Sei sulla pagina 1di 188

Perhitungan Hydrolis Desa Ka

Kriteria Desain :

Kebut. Air = 60 lt / org / hari


Pertumbuhan Pddk = 1.9 % / thn
Periode Desain = 15 thn
Faktor Harian Puncak, jp = 1.1
Minor Loss = 10 %

DATA BEBAN NODE BEBAN P


No Jalur Node Elevasi Beda Tinggi Pjg Pipa Slope Jmlh. Pddk Kebuth. Air Jmlh. Pddk Kebut. Air Kebut air Jmlh. Pddk
Pipa h ^h L S yg dilayani Proy 15 thn Proy 15 thn jam puncak yg disuplai
(+ m) (m) (m) (%) (jiwa) (lt/d) (jiwa) (lt/dt) (l/dt) (jiwa)

PMA 180.00 4.00 50


1 PMA P1 176.00 4.00 50 8.00 1542 1.07 2045 1.42 1.56 1542
2 P1 P2 172.00 1.00 50 2.00 1542 1.07 2045 1.42 1.56 1542
3 P2 P3 171.00 3.00 50 6.00 1542 1.07 2045 1.42 1.56 1542
4 P3 P4 168.00 1.00 50 2.00 1542 1.07 2045 1.42 1.56 1542
5 P4 P5 167.00 3.00 50 6.00 1542 1.07 2045 1.42 1.56 1542
6 P5 P6 164.00 1.00 50 2.00 1542 1.07 2045 1.42 1.56 1542
7 P6 P7 163.00 3.00 50 6.00 1542 1.07 2045 1.42 1.56 1542
8 P7 P8 160.00 2.00 50 4.00 1542 1.07 2045 1.42 1.56 1542
9 P8 P9 158.00 -6.00 50 (12.00) 1542 1.07 2045 1.42 1.56 1542
10 P9 P10 164.00 3.00 50 6.00 1542 1.07 2045 1.42 1.56 1542
11 P10 P11 161.00 4.00 50 8.00 1542 1.07 2045 1.42 1.56 1542
12 P11 P12 157.00 -1.00 50 (2.00) 1542 1.07 2045 1.42 1.56 1542
13 P12 P13 158.00 0.00 50 0.00 1542 1.07 2045 1.42 1.56 1542
14 P13 P14 158.00 -1.00 50 (2.00) 1542 1.07 2045 1.42 1.56 1542
15 P14 P15 159.00 -8.00 50 (16.00) 1542 1.07 2045 1.42 1.56 1542
16 P15 P16 167.00 0.00 50 0.00 1542 1.07 2045 1.42 1.56 1542
17 P16 P17 167.00 1.00 50 2.00 1542 1.07 2045 1.42 1.56 1542
18 P17 P18 166.00 -1.00 50 (2.00) 1542 1.07 2045 1.42 1.56 1542
19 P18 P19 167.00 2.00 50 4.00 1542 1.07 2045 1.42 1.56 1542
20 P19 P20 165.00 6.00 50 12.00 1542 1.07 2045 1.42 1.56 1542
21 P20 P21 159.00 12.00 50 24.00 1542 1.07 2045 1.42 1.56 1542
22 P21 P22 147.00 8.00 50 16.00 1542 1.07 2045 1.42 1.56 1542
23 P22 P23 139.00 3.00 50 6.00 1542 1.07 2045 1.42 1.56 1542
24 P23 P24 136.00 4.00 50 8.00 1542 1.07 2045 1.42 1.56 1542
25 P24 P25 132.00 6.00 50 12.00 1542 1.07 2045 1.42 1.56 1542
PENTIL 132.00
26 P25 P26 126.00 4.00 50 8.00 1542 1.07 2045 1.42 1.56 1542
27 P26 P27 122.00 2.00 50 4.00 1542 1.07 2045 1.42 1.56 1542
28 P27 P28 120.00 5.00 50 10.00 1542 1.07 2045 1.42 1.56 1542
29 P28 P29 115.00 7.00 50 14.00 1542 1.07 2045 1.42 1.56 1542
30 P29 P30 108.00 4.00 50 8.00 1542 1.07 2045 1.42 1.56 1542
31 P30 P31 104.00 2.00 50 4.00 1542 1.07 2045 1.42 1.56 1542
32 P31 P32 102.00 0.00 50 0.00 1542 1.07 2045 1.42 1.56 1542
33 P32 P33 102.00 1.00 50 2.00 1542 1.07 2045 1.42 1.56 1542
34 P33 P34 101.00 3.00 50 6.00 1542 1.07 2045 1.42 1.56 1542
35 P34 P35 98.00 3.00 50 6.00 1542 1.07 2045 1.42 1.56 1542
36 P35 P36 95.00 2.00 50 4.00 1542 1.07 2045 1.42 1.56 1542
37 P36 P37 93.00 2.00 50 4.00 1542 1.07 2045 1.42 1.56 1542
38 P37 P38 91.00 3.00 50 6.00 1542 1.07 2045 1.42 1.56 1542
PENTIL 91.00
39 P38 P39 88.00 2.00 50 4.00 1542 1.07 2045 1.42 1.56 1542
40 P39 P40 86.00 2.00 50 4.00 1542 1.07 2045 1.42 1.56 1542
41 P40 P41 84.00 3.00 50 6.00 1542 1.07 2045 1.42 1.56 1542
42 P41 P42 81.00 3.00 50 6.00 1542 1.07 2045 1.42 1.56 1542
43 P42 P43 78.00 1.00 50 2.00 1542 1.07 2045 1.42 1.56 1542
45 P43 P44 77.00 2.00 50 4.00 1542 1.07 2045 1.42 1.56 1542
46 P44 P45 75.00 1.00 50 2.00 1542 1.07 2045 1.42 1.56 1542
47 P46 P47 74.00 1.00 50 2.00 1542 1.07 2045 1.42 1.56 1542
48 P47 P48 73.00 3.00 50 6.00 1542 1.07 2045 1.42 1.56 1542
49 P48 P49 70.00 2.00 50 4.00 1542 1.07 2045 1.42 1.56 1542
50 P49 P50 68.00 -2.00 50 (4.00) 1542 1.07 2045 1.42 1.56 1542
51 P50 P51 70.00 -2.00 50 (4.00) 1542 1.07 2045 1.42 1.56 1542
52 P51 P52 72.00 -2.00 50 (4.00) 1542 1.07 2045 1.42 1.56 1542
53 P52 P53 74.00 -1.00 50 (2.00) 1542 1.07 2045 1.42 1.56 1542
54 P53 P54 75.00 1.00 50 2.00 1542 1.07 2045 1.42 1.56 1542
55 P54 P55 74.00 3.00 50 6.00 1542 1.07 2045 1.42 1.56 1542
56 P55 P56 71.00 3.00 50 6.00 1542 1.07 2045 1.42 1.56 1542
57 P56 P57 68.00 1.00 50 2.00 1542 1.07 2045 1.42 1.56 1542
58 P57 P58 67.00 5.00 50 10.00 1542 1.07 2045 1.42 1.56 1542
59 P58 P59 62.00 6.00 50 12.00 1542 1.07 2045 1.42 1.56 1542
60 P59 P60 56.00 2.00 50 4.00 1542 1.07 2045 1.42 1.56 1542
61 P60 P61 54.00 2.00 50 4.00 1542 1.07 2045 1.42 1.56 1542
62 P61 P62 52.00 2.00 50 4.00 1542 1.07 2045 1.42 1.56 1542
63 P62 P63 50.00 -1.00 50 (2.00) 1542 1.07 2045 1.42 1.56 1542
64 P63 P64 51.00 -1.00 50 (2.00) 1542 1.07 2045 1.42 1.56 1542
65 P64 P65 52.00 1.00 50 2.00 1542 1.07 2045 1.42 1.56 1542
66 P65 P66 51.00 0.00 50 0.00 1542 1.07 2045 1.42 1.56 1542
67 P66 P67 51.00 -3.00 50 (6.00) 1542 1.07 2045 1.42 1.56 1542
68 P67 P68 54.00 -5.00 50 (10.00) 1542 1.07 2045 1.42 1.56 1542
69 P68 RES 59.00 5.00 50 10.00 1542 1.07 2045 1.42 1.56 1542
3,450 1542 0.83 1542 96.57 3181.40

2295.366493
Desa Kanjopang
Formula Hazen William :
S (slope) = ( ^H/L)*100
D (diam) teoritis = ((3.59*Q*10^6)/(S^0.54*C))^0.38
Hloss / 100 m = ((3.59*Q*10^6)/(D^2.63*C))^1.85
V = 4*Q/1000(3.14*(D/1000)^2)

BEBAN PIPA PERHITUNGAN HEAD LOSS


Jmlh. Pddk Flow Flow Koeff HW Diam. Pipa Diam. Pipa Hloss Total Hloss HGL Sisa Kcptan
Proy 15 thn Jam Puncak C D teoritis D desain per 100 m (+10% minor) Tekan V
(jiwa) (lt/dt) (lt/dt) (mm) (mm) (m) (m) (m) (m) (m/dtk)

180.00
2045 1.42 1.56 120 38.83 63.00 0.77 0.42 179.58 3.58 0.50
2045 1.42 1.56 120 51.61 63.00 0.77 0.42 179.16 7.16 0.50
2045 1.42 1.56 120 41.19 63.00 0.77 0.42 178.74 7.74 0.50
2045 1.42 1.56 120 51.61 63.00 0.77 0.42 178.32 10.32 0.50
2045 1.42 1.56 120 41.19 63.00 0.77 0.42 177.89 10.89 0.50
2045 1.42 1.56 120 51.61 63.00 0.77 0.42 177.47 13.47 0.50
2045 1.42 1.56 120 41.19 63.00 0.77 0.42 177.05 14.05 0.50
2045 1.42 1.56 120 44.76 63.00 0.77 0.42 176.63 16.63 0.50
2045 1.42 1.56 120 35.73 63.00 0.77 0.42 176.21 18.21 0.50
2045 1.42 1.56 120 41.19 63.00 0.77 0.42 175.79 11.79 0.50
2045 1.42 1.56 120 38.83 63.00 0.77 0.42 175.37 14.37 0.50
2045 1.42 1.56 120 51.61 63.00 0.77 0.42 174.95 17.95 0.50
2045 1.42 1.56 120 #DIV/0! 63.00 0.77 0.42 174.52 16.52 0.50
2045 1.42 1.56 120 51.61 63.00 0.77 0.42 174.10 16.10 0.50
2045 1.42 1.56 120 33.68 63.00 0.77 0.42 173.68 14.68 0.50
2045 1.42 1.56 120 #DIV/0! 63.00 0.77 0.42 173.26 6.26 0.50
2045 1.42 1.56 120 51.61 63.00 0.77 0.42 172.84 5.84 0.50
2045 1.42 1.56 120 51.61 63.00 0.77 0.42 172.42 6.42 0.50
2045 1.42 1.56 120 44.76 63.00 0.77 0.42 172.00 5.00 0.50
2045 1.42 1.56 120 35.73 63.00 0.77 0.42 171.58 6.58 0.50
2045 1.42 1.56 120 30.99 63.00 0.77 0.42 171.15 12.15 0.50
2045 1.42 1.56 120 33.68 63.00 0.77 0.42 170.73 23.73 0.50
2045 1.42 1.56 120 41.19 63.00 0.77 0.42 170.31 31.31 0.50
2045 1.42 1.56 120 38.83 63.00 0.77 0.42 169.89 33.89 0.50
2045 1.42 1.56 120 35.73 63.00 0.77 0.42 169.47 37.47 0.50
132.00
2045 1.42 1.56 120 38.83 63.00 0.77 0.42 131.58 5.58 0.50
2045 1.42 1.56 120 44.76 63.00 0.77 0.42 131.16 9.16 0.50
2045 1.42 1.56 120 37.09 63.00 0.77 0.42 130.74 10.74 0.50
2045 1.42 1.56 120 34.62 63.00 0.77 0.42 130.32 15.32 0.50
2045 1.42 1.56 120 38.83 63.00 0.77 0.42 129.89 21.89 0.50
2045 1.42 1.56 120 44.76 63.00 0.77 0.42 129.47 25.47 0.50
2045 1.42 1.56 120 #DIV/0! 63.00 0.77 0.42 129.05 27.05 0.50
2045 1.42 1.56 120 51.61 63.00 0.77 0.42 128.63 26.63 0.50
2045 1.42 1.56 120 41.19 63.00 0.77 0.42 128.21 27.21 0.50
2045 1.42 1.56 120 41.19 63.00 0.77 0.42 127.79 29.79 0.50
2045 1.42 1.56 120 44.76 63.00 0.77 0.42 127.37 32.37 0.50
2045 1.42 1.56 120 44.76 63.00 0.77 0.42 126.95 33.95 0.50
2045 1.42 1.56 120 41.19 63.00 0.77 0.42 126.52 35.52 0.50
91.00
2045 1.42 1.56 120 44.76 63.00 0.77 0.42 90.58 2.58 0.50
2045 1.42 1.56 120 44.76 63.00 0.77 0.42 90.16 4.16 0.50
2045 1.42 1.56 120 41.19 63.00 0.77 0.42 89.74 5.74 0.50
2045 1.42 1.56 120 41.19 63.00 0.77 0.42 89.32 8.32 0.50
2045 1.42 1.56 120 51.61 63.00 0.77 0.42 88.89 10.89 0.50
2045 1.42 1.56 120 44.76 63.00 0.77 0.42 88.47 11.47 0.50
2045 1.42 1.56 120 51.61 63.00 0.77 0.42 88.05 13.05 0.50
2045 1.42 1.56 120 51.61 63.00 0.77 0.42 87.63 13.63 0.50
2045 1.42 1.56 120 41.19 63.00 0.77 0.42 87.21 14.21 0.50
2045 1.42 1.56 120 44.76 63.00 0.77 0.42 86.79 16.79 0.50
2045 1.42 1.56 120 44.76 63.00 0.77 0.42 86.37 18.37 0.50
2045 1.42 1.56 120 44.76 63.00 0.77 0.42 85.95 15.95 0.50
2045 1.42 1.56 120 44.76 63.00 0.77 0.42 85.52 13.52 0.50
2045 1.42 1.56 120 51.61 63.00 0.77 0.42 85.10 11.10 0.50
2045 1.42 1.56 120 51.61 63.00 0.77 0.42 84.68 9.68 0.50
2045 1.42 1.56 120 41.19 63.00 0.77 0.42 84.26 10.26 0.50
2045 1.42 1.56 120 41.19 63.00 0.77 0.42 83.84 12.84 0.50
2045 1.42 1.56 120 51.61 63.00 0.77 0.42 83.42 15.42 0.50
2045 1.42 1.56 120 37.09 63.00 0.77 0.42 83.00 16.00 0.50
2045 1.42 1.56 120 35.73 63.00 0.77 0.42 82.58 20.58 0.50
2045 1.42 1.56 120 44.76 63.00 0.77 0.42 82.15 26.15 0.50
2045 1.42 1.56 120 44.76 63.00 0.77 0.42 81.73 27.73 0.50
2045 1.42 1.56 120 44.76 63.00 0.77 0.42 81.31 29.31 0.50
2045 1.42 1.56 120 51.61 63.00 0.77 0.42 80.89 30.89 0.50
2045 1.42 1.56 120 51.61 63.00 0.77 0.42 80.47 29.47 0.50
2045 1.42 1.56 120 51.61 63.00 0.77 0.42 80.05 28.05 0.50
2045 1.42 1.56 120 #DIV/0! 63.00 0.77 0.42 79.63 28.63 0.50
2045 1.42 1.56 120 41.19 63.00 0.77 0.42 79.21 28.21 0.50
2045 1.42 1.56 120 37.09 63.00 0.77 0.42 78.78 24.78 0.50
2045 1.42 1.56 120 37.09 63.00 0.77 0.42 78.36 19.36 0.50
Perhitungan Hydrolis Des
Kriteria Desain :

Kebut. Air = 60.0 lt / org / hari


Pertumbuhan Pddk = 1.9 % / thn
Periode Desain = 15.0 thn
Faktor Jam Puncak, jp = 1.5
Minor Loss = 10.0 %

DATA BEBAN NODE


No Elevasi Beda Tinggi Pjg Pipa Slope Jmlh. Pddk Kebuth. Air Jmlh. Pddk Kebut. Air
Node
jalur pipa h ^h L S yg dilayani Proy 15 thn Proy 15 thn
(+ m) (m) (m) (%) (jiwa) (lt/d) (jiwa) (lt/dt)

