 41,846.74
IMPREVISTOS 3.00% $ 7,384.72
UTILIDAD 5.00% $ 12,307.86
Sub-Total $ 61,539
ITEM: 4.03
CONCRETO 2500 PSI
UNIDAD: M3
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 7,973.44
Sub-Total $ 242,306
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.00 $ 17,234
Sub-Total $ 17,234.44
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 45,477.43
IMPREVISTOS 3.00% $ 8,025.43
UTILIDAD 5.00% $ 13,375.71
Sub-Total $ 66,879
ITEM: 4.04
CONCRETO 3000 PSI
UNIDAD: M3
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 7,973.44
Sub-Total $ 260,522
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.00 $ 17,234
Sub-Total $ 17,234.44
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 48,574.05
IMPREVISTOS 3.00% $ 8,571.89
UTILIDAD 5.00% $ 14,286.48
Sub-Total $ 71,432
ITEM: 4.05
CONCRETO 3500 PSI
UNIDAD: M3
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 7,973.44
Sub-Total $ 285,214
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.00 $ 17,234
Sub-Total $ 17,234.44
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 52,771.65
IMPREVISTOS 3.00% $ 9,312.64
UTILIDAD 5.00% $ 15,521.07
Sub-Total $ 77,605
ITEM: 4.06
MORTERO 1:2
UNIDAD: M3
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 7,111.72
Sub-Total $ 333,220
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.00 $ 17,234
Sub-Total $ 17,234.44
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 60,786.18
IMPREVISTOS 3.00% $ 10,726.97
UTILIDAD 5.00% $ 17,878.29
Sub-Total $ 89,391
ITEM: 4.07
MORTERO 1:3
UNIDAD: M3
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 7,111.72
Sub-Total $ 264,646
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.00 $ 17,234
Sub-Total $ 17,234.44
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 49,128.70
IMPREVISTOS 3.00% $ 8,669.77
UTILIDAD 5.00% $ 14,449.62
Sub-Total $ 72,248
ITEM: 4.08
MORTERO 1:3 IMPERMEABILIZADO
UNIDAD: M3
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 7,111.72
Sub-Total $ 273,716
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.00 $ 17,234
Sub-Total $ 17,234.44
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 50,670.52
IMPREVISTOS 3.00% $ 8,941.86
UTILIDAD 5.00% $ 14,903.09
Sub-Total $ 74,515
ITEM: 4.09
MORTERO 1:4
UNIDAD: M3
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 7,111.72
Sub-Total $ 224,969
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.00 $ 17,234
Sub-Total $ 17,234.44
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 42,383.54
IMPREVISTOS 3.00% $ 7,479.45
UTILIDAD 5.00% $ 12,465.75
Sub-Total $ 62,329
ITEM: 4.10
MORTERO 1:4 IMPERMEABILIZADO
UNIDAD: M3
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 7,111.72
Sub-Total $ 233,214
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.00 $ 17,234
Sub-Total $ 17,234.44
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 43,785.19
IMPREVISTOS 3.00% $ 7,726.80
UTILIDAD 5.00% $ 12,878.00
Sub-Total $ 64,390
ITEM: 4.11
MORTERO 1:5
UNIDAD: M3
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 7,111.72
Sub-Total $ 197,022
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.00 $ 17,234
Sub-Total $ 17,234.44
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 37,632.59
IMPREVISTOS 3.00% $ 6,641.04
UTILIDAD 5.00% $ 11,068.41
Sub-Total $ 55,342
ITEM: 4.12
MORTERO 1:6
UNIDAD: M3
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 7,111.72
Sub-Total $ 177,398
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.00 $ 17,234
Sub-Total $ 17,234.44
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 34,296.42
IMPREVISTOS 3.00% $ 6,052.31
UTILIDAD 5.00% $ 10,087.18
Sub-Total $ 50,436
ITEM: 4.13
MORTERO 1:10
UNIDAD: M3
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 7,111.72
Sub-Total $ 134,694
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.00 $ 17,234
Sub-Total $ 17,234.44
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 27,036.83
IMPREVISTOS 3.00% $ 4,771.20
UTILIDAD 5.00% $ 7,952.01
Sub-Total $ 39,760
ITEM: 5.01
BASE EN CONCRETO POBRE 1500 PS1 E=0.05M
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 743.36
Sub-Total $ 10,720
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.25 $ 4,309
Sub-Total $ 4,308.61
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 2,681.15
IMPREVISTOS 3.00% $ 473.14
UTILIDAD 5.00% $ 788.57
Sub-Total $ 3,943
ITEM: 5.02
CONCRETO CICLÓPEO 2000 PSI, 40% ROCA MEDIA ZONGA
UNIDAD: M3
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 6,677.76
Sub-Total $ 210,778
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 2.00 $ 34,469
(5) AYUDANTE AA $ 18,114 1.70 $ 30,793 2.00 $ 61,586
Sub-Total $ 96,055.14
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 53,296.79
IMPREVISTOS 3.00% $ 9,405.32
UTILIDAD 5.00% $ 15,675.53
Sub-Total $ 78,378
ITEM: 5.03
CASETON DE LONA 0.85 X 0.35
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 947.89
Sub-Total $ 12,733
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 1.00 $ 18,958
Sub-Total $ 18,957.89
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 5,548.63
IMPREVISTOS 3.00% $ 979.17
UTILIDAD 5.00% $ 1,631.95
Sub-Total $ 8,160
Precio unitario total aproximado al peso $ 40,799
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 5.04
CASETON DE LONA 0.85 X 0.70
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,137.47
Sub-Total $ 20,469
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 1.20 $ 22,749
Sub-Total $ 22,749.47
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 7,540.56
IMPREVISTOS 3.00% $ 1,330.69
UTILIDAD 5.00% $ 2,217.81
Sub-Total $ 11,089
Precio unitario total aproximado al peso $ 55,445
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 5.05
COLUMNAS 3000 PSI (SIN REFUERZO)
UNIDAD: M3
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 42,517.12
Sub-Total $ 319,857
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 10.29 $ 177,342
Sub-Total $ 177,342.43
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 91,751.75
IMPREVISTOS 3.00% $ 16,191.48
UTILIDAD 5.00% $ 26,985.81
Sub-Total $ 134,929
ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA ITEM: 5.06
DE REFUERZO, CONCRETO DE 3000 PSI UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 2,858.49
Sub-Total $ 59,784
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.75 $ 12,926
AYUDANTE AA $ 3,623 1.70 $ 6,159 0.75 $ 4,619
Sub-Total $ 17,544.80
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 13,631.89
IMPREVISTOS 3.00% $ 2,405.63
UTILIDAD 5.00% $ 4,009.38
Sub-Total $ 20,047
ITEM: 5.07
ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM, INCL. MALLA
DE REFUERZO, CONCRETO DE 3000 PSI UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 3,150.90
Sub-Total $ 63,634
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.00 $ 17,234
AYUDANTE AA $ 3,623 1.70 $ 6,159 1.00 $ 6,159
Sub-Total $ 23,393.07
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 15,330.30
IMPREVISTOS 3.00% $ 2,705.35
UTILIDAD 5.00% $ 4,508.91
Sub-Total $ 22,545
ITEM: 5.08
ENTREPISOS CASETÓN CON VIGAS, 3000 PSI H=0.30 m (SIN REFUERZO)
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 4,345.87
Sub-Total $ 57,462
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 2.10 $ 36,192
Sub-Total $ 36,192.33
Total Costo Directo $ 98,000
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 16,659.95
IMPREVISTOS 3.00% $ 2,939.99
UTILIDAD 5.00% $ 4,899.99
Sub-Total $ 24,500
ITEM: 5.09
ENTREPISOS CASETÓN CON VIGAS, 3000 PSI H=0.35 m (SIN REFUERZO)
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 4,666.88
Sub-Total $ 61,194
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 2.40 $ 41,363
Sub-Total $ 41,362.67
Total Costo Directo $ 107,224
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 18,228.07
IMPREVISTOS 3.00% $ 3,216.72
UTILIDAD 5.00% $ 5,361.20
Sub-Total $ 26,806
ITEM: 5.10
ENTREPISOS CASETÓN CON VIGAS, 3000 PSI H=0.40 m (SIN REFUERZO)
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 4,987.90
Sub-Total $ 65,175
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 2.70 $ 46,533
Sub-Total $ 46,533.00
Total Costo Directo $ 116,696
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 19,838.37
IMPREVISTOS 3.00% $ 3,500.89
UTILIDAD 5.00% $ 5,834.81
Sub-Total $ 29,174
ITEM: 5.11
ENTREPISOS CASETÓN CON VIGAS, 3000 PSI H=0.45 m (SIN REFUERZO)
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 5,265.83
Sub-Total $ 68,660
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 2.95 $ 50,842
Sub-Total $ 50,841.61
Total Costo Directo $ 124,768
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 21,210.49
IMPREVISTOS 3.00% $ 3,743.03
UTILIDAD 5.00% $ 6,238.38
Sub-Total $ 31,192
ITEM: 5.12
ENTREPISOS CASETÓN CON VIGAS, 3000 PSI H=0.50 m (SIN REFUERZO)
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 5,586.85
Sub-Total $ 72,107
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 3.25 $ 56,012
Sub-Total $ 56,011.94
Total Costo Directo $ 133,706
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 22,729.94
IMPREVISTOS 3.00% $ 4,011.17
UTILIDAD 5.00% $ 6,685.28
Sub-Total $ 33,426
ITEM: 5.13
ESCALERA MACIZA UN TRAMO 3000 PSI (SIN REFUERZO)
UNIDAD: M3
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 33,908.96
Sub-Total $ 410,607
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 15.80 $ 272,304
Sub-Total $ 272,304.22
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 121,859.36
IMPREVISTOS 3.00% $ 21,504.59
UTILIDAD 5.00% $ 35,840.99
Sub-Total $ 179,205
ITEM: 5.14
MURO LADRILLO ESTRUCTURAL E=0.12 cm
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,088.05
Sub-Total $ 37,391
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.90 $ 15,511
Sub-Total $ 15,511.00
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 9,178.31
IMPREVISTOS 3.00% $ 1,619.70
UTILIDAD 5.00% $ 2,699.50
Sub-Total $ 13,498
ITEM: 5.15
ENTREPISO PLACA MACIZA 3000 PSI E: 0.10 M
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 15,142.70
Sub-Total $ 30,093
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.55 $ 9,479
Sub-Total $ 9,478.94
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 9,301.45
IMPREVISTOS 3.00% $ 1,641.43
UTILIDAD 5.00% $ 2,735.72
Sub-Total $ 13,679
Precio unitario total aproximado al peso $ 68,393
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 5.16
ENTREPISO PLACA MACIZA 3000 PSI E: 0.12 M (SIN REFUERZO)
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 15,379.72
Sub-Total $ 35,551
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.68 $ 11,719
Sub-Total $ 11,719.42
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 10,650.58
IMPREVISTOS 3.00% $ 1,879.51
UTILIDAD 5.00% $ 3,132.52
Sub-Total $ 15,663
Precio unitario total aproximado al peso $ 78,313
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 5.17
ENTREPISO PLACA MACIZA 3000 PSI E: 0.15 M (SIN REFUERZO)
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 15,713.71
Sub-Total $ 43,739
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.85 $ 14,649
Sub-Total $ 14,649.28
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 12,597.36
IMPREVISTOS 3.00% $ 2,223.06
UTILIDAD 5.00% $ 3,705.11
Sub-Total $ 18,526
Precio unitario total aproximado al peso $ 92,628
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 5.18
MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M (SIN
REFUERZO) UNIDAD: M3
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 15,803.19
Sub-Total $ 324,171
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 10.68 $ 184,064
Sub-Total $ 184,063.86
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 89,086.49
IMPREVISTOS 3.00% $ 15,721.14
UTILIDAD 5.00% $ 26,201.91
Sub-Total $ 131,010
ITEM: 5.19
PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1
M) UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,738.60
Sub-Total $ 28,390
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.90 $ 15,511
Sub-Total $ 15,511.00
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 7,758.69
IMPREVISTOS 3.00% $ 1,369.18
UTILIDAD 5.00% $ 2,281.97
Sub-Total $ 11,410
ITEM: 5.20
ACERO FIGURADO 60000 PSI
UNIDAD: KG
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 25.85
Sub-Total $ 3,189
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.03 $ 517
Sub-Total $ 517.03
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 634.42
IMPREVISTOS 3.00% $ 111.96
UTILIDAD 5.00% $ 186.59
Sub-Total $ 933
ITEM: 5.21
ACERO FIGURADO 37000 PSI
UNIDAD: KG
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 25.85
Sub-Total $ 3,036
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.03 $ 517
Sub-Total $ 517.03
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 608.41
IMPREVISTOS 3.00% $ 107.37
UTILIDAD 5.00% $ 178.94
Sub-Total $ 895
ITEM: 5.22
REFUERZO MALLA ELECTROSOLDADA
UNIDAD: KG
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 30.16
Sub-Total $ 3,703
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.04 $ 603
Sub-Total $ 603.21
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 737.22
IMPREVISTOS 3.00% $ 130.10
UTILIDAD 5.00% $ 216.83
Sub-Total $ 1,084
ITEM: 5.23
TANQUE ELEVADO EN CONCRETO DE 3500 PSI
UNIDAD: M3
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 25,990.08
Sub-Total $ 348,263
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 11.20 $ 193,026
Sub-Total $ 193,025.77
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 96,437.34
IMPREVISTOS 3.00% $ 17,018.35
UTILIDAD 5.00% $ 28,363.92
Sub-Total $ 141,820
ITEM: 5.23
TANQUE SUBTERRANEO EN CONCRETO DE 3000 PSI (SIN REFUERZO)
UNIDAD: M3
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 25,107.73
Sub-Total $ 316,873
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 10.30 $ 177,515
Sub-Total $ 177,514.77
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 88,314.26
IMPREVISTOS 3.00% $ 15,584.87
UTILIDAD 5.00% $ 25,974.78
Sub-Total $ 129,874
ITEM: 5.24
VIGA AEREA 3000 PSI
UNIDAD: M3
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 16,891.83
Sub-Total $ 373,478
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 10.50 $ 180,962
Sub-Total $ 180,961.66
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 97,126.29
IMPREVISTOS 3.00% $ 17,139.93
UTILIDAD 5.00% $ 28,566.55
Sub-Total $ 142,833
ITEM: 5.26
VIGA CINTA 3000 PSI (SIN REFUERZO)
UNIDAD: M3
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 17,495.04
Sub-Total $ 335,878
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 11.20 $ 193,026
Sub-Total $ 193,025.77
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 92,887.73
IMPREVISTOS 3.00% $ 16,391.95
UTILIDAD 5.00% $ 27,319.92
Sub-Total $ 136,600
ITEM: 5.27
VIGA CINTA 3000 PSI (SIN REFUERZO)
UNIDAD: M3
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 15,349.15
Sub-Total $ 335,878
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 9.29 $ 160,108
Sub-Total $ 160,107.99
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 86,926.91
IMPREVISTOS 3.00% $ 15,340.04
UTILIDAD 5.00% $ 25,566.74
Sub-Total $ 127,834
Precio unitario total aproximado al peso $ 639,168
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 5.28
PLACA FACIL BLOQUELON
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,562.66
Sub-Total $ 80,051
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.40 $ 24,128
Sub-Total $ 24,128.22
Sub-Total $ 26,435
ITEM: 6.01
ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M INCLUYE REFUERZO
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,452.05
Sub-Total $ 10,992
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.77 $ 13,271
Sub-Total $ 13,270.52
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 4,371.45
IMPREVISTOS 3.00% $ 771.43
UTILIDAD 5.00% $ 1,285.72
Sub-Total $ 6,429
ITEM: 6.02
ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M INCLUYE REFUERZO
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 2,710.17
Sub-Total $ 11,251
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.50 $ 25,852
Sub-Total $ 25,851.67
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 6,768.16
IMPREVISTOS 3.00% $ 1,194.38
UTILIDAD 5.00% $ 1,990.63
Sub-Total $ 9,953
ITEM: 6.03
ALFAJÍA EN LADRILLO PRENSADO MACIZO
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,607.16
Sub-Total $ 21,285
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.86 $ 14,822
Sub-Total $ 14,821.62
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 6,411.36
IMPREVISTOS 3.00% $ 1,131.42
UTILIDAD 5.00% $ 1,885.70
Sub-Total $ 9,428
ITEM: 6.04
