Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
PRODUCT CATALOG
About TOP-CO
Top-Co is a multinational corporation specialized in the design and manufacture of
casing equipment. We differentiate ourselves by providing fit-for-purpose applications
engineering support to help drilling and cementing engineers achieve long-term
wellbore integrity.
The company was founded in 1963 and today counts three manufacturing plants:
original facility in Edmonton, Alberta, strategically located manufacturing platform in
Weatherford, Texas, and a state-of-the-art facility conveniently located in Tianjin Free
Trade Zone, China.
Our products are manufactured and tested according to various API documents and are
distributed internationally through a network of agents and distributors operating in
most countries with oil and gas activities. We are reputed as a leading manufacturer
and supplier of reliable products backed by exceptional product support.
Product & Customer Support
100% of Top-Co’s specialized resources and core competencies are focused on casing
cementing solutions and hardware for oil, gas, and geothermal wells. With more than
50 years of providing fit-for-purpose solutions to solve challenges with casing running
and cementing, our responsive specialized technical staff provides product support
to our customers through strategically located global offices in USA, Canada, Mexico,
Colombia, United Arab Emirates, United Kingdom, Australia, China and Malaysia.
Leading Manufacturing Facility
Top-Co’s operations are vertically integrated in a lean manufacturing platform and our
specialized production facilities and large stocked inventory of immediately available
parts in regional markets translates into industry leading order fill performance standards.
Our certified production facilities include computer controlled machining centers,
electronically controlled heat treating conveyor lines, and a state-of-the-art testing facility
which is one of the most sophisticated in North America.
Industry Certification
Top-Co is certified to internationally recognized Quality Management Standards including
International Organization for Standardization (ISO) 9001:2008 and American Petroleum
Institute API Q1.
Required products are traceable in accordance with API Q1 specifications and are ISO
Quality Management System compliant. Top-Co maintains traceability and product
Company Profile
verification systems in all manufacturing processes for float equipment from receipt of
raw materials to shipment of finished goods.
Contents
TOP-CO’S FIT-FOR-PURPOSE PROPOSAL
Applications Engineering 4
Design Engineering 5
Research and Development 5
Quality Manufacturing and Certifications 6
Segments and Value Propositions 8
FLOAT EQUIPMENT
Overview 10
Plunger Style Float Equipment 10
Flapper Style Auto Fill Float Equipment 12
Guide Shoe 12
Insert Float Equipment 13
Optional Items 13
INNER STRING FLOAT EQUIPMENT
Overview 16
Inner String Equipment Accessories 16
STAGE CEMENTING EQUIPMENT
Overview 18
Sequence of Operation 19
CEMENTING PLUGS
Overview 22
Dimension Tables 24
CENTRALIZER SUBS
Overview 25
CENTRALIZERS and CASING ACCESSORIES
Overview 27
Welded Centralizers 27
Non-Weld Centralizers 28
Solid Body Centralizers 28
CASING ACCESSORIES
Stop Collars 30
Cement Baskets 31
Wellbore Cleaning Tools 31
Centralizer Installation 31
Specialty Equipment 31
Engineered Casing Centralization Programs 32
Applications Engineering
The fit-for-purpose concept consists of a technical procedure to better
select and recommend our equipment.
Analyzing the wellbore schematic and interacting with the drilling
engineer, Top-Co defines the general themes and operating practices
in the specific drilling area. These include bottomhole temperatures,
expected mud weights, planned tops of cement, potential depleted
zones, etc. By evaluating these parameters, we identify specific casing
running and cementing challenges that our equipment can address,
such as:
• High levels of torque.
• High levels of drag.
• Buckling (sinusoidal and helical).
• Differential pressure sticking.
• Tight annular clearances.
• Washout sections.
• Wellbore stability.
• Challenging trajectories.
• High temperature/high pressure.
• Gas migration.
• Weak formations.
• Tight pore/fracture pressure windows.
4
TOP-CO
Design Engineering
Top-Co’s design engineers are dedicated to bringing outstanding new products to market
and to continually improving existing product lines. Using classical analysis as well as
modern analytical tools (including Solidworks 3D modelling, finite element analysis,
and computational fluid dynamics software), we promise to:
• Stay on the cutting edge of innovation.