RES 1 58.0 0 0.00 0 0.00


1 RES - 1 1 51.0 7.00 50 14.00 0 0.00 0 0.00
2 1 - 2 2 49.0 2.00 50 4.00 0 0.00 0 0.00
3 2 - 3 3 49.0 0.00 50 0.00 0 0.00 0 0.00
4 3 - 4 4 46.0 3.00 50 6.00 0 0.00 0 0.00
5 4 - 5 5 44.0 2.00 50 4.00 0 0.00 0 0.00
6 5 - 6 6 44.0 0.00 50 0.00 0 0.00 0 0.00
7 6 - 7 7 44.0 0.00 50 0.00 0 0.00 0 0.00
7 8 8 45.0 -1.00 50 (2.00) 0 0.00 0 0.00
8 8 - 9 9 40.0 5.00 50 10.00 0 0.00 0 0.00
9 9 - 10 10 38.0 2.00 50 4.00 0 0.00 0 0.00
10 10 - 11 11 34.0 4.00 50 8.00 0 0.00 0 0.00
11 12 12 33.0 1.00 50 2.00 0 0.00 0 0.00
11 12 - 13 13 32.0 1.00 50 2.00 0 0.00 0 0.00
12 13 - 14 14 33.0 -1.00 50 (2.00) 0 0.00 0 0.00
13 14 - 15 15 36.0 -3.00 50 (6.00) 0 0.00 0 0.00
14 15 - 16 16 38.0 -2.00 50 (4.00) 0 0.00 0 0.00
16 17 17 39.0 -1.00 50 (2.00) 0 0.00 0 0.00
16 17 - 18 18 34.0 5.00 50 10.00 0 0.00 0 0.00
17 18 - 19 19 31.0 3.00 50 6.00 0 0.00 0 0.00
18 19 - 20 20 28.0 3.00 50 6.00 0 0.00 0 0.00
20 21 21 23.0 5.00 50 10.00 0 0.00 0 0.00
21 22 22 19.0 4.00 50 8.00 0 0.00 0 0.00
22 23 23 19.0 0.00 50 0.00 0 0.00 0 0.00
23 24 24 19.0 0.00 50 0.00 0 0.00 0 0.00
24 25 25 19.0 0.00 50 0.00 0 0.00 0 0.00
25 26 26 20.0 -1.00 50 (2.00) 0 0.00 0 0.00
26 27 27 19.0 1.00 50 2.00 0 0.00 0 0.00
27 28 28 17.0 2.00 50 4.00 0 0.00 0 0.00
28 29 29 16.0 1.00 50 2.00 0 0.00 0 0.00
29 30 30 16.0 0.00 50 0.00 0 0.00 0 0.00
30 31 31 16.0 0.00 50 0.00 0 0.00 0 0.00
31 32 32 15.0 1.00 50 2.00 0 0.00 0 0.00
32 33 33 15.0 0.00 50 0.00 0 0.00 0 0.00
33 34 34 15.0 0.00 50 0.00 0 0.00 0 0.00
34 35 35 15.0 0.00 50 0.00 0 0.00 0 0.00
35 36 36 15.0 0.00 50 0.00 0 0.00 0 0.00
36 37 37 14.0 1.00 50 2.00 0 0.00 0 0.00
37 38 38 13.0 1.00 50 2.00 0 0.00 0 0.00
38 39 39 13.0 0.00 50 0.00 0 0.00 0 0.00
0
39 39 13.0 0.00 0 0.00 0 0.00 0 0.00
39 40 40 13.0 0.00 50 0.00 0 0.00 0 0.00
40 41 41 13.0 0.00 50 0.00 0 0.00 0 0.00
41 42 42 14.0 -1.00 50 (2.00) 0 0.00 0 0.00
42 43 43 14.0 0.00 50 0.00 0 0.00 0 0.00
43 44 44 14.0 0.00 50 0.00 0 0.00 0 0.00
0
39 13.0 0.00 0 #DIV/0! 0 0.00 0 0.00
39 45 45 13.0 0.00 50 0.00 0 0.00 0 0.00
45 46 46 13.0 0.00 50 0.00 0 0.00 0 0.00
46 47 47 12.0 1.00 50 2.00 0 0.00 0 0.00
47 48 48 12.0 0.00 50 0.00 0 0.00 0 0.00
48 49 49 12.0 0.00 50 0.00 0 0.00 0 0.00
49 50 50 12.0 0.00 50 0.00 0 0.00 0 0.00
50 51 51 12.0 0.00 50 0.00 0 0.00 0 0.00
51 52 52 12.0 0.00 50 0.00 0 0.00 0 0.00
52 53 53 12.0 0.00 50 0.00 0 0.00 0 0.00
53 54 54 12.0 0.00 50 0.00 0 0.00 0 0.00
54 55 55 13.0 -1.00 50 (2.00) 0 0.00 0 0.00
55 56 56 13.0 0.00 50 0.00 0 0.00 0 0.00
56 57 57 13.0 0.00 50 0.00 0 0.00 0 0.00
57 58 58 13.0 0.00 50 0.00 0 0.00 0 0.00
58 59 59 12.0 1.00 50 2.00 0 0.00 0 0.00
59 60 60 12.0 0.00 50 0.00 0 0.00 0 0.00
60 61 61 12.0 0.00 50 0.00 0 0.00 0 0.00
0
61 12.0 0.00 0 #DIV/0! 0 0.00 0 0.00
61 62 62 11.0 1.00 50 2.00 0 0.00 0 0.00
62 63 63 10.0 1.00 50 2.00 0 0.00 0 0.00
0
61 12.0 0.00 0 #DIV/0! 0 0.00 0 0.00
61 64 64 14.0 -2.00 50 (4.00) 0 0.00 0 0.00
64 65 65 18.0 -4.00 50 (8.00) 0 0.00 0 0.00
65 66 66 20.0 -2.00 50 (4.00) 0 0.00 0 0.00
66 67 67 24.0 -4.00 50 (8.00) 0 0.00 0 0.00
67 68 68 29.0 -5.00 50 (10.00) 0 0.00 0 0.00
0
64 14.0 0.00 0 #DIV/0! 0 0.00 0 0.00
64 68 68 16.0 -2.00 50 (4.00) 0 0.00 0 0.00
68 69 69 18.0 -2.00 50 (4.00) 0 0.00 0 0.00
69 70 70 19.0 -1.00 50 (2.00) 0 0.00 0 0.00
70 71 71 18.0 1.00 50 2.00 0 0.00 0 0.00
71 72 72 19.0 -1.00 50 (2.00) 0 0.00 0 0.00
72 73 73 19.0 0.00 50 0.00 0 0.00 0 0.00
73 74 74 17.0 2.00 50 4.00 0 0.00 0 0.00
74 75 75 16.0 1.00 50 2.00 0 0.00 0 0.00
75 76 76 14.0 2.00 50 4.00 0 0.00 0 0.00
76 77 77 15.0 -1.00 50 (2.00) 0 0.00 0 0.00
77 78 78 18.0 -3.00 50 (6.00) 0 0.00 0 0.00
78 79 79 20.0 -2.00 50 (4.00) 0 0.00 0 0.00
79 80 80 19.0 1.00 50 2.00 0 0.00 0 0.00
80 81 81 17.0 2.00 50 4.00 0 0.00 0 0.00
81 82 82 16.0 1.00 50 2.00 0 0.00 0 0.00
82 83 83 16.0 0.00 50 0.00 0 0.00 0 0.00
83 84 84 16.0 0.00 50 0.00 0 0.00 0 0.00
84 85 85 16.0 0.00 50 0.00 0 0.00 0 0.00
85 86 86 15.0 1.00 50 2.00 0 0.00 0 0.00
86 87 87 15.0 0.00 50 0.00 0 0.00 0 0.00
87 88 88 15.0 0.00 50 0.00 0 0.00 0 0.00
88 89 89 15.0 0.00 50 0.00 0 0.00 0 0.00
19 89 - 90 90 15.0 0.00 50 0.00 0 0.00 0 0.00
4550 0 0.00 - -

1150 0 tanda percabangan, jadi ini hasil da


250 0 contoh:
100 patok 15-16 harus mengaliri hasil p
1500 0
kolom biru adalah Kontrol, anta
0
1150
250 165
1400 0

0
ydrolis Desa Penjernihan
Formula Hazen William :
S (slope) = ( ^H/L)*100
D (diam) teoritis = ((3.59*Q*10^6)/(S^0.54*C))^0.38
Hloss / 100 m = ((3.59*Q*10^6)/(D^2.63*C))^1.85
V = 4*Q/1000(3.14*(D/1000)^2)

BEBAN PIPA PERHITUNGAN HEAD LOSS


Kebut air Jmlh. Pddk Jmlh. Pddk Flow Flow Koeff HW Diam. Pipa Diam. Pipa Hloss Total Hloss HGL Sisa Kcptan
jam puncak yg disuplai Proy 15 thn Jam Puncak C D teoritis D desain per 100 m (+10% minor) Tekan V
(l/dt) (jiwa) (jiwa) (lt/dt) (lt/dt) (mm) (mm) (m) (m) (m) (m) (m/dtk)

0.00 1542 58.00


0.00 1542 2045 1.42 2.13 130 37.78 63.00 1.17 0.64 58.64 7.64
0.00 1542 2045 1.42 2.13 130 48.85 63.00 1.17 0.64 58.00 9.00 0.68
0.00 1542 2045 1.42 2.13 130 #DIV/0! 63.00 1.17 0.64 57.36 8.36 0.68
0.00 1542 2045 1.42 2.13 130 44.95 63.00 1.17 0.64 56.71 10.71 0.68
0.00 1542 2045 1.42 2.13 130 48.85 63.00 1.17 0.64 56.07 12.07 0.68
0.00 1542 2045 1.42 2.13 130 #DIV/0! 63.00 1.17 0.64 55.42 11.42 0.68
0.00 1542 2045 1.42 2.13 130 #DIV/0! 63.00 1.17 0.64 54.78 10.78 0.68
0.00 1542 2045 1.42 2.13 130 56.32 63.00 1.17 0.64 57.36 12.36 0.68
0.00 1542 2045 1.42 2.13 130 40.48 63.00 1.17 0.64 56.71 16.71 0.68
0.00 1542 2045 1.42 2.13 130 48.85 63.00 1.17 0.64 56.07 18.07 0.68
0.00 1542 2045 1.42 2.13 130 42.38 63.00 1.17 0.64 55.42 21.42 0.68
0.00 1542 2045 1.42 2.13 130 56.32 63.00 1.17 0.64 56.71 23.71 0.68
0.00 0 0 0.00 0.00 130 0.00 63.00 0.00 0.00 56.71 24.71 0.00
0.00 0 0 0.00 0.00 130 0.00 63.00 0.00 0.00 56.71 23.71 0.00
0.00 0 0 0.00 0.00 130 0.00 63.00 0.00 0.00 56.71 20.71 0.00
0.00 0 0 0.00 0.00 130 0.00 63.00 0.00 0.00 56.71 18.71 0.00
0.00 0 0 0.00 0.00 130 0.00 63.00 0.00 0.00 56.71 17.71 0.00
0.00 0 0 0.00 0.00 130 0.00 63.00 0.00 0.00 56.71 22.71 0.00
0.00 0 0 0.00 0.00 130 0.00 63.00 0.00 0.00 56.71 25.71 0.00
0.00 0 0 0.00 0.00 130 0.00 63.00 0.00 0.00 56.71 28.71 0.00
0.00 0 0 0.00 0.00 130 0.00 63.00 0.00 0.00 56.71 33.71 0.00
0.00 0 0 0.00 0.00 130 0.00 63.00 0.00 0.00 56.71 37.71 0.00
0.00 0 0 0.00 0.00 130 #DIV/0! 63.00 0.00 0.00 56.71 37.71 0.00
0.00 0 0 0.00 0.00 130 #DIV/0! 63.00 0.00 0.00 56.71 37.71 0.00
0.00 0 0 0.00 0.00 130 #DIV/0! 63.00 0.00 0.00 56.71 37.71 0.00
0.00 0 0 0.00 0.00 130 0.00 63.00 0.00 0.00 56.71 36.71 0.00
0.00 0 0 0.00 0.00 130 0.00 63.00 0.00 0.00 56.71 37.71 0.00
0.00 0 0 0.00 0.00 130 0.00 63.00 0.00 0.00 56.71 39.71 0.00
0.00 0 0 0.00 0.00 130 0.00 63.00 0.00 0.00 56.71 40.71 0.00
0.00 0 0 0.00 0.00 130 #DIV/0! 63.00 0.00 0.00 56.71 40.71 0.00
0.00 0 0 0.00 0.00 130 #DIV/0! 63.00 0.00 0.00 56.71 40.71 0.00
0.00 0 0 0.00 0.00 130 0.00 63.00 0.00 0.00 56.71 41.71 0.00
0.00 0 0 0.00 0.00 130 #DIV/0! 63.00 0.00 0.00 56.71 41.71 0.00
0.00 0 0 0.00 0.00 130 #DIV/0! 63.00 0.00 0.00 56.71 41.71 0.00
0.00 0 0 0.00 0.00 130 #DIV/0! 63.00 0.00 0.00 56.71 41.71 0.00
0.00 0 0 0.00 0.00 130 #DIV/0! 63.00 0.00 0.00 56.71 41.71 0.00
0.00 0 0 0.00 0.00 130 0.00 63.00 0.00 0.00 56.71 42.71 0.00
0.00 0 0 0.00 0.00 130 0.00 63.00 0.00 0.00 56.71 43.71 0.00
0.00 0 0 0.00 0.00 130 #DIV/0! 63.00 0.00 0.00 56.71 43.71 0.00

0.00 0 0.00 0.00 130 #DIV/0! 63.00 0.00 0.00 56.71 43.71 0.00
0.00 0 0 0.00 0.00 130 #DIV/0! 63.00 0.00 0.00 56.71 43.71 0.00
0.00 0 0 0.00 0.00 130 #DIV/0! 63.00 0.00 0.00 56.71 43.71 0.00
0.00 0 0 0.00 0.00 130 0.00 63.00 0.00 0.00 56.71 42.71 0.00
0.00 0 0 0.00 0.00 130 #DIV/0! 63.00 0.00 0.00 56.71 42.71
0.00 0 0 0.00 0.00 130 #DIV/0! 63.00 0.00 0.00 56.71 42.71 0.00

0.00 0 0.00 0.00 130 #DIV/0! 63.00 0.00 0.00 56.71 43.71
0.00 0 0 0.00 0.00 130 #DIV/0! 63.00 0.00 0.00 56.71 43.71
0.00 0 0 0.00 0.00 130 #DIV/0! 63.00 0.00 0.00 56.71 43.71
0.00 0 0 0.00 0.00 130 0.00 63.00 0.00 0.00 56.71 44.71
0.00 0 0 0.00 0.00 130 #DIV/0! 63.00 0.00 0.00 56.71 44.71
0.00 0 0 0.00 0.00 130 #DIV/0! 63.00 0.00 0.00 56.71 44.71
0.00 0 0 0.00 0.00 130 #DIV/0! 63.00 0.00 0.00 56.71 44.71
0.00 0 0 0.00 0.00 130 #DIV/0! 63.00 0.00 0.00 56.71 44.71
0.00 0 0 0.00 0.00 130 #DIV/0! 63.00 0.00 0.00 56.71 44.71
0.00 0 0 0.00 0.00 130 #DIV/0! 63.00 0.00 0.00 56.71 44.71
0.00 0 0 0.00 0.00 130 #DIV/0! 63.00 0.00 0.00 56.71 44.71
0.00 0 0 0.00 0.00 130 0.00 63.00 0.00 0.00 56.71 43.71
0.00 0 0 0.00 0.00 130 #DIV/0! 63.00 0.00 0.00 56.71 43.71
0.00 0 0 0.00 0.00 130 #DIV/0! 63.00 0.00 0.00 56.71 43.71
0.00 0 0 0.00 0.00 130 #DIV/0! 63.00 0.00 0.00 56.71 43.71
0.00 0 0 0.00 0.00 130 0.00 63.00 0.00 0.00 56.71 44.71
0.00 0 0 0.00 0.00 130 #DIV/0! 63.00 0.00 0.00 56.71 44.71
0.00 0 0 0.00 0.00 130 #DIV/0! 63.00 0.00 0.00 56.71 44.71

0.00 0 0.00 0.00 130 #DIV/0! 63.00 0.00 0.00 56.71 44.71
0.00 0 0 0.00 0.00 130 0.00 63.00 0.00 0.00 56.71 45.71
0.00 0 0 0.00 0.00 130 0.00 63.00 0.00 0.00 56.71 46.71
0.00 0 0.00 0.00 130 #DIV/0! 63.00 0.00 0.00 56.71 44.71
0.00 0 0 0.00 0.00 130 0.00 63.00 0.00 0.00 56.71 42.71
0.00 0 0 0.00 0.00 130 0.00 63.00 0.00 0.00 56.71 38.71
0.00 0 0 0.00 0.00 130 0.00 63.00 0.00 0.00 56.71 36.71
0.00 0 0 0.00 0.00 130 0.00 63.00 0.00 0.00 56.71 32.71
0.00 0 0 0.00 0.00 130 0.00 63.00 0.00 0.00 56.71 27.71

0.00 0 0.00 0.00 130 #DIV/0! 63.00 0.00 0.00 56.71 42.71
0.00 0 0 0.00 0.00 130 0.00 63.00 0.00 0.00 56.71 40.71
0.00 0 0 0.00 0.00 130 0.00 63.00 0.00 0.00 56.71 38.71
0.00 0 0 0.00 0.00 130 0.00 63.00 0.00 0.00 56.71 37.71
0.00 0 0 0.00 0.00 130 0.00 63.00 0.00 0.00 56.71 38.71
0.00 0 0 0.00 0.00 130 0.00 63.00 0.00 0.00 56.71 37.71
0.00 0 0 0.00 0.00 130 #DIV/0! 63.00 0.00 0.00 56.71 37.71
0.00 0 0 0.00 0.00 130 0.00 63.00 0.00 0.00 56.71 39.71
0.00 0 0 0.00 0.00 130 0.00 63.00 0.00 0.00 56.71 40.71
0.00 0 0 0.00 0.00 130 0.00 63.00 0.00 0.00 56.71 42.71
0.00 0 0 0.00 0.00 130 0.00 63.00 0.00 0.00 56.71 41.71
0.00 0 0 0.00 0.00 130 0.00 63.00 0.00 0.00 56.71 38.71
0.00 0 0 0.00 0.00 130 0.00 63.00 0.00 0.00 56.71 36.71
0.00 0 0 0.00 0.00 130 0.00 63.00 0.00 0.00 56.71 37.71
0.00 0 0 0.00 0.00 130 0.00 63.00 0.00 0.00 56.71 39.71
0.00 0 0 0.00 0.00 130 0.00 63.00 0.00 0.00 56.71 40.71
0.00 0 0 0.00 0.00 130 #DIV/0! 63.00 0.00 0.00 56.71 40.71
0.00 0 0 0.00 0.00 130 #DIV/0! 63.00 0.00 0.00 56.71 40.71
0.00 0 0 0.00 0.00 130 #DIV/0! 63.00 0.00 0.00 56.71 40.71
0.00 0 0 0.00 0.00 130 0.00 63.00 0.00 0.00 56.71 41.71
0.00 0 0 0.00 0.00 130 #DIV/0! 63.00 0.00 0.00 56.71 41.71
0.00 0 0 0.00 0.00 130 #DIV/0! 63.00 0.00 0.00 56.71 41.71
0.00 0 0 0.00 0.00 130 #DIV/0! 63.00 0.00 0.00 56.71 41.71
0.00 0 0 0.00 0.00 130 #DIV/0! 63.00 0.00 0.00 56.71 41.71 0.00
-

ercabangan, jadi ini hasil dari total beban yang harus di tanggung oleh patok di depan percabangan.