DINTELES CONCRETO DE 2500 PSI 15X20 INCLUYE REFUERZO
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,910.94
Sub-Total $ 16,832
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.00 $ 17,234
Sub-Total $ 17,234.44
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 6,116.18
IMPREVISTOS 3.00% $ 1,079.33
UTILIDAD 5.00% $ 1,798.88
Sub-Total $ 8,994
Precio unitario total aproximado al peso $ 44,972
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 6.05
DINTELES EN BLOQUE 0.12 M INCLUYE REFUERZO
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,049.22
Sub-Total $ 12,756
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.50 $ 8,617
Sub-Total $ 8,617.22
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 3,811.80
IMPREVISTOS 3.00% $ 672.67
UTILIDAD 5.00% $ 1,121.12
Sub-Total $ 5,606
ITEM: 6.06
DINTELES EN VARILLA
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,049.22
Sub-Total $ 10,711
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.50 $ 8,617
Sub-Total $ 8,617.22
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 3,464.16
IMPREVISTOS 3.00% $ 611.32
UTILIDAD 5.00% $ 1,018.87
Sub-Total $ 5,094
ITEM: 6.07
ENCHAPES LADRILLO PRENSADO
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 2,270.79
Sub-Total $ 48,898
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.10 $ 18,958
Sub-Total $ 18,957.89
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 11,921.45
IMPREVISTOS 3.00% $ 2,103.79
UTILIDAD 5.00% $ 3,506.31
Sub-Total $ 17,532
Precio unitario total aproximado al peso $ 87,658
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 6.08
INSTALACIÓN CARPINTERÍA METÁLICA EN VANOS DE MAMPOSTERIA
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 838.05
Sub-Total $ 2,520
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.90 $ 15,511
Sub-Total $ 15,511.00
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 3,207.81
IMPREVISTOS 3.00% $ 566.08
UTILIDAD 5.00% $ 943.47
Sub-Total $ 4,717
ITEM: 6.09
MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO)
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,352.82
Sub-Total $ 88,466
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.20 $ 20,681
Sub-Total $ 20,681.33
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 18,785.01
IMPREVISTOS 3.00% $ 3,315.00
UTILIDAD 5.00% $ 5,525.00
Sub-Total $ 27,625
ITEM: 6.10
MURO EN BLOQUE DE CONCRETO 0.09 M
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 840.71
Sub-Total $ 20,518
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.70 $ 12,064
Sub-Total $ 12,064.11
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 5,681.80
IMPREVISTOS 3.00% $ 1,002.67
UTILIDAD 5.00% $ 1,671.12
Sub-Total $ 8,356
Precio unitario total aproximado al peso $ 41,778
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 6.11
MURO EN BLOQUE DE CONCRETO 0.09 M (LINEAL)
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 450.27
Sub-Total $ 13,625
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.45 $ 7,755
Sub-Total $ 7,755.50
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 3,711.20
IMPREVISTOS 3.00% $ 654.92
UTILIDAD 5.00% $ 1,091.53
Sub-Total $ 5,458
ITEM: 6.12
MURO EN BLOQUE DE CONCRETO 0.19 M
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 926.88
Sub-Total $ 36,518
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.80 $ 13,788
Sub-Total $ 13,787.56
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 8,709.44
IMPREVISTOS 3.00% $ 1,536.96
UTILIDAD 5.00% $ 2,561.60
Sub-Total $ 12,808
Precio unitario total aproximado al peso $ 64,040
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 6.13
MURO EN BLOQUE DE CONCRETO 0.19 M (LINEAL)
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 625.27
Sub-Total $ 21,714
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.45 $ 7,755
Sub-Total $ 7,755.50
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 5,116.12
IMPREVISTOS 3.00% $ 902.84
UTILIDAD 5.00% $ 1,504.74
Sub-Total $ 7,524
Precio unitario total aproximado al peso $ 37,619
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 6.14
MURO EN BLOQUE TRADICIONAL ESTRIADO #4
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 840.71
Sub-Total $ 14,140
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.70 $ 12,064
Sub-Total $ 12,064.11
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 4,597.58
IMPREVISTOS 3.00% $ 811.34
UTILIDAD 5.00% $ 1,352.23
Sub-Total $ 6,761
Precio unitario total aproximado al peso $ 33,806
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 6.15
MURO EN BLOQUE TRADICIONAL ESTRIADO #4 (LINEAL)
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 437.77
Sub-Total $ 8,834
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.45 $ 7,755
Sub-Total $ 7,755.50
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 2,894.64
IMPREVISTOS 3.00% $ 510.82
UTILIDAD 5.00% $ 851.37
Sub-Total $ 4,257
ITEM: 6.16
MURO EN BLOQUE TRADICIONAL ESTRIADO #5
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 840.71
Sub-Total $ 21,015
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.70 $ 12,064
Sub-Total $ 12,064.11
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 5,766.29
IMPREVISTOS 3.00% $ 1,017.58
UTILIDAD 5.00% $ 1,695.97
Sub-Total $ 8,480
Precio unitario total aproximado al peso $ 42,399
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 6.17
MURO EN BLOQUE TRADICIONAL ESTRIADO #5 (LINEAL)
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 437.77
Sub-Total $ 12,214
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.45 $ 7,755
Sub-Total $ 7,755.50
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 3,469.24
IMPREVISTOS 3.00% $ 612.22
UTILIDAD 5.00% $ 1,020.37
Sub-Total $ 5,102
ITEM: 6.18
MURO EN LADRILLO MACIZO PRENSADO 12 CM
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 790.71
Sub-Total $ 61,428
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.70 $ 12,064
Sub-Total $ 12,064.11
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 12,628.02
IMPREVISTOS 3.00% $ 2,228.47
UTILIDAD 5.00% $ 3,714.12
Sub-Total $ 18,571
ITEM: 6.19
MURO EN LADRILLO MACIZO PRENSADO 12 CM (LINEAL)
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 512.77
Sub-Total $ 36,857
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.45 $ 7,755
Sub-Total $ 7,755.50
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 7,671.23
IMPREVISTOS 3.00% $ 1,353.75
UTILIDAD 5.00% $ 2,256.24
Sub-Total $ 11,281
ITEM: 6.20
MURO EN LADRILLO PORTANTE PRENSADO P-V 15 CM
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 833.79
Sub-Total $ 60,685
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.75 $ 12,926
Sub-Total $ 12,925.83
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 12,655.59
IMPREVISTOS 3.00% $ 2,233.34
UTILIDAD 5.00% $ 3,722.23
Sub-Total $ 18,611
ITEM: 6.21
MURO EN LADRILLO PORTANTE PRENSADO P-V 15 CM (LINEAL)
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 575.27
Sub-Total $ 36,442
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.45 $ 7,755
Sub-Total $ 7,755.50
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 7,611.35
IMPREVISTOS 3.00% $ 1,343.18
UTILIDAD 5.00% $ 2,238.63
Sub-Total $ 11,193
ITEM: 6.22
MURO LADRILLO MACIZO REC. 0.10CM
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 833.79
Sub-Total $ 27,756
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.75 $ 12,926
Sub-Total $ 12,925.83
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 7,057.72
IMPREVISTOS 3.00% $ 1,245.48
UTILIDAD 5.00% $ 2,075.80
Sub-Total $ 10,379
ITEM: 6.23
MURO LADRILLO MACIZO REC. 0.10CM (LINEAL)
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 567.70
Sub-Total $ 16,514
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.55 $ 9,479
Sub-Total $ 9,478.94
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 4,515.28
IMPREVISTOS 3.00% $ 796.81
UTILIDAD 5.00% $ 1,328.02
Sub-Total $ 6,640
ITEM: 6.24
MURO EN LADRILLO PRENSADO LIVIANO 12 CM
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 833.79
Sub-Total $ 57,961
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.75 $ 12,926
Sub-Total $ 12,925.83
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 12,192.56
IMPREVISTOS 3.00% $ 2,151.63
UTILIDAD 5.00% $ 3,586.05
Sub-Total $ 17,930
ITEM: 6.25
MURO EN LADRILLO PRENSADO LIVIANO 12 CM (LINEAL)
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 543.36
Sub-Total $ 33,337
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.50 $ 8,617
Sub-Total $ 8,617.22
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 7,224.55
IMPREVISTOS 3.00% $ 1,274.92
UTILIDAD 5.00% $ 2,124.87
Sub-Total $ 10,624
ITEM: 6.26
MURO LADRILLO TOLETE COMUN 12 CM
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 833.79
Sub-Total $ 31,411
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.75 $ 12,926
Sub-Total $ 12,925.83
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 7,679.06
IMPREVISTOS 3.00% $ 1,355.13
UTILIDAD 5.00% $ 2,258.55
Sub-Total $ 11,293
ITEM: 6.27
MURO LADRILLO TOLETE COMUN 12 CM
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 543.36
Sub-Total $ 18,937
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.50 $ 8,617
Sub-Total $ 8,617.22
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 4,776.55
IMPREVISTOS 3.00% $ 842.92
UTILIDAD 5.00% $ 1,404.87
Sub-Total $ 7,024
ITEM: 6.28
MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 919.96
Sub-Total $ 36,721
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.85 $ 14,649
Sub-Total $ 14,649.28
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 8,889.40
IMPREVISTOS 3.00% $ 1,568.72
UTILIDAD 5.00% $ 2,614.53
Sub-Total $ 13,073
ITEM: 6.29
MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL)
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 598.95
Sub-Total $ 22,321
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.55 $ 9,479
Sub-Total $ 9,478.94
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 5,507.79
IMPREVISTOS 3.00% $ 971.96
UTILIDAD 5.00% $ 1,619.94
Sub-Total $ 8,100
ITEM: 6.30
REMATES LADRILLO MACIZO PRENSADO
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 489.10
Sub-Total $ 17,323
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.35 $ 6,032
Sub-Total $ 6,032.06
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 4,053.51
IMPREVISTOS 3.00% $ 715.32
UTILIDAD 5.00% $ 1,192.21
Sub-Total $ 5,961
Precio unitario total aproximado al peso $ 29,805
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 6.31
SOBRECIMIENTOS 0.15 M
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 790.71
Sub-Total $ 16,389
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.70 $ 12,064
Sub-Total $ 12,064.11
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 4,971.50
IMPREVISTOS 3.00% $ 877.32
UTILIDAD 5.00% $ 1,462.21
Sub-Total $ 7,311
Precio unitario total aproximado al peso $ 36,555
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 6.32
SOBRECIMIENTOS 0.25 M
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,025.55
Sub-Total $ 25,422
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.90 $ 15,511
Sub-Total $ 15,511.00
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 7,132.90
IMPREVISTOS 3.00% $ 1,258.75
UTILIDAD 5.00% $ 2,097.91
Sub-Total $ 10,490
Precio unitario total aproximado al peso $ 52,448
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 6.33
SOPORTE MESON EN BLOQUE DE CONCRETO 60X90X10 CM
UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 954.53
Sub-Total $ 22,498
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.60 $ 10,341
Sub-Total $ 10,340.67
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 5,744.83
IMPREVISTOS 3.00% $ 1,013.79
UTILIDAD 5.00% $ 1,689.66
Sub-Total $ 8,448
MURO DRYWALL DOBLE CARA 0.12 M (INCLUYE VINILO TIPO 1 A DOS ITEM: 6.34
CAPAS) UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,540.08
Sub-Total $ 28,700
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.50 $ 25,852
Sub-Total $ 25,851.67
Sub-Total $ 14,023
MURO DRYWALL DOBLE CARA 0.10 M (INCLUYE VINILO TIPO 1 A DOS ITEM: 6.35
CAPAS) UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,453.91
Sub-Total $ 28,262
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.40 $ 24,128
Sub-Total $ 24,128.22
Sub-Total $ 13,461
MURO SUPERBOARD DOBLE CARA 0.12 M (INCLUYE VINILO TIPO 1 A ITEM: 6.36
DOS CAPAS) UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,626.26
Sub-Total $ 41,508
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.60 $ 27,575
Sub-Total $ 27,575.11
Sub-Total $ 17,677
MURO SUPERBOARD DOBLE CARA 0.10 M (INCLUYE VINILO TIPO 1 A ITEM: 6.35
DOS CAPAS) UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,540.08
Sub-Total $ 41,071
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.50 $ 25,852
Sub-Total $ 25,851.67
Sub-Total $ 17,116
ITEM: 7.01
FILOS Y DILATACIONES
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 217.61
Sub-Total $ 2,143
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.18 $ 3,102
Sub-Total $ 3,102.20
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 928.60
IMPREVISTOS 3.00% $ 163.87
UTILIDAD 5.00% $ 273.12
Sub-Total $ 1,366
ITEM: 7.02
GOTERA EN MORTERO 1:4
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 284.45
Sub-Total $ 2,143
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.23 $ 3,964
Sub-Total $ 3,963.92
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 1,086.46
IMPREVISTOS 3.00% $ 191.73
UTILIDAD 5.00% $ 319.55
Sub-Total $ 1,598
ITEM: 7.03
MALLA BAJO ENTRAMADO
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 344.69
Sub-Total $ 4,669
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.40 $ 6,894
Sub-Total $ 6,893.78
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 2,024.27
IMPREVISTOS 3.00% $ 357.22
UTILIDAD 5.00% $ 595.37
Sub-Total $ 2,977
ITEM: 7.04
PAÑETE BAJO GUADUA 1:5, E=2 CM
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 861.80
Sub-Total $ 1,876
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.90 $ 15,511
Sub-Total $ 15,511.00
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 3,102.36
IMPREVISTOS 3.00% $ 547.48
UTILIDAD 5.00% $ 912.46
Sub-Total $ 4,562
ITEM: 7.05
PAÑETE BAJO MALLA 1:4, E=2 CM
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 924.30
Sub-Total $ 4,285
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.90 $ 15,511
Sub-Total $ 15,511.00
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 3,522.47
IMPREVISTOS 3.00% $ 621.61
UTILIDAD 5.00% $ 1,036.02
Sub-Total $ 5,180
ITEM: 7.06
PAÑETE BAJO MALLA 1:5, E=2 CM
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 924.30
Sub-Total $ 3,753
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.90 $ 15,511
Sub-Total $ 15,511.00
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 3,431.98
IMPREVISTOS 3.00% $ 605.64
UTILIDAD 5.00% $ 1,009.40
Sub-Total $ 5,047
ITEM: 7.07
PAÑETE BAJO MALLA 1:6, E=2 CM
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 924.30
Sub-Total $ 3,379
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.90 $ 15,511
Sub-Total $ 15,511.00
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 3,368.43
IMPREVISTOS 3.00% $ 594.43
UTILIDAD 5.00% $ 990.71
Sub-Total $ 4,954
ITEM: 7.08
PAÑETE CULATAS 1:4, E=2 CM
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 881.21
Sub-Total $ 4,285
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.85 $ 14,649
Sub-Total $ 14,649.28
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 3,368.65
IMPREVISTOS 3.00% $ 594.47
UTILIDAD 5.00% $ 990.78
Sub-Total $ 4,954
ITEM: 7.09
PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 751.96
Sub-Total $ 9,104
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.70 $ 12,064
Sub-Total $ 12,064.11
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 3,726.48
IMPREVISTOS 3.00% $ 657.61
UTILIDAD 5.00% $ 1,096.02
Sub-Total $ 5,480
Precio unitario total aproximado al peso $ 27,401
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 7.10
PAÑETE LISO MUROS 1:4, E=1.5 - 2 CM
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 751.96
Sub-Total $ 3,214
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.70 $ 12,064
Sub-Total $ 12,064.11
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 2,725.08
IMPREVISTOS 3.00% $ 480.90
UTILIDAD 5.00% $ 801.50
Sub-Total $ 4,007
ITEM: 7.10
PAÑETE LISO MUROS 1:5, E=1.5 - 2 CM
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 751.96
Sub-Total $ 2,815
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.70 $ 12,064