• Ensure our products are verified as fit-for-purpose.
Through these efforts, Top-Co’s team of Professional Engineers maintains the high standard
of product quality that is well known in the industry. Our commitment to future product
development will always be maintained in the forefront of our corporate strategy.
Products are validated in our state-of-the-art testing facility for performance
against industry standard specifications, customer requirements, and real world
operating conditions.
CAPABILITIES:
Flow loop
• Maximum flow rate of 22 bpm*.
• Maximum static pressure capability of 5,000 psi.
* through a flow diameter of 4”
High pressure / high temperature test chamber
• The maximum working temperature is 500°F (260°C) at a maximum working pres-
sure of 15,000 psi (103 MPa).
• The fixture is equipped with three temperature probes for measuring both internal
and external temperature of float equipment during testing process.
Centralizer test bench
• Maximum working diameter of 36” (centralizers).
• Maximum load force of 50,000 lb.
• Maximum cylinder stroke of 36”.
Quality Manufacturing
Utilizing modern production equipment, Top-Co ensures superior productivity performance and continuous compliance
with quality standards. All three Top-Co manufacturing facilities – United States, Canada, China - follow procedures
in accordance with international quality standards, including API Q1 and ISO 9001. Our international suite of quality
certifications reflects a corporate commitment to customer satisfaction, product conformance and reliability. Our Qual-
ity Management System clearly identifies individual and unique customer needs and ensures the communication of these
needs is facilitated throughout the entire organization and manufacturing process.
Operating processes reflect a full range of lean manufacturing and 5S principles. The operational excellence and
production teams are dedicated to process mapping to identify continuous improvement programs which are realized
in stable, predictable, and competitive pricing.
6
TOP-CO
Certifications
7
Fit-for-Purpose Casing, Cementing, and Completion Solutions
NOC
• Over 50 years’ experience.
• Reliable brand.
• Applications engineering training.
• Highly experienced tendering team.
• Quick quoting times.
Common to all
• Certified quality.
• Testing beyond API requirements.
• Truth in advertising.
• Superior customer service.
8
TOP-CO
Service Companies
Distributors
• Local support from our regional directors.
• Product availability and training.
• Forecasted inventory stocking plans.
• Market analysis.
• Brand equity.
9
Fit-for-Purpose Casing, Cementing, and Completion Solutions
FLOAT EQUIPMENT
OVERVIEW
tested
experts
Top-Co’s float equipment is a key component for
by
running casing and performing cementing operations.
During cementing operations, float equipment is
proven
essential for preventing back-flow while also
serving as a landing point for wiping and displacement
plugs. When surge pressures on the formation are
in the a concern, Top-Co’s float equipment can be configured
field
to auto-fill to prevent formation damage. Our float
equipment is manufactured to the highest quality
specifications and meets or exceeds the highest
API standards. Float equipment is available in sizes
2-3/8” (63mm) to 30” (762mm) with a number of
customizable options.
Spring
Cage
www.top-co.us
10 Technical Support Line: Phone: +1.780.440.4440 | Toll Free: +1.866.640.4440
FLOAT EQUIPMENT TOP-CO
Type 969
Premium Sidewinder™
Reamer Shoe
askus@top-co.us
Canada: +1.780.440.4440 | USA: +1.877.246.2612 11
Fit-for-Purpose Casing, Cementing, and Completion Solutions
Auto-Fill Equipment
Top-Co’s auto-fill equipment allows for automatic
filling of fluid within the casing, reducing casing Upper Flapper Body
running time by eliminating the need to fill
from surface as well as lowering surge pressures
on formations.
Flapper Assembly
Seat
Retaining Ring
O-ring
Main Body
Shear Screw
Guide Shoe
www.top-co.us
12 Technical Support Line: Phone: +1.780.440.4440 | Toll Free: +1.866.640.4440
FLOAT EQUIPMENT TOP-CO
OPTIONAL ITEMS
Nose Options
Design Options
Jets:
other
• Non-rotating plate.
• Ball catcher/deflector.