5-16 harus mengaliri hasil perhitungan dari patok 16-17 dan 21-22

m biru adalah Kontrol, antara kolom biru baris pertama dan kolom biru baris terakhir
86
BLOK III
21,9 M

BLOK I
14,0 M

12,1M
BLOK II
35,5 M
BLOK I
Tabel 5 - 2.
PROYEKSI KEBUTUHAN AIR BERSIH
DESA HARAPAN KEC. MALILI

Tahun Proyeksi Ke n ANALISA PERHITUNG


No Uraian Satuan Tahun
5th 10th 15th KODE
perenc.
1 Jumlah penduduk jiwa 1,558 1,712 1,899 2,066 1
Pelayanan penduduk % 70 100 100 100 2
jiwa 1,091 1,712 1,899 2,066 3
2 Pelayanan SR % 84 100 100 100 4
jiwa 915 1,712 1,899 2,066 5
jiwa/sb 5 5 5 5 6
Jmlh. Sb 183 342 380 413 7
Pemakaian Air Lt/org/hr 60 60 60 60 8
Lt/sb/hr 300 300 300 300 9
Lt/det 0.64 1.19 1.32 1.43 10
3 Pelayanan KU / HU % - - - - 11
jiwa - - - - 12
jiwa/HU 100 100 100 100 13
Jmlh. HU - - - - 14
Pemakaian Air Lt/org/hr 45 45 45 45 15
Lt/HU/hr 4,500 4,500 4,500 4,500 16
Lt/det - - - - 17
4 Total Domestik Lt/det 0.64 1.19 1.32 1.43 18
5 Total Non Domestik % 0 0 0 0 19
Lt/det - - - - 20
6 Total Kebutuhan Air Lt/det 0.64 1.19 1.32 1.43 21
7 Kehilangan Air % 20 20 20 20 22
Lt/det 0.13 0.24 0.26 0.29 23
8 Kebutuhan Air
- Rata-rata Lt/det 0.76 1.43 1.58 1.72 24
- Harian Puncak Faktor 1.1 1.1 1.1 1.1 25
Lt/det 0.84 1.57 1.74 1.89 26
M3/hari 3.02 5.65 6.27 6.82 27
M3/hari 72.47 135.57 150.42 163.65 28
- Jam Puncak Faktor 1.5 1.5 1.5 1.5 29
Lt/det 1.14 2.14 2.37 2.58 30
9 Kebutuhan Air Baku Faktor 3.0 3.0 3.0 3.0 31
Lt/det 2.52 4.71 5.22 5.68 32

10 Volume Resevoir M3 14.49 27.11 30.08 32.73 33


Tabel 5 - 2.
ROYEKSI KEBUTUHAN AIR BERSIH
DESA HARAPAN KEC. MALILI

ANALISA PERHITUNGAN
KETERANGAN
CARA HITUNG

rata2 kenaikan 2% pertahun


juklak 100% pelayanan

juklak / survei
(5)= ((4)*(3))/100
juklak
(7)= (5) / (6)
juklak
(9)= (8) x (6)
(10)=(5)x(8)/86400
(11)= 100 - (4)
(12)=(11)/100*(3)
juklak
(14)=(12)/(13)
juklak
(16)=(13)*(15)
(17)=(12)*(15)/86400
(18)=(10)+(17)

(21)=(18) + (20)
juklak
(23)=(21)*(22)/100

(24)=(21)+ 23)
juklak
(26)=(24)* (25)
(27)=(26)x3600/1000
(28)=(27)*24
juklak (minimum)
(30)=(24)*(27)
faktor keamanan
(32)=(26)*(33) Besarnya debit perencanaan
3X kebutuhan air baku
(30)=(0.2)*(28) Minimum 20% harian Maks
Kriteria perencanaan
PAMSIMAS

TABEL PERHITUNGAN O & M BERDASARKAN PEMANF


KOMPONEN BIAYA JUMLAH KOMP
A. Penduduk 6.7 H. Biaya Pemel
1 Jumlah penduduk awal (Po) 1,558 Jiwa 1
2 Jumlah KK awal 231 KK 2
3 Pertumbuhan penduduk 1.3% Persen 3
4 Tahun proyeksi 15 Tahun
5 Penduduk proyeksi (Pn) 1,891 Jiwa I. Total Biaya P
6 Jumlah KK proyeksi 280 KK
7 Pemanfaat air minum yg direncanakan 1260 Jiwa J. Harga Air
Tarif Harga Air
B. Biaya investasi SPAM 410,379,000 Rupiah
L. Iuran Rata-r
C. Waktu Operasional 24 Jam/hari
D. Sistem Pelayanan (RKM) M. Iuran Tetap (
1 Sambungan Rumah (SR) 183 Unit 1
2 Hidran Umum (HU) - Unit 2
3 Kran Umum (KU) - Unit 3
4 Sambungan Sosial - Unit 4
5 Sambungan Sekolah - Unit
E. Kebutuhan air K. Iuran Menur
1 Keb. air domestik SR 60 Lt/org/hari 1
2 Keb. air domestik KU/HU 60 Lt/org/hari 2
3 Persentase kebocoran 20% Persen 3
4 Air SR, KU/HU & kebocoran 144 Lt/org/hari
5 Pemakaian air rata-rata 93,480 Lt/hari IURAN YANG
6 Pemakaian air rata-rata 93 M3/hari L. Iuran Progresif
F. Penyusutan 1
1 Biaya investasi (dg inkind) 410,379,000 Rupiah 2
2 Persentase penyusutan (5 - 10) % 5.0% Persen 3
3 Biaya penyusutan pertahun 20,518,950 Rupiah 4
4 Biaya penyusutan perbulan 1,709,913 Rupiah
G Biaya Operasional 1% 0.5% M Iuran HU/KU
1 Honor tenaga perbulan (direncanakan) 1,200,000 Rupiah 1
2 Kualitas air & promkes (direncanakan) 500,000 Rupiah 2
3 Pengembangan perbulan (direncanakan) 500,000 Rupiah
MINIMAL TAR
Penyusutan 8%, biaya investasi dicapai dalam periode : 0
20 tahun 164
TARGET AWAL UN

Perhitungan Rencana SR untuk Kebutuhan Biaya Operasional Pemeliharaaan 25


PAMSIMAS

BERDASARKAN PEMANFAAT AWAL (KU/HU) & SR


KOMPONEN BIAYA JUMLAH
Biaya Pemeliharaan (direncanakan)
Persentase pertahun 1% Persen
Biaya Pemeliharaan pertahun 4,103,790 Rupiah
Biaya Pemeliharaan perbulan 341,983 Rupiah

Total Biaya Pengelolaan 4,251,895 Rupiah/Bulan

Harga Air 2,582 Rupiah/M3


Tarif Harga Air Dibulatkan 2,600 Rupiah/M3

Iuran Rata-rata 23,234.40 Rupiah/KK/Bulan

Iuran Tetap (Riil)


Pemakaian air rata-rata 9 M3/bulan
Harga air perkubik 2,582 Rupiah/M3
Harga air per kubik dibulatkan 2,600 Rupiah/M3
Iuran tetap bulanan 23,400 Rupiah/KK/Bulan

Iuran Menurut Klasifikasi


Harga air Rata-rata 2,600 Rupiah/M3
Mampu (SR) 2,600 Rupiah/M3
Tidak Mampu (HU/KU) 1,800 Rupiah/M3

IURAN YANG DITERAPKAN


Iuran Progresif (SR)
Golongan I (<10 M3) 2,600 Rupiah/M3
Golongan II (10 < 20 M3) 2,900 Rupiah/M3
Golongan III (20 < 30 M3) 3,100 Rupiah/M3
Golongan IV (> 30 M3) 3,400 Rupiah/M3

Iuran HU/KU
Banyak Pemakaian air 10 M3/bulan
Iuran KK perbulan 18,000 Rp/KK/bulan

MINIMAL TARGET PENGGUNA


KK untuk pengguna HU/KU/Sosial - p/bulan
Unit SR & Iuran Sekolah 4,251,895 p/bulan
TARGET AWAL UNTUK O & M 4,251,895 p/bulan

Perhitungan Rencana SR untuk Kebutuhan Biaya Operasional Pemeliharaaan 25


Provinsi / Kabupaten / Kecamatan / Desa : Sulawesi Selatan / Luwu Timur / Towuti / Buangin

Diperiksa Oleh : Dibuat Oleh :

PPK PAMSIMAS Kab. Luwu Timur Fasilitator Masyarakat KKM Lamonto

ARVAN, ST A.IIS ARISKA PABENTENGI, A.Md MAKSUM


NIP. 19801222 201101 1 006 Koordinator

Kelompok Kesw

Kab : Luwu Timur Koordinator Kabupaten


Desa : Buangin SYARIFAH DARMAWATI
Kec :Towuti DC KAB.LUWU TIMUR
( )
esa : Sulawesi Selatan / Luwu Timur / Towuti / Buangin

Buangin, Desember 2017

Dibuat Oleh :

Satlak PAMSIMAS

AHMAD MUJIONO
Ketua

Kelompok Keswadayaan Masyarakat

PEMIDELIUS GALA, ST
Memasang 1 m' Pipa galvanis diameter 1/2"
Pekerja Hari/Orang 0.054 100,000.00 5,400.00
JUMLAH 5,400.00
Memasang 1 m' Pipa galvanis diameter 3/4"
Pekerja Hari/Orang 0.054 100,000.00 5,400.00
JUMLAH 5,400.00
Memasang 1 m' Pipa galvanis diameter 2"
Pekerja Hari/Orang 0.108 100,000.00 10,800.00
JUMLAH 10,800.00
Memasang 1 m' Pipa galvanis diameter 2 1/2"
Pekerja Hari/Orang 0.108 100,000.00 10,800.00
JUMLAH 10,800.00
Memasang 1 m' Pipa PVC tipe SNI diameter 1/2"
Pekerja Hari/Orang 0.036 100,000.00 3,600.00
JUMLAH 3,600.00
Memasang 1 m' Pipa PVC tipe SNI diameter 3/4"
Pekerja Hari/Orang 0.036 100,000.00 3,600.00
JUMLAH 3,600.00
Memasang 1 m' Pipa PVC tipe SNI diameter 1"
Pekerja Hari/Orang 0.036 100,000.00 3,600.00
JUMLAH 3,600.00
Memasang 1 m' Pipa PVC tipe SNI diameter 11/2"
Pekerja Hari/Orang 0.050 100,000.00 5,000.00
JUMLAH 5,000.00
Memasang 1 m' Pipa PVC tipe SNI diameter 2"
Pekerja Hari/Orang 0.054 100,000.00 5,400.00
JUMLAH 5,400.00
Memasang 1 m' Pipa PVC tipe SNI diameter 3"
Pekerja Hari/Orang 0.081 100,000.00 8,100.00
JUMLAH 8,100.00

Memasang 1 m' Pipa PVC tipe SNI diameter 4"


Pekerja Hari/Orang 0.108 100,000.00 10,800.00
JUMLAH 10,800.00

Memasang 1 m' Pipa PVC tipe SNI diameter 6"


Pekerja Hari/Orang 0.162 100,000.00 16,200.00
JUMLAH 16,200.00

PAMSIMAS 2014 ANALISA SATUAN RKM DESA MASIKU


- hal . 12 -

PAMSIMAS 2014 ANALISA SATUAN RKM DESA MASIKU


Tulangan Kolom Ø Berat Panjang Jml Tot.
Per M Btg Btg Jumlah TitikPanjang
(MM) (Kg/M) (M) (Bh) (M)

12 0.89 2.00 4.00 4.00 32.00


8 0.39 0.70 11.00 4.00 30.80

JUMLAH

Tulangan Sloef Ø Berat Panjang Jml Tot.


Per M Btg Btg Panjang Panjang
(MM) (Kg/M) (M) (Bh) (M)

12 0.89 14.00 4.00 56.00


8 0.39 0.50 93.33 0.00 46.67

JUMLAH
Tulangan Lantai Ø Berat Panjang Jml Tot.
Per M Btg Melintang Panjang Panjang
(MM) (Kg/M) (M) (Bh) (M)

A Type A 12 0.89 4.00 14.33 57.33

12 0.89 4.00 14.33 57.33

JUMLAH

Tulangan Dinding Ø Berat Panjang Jml Tot.


Per M Btg Melintang Jumlah Sisi Panjang
(MM) (Kg/M) (M) (Bh) (M)

Tulangan P = 2 M DAN T = 1,5 M


12 0.89 3.00 13.33 2.00 80.00
A Type A
A Type A

12 0.89 4.00 10.00 2.00 80.00

Tulangan P = 2 M DAN T = 1,5 M

12 0.89 3.00 13.33 2.00 80.00

A Type A
12 0.89 4.00 10.00 2.00 80.00

JUMLAH

Tulangan Ring Balk O Berat Panjang Jml Tot.


Per M Btg Btg Panjang Panjang
(MM) (Kg/M) (M) (Bh) (M)

12 0.89 14.00 4.00 56.00


8 0.39 0.30 94.33 0.00 28.30

JUMLAH
Tulangan Plat O Berat Panjang Jml Tot.
Per M Btg Btg Panjang Panjang
(MM) (Kg/M) (M) (Bh) (M)

Melintang
12 0.89 3.00 14.33 43.00

Memanjang
12 0.89 4.00 14.33 57.33

JUMLAH

JUMLAH TOTAL BESI =


Berat
Jumlah Total KET

Batang (Kg)

2.67 28.42
2.57 12.16 Jarak 15 cm

40.57 KG

Berat
Jumlah Total KET

Batang (Kg)

4.67 49.73
3.89 18.42 Jarak 15 cm

68.15 KG
Berat
Jumlah Total KET

Batang (Kg)

Melintang
4.78 50.91 Jarak 15 cm
Memanjang
4.78 50.91 Jarak 15 cm

101.82 KG

Berat
Jumlah Total KET

Batang (Kg)

Melintang
6.67 71.04 Jarak 15 cm
Memanjang
6.67 71.04 Jarak 15 cm

Melintang
6.67 71.04 Jarak 15 cm
Memanjang
6.67 71.04 Jarak 15 cm

284.16 KG

Berat
Jumlah Total KET

Batang (Kg)

4.67 49.73
2.36 11.17 Jarak 15 cm

60.90 KG
Berat
Jumlah Total KET

Batang (Kg)

3.58 38.18 Jarak 15 cm

4.78 50.91 Jarak 20 cm

89.10 KG

JUMLAH TOTAL BESI = 644.69 KG


DAFTAR ANALISA TAHUN ANGGARAN 2017

SNI 2835:2008
Menggali 1 m3 tanah biasa sedalam 1 meter
0.7500 Pekerja x Rp. 100,000.00 Rp. 75,000.00
Jumlah Rp. 75,000.00
SNI 2835:2008
Menggali 1 m3 tanah keras sedalam 1 meter
1.0000 Pekerja x Rp. 100,000.00 Rp. 100,000.00
Jumlah Rp. 100,000.00
SNI 2835:2008
Menggali 1 m3 Tanah cadas sedalam 1 meter
1.5000 Pekerja x Rp. 100,000.00 Rp. 150,000.00
Jumlah Rp. 150,000.00
SNI 2835:2008
Mengerjakan 1 m2 Stripping tebing setinggi 1 meter
0.0500 Pekerja x Rp. 100,000.00 Rp. 5,000.00
Jumlah Rp. 5,000.00
SNI 2835:2008
Mengurug Kembali 1 m3 galian (1/3 indeks pek.Galian)
0.2500 Pekerja x Rp. 100,000.00 Rp. 25,000.00
Jumlah Rp. 25,000.00

SNI 2835:2008
Memadatkan 1 m3 tanah (per 20 cm)
0.5000 Pekerja x Rp. 100,000.00 Rp. 50,000.00
Jumlah Rp. 50,000.00

SNI 2835:2008
Mengurug 1 m3 Pasir Urug
1.2000 M3 Pasir Timbunan x Rp. 112,500.00 Rp. 135,000.00
0.3000 Pekerja x Rp. 100,000.00 Rp. 30,000.00
Jumlah Rp. 165,000.000

1 m3 Pek. Timbunan Sirtu


1.2000 M3 Sirtu x Rp. 112,500.00 Rp. 135,000.00
0.3000 Pekerja x Rp. 100,000.00 Rp. 30,000.00
Jumlah Rp. 165,000.00

SNI 2835:2008
Mengurug 1 m3 sirtu padat untuk peninggian lantai bangunan
1.2000 M3 Sirtu x Rp. 112,500.00 Rp. 135,000.00
0.2500 Pekerja x Rp. 100,000.00 Rp. 25,000.00
Jumlah Rp. 160,000.00
1 m Pek. Urugan Pasir Bawah Pondasi / Lantai
3

1.2000 M3 Pasir Urug x Rp. 112,500.00 Rp. 135,000.00


0.3000 Pekerja x Rp. 100,000.00 Rp. 30,000.00
Jumlah Rp. 165,000.00

SNI 2836:2008
Memasang 1 m3 batu kosong (anstamping)
1.2000 M3 Batu Kali (batu belah 15/20 cm) x Rp. 150,000.00 Rp. 180,000.00
0.4320 M3 Pasir Uurg x Rp. 112,500.00 Rp. 48,600.00
0.7800 Pekerja x Rp. 100,000.00 Rp. 78,000.00
0.3900 Tukang Batu x Rp. 120,000.00 Rp. 46,800.00
Jumlah Rp. 353,400.00

- hal 01 -

PAMSIMAS 2014 ANALISA SATUAN RKM DESA MASIKU


SNI 2836:2008
Memasang 1 m3 pondasi batu belah, campuran 1 PC : 3 PP
1.2000 M3 Batu Kali (batu belah 15/20 cm x Rp. 150,000.00 Rp. 180,000.00
4.0400 Zak Semen 50 Kg x Rp. 70,000.00 Rp. 282,800.00
0.4850 M Pasir Pasangan
3
x Rp. 112,500.00 Rp. 54,562.50
0.7500 Tukang Batu x Rp. 120,000.00 Rp. 90,000.00
1.5000 Pekerja x Rp. 100,000.00 Rp. 150,000.00
Jumlah Rp. 757,362.50