Sub-Total $ 12,064.11
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 2,657.21
IMPREVISTOS 3.00% $ 468.92
UTILIDAD 5.00% $ 781.53
Sub-Total $ 3,908
ITEM: 7.12
PAÑETE LISO BAJO PLACA 1:4, E=2 CM
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 795.04
Sub-Total $ 4,285
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.75 $ 12,926
Sub-Total $ 12,925.83
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 3,061.02
IMPREVISTOS 3.00% $ 540.18
UTILIDAD 5.00% $ 900.30
Sub-Total $ 4,501
ITEM: 7.13
PAÑETE LISO BAJO PLACA 1:5, E=2 CM
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 795.04
Sub-Total $ 3,753
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.75 $ 12,926
Sub-Total $ 12,925.83
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 2,970.52
IMPREVISTOS 3.00% $ 524.21
UTILIDAD 5.00% $ 873.68
Sub-Total $ 4,368
ITEM: 7.14
PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 881.21
Sub-Total $ 2,815
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.85 $ 14,649
Sub-Total $ 14,649.28
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 3,118.67
IMPREVISTOS 3.00% $ 550.35
UTILIDAD 5.00% $ 917.25
Sub-Total $ 4,586
ITEM: 7.15
PAÑETE RÚSTICO PLACAS 1:5, E=2 CM
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 881.21
Sub-Total $ 3,753
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.85 $ 14,649
Sub-Total $ 14,649.28
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 3,278.16
IMPREVISTOS 3.00% $ 578.50
UTILIDAD 5.00% $ 964.16
Sub-Total $ 4,821
ITEM: 8.01
INMUNIZANTE CUBIERTA
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (10%) % $ 259
Sub-Total $ 258.52
Sub-Total $ 2,516
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.30 $ 5,170
Sub-Total $ 5,170.33
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 1,350.54
IMPREVISTOS 3.00% $ 238.33
UTILIDAD 5.00% $ 397.22
Sub-Total $ 1,986
Precio unitario total aproximado al peso $ 9,930
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 8.02
AFINADO CUBIERTA PLANA E=0.03
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (10%) % $ 689
Sub-Total $ 689.38
Sub-Total $ 6,428
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.80 $ 13,788
Sub-Total $ 13,787.56
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 3,553.78
IMPREVISTOS 3.00% $ 627.14
UTILIDAD 5.00% $ 1,045.23
Sub-Total $ 5,226
ITEM: 8.03
ENTRAMADO DE MADERA CIELORRASO
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (10%) % $ 603
Sub-Total $ 603.21
Sub-Total $ 6,618
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.70 $ 12,064
Sub-Total $ 12,064.11
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 3,278.50
IMPREVISTOS 3.00% $ 578.56
UTILIDAD 5.00% $ 964.27
Sub-Total $ 4,821
Precio unitario total aproximado al peso $ 24,107
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 8.04
ESTRUCTURA DE MADERA PARA TEJA DE BARRO
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (10%) % $ 1,637
Sub-Total $ 1,637.27
Sub-Total $ 11,280
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.90 $ 32,745
Sub-Total $ 32,745.44
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 7,762.66
IMPREVISTOS 3.00% $ 1,369.88
UTILIDAD 5.00% $ 2,283.14
Sub-Total $ 11,416
Precio unitario total aproximado al peso $ 57,078
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 8.05
ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (10%) % $ 862
Sub-Total $ 861.72
Sub-Total $ 8,876
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.00 $ 17,234
Sub-Total $ 17,234.44
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 4,585.27
IMPREVISTOS 3.00% $ 809.16
UTILIDAD 5.00% $ 1,348.61
Sub-Total $ 6,743
Precio unitario total aproximado al peso $ 33,715
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 8.06
ESTRUCTURA METALICA PARA TEJA DE FIBROCEMENTO
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (10%) % $ 410
Sub-Total $ 410.36
Sub-Total $ 13,589
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA HH $ 19,311 1.70 $ 32,829 0.25 $ 8,207
Sub-Total $ 8,207.18
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 3,775.03
IMPREVISTOS 3.00% $ 666.18
UTILIDAD 5.00% $ 1,110.30
Sub-Total $ 5,552
Precio unitario total aproximado al peso $ 27,758
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 8.07
CABALLETE ARTICULADO TEJA FIBROCEMENTO
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (10%) % $ 465
Sub-Total $ 465.33
Sub-Total $ 45,134
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.54 $ 9,307
Sub-Total $ 9,306.60
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 9,334.01
IMPREVISTOS 3.00% $ 1,647.18
UTILIDAD 5.00% $ 2,745.30
Sub-Total $ 13,726
Precio unitario total aproximado al peso $ 68,632
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 8.08
CABALLETE TEJA ETERNIT FIJO
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (5%) % $ 465
Sub-Total $ 465.33
Sub-Total $ 49,188
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.54 $ 9,307
Sub-Total $ 9,306.60
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 10,023.19
IMPREVISTOS 3.00% $ 1,768.80
UTILIDAD 5.00% $ 2,948.00
Sub-Total $ 14,740
Precio unitario total aproximado al peso $ 73,700
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 8.09
CABALLETE ARTICULADO TEJA ESPAÑOLA
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (5%) % $ 465
Sub-Total $ 465.33
Sub-Total $ 48,424
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.54 $ 9,307
Sub-Total $ 9,306.60
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 9,893.31
IMPREVISTOS 3.00% $ 1,745.88
UTILIDAD 5.00% $ 2,909.80
Sub-Total $ 14,549
Precio unitario total aproximado al peso $ 72,745
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 8.10
CABALLETE TEJA ESPAÑOLA
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (5%) % $ 465
Sub-Total $ 465.33
Sub-Total $ 19,893
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.54 $ 9,307
Sub-Total $ 9,306.60
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 5,042.95
IMPREVISTOS 3.00% $ 889.93
UTILIDAD 5.00% $ 1,483.22
Sub-Total $ 7,416
Precio unitario total aproximado al peso $ 37,081
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 8.11
CABALLETE TECHOLINE
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (5%) % $ 862
Sub-Total $ 861.72
Sub-Total $ 19,070
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.00 $ 17,234
Sub-Total $ 17,234.44
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 6,318.25
IMPREVISTOS 3.00% $ 1,114.98
UTILIDAD 5.00% $ 1,858.31
Sub-Total $ 9,292
Precio unitario total aproximado al peso $ 46,458
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 8.12
CABALLETE TERMOACUSTICA
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (5%) % $ 862
Sub-Total $ 861.72
Sub-Total $ 20,900
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.00 $ 17,234
Sub-Total $ 17,234.44
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 6,629.35
IMPREVISTOS 3.00% $ 1,169.88
UTILIDAD 5.00% $ 1,949.81
Sub-Total $ 9,749
Precio unitario total aproximado al peso $ 48,745
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 8.13
FLANCHE METALICO
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (5%) % $ 388
Sub-Total $ 387.77
Sub-Total $ 12,763
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.45 $ 7,755
Sub-Total $ 7,755.50
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 3,554.07
IMPREVISTOS 3.00% $ 627.19
UTILIDAD 5.00% $ 1,045.31
Sub-Total $ 5,227
Precio unitario total aproximado al peso $ 26,133
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 8.14
CUBIERTA TEJA ETERNIT ONDULADA P7 FIBROCEMENTO
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (5%) % $ 517
Sub-Total $ 517.03
Sub-Total $ 22,769
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.60 $ 10,341
Sub-Total $ 10,340.67
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 5,716.54
IMPREVISTOS 3.00% $ 1,008.80
UTILIDAD 5.00% $ 1,681.33
Sub-Total $ 8,407
ITEM: 8.15
CUBIERTA TEJA ESPAÑOLA ETERNIT
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (5%) % $ 517
Sub-Total $ 517.03
Sub-Total $ 54,528
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.60 $ 10,341
Sub-Total $ 10,340.67
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 11,115.57
IMPREVISTOS 3.00% $ 1,961.57
UTILIDAD 5.00% $ 3,269.28
Sub-Total $ 16,346
Precio unitario total aproximado al peso $ 81,732
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 8.16
CUBIERTA TEJA TECHOLINE
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (5%) % $ 3,447
Sub-Total $ 3,446.89
Sub-Total $ 30,555
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 4.00 $ 68,938
Sub-Total $ 68,937.78
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 17,499.74
IMPREVISTOS 3.00% $ 3,088.19
UTILIDAD 5.00% $ 5,146.98
Sub-Total $ 25,735
Precio unitario total aproximado al peso $ 128,675
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 8.17
CUBIERTA TEJA DE BARRO
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (5%) % $ 1,034
Sub-Total $ 1,034.07
Sub-Total $ 20,028
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.20 $ 20,681
Sub-Total $ 20,681.33
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 7,096.32
IMPREVISTOS 3.00% $ 1,252.29
UTILIDAD 5.00% $ 2,087.15
Sub-Total $ 10,436
Precio unitario total aproximado al peso $ 52,179
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 8.18
CUBIERTA TEJA P7 PVC TRASLUCIDA
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (5%) % $ 1,034
Sub-Total $ 1,034.07
Sub-Total $ 28,775
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.20 $ 20,681
Sub-Total $ 20,681.33
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 8,583.37
IMPREVISTOS 3.00% $ 1,514.71
UTILIDAD 5.00% $ 2,524.52
Sub-Total $ 12,623
Precio unitario total aproximado al peso $ 63,113
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 8.19
CUBIERTA TEJA TERMOACUSTICA
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (5%) % $ 603
Sub-Total $ 603.21
Sub-Total $ 41,300
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.70 $ 12,064
Sub-Total $ 12,064.11
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 9,174.44
IMPREVISTOS 3.00% $ 1,619.02
UTILIDAD 5.00% $ 2,698.37
Sub-Total $ 13,492
Precio unitario total aproximado al peso $ 67,459
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 8.20
CUBIERTA TEJA TERMOACUSTICA
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (5%) % $ 603
Sub-Total $ 603.21
Sub-Total $ 47,150
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.70 $ 12,064
Sub-Total $ 12,064.11
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 10,168.94
IMPREVISTOS 3.00% $ 1,794.52
UTILIDAD 5.00% $ 2,990.87
Sub-Total $ 14,954
Precio unitario total aproximado al peso $ 74,772
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 8.21
CUBIERTA TEJA STANDING SEAM CAL 26 E:0,46
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (5%) % $ 431
Sub-Total $ 430.86
Sub-Total $ 52,000
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.50 $ 8,617
Sub-Total $ 8,617.22
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 10,378.17
IMPREVISTOS 3.00% $ 1,831.44
UTILIDAD 5.00% $ 3,052.40
Sub-Total $ 15,262
ITEM: 8.22
CUBIERTA TIPO SANDWICH AISL. POLIURETANO
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (5%) % $ 431
Sub-Total $ 430.86
Sub-Total $ 109,000
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.50 $ 8,617
Sub-Total $ 8,617.22
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 20,068.17
IMPREVISTOS 3.00% $ 3,541.44
UTILIDAD 5.00% $ 5,902.40
Sub-Total $ 29,512
ITEM: 8.23
CUBIERTA CANALETA 45 FIBROCEMENTO ETERNIT SUMIN E INSTAL
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (5%) % $ 431
Sub-Total $ 430.86
Sub-Total $ 51,538
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.50 $ 8,617
Sub-Total $ 8,617.22
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 10,299.63
IMPREVISTOS 3.00% $ 1,817.58
UTILIDAD 5.00% $ 3,029.30
Sub-Total $ 15,147
Precio unitario total aproximado al peso $ 75,733
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 8.24
CUBIERTA CANALETA 90 FIBROCEMENTO ETERNIT SUMIN E INSTAL
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (5%) % $ 431
Sub-Total $ 430.86
Sub-Total $ 63,700
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.50 $ 8,617
Sub-Total $ 8,617.22
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 12,367.17
IMPREVISTOS 3.00% $ 2,182.44
UTILIDAD 5.00% $ 3,637.40
Sub-Total $ 18,187
Precio unitario total aproximado al peso $ 90,935
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 8.35
CUBIERTA TIPO SANDWICH AISL. POLIURETANO
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (5%) % $ 17,369 0.05 $ 431
Sub-Total $ 430.86
Sub-Total $ 31,500
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.50 $ 8,617
Sub-Total $ 8,617.22
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 6,893.17
IMPREVISTOS 3.00% $ 1,216.44
UTILIDAD 5.00% $ 2,027.40
Sub-Total $ 10,137
ITEM ACTIVIDAD
1.0 PRELIMINARES
1.01 CAMPAMENTO 18 M2
1.02 CAMPAMENTO 9 M3
1.03 CERCA EN ALAMBRE DE PUA 3 HILOS CAL. 14
1.04 CERCA EN TABLA
1.05 CERCA EN TELA VERDE H = 2.10 M
1.06 DESMONTE APARATOS SANITARIOS
1.07 DESMONTE CIELO RASO CON SU ESTRUCTURA
1.08 DESMONTE CUBIERTA ASBESTO CEMENTO
1.09 DESMONTE MARCO Y PUERTA
1.1 DESMONTE TEJA DE BARRO
1.11 DESMONTE TEJA DE ZINC
1.12 DESMONTE VENTANAS
1.13 LOCALIZACION Y REPLANTEO APARATO TOPOGRAFICO
1.14 LOCALIZACION Y REPLANTEO ARTESANAL
1.15 ROCERIA Y LIMPIEZA
2.0 DEMOLICIONES
2.01 DEMOLICION CIMIENTOS ENTERRADOS
2.02 DEMOLICION ESTRUCTURA CONCRETO CICLOPEO
2.03 DEMOLICION MURO DOBLE E=0.25 M
2.04 DEMOLICION MURO SENCILLO E= 0.15 M
2.05 DEMOLICION PLACA ALIGERADA E= 0.25M
2.06 DEMOLICION PLACA ALIGERADA E= 0.45 M
2.07 DEMOLICION PLACA MACIZA E= 0.30 M ENTREPISO
2.08 DEMOLICION PLACA MACIZA E=0.15 M ENTREPISO
2.09 DEMOLICION PLACAS PISO CONCRETO 0.10 M - 0.12M
2.10 DEMOLICION VIGAS Y COLUMNAS (ESTRUCTURA CONCRETO REFORZADO)
2.11 DESMONTE ENCHAPE PARED
2.12 LEVANTADA ENCHAPE PISOS H: 0.02 M - 0.04 M
3.0 EXCAVACIONES Y RELLENOS
3.01 CARGUE A MAQUINA, RETIRO Y DISPOSICION FINAL DE SOBRANTES HASTA 16 KMS
3.02 CARGUE A MAQUINA, RETIRO Y DISPOSICION FINAL DE SOBRANTES HASTA 24 KMS
3.03 CARGUE A MAQUINA, RETIRO Y DISPOSICION FINAL DE SOBRANTES HASTA 8 KMS
3.04 CARGUE MANUAL, RETIRO Y DISPOSICION FINAL DE SOBRANTES HASTA 16 KMS
3.05 CARGUE MANUAL, RETIRO Y DISPOSICION FINAL DE SOBRANTES HASTA 24 KMS
3.06 CARGUE MANUAL, RETIRO Y DISPOSICION FINAL DE SOBRANTES HASTA 8 KMS
3.07 DESCAPOTE A MAQUINA E: 0.20 M
3.08 DESCAPOTE MANUAL E: 0.20 M
3.09 EXCAVACION MANUAL EN MATERIAL COMUN 0 A 2 MTS
3.10 EXCAVACION MANUAL EN CONGLOMERADO 0 A 2MTS
3.11 EXCAVACION EN ROCA 0 A 2 MTS
3.12 EXCAVACION MANUAL ROCA CON EXPLOSIVO 0 A 2M
3.13 RELLENO DE EXCAVACION CON MATERIAL LOCAL COMPACTADO
3.14 RELLENO GRAVILLA FINA 1/2”
3.15 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE
3.16 RELLENO AGREGADO EN MATERIAL DE BASE COMPACATADO MECÁNICAMENTE
3.17 RELLENO ARENA
4.0 CONCRETOS Y MORTEROS MEZCLADO EN SITIO
4.01 CONCRETO 1500 PSI
4.02 CONCRETO 2000 PSI
4.03 CONCRETO 2500 PSI
4.04 CONCRETO 3000 PSI
4.05 CONCRETO 3500 PSI
4.06 MORTERO 1:2
4.07 MORTERO 1:3
4.08 MORTERO 1:3 IMPERMEABILIZADO
4.09 MORTERO 1:4
4.10 MORTERO 1:4 IMPERMEABILIZADO
4.11 MORTERO 1:5
4.12 MORTERO 1:6
4.13 MORTERO 1:10
5.0 ESTRUCTURAS EN CONCRETO
5.01 BASE EN CONCRETO POBRE 1500 PS1 E=0.05M
5.02 CONCRETO CICLÓPEO 2000 PSI, 40% ROCA MEDIA ZONGA
5.03 CASETON DE LONA 0.85 X 0.35
5.04 CASETON DE LONA 0.85 X 0.70
5.05 COLUMNAS 3000 PSI (SIN REFUERZO)
5.06 ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3000 PS
ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM, INCL. MALLA DE REFUERZO, CONCRETO DE 3000 P
5.07
5.08 ENTREPISOS CASETÓN CON VIGAS, 3000 PSI H=0.30 m (SIN REFUERZO)
5.09 ENTREPISOS CASETÓN CON VIGAS, 3000 PSI H=0.35 m (SIN REFUERZO)
5.1 ENTREPISOS CASETÓN CON VIGAS, 3000 PSI H=0.40 m (SIN REFUERZO)
5.11 ENTREPISOS CASETÓN CON VIGAS, 3000 PSI H=0.45 m (SIN REFUERZO)
5.12 ENTREPISOS CASETÓN CON VIGAS, 3000 PSI H=0.50 m (SIN REFUERZO)
5.13 ESCALERA MACIZA UN TRAMO 3000 PSI (SIN REFUERZO)
5.14 MURO LADRILLO ESTRUCTURAL E=0.12 M (SIN REFUERZO Y SIN GROUTING)
5.15 ENTREPISO PLACA MACIZA 3000 PSI E: 0.10 M (SIN REFUERZO)
5.16 ENTREPISO PLACA MACIZA 3000 PSI E: 0.12 M (SIN REFUERZO)
5.17 ENTREPISO PLACA MACIZA 3000 PSI E: 0.15 M (SIN REFUERZO)
5.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M (SIN REFUERZO)
PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) INCLUYE REFUERZO
5.19
9.07 CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN TUBO ESTRUCTURAL GALVANIZADO 2")
11.42 TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE VALVULA DE CIERRE CON FLOTADOR)
11.43 TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE VALVULA DE CIERRE CON FLOTADOR)
12.0 APARATOS SANITARIOS
12.01 SUMINISTRO E INSTALACION SANITARIO BLANCO
12.02 SUMINISTRO E INSTALACION SANITARIO COLOR
12.13 SUMINISTRO E INSTALACIÓN JUEGO DE INCRUSTACIONES (INCLUYE: TOALLERO, PORTARROLLO, PERCHA DOB
13.0 DESAGÜES
13.01 SIFÓN PARA DRENAJE EN PVC DE 4"
13.02 SIFÓN PARA DRENAJE EN PVC DE 6"
13.03 CAJA INSPECCIÓN DIMENSIONES INTERNAS= 100X100X100 CM. (INCLUYE TAPA EN CONCRETO REFORZADO Y
13.05 CAJA INSPECCIÓN DIMENSIONES INTERNAS= 80X80X80 CM. (INCLUYE TAPA EN CONCRETO REFORZADO Y PA
18.01 SUMINISTRO JUEGO DE (2) ESTRUCTURAS MULTIPLE MOVIBLE, (MICROFUTBOL - BALONCESTO),CON MEDIDA
18.02 SUMINISTRO DE MALLAS PARA PORTERIAS DE FUTBOL EN NYLON CAL. 5, MEDIDAS REGLAMENTARIAS.
18.03 SUMINISTRO DE MALLAS PARA PORTERIAS DE MICROFUTBOL EN NYLON CAL. 5, MEDIDAS REGLAMENTARIAS
18.04 SUMINISTRO DE MALLAS PARA CANCHA DE TENIS EN NYLON CAL. 4, MEDIDAS REGLAMENTARIAS. INCLUYE G
18.05 SUMINISTRO DE MALLAS PARA CANCHA DE VOLEIBOL EN NYLON CAL. 5, MEDIDAS REGLAMENTARIAS. INCLU
18.06
18.07
18.08
STRUCTURA
VR / TOTAL CON
UND VR / UNI DIRECTO A.I.U 25%
M3 $ 174,468.89 $ 218,086.11
M3 $ 139,575.11 $ 174,468.89
M2 $ 13,270.52 $ 16,588.15
M2 $ 9,858.10 $ 12,322.63
M2 $ 26,170.33 $ 32,712.92
M2 $ 34,893.78 $ 43,617.22
M2 $ 65,425.83 $ 81,782.29
M2 $ 34,893.78 $ 43,617.22
M2 $ 15,702.20 $ 19,627.75
M3 $ 183,192.33 $ 228,990.42
M2 $ 4,739.47 $ 5,924.34
M2 $ 5,308.21 $ 6,635.26
M3 $ 229,852.89 $ 287,316.11
M3 $ 246,157.29 $ 307,696.61
M3 $ 267,514.29 $ 334,392.86
M3 $ 285,729.69 $ 357,162.11
M3 $ 310,421.49 $ 388,026.86
M3 $ 357,565.77 $ 446,957.21
M3 $ 288,992.37 $ 361,240.46
M3 $ 298,061.87 $ 372,577.33
M3 $ 249,314.97 $ 311,643.71
M3 $ 257,559.97 $ 321,949.96
M3 $ 221,368.17 $ 276,710.21
M3 $ 201,743.67 $ 252,179.58
M3 $ 159,040.17 $ 198,800.21
M2 $ 15,771.47 $ 19,714.34
M3 $ 313,510.54 $ 391,888.17
ML $ 32,638.98 $ 40,798.73
ML $ 44,356.24 $ 55,445.30
M3 $ 539,716.15 $ 674,645.19
M2 $ 80,187.57 $ 100,234.47
M2 $ 90,178.25 $ 112,722.82
M2 $ 97,999.73 $ 122,499.66
M2 $ 107,223.96 $ 134,029.95
M2 $ 116,696.30 $ 145,870.37
M2 $ 124,767.60 $ 155,959.50
M2 $ 133,705.51 $ 167,131.89
M3 $ 716,819.78 $ 896,024.72
M2 $ 53,990.05 $ 67,487.56
M2 $ 54,714.40 $ 68,393.00
M2 $ 62,650.46 $ 78,313.07
M2 $ 74,102.13 $ 92,627.66
M3 $ 524,038.16 $ 655,047.70
KG $ 3,731.88 $ 4,664.86
KG $ 3,578.88 $ 4,473.61
KG $ 4,336.57 $ 5,420.71
M3 $ 567,278.45 $ 709,098.07
M3 $ 519,495.62 $ 649,369.53
M3 $ 571,331.10 $ 714,163.87
M3 $ 546,398.41 $ 682,998.02
M3 $ 511,334.74 $ 639,168.42
M2 $ 105,741.77 $ 132,177.21
ML $ 25,714.43 $ 32,143.04
ML $ 39,812.69 $ 49,765.87
ML $ 37,713.90 $ 47,142.38
ML $ 35,977.53 $ 44,971.91
ML $ 22,422.34 $ 28,027.93
ML $ 20,377.39 $ 25,471.74
M2 $ 70,126.18 $ 87,657.72
M2 $ 18,869.49 $ 23,586.86
M2 $ 110,500.07 $ 138,125.09
M2 $ 33,422.38 $ 41,777.97
ML $ 21,830.57 $ 27,288.21
M2 $ 51,231.99 $ 64,039.99
ML $ 30,094.82 $ 37,618.53
M2 $ 27,044.58 $ 33,805.72
ML $ 17,027.32 $ 21,284.15
M2 $ 33,919.38 $ 42,399.22
ML $ 20,407.32 $ 25,509.15
M2 $ 74,282.50 $ 92,853.12
ML $ 45,124.88 $ 56,406.10
M2 $ 74,444.62 $ 93,055.78
ML $ 44,772.67 $ 55,965.84
M2 $ 41,516.02 $ 51,895.03
ML $ 26,560.48 $ 33,200.60
M2 $ 71,720.94 $ 89,651.18
ML $ 42,497.38 $ 53,121.72
M2 $ 45,170.94 $ 56,463.68
ML $ 28,097.38 $ 35,121.72
M2 $ 52,290.56 $ 65,363.20
ML $ 32,398.77 $ 40,498.46
ML $ 23,844.16 $ 29,805.20
ML $ 29,244.12 $ 36,555.15
ML $ 41,958.25 $ 52,447.81
UND $ 33,793.12 $ 42,241.40
M2 $ 56,091.47 $ 70,114.34
M2 $ 53,844.35 $ 67,305.44
M2 $ 70,709.49 $ 88,386.86
M2 $ 68,462.37 $ 85,577.96
ML $ 5,462.37 $ 6,827.96
ML $ 6,390.93 $ 7,988.66
M2 $ 11,907.47 $ 14,884.33
M2 $ 18,249.20 $ 22,811.50
M2 $ 20,720.42 $ 25,900.52
M2 $ 20,188.10 $ 25,235.12
M2 $ 19,814.30 $ 24,767.87
M2 $ 19,815.61 $ 24,769.51
M2 $ 21,920.47 $ 27,400.58
M2 $ 16,029.91 $ 20,037.38
M2 $ 15,630.67 $ 19,538.33
M2 $ 18,005.99 $ 22,507.49
M2 $ 17,473.67 $ 21,842.09
M2 $ 18,345.09 $ 22,931.36
M2 $ 19,283.29 $ 24,104.11
ML
M2
M2
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
ML
UND $ 71,475.74 $ 89,344.67
ML $ 42,463.67 $ 53,079.58
ML $ 82,911.04 $ 103,638.81
M2 $ 86,385.79 $ 107,982.24
M2 $ 93,684.35 $ 117,105.44
ML $ 62,988.21 $ 78,735.26
M2 $ 68,224.94 $ 85,281.17
ML $ 35,063.37 $ 43,829.21
ML $ 65,687.37 $ 82,109.21
ML $ 58,337.37 $ 72,921.71
UND $ 172,536.83 $ 215,671.04
UND $ 179,432.62 $ 224,290.78
ML $ 29,552.30 $ 36,940.37
UND $ 102,030.12 $ 127,537.64
UND $ 52,550.70 $ 65,688.37
UND $ 116,693.60 $ 145,866.99
UND $ 68,838.50 $ 86,048.12
UND $ 41,456.10 $ 51,820.12
UND $ 56,353.92 $ 70,442.40
UND $ 45,254.40 $ 56,568.00
UND $ 101,709.69 $ 127,137.12
UND $ 52,913.69 $ 66,142.12
UND $ 76,113.69 $ 95,142.12
UND $ 160,084.99 $ 200,106.23
UND $ 200,403.19 $ 250,503.98
UND $ 240,781.99 $ 300,977.48
UND $ 323,378.98 $ 404,223.73
ML $ 2,787.58 $ 3,484.47
ML $ 3,437.52 $ 4,296.90
ML $ 5,139.40 $ 6,424.25
ML $ 9,040.28 $ 11,300.35
UND $ 213,786.49 $ 267,233.11
M2 $ - $ -
M3 $ - $ -
M2 $ - $ -
M2 $ - $ -
M2 $ - $ -
ML $ - $ -
M2 $ - $ -
M2 $ - $ -
M2 $ - $ -
M2 $ - $ -
M2 $ - $ -
M2 $ - $ -
M2 $ - $ -
M2 $ - $ -
M2 $ - $ -
M2 $ - $ -
M2 $ - $ -
M2 $ - $ -
M2 $ - $ -
M2 $ - $ -
M2 $ - $ -
M2 $ - $ -
ML $ - $ -
M2 $ - $ -
M2 $ - $ -
M2 $ - $ -
M2 $ - $ -
M2 $ - $ -
M2 $ - $ -
M2 $ - $ -
M2 $ - $ -
M2 $ - $ -
M2 $ - $ -
ML $ - $ -
ML $ - $ -
ML $ - $ -
ML $ - $ -
ML $ - $ -
ML $ - $ -
ML $ - $ -
M2 $ 27,602.16 $ 34,502.70
M2 $ 38,445.76 $ 48,057.20
M2 $ 8,258.61 $ 10,323.26
M2 $ 12,917.46 $ 16,146.83
ML $ 3,553.85 $ 4,442.31
M2 $ 8,543.65 $ 10,679.56
M2 $ 34,178.65 $ 42,723.31
M2 $ 4,319.69 $ 5,399.62
M2 $ 15,070.77 $ 18,838.47
M2 $ 10,193.08 $ 12,741.35
ML $ 3,646.59 $ 4,558.24
ML $ 3,593.85 $ 4,492.31
M2 $ 9,748.12 $ 12,185.15
ML $ 3,493.85 $ 4,367.31
M2 $ 10,919.65 $ 13,649.56
ML $ 4,400.85 $ 5,501.06
ML $ 4,650.85 $ 5,813.56
M2 $ 5,662.01 $ 7,077.52
ML $ 3,407.07 $ 4,258.84
M2 $ 13,296.70 $ 16,620.87
ML $ 2,707.74 $ 3,384.68
M2 $ 8,010.65 $ 10,013.31
M2 $ 9,510.18 $ 11,887.72
M2 $ 6,360.25 $ 7,950.32
M2 $ 7,364.37 $ 9,205.46
M2 $ 6,246.31 $ 7,807.89
M2 $ 7,288.41 $ 9,110.51
M2 $ 5,960.25 $ 7,450.32
M2 $ 6,804.37 $ 8,505.46
M2 $ 5,894.31 $ 7,367.89
M2 $ 6,760.41 $ 8,450.51
ITEM: 9.01
CAJA CONTADOR DE AGUA
UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 2,991.44
Sub-Total $ 35,656
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA HH $ 19,311 1.70 $ 32,829 1.00 $ 32,829
Sub-Total $ 32,828.70
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 12,150.87
IMPREVISTOS 3.00% $ 2,144.27
UTILIDAD 5.00% $ 3,573.79
Sub-Total $ 17,869
Precio unitario total aproximado al peso $ 89,345
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,049.22
Sub-Total $ 24,180
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.00 $ 17,234
Sub-Total $ 17,234.44
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 7,218.82
IMPREVISTOS 3.00% $ 1,273.91
UTILIDAD 5.00% $ 2,123.18
Sub-Total $ 10,616
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,554.00
Sub-Total $ 58,377
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA HH $ 19,311 1.70 $ 32,829 0.70 $ 22,980
Sub-Total $ 22,980.09
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 14,094.88
IMPREVISTOS 3.00% $ 2,487.33
UTILIDAD 5.00% $ 4,145.55
Sub-Total $ 20,728
ITEM: 9.04
PUERTA VENTANA EN LÁMINA CAL 18 (INCLUYE ANTICORROSIVO)
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,554.00
Sub-Total $ 61,852
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA HH $ 19,311 1.70 $ 32,829 0.70 $ 22,980
Sub-Total $ 22,980.09
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 14,685.59
IMPREVISTOS 3.00% $ 2,591.57
UTILIDAD 5.00% $ 4,319.29
Sub-Total $ 21,596
Precio unitario total aproximado al peso $ 107,982
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 9.05
VENTANA LÁMINA CAL. 18 (INCLUYE ANTICORROSIVO)
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 2,210.58
Sub-Total $ 55,362
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA HH $ 19,311 1.70 $ 32,829 1.10 $ 36,112
Sub-Total $ 36,111.57
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 15,926.34
IMPREVISTOS 3.00% $ 2,810.53
UTILIDAD 5.00% $ 4,684.22
Sub-Total $ 23,421
ITEM: 9.06
REJILLA PISO 0.30 M
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,685.32
Sub-Total $ 35,697
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA HH $ 19,311 1.70 $ 32,829 0.78 $ 25,606
Sub-Total $ 25,606.39
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 10,707.99
IMPREVISTOS 3.00% $ 1,889.65
UTILIDAD 5.00% $ 3,149.41
Sub-Total $ 15,747
Precio unitario total aproximado al peso $ 78,735
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 2,316.44
Sub-Total $ 33,080
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA HH $ 19,311 1.70 $ 32,829 1.00 $ 32,829
Sub-Total $ 32,828.70
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 11,598.24
IMPREVISTOS 3.00% $ 2,046.75
UTILIDAD 5.00% $ 3,411.25
Sub-Total $ 17,056
Precio unitario total aproximado al peso $ 85,281
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 9.08
MARCO PARA PUERTA EN LÁMINA CAL 18 0.8M
UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 2,644.72
Sub-Total $ 40,520
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA HH $ 19,311 1.70 $ 32,829 1.20 $ 39,394
Sub-Total $ 39,394.44
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 14,034.99
IMPREVISTOS 3.00% $ 2,476.76
UTILIDAD 5.00% $ 4,127.94
Sub-Total $ 20,640
Precio unitario total aproximado al peso $ 103,198
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 9.09
PUERTA EN LÁMINA CAL. 16 (INCLUYE ANTICORROSIVO)
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 2,480.58
Sub-Total $ 118,898
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA HH $ 19,311 1.70 $ 32,829 1.10 $ 36,112
Sub-Total $ 36,111.57
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 26,773.27
IMPREVISTOS 3.00% $ 4,724.69
UTILIDAD 5.00% $ 7,874.49
Sub-Total $ 39,372
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 119.66
Sub-Total $ 3,684
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA HH $ 19,311 1.70 $ 32,829 0.04 $ 1,313
Sub-Total $ 1,313.15
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 869.81
IMPREVISTOS 3.00% $ 153.50
UTILIDAD 5.00% $ 255.83
Sub-Total $ 1,279
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 3,336.87
Sub-Total $ 56,648
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA HH $ 19,311 1.70 $ 32,829 1.00 $ 32,829
Sub-Total $ 32,828.70
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 15,778.37
IMPREVISTOS 3.00% $ 2,784.42
UTILIDAD 5.00% $ 4,640.70
Sub-Total $ 23,203
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 205.01
Sub-Total $ 2,870
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA HH $ 19,311 1.70 $ 32,829 0.05 $ 1,510
Sub-Total $ 1,510.12
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 779.39
IMPREVISTOS 3.00% $ 137.54
UTILIDAD 5.00% $ 229.23
Sub-Total $ 1,146
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 3,336.87
Sub-Total $ 180,229
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA HH $ 19,311 1.70 $ 32,829 1.00 $ 32,829
Sub-Total $ 32,828.70
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 36,787.09
IMPREVISTOS 3.00% $ 6,491.84
UTILIDAD 5.00% $ 10,819.73
Sub-Total $ 54,099
Precio unitario total aproximado al peso $ 270,493
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 8,261.18
Sub-Total $ 148,256
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA HH $ 19,311 1.70 $ 32,829 2.50 $ 82,072
Sub-Total $ 82,071.75
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 40,560.03
IMPREVISTOS 3.00% $ 7,157.65
UTILIDAD 5.00% $ 11,929.42
Sub-Total $ 59,647
Precio unitario total aproximado al peso $ 298,236
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 9,902.61
Sub-Total $ 251,301
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA HH $ 19,311 1.70 $ 32,829 3.00 $ 98,486
Sub-Total $ 98,486.10
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 61,147.27
IMPREVISTOS 3.00% $ 10,790.69
UTILIDAD 5.00% $ 17,984.49
Sub-Total $ 89,922
ITEM: 10.01
COLUMNA EN MADERA ROLLIZA E: 0.20M
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 517.03
Sub-Total $ 29,376
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.30 $ 5,170
Sub-Total $ 5,170.33
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 5,960.77
IMPREVISTOS 3.00% $ 1,051.90
UTILIDAD 5.00% $ 1,753.17
Sub-Total $ 8,766
ITEM: 10.02
DINTEL MADERA 0.20X0.20M (INCLUYE PLATINA Y TORNILLOS)
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 517.03
Sub-Total $ 60,000
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.30 $ 5,170
Sub-Total $ 5,170.33
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 11,166.85
IMPREVISTOS 3.00% $ 1,970.62
UTILIDAD 5.00% $ 3,284.37
Sub-Total $ 16,422
ITEM: 10.03
DINTEL MADERA 0.15X0.15M (INCLUYE PLATINA Y TORNILLOS)
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 517.03
Sub-Total $ 52,650
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.30 $ 5,170
Sub-Total $ 5,170.33
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 9,917.35
IMPREVISTOS 3.00% $ 1,750.12
UTILIDAD 5.00% $ 2,916.87
Sub-Total $ 14,584
ITEM: 10.04
PUERTA MADERA 0.65X2.15M (INCLUYE CERRADURA Y BISAGRAS 3")
UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 2,585.17
Sub-Total $ 144,100
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.50 $ 25,852
Sub-Total $ 25,851.67
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 29,331.26
IMPREVISTOS 3.00% $ 5,176.10
UTILIDAD 5.00% $ 8,626.84
Sub-Total $ 43,134
ITEM: 10.05
PUERTA MADERA 0.7X2.0M (INCLUYE CERRADURA Y BISAGRAS 3")
UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 2,757.51
Sub-Total $ 149,100
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.60 $ 27,575
Sub-Total $ 27,575.11
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 30,503.55
IMPREVISTOS 3.00% $ 5,382.98
UTILIDAD 5.00% $ 8,971.63
Sub-Total $ 44,858
ITEM: 11.01
ACOMETIDA EN PVC 1/2" 5M
UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 2,843.68
Sub-Total $ 163,680
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 3.00 $ 56,874
Sub-Total $ 56,873.67
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 37,977.54
IMPREVISTOS 3.00% $ 6,701.92
UTILIDAD 5.00% $ 11,169.86
Sub-Total $ 55,849
ITEM: 11.02
ACOMETIDA EN PVC 3/4" 5M
UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 2,843.68
Sub-Total $ 177,012
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 3.00 $ 56,874
Sub-Total $ 56,873.67
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 40,244.07
IMPREVISTOS 3.00% $ 7,101.89
UTILIDAD 5.00% $ 11,836.49
Sub-Total $ 59,182
Precio unitario total aproximado al peso $ 295,912
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 11.03
BAJANTE AGUAS LLUVIAS PVC 3"
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 303.33
Sub-Total $ 12,522
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 0.32 $ 6,067
Sub-Total $ 6,066.52
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 3,211.53
IMPREVISTOS 3.00% $ 566.74
UTILIDAD 5.00% $ 944.57
Sub-Total $ 4,723
Precio unitario total aproximado al peso $ 23,614
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 11.04
BAJANTE AGUAS LLUVIAS PVC 4"
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 398.12
Sub-Total $ 19,996
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 0.42 $ 7,962
Sub-Total $ 7,962.31
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 4,820.53
IMPREVISTOS 3.00% $ 850.68
UTILIDAD 5.00% $ 1,417.80
Sub-Total $ 7,089
Precio unitario total aproximado al peso $ 35,445
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 11.05
BAJANTE AGUAS RESIDUALES PVC 3"
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 473.95
Sub-Total $ 14,975
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 0.50 $ 9,479
Sub-Total $ 9,478.94
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 4,237.74
IMPREVISTOS 3.00% $ 747.84
UTILIDAD 5.00% $ 1,246.39
Sub-Total $ 6,232
Precio unitario total aproximado al peso $ 31,160
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 11.06
BAJANTE AGUAS RESIDUALES PVC 4"
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 521.34
Sub-Total $ 22,704
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 0.55 $ 10,427
Sub-Total $ 10,426.84
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 5,720.81
IMPREVISTOS 3.00% $ 1,009.55
UTILIDAD 5.00% $ 1,682.59
Sub-Total $ 8,413
Precio unitario total aproximado al peso $ 42,065
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 11.07
BAJANTE AGUAS RESIDUALES PVC 6"
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 947.89
Sub-Total $ 36,465
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 1.00 $ 18,958
Sub-Total $ 18,957.89
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 9,582.96
IMPREVISTOS 3.00% $ 1,691.11