• Landing plate/baffle plate.
• Orifice.
• Latch-in plate.
askus@top-co.us
Canada: +1.780.440.4440 | USA: +1.877.246.2612 13
Fit-for-Purpose Casing, Cementing, and Completion Solutions
3” 4-1/4”
6-5/8” 20.00 - 32.00 8,892 8,537 12,933 12,418 16,585 16,064 17,783 17,074 21,821 21,135
7” 20.00 - 32.00 8,795 8,397 12,740 12,213 15,129 14,503 17,518 16,793 19,906 19,083
7-5/8” 20.00 - 39.00 8,014 7,615 11,657 11,076 14,957 14,321 15,820 15,230 19,675 18,838
8-5/8” 24.00 - 49.00 7,894 7,490 11,482 10,894 14,704 14,054 15,365 14,980 19,344 18,489
9-5/8” 32.30 - 53.50 7,632 7,220 11,101 10,501 14,206 13,531 14,383 14,439 18,471 17,809
10-3/4” 32.75 - 55.50 6,515 6,258 8,680 9,102 11,494 11,738 10,888 12,516 14,093 15,443
11-3/4” 42.00 - 71.00 5,947 5,926 7,832 8,619 10,371 11,109 9,680 11,851 12,565 14,618
13-3/8” 48.00 - 72.00 4,642 5,162 5,883 7,508 7,821 9,681 6,904 10,324 9,085 12,737
16” 65.00 - 109.00 4,141 4,869 5,134 7,082 6,807 9,113 5,838 9,738 7,707 11,993
18-5/8” 87.50 - 117.50 4,928 5,330 6,310 7,752 8,278 9,937 7,513 10,659 9,712 13,076
20” 94.00 - 133.00 3,045 4,228 4,077 6,480 4,650 7,905 4,130 8,456 5,242 10,401
www.top-co.us
14 Technical Support Line: Phone: +1.780.440.4440 | Toll Free: +1.866.640.4440
FLOAT EQUIPMENT TOP-CO
2” 4”
askus@top-co.us
Canada: +1.780.440.4440 | USA: +1.877.246.2612 15
Fit-for-Purpose Casing, Cementing, and Completion Solutions
engineered
Top-Co’s inner string cementing float equipment allows
large diameter casing strings to be cemented through the
drill pipe or tubing by stabbing/latching and sealing into
for the float shoe or collar. This eliminates the drill out of
cementing
large quantities of cement, reduces circulating times, and
reduces pumping pressures. Top-Co’s inner string cementing
large casing
float equipment utilizes the HFX® valve and is offered
with or without a latch-in feature on the stinger.
7” 5,000
7-5/8” 5,000
8-5/8” 5,000
9-5/8” 5,000
10-3/4” 5,000
11-3/4” 5,000
13-3/8” 5,000
16” 2,000
18-5/8” 1,700
20” 1,700
7" 20.00 - 32.00 8,795 8,397 12,740 12,213 15,129 14,503 17,518 16,793 19,906 19,083
7-5/8" 20.00 - 39.00 8,014 7,615 11,657 11,076 14,957 14,321 15,820 15,230 19,675 18,838
8-5/8" 24.00 - 49.00 7,894 7,490 11,482 10,894 14,704 14,054 15,365 14,980 19,344 18,489
9-5/8" 32.30 - 53.50 7,632 7,220 11,101 10,501 14,206 13,531 14,383 14,439 18,471 17,809
10-3/4" 32.75 - 55.50 6,515 6,258 8,680 9,102 11,494 11,738 10,888 12,516 14,093 15,443
11-3/4" 42.00 - 71.00 5,947 5,926 7,832 8,619 10,371 11,109 9,680 11,851 12,565 14,618
13-3/8" 48.00 - 72.00 4,642 5,162 5,883 7,508 7,821 9,681 6,904 10,324 9,085 12,737
16" 65.00 - 109.00 4,141 4,869 5,134 7,082 6,807 9,113 5,838 9,738 7,707 11,993
18-5/8" 87.50 - 117.50 4,928 5,330 6,310 7,752 8,278 9,937 7,513 10,659 9,712 13,076
20" 94.00 - 133.00 3,045 4,228 4,077 6,480 4,650 7,905 4,130 8,456 5,242 10,401
askus@top-co.us
Canada: +1.780.440.4440 | USA: +1.877.246.2612 17
Fit-for-Purpose Casing, Cementing, and Completion Solutions
OVERVIEW
effective
3 stage cement jobs. This reduces breakdown of weak
formations due to high hydrostatic pressure from a tall
for
cement
isolation around lost circulation zones. It also assists
in selectively placing cement over specific casing intervals.