SNI 2836:2008
Memasang 1 m3 pondasi batu belah, campuran 1 PC : 4 PP
1.2000 M3 Batu Kali (batu belah 15/20 cm x Rp. 150,000.00 Rp. 180,000.00
3.2600 Zak Semen 50 Kg x Rp. 70,000.00 Rp. 228,200.00
0.5220 M3 Pasir Pasangan x Rp. 112,500.00 Rp. 58,725.00
0.7500 Tukang Batu x Rp. 120,000.00 Rp. 90,000.00
1.5000 Pekerja x Rp. 100,000.00 Rp. 150,000.00
Jumlah Rp. 706,925.00
SNI 2836:2008
Memasang 1 m3 Pondasi batu belah, campuran 1 PC : 5 PP
1.2000 M3 Batu Kali (batu belah 15/20 cm x Rp. 150,000.00 Rp. 180,000.00
2.7200 Zak Semen 50 Kg x Rp. 70,000.00 Rp. 190,400.00
0.5440 M3 Pasir Pasangan x Rp. 112,500.00 Rp. 61,200.00
0.7500 Tukang Batu x Rp. 120,000.00 Rp. 90,000.00
1.5000 Pekerja x Rp. 100,000.00 Rp. 150,000.00
Jumlah Rp. 671,600.00
SNI 2836:2008
Memasang 1 m3 Pondasi batu belah, campuran 1 PC : 8 PP
1.2000 M3 Batu Gunung x Rp. 150,000.00 Rp. 180,000.00
2.3400 zak Semen 50 Kg x Rp. 70,000.00 Rp. 163,800.00
0.5610 M3 Pasir Pasangan x Rp. 112,500.00 Rp. 63,112.50
1.5000 Tukang Batu x Rp. 120,000.00 Rp. 180,000.00
0.0750 Pekerja x Rp. 100,000.00 Rp. 7,500.00
Jumlah Rp. 594,412.50
SNI 6987:2008
Memasang 1 m2 dinding bata merah uk. (5x11x22) cm tebal 1/2 bata, Camp. spesi 1 PC : 2 PP
70.0000 Biji Batu Bata x Rp. 600.00 Rp. 42,000.00
0.3790 Zak Semen 50 Kg x Rp. 70,000.00 Rp. 26,530.00
0.0380 M3 Pasir Pasangan x Rp. 112,500.00 Rp. 4,275.00
0.1000 Tukang Batu x Rp. 120,000.00 Rp. 12,000.00
0.3000 Pekerja x Rp. 100,000.00 Rp. 30,000.00
Jumlah Rp. 114,805.00
SNI 6987:2008
Memasang 1 m2 dinding bata merah uk. (5x11x22) cm tebal 1/2 bata, Camp. spesi 1 PC : 4 PP
70.000 Biji Batu Bata x Rp. 600.00 Rp. 42,000.00
0.2300 Zak Semen 50 Kg x Rp. 70,000.00 Rp. 16,100.00
0.0430 M3 Pasir Pasangan x Rp. 112,500.00 Rp. 4,837.50
0.1000 Tukang Batu x Rp. 120,000.00 Rp. 12,000.00
0.3000 Pekerja x Rp. 100,000.00 Rp. 30,000.00
Jumlah Rp. 104,937.50

SNI 6987:2008
Memasang 1 m2 dinding bata merah uk. (5x11x22) cm tebal 1/2 bata, Camp. spesi 1 PC : 3 PP
70.0000 Biji Batu Bata x Rp. 600.00 Rp. 42,000.00
0.2874 Zak Semen 50 Kg x Rp. 70,000.00 Rp. 20,118.00
0.0400 M3 Pasir Pasangan x Rp. 112,500.00 Rp. 4,500.00
0.1000 Tukang Batu x Rp. 120,000.00 Rp. 12,000.00
0.3000 Pekerja x Rp. 100,000.00 Rp. 30,000.00
Jumlah Rp. 108,618.00

- hal. 02 -

PAMSIMAS 2014 ANALISA SATUAN RKM DESA MASIKU


SNI 6987:2008
Memasang 1 m2 dinding bata merah uk. (5x11x22) cm tebal 1/2 bata, Camp. spesi 1 PC : 5 PP
70.0000 Biji Batu Bata x Rp. 600.00 Rp. 42,000.00
0.1936 Zak Semen 50 Kg x Rp. 70,000.00 Rp. 13,552.00
0.0450 M3 Pasir Pasangan x Rp. 112,500.00 Rp. 5,062.50
0.1000 Tukang Batu x Rp. 120,000.00 Rp. 12,000.00
0.3000 Pekerja x Rp. 100,000.00 Rp. 30,000.00
Jumlah Rp. 102,614.50

SNI 7394:2008
Membuat 1 m3 lantai kerja beton mutu f'c =7,4 Mpa (K100) slump (3-6) cm, w/c = 0,87 (A)
4.6000 Zak Semen 50 Kg x Rp. 70,000.00 Rp. 322,000.00
0.6379 M3 Pasir Beton / Kasar x Rp. 150,000.00 Rp. 95,678.57
0.7607 M3 Batu Pecah 2-3 x Rp. 250,000.00 Rp. 190,185.19
200 Air x Rp. 100.00 Rp. 20,000.00
0.2000 Tukang Batu x Rp. 120,000.00 Rp. 24,000.00
1.2000 Pekerja x Rp. 100,000.00 Rp. 120,000.00
Jumlah Rp. 771,863.76
SNI 7394:2008
Pembesian 10 kg dengan besi polos atau besi ulir (B)
10.5000 Kg Besi Beton x Rp. 10,500.00 Rp. 110,250.00
0.1500 Kg Kawat Beton x Rp. 25,000.00 Rp. 3,750.00
0.0700 Tukang Besi x Rp. 120,000.00 Rp. 8,400.00
0.0700 Pekerja x Rp. 100,000.00 Rp. 7,000.00
Jumlah 10 kg Rp. 129,400.00
1 kg Rp. 12,940.00
SNI 7394:2008
Bahan Bekesting (Cetakan) ( C )
Memasang 1 m2 bekesting untuk pondasi
0.0400 M3 Kayu Balok Kls III x Rp. 2,500,000.00 Rp. 100,000.00
0.3000 kg Paku 5 cm- 10 cm x Rp. 18,000.00 5,400.00
0.1000 ltr Minyak bekesting x Rp. 25,000.00 2,500.00
0.2600 Tukang Kayu x Rp. 120,000.00 Rp. 31,200.00
0.5200 Pekerja x Rp. 100,000.00 Rp. 52,000.00
Jumlah Rp. 191,100.00

SNI 7394:2008
Memasang 1 m2 bekesting untuk Sloof
0.0450 M3 Kayu Balok Kls III x Rp. 2,500,000.00 Rp. 112,500.00
0.3000 kg Paku 5 cm- 10 cm x Rp. 18,000.00 5,400.00
0.1000 ltr Minyak bekesting x Rp. 25,000.00 2,500.00
0.2600 Tukang Kayu x Rp. 120,000.00 Rp. 31,200.00
0.5200 Pekerja x Rp. 100,000.00 Rp. 52,000.00
Jumlah Rp. 203,600.00

SNI 7394:2008
Memasang 1 m2 bekesting untuk Kolom
0.0400 M3 Kayu Balok Kls III x Rp. 2,500,000.00 Rp. 100,000.00
0.4000 kg Paku 5 cm- 12 cm x Rp. 18,000.00 Rp. 7,200.00
0.2000 ltr Minyak bekesting x Rp. 25,000.00 Rp. 5,000.00
0.0150 m3 Balok Kayu Kals II x Rp. 3,000,000.00 Rp. 45,000.00
0.3500 lbr Plywood tebal 9 mm x Rp. 70,000.00 Rp. 24,500.00
2.0000 Btg dolken 8-10cm/4m (KlasIII) x Rp. 28,000.00 Rp. 56,000.00
0.3300 Tukang Kayu x Rp. 120,000.00 Rp. 39,600.00
0.6600 Pekerja x Rp. 100,000.00 Rp. 66,000.00
Jumlah Rp. 343,300.00

- hal . 03 -

PAMSIMAS 2014 ANALISA SATUAN RKM DESA MASIKU


SNI 7394:2008
Memasang 1 m2 bekesting untuk Balok
0.0400 M3 Kayu Balok Kls III x Rp. 2,500,000.00 Rp. 100,000.00
0.4000 kg Paku 5 cm- 12 cm x Rp. 18,000.00 Rp. 7,200.00
0.2000 ltr Minyak bekesting x Rp. 25,000.00 Rp. 5,000.00
0.0180 m3 Balok Kayu Kals II x Rp. 3,000,000.00 Rp. 54,000.00
0.3500 lbr Plywood tebal 9 mm x Rp. 70,000.00 Rp. 24,500.00
2.0000 Btg dolken 8-10cm/4m (KlasIII) x Rp. 28,000.00 Rp. 56,000.00
0.3300 Tukang Kayu x Rp. 120,000.00 Rp. 39,600.00
0.6600 Pekerja x Rp. 100,000.00 Rp. 66,000.00
Jumlah Rp. 352,300.00

SNI 7394:2008
Memasang 1 m2 bekesting untuk plat lantai
0.0400 M3 Kayu Balok Kls III x Rp. 2,500,000.00 Rp. 100,000.00
0.4000 kg Paku 5 cm- 12 cm x Rp. 18,000.00 Rp. 7,200.00
0.2000 ltr Minyak bekesting x Rp. 25,000.00 Rp. 5,000.00
0.0150 m3 Balok Kayu Kals II x Rp. 3,000,000.00 Rp. 45,000.00
0.3500 lbr Plywood tebal 9 mm x Rp. 70,000.00 Rp. 24,500.00
6.0000 Btg dolken 8-10cm/4m (KlasIII) x Rp. 28,000.00 Rp. 168,000.00
0.3300 Tukang Kayu x Rp. 120,000.00 Rp. 39,600.00
0.6600 Pekerja x Rp. 100,000.00 Rp. 66,000.00
Jumlah Rp. 455,300.00

SNI 7394:2008
Memasang 1 m2 bekesting untuk dinding
0.0300 M3 Kayu Balok Kls III x Rp. 2,500,000.00 Rp. 75,000.00
0.4000 kg Paku 5 cm- 12 cm x Rp. 18,000.00 Rp. 7,200.00
0.2000 ltr Minyak bekesting x Rp. 25,000.00 Rp. 5,000.00
0.0200 m3 Balok Kayu Kals II x Rp. 3,000,000.00 Rp. 60,000.00
0.3500 lbr Plywood tebal 9 mm x Rp. 70,000.00 Rp. 24,500.00
3.0000 Btg dolken 8-10cm/4m (KlasIII) x Rp. 28,000.00 Rp. 84,000.00
0.3300 Tukang Kayu x Rp. 120,000.00 Rp. 39,600.00
0.6600 Pekerja x Rp. 100,000.00 Rp. 66,000.00
Jumlah Rp. 361,300.00

SNI 7394:2008
Membuat 1 m3 pondasi beton bertulang (150 kg besi+bekesting)
Beton
6.7200 zak Semen 50 Kg x Rp. 70,000.00 Rp. 470,400.00
0.5400 m3 Pasir beton' x Rp. 150,000.00 Rp. 81,000.00
0.8100 m3 kerikil x Rp. 250,000.00 Rp. 202,500.00
0.2750 Tukang Batu x Rp. 120,000.00 Rp. 33,000.00
5.3000 Pekerja x Rp. 100,000.00 Rp. 530,000.00
Rp. 1,316,900.00
Besi 150 kg
157.50 kg Besi beton polos x Rp. 10,500.00 Rp. 1,653,750.00
2.2500 kg kawat beton x Rp. 25,000.00 Rp. 56,250.00
1.0500 Tukang Besi x Rp. 120,000.00 Rp. 126,000.00
Rp. 1,836,000.00
Bekesting
0.2000 M3 Kayu Balok Kls III x Rp. 2,500,000.00 Rp. 500,000.00
1.5000 kg Paku 5 cm- 12 cm x Rp. 18,000.00 Rp. 27,000.00
0.4000 ltr Minyak bekesting x Rp. 25,000.00 Rp. 10,000.00
1.3000 Tukang Kayu x Rp. 120,000.00 Rp. 156,000.00
Rp. 693,000.00
Jumlah Total Rp. 3,845,900.00

- hal . 04 -

PAMSIMAS 2014 ANALISA SATUAN RKM DESA MASIKU


SNI 7394:2008
Membuat 1 m3 sloof beton bertulang (200 kg besi+bekesting)
Beton
6.7200 zak Semen 50 Kg x Rp. 70,000.00 Rp. 470,400.00
0.5400 m3 Pasir beton' x Rp. 150,000.00 Rp. 81,000.00
0.8100 m3 kerikil x Rp. 250,000.00 Rp. 202,500.00
0.2750 Tukang Batu x Rp. 120,000.00 Rp. 33,000.00
5.6500 Pekerja x Rp. 100,000.00 Rp. 565,000.00
Rp. 1,351,900.00
Besi 200 kg
210.00 kg Besi beton polos x Rp. 10,500.00 Rp. 2,205,000.00
3.0000 kg kawat beton x Rp. 25,000.00 Rp. 75,000.00
1.4000 Tukang Besi x Rp. 120,000.00 Rp. 168,000.00
Rp. 2,448,000.00
Bekesting
0.2000 M3 Kayu Balok Kls III x Rp. 2,500,000.00 Rp. 500,000.00
1.5000 kg Paku 5 cm- 12 cm x Rp. 18,000.00 Rp. 27,000.00
0.4000 ltr Minyak bekesting x Rp. 25,000.00 Rp. 10,000.00
1.3000 Tukang Kayu x Rp. 120,000.00 Rp. 156,000.00
Rp. 693,000.00
Jumlah Total Rp. 4,492,900.00

SNI 7394:2008
Membuat 1 m3 Kolom beton bertulang (300 kg besi+bekesting)
Beton
6.7200 zak Semen 50 Kg x Rp. 70,000.00 Rp. 470,400.00
0.5400 m3 Pasir beton' x Rp. 150,000.00 Rp. 81,000.00
0.8100 m3 kerikil x Rp. 250,000.00 Rp. 202,500.00
0.2750 Tukang Batu x Rp. 120,000.00 Rp. 33,000.00
7.0500 Pekerja x Rp. 100,000.00 Rp. 705,000.00
Rp. 1,491,900.00
Besi 300 kg
315.00 kg Besi beton polos x Rp. 10,500.00 Rp. 3,307,500.00
4.5000 kg kawat beton x Rp. 25,000.00 Rp. 112,500.00
2.1000 Tukang Besi x Rp. 120,000.00 Rp. 252,000.00
Rp. 3,672,000.00
Bekesting
0.1500 M3 Kayu Klas II x Rp. 3,000,000.00 Rp. 450,000.00
0.4000 M3 Kayu Balok Kls III x Rp. 2,500,000.00 Rp. 1,000,000.00
4.0000 kg Paku 5 cm- 12 cm x Rp. 18,000.00 Rp. 72,000.00
2.0000 ltr Minyak bekesting x Rp. 25,000.00 Rp. 50,000.00
20.0000 bt dolken 8-10 cm (klas III) x Rp. 28,000.00 Rp. 560,000.00
1.6500 Tukang Kayu x Rp. 120,000.00 Rp. 198,000.00
Rp. 2,330,000.00
Jumlah Total Rp. 7,493,900.00

SNI 7394:2008
Membuat 1 m3 balok beton bertulang (200 kg besi+bekesting)
Beton
6.7200 zak Semen 50 Kg x Rp. 70,000.00 Rp. 470,400.00
0.5400 m3 Pasir beton' x Rp. 150,000.00 Rp. 81,000.00
0.8100 m3 kerikil x Rp. 250,000.00 Rp. 202,500.00
0.2750 Tukang Batu x Rp. 120,000.00 Rp. 33,000.00
6.3500 Pekerja x Rp. 100,000.00 Rp. 635,000.00
Rp. 1,421,900.00
Besi 200 kg
210.00 kg Besi beton polos x Rp. 10,500.00 Rp. 2,205,000.00
3.0000 kg kawat beton x Rp. 25,000.00 Rp. 75,000.00
1.4000 Tukang Besi x Rp. 120,000.00 Rp. 168,000.00
Rp. 2,448,000.00

- hal . 05 -

PAMSIMAS 2014 ANALISA SATUAN RKM DESA MASIKU


Bekesting
0.15 Kayu Klas II x Rp. - Rp. -
0.3000 M3 Kayu Balok Kls III x Rp. 2,500,000.00 Rp. 750,000.00
4.0000 kg Paku 5 cm- 12 cm x Rp. 18,000.00 Rp. 72,000.00
2.0000 ltr Minyak bekesting x Rp. 25,000.00 Rp. 50,000.00
1.6500 Tukang Kayu x Rp. 120,000.00 Rp. 198,000.00
Rp. 1,070,000.00
Jumlah Total Rp. 4,939,900.00

SNI 7394:2008
Membuat 1 m3 Plat beton bertulang (150 kg besi+bekesting)
Beton
6.7200 zak Semen 50 Kg x Rp. 70,000.00 Rp. 470,400.00
0.5400 m3 Pasir beton' x Rp. 150,000.00 Rp. 81,000.00
0.8100 m3 kerikil x Rp. 250,000.00 Rp. 202,500.00
0.2750 Tukang Batu x Rp. 120,000.00 Rp. 33,000.00
5.3000 Pekerja x Rp. 100,000.00 Rp. 530,000.00
Rp. 1,316,900.00
Besi 200 kg
157.50 kg Besi beton polos x Rp. 10,500.00 Rp. 1,653,750.00
2.2500 kg kawat beton x Rp. 25,000.00 Rp. 56,250.00
1.0500 Tukang Besi x Rp. 120,000.00 Rp. 126,000.00
Rp. 1,836,000.00
Bekesting
0.15 Kayu Klas II x Rp. 3,000,000.00 Rp. 450,000.00
0.3000 M 3
Kayu Balok Kls III x Rp. 2,500,000.00 Rp. 750,000.00
4.0000 kg Paku 5 cm- 12 cm x Rp. 18,000.00 Rp. 72,000.00
2.0000 ltr Minyak bekesting x Rp. 25,000.00 Rp. 50,000.00
1.6500 Tukang Kayu x Rp. 120,000.00 Rp. 198,000.00
Rp. 1,520,000.00
Jumlah Total Rp. 4,672,900.00