UTILIDAD 5.00% $ 2,818.52
Sub-Total $ 14,093
Precio unitario total aproximado al peso $ 70,463
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 11.08
INSTALACION APARATO SANITARIO
UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,594.19
Sub-Total $ -
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.85 $ 31,884
Sub-Total $ 31,883.72
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 5,691.24
IMPREVISTOS 3.00% $ 1,004.34
UTILIDAD 5.00% $ 1,673.90
Sub-Total $ 8,369
ITEM: 11.09
INSTALACIÓN BOMBAS AGUA
UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 23,545.70
Sub-Total $ -
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 18.00 $ 341,242
SUB-CONTRATO HIDRÁULICO-
38% $ 129,671.96
SANITARIO %
Sub-Total $ 470,913.95
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 84,058.14
IMPREVISTOS 3.00% $ 14,833.79
UTILIDAD 5.00% $ 24,722.98
Sub-Total $ 123,615
ITEM: 11.10
INSTALACIÓN EQUIPO HIDRONEUMÁTICO
UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 44,475.21
Sub-Total $ -
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 34.00 $ 644,568
SUB-CONTRATO HIDRÁULICO-
38% $ 244,935.92
SANITARIO %
Sub-Total $ 889,504.13
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 158,776.49
IMPREVISTOS 3.00% $ 28,019.38
UTILIDAD 5.00% $ 46,698.97
Sub-Total $ 233,495
ITEM: 11.11
LLAVE JARDIN PESADA
UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 284.37
Sub-Total $ 23,000
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 0.30 $ 5,687
Sub-Total $ 5,687.37
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 4,925.19
IMPREVISTOS 3.00% $ 869.15
UTILIDAD 5.00% $ 1,448.59
Sub-Total $ 7,243
ITEM: 11.12
PUNTO AGUA CALIENTE DUCHA
UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,516.63
Sub-Total $ 5,398
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 1.60 $ 30,333
Sub-Total $ 30,332.62
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 6,332.10
IMPREVISTOS 3.00% $ 1,117.43
UTILIDAD 5.00% $ 1,862.38
Sub-Total $ 9,312
Precio unitario total aproximado al peso $ 46,560
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 11.13
PUNTO AGUA CALIENTE LAVADORA
UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,421.84
Sub-Total $ 20,559
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 1.50 $ 28,437
Sub-Total $ 28,436.83
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 8,571.00
IMPREVISTOS 3.00% $ 1,512.53
UTILIDAD 5.00% $ 2,520.88
Sub-Total $ 12,604
Precio unitario total aproximado al peso $ 63,022
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 11.14
PUNTO AGUA CALIENTE LAVAMANOS
UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,421.84
Sub-Total $ 5,737
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 1.50 $ 28,437
Sub-Total $ 28,436.83
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 6,051.30
IMPREVISTOS 3.00% $ 1,067.88
UTILIDAD 5.00% $ 1,779.79
Sub-Total $ 8,899
ITEM: 11.15
PUNTO AGUA CALIENTE LAVAPLATOS
UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,421.84
Sub-Total $ 5,737
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 1.50 $ 28,437
Sub-Total $ 28,436.83
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 6,051.30
IMPREVISTOS 3.00% $ 1,067.88
UTILIDAD 5.00% $ 1,779.79
Sub-Total $ 8,899
ITEM: 11.16
PUNTO AGUA FRIA DUCHA
UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,137.47
Sub-Total $ 16,635
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 1.20 $ 22,749
Sub-Total $ 22,749.47
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 6,888.78
IMPREVISTOS 3.00% $ 1,215.67
UTILIDAD 5.00% $ 2,026.11
Sub-Total $ 10,131
ITEM: 11.17
PUNTO AGUA FRIA LAVADERO
UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,042.68
Sub-Total $ 9,451
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 1.10 $ 20,854
Sub-Total $ 20,853.68
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 5,329.02
IMPREVISTOS 3.00% $ 940.41
UTILIDAD 5.00% $ 1,567.36
Sub-Total $ 7,837
ITEM: 11.18
PUNTO AGUA FRIA LAVAPLATOS - LAVAMANOS
UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,042.68
Sub-Total $ 9,451
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 1.10 $ 20,854
Sub-Total $ 20,853.68
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 5,329.05
IMPREVISTOS 3.00% $ 940.42
UTILIDAD 5.00% $ 1,567.37
Sub-Total $ 7,837
ITEM: 11.19
PUNTO AGUA FRIA SANITARIO
UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,042.68
Sub-Total $ 8,618
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 1.10 $ 20,854
Sub-Total $ 20,853.68
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 5,187.41
IMPREVISTOS 3.00% $ 915.42
UTILIDAD 5.00% $ 1,525.71
Sub-Total $ 7,629
ITEM: 11.20
SALIDA SANITARIA PVC-S 2"
UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,232.26
Sub-Total $ 10,971
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 1.30 $ 24,645
Sub-Total $ 24,645.26
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 6,264.16
IMPREVISTOS 3.00% $ 1,105.44
UTILIDAD 5.00% $ 1,842.40
Sub-Total $ 9,212
Precio unitario total aproximado al peso $ 46,060
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 11.21
SALIDA SANITARIA PVC-S 3"
UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,232.26
Sub-Total $ 16,327
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 1.30 $ 24,645
Sub-Total $ 24,645.26
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 7,174.77
IMPREVISTOS 3.00% $ 1,266.14
UTILIDAD 5.00% $ 2,110.23
Sub-Total $ 10,551
Precio unitario total aproximado al peso $ 52,756
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 11.22
SALIDA SANITARIA PVC-S 3” - SIFON DE PISO
UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,232.26
Sub-Total $ 23,525
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 1.30 $ 24,645
Sub-Total $ 24,645.26
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 8,398.43
IMPREVISTOS 3.00% $ 1,482.08
UTILIDAD 5.00% $ 2,470.13
Sub-Total $ 12,351
ITEM: 11.23
SALIDA SANITARIA PVC-S 4"
UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,232.26
Sub-Total $ 26,523
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 1.30 $ 24,645
Sub-Total $ 24,645.26
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 8,908.09
IMPREVISTOS 3.00% $ 1,572.02
UTILIDAD 5.00% $ 2,620.03
Sub-Total $ 13,100
Precio unitario total aproximado al peso $ 65,501
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 11.24
RED SUMINISTRO CPVC 1/2"
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 236.97
Sub-Total $ 4,388
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 0.25 $ 4,739
Sub-Total $ 4,739.47
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 1,591.87
IMPREVISTOS 3.00% $ 280.92
UTILIDAD 5.00% $ 468.20
Sub-Total $ 2,341
Precio unitario total aproximado al peso $ 11,705
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 11.25
RED SUMINISTRO CPVC 3/4"
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 236.97
Sub-Total $ 13,704
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 0.25 $ 4,739
Sub-Total $ 4,739.47
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 3,175.68
IMPREVISTOS 3.00% $ 560.41
UTILIDAD 5.00% $ 934.02
Sub-Total $ 4,670
Precio unitario total aproximado al peso $ 23,351
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 11.26
RED SUMINISTRO PVC 1/2"
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 236.97
Sub-Total $ 3,244
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 0.25 $ 4,739
Sub-Total $ 4,739.47
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 1,397.42
IMPREVISTOS 3.00% $ 246.60
UTILIDAD 5.00% $ 411.00
Sub-Total $ 2,055
Precio unitario total aproximado al peso $ 10,275
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 11.27
RED SUMINISTRO PVC 3/4"
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 236.97
Sub-Total $ 4,326
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 0.25 $ 4,739
Sub-Total $ 4,739.47
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 1,581.44
IMPREVISTOS 3.00% $ 279.08
UTILIDAD 5.00% $ 465.13
Sub-Total $ 2,326
Precio unitario total aproximado al peso $ 11,628
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 11.28
RED SUMINISTRO PVC 1"
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 284.37
Sub-Total $ 5,703
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 0.30 $ 5,687
Sub-Total $ 5,687.37
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 1,984.70
IMPREVISTOS 3.00% $ 350.24
UTILIDAD 5.00% $ 583.74
Sub-Total $ 2,919
Precio unitario total aproximado al peso $ 14,593
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 11.29
RED SUMINISTRO PVC 1.1/2"
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 284.37
Sub-Total $ 12,203
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 0.30 $ 5,687
Sub-Total $ 5,687.37
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 3,089.70
IMPREVISTOS 3.00% $ 545.24
UTILIDAD 5.00% $ 908.74
Sub-Total $ 4,544
Precio unitario total aproximado al peso $ 22,718
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 11.30
RED SUMINISTRO PVC 2"
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 426.55
Sub-Total $ 16,173
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 0.45 $ 8,531
Sub-Total $ 8,531.05
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 4,272.20
IMPREVISTOS 3.00% $ 753.92
UTILIDAD 5.00% $ 1,256.53
Sub-Total $ 6,283
Precio unitario total aproximado al peso $ 31,413
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 11.31
RED SUMINISTRO PVC 2.1/2"
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 568.74
Sub-Total $ 24,550
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 0.60 $ 11,375
Sub-Total $ 11,374.73
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 6,203.83
IMPREVISTOS 3.00% $ 1,094.79
UTILIDAD 5.00% $ 1,824.66
Sub-Total $ 9,123
Precio unitario total aproximado al peso $ 45,616
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 11.32
RED SANITARIA PVC-S 2"
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 473.95
Sub-Total $ 7,894
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 0.50 $ 9,479
Sub-Total $ 9,478.94
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 3,034.01
IMPREVISTOS 3.00% $ 535.41
UTILIDAD 5.00% $ 892.36
Sub-Total $ 4,462
Precio unitario total aproximado al peso $ 22,309
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 11.33
RED SANITARIA PVC-S 3"
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 616.13
Sub-Total $ 12,018
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 0.65 $ 12,323
Sub-Total $ 12,322.63
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 4,242.65
IMPREVISTOS 3.00% $ 748.70
UTILIDAD 5.00% $ 1,247.84
Sub-Total $ 6,239
Precio unitario total aproximado al peso $ 31,196
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 11.34
RED SANITARIA PVC-S 4"
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 663.53
Sub-Total $ 21,574
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 0.70 $ 13,271
Sub-Total $ 13,270.52
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 6,036.31
IMPREVISTOS 3.00% $ 1,065.23
UTILIDAD 5.00% $ 1,775.38
Sub-Total $ 8,877
Precio unitario total aproximado al peso $ 44,385
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 11.35
RED SANITARIA PVC-S 6"
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 758.32
Sub-Total $ 42,108
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 0.80 $ 15,166
Sub-Total $ 15,166.31
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 9,865.47
IMPREVISTOS 3.00% $ 1,740.97
UTILIDAD 5.00% $ 2,901.61
Sub-Total $ 14,508
Precio unitario total aproximado al peso $ 72,540
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 11.36
VÀLVULA DE REGISTRO 1/2"
UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 521.34
Sub-Total $ 20,002
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 0.55 $ 10,427
Sub-Total $ 10,426.84
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 5,261.53
IMPREVISTOS 3.00% $ 928.51
UTILIDAD 5.00% $ 1,547.51
Sub-Total $ 7,738
Precio unitario total aproximado al peso $ 38,688
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 11.37
VÀLVULA DE REGISTRO 3/4"
UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 521.34
Sub-Total $ 50,007
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 0.55 $ 10,427
Sub-Total $ 10,426.84
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 10,362.38
IMPREVISTOS 3.00% $ 1,828.66
UTILIDAD 5.00% $ 3,047.76
Sub-Total $ 15,239
ITEM: 11.38
VÀLVULA DE REGISTRO 1"
UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 521.34
Sub-Total $ 57,607
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 0.55 $ 10,427
Sub-Total $ 10,426.84
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 11,654.38
IMPREVISTOS 3.00% $ 2,056.66
UTILIDAD 5.00% $ 3,427.76
Sub-Total $ 17,139
Precio unitario total aproximado al peso $ 85,694
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 11.39
REVENTILACIÓN 2"
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 284.37
Sub-Total $ 8,537
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 0.30 $ 5,687
Sub-Total $ 5,687.37
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 2,466.42
IMPREVISTOS 3.00% $ 435.25
UTILIDAD 5.00% $ 725.42
Sub-Total $ 3,627
Precio unitario total aproximado al peso $ 18,135
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 11.40
REVENTILACIÓN 3"
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 236.97
Sub-Total $ 13,698
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 0.25 $ 4,739
Sub-Total $ 4,739.47
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 3,174.62
IMPREVISTOS 3.00% $ 560.23
UTILIDAD 5.00% $ 933.71
Sub-Total $ 4,669
Precio unitario total aproximado al peso $ 23,343
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 3,317.63
TANQUE PLASTICO CON TAPA ETERNIT 250 LITROS UND $ 109,900 1.00 $ 109,900
Sub-Total $ 146,800
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 3.50 $ 66,353
Sub-Total $ 66,352.61
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 36,799.94
IMPREVISTOS 3.00% $ 6,494.11
UTILIDAD 5.00% $ 10,823.51
Sub-Total $ 54,118
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 3,317.63
Sub-Total $ 226,800
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 3.50 $ 66,353
Sub-Total $ 66,352.61
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 50,399.94
IMPREVISTOS 3.00% $ 8,894.11
UTILIDAD 5.00% $ 14,823.51
Sub-Total $ 74,118
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 3,791.58
Sub-Total $ 309,800
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 4.00 $ 75,832
Sub-Total $ 75,831.55
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 66,201.93
IMPREVISTOS 3.00% $ 11,682.69
UTILIDAD 5.00% $ 19,471.16
Sub-Total $ 97,356
ITEM: 12.01
SUMINISTRO E INSTALACION SANITARIO BLANCO
UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,421.84
Sub-Total $ 200,527
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 1.50 $ 28,437
Sub-Total $ 28,436.83
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 39,165.56
IMPREVISTOS 3.00% $ 6,911.57
UTILIDAD 5.00% $ 11,519.28
Sub-Total $ 57,596
ITEM: 12.02
SUMINISTRO E INSTALACION SANITARIO COLOR
UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,421.84
Sub-Total $ 206,527
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 1.50 $ 28,437
Sub-Total $ 28,436.83
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 40,185.56
IMPREVISTOS 3.00% $ 7,091.57
UTILIDAD 5.00% $ 11,819.28
Sub-Total $ 59,096
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 2,843.68
Sub-Total $ 75,272
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 1.50 $ 28,437
Sub-Total $ 28,436.83
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 18,113.93
IMPREVISTOS 3.00% $ 3,196.58
UTILIDAD 5.00% $ 5,327.63
Sub-Total $ 26,638
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 2,843.68
Sub-Total $ 79,272
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 1.50 $ 28,437
Sub-Total $ 28,436.83
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 18,793.93
IMPREVISTOS 3.00% $ 3,316.58
UTILIDAD 5.00% $ 5,527.63
Sub-Total $ 27,638
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 2,843.68
Sub-Total $ 116,172
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 1.50 $ 28,437
Sub-Total $ 28,436.83
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 25,066.93
IMPREVISTOS 3.00% $ 4,423.58
UTILIDAD 5.00% $ 7,372.63
Sub-Total $ 36,863
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 2,843.68
Sub-Total $ 121,172
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 1.50 $ 28,437
Sub-Total $ 28,436.83
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 25,916.93
IMPREVISTOS 3.00% $ 4,573.58
UTILIDAD 5.00% $ 7,622.63
Sub-Total $ 38,113
ITEM: 12.07
SUMINISTRO E INSTALACION ORINAL DE LLAVE (INCLUYE GRIFERIA)
UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 2,843.68
Sub-Total $ 212,712
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 1.50 $ 28,437
Sub-Total $ 28,436.83
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 41,478.73
IMPREVISTOS 3.00% $ 7,319.78
UTILIDAD 5.00% $ 12,199.63
Sub-Total $ 60,998
Precio unitario total aproximado al peso $ 304,991
ALCALDÍA MUNICIPAL DE IBAGUÉ