Stage collars are available in different casing grades,
placement
weights, and thread connections. Plugsets are available
for each stage collar application and are ordered
separately. Both hydraulic and mechanical stage collars
are compatible for use with external casing packers.
A combination of two stage tools can be configured for
three stage cementing operations.
www.top-co.us
18 Technical Support Line: Phone: +1.780.440.4440 | Toll Free: +1.866.640.4440
STAGE CEMENTING EQUIPMENT TOP-CO
Sequence of Operation
Step 1- Stage collar in ‘running-in’ and first stage cementing position. First stage shut-off plug will pass through stage
cementing collar while displacing first stage cement, landing on baffle plate located in float collar.
Step 2- HYDRAULIC opening: Opening sleeve is shifted down by applying hydraulic casing pressure, allowing second stage
cement to be displaced through the ports.
Step 2- MECHANICAL opening: Opening dart is dropped (free-fall), and landed in the opening seat. casing pressure is
applied, the opening sleeve is shifted to the open position allowing second stage cement to be displaced through
the ports.
Step 3- Once the second stage cement job is complete, the closing plug lands in the stage cementing collar closing seat.
Application of casing pressure shears the shear screws and pushes the closing sleeve to the closed and locked
position, sealing off the ports. This completes the two stage cement job. (Hydraulic operation works the same,
but no opening dart will be present).
4 N/A 900 - 3,600 1,300 - 1,600 9,800 9,903 13,475 12,630 400 5.250 2.780
5-3/4 19.5 - 23 900 - 3,600 900 - 1,200 7,350 5,604 10,106 6,507 400 7.000 5.090
20 - 24 5.934
6-5/8 900 - 3,600 900 - 1,200 6,431 3,992 8,842 4,587 400 8.000
28 - 32 5.675
20 - 26 6.351
7 900 - 3600 800 - 1,100 6,236 3,650 8,575 4,271 400 8.250
29 - 32 6.161
26.4 - 29.7 6.854
7-5/8 900 - 3,600 800 - 1,100 5,717 3,053 7,860 3,427 400 9.000
33.7 - 39 6.760
8-5/8 28 - 32 900 - 3,600 600 - 900 5,977 3,351 8,218 3,850 400 10.125 7.902
32.3 - 36 8.855
9-5/8 900 - 3,600 500 - 800 5,440 2,738 7,480 2,978 400 11.125
40 - 53.5 8.689
40.5 - 45.5 9.904
10-3/4 700 - 2,800 300 - 600 5,629 2,953 7,739 3,284 400 12.250
51 - 60.7 9.704
47 - 54 10.880
11-3/4 650 - 2,600 300 - 600 6,935 4,877 9,536 5,472 400 13.630
60 - 64 10.682
12-3/4 N/A 650 - 2,600 300 - 600 5,814 3,164 7,993 3,584 400 14.750 11.886
13-3/8 61 - 72 625 - 2,500 300 - 600 5,717 3,053 7,860 3,427 400 15.000 12.375
NOTE:
1. Casing weight ranges apply to API 8RD and Buttress connections only.
2. Opening pressure can be adjusted by varying the number of shear screws.
www.top-co.us
20 Technical Support Line: Phone: +1.780.440.4440 | Toll Free: +1.866.640.4440
STAGE CEMENTING EQUIPMENT TOP-CO
4 N/A 700 - 1,000 1,300 - 1,600 9,800 9,903 13,475 12,630 400 5.250 2.780
9.5 - 11.6 3.975
4-1/2 700 - 1,000 1,200 - 1,500 8,948 8,408 12,303 15,500 400 5.750
13.5 - 15.1 3.805
11.5 - 13 4.445
5 700 - 1,000 1,000 - 1,300 8,252 7,152 11,319 8,711 400 6.250
15 - 18 4.293
14 - 15.5 4.897
5-1/2 500 - 800 700 - 1,000 7,813 6,417 11,033 8,192 400 6.625
17 - 20 4.835
5-3/4 19.5 - 23 600 - 900 900 - 1,200 7,350 5,604 10,106 6,507 400 7.000 5.090
20 - 24 5.934
6-5/8 600 - 900 900 - 1,200 6,421 3,992 8,842 4,587 400 8.000
28 - 32 5.675
20 - 26 6.351
7 500 - 800 800 - 1,100 6.236 3,650 8,575 4,271 400 8.250
29 - 32 6.161
26.4 - 29.7 6.854
7-5/8 500 - 800 800 - 1,100 5,717 3,053 7,860 3,427 400 9.000
33.7 - 39 6.760
8-5/8 28 - 32 400 - 700 600 - 900 5,977 3,351 8,218 3,850 400 10.125 7.902
32.3 - 36 8.855
9-5/8 400 - 700 500 - 800 5,440 2,738 7,480 2,978 400 11.125
40 - 53.5 8.689
40.5 - 45.5 9.904
10-3/4 200 - 500 300 - 600 5,629 2,953 7,739 3,284 400 12.250
51 - 60.7 9.704
47 - 54 10.880
11-3/4 200 - 500 300 - 600 6,925 4,877 9,536 5,472 400 13.630
60 - 64 10.682
12-3/4 N/A 200 - 500 300 - 600 5,814 3,164 7,993 3,584 400 14.750 11.886
13-3/8 61 - 72 200 - 500 300 - 600 5,717 3,053 7,860 3,427 400 15.000 12.375
NOTE:
Casing weight ranges apply to API 8RD and Buttress connections only.
askus@top-co.us
Canada: +1.780.440.4440 | USA: +1.877.246.2612 21
Fit-for-Purpose Casing, Cementing, and Completion Solutions
CEMENTING PLUGS
designed
OVERVIEW
and Top-Co’s cementing plugs are used during cementing operations for
tested
wiping the casing ID clean of drilling fluids and providing separation
between mud, spacers, and cement. They also prevent over displacement
superior
of the cement slurry and indicate when the cementing job is complete. All
for
performance
Type 247/248 - Top and Bottom, Non-Rotating Phenolic Core Plugs
• Requires Top-Co float collar with non-rotating plate installed.
• Phenolic core cementing plugs with integral teeth.
• Wiping fins are molded from natural rubber or hydrogenated nitrile (HNBR).
• Temperature rating (°F): -65 to 180 (Standard); -40 to 300 (High Temp).
• PDC drillable.
www.top-co.us
22 Technical Support Line: Phone: +1.780.440.4440 | Toll Free: +1.866.640.4440
CEMENTING PLUGS TOP-CO
askus@top-co.us
Canada: +1.780.440.4440 | USA: +1.877.246.2612 23
Fit-for-Purpose Casing, Cementing, and Completion Solutions
Dimension Tables
A B C C
BUMP PRES-
SIZE WEIGHT RANGE “A” “B” “C” “D” “E”
SURE
(in) (lb/ft) (in) (in) (in) (in) (in)
(psi)
SIZE BUMP PRESSURE BACK PRESSURE* “A” “B” “C” “D” “E” “F”
(in) (psi) (psi) (in) (in) (in) (in) (in) (in)
www.top-co.us
24 Technical Support Line: Phone: +1.780.440.4440 | Toll Free: +1.866.640.4440
TOP-CO
CENTRALIZER SUBS
OVERVIEW
endure
from mechanical stock tubing, the centralizer subs are designed to
perform in wells containing tight clearances and under-reamed hole
sections. Additionally, Top-Co’s customization capabilities allow
extreme
the sub design to match the exact needs of most well and casing
programs. Combined with Top-Co’s expert Applications Engineering
team and the simulations offered, the centralizer subs meet specific
Advantages:
• Compression of the bow springs between the vanes ensures their protection
when going through dog legs and tight clearances.