SNI 7394:2008
Membuat 1 m3 Dinding beton bertulang (150 kg besi+bekesting)
Beton
6.7200 zak Semen 50 Kg x Rp. 70,000.00 Rp. 470,400.00
0.5400 m3 Pasir beton' x Rp. 150,000.00 Rp. 81,000.00
0.8100 m3 kerikil x Rp. 250,000.00 Rp. 202,500.00
0.2750 Tukang Batu x Rp. 120,000.00 Rp. 33,000.00
5.3000 Pekerja x Rp. 100,000.00 Rp. 530,000.00
Rp. 1,316,900.00

Besi 200 kg
157.50 kg Besi beton polos x Rp. 10,500.00 Rp. 1,653,750.00
2.2500 kg kawat beton x Rp. 25,000.00 Rp. 56,250.00
1.0500 Tukang Besi x Rp. 120,000.00 Rp. 126,000.00
Rp. 1,836,000.00

Bekesting
0.16 Kayu Klas II x Rp. 3,000,000.00 Rp. 480,000.00
0.2400 M 3
Kayu Balok Kls III x Rp. 2,500,000.00 Rp. 600,000.00
3.2000 kg Paku 5 cm- 12 cm x Rp. 18,000.00 Rp. 57,600.00
1.6000 ltr Minyak bekesting x Rp. 25,000.00 Rp. 40,000.00
1.3000 Tukang Kayu x Rp. 120,000.00 Rp. 156,000.00
Rp. 1,333,600.00
Jumlah Total Rp. 4,486,500.00

- hal . 06 -

PAMSIMAS 2014 ANALISA SATUAN RKM DESA MASIKU


SNI 7394:2008
Membuat 1 m' kolom praktis beton bertulang (11 x 11) cm
0.0020 M3 Kayu Balok Kls III x Rp. 2,500,000.00 Rp. 5,000.00
0.0100 kg Paku 5 cm- 12 cm x Rp. 18,000.00 Rp. 180.00
3.0000 kg Besi beton polos x Rp. 10,500.00 Rp. 31,500.00
0.0450 kg kawat beton x Rp. 25,000.00 Rp. 1,125.00
0.0800 zak Semen 50 Kg x Rp. 70,000.00 Rp. 5,600.00
0.0060 m3 Pasir beton' x Rp. 150,000.00 Rp. 900.00
0.0090 m3 kerikil x Rp. 250,000.00 Rp. 2,250.00
0.0200 Tukang Batu x Rp. 120,000.00 Rp. 2,400.00
0.0200 Tukang Kayu x Rp. 120,000.00 Rp. 2,400.00
0.0200 Tukang Besi x Rp. 120,000.00 Rp. 2,400.00
0.1800 Pekerja x Rp. 100,000.00 Rp. 18,000.00
Jumlah Rp. 71,755.00

SNI 7394:2008
Membuat 1 m' Ring balok beton bertulang (10 x 15) cm
0.0030 M3 Kayu Balok Kls III x Rp. 2,500,000.00 Rp. 7,500.00
0.0200 kg Paku 5 cm- 12 cm x Rp. 18,000.00 Rp. 360.00
3.6000 kg Besi beton polos x Rp. 10,500.00 Rp. 37,800.00
0.0500 kg kawat beton x Rp. 25,000.00 Rp. 1,250.00
0.1100 zak Semen 50 Kg x Rp. 70,000.00 Rp. 7,700.00
0.0090 m3 Pasir beton' x Rp. 150,000.00 Rp. 1,350.00
0.0150 m3 kerikil x Rp. 250,000.00 Rp. 3,750.00
0.0330 Tukang Batu x Rp. 120,000.00 Rp. 3,960.00
0.0330 Tukang Kayu x Rp. 120,000.00 Rp. 3,960.00
0.0330 Tukang Besi x Rp. 120,000.00 Rp. 3,960.00
0.2970 Pekerja x Rp. 100,000.00 Rp. 29,700.00
Jumlah Rp. 101,290.00
SNI 2837:2008
Memasang 1 m2 plesteran 1 PC : 3 PP, tebal 15 mm
0.1555 Zak Semen Pc 50 Kg x Rp. 70,000.00 Rp. 10,886.40
0.0230 M3 Pasir Pasangan x Rp. 112,500.00 Rp. 2,587.50
0.1500 Tukang Batu x Rp. 120,000.00 Rp. 18,000.00
0.3000 Pekerja x Rp. 100,000.00 Rp. 30,000.00
Jumlah Rp. 61,473.90
SNI 2837:2008
Memasang 1 m2 plesteran 1 PC : 4 PP, tebal 15 mm
0.1248 Zak Semen Pc. 50 Kg x Rp. 70,000.00 Rp. 8,736.00
0.0240 M3 Pasir Pasangan x Rp. 112,500.00 Rp. 2,700.00
0.1500 Tukang Batu x Rp. 120,000.00 Rp. 18,000.00
0.3000 Pekerja x Rp. 100,000.00 Rp. 30,000.00
Jumlah Rp. 59,436.00

SNI 2837:2008
Memasang 1 m2 plesteran 1 PC : 5 PP, tebal 15 mm
0.1168 Zak Semen Pc. 50 Kg x Rp. 70,000.00 Rp. 8,176.00
0.0260 M3 Pasir Pasangan x Rp. 112,500.00 Rp. 2,925.00
0.1500 Tukang Batu x Rp. 120,000.00 Rp. 18,000.00
0.3000 Pekerja x Rp. 100,000.00 Rp. 30,000.00
Jumlah Rp. 59,101.00

SNI 2837:2008
Memasang 1 m2 finishing siar pasangan dinding batu bata (=20 m')
0.0622 Zak Semen Pc. 50 Kg x Rp. 70,000.00 Rp. 4,351.20
0.0750 Tukang Batu x Rp. 120,000.00 Rp. 9,000.00
0.1500 Pekerja x Rp. 100,000.00 Rp. 15,000.00
Jumlah Rp. 28,351.20

- hal . 07 -

PAMSIMAS 2014 ANALISA SATUAN RKM DESA MASIKU


SNI 2837:2008
Memasang 1 m2 finishing siar pasangan batu kali adukan 1 PC:2 PP
0.1268 Zak Semen Pc. 50 Kg x Rp. 70,000.00 Rp. 8,876.00
0.0120 m3 Pasir Pasangan x Rp. 112,500.00 Rp. 1,350.00
0.1500 Tukang Batu x Rp. 120,000.00 Rp. 18,000.00
0.3000 Pekerja x Rp. 100,000.00 Rp. 30,000.00
Jumlah Rp. 58,226.00
SNI 2837:2008
Memasang 1m2 acian
0.0650 Zak Semen 50 kg x Rp. 70,000.00 Rp. 4,550.00
0.1000 Tukang Batu x Rp. 120,000.00 Rp. 12,000.00
0.2000 Pekerja x Rp. 100,000.00 Rp. 20,000.00
Jumlah Rp. 36,550.00
SNI 2837:2008
Memasang 1 m2 Lantai keramik ukuran (30x30) cm
0.9892 buah Ubin keramik x Rp. - Rp. -
0.0450 M 3
Pasir Pasangan x Rp. 112,500.00 Rp. 5,062.50
0.2000 Zak Semen 50 kg x Rp. 70,000.00 Rp. 14,000.00
0.3500 Tukang Batu x Rp. 120,000.00 Rp. 42,000.00
0.7000 Pekerja x Rp. 100,000.00 Rp. 70,000.00
Jumlah Rp. 131,062.50
SNI 2837:2008
Memasang 1 m2 Lantai keramik ukuran (33x33) cm
0.8333 Dos Ubin keramik x Rp. - Rp. -
0.0450 M 3
Pasir Pasangan x Rp. 112,500.00 Rp. 5,062.50
0.1638 Zak Semen 50 kg x Rp. 70,000.00 Rp. 11,466.00
0.3500 Tukang Batu x Rp. 120,000.00 Rp. 42,000.00
0.7000 Pekerja x Rp. 100,000.00 Rp. 70,000.00
Jumlah Rp. 128,528.50
SNI 2837:2008
Memasang 1 m2 Lantai keramik ukuran (20x20) cm
2.2083 Dos Tegel 20 x 20 x Rp. - Rp. -
0.0450 M 3
Pasir Pasangan x Rp. 112,500.00 Rp. 5,062.50
0.2080 Zak Semen 50 kg x Rp. 70,000.00 Rp. 14,560.00
0.3500 Tukang Batu x Rp. 120,000.00 Rp. 42,000.00
0.7000 Pekerja x Rp. 100,000.00 Rp. 70,000.00
Jumlah Rp. 131,622.50

SNI 2837:2008
Memasang 1 m2 dinding porselin ukuran (10x20) cm
4.4167 Dos porselin x Rp. - Rp. -
0.0180 M 3
Pasir Pasangan x Rp. 112,500.00 Rp. 2,025.00
0.1860 Zak Semen 50 kg x Rp. 70,000.00 Rp. 13,020.00
0.4500 Tukang Batu x Rp. 120,000.00 Rp. 54,000.00
0.9000 Pekerja x Rp. 100,000.00 Rp. 90,000.00
Jumlah Rp. 159,045.00

SNI 2837:2008
Memasang 1 m2 dinding keramik ukuran (20x20) cm
2.2083 Dos Tegel 20 x 20 x Rp. - Rp. -
0.0180 M 3
Pasir Pasangan x Rp. 112,500.00 Rp. 2,025.00
0.1860 Zak Semen 50 kg x Rp. 70,000.00 Rp. 13,020.00
0.4500 Tukang Batu x Rp. 120,000.00 Rp. 54,000.00
0.9000 Pekerja x Rp. 100,000.00 Rp. 90,000.00
Jumlah Rp. 159,045.00

- hal . 8 -

PAMSIMAS 2014 ANALISA SATUAN RKM DESA MASIKU


1 m2 Pek. Cat Atap Genteng
0.1250 Kg Cat Genteng x Rp. 95,000.00 Rp. 11,875.00
0.0750 Tukang Cat x Rp. 120,000.00 Rp. 9,000.00
0.0500 Pekerja x Rp. 100,000.00 Rp. 5,000.00
Jumlah Rp. 25,875.00
1 m2Pek. Cat Atap Seng
0.1250 Kg Cat Meni x Rp. 30,000.00 Rp. 3,750.00
0.0750 Tukang Cat x Rp. 120,000.00 Rp. 9,000.00
0.0500 Pekerja x Rp. 100,000.00 Rp. 5,000.00
Jumlah Rp. 17,750.00
SNI 3434:2008
Membuat dan Memasang 1 m3 Kusen Pintu dan kusen jendela kayu klas I
1.1000 M3 Kayu Bayam x Rp. 4,000,000.00 Rp. 4,400,000.00
1.2500 kg pAku 10 cm x Rp. 18,000.00 Rp. 22,500.00
1.0000 kg Lem Kayu x Rp. 20,000.00 Rp. 20,000.00
21.0000 Tukang Kayu x Rp. 120,000.00 Rp. 2,520,000.00
7.0000 Pekerja x Rp. 100,000.00 Rp. 700,000.00
Jumlah Rp. 7,662,500.00

SNI 3434:2008
Membuat dan Memasang 1 m3 Kusen Pintu dan kusen jendela kayu klas II
1.2000 M3 Kayu klas II x Rp. 3,000,000.00 Rp. 3,600,000.00
1.2500 kg pAku 10 cm x Rp. 18,000.00 Rp. 22,500.00
1.0000 kg Lem Kayu x Rp. 20,000.00 Rp. 20,000.00
18.0000 Tukang Kayu x Rp. 120,000.00 Rp. 2,160,000.00
6.0000 Pekerja x Rp. 100,000.00 Rp. 600,000.00
Jumlah Rp. 6,402,500.00

SNI 3434:2008
Membuat dan Memasang 1 m2 Daun Pintu Panel, Kayu Klas I
0.0400 M3 Papan kayu Klas I x Rp. 4,000,000.00 Rp. 160,000.00
0.5000 kg Lem Kayu x Rp. 20,000.00 Rp. 10,000.00
3.0000 Tukang Kayu x Rp. 120,000.00 Rp. 360,000.00
1.0000 Pekerja x Rp. 100,000.00 Rp. 100,000.00
Jumlah Rp. 630,000.00
SNI 3434:2008
Membuat dan Memasang 1 m2 Daun Pintu Panel, Kayu Klas II
0.0400 M3 Papan kayu Klas II x Rp. 3,000,000.00 Rp. 120,000.00
0.5000 kg Lem Kayu x Rp. 20,000.00 Rp. 10,000.00
3.0000 Tukang Kayu x Rp. 120,000.00 Rp. 360,000.00
1.0000 Pekerja x Rp. 100,000.00 Rp. 100,000.00
Jumlah Rp. 590,000.00

SNI 3434:2008
Memasang 1 m3 Konstruksi kuda2 konvensional, kayu klas II
1.1000 M3 Balok klas II x Rp. 3,000,000.00 Rp. 3,300,000.00
15.0000 kg Besi srip tebal 5 mm x Rp. 15,000.00 Rp. 225,000.00
5.6000 kg Paku 12 cm x Rp. 18,000.00 Rp. 100,800.00
12.0000 Tukang Kayu x Rp. 120,000.00 Rp. 1,440,000.00
4.0000 Pekerja x Rp. 100,000.00 Rp. 400,000.00
Jumlah Rp. 5,465,800.00

SNI 3434:2008
Memasang 1 m3 Konstruksi kuda2 konvensional, kayu klas I
1.2000 M3 Kayu Kls I x Rp. 4,000,000.00 Rp. 4,800,000.00
15.0000 kg Besi srip tebal 5 mm x Rp. 15,000.00 Rp. 225,000.00
5.6000 kg Paku 12 cm x Rp. 18,000.00 Rp. 100,800.00
20.1000 Tukang Kayu x Rp. 120,000.00 Rp. 2,412,000.00
6.7000 Pekerja x Rp. 100,000.00 Rp. 670,000.00
Jumlah Rp. 8,207,800.00

- hal . 09 -

PAMSIMAS 2014 ANALISA SATUAN RKM DESA MASIKU


SNI 3434:2008
Memasang 1 m3 Konstruksi Gording , kayu klas II
1.1000 M3 Kayu Kls II x Rp. 3,000,000.00 Rp. 3,300,000.00
15.0000 kg Besi srip tebal 5 mm x Rp. 15,000.00 Rp. 225,000.00
3.0000 kg Paku 12 cm x Rp. 18,000.00 Rp. 54,000.00
7.2000 Tukang Kayu x Rp. 120,000.00 Rp. 864,000.00
2.4000 Pekerja x Rp. 100,000.00 Rp. 240,000.00
Jumlah Rp. 4,683,000.00
1 m Pek. Atap Seng BJLS 20
2

6.0000 Kk Seng BJLS 20 (6kk) x Rp. 7,125.00 Rp. 42,750.00


0.0400 Kg Paku Seng x Rp. 55,000.00 Rp. 2,200.00
0.2000 Tukang Kayu x Rp. 120,000.00 Rp. 24,000.00
0.1000 Pekerja x Rp. 100,000.00 Rp. 10,000.00
Jumlah Rp. 78,950.00
1 m2 Pek. Atap Seng BJLS 0,35
6.0000 Kk Seng BJLS 0,35 x Rp. 7,125.00 RP. 42,750.00
0.0400 Kg Paku Seng x Rp. 55,000.00 RP. 2,200.00
0.2000 Tukang Kayu x Rp. 120,000.00 RP. 24,000.00
0.1000 Pekerja x Rp. 100,000.00 RP. 10,000.00
Jumlah RP. 78,950.00
1 m Pek. Bumbungan Seng
1

0.3000 Lbr Seng Plat BJLS 20 x Rp. 7,125.00 Rp. 2,137.50


0.0200 Kg Paku Seng x Rp. 55,000.00 Rp. 1,100.00
0.0250 Tukang Kayu x Rp. 120,000.00 Rp. 3,000.00
0.0250 Pekerja x Rp. 100,000.00 Rp. 2,500.00
Jumlah Rp. 8,737.50
SNI 3434:2008
Memasang 1 m' lisplank ukuran (3x20) cm. Kayu klas I
0.0108 M3 Papan Bayam x Rp. 4,000,000.00 Rp. 43,200.00
0.1000 Kg Paku x Rp. 18,000.00 Rp. 1,800.00
0.2000 Tukang Kayu x Rp. 120,000.00 Rp. 24,000.00
0.1000 Pekerja x Rp. 100,000.00 Rp. 10,000.00
Jumlah Rp. 79,000.00
SNI 3434:2008
Memasang 1 m' lisplank ukuran (3x20) cm. Kayu klas II
0.0108 M3 Papan Samarinda x Rp. 3,000,000.00 Rp. 32,400.00
0.1000 Kg Paku x Rp. 18,000.00 Rp. 1,800.00
0.2000 Tukang Kayu x Rp. 120,000.00 Rp. 24,000.00
0.1000 Pekerja x Rp. 100,000.00 Rp. 10,000.00
Jumlah Rp. 68,200.00

SNI 3434:2008
Memasang 1 m2 rangka langit-langit (50x100) cm, kayu klas II - kaso-kaso (5x7) cm
0.0154 M3 Kaso-kaso (5x7) cm x Rp. 3,000,000.00 Rp. 46,200.00
0.2000 Kg Paku x Rp. 18,000.00 Rp. 3,600.00
0.3000 Tukang Kayu x Rp. 120,000.00 Rp. 36,000.00
0.1500 Pekerja x Rp. 100,000.00 Rp. 15,000.00
Jumlah Rp. 100,800.00

SNI 3434:2008
Memasang 1 m2 rangka langit-langit (50x100) cm, kayu klas III - kaso-kaso (5x7) cm
0.0154 M3 Kaso-kaso (5x7) cm x Rp. 2,500,000.00 Rp. 38,500.00
0.2000 Kg Paku x Rp. 18,000.00 Rp. 3,600.00
0.3000 Tukang Kayu x Rp. 120,000.00 Rp. 36,000.00
0.1500 Pekerja x Rp. 100,000.00 Rp. 15,000.00
Jumlah Rp. 93,100.00