SECRETARÍA DE INFRAESTRUCTURA
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 3,791.58
Sub-Total $ 816,412
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 2.00 $ 37,916
Sub-Total $ 37,915.78
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 145,880.29
IMPREVISTOS 3.00% $ 25,743.58
UTILIDAD 5.00% $ 42,905.97
Sub-Total $ 214,530
Precio unitario total aproximado al peso $ 1,072,649
ALCALDÍA MUNICIPAL DE IBAGUÉ
SECRETARÍA DE INFRAESTRUCTURA
ITEM: 12.09
SUMINISTRO E INSTALACION DUCHA SENCILLA
UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 758.32
GRIFERIA PARA DUCHA SENCILLA GRIVAL PISCIS UND $ 28,900 1.00 $ 28,900
Sub-Total $ 29,030
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 0.80 $ 15,166
Sub-Total $ 15,166.31
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 7,642.29
IMPREVISTOS 3.00% $ 1,348.64
UTILIDAD 5.00% $ 2,247.73
Sub-Total $ 11,239
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,706.21
Sub-Total $ 136,420
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 1.80 $ 34,124
Sub-Total $ 34,124.20
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 29,282.57
IMPREVISTOS 3.00% $ 5,167.51
UTILIDAD 5.00% $ 8,612.52
Sub-Total $ 43,063
Precio unitario total aproximado al peso $ 215,313
ALCALDÍA MUNICIPAL DE IBAGUÉ
SECRETARÍA DE INFRAESTRUCTURA
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,706.21
Sub-Total $ 183,320
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 1.80 $ 34,124
Sub-Total $ 34,124.20
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 37,255.57
IMPREVISTOS 3.00% $ 6,574.51
UTILIDAD 5.00% $ 10,957.52
Sub-Total $ 54,788
Precio unitario total aproximado al peso $ 273,938
ALCALDÍA MUNICIPAL DE IBAGUÉ
SECRETARÍA DE INFRAESTRUCTURA
ITEM: 12.12
SUMINISTRO E INSTALACIÓN LAVADERO 70 X 55 X 22 CM GRANITO
PULIDO (INCLUYE BASE EN BLOQUE Y LLAVE TERMINAL METALICA) UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,546.84
Sub-Total $ 244,248
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA BB $ 11,152 1.70 $ 18,958 1.50 $ 28,437
Sub-Total $ 28,436.83
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 46,619.39
IMPREVISTOS 3.00% $ 8,226.95
UTILIDAD 5.00% $ 13,711.59
Sub-Total $ 68,558
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,723.44
Sub-Total $ 48,310
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 2.00 $ 34,469
Sub-Total $ 34,468.89
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 14,365.40
IMPREVISTOS 3.00% $ 2,535.07
UTILIDAD 5.00% $ 4,225.12
Sub-Total $ 21,126
ITEM: 13.01
SIFÓN PARA DRENAJE EN PVC DE 4"
UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,245.24
Sub-Total $ 13,329
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.30 $ 22,405
Sub-Total $ 22,404.78
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 6,286.45
IMPREVISTOS 3.00% $ 1,109.37
UTILIDAD 5.00% $ 1,848.96
Sub-Total $ 9,245
Precio unitario total aproximado al peso $ 46,224
ALCALDÍA MUNICIPAL DE IBAGUÉ
SECRETARÍA DE INFRAESTRUCTURA
ITEM: 13.02
SIFÓN PARA DRENAJE EN PVC DE 6"
UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,245.24
Sub-Total $ 107,523
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.30 $ 22,405
Sub-Total $ 22,404.78
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 22,299.43
IMPREVISTOS 3.00% $ 3,935.19
UTILIDAD 5.00% $ 6,558.66
Sub-Total $ 32,793
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 8,219.56
Sub-Total $ 210,446
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 7.00 $ 120,641
Sub-Total $ 120,641.11
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 57,682.09
IMPREVISTOS 3.00% $ 10,179.19
UTILIDAD 5.00% $ 16,965.32
Sub-Total $ 84,827
ITEM: 13.04
CAJA INSPECCIÓN DIMENSIONES INTERNAS= 60X60X60 CM. (INCLUYE
TAPA EN CONCRETO REFORZADO Y PAÑETE IMPERMEABILIZADO) UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 5,989.47
Sub-Total $ 84,677
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 5.50 $ 94,789
Sub-Total $ 94,789.44
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 31,527.45
IMPREVISTOS 3.00% $ 5,563.67
UTILIDAD 5.00% $ 9,272.78
Sub-Total $ 46,364
ITEM: 13.05
CAJA INSPECCIÓN DIMENSIONES INTERNAS= 80X80X80 CM. (INCLUYE
TAPA EN CONCRETO REFORZADO Y PAÑETE IMPERMEABILIZADO) UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 5,989.47
Sub-Total $ 161,419
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 5.50 $ 94,789
Sub-Total $ 94,789.44
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 44,573.66
IMPREVISTOS 3.00% $ 7,865.94
UTILIDAD 5.00% $ 13,109.90
Sub-Total $ 65,549
ITEM: 14.01
ACOMETIDA AÉREA PVC
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 608.44
Sub-Total $ 16,775
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA FF $ 15,907 1.70 $ 27,042 0.45 $ 12,169
Sub-Total $ 12,168.86
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 5,023.89
IMPREVISTOS 3.00% $ 886.57
UTILIDAD 5.00% $ 1,477.61
Sub-Total $ 7,388
ITEM: 14.02
SALIDA LÁMPARA + TOMA EMT COMPLETA
UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,149.28
Sub-Total $ 77,895
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA FF $ 15,907 1.70 $ 27,042 0.85 $ 22,986
Sub-Total $ 22,985.62
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 17,345.12
IMPREVISTOS 3.00% $ 3,060.90
UTILIDAD 5.00% $ 5,101.51
Sub-Total $ 25,508
ITEM: 14.03
SALIDA LÁMPARA + TOMA PVC COMPLETA
UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 946.47
Sub-Total $ 32,675
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA FF $ 15,907 1.70 $ 27,042 0.70 $ 18,929
Sub-Total $ 18,929.33
Total Costo Directo $ 52,551
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 8,933.62
IMPREVISTOS 3.00% $ 1,576.52
UTILIDAD 5.00% $ 2,627.53
Sub-Total $ 13,138
ITEM: 14.04
SALIDA LÁMPARA CONMUTABLE EMT COMPLETA
UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,216.89
Sub-Total $ 91,139
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA FF $ 15,907 1.70 $ 27,042 0.90 $ 24,338
Sub-Total $ 24,337.71
Sub-Total $ 29,173
ITEM: 14.05
SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA
UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,014.07
Sub-Total $ 47,543
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA FF $ 15,907 1.70 $ 27,042 0.75 $ 20,281
Sub-Total $ 20,281.43
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 11,702.54
IMPREVISTOS 3.00% $ 2,065.15
UTILIDAD 5.00% $ 3,441.92
Sub-Total $ 17,210
ITEM: 14.06
SALIDA TELÉFONO PVC COMPLETA
UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 878.86
Sub-Total $ 23,000
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA FF $ 15,907 1.70 $ 27,042 0.65 $ 17,577
Sub-Total $ 17,577.24
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 7,047.54
IMPREVISTOS 3.00% $ 1,243.68
UTILIDAD 5.00% $ 2,072.80
Sub-Total $ 10,364
ITEM: 14.07
SALIDA TIMBRE PVC COMPLETA
UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 919.42
Sub-Total $ 37,046
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA FF $ 15,907 1.70 $ 27,042 0.68 $ 18,388
Sub-Total $ 18,388.49
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 9,580.17
IMPREVISTOS 3.00% $ 1,690.62
UTILIDAD 5.00% $ 2,817.70
Sub-Total $ 14,088
ITEM: 14.08
SALIDA TOMA DOBLE PVC COMPLETA
UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 811.26
Sub-Total $ 28,218
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA FF $ 15,907 1.70 $ 27,042 0.60 $ 16,225
Sub-Total $ 16,225.14
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 7,693.25
IMPREVISTOS 3.00% $ 1,357.63
UTILIDAD 5.00% $ 2,262.72
Sub-Total $ 11,314
ITEM: 14.09
SALIDA TRIFÁSICA PVC COMPLETA
UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,419.70
SUPLEMENTO PVC 10X10 PARA TOMA CORRIENTE UND $ 700 1.00 $ 700
Sub-Total $ 71,896
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA FF $ 15,907 1.70 $ 27,042 1.05 $ 28,394
Sub-Total $ 28,394.00
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 17,290.65
IMPREVISTOS 3.00% $ 3,051.29
UTILIDAD 5.00% $ 5,085.48
Sub-Total $ 25,427
ITEM: 14.10
SALIDA T.V PVC COMPLETA
UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,419.70
Sub-Total $ 23,100
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA FF $ 15,907 1.70 $ 27,042 1.05 $ 28,394
Sub-Total $ 28,394.00
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 8,995.33
IMPREVISTOS 3.00% $ 1,587.41
UTILIDAD 5.00% $ 2,645.68
Sub-Total $ 13,228
Precio unitario total aproximado al peso $ 66,142
ALCALDÍA MUNICIPAL DE IBAGUÉ
SECRETARÍA DE INFRAESTRUCTURA
ITEM: 14.11
SALIDA BIFÁSICA PVC COMPLETA
UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,419.70
SUPLEMENTO PVC 10X10 PARA TOMA CORRIENTE UND $ 700 1.00 $ 700
TOMA DOBLE POLO A TIERRA BLANCA LUNARE UND $ 5,900 1.00 $ 5,900
ACCESORIO ELECTRICO ADAPTADOR TERMINAL
UND $ 200 2.00 $ 400
CONDUIT PAVCO 1/2"
TUBO ELECTRICO CONDUIT PAVCO 1/2" ML $ 800 6.00 $ 4,800
Sub-Total $ 46,300
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA FF $ 15,907 1.70 $ 27,042 1.05 $ 28,394
Sub-Total $ 28,394.00
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 12,939.33
IMPREVISTOS 3.00% $ 2,283.41
UTILIDAD 5.00% $ 3,805.68
Sub-Total $ 19,028
ITEM: 14.12
TABLERO PARCIALES 4 CIRCUITOS (INCLUYE TACOS DE 30A)
UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 89,100
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA FF $ 15,907 1.70 $ 27,042 2.50 $ 67,605
Sub-Total $ 67,604.75
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 27,214.45
IMPREVISTOS 3.00% $ 4,802.55
UTILIDAD 5.00% $ 8,004.25
Sub-Total $ 40,021
ITEM: 14.13
TABLERO PARCIALES 6 CIRCUITOS (INCLUYE TACOS DE 30A)
UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 3,785.87
Sub-Total $ 120,900
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA FF $ 15,907 1.70 $ 27,042 2.80 $ 75,717
Sub-Total $ 75,717.32
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 34,068.54
IMPREVISTOS 3.00% $ 6,012.10
UTILIDAD 5.00% $ 10,020.16
Sub-Total $ 50,101
ITEM: 14.14
TABLERO PARCIALES 8 CIRCUITOS (INCLUYE TACOS DE 30A)
UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 4,056.29
Sub-Total $ 155,600
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA FF $ 15,907 1.70 $ 27,042 3.00 $ 81,126
Sub-Total $ 81,125.70
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 40,932.94
IMPREVISTOS 3.00% $ 7,223.46
UTILIDAD 5.00% $ 12,039.10
Sub-Total $ 60,195
ITEM: 14.15
TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A)
UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 4,732.33
Sub-Total $ 224,000
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA FF $ 15,907 1.70 $ 27,042 3.50 $ 94,647
Sub-Total $ 94,646.65
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 54,974.43
IMPREVISTOS 3.00% $ 9,701.37
UTILIDAD 5.00% $ 16,168.95
Sub-Total $ 80,845
ITEM: 14.16
TUBERÍA PVC CONDUIT 1/2"
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 94.65
Sub-Total $ 800
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA FF $ 15,907 1.70 $ 27,042 0.07 $ 1,893
Sub-Total $ 1,892.93
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 473.89
IMPREVISTOS 3.00% $ 83.63
UTILIDAD 5.00% $ 139.38
Sub-Total $ 697
ITEM: 14.17
TUBERÍA PVC CONDUIT 3/4"
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 108.17
Sub-Total $ 1,166
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA FF $ 15,907 1.70 $ 27,042 0.08 $ 2,163
Sub-Total $ 2,163.35
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 584.38
IMPREVISTOS 3.00% $ 103.13
UTILIDAD 5.00% $ 171.88
Sub-Total $ 859
ITEM: 14.18
TUBERÍA PVC CONDUIT 1"
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 135.21
Sub-Total $ 2,300
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA FF $ 15,907 1.70 $ 27,042 0.10 $ 2,704
Sub-Total $ 2,704.19
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 873.70
IMPREVISTOS 3.00% $ 154.18
UTILIDAD 5.00% $ 256.97
Sub-Total $ 1,285
ITEM: 14.19
TUBERÍA PVC CONDUIT 1 1/2"
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 162.25
Sub-Total $ 5,633
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA FF $ 15,907 1.70 $ 27,042 0.12 $ 3,245
Sub-Total $ 3,245.03
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 1,536.85
IMPREVISTOS 3.00% $ 271.21
UTILIDAD 5.00% $ 452.01
Sub-Total $ 2,260
ITEM: 14.20
LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL)
UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 3,042.21
Sub-Total $ 149,900
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA FF $ 15,907 1.70 $ 27,042 2.25 $ 60,844
Sub-Total $ 60,844.28
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 36,343.70
IMPREVISTOS 3.00% $ 6,413.59
UTILIDAD 5.00% $ 10,689.32
Sub-Total $ 53,447
ITEM: 15.01
NIVELACION MANUAL PISO
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 275.75
Sub-Total $ -
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.16 $ 2,758
Sub-Total $ 2,757.51
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 515.65
IMPREVISTOS 3.00% $ 91.00
UTILIDAD 5.00% $ 151.66
Sub-Total $ 758
ITEM: 15.02
BASE ARENA CEMENTO
UNIDAD: M3
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (10%) % $ 1,241
COMPACTADOR MECANICO RANA HORA $ 7,500 0.32 $ 2,400
Sub-Total $ 3,640.88
Sub-Total $ 103,467
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.72 $ 12,409
Sub-Total $ 12,408.80
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 20,317.84
IMPREVISTOS 3.00% $ 3,585.50
UTILIDAD 5.00% $ 5,975.83
Sub-Total $ 29,879
Precio unitario total aproximado al peso $ 149,396
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 15.03
ALISTADO DE PISO E:4CM
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 442.93
Sub-Total $ 10,082
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.26 $ 4,429
Sub-Total $ 4,429.25
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 2,542.17
IMPREVISTOS 3.00% $ 448.62
UTILIDAD 5.00% $ 747.70
Sub-Total $ 3,738
ITEM: 15.04
ALISTADO IMPERMEABILIZADO E=0.04
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 442.93
Sub-Total $ 19,151
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.26 $ 4,429
Sub-Total $ 4,429.25
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 4,083.98
IMPREVISTOS 3.00% $ 720.70
UTILIDAD 5.00% $ 1,201.17
Sub-Total $ 6,006
ITEM: 15.05
ALISTADO TERRAZAS E:0.08
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,473.54
Sub-Total $ 38,303
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.86 $ 14,735
Sub-Total $ 14,735.45
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 9,266.96
IMPREVISTOS 3.00% $ 1,635.35
UTILIDAD 5.00% $ 2,725.58
Sub-Total $ 13,628
ITEM: 15.06
CAÑUELA EN CONCRETO 0.20*0.10
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 594.59
Sub-Total $ 6,134
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.35 $ 5,946
Sub-Total $ 5,945.88
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 2,154.59
IMPREVISTOS 3.00% $ 380.22
UTILIDAD 5.00% $ 633.70
Sub-Total $ 3,169
ITEM:
PLACA BASE EN CONCRETO E:0.08 2500PSI
UNIDAD:
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total
Sub-Total
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total
Sub-Total
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 8,375.70
IMPREVISTOS 3.00% $ 1,478.06
UTILIDAD 5.00% $ 2,463.44
Sub-Total
15.07
M2
$ 1,956.11
$ 27,752
$ -
$ 19,561.09
$ 49,269
$ 12,317
$ 61,586
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 15.08
PLACA BASE EN CONCRETO E:0.10 2500PSI
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,473.54
Sub-Total $ 32,367
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.86 $ 14,735
Sub-Total $ 14,735.45
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 8,257.92
IMPREVISTOS 3.00% $ 1,457.28
UTILIDAD 5.00% $ 2,428.80
Sub-Total $ 12,144
ITEM: 15.09
PLACA BASE EN CONCRETO E:0.15 2500PSI
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,956.11
Sub-Total $ 46,213
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.14 $ 19,561
Sub-Total $ 19,561.09
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 11,514.14
IMPREVISTOS 3.00% $ 2,031.91
UTILIDAD 5.00% $ 3,386.51
Sub-Total $ 16,933
ITEM: 15.10
PLACA BASE CONCRETO POBRE E=0.05M 2000PSI
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,956.11
Sub-Total $ 19,608
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.14 $ 19,561
Sub-Total $ 19,561.09
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 6,991.32
IMPREVISTOS 3.00% $ 1,233.76
UTILIDAD 5.00% $ 2,056.27
Sub-Total $ 10,281
ITEM: 15.11
PLACA CONCRETO 3000 PSI E=0,08 M
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (10%) % $ 1,956
Sub-Total $ 1,956.11
Sub-Total $ 29,313
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.14 $ 19,561
Sub-Total $ 19,561.09
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 8,641.12
IMPREVISTOS 3.00% $ 1,524.90
UTILIDAD 5.00% $ 2,541.51
Sub-Total $ 12,708
Precio unitario total aproximado al peso $ 63,538
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 15.12
PLACA CONCRETO 3000 PSI E=0,10 M
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (10%) % $ 1,956
Sub-Total $ 1,956.11
Sub-Total $ 34,275
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.14 $ 19,561
Sub-Total $ 19,561.09
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 9,484.72
IMPREVISTOS 3.00% $ 1,673.77
UTILIDAD 5.00% $ 2,789.62