• The solid vanes guarantee a minimum standoff when higher than expected
side forces are encountered.
• Stress caused by inadvertent rotation is distributed evenly around the collar
instead of being concentrated on a single bow, reducing the risk of failure.
• Vane dimensions are customizable to increase flow by area and standoff.
• Particularly well suited for reciprocation.
• The centralizer will stay in place due to the notched collar design.
Top‐Co’s Type 360 ‐ D2®
• Guaranteed stand-off that will lead to improved mud displacement and cementing. (D Squared) Bow Spring Centralizer
Sub is covered by US Patent 3484803
/7140432 & Trademark 72186499
askus@top-co.us
Canada: +1.780.440.4440 | USA: +1.877.246.2612 25
Fit-for-Purpose Casing, Cementing, and Completion Solutions
www.top-co.us
26 Technical Support Line: Phone: +1.780.440.4440 | Toll Free: +1.866.640.4440
TOP-CO
for successful Top-Co’s centralizers and casing accessories are designed and man-
cementing
ufactured to assist casing running and cementing. Starting, Running
and Restoring force tests performed in Top-Co’s Test Facility as per API
Specification 10D, and holding force tests as per API Recommended
and Practice 10D-2. The tests are conducted at Top-Co’s state-of-the-art
CENTRALIZERS
Welded Centralizers
askus@top-co.us
Canada: +1.780.440.4440 | USA: +1.877.246.2612 27
Fit-for-Purpose Casing, Cementing, and Completion Solutions
Non-Weld Centralizers
-0.2
TOP-CO TOP-CO
-0.4
Depth Profile (mm)
-0.6
-0.8
-1
-1.2
Competitor
Competitor
-1.4
• 5.5 times less volume loss with Top-Co’s Top Reach Glider®
Abrasion testing was performed on a Linear Abraser Model 5750 from Taber Industries. The test method was based on ASTM G133 speci-
fications, with the following deviations:
1. Specimens were cut and machined from the centralizers and used as is.
2. Abradant: H-22 Wearaser®- Verified, coarse; material Alumina Silicate; size diameter 6.35 mm (1/4”).
3. Normal force: 24.0 N.
4. Stroke length: 12.5 mm.
5. Oscillating frequency: 1.25 Hz.
6. Test durations: 53 min 20 s (sliding distance =100 m).
Equipment Description
CNC Mill Fadal VMC5020A
Boring Bar Material: Steel, Diameter 0.50”, Length: 6” Insert
Carbide Insert Smooth Finish Style TCMT-21.52, Insert Size: 0.25”, Thick-
ness: 0.09375”, Tip Radius: 0.03125”
Vise Kurt Anglock D688
Competitor
CASING ACCESSORIES
Stop Collars
Type 405 - Hinged with Bolt
• Bolt lock mechanism allows for quick and easy installation over casing.
• Holding force tested as per API Recommended Practice 10D-2.
Type 410 - Hinged with Spiral Nails
• Utilizes spiral locking pins which, when driven in firmly, lock the collar into posi-
tion around the casing.
• Sizes less than 13-3/8” use two spiral locking nails.
• Sizes 13-3/8” and greater use four spiral locking nails.
• Holding force tested as per API Recommended Practice 10D-2.
Cement Baskets
Type 400 - Welded, Hinged/ Slip On
• Design allows cement to flow in an upward direction and helps support the
hydrostatic column of fluid.
• Typically run above weak formations requiring protection from the pressure
exerted by the cement column.
• Also available is Type 403 Cement Basket – slip-on with internal stop collar.
Centralizer Installation
Preferred installation is over the stop collar. This allows
for the bow spring centralizer to be pulled into the hole
during run-in (Fig 1). Pushing the centralizer will increase
starting and running forces and may damage the bows.
Placement over the coupling eliminates need for stop
collar but can reduce standoff at midspan (Fig 2).
For solid body centralizers, stop collars are recommended
to be placed above and below centralizer (Fig 3),
but can also be installed between collar and coupling
(Fig 4), or they are installed to float between couplings.