- hal . 10 -

PAMSIMAS 2014 ANALISA SATUAN RKM DESA MASIKU


SNI 3434:2008
Memasang 1 m2 rangka langit-langit (60x60) cm, kayu klas II
0.0163 M3 Kaso-kaso (5x7) cm x Rp. 3,000,000.00 Rp. 48,900.00
0.2500 Kg Paku x Rp. 18,000.00 Rp. 4,500.00
0.3000 Tukang Kayu x Rp. 120,000.00 Rp. 36,000.00
0.2000 Pekerja x Rp. 100,000.00 Rp. 20,000.00
Jumlah Rp. 109,400.00
SNI 3434:2008
Memasang 1 m2 rangka rangka atap sirap, kayu klas II
0.1650 M3 Kayu klas II x Rp. 3,000,000.00 Rp. 495,000.00
0.2000 Kg Paku 5 ~ 10 CM x Rp. 18,000.00 Rp. 3,600.00
0.1200 Tukang Kayu x Rp. 120,000.00 Rp. 14,400.00
0.1200 Pekerja x Rp. 100,000.00 Rp. 12,000.00
Jumlah Rp. 525,000.00
SNI 2839:2008
Memasang 1 m2 langit2 tripleks ukuran (120x240) cm , tebal 3 mm , 4 mm
0.3750 Lbr Tripleks 3 mm x Rp. 70,000.00 Rp. 26,250.00
0.0300 Kg Paku tripleks x Rp. 18,000.00 Rp. 540.00
0.1000 Tukang Kayu x Rp. 120,000.00 Rp. 12,000.00
0.1000 Pekerja x Rp. 100,000.00 Rp. 10,000.00
Jumlah Rp. 48,790.00

1 m2 Pengecatan Dengan Cat Mengkilap 3 x


0.3000 Kg Cat Mengkilap x Rp. 58,000.00 Rp. 17,400.00
0.1500 Kg Cat Dasar x Rp. 30,000.00 Rp. 4,500.00
0.1000 Kg Plamur x Rp. 60,000.00 Rp. 6,000.00
0.0750 Ltr Minyak Cat x Rp. 25,000.00 Rp. 1,875.00
0.1000 Lbr Kertas Gosok x Rp. 3,000.00 Rp. 300.00
0.0750 Tukang Cat x Rp. 120,000.00 Rp. 9,000.00
0.0500 Pekerja x Rp. 100,000.00 Rp. 5,000.00
Jumlah Rp. 44,075.00
1 m Pengecatan Dinding Tembok
2

0.3000 Kg Cat Tembok x Rp. 185,000.00 Rp. 55,500.00


0.1000 Kg Plamur x Rp. 60,000.00 Rp. 6,000.00
0.1000 Lbr Kertas Gosok x Rp. 3,000.00 Rp. 300.00
0.0750 Tukang Cat x Rp. 120,000.00 Rp. 9,000.00
0.0500 Pekerja x Rp. 100,000.00 Rp. 5,000.00
Jumlah Rp. 75,800.00

- hal . 11 -

PAMSIMAS 2014 ANALISA SATUAN RKM DESA MASIKU


DAFTAR SURVEY HARGA BAHAN TAHUN 2017
NO. JENIS BAHAN SAT. HARGA
1 2 3 Rp 6.00
BAHAN DASAR
1 Batu Kali M³ Rp 150,000.00
2 Batu Gunung / Batu Belah M³ Rp 150,000.00
3 Bata Merah Bh Rp 600.00
4 Pasir Timbunan / Urug M³ Rp 112,500.00
5 Pasir Pasangan M³ Rp 112,500.00
6 Pasir Beton M³ Rp 150,000.00
7 Kerikil Beton 2-3 cm M³ Rp 250,000.00
8 Semen (PC) 50 Kg Zak / Kg Rp 70,000.00
BAHAN KAYU
1 Balok Kls. I Uk. 5 x 7 x 400 cm M³ Rp 4,000,000.00
2 Papan Kls. I Uk. 2 x 20 x 400 cm M³ Rp 4,000,000.00
3 Balok Kls. II Uk. 5 x 7 x 400 cm M³ Rp 3,000,000.00
4 Papan Kls. II Uk. 2 x 20 x 400 cm M³ Rp 3,000,000.00
5 Balok Kls. III Uk. 5 x 7 x 400 cm M³ Rp 2,500,000.00
6 Papan Kls. III Uk. 2 x 20 x 400 cm M³ Rp 2,500,000.00
7 Papan Kls IV Uk. 3 x 20 x 400 cm M³ Rp 2,000,000.00
8 Balok Kls IV Uk. 5 x 7 x 400 cm M³ Rp 2,000,000.00
9 Kayu Lapis 3 mm uk. 120 x 240 cm Lbr Rp 53,000.00
10 Plywood tebal 3 mm Lbr Rp 70,000.00
11 Bambu Btg Rp 15,000.00
12 Seng Gelombang 6 kaki Lbr Rp 42,750.00
BAHAN BESI
1 Besi polos Kg Rp 10,500.00
2 Kawat Beton Kg Rp 25,000.00
3 Besi Siku 40.40.4 M Rp 75,000.00
4 Besi Siku 60.60.6 M Rp 95,000.00
5 Besi Strep 30.3 mm M Rp 15,000.00
6 Besi Plat 3 mm (125 x 240) M² Rp 850,000.00
7 Paku Biasa Kg Rp 18,000.00
8 Paku Seng (Payung) RRT Kg Rp 55,000.00
9 Kran Air -1/2" bh Rp 25,000.00
BAHAN PIPA PVC
1 Pipa PVC S-12.5 Ø 160 - 6" (6 mtr) Btg Rp 767,500.00
2 Pipa PVC S-12.5 Ø 110 - 4" (6 mtr) Btg Rp 370,000.00
3 Pipa PVC S-12.5 Ø 90 - 3" (6 mtr) Btg Rp 255,000.00
4 Pipa PVC S-12.5 Ø 63 - 2" (6 mtr) Btg Rp 125,000.00

PAMSIMAS III RKM DESA HARAPAN


NO. JENIS BAHAN SAT. HARGA
1 2 3 Rp 6.00
5 Pipa PVC S-10 Ø 50 - 1 ½" (6 mtr) Btg Rp 95,000.00
6 Pipa PVC S-10 Ø 40 - 1 ¼" (6 mtr) Btg Rp 58,500.00
7 Pipa PVC S-10 Ø 32 - 1" Btg Rp 45,000.00
8 Pipa PVC S-10 Ø 28 - ¾" Btg Rp 29,500.00
9 Pipa PVC S-10 Ø 20 - ½" Btg Rp 21,500.00
10 Knee 90° Ø 3" Bh Rp 35,000.00
11 Knee 90° Ø 2" Bh Rp 30,000.00
12 Knee 90° Ø 1½" Bh Rp 17,500.00
13 Knee 90° Ø 1¼" Bh Rp -
14 Knee 90° Ø 1" Bh Rp 10,000.00
15 Knee 90° Ø ¾" Bh Rp 6,000.00
16 Knee 90° Ø ½" Bh Rp 5,000.00
17 Tee Ø 3x3x3" Bh Rp 175,000.00
18 Tee Ø 2x2x2" Bh Rp 85,000.00
19 Tee Ø 2x1x2" Bh Rp 80,000.00
20 Tee Ø 1½x1½x1½" Bh Rp 40,000.00
21 Tee Ø 1¼x1¼x1¼" Bh Rp 25,000.00
22 Tee Ø 1¼x1x1¼" Bh Rp 25,000.00
23 Tee Ø 1x1x1" Bh Rp 10,000.00

PAMSIMAS III RKM DESA HARAPAN


NO. JENIS BAHAN SAT. HARGA
1 2 3 Rp 6.00
24 Tee Ø ¾x¾x¾" Bh Rp 7,500.00
25 Tee Ø ½x½x½" Bh Rp 5,000.00
26 Tee 4" x 4" x 4" Bh Rp 185,000.00
27 Tee 4" x 3" x 4" Bh Rp 175,000.00
28 Tee 4" x 2" x 4" Bh Rp 165,000.00
29 Reducer Ø 3x2" Bh Rp 50,000.00
30 Reducer Ø 2x1½" Bh Rp 50,000.00
31 Reducer Ø 2x1¼" Bh Rp 50,000.00
32 Reducer Ø 1½x1¼" Bh Rp 40,000.00
33 Reducer Ø 1½x1" Bh Rp 40,000.00
34 Reducer Ø 1¼x1" Bh Rp 40,000.00
35 Reducer Ø 1¼x¾" Bh Rp 40,000.00
36 Reducer Ø ¾x½" Bh Rp 5,000.00
37 Dop Ø 3" Bh Rp 30,000.00
37 Dop Ø 2" Bh Rp 22,000.00
38 Dop Ø 1½" Bh Rp 10,000.00
39 Dop Ø 1¼" Bh Rp 7,500.00
40 Dop Ø 1" Bh Rp 7,000.00
41 Double Socked Drat Dalam 3" Bh Rp 80,000.00
42 Double Socked Drat Dalam 1½" Bh Rp 40,000.00
43 Socked Drat Luar 3" Bh Rp 80,000.00
44 Socked Drat Luar 2" Bh Rp 40,000.00
45 Socked Drat Luar 1½" Bh Rp 40,000.00
46 Lem Pipa Klg Rp 75,000.00
47 Fiber Kapasitas 1000 l bh Rp 1,500,000.00
BAHAN PIPA GALVANIS `
PIPA GI, SNI
1 Pipa galvanis Ø 4" btg Rp 825,000.00
1 Pipa galvanis Ø 3" btg Rp 745,000.00
2 Pipa galvanis Ø 21/2" btg Rp 625,000.00
3 Pipa galvanis Ø 2" btg Rp 450,000.00
4 Pipa galvanis Ø 1,5 " btg Rp 345,000.00
5 Pipa galvanis Ø 1,25" btg Rp 235,000.00
6 Pipa galvanis Ø 1 " btg Rp 215,000.00
7 Pipa galvanis Ø 3/4 " btg Rp 145,000.00
8 Pipa galvanis Ø 1/2 " btg Rp 115,000.00
17 Socked Ø 3" Bh Rp 80,000.00
18 Socked Ø 2" Bh Rp 27,500.00
19 Socked Ø 1" Bh Rp 7,500.00

PAMSIMAS III RKM DESA HARAPAN


NO. JENIS BAHAN SAT. HARGA
1 2 3 Rp 6.00
20 Socked Ø 3/4" Bh Rp 5,000.00
21 Socked Ø 1/2" Bh Rp 4,000.00
22 Sambungan Knee Ø 3" Bh Rp 80,000.00
23 Sambungan Knee Ø 2" Bh Rp 27,500.00
24 Sambungan Knee Ø 1" Bh Rp 9,000.00
25 Sambungan Knee Ø 3/4" Bh Rp 6,000.00
26 Sambungan Knee Ø 1/2" Bh Rp 4,500.00
27 Sambungan Tee Ø 3" Bh Rp 110,000.00
28 Sambungan Tee Ø 2" Bh Rp 45,000.00
29 Sambungan Tee Ø 1 " Bh Rp 30,000.00
30 Sambungan Tee Ø 1/2" Bh Rp 5,000.00
31 Dop Ø 3" Bh Rp 80,000.00
32 Dop Ø 2 " Bh Rp 27,500.00
33 Dop Ø 1" Bh Rp 7,500.00
34 Dop Ø 3/4" Bh Rp 5,000.00
35 Dop Ø 1/2" Bh Rp 4,000.00
36 Flange Ø 4' Bh Rp 85,000.00

PAMSIMAS III RKM DESA HARAPAN


NO. JENIS BAHAN SAT. HARGA
1 2 3 Rp 6.00
37 Flange Ø 3' Bh Rp 75,000.00
38 Flange Ø 2' Bh Rp 50,000.00
39 Stop Kran Ø 3" Bh Rp 400,000.00
40 Stop Kran Ø 2" Bh Rp 350,000.00
41 Stop Kran Ø 1½" Bh Rp 80,000.00
42 Stop Kran Ø 3/4" Bh Rp 17,500.00
43 Stop Kran Ø 1/2" Bh Rp 10,000.00
44 Kran Air -1/2" Bh Rp 10,000.00
44 Water meter induk Ø3" (Standar PDAM) Bh Rp 1,850,000.00
45 Water meter induk Ø2" (Standar PDAM) Bh Rp 1,300,000.00
46 Water meter Ø3/4" (Standar PDAM) Bh Rp 375,000.00
47 Water meter Ø1/2" (Standar PDAM) Bh Rp 300,000.00
48 Clam sadle 3"-1" Bh Rp 25,000.00
49 Clam sadle 2"-1" Bh Rp 29,000.00
50 Clam sadle 2"-3/4" Bh Rp 29,000.00
51 Socked drat luar 1" Bh Rp 10,000.00
52 Socked drat luar 3/4" Bh Rp 6,000.00
53 Socked drat luar 1/2" Bh Rp 5,000.00
54 Kunci Sney 1/2" - 3" Bh Rp 2,000,000.00
55 Kunci Pipa Bh Rp 300,000.00
BAHAN FINISHING
1 Cat Tembok 5 KG Kg Rp 185,000.00
2 Cat Kayu/Besi Kg Rp 58,000.00
3 Cat Atap Kg Rp 95,000.00
4 Cat Water Silky Kg Rp 185,000.00
5 Plamur Kg Rp 60,000.00
6 Amplas / Kertas Gosok Lbr Rp 3,000.00
7 Kuas Cat Kecil bh Rp 5,000.00
8 Kuas Cat Besar bh Rp 25,000.00
9 Kuas Rol bh Rp 35,000.00
10 Minyak Bekisting Kg Rp 25,000.00
Cat Meni Kg Rp 30,000.00
ALAT
1 Gerobak Dorong Bh Rp 500,000.00
2 Sekop Besar Bh Rp 85,000.00
3 Sekop Kecil Bh Rp 60,000.00
4 Gergaji besi set Rp 56,000.00
5 Linggis Bh Rp 86,000.00
7 Sendok Semen Bh Rp 35,000.00

PAMSIMAS III RKM DESA HARAPAN


NO. JENIS BAHAN SAT. HARGA
1 2 3 Rp 6.00
8 Ember Cor Bh Rp 15,000.00
9 Tali Plastik m' Rp 5,000.00
10 Rol Derek/catrol Bh Rp 125,000.00
11 Meteran Roll 50 Meter Bh Rp 75,000.00
12 Meteran 5 Meter Bh Rp 34,000.00

DAFTAR UPAH KERJA


NO. UPAH KERJA SAT. HARGA

1 2 3 4

1 Pekerja Org / Hr Rp 100,000.00


2 Tukang Org / Hr Rp 120,000.00

PAMSIMAS III RKM DESA HARAPAN


RVEY HARGA BAHAN TAHUN 2017
KET.
7

Rp 1,400.00

56,000
64,000
42,000
48,000
35,000
40,000
48,000
28,000

6100/kaki

Rp 128,000.00
Rp 61,700.00
Rp 42,500.00
Rp 20,900.00

PAMSIMAS III RKM DESA HARAPAN


KET.
7
Rp 15,900.00
Rp 9,800.00
Rp 7,500.00
Rp 5,000.00
Rp 3,600.00

PAMSIMAS III RKM DESA HARAPAN


KET.
7

Rp 137,500.00
Rp 124,166.67
Rp 104,166.67
Rp 75,000.00
Rp 57,500.00
Rp 39,166.67
Rp 35,833.33
Rp 24,166.67
Rp 19,166.67

PAMSIMAS III RKM DESA HARAPAN


KET.
7

PAMSIMAS III RKM DESA HARAPAN


KET.
7

Rp 37,000.00

PAMSIMAS III RKM DESA HARAPAN


KET.
7

DAFTAR UPAH KERJA


KET.