Sub-Total $ 13,948
Precio unitario total aproximado al peso $ 69,741
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 15.13
PLACA CONCRETO 3000 PSI E=0,12 M
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (10%) % $ 1,956
Sub-Total $ 1,956.11
Sub-Total $ 39,238
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.14 $ 19,561
Sub-Total $ 19,561.09
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 10,328.31
IMPREVISTOS 3.00% $ 1,822.64
UTILIDAD 5.00% $ 3,037.74
Sub-Total $ 15,189
Precio unitario total aproximado al peso $ 75,943
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 15.14
PLACA CONCRETO 3000 PSI E=0,15M
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (10%) % $ 1,956
Sub-Total $ 1,956.11
Sub-Total $ 49,162
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.14 $ 19,561
Sub-Total $ 19,561.09
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 12,015.50
IMPREVISTOS 3.00% $ 2,120.38
UTILIDAD 5.00% $ 3,533.97
Sub-Total $ 17,670
Precio unitario total aproximado al peso $ 88,349
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 15.15
PISO FORMATO 20X20 CM
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,723.44
Sub-Total $ 28,242
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.00 $ 17,234
Sub-Total $ 17,234.44
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 8,023.98
IMPREVISTOS 3.00% $ 1,416.00
UTILIDAD 5.00% $ 2,359.99
Sub-Total $ 11,800
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,981.96
Sub-Total $ 41,577
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.15 $ 19,820
Sub-Total $ 19,819.61
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 10,774.36
IMPREVISTOS 3.00% $ 1,901.36
UTILIDAD 5.00% $ 3,168.93
Sub-Total $ 15,845
ITEM: 15.17
PISO FORMATO 42,5X42,5 CM T5 ANTIDESLIZANTE
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,895.79
Sub-Total $ 33,177
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.10 $ 18,958
Sub-Total $ 18,957.89
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 9,185.22
IMPREVISTOS 3.00% $ 1,620.92
UTILIDAD 5.00% $ 2,701.53
Sub-Total $ 13,508
ITEM: 15.18
PISO FORMATO 45,8 X 45,8 CM EXTERIOR TRAFICO ALTO
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,895.79
Sub-Total $ 39,267
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.10 $ 18,958
Sub-Total $ 18,957.89
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 10,220.52
IMPREVISTOS 3.00% $ 1,803.62
UTILIDAD 5.00% $ 3,006.03
Sub-Total $ 15,030
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,895.79
Sub-Total $ 66,042
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.10 $ 18,958
Sub-Total $ 18,957.89
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 14,772.27
IMPREVISTOS 3.00% $ 2,606.87
UTILIDAD 5.00% $ 4,344.78
Sub-Total $ 21,724
ITEM: 15.20
PISO EN GRANITO
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 70,062
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.50 $ 25,852
Sub-Total $ 25,851.67
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 16,744.82
IMPREVISTOS 3.00% $ 2,954.97
UTILIDAD 5.00% $ 4,924.95
Sub-Total $ 24,625
ITEM: 15.21
PASO ESCALERA GRANITO
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (10%) % $ 2,585
Sub-Total $ 2,585.17
Sub-Total $ 70,062
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.50 $ 25,852
Sub-Total $ 25,851.67
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 16,744.82
IMPREVISTOS 3.00% $ 2,954.97
UTILIDAD 5.00% $ 4,924.95
Sub-Total $ 24,625
ITEM: 15.22
PISO EN GRAVILLA LAVADA
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (10%) % $ 3,102
Sub-Total $ 3,102.20
Sub-Total $ 32,501
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.80 $ 31,022
Sub-Total $ 31,022.00
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 11,326.28
IMPREVISTOS 3.00% $ 1,998.76
UTILIDAD 5.00% $ 3,331.26
Sub-Total $ 16,656
ITEM: 15.23
GRADAS EN GRAVILLA
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (10%) % $ 4,309
Sub-Total
Sub-Total $ 12,883
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 2.50 $ 43,086
Sub-Total $ 43,086.11
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 9,514.75
IMPREVISTOS 3.00% $ 1,679.07
UTILIDAD 5.00% $ 2,798.46
Sub-Total $ 13,992
ITEM: 15.24
GRADAS EN GRAVILLA
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (10%) % $ 4,309
Sub-Total
Sub-Total $ 1,973
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 2.50 $ 43,086
Sub-Total $ 43,086.11
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 7,660.03
IMPREVISTOS 3.00% $ 1,351.77
UTILIDAD 5.00% $ 2,252.95
Sub-Total $ 11,265
ITEM: 15.25
PISO EN CONCRETO ESMALTADO E=0,05 M
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (10%) % $ 862
Sub-Total $ 861.72
Sub-Total $ 18,182
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.50 $ 8,617
Sub-Total $ 8,617.22
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 4,702.31
IMPREVISTOS 3.00% $ 829.82
UTILIDAD 5.00% $ 1,383.03
Sub-Total $ 6,915
Precio unitario total aproximado al peso $ 34,576
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 15.26
PISO EN CONCRETO AFINADO COLOR E=0,05 M
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (10%) % $ 862
Sub-Total $ 861.72
Sub-Total $ 19,832
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.50 $ 8,617
Sub-Total $ 8,617.22
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 4,982.81
IMPREVISTOS 3.00% $ 879.32
UTILIDAD 5.00% $ 1,465.53
Sub-Total $ 7,328
Precio unitario total aproximado al peso $ 36,638
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 15.27
PISO EN DECORPISO
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (10%) % $ 2,585
Sub-Total $ 2,585.17
Sub-Total $ 38,313
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.50 $ 25,852
Sub-Total $ 25,851.67
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 11,347.44
IMPREVISTOS 3.00% $ 2,002.49
UTILIDAD 5.00% $ 3,337.48
Sub-Total $ 16,687
Precio unitario total aproximado al peso $ 83,437
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 15.28
TABLETA DE GRES .30Mx.30M CON ALISTADO
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,895.79
Sub-Total $ 48,842
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.10 $ 18,958
Sub-Total $ 18,957.89
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 11,848.32
IMPREVISTOS 3.00% $ 2,090.88
UTILIDAD 5.00% $ 3,484.80
Sub-Total $ 17,424
Precio unitario total aproximado al peso $ 87,120
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 15.29
TABLETA DE GRES .20Mx.20M CON ALISTADO
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,895.79
Sub-Total $ 46,742
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.10 $ 18,958
Sub-Total $ 18,957.89
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 11,491.32
IMPREVISTOS 3.00% $ 2,027.88
UTILIDAD 5.00% $ 3,379.80
Sub-Total $ 16,899
Precio unitario total aproximado al peso $ 84,495
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 15.30
PISO EN ADOQUIN CONCRETO 6 CM
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (10%) % $ 1,723
Sub-Total $ 1,723.44
Sub-Total $ 61,485
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.00 $ 17,234
Sub-Total $ 17,234.44
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 13,675.21
IMPREVISTOS 3.00% $ 2,413.27
UTILIDAD 5.00% $ 4,022.12
Sub-Total $ 20,111
ITEM: 15.31
PISO EN ADOQUIN CONCRETO 8 CM
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (10%) % $ 1,723
Sub-Total $ 1,723.44
Sub-Total $ 60,653
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.00 $ 17,234
Sub-Total $ 17,234.44
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 13,533.77
IMPREVISTOS 3.00% $ 2,388.31
UTILIDAD 5.00% $ 3,980.52
Sub-Total $ 19,903
Precio unitario total aproximado al peso $ 99,513
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 15.32
PISO EN ADOQUIN GRES PEATONAL
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (10%) % $ 1,810
Sub-Total $ 1,809.62
Sub-Total $ 52,683
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.05 $ 18,096
Sub-Total $ 18,096.17
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 12,340.01
IMPREVISTOS 3.00% $ 2,177.65
UTILIDAD 5.00% $ 3,629.41
Sub-Total $ 18,147
ITEM: 15.33
PISO EN ADOQUIN GRES VEHICULAR
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (10%) % $ 1,810
Sub-Total $ 1,809.62
Sub-Total $ 68,183
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.05 $ 18,096
Sub-Total $ 18,096.17
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 14,975.01
IMPREVISTOS 3.00% $ 2,642.65
UTILIDAD 5.00% $ 4,404.41
Sub-Total $ 22,022
ITEM: 15.34
PISO EN VINILO
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (10%) % $ 1,206
Sub-Total $ 1,206.41
Sub-Total $ 41,280
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.70 $ 12,064
Sub-Total $ 12,064.11
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 9,273.59
IMPREVISTOS 3.00% $ 1,636.52
UTILIDAD 5.00% $ 2,727.53
Sub-Total $ 13,638
Precio unitario total aproximado al peso $ 68,188
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 15.35
GUARDAESCOBA EN PORCELANATO H=0,08
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (10%) % $ 155
Sub-Total $ 155.11
Sub-Total $ 23,655
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.09 $ 1,551
Sub-Total $ 1,551.10
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 4,311.41
IMPREVISTOS 3.00% $ 760.84
UTILIDAD 5.00% $ 1,268.06
Sub-Total $ 6,340
ITEM: 15.36
GUARDAESCOBA EN DUROPISO O SIMILAR
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (10%) % $ 155
Sub-Total $ 155.11
Sub-Total $ 4,165
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.09 $ 1,551
Sub-Total $ 1,551.10
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 998.11
IMPREVISTOS 3.00% $ 176.14
UTILIDAD 5.00% $ 293.56
Sub-Total $ 1,468
ITEM: 15.37
GUARDAESCOBA EN GRANITO PULIDO
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (10%) % $ 3,447
Sub-Total $ 3,446.89
Sub-Total $ 9,700
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 2.00 $ 34,469
Sub-Total $ 34,468.89
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 8,094.68
IMPREVISTOS 3.00% $ 1,428.47
UTILIDAD 5.00% $ 2,380.79
Sub-Total $ 11,904
Precio unitario total aproximado al peso $ 59,520
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (10%) % $ 1,723
Sub-Total $ 1,723.44
Sub-Total $ 13,235
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.00 $ 17,234
Sub-Total $ 17,234.44
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 5,472.79
IMPREVISTOS 3.00% $ 965.79
UTILIDAD 5.00% $ 1,609.64
Sub-Total $ 8,048
ITEM: 15.39
GUARDAESCOBAS EN PVC
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (10%) % $ 862
Sub-Total $ 861.72
Sub-Total $ 8,478
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.50 $ 8,617
Sub-Total $ 8,617.22
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 3,052.68
IMPREVISTOS 3.00% $ 538.71
UTILIDAD 5.00% $ 897.85
Sub-Total $ 4,489
Precio unitario total aproximado al peso $ 22,446
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 15.40
GUARDAESCOBAS EN GRAVILLA
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (10%) % $ 862
Sub-Total $ 861.72
Sub-Total $ 3,478
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.50 $ 8,617
Sub-Total $ 8,617.22
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 2,202.60
IMPREVISTOS 3.00% $ 388.69
UTILIDAD 5.00% $ 647.82
Sub-Total $ 3,239
ITEM: 16.00
ZOCALO P/TABLETA 7.5 CMS
UNIDAD: 0
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (10%) % $ 1,206
Sub-Total $ 1,206.41
Sub-Total $ 17,638
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.70 $ 12,064
Sub-Total $ 12,064.11
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 5,254.52
IMPREVISTOS 3.00% $ 927.27
UTILIDAD 5.00% $ 1,545.45
Sub-Total $ 7,727
ITEM: 16.01
ARMADURA MADERA Y MALLA
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 818.64
Sub-Total $ 10,411
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.95 $ 16,373
Sub-Total $ 16,372.72
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 4,692.37
IMPREVISTOS 3.00% $ 828.06
UTILIDAD 5.00% $ 1,380.11
Sub-Total $ 6,901
ITEM: 16.02
CIELO RASO PLANO DRYWALL (INCLUYE PINTURA)
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 731.37
Sub-Total $ 26,512
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.65 $ 11,202
Sub-Total $ 11,202.39
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 6,535.78
IMPREVISTOS 3.00% $ 1,153.37
UTILIDAD 5.00% $ 1,922.29
Sub-Total $ 9,611
ITEM: 16.04
MALLA CON VENA
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 184.72
Sub-Total $ 4,627
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.20 $ 3,447
Sub-Total $ 3,446.89
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 1,403.96
IMPREVISTOS 3.00% $ 247.76
UTILIDAD 5.00% $ 412.93
Sub-Total $ 2,065
Precio unitario total aproximado al peso $ 10,323
ALCALDÍA MUNICIPAL DE IBAGUÉ
SECRETARÍA DE INFRAESTRUCTURA
ITEM: 17.01
IMPERMEABILIZACIÓN FACHADA A DOS CAPAS
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 276.02
Sub-Total $ 9,596
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
AYUDANTE CC $ 4,166 1.70 $ 7,082 0.43 $ 3,045
Sub-Total $ 3,045.44
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 2,195.97
IMPREVISTOS 3.00% $ 387.52
UTILIDAD 5.00% $ 645.87
Sub-Total $ 3,229
ITEM: 17.02
ANTICORROSIVO SOBRE LÁMINA LINEAL
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 79.28
Sub-Total $ 1,889
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA CC $ 11,659 1.70 $ 19,820 0.08 $ 1,586
Sub-Total $ 1,585.57
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 604.15
IMPREVISTOS 3.00% $ 106.62
UTILIDAD 5.00% $ 177.69
Sub-Total $ 888
ITEM: 17.03
ANTICORROSIVO SOBRE LÁMINA LLENA
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 247.75
Sub-Total $ 3,341
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA CC $ 11,659 1.70 $ 19,820 0.25 $ 4,955
Sub-Total $ 4,954.90
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 1,452.42
IMPREVISTOS 3.00% $ 256.31
UTILIDAD 5.00% $ 427.18
Sub-Total $ 2,136
ITEM: 17.04
BARNIZ SOBRE MUEBLES
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 247.75
Sub-Total $ 28,976
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA CC $ 11,659 1.70 $ 19,820 0.25 $ 4,955
Sub-Total $ 4,954.90
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 5,810.37
IMPREVISTOS 3.00% $ 1,025.36
UTILIDAD 5.00% $ 1,708.93
Sub-Total $ 8,545
ITEM: 17.05
CARBURO SOBRE PAÑETES
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 158.56
Sub-Total $ 990
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA CC $ 11,659 1.70 $ 19,820 0.16 $ 3,171
Sub-Total $ 3,171.14
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 734.35
IMPREVISTOS 3.00% $ 129.59
UTILIDAD 5.00% $ 215.98
Sub-Total $ 1,080
ITEM: 17.06
GRANIPLAST ESGRAFIADO FACHADA
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 625.87
Sub-Total $ 9,490
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA CC $ 11,659 1.70 $ 19,820 0.25 $ 4,955
Sub-Total $ 4,954.90
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 2,562.03
IMPREVISTOS 3.00% $ 452.12
UTILIDAD 5.00% $ 753.54
Sub-Total $ 3,768
ITEM: 17.07
MARMOLINA SOBRE PAÑETE
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 297.29
Sub-Total $ 3,950
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA CC $ 11,659 1.70 $ 19,820 0.30 $ 5,946
Sub-Total $ 5,945.88
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 1,732.82
IMPREVISTOS 3.00% $ 305.79
UTILIDAD 5.00% $ 509.65
Sub-Total $ 2,548
Precio unitario total aproximado al peso $ 12,741
ALCALDÍA MUNICIPAL DE IBAGUÉ
SECRETARÍA DE INFRAESTRUCTURA
ITEM: 17.08
DEMARCACIÓN CON MARMOLINA
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 148.65
Sub-Total $ 525
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA CC $ 11,659 1.70 $ 19,820 0.15 $ 2,973
Sub-Total $ 2,972.94
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 619.92
IMPREVISTOS 3.00% $ 109.40
UTILIDAD 5.00% $ 182.33
Sub-Total $ 912
ITEM: 17.09
ESMALTE SOBRE LÁMINA LINEAL
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 79.28
Sub-Total $ 1,929
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA CC $ 11,659 1.70 $ 19,820 0.08 $ 1,586
Sub-Total $ 1,585.57
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 610.95
IMPREVISTOS 3.00% $ 107.82
UTILIDAD 5.00% $ 179.69
Sub-Total $ 898
ITEM: 17.10
ESMALTE SOBRE LÁMINA LLENA
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 198.20
Sub-Total $ 5,586
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA CC $ 11,659 1.70 $ 19,820 0.20 $ 3,964
Sub-Total $ 3,963.92
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 1,657.18
IMPREVISTOS 3.00% $ 292.44
UTILIDAD 5.00% $ 487.41
Sub-Total $ 2,437
ITEM: 17.11
ESMALTE SOBRE MADERA LINEAL
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 79.28
Sub-Total $ 1,829
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA CC $ 11,659 1.70 $ 19,820 0.08 $ 1,586
Sub-Total $ 1,585.57
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 593.95
IMPREVISTOS 3.00% $ 104.82
UTILIDAD 5.00% $ 174.69
Sub-Total $ 873
Precio unitario total aproximado al peso $ 4,367
ALCALDÍA MUNICIPAL DE IBAGUÉ
SECRETARÍA DE INFRAESTRUCTURA
ITEM: 17.12
ESMALTE SOBRE MADERA LLENA