Specialty Equipment
Type 100 - API Modified High Pressure Thread Compound
• Excellent lubrication qualities to prevent galling and wear of threads.
• Manufactured to API BUL 5A3 requirements.
• Brushable over a wide temperature range.
• Leak prevention to 10,000 psi.
• Not recommended for rotary shoulder connections.
• Available as a lead-free option.
ABSTRACT
Fit-for-purposed engineered casing centralization programs, based on actual downhole conditions AND drilling practices,
can help to minimize the compromise between getting casing to bottom and achieving good zonal isolation. Pre and post
installation analysis must be conducted to identify the main expected challenges and implement mitigating techniques.
Close communication between operator and manufacturer increases the chances of success.
CONSIDERATIONS
BALANCING COMPETING FORCES
• Review and evaluate previous casing centralization programs.
• Centralizer OD: improves stand-off but increases drag.
• Discuss with the drilling engineer past experiences in
running casing in the area. • Centralization at mid-span: improves mud removal but allows
couplings to increase drag.
• If available, obtain relevant data from offset wells.
• Installation over coupling: reduces drag but reduces removal of
• Competency of formations. excess mud cake (differential pressure sticking).
• Type of formations and abrasiveness. • Installation over coupling: reduces drag but reduces stand-off.
• Location of permeable formations. • Higher restoring forces: better stand-off but higher “stiffness”.
• Location and severity of washout sections. • Semi-rigid centralizers: higher restoring forces but lower
• Wellbore stability concerns. performance in washouts.
• Drilling mud type (OBM, WBM). • Polymer centralizers: lower coefficient of friction but lower
wear resistance.
• Define maximum bottomhole temperature.
• Fixed to casing: overcomes drag but increases torque.
• Type of bottom hole assembly.
• Spiral blades: promote fluid agitation but “bulldoze” cuttings.
• Type of stabilizers.
• Straight blades: reduced drag but less “bridging” effect.
• Casing running practices.
• Two smaller centralizers versus one larger centralizer.
• Discuss with the production engineer zonal isolation issues
or concerns. • Stop collars: improve positioning but take longer to install.
• If available, discuss results from micro-seismic. • Floating installation: easier reciprocation but less mud removal.
• Consider formation pressure windows and ECD concerns • Blade count: higher stability but lower flow by area.
during cementing.
• Define cementing objectives.
www.top-co.us
32 Technical Support Line: Phone: +1.780.440.4440 | Toll Free: +1.866.640.4440
TOP-CO
BUCKLING:
none
sinusodial
helical
• Analyze development of side forces during casing run and define centralizer types accordingly
(check shallow doglegs).
• Determine rotation requirements and select centralizer type and installation mode accordingly.
• Consider casing to centralizer coefficient of friction.
• Evaluate stand-off at mid-span.
• Evaluate changes in stand-off throughout the cement job.
• Consider spacing based on swirl length.
• Evaluate displacing efficiencies for a given stand-off profile.
• Consider perforation intervals.
• Discuss centralization program and installation procedures with field personnel.
• Conduct post installation analysis and calibration.
• Implement gradual changes based on casing running issues and zonal isolation success.
• Develop field-specific Standard Operating Procedures.
askus@top-co.us
Canada: +1.780.440.4440 | USA: +1.877.246.2612 33
Fit-for-Purpose Casing, Cementing, and Completion Solutions
www.top-co.us
34 Technical Support Line: Phone: +1.780.440.4440 | Toll Free: +1.866.640.4440
TOP-CO
TOP-CO Worldwide
United States | Canada | Mexico | Colombia | United Kingdom | United Arab Emirates | Malaysia | China | Australia
askus@top-co.us
Canada: +1.780.440.4440 | USA: +1.877.246.2612 35
TM
Corporate Office
Beltway Antoine Business Center
3433 N. Sam Houston Parkway W.
Suite 404
Houston, Texas 77086
Phone: +1.832.300.3660
Toll Free: +1.877.246.2612
7720-17 Street NW
Edmonton, Alberta T6P 1S7
Phone: +1.780.440.4440
Toll Free: +1.866.640.4440
www.top-co.us
askus@top-co.us
PC-01-2015-R7