PAMSIMAS III RKM DESA HARAPAN


TIME SCHEDULE PR

JUMLAH
NO URAIAN KEGIATAN HARGA BOBOT (%) BULAN I
(RP) 1 2 3
1 PEKERJAAN SARANA AIR MINUM 410,379,000 92.18
PEKERJAAN SCT 2,691,000 0.60
PEMASANGAN POMPA 52,400,000 11.77
PEMASANGAN POMPA BOOSTER 34,200,000 7.68
PEMASANGAN LISTRIK 5,015,000 1.13 0.56
PIPA DAN ASSECORIES 227,497,000 51.10 25.55
PEKERJAAN LINTASAN 14,261,000 3.20
PEMASANGAN PIPA 71,232,000 16.00
ALAT SAB 3,083,000 0.69 0.69
2 KESEHATAN 14,270,000 3.21
PHBS MASYARAKAT 4,790,000 1.08 0.54 0.54
PHBS SEKOLAH 8,680,000 1.95 0.97 0.97
SURVEYLANCE KUALITAS AIR 800,000 0.18
3 PEMBERDAYAAN 2,743,000 0.62
PELATIHAN TEKNIK 652,000 0.15 0.15
PELATIHAN ADMINISTRASI KEUANGAN 636,000 0.14 0.14
PELATIHAN PENGADAAN BARANG DAN JASA 743,000 0.17 0.17
PELATIHAN KPSPAM 712,000 0.16
4 BIAYA OPERASIONAL LKM 17,808,000 4.00
ALAT TULIS KANTOR (ATK) 1,768,000 0.40 0.20 0.20
ADMINISTRASI DAN PELAPORAN 2,890,000 0.65 0.04 0.04 0.04
TRANSPORTASI, DLL 13,150,000 2.95 0.18 0.18 0.18
TOTAL 445,200,000 100.00
RENCANA 1.10 2.78 27.48
KOMULATIF RENCANA 1.10 3.88 31.36
REALISASI 0.00 0.00 0.00
KOMULATIF REALISASI 0.00 0.00 0.00

Dibuat Oleh :
Satlak PAMSIMAS KKM Lamonto

AHMAD MUJIONO MAKSUM


Ketua Koordinator
ME SCHEDULE PROGRAM PAMSIMAS

WAKTU PELAKSANAAN
AN I BULAN II BULAN III BULAN IV
4 1 2 3 4 1 2 3 4 1 2 3 4

0.15 0.15 0.15 0.15


5.88 5.88
3.84 3.84
0.56
25.55
1.60 1.60
2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00

0.18

0.16

0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04
0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18

26.50 11.95 11.95 2.23 2.23 2.38 2.38 2.38 2.38 1.83 1.83 0.23 0.40
57.86 69.81 81.76 83.99 86.21 88.59 90.96 93.34 95.72 97.54 99.37 99.60 100.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Didampingi Oleh : Mengetahui


Fasilitator Masyarakat Senior Fasilitator

A.IIS ARISKA PABENTENGI, A.Md PEMIDELIUS GALA, ST


TFM WSS FS
KETERANGAN

A, ST
TAKE OF SHEET
Jenis Prasarana : BAK RESERVOIR
Desa : Harapan PENYEDIAAN AIR BERSIH DAN SANITASI BERBASIS MASYAR
Kecamatan : Tomoni RENCANA ANGGARAN BIAYA
Kabupaten : Luwu Timur TAHUN ANGGARAN 2016

NO URAIAN / SKETSA GAMBAR HITUNGAN VOLUME

I. PEKERJAAN GALIAN TANAH Galian = 16 m


1 Galian Tanah
Volume Galian= 16 x 0.81

= 13 m3

Volume Galian = 4.3

2 Pasangan Batu Kosong p1 = 16 m


Luas Total = 0.18
= 0.18 m2

Volume Pasangan= 0.18 x 16

= 2.88
= 2.9 m3

3 Pasir Uruq p1 = 16 m
Luas Total = 0.08
= 0.08 m2

Volume Pasangan= 0.08 x 16

= 1.28
= 1.28 m3

4 Pasangan Batu 1 : 4 Type 1 p1 = 16 m


Luas Total = 0.53
= 0.53 m2

Volume Pasangan= 0.525 x 16

= 8.4
= 8.4 m3

5 Pekerjaan Sloef Beton 1 : 2 : 3 p1 = 16 m


Luas Total = 0.02
= 0.02 m2

Volume Pasangan=0.0225 x 16

= 0.36
= 0.36 m3

6 Kolom 1 : 2 : 3 P = 1.8 m
Luas Total = 0.04
Jumlah Kolom = 6.00 Buah

Volume Pasangan= 0.04 x 1.8

= 0.432
= 0.43 m3

7 Ring Balk 1 : 2 : 3 P = 16 m
Luas Total = 0.02

Volume Pasangan= 0.02 x 16

= 0.24
= 0.24 m3

8 Dinding Beton Sisi Memanjang T = 15 CM Tebal = 0.15 m


Luas Segmen = 8.00 m2

Jumlah Dinding = 2.00 Buah


Tebal = 0.12 m
Luas Segmen = 7.00 m2

Jumlah Dinding = 1.00 Buah


Volume = 0.12 x 7.00
= 0.84
= ###
Volume Pasangan= 0.15 x 8.00

= 2.4
= 2.40 m3

9 Dinding Beton Sisi Melintang T = 15 CM Tebal = 0.15 m


Luas Segmen = 8.00 m2

Jumlah Dinding = 2.00 Buah


Volume Pasangan= 0.15 x 8.00

= 2.4
= 2.4 m3

10 Plat Beton 1 : 2 ; 3 T = 12 cm Tebal = 0.12 m


Luas Total = 14.00 m2
- 0.64

Volume Pasangan= 0.12 x ###

= 1.6032
= 1.6 m3

11 Plat Beton (Timbul) 1 : 2 ; 3 T = 10 cm T = 0 m


Luas Total = = 0.40 M2

Volume Pasangan= 0.00 x 0.40

= 0
= 0.00 m3

12 Lantai Beton 1 : 2 ; 3 T = 15 cm T = 0.15 m


Luas Total = = 14.00 M2

Volume Pasangan= 0.15 x ###

= 2.1
= 2.1 m3

13 Plasteran Pondasi 1 : 4 Panjang = 16 m


Tinggi = 0.20 m

Volume Pasangan= 16.00 x 0.20

= 3.2
= 3.20 m2

14 Plasteran Dinding 1 : 4 Panjang = 32 m


Tinggi = 2.00 m

Volume Pasangan= 32.00 x 2.00


= 64
= 64 m2

15 Pondasi Box 1 : 4 Panjang = 2 m


Luas = 0.42 m

Volume Pasangan= 2.00 x 0.42

= 0.84
= 0.84 m2

16 Plasteran Box 1 : 4 Panjang = 3 m


Tinggi = 0.80 m

Volume Pasangan= 3.00 x 0.80

= 2.4
= 2.4 m2
NITASI BERBASIS MASYARAKAT
GARAN BIAYA
ARAN 2016

UME KET.

16

16

16
16

X 6.00

x 1.00

X 2.00
X 2.00
Tulangan Kolom O Berat Panjang Jml Tot.
Per M Btg Btg Jumlah TitikPanjang
(MM) (Kg/M) (M) (Bh) (M)

12 0.89 2.00 4.00 4.00 32.00


8 0.39 0.80 13.33 4.00 42.67

JUMLAH

Tulangan Sloef O Berat Panjang Jml Tot.


Per M Btg Btg Panjang Panjang
(MM) (Kg/M) (M) (Bh) (M)

12 0.89 16.00 4.00 64.00


8 0.39 0.60 106.67 0.00 64.00

JUMLAH
Tulangan Lantai O Berat Panjang Jml Tot.
Per M Btg Melintang Panjang Panjang
(MM) (Kg/M) (M) (Bh) (M)

A Type A 12 0.89 3.00 26.67 80.00

12 0.89 4.00 26.67 106.67

JUMLAH

Tulangan Dinding O Berat Panjang Jml Tot.


Per M Btg Melintang Jumlah Sisi Panjang
(MM) (Kg/M) (M) (Bh) (M)

Tulangan P = 8 M DAN T = 2 M
12 0.89 2.00 26.67 2.00 106.67
A Type A

12 0.89 3.00 13.33 2.00 80.00


Tulangan P = 2 M DAN T = 2 M

12 0.89 2.00 13.33 2.00 53.33

A Type A
12 0.89 4.00 13.33 2.00 106.67

JUMLAH

Tulangan Anak Balok O Berat Panjang Jml Tot.


Per M Btg Btg Panjang Panjang
(MM) (Kg/M) (M) (Bh) (M)

12 0.89 4.00 6.00 24.00


8 0.39 0.90 26.67 0.00 24.00

JUMLAH
Tulangan Plat O Berat Panjang Jml Tot.
Per M Btg Btg Panjang Panjang
(MM) (Kg/M) (M) (Bh) (M)

Melintang
12 0.89 3.00 27.67 83.00

Memanjang
12 0.89 4.00 20.00 80.00

JUMLAH

JUMLAH TOTAL BESI =


Berat
Jumlah Total KET

Batang (Kg)

2.67 28.42
3.56 16.84 Jarak 15 cm

45.26 KG

Berat
Jumlah Total KET

Batang (Kg)

5.33 56.83
5.33 25.26 Jarak 15 cm

82.09 KG
Berat
Jumlah Total KET

Batang (Kg)

Melintang
6.67 71.04 Jarak 15 cm
Memanjang
8.89 94.72 Jarak 15 cm

165.76 KG

Berat
Jumlah Total KET

Batang (Kg)

Melintang
8.89 94.72 Jarak 15 cm
Memanjang
6.67 71.04 Jarak 15 cm
Melintang
4.44 47.36 Jarak 15 cm
Memanjang
8.89 94.72 Jarak 15 cm

307.84 KG

Berat
Jumlah Total KET

Batang (Kg)

Err:509
2.00 21.31 Err:509
2.00 9.47 Jarak 15 cm Err:509 120

4.736 80 bt 12
50000
Rp 9,125,000.00 957.2072 304.0541
30.78 KG 79.76727 25.33784
Berat
Jumlah Total KET 2 4.736
Batang (Kg) 3 56.832
6 22.4297 44.85939
7 3.738283
6.92 73.70 Jarak 15 cm 9
29 Err:509
2
6.67 71.04 Jarak 20 cm 7 Err:509
7 Err:509
72
144.74 KG 864
767.232 864
JUMLAH TOTAL BESI = 776.47 KG 789.6617 72
Err:509
TAKE OF SHEET
Jenis Prasarana : Bak PMA
Desa : Harapan PENYEDIAAN AIR BERSIH DAN SANITASI BERBASIS MASYAR
Kecamatan : Malili RENCANA ANGGARAN BIAYA
Kabupaten : Luwu Timur TAHUN ANGGARAN 2016

NO URAIAN / SKETSA GAMBAR HITUNGAN VOLUME

I. PEKERJAAN GALIAN TANAH Galian = 10.6 m


1 Galian Tanah
Volume Galian= 10.6 x 0.81

= 8.6 m3

Volume Galian = 2.9

2 Pasangan Batu Kosong p1 = 10.6 m


Luas Total = 0.18
= 0.18 m2

Volume Pasangan= 0.18 x 10.6

= 1.908
= 1.9 m3

3 Pasir Uruq p1 = 10.6 m


Luas Total = 0.08
= 0.08 m2

Volume Pasangan= 0.08 x 10.6

= 0.848
= 0.848 m3

4 Pasangan Batu 1 : 4 Type 1 p1 = 10.6 m


Luas Total = 0.53
= 0.53 m2

Volume Pasangan= 0.525 x 10.6

= 5.565
= 5.57 m3

5 Pekerjaan Sloef Beton 1 : 2 : 3 p1 = 10.6 m


Luas Total = 0.02
= 0.02 m2

Volume Pasangan= 0.0225 x 10.6

= 0.2385
= 0.24 m3

6 Kolom 1 : 2 : 3 P = 0.8 m
Luas Total = 0.04
Jumlah Kolom = 4.00 Buah

Volume Pasangan= 0.04 x 0.8

= 0.128
= 0.13 m3

7 Ring Balk 1 : 2 : 3 P = 10.6 m


Luas Total = 0.02

Volume Pasangan= 0.02 x 10.6

= 0.159
= 0.16 m3

8 Dinding Beton Sisi Memanjang T = 20 CM Tebal = 0.15 m


Luas Segmen = 8.00 m2

Jumlah Dinding = 2.00 Buah

Volume Pasangan= 0.15 x 8.00

= 2.4
= 2.4 m3

9 Dinding Beton Sisi Melintang T = 20 CM Tebal = 0.15 m


Luas Segmen = 6.00 m2

Jumlah Dinding = 2.00 Buah

Volume Pasangan= 0.15 x 6.00

= 1.8
= 1.8 m3
10 Plat Beton 1 : 2 ; 3 T = 12 cm Tebal = 0.12 m
Luas Total = 2.00 m2
- 0.36

Volume Pasangan= 0.12 x 1.64

= 0.1968
= 0.2 m3

11 Plat Beton (Timbul) 1 : 2 ; 3 T = 10 cm T = 0 m


Luas Total = = 0.40 M2

Volume Pasangan= 0.00 x 0.40

= 0
= 0.00 m3

12 Lantai Beton 1 : 2 ; 3 T = 15 cm T = 0.15 m


Luas Total = = 12.00 M2

Volume Pasangan= 0.15 x ###

= 1.8
= 1.8 m3

13 Plasteran Pondasi 1 : 4 Panjang = 10.6 m


Tinggi = 0.20 m

Volume Pasangan= 10.60 x 0.20

= 2.12
= 2.12 m2

14 Plasteran Dinding 1 : 4 Panjang = 10.6 m


Tinggi = 0.80 m

Volume Pasangan= 10.60 x 0.80

= 8.48
= 8.48 m2

15 Pondasi Box 1 : 4 Panjang = 2 m


Luas = 0.42 m
Volume Pasangan= 2.00 x 0.42

= 0.84
= 0.84 m2

16 Plasteran Box 1 : 4 Panjang = 3 m


Tinggi = 0.80 m

Volume Pasangan= 3.00 x 0.80

= 2.4
= 2.4 m2
NITASI BERBASIS MASYARAKAT
GARAN BIAYA
ARAN 2016

UME KET.

10.6

10.6

10.6
10.6

X 4.00

X 2.00

X 2.00
Tulangan Kolom Ø Berat Panjang Jml Tot.
Per M Btg Btg Jumlah TitikPanjang
(MM) (Kg/M) (M) (Bh) (M)

12 0.89 2.00 4.00 4.00 32.00


8 0.39 0.70 11.00 4.00 30.80

JUMLAH

Tulangan Sloef Ø Berat Panjang Jml Tot.


Per M Btg Btg Panjang Panjang
(MM) (Kg/M) (M) (Bh) (M)

12 0.89 14.00 4.00 56.00


8 0.39 0.50 93.33 0.00 46.67

JUMLAH
Tulangan Lantai Ø Berat Panjang Jml Tot.
Per M Btg Melintang Panjang Panjang
(MM) (Kg/M) (M) (Bh) (M)

A Type A 12 0.89 1.00 7.67 7.67

12 0.89 1.00 7.67 7.67

JUMLAH

Tulangan Dinding Ø Berat Panjang Jml Tot.


Per M Btg Melintang Jumlah Sisi Panjang
(MM) (Kg/M) (M) (Bh) (M)

Tulangan P = 2 M DAN T = 1,5 M


12 0.89 3.00 13.33 2.00 80.00
A Type A
A Type A

12 0.89 4.00 10.00 2.00 80.00

Tulangan P = 2 M DAN T = 1,5 M

12 0.89 3.00 13.33 2.00 80.00

A Type A
12 0.89 4.00 10.00 2.00 80.00

JUMLAH

Tulangan Ring Balk O Berat Panjang Jml Tot.


Per M Btg Btg Panjang Panjang
(MM) (Kg/M) (M) (Bh) (M)

12 0.89 14.00 4.00 56.00


8 0.39 0.30 94.33 0.00 28.30

JUMLAH
Tulangan Plat O Berat Panjang Jml Tot.
Per M Btg Btg Panjang Panjang
(MM) (Kg/M) (M) (Bh) (M)

Melintang
12 0.89 1.00 7.67 7.67

Memanjang
12 0.89 1.00 7.67 7.67

JUMLAH

JUMLAH TOTAL BESI =


Berat
Jumlah Total KET

Batang (Kg)

2.67 28.42
2.57 12.16 Jarak 15 cm

40.57 KG

Berat
Jumlah Total KET

Batang (Kg)

4.67 49.73
3.89 18.42 Jarak 15 cm

68.15 KG
Berat
Jumlah Total KET

Batang (Kg)

Melintang
0.64 6.81 Jarak 15 cm
Memanjang
0.64 6.81 Jarak 15 cm

13.62 KG

Berat
Jumlah Total KET

Batang (Kg)

Melintang
6.67 71.04 Jarak 15 cm
Memanjang
6.67 71.04 Jarak 15 cm

Melintang
6.67 71.04 Jarak 15 cm
Memanjang
6.67 71.04 Jarak 15 cm

284.16 KG

Berat
Jumlah Total KET

Batang (Kg)

4.67 49.73
2.36 11.17 Jarak 15 cm

60.90 KG
Berat 15.33333
Jumlah Total KET

Batang (Kg)

0.64 6.81 Jarak 15 cm

0.64 6.81 Jarak 20 cm

13.62 KG

JUMLAH TOTAL BESI = 481.01 KG


A. GALIAN TANAH/URUG KEMBALI/Pasir Urug/Timbunan Tanah
Lebar
Bentuk Galian Panjang Tinggi Luas
Atas Bawah
- Persegi empat 20 M 0.5 M 0.45 M 0.225 M2
- Trapesium 0 M 0.5 M 0.5 M 1.6 M 0.8 M2

B. Pondasi
Lebar
Bentuk Pondasi Panjang Tinggi Luas
Atas Bawah
- Persegi empat 20 M 0.5 M 0.5 M 0.225 M2
- Trapesium 20 M 0.25 M 0.35 M 0.8 M 0.24 M2

C. LANTAI

Dimensi Panjang Lebar Tebal Luas Volume

A Pasangan Batu Kali 3 M 1.5 M 0.2 M 4.5 M2 0.9 M3


B Plasteran 3 M 1.5 M 0.05 M 4.5 M2 0.225 M3

D PLAT ATAP

Dimensi Panjang Lebar Tebal Luas Volume

1 1 x 2 x 0.1
A Kubikasi Beton 1 M 2 M 0.1 M 0.2 M2 0.4 M3
B Pembesian
Tulangan Pokok
- Besi 12 1 M 5.322 Kg 1 Btg
- Besi 12 M 2 M 19.51 Kg 2 Btg
- Bekisting 49.67 Kg

Dimensi Panjang Lebar Tebal Luas Volume

Panel Cetakan Vol. Kebutuhan


Papan 2 X 30 1 M 0.02 M 0.3 M 0.006 M2 1 sisi
Balok 4/6 ( Pengatur Jarak ) 1 M 0.04 M 0.06 M 0.002 M2 5 Titik

E PLAT DINDING

Dimensi Panjang Lebar Tebal Luas Volume

1 1 x 1 x 0.15
A Kubikasi Beton 0 M 0 M 0.12 M 0 M2 0 M3
B Pembesian
Tulangan Pokok
- Besi 12 Vertikal 0 M 0 Sisi 0 Kg 0 Btg
- Besi 10 Horisontal 0 Sisi 0 M 0 Kg 0 Btg
- Bekisting 0

Dimensi Tinggi Lebar Tebal Luas Volume

Panel Cetakan Vol. Kebutuhan


Papan 2 X 30 0 M 0M 0.3 M 0 M2 2 sisi
Balok 4/6 ( Pengatur Jarak ) 0 M 0.04 M 0.06 M 0.002 M2 0 Titik

B FINISHING
Jumlah
Dimensi Panjang Tinggi Tebal Luas Bidang
A Plesteran 3 M 0.8 M 0.015 M 4.8 M2 2 sisi
B Acian 3 M 0.8 M 0.005 M 4.8 M2 2 sisi
C Cat 3 M 0.8 M 2.4 M2 1 sisi
Urug Kembali Pasir Urug Timbunan Tanah Batu Kosong
Volume Tebal
Vol. Tebal Vol. Tebal
Urugan
4.5 M3 1.5 M
0 M3 0 M 0 M 0 M3 0.2 M 2 M3 0.1 M