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 247.75
Sub-Total $ 5,717
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA CC $ 11,659 1.70 $ 19,820 0.25 $ 4,955
Sub-Total $ 4,954.90
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 1,856.34
IMPREVISTOS 3.00% $ 327.59
UTILIDAD 5.00% $ 545.98
Sub-Total $ 2,730
Precio unitario total aproximado al peso $ 13,650
ALCALDÍA MUNICIPAL DE IBAGUÉ
SECRETARÍA DE INFRAESTRUCTURA
ITEM: 17.13
ESMALTE SOBRE MARCOS LÁMINA
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 79.28
Sub-Total $ 2,736
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA CC $ 11,659 1.70 $ 19,820 0.08 $ 1,586
Sub-Total $ 1,585.57
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 748.14
IMPREVISTOS 3.00% $ 132.03
UTILIDAD 5.00% $ 220.04
Sub-Total $ 1,100
ITEM: 17.14
ESMALTE SOBRE MARCOS MADERA
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 79.28
Sub-Total $ 2,986
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA CC $ 11,659 1.70 $ 19,820 0.08 $ 1,586
Sub-Total $ 1,585.57
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 790.64
IMPREVISTOS 3.00% $ 139.53
UTILIDAD 5.00% $ 232.54
Sub-Total $ 1,163
Precio unitario total aproximado al peso $ 5,814
ALCALDÍA MUNICIPAL DE IBAGUÉ
SECRETARÍA DE INFRAESTRUCTURA
ITEM: 17.15
ESTUCO
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 188.29
Sub-Total $ 1,708
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA CC $ 11,659 1.70 $ 19,820 0.19 $ 3,766
Sub-Total $ 3,765.73
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 962.54
IMPREVISTOS 3.00% $ 169.86
UTILIDAD 5.00% $ 283.10
Sub-Total $ 1,416
ITEM: 17.16
ESTUCO (LINEAL)
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 118.92
Sub-Total $ 910
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA CC $ 11,659 1.70 $ 19,820 0.12 $ 2,378
Sub-Total $ 2,378.35
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 579.20
IMPREVISTOS 3.00% $ 102.21
UTILIDAD 5.00% $ 170.35
Sub-Total $ 852
ITEM: 17.17
ESTUCO Y VINILO TIPO 1 A TRES CAPAS
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 495.49
Sub-Total $ 2,891
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA CC $ 11,659 1.70 $ 19,820 0.50 $ 9,910
Sub-Total $ 9,909.81
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 2,260.44
IMPREVISTOS 3.00% $ 398.90
UTILIDAD 5.00% $ 664.83
Sub-Total $ 3,324
ITEM: 17.18
TINTILLA SOBRE MADERA LINEAL
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 69.37
Sub-Total $ 1,251
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA CC $ 11,659 1.70 $ 19,820 0.07 $ 1,387
Sub-Total $ 1,387.37
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 460.32
IMPREVISTOS 3.00% $ 81.23
UTILIDAD 5.00% $ 135.39
Sub-Total $ 677
ITEM: 17.19
TINTILLA SOBRE MADERA LLENA
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 247.75
Sub-Total $ 2,808
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA CC $ 11,659 1.70 $ 19,820 0.25 $ 4,955
Sub-Total $ 4,954.90
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 1,361.81
IMPREVISTOS 3.00% $ 240.32
UTILIDAD 5.00% $ 400.53
Sub-Total $ 2,003
ITEM: 17.20
PINTURA EPÓXICA
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 297.29
Sub-Total $ 3,267
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA CC $ 11,659 1.70 $ 19,820 0.30 $ 5,946
Sub-Total $ 5,945.88
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 1,616.73
IMPREVISTOS 3.00% $ 285.31
UTILIDAD 5.00% $ 475.51
Sub-Total $ 2,378
ITEM: 17.21
VINILO TIPO 1 SOBRE PAÑETE A DOS CAPAS
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 257.65
Sub-Total $ 950
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA CC $ 11,659 1.70 $ 19,820 0.26 $ 5,153
Sub-Total $ 5,153.10
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 1,081.24
IMPREVISTOS 3.00% $ 190.81
UTILIDAD 5.00% $ 318.01
Sub-Total $ 1,590
ITEM: 17.22
VINILO TIPO 1 SOBRE PAÑETE A TRES CAPAS
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 287.38
Sub-Total $ 1,329
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA CC $ 11,659 1.70 $ 19,820 0.29 $ 5,748
Sub-Total $ 5,747.69
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 1,251.94
IMPREVISTOS 3.00% $ 220.93
UTILIDAD 5.00% $ 368.22
Sub-Total $ 1,841
ITEM: 17.23
VINILO TIPO 1 SOBRE ESTUCO A DOS CAPAS
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 257.65
Sub-Total $ 836
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA CC $ 11,659 1.70 $ 19,820 0.26 $ 5,153
Sub-Total $ 5,153.10
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 1,061.87
IMPREVISTOS 3.00% $ 187.39
UTILIDAD 5.00% $ 312.32
Sub-Total $ 1,562
ITEM: 17.24
VINILO TIPO 1 SOBRE ESTUCO A TRES CAPAS
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 287.38
Sub-Total $ 1,253
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA CC $ 11,659 1.70 $ 19,820 0.29 $ 5,748
Sub-Total $ 5,747.69
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 1,239.03
IMPREVISTOS 3.00% $ 218.65
UTILIDAD 5.00% $ 364.42
Sub-Total $ 1,822
ITEM: 17.25
VINILO TIPO 2 SOBRE PAÑETE A DOS CAPAS
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 257.65
Sub-Total $ 550
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA CC $ 11,659 1.70 $ 19,820 0.26 $ 5,153
Sub-Total $ 5,153.10
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 1,013.24
IMPREVISTOS 3.00% $ 178.81
UTILIDAD 5.00% $ 298.01
Sub-Total $ 1,490
ITEM: 17.26
VINILO TIPO 2 SOBRE PAÑETE A TRES CAPAS
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 287.38
Sub-Total $ 769
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA CC $ 11,659 1.70 $ 19,820 0.29 $ 5,748
Sub-Total $ 5,747.69
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 1,156.74
IMPREVISTOS 3.00% $ 204.13
UTILIDAD 5.00% $ 340.22
Sub-Total $ 1,701
ITEM: 17.27
VINILO TIPO 2 SOBRE ESTUCO A DOS CAPAS
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 257.65
Sub-Total $ 484
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA CC $ 11,659 1.70 $ 19,820 0.26 $ 5,153
Sub-Total $ 5,153.10
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 1,002.03
IMPREVISTOS 3.00% $ 176.83
UTILIDAD 5.00% $ 294.72
Sub-Total $ 1,474
ITEM: 17.28
VINILO TIPO 2 SOBRE ESTUCO A TRES CAPAS
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 287.38
Sub-Total $ 725
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA CC $ 11,659 1.70 $ 19,820 0.29 $ 5,748
Sub-Total $ 5,747.69
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 1,149.27
IMPREVISTOS 3.00% $ 202.81
UTILIDAD 5.00% $ 338.02
Sub-Total $ 1,690
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ -
Sub-Total $ 2,360,000
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
Sub-Total $ -
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 401,200.00
IMPREVISTOS 3.00% $ 70,800.00
UTILIDAD 5.00% $ 118,000.00
Sub-Total $ 590,000
Precio unitario total aproximado al peso $ 2,950,000
ALCALDÍA MUNICIPAL DE IBAGUÉ
SECRETARÍA DE INFRAESTRUCTURA
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ -
Sub-Total $ 185,000
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
Sub-Total $ -
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 31,450.00
IMPREVISTOS 3.00% $ 5,550.00
UTILIDAD 5.00% $ 9,250.00
Sub-Total $ 46,250
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ -
Sub-Total $ 95,000
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
Sub-Total $ -
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 16,150.00
IMPREVISTOS 3.00% $ 2,850.00
UTILIDAD 5.00% $ 4,750.00
Sub-Total $ 23,750
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ -
Sub-Total $ 250,000
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
Sub-Total $ -
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 42,500.00
IMPREVISTOS 3.00% $ 7,500.00
UTILIDAD 5.00% $ 12,500.00
Sub-Total $ 62,500
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ -
Sub-Total $ 95,000
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
Sub-Total $ -
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 16,150.00
IMPREVISTOS 3.00% $ 2,850.00
UTILIDAD 5.00% $ 4,750.00
Sub-Total $ 23,750
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (10%) % $ 1,034
COMPACTADOR MECANICO RANA HORA $ 7,500 0.05 $ 375
Sub-Total $ 1,409.07
Sub-Total $ 36,893
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.60 $ 10,341
Sub-Total $ 10,340.67
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 8,269.29
IMPREVISTOS 3.00% $ 1,459.29
UTILIDAD 5.00% $ 2,432.14
Sub-Total $ 12,161
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
HERRAMIENTA MENOR (10%) % $ 603
COMPACTADOR MECANICO RANA HORA $ 7,500 0.03 $ 188
Sub-Total $ 790.71
Sub-Total $ 11,698
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.35 $ 6,032
Sub-Total $ 6,032.06
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 3,148.48
IMPREVISTOS 3.00% $ 555.61
UTILIDAD 5.00% $ 926.02
Sub-Total $ 4,630
ITEM: 6.07
ENCHAPES LADRILLO PRENSADO
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,518.91
Sub-Total $ 40,195
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.70 $ 12,064
Sub-Total $ 12,064.11
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 9,142.31
IMPREVISTOS 3.00% $ 1,613.35
UTILIDAD 5.00% $ 2,688.92
Sub-Total $ 13,445
ITEM: 6.07
ENCHAPES LADRILLO PRENSADO
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,518.91
Sub-Total $ 40,195
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.70 $ 12,064
Sub-Total $ 12,064.11
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 9,142.31
IMPREVISTOS 3.00% $ 1,613.35
UTILIDAD 5.00% $ 2,688.92
Sub-Total $ 13,445
ITEM: 6.07
ENCHAPES LADRILLO PRENSADO
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 2,208.29
Sub-Total $ 48,595
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.10 $ 18,958
Sub-Total $ 18,957.89
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 11,859.38
IMPREVISTOS 3.00% $ 2,092.83
UTILIDAD 5.00% $ 3,488.05
Sub-Total $ 17,440
ITEM: 3.15
RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE
UNIDAD: M3
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 3,078.21
Sub-Total $ 37,440
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.70 $ 12,064
Sub-Total $ 12,064.11
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 8,938.99
IMPREVISTOS 3.00% $ 1,577.47
UTILIDAD 5.00% $ 2,629.12
Sub-Total $ 13,146
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 9,782.06
Sub-Total $ 232,846
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 7.00 $ 120,641
Sub-Total $ 120,641.11
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 61,755.82
IMPREVISTOS 3.00% $ 10,898.09
UTILIDAD 5.00% $ 18,163.48
Sub-Total $ 90,817
ITEM: 13.04
CAJA INSPECCIÓN DIMENSIONES INTERNAS= 60X60X60 CM. (INCLUYE
TAPA EN CONCRETO REFORZADO Y PAÑETE IMPERMEABILIZADO) UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 5,989.47
Sub-Total $ 129,802
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 5.50 $ 94,789
Sub-Total $ 94,789.44
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 39,198.82
IMPREVISTOS 3.00% $ 6,917.44
UTILIDAD 5.00% $ 11,529.07
Sub-Total $ 57,645
ITEM: 11.26
RED SUMINISTRO PVC 1/2"
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 215.43
Sub-Total $ 8,879
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.25 $ 4,309
Sub-Total $ 4,308.61
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 2,278.51
IMPREVISTOS 3.00% $ 402.09
UTILIDAD 5.00% $ 670.15
Sub-Total $ 3,351
ITEM: 11.26
RED SUMINISTRO PVC 1/2"
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 258.52
Sub-Total $ 19,853
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.30 $ 5,170
Sub-Total $ 5,170.33
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 4,297.90
IMPREVISTOS 3.00% $ 758.45
UTILIDAD 5.00% $ 1,264.09
Sub-Total $ 6,320
ITEM: 6.06
DINTELES EN VARILLA
UNIDAD: ML
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 728.21
Sub-Total $ 11,210
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.35 $ 6,032
Sub-Total $ 6,032.06
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 3,054.91
IMPREVISTOS 3.00% $ 539.10
UTILIDAD 5.00% $ 898.50
Sub-Total $ 4,493
ITEM: 6.26
MURO LADRILLO TOLETE COMUN 12 CM
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 876.88
Sub-Total $ 30,961
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.80 $ 13,788
Sub-Total $ 13,787.56
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 7,756.38
IMPREVISTOS 3.00% $ 1,368.77
UTILIDAD 5.00% $ 2,281.29
Sub-Total $ 11,406
ITEM: 6.09
MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO)
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,352.82
Sub-Total $ 59,328
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.20 $ 20,681
Sub-Total $ 20,681.33
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 13,831.58
IMPREVISTOS 3.00% $ 2,440.87
UTILIDAD 5.00% $ 4,068.11
Sub-Total $ 20,341
ITEM: 6.09
MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO)
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 258.52
Sub-Total $ 27,000
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.30 $ 5,170
Sub-Total $ 5,170.33
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 5,512.90
IMPREVISTOS 3.00% $ 972.87
UTILIDAD 5.00% $ 1,621.44
Sub-Total $ 8,107
ITEM: 6.09
MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO)
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 258.52
Sub-Total $ 32,000
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.30 $ 5,170
Sub-Total $ 5,170.33
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 6,362.90
IMPREVISTOS 3.00% $ 1,122.87
UTILIDAD 5.00% $ 1,871.44
Sub-Total $ 9,357
ITEM: 6.09
MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO)
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 258.52
Sub-Total $ 27,000
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.30 $ 5,170
Sub-Total $ 5,170.33
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 5,512.90
IMPREVISTOS 3.00% $ 972.87
UTILIDAD 5.00% $ 1,621.44
Sub-Total $ 8,107
ITEM: 6.09
MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO)
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 25.85
Sub-Total $ 3,000
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.03 $ 517
Sub-Total $ 517.03
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 602.29
IMPREVISTOS 3.00% $ 106.29
UTILIDAD 5.00% $ 177.14
Sub-Total $ 886
ITEM: 6.09
MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO)
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 51.70
Sub-Total $ 19,500
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.06 $ 1,034
Sub-Total $ 1,034.07
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 3,499.58
IMPREVISTOS 3.00% $ 617.57
UTILIDAD 5.00% $ 1,029.29
Sub-Total $ 5,146
ITEM: 3.17
RELLENO ARENA
UNIDAD: M3
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 517.03
Sub-Total $ 104,500
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.60 $ 10,341
Sub-Total $ 10,340.67
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 19,610.81
IMPREVISTOS 3.00% $ 3,460.73
UTILIDAD 5.00% $ 5,767.88
Sub-Total $ 28,839
ITEM: 6.33
SOPORTE MESON EN BLOQUE DE CONCRETO 60X90X10 CM
UNIDAD: UND
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,292.58
Sub-Total $ 695,180
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 1.50 $ 25,852
Sub-Total $ 25,851.67
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 122,795.04
IMPREVISTOS 3.00% $ 21,669.71
UTILIDAD 5.00% $ 36,116.19
Sub-Total $ 180,581
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 45,003.22
Sub-Total $ 609,219
III. TRANSPORTES
Material Unidad Cantidad Tarifa Valor-Unit.
VOLQUETA M3 VJ 4.00 $ 35,000 140,000
Sub-Total $ 140,000.00
Sub-Total $ 241,282.22
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 176,035.74
IMPREVISTOS 3.00% $ 31,065.13
UTILIDAD 5.00% $ 51,775.22
Sub-Total $ 258,876
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 20,426.61
Sub-Total $ 240,812
III. TRANSPORTES
Material Unidad Cantidad Tarifa Valor-Unit.
VOLQUETA M3 VJ 1.80 $ 35,000 63,000
Sub-Total $ 63,000.00
Sub-Total $ 120,641.11
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 75,629.55
IMPREVISTOS 3.00% $ 13,346.39
UTILIDAD 5.00% $ 22,243.99
Sub-Total $ 111,220
ITEM: 5.08
ENTREPISOS CASETÓN CON VIGAS, 3000 PSI H=0.30 m (SIN REFUERZO)
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 1,463.71
Sub-Total $ 28,786
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 0.85 $ 14,649
Sub-Total $ 14,649.28
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 7,632.91
IMPREVISTOS 3.00% $ 1,346.98
UTILIDAD 5.00% $ 2,244.97
Sub-Total $ 11,225
Precio unitario total aproximado al peso $ 56,124
ALCALDÍA MUNICIPAL DE IBAGUÉ SECRETARÍA
DE INFRAESTRUCTURA
ITEM: 5.08
ENTREPISOS CASETÓN CON VIGAS, 3000 PSI H=0.30 m (SIN REFUERZO)
UNIDAD: M2
I. EQUIPO
Descripción Tipo Tarifa/Hora Rendimiento Valor-Unit.
Sub-Total $ 16,159.81
Sub-Total $ 253,494
III. TRANSPORTES
Distancia
Material Cantidad (M3) Tarifa/M3-Km Valor-Unit.
(KM)
Sub-Total $ -
IV. MANO DE OBRA
Trabajador Jornal Prestaciones Jornal Total Rendimiento Valor-Unit.
CUADRILLA AA $ 10,138 1.70 $ 17,234 11.50 $ 198,196
Sub-Total $ 198,196.11
V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACIÓN 17.00% $ 79,534.49
IMPREVISTOS 3.00% $ 14,035.50
UTILIDAD 5.00% $ 23,392.50
Sub-Total $ 116,962