SUMMARY OF BILL OF QUANTITIES (R-1):

SL No Description Total weight Total Amount (Tk.)


(kg) Including VAT+ TAX
1 Ware House Expansion shed 26,701.00 4,279,865.00
2 Ware House Expansion Cover shed 11,805.00 1,721,549.00
Grand Total Amount = 38,506.00 6,001,414.00
BILL OF QUANTITIES
Date 22.07.2018
Name of Company Square Textile Limited (Unit-4)
Name of Project Warehouse Expansion Shed
Project Location Olipur, Habigonj.
Project Area 9540.00 sft o/o
Clear Height 20.00 ft,
Project Code MSSL-2018-07-09-0174-R2
A. Structural Framing Materials:
SL
Item Name SCOPE OF WORK Unit Quantity Rate (Tk.) Amount (Tk)
No.
STEEL WORKS Sft. 9,540.00
Supply of M.S. Foundation bolt of ASTM A36 Grade 36 will
1 Anchor Bolts be Galvanized as specified by ASTM and as per design & Kg 273.00 108.00 29,484.00
drawing.
Supply & Fabrication of structural steel member (Column,
2 MS Plate Beam, Rafter) will be Built-up ''I'' section of M.S. steel plate of Kg 11,008.00 110.00 1,210,880.00
ASTM A572, Grade-50 (Fy = 34.5 kN/cm2)
Supply & Fabrication of structural steel Purlin, Girts & Sag rod
either Z sections will be cold formed from Galvanized steel which
3 Purlin/Girt has a minimum yield strength of 345 Mpa (50,000 psi) and will Kg 6,357.00 114.00 724,698.00
conform to the physical specifications of ASTM A-653 (Grade
50) or equivalent.
Supply of Screw & high strength bolts of ATSM A325 M,
Nut and Bolts &
4 Class A (8.8)(Minimum Tensile Strength 120/125 ksi ) with nut & Kg 386.00 240.00 92,640.00
Screw
washer.
A. Sub-total of Framing Material = 2,057,702.00
B. Sheeting & Sheeting Accessories:
SL
Item Name Description Unit Quantity Rate (Tk.) Amount (Tk)
No.
Supply of Roof,Wall sheet & Ridging, flashing, gable trim and
Roof,Wall Sheet
corner trimmings, eve gutter, gutter Strip 0.47mm thick high
&
5 tensile steel color coated sheets(TATA Cottage Green) of Kg 6,127.00 200.00 1,225,400.00
Capping/Triming
yeild strength 550 Mpa, Top coat of silicon modified polyester
Accessories
paint, as per ASTM A792 / A792M unless otherwise stated.
B. Sub- Total of Sheeting & Accessories= 1,225,400.00
C. Building Accessories:
SL
Item Name Description Unit Quantity Rate (Tk.) Amount (Tk)
No.
6 Bird Mesh Supply of Bird Mesh for Insulation. Kg 1,635.00 230.00 376,050.00
7 Insulation Supply of 50.0mm thick Glass Wool for Roof. Kg 608.00 450.00 273,600.00
C. Sub-total of Building Accessories: = 649,650.00
D. Transportation & Erection:
SL
Item Name Description Unit Quantity Rate (Tk.) Amount (Tk)
No.
Transportation & Erection of pre-engineered welded Column,
Transportation &
8 fitting & fixing charge of Decking sheet in/c Capping etc (basis on Kg 26,701.00 13.00 347,113.00
Erection
floor area) per drawing all complete..
C. Sub- total of Transportation & Erection= 347,113.00
Total (A+B+C+D) = 4,279,865.00
Total Wt.(kg) = 26,701.00
Unit Tk/ Kg. = 160.29
In Wards: Fourty Two Lac Seventy Nine Thousand Eight Hundred Sixty Five Only.
Note: Above Cost is included from VAT & AIT.
Materials Tolerance ±5%
BILL OF QUANTITIES
Date 22.07.2018
Name of Company Square Textile Limited (Unit-4)
Name of Project Warehouse Expansion Cover Shed
Project Location Olipur, Habigonj.
Project Area 5122.00 sft o/o
Clear Height 18.00 ft,
Project Code MSSL-2018-07-09-0174-R2
A. Structural Framing Materials:
SL
Item Name SCOPE OF WORK Unit Quantity Rate (Tk.) Amount (Tk)
No.
STEEL WORKS Sft. 5,122.00
Supply & Fabrication of structural steel member (Column,
2 MS Plate Beam, Rafter) will be Built-up ''I'' section of M.S. steel plate of Kg 5,463.00 108.00 590,004.00
ASTM A572, Grade-50 (Fy = 34.5 kN/cm2)
Supply & Fabrication of structural steel Purlin, Girts & Sag rod
either Z sections will be cold formed from Galvanized steel which
3 Purlin/Girt has a minimum yield strength of 345 Mpa (50,000 psi) and will Kg 2,628.00 110.00 289,080.00
conform to the physical specifications of ASTM A-653 (Grade
50) or equivalent.
Supply of Screw & high strength bolts of ATSM A325 M,
Nut and Bolts,
4 Class A (8.8)(Minimum Tensile Strength 120/125 ksi ) with nut & Kg 185.00 240.00 44,400.00
Screw
washer.
A. Sub-total of Framing Material = 923,484.00
B. Sheeting & Sheeting Accessories:
SL
Item Name Description Unit Quantity Rate (Tk.) Amount (Tk)
No.
Supply of Roof,Wall sheet & Ridging, flashing, gable trim and
Roof,Wall Sheet
corner trimmings, eve gutter, gutter Strip 0.47mm thick high
&
5 tensile steel color coated sheets(TATA Cottage Green) of Kg 3,223.00 200.00 644,600.00
Capping/Triming
yeild strength 550 Mpa, Top coat of silicon modified polyester
Accessories
paint, as per ASTM A792 / A792M unless otherwise stated.
B. Sub- Total of Sheeting & Accessories= 644,600.00
C. Transportation & Erection:
SL
Item Name Description Unit Quantity Rate (Tk.) Amount (Tk)
No.
Transportation & Erection of pre-engineered welded Column,
Transportation &
6 fitting & fixing charge of Decking sheet in/c Capping etc (basis on Kg 11,805.00 13.00 153,465.00
Erection
floor area) per drawing all complete..
C. Sub- total of Transportation & Erection= 153,465.00
Total (A+B+C) = 1,721,549.00
Total Wt.(kg) = 11,805.00
Unit Tk/ Kg. = 145.83
In Wards: Seventeen Lac Twenty One Thousand Five Hundred Fourty Nine Only.
Note: Above Cost is included from VAT & AIT.