Volume

4.5 M3
4.8 M3

Jenis
Besi Polos
Besi Polos
Besi Polos
Besi Polos
Besi Polos
Besi Polos
Besi Polos


Koef. Besi Jumlah
Jarak Behel
1 Kg 1 Btg Tulangan

0.887 Kg 10.64 Kg/Btg 6 Titik 1 Lapis


0.887 Kg 10.64 Kg/Btg 11 Titik 1 Lapis

Volume

Vol. Kebutuhan Kayu 4 m/lbr Kebutuhan


0.02 M3 0.024 M3/lbr 1 Lbr 3.333 Titik
0.012 M3 0.01 M3/Btg 2 Btg

0.032 M3

Koef. Besi Jumlah


Jarak Behel
1 Kg 1 Btg Tulangan

4 Bidang
0.887 Kg 10.64 Kg/Btg 0 Titik 2 Lapis
0.620 Kg 7.44 Kg/Btg 0 Titik 2 Lapis

Volume

Vol. Kebutuhan Kayu 4 m/lbr Kebutuhan


0 M3 0.024 M3/lbr 0 Lbr 0 Titik 4 Bidang
0 M3 0.01 M3/Btg 0 Btg 4 Bidang
8 Bidang
0 M3

Volume

0.072 M3
0.024 M3
Batu Kosong
Vol.

0 M3

Ukuran Berat/Batang Harga/Batang Harga/Kg Spesifikasi


4 X 12 1.18 8,673 7,350 SNI
6 X 12 2.66 19,418 7,300 SNI
8 X 12 4.73 34,056 7,200 SNI
10 X 12 7.40 53,280 7,200 SNI
12 X 12 10.65 76,680 7,200 SNI
14 X 12 14.50 104,400 7,200 SNI
16 X 12 18.94 136,360 7,200 SNI

8 = 0.393 Kg/m'
10 = 0.620 Kg/m'
12 = 0.887 Kg/m'
14 = 1.209 Kg/m'
16 = 1.580 Kg/m'
RENCANA ANGGARAN BIAYA
Provinsi / Kabupaten / Kecamatan / Desa : Sulawesi Selatan / Luwu Timur

Nomor RAB : 01-A

Pekerjaan Kegiatan : Sarana Air Minum

Volume
URAIAN Koef Vol Kontribusi Masyarakat
Total APBN
inCash inKind
A. PEKERJAAN TANAH
1 GALIAN TANAH BIASA SNI 2835:2008 8.59
Pekerja 0.75 6.44 6.44
2 Urugan Kembali SNI 2835:2008 2.86
Pekerja 0.25 0.72 0.72
B. PEKERJAAN PASANGAN
1 Urugan Pasir Bawah Pondasi SNI 2835:2008 0.848
Pasir Urug 1.2 0.82 1.02
Pekerja 0.3 0.25 0.25
2 Pasangan Batu Kosong SNI 2836:2008 1.91
Batu Kali (batu belah 15/20 cm) 1.20 2.29 2.29
Pasir Urug 0.43 0.82 0.82
Pekerja 0.78 1.49 1.49
Tukang Batu 0.39 0.74 0.74
3 PAS. BATU GUNUNG 1 : 4 SNI 2836:2008 5.57
Batu Kali (batu belah 15/20 cm 1.20 6.68 6.68
Semen 50 Kg 3.26 18.14 18.14
Pasir Pasangan 0.52 2.90 2.90
Tukang Batu 0.75 4.17 4.17
Pekerja 1.50 8.35 8.35
C. PEK. BETON BERTULANG (150 kg besi+bekesting) SNI 7394:2008
PLAT ATAP BETON )
PEK. BETON 1 : 2 : 3 0.20
Semen portland 6.72 1.32 1.32
Pasir Beton 0.54 0.11 0.11
Kerikil beton 0.81 0.16 0.16
Pekerja 0.28 0.05 0.05
Tukang 5.30 1.04 1.04
PEMBESIAN ( 200 Kg ) 0.09
Besi Beton 157.50 13.62 13.62
Kawat beton 2.25 0.19 0.19
Tukang 1.05 0.09 0.09
BEKISTING PLAT LANTAI DAN ATAP 0.07
Paku biasa 2" - 5" 4.00 0.28 0.28
kayu Klas II 0.15 0.01 0.01
Balok kayu Klas III 0.30 0.02 0.02
Minyak Bekisting 2.00 0.14 0.14
Tukang 1.65 0.12 0.12

PMA
Volume
URAIAN Koef Vol Kontribusi Masyarakat
Total APBN
inCash inKind
D. PEKERJAAN FINISHING
1 PLESTERAN 1 : 3 TEBAL 15 mm SNI 2837:2008 16.96
Semen Pc. 50 Kg 0.16 2.64 2.64
Pasir Pasangan 0.02 0.39 0.39
Tukang Batu 0.15 2.54 2.54
Pekerja 0.30 5.09 5.09
2 ACIAN SNI 2837:2008 16.96 6.19 6.19
Semen Pc. 50 Kg 0.07 1.10 1.10
Pekerja 0.10 1.70 1.70
Tukang 0.20 3.39 3.39
3 PENGECATAN SNI 2839:2008 16.96
Cat cat anti Lumut 0.30 5.09 5.09
Cat Dasar 0.15 2.54 2.54
Plamur 0.10 1.70 1.70
Minyak Cat 0.08 1.27 1.27
Kertas Gosok 0.10 1.70 1.70
Tukang Cat 0.08 1.27 1.27
Pekerja 0.05 0.85 0.85
E. PEKERJAAN PIPA DAN ACCESSORIES 1
Pipa Inlet, Penguras, Peluap GI Ø 2 SNI 1 1 1
Socket drad dalam PVC Ø 2" Polos 1 1 1
Socket Drad luar Ø 2" 2 2 2
Tee GI Ø 2" 1 1 1
Knee 90 GI Ø 2" 2 2 2
Stop Kran 2 2 2
Plakat Nama 1 1 1
Plat Baja ( Man Hole ) 2 2 2
F. SARINGAN PASIR LAMBAT 1
Pasir 0.1 0.10
Kerikil beton 0.1 0.10
Ijuk 1 1
Arang 1 1
G. LANGSIRAN MATERIAL 1
Semen Portland 34
Pasir 12
Kerikil beton 0.3
Batu Kali 11
Besi Beton 5

PMA
Volume
URAIAN Koef Vol Kontribusi Masyarakat
Total APBN
inCash inKind

Diketahui Oleh : Diperiksa Oleh :


PPK PAMSIMAS Kab. Luwu Timur Senior Fasilitator Fasilitator Masyarakat

ARVAN, ST PEMIDELIUS GALA, ST A.IIS ARISKA PABENTENGI, A.Md


NIP. 19801222 201101 1 006 TFM WSS

PMA
A ANGGARAN BIAYA
Desa : Sulawesi Selatan / Luwu Timur / Towuti / Buangin
Sub pekerjaan/Kegiatan : Penangkap Mata Air -
Harapan
Ukuran/Dimensi : 3 x 1,5 x 1 Meter

Harga Biaya (Rp)


Satuan Satuan Kontribusi Masyarakat
Total APBN
(Rp) inCash inKind

M' 75,000 643,950 643,950


Hok 100,000 643,950 643,950
M' 25,000 71,550 71,550
Hok 100,000 71,550 71,550

M3 165,000 178,080 178,080


M3 150,000 152,640 152,640
Hok 100,000 25,440 25,440
M3 353,400 705,197 705,197
M3 150,000.00 343,440 343,440
M3 150,000.00 123,638 123,638
Hok 100,000.00 148,824 148,824
Hok 120,000 89,294 89,294
M3 757,363 4,042,973 4,042,973
M3 150,000.00 1,001,700 1,001,700
Zak 70,000.00 1,269,933 1,269,933
M3 150,000.00 435,740 435,740
Hok 120,000 500,850 500,850
Hok 100,000.00 834,750 834,750

M3 1,316,900 278,944 - - 278,944


Zak 70,000 92,575 - - 92,575
M3 150,000 15,941 - - 15,941
M3 250,000 39,852 - - 39,852
Hok 100,000 5,412 - - 5,412
Hok 120,000 125,165 - - 125,165
Kg 2,448,000 151,916 - - 151,916
Kg 10,000 136,160 - - 136,160
Kg 25,000 4,863 - - 4,863
Hok 120,000 10,893 - - 10,893
M2 1,316,900 96,924 - - 96,924
Kg 15,000 4,267 - - 4,267
M3 2,500,000 26,667 - - 26,667
M3 2,300,000 49,067 - - 49,067
Ltr 20,000 2,844 - - 2,844
Hok 120,000 14,080 - - 14,080

PMA
Harga Biaya (Rp)
Satuan Satuan Kontribusi Masyarakat
Total APBN
(Rp) inCash inKind

M² 61,474 1,057,225 1,057,225


Zak 70,000 184,633 184,633
M3 150,000 58,512 58,512
Hok 120,000 305,280 305,280
Hok 100,000 508,800 508,800
M² 36,550 687,728 687,728
Zak 70,000 77,168 77,168
Hok 120,000 203,520 203,520
Hok 120,000 407,040 407,040
M² 75,800 666,104 666,104
Kg 38,000 193,344 193,344
Kg 38,000 96,672 96,672
Kg 60,000 101,760 101,760
Ltr 25,000 31,800 31,800
Lbr 3,000 5,088 5,088
Hok 120,000 152,640 152,640
Hok 100,000 84,800 84,800
3,310,000 3,310,000
Btg 450,000 450,000 450,000
Bh 80,000 80,000 80,000
Bh 40,000 80,000 80,000
Bh 45,000 45,000 45,000
Bh 27,500 55,000 55,000
Bh 350,000 700,000 700,000
Bh 500,000 500,000 500,000
LS 700,000 1,400,000 1,400,000
140,000 140,000
M3 150,000 15,000 15,000
M3 250,000 25,000 25,000
Ls 50,000 50,000 50,000
Ls 50,000 50,000 50,000
428,000 428,000
Zak 5,000 170,000 170,000
M3 10,000 120,000 120,000
M3 10,000 3,000 3,000
M3 10,000 110,000 110,000
Btg 5,000 25,000 25,000
UPAH 4,554,876 - - 4,554,876
DIBULATKAN 4,554,000 - - 4,554,000
BAHAN 7,335,715 - - 7,335,715
DIBULATKAN 7,336,000 - - 7,336,000
JUMLAH TOTAL 11,890,000 - - 11,890,000

PMA
Harga Biaya (Rp)
Satuan Satuan Kontribusi Masyarakat
Total APBN
(Rp) inCash inKind
Buangin, Desember 2017

Dibuat Oleh :
KKM Lamonto Satlak Pamsimas

MAKSUM AHMAD MUJIONO


Koordinator Ketua

PMA
RENCANA ANGGARAN BIAY
Provinsi / Kabupaten / Kecamatan / Desa : Sulawesi Selatan / Luwu T
Nomor RAB : 02-B
Pekerjaan Kegiatan : Sarana Air Minum

Volume
URAIAN Koef Volume Kontribusi Masyarakat
Total APBDes APBN
inCash inKind
1 2=3+4+5 3 4 6
A. PEKERJAAN TANAH ( SNI 2835:2008 )
GALIAN TANAH 13.0
Pekerja 0.75 9.72 9.72
URUGAN KEMBALI 4.32
Pekerja 0.25 1.08 1.08
B. PEKERJAAN PASANGAN BATU ( SNI 2836:2008 )
PAS.BATU KOSONG 2.88
Batu belah 15/20 cm 1.20 3.46 3.46
Pasir urug 0.43 1.24 1.24
Pekerja 0.78 2.25 2.25
Tukang 0.39 1.12 1.12
Pek. pondasi batu belah, campuran 1 PC : 3 PP 8.4
Batu belah 10/15 cm 1.20 10.08 10.08
Semen portland 4.04 33.94 33.94
Pasir pasang 0.49 4.07 4.07
Pekerja 1.50 12.60 12.60
Tukang 0.75 6.30 6.30
D. PEKERJAAN BETON
1 SLOEF 15/15 SNI 7394:2008
BETON (200 kg besi+bekesting) 0.36
Semen portland 6.72 2.42 2.42
Pasir Beton 0.54 0.19 0.19
Kerikil beton 0.81 0.29 0.29
Pekerja 5.65 2.03 2.03
Tukang 0.28 0.10 0.10
PEMBESIAN 0.38
Besi Beton 210.00 79.80 79.80
Kawat beton 3.00 1.14 1.14
Tukang 1.40 0.53 0.53
BEKISTING 0.36
Kayu Balok Klas III 0.20 0.07 0.07
Paku biasa 2" - 5' 1.50 0.54 0.54
Minyak bekisting 0.40 0.14 0.14
Tukang 1.30 0.47 0.47

RESERVOIR
Volume
URAIAN Koef Volume Kontribusi Masyarakat
Total APBDes APBN
inCash inKind
2 KOLOM 20/20 SNI 7394:2008
BETON (300 kg besi+bekesting) 0.432
Semen portland 6.72 2.90 2.90
Pasir Beton 0.54 0.23 0.23
Kerikil beton 0.81 0.35 0.35
Pekerja 7.05 3.05 3.05
Tukang 0.28 0.12 0.12
PEMBESIAN 0.21
Besi Beton 315.00 66.15 66.15
Kawat beton 4.50 0.95 0.95
Tukang 2.10 0.44 0.44
BEKISTING 0.432
Kayu Kls II 0.15 0.06 0.06
Paku biasa 2" - 5' 4.00 1.73 1.73
Balok kayu Klas III 0.40 0.17 0.17
Minyak bekisting 2.00 0.86 0.86
Tukang 1.65 0.71 0.71
3 Balok 10/15 SNI 7394:2008
BETON (200 kg besi+bekesting) 0.24
Semen portland 6.72 1.61 1.61
Pasir Beton 0.54 0.13 0.13
Kerikil beton 0.81 0.19 0.19
Pekerja 6.35 1.52 1.52
Tukang 0.28 0.07 0.07
PEMBESIAN 0.15
Besi Beton 210.00 30.78 30.78
Kawat beton 3.00 0.44 0.44
Tukang 1.40 0.21 0.21
BEKISTING 0.24
Kayu Kelas II 0.15 0.04 0.04
Paku biasa 2" - 5' 4.00 0.96 0.96
Balok kayu Klas III 0.30 0.07 0.07
Minyak bekisting 2.00 0.48 0.48
Tukang 1.65 0.40 0.40
4 Dinding Tebal 15 cm (150 kg besi+bekesting)
BETON BERTULANG ( SNI 7394:2008 ) 4.80
Semen portland 6.72 32.26 32.26
Pasir Beton 0.54 2.59 2.59
Kerikil beton 0.81 3.89 3.89
Pekerja 5.30 25.44 25.44
Tukang 0.28 1.32 1.32

RESERVOIR
Volume
URAIAN Koef Volume Kontribusi Masyarakat
Total APBDes APBN
inCash inKind
PEMBESIAN 1.95
Besi Beton 157.50 307.84 307.84
Kawat beton 2.25 4.40 4.40
Tukang 1.05 2.05 2.05
BEKISTING 1.20
Kayu Klas II 0.16 0.19 0.19
Paku biasa 2" - 5' 3.20 3.84 3.84
Balok kayu Klas III 0.24 0.29 0.29
Minyak bekisting 1.60 1.92 1.92
Tukang 1.30 1.56 1.56
5 Dinding Sekat Tebal 12 cm (150 kg besi+bekesting)
BETON BERTULANG ( SNI 7394:2008 ) 0.84
Semen portland 6.72 5.64 5.64
Pasir Beton 0.54 0.45 0.45
Kerikil beton 0.81 0.68 0.68
Pekerja 5.30 4.45 4.45
Tukang 0.28 0.23 0.23
PEMBESIAN 0.00 0.98
Besi Beton 157.50 153.92 153.92
Kawat beton 2.25 2.20 2.20
Tukang 1.05 1.03 1.03
BEKISTING 0.00 0.56
Kayu Klas II 0.16 0.09 0.09
Paku biasa 2" - 5' 3.20 1.79 1.79
Balok kayu Klas III 0.24 0.13 0.13
Minyak bekisting 1.60 0.90 0.90
Tukang 1.30 0.73 0.73
6 PLAT ATAP DAN LANTAI (150 kg besi+bekesting)
BETON BERTULANG ( SNI 7394:2008 ) 3.70
Semen portland 6.72 24.89 24.89
Pasir Beton 0.54 2.00 2.00
Kerikil beton 0.81 3.00 3.00
Pekerja 5.30 19.63 19.63
Tukang 0.28 1.02 1.02
PEMBESIAN 1.97
Besi Beton 157.50 310.50 310.50
Kawat beton 2.25 4.44 4.44
Tukang 1.05 2.07 2.07

RESERVOIR
Volume
URAIAN Koef Volume Kontribusi Masyarakat
Total APBDes APBN
inCash inKind
BEKISTING 0.34
Kayu Klas II 0.15 0.05 0.05
Paku biasa 2" - 5" 4.00 1.35 1.35
Balok kayu Klas III 0.30 0.10 0.10
Minyak bekisting 2.00 0.68 0.68
Tukang 1.65 0.56 0.56
D. PEKERJAAN FINISHING
1 PLESTERAN 1 : 3 TEBAL 15 mm SNI 2837:2008 64.00
Semen Pc. 50 Kg 0.16 9.95 9.95
Pasir Pasangan 0.02 1.47 1.47
Tukang Batu 0.15 9.60 9.60
Pekerja 0.30 19.20 19.20
2 ACIAN SNI 2837:2008 64.00
Semen Pc. 50 Kg 0.07 4.16 4.16
Pekerja 0.20 12.80 12.80
Tukang 0.10 6.40 6.40
3 PENGECATAN SNI 2839:2008 44.00
Cat cat anti Lumut 0.30 13.20 13.20
Cat Dasar 0.15 6.60 6.60
Plamur 0.10 4.40 4.40
Minyak Cat 0.08 3.30 3.30
Kertas Gosok 0.10 4.40 4.40
Tukang Cat 0.08 3.30 3.30
Pekerja 0.05 2.20 2.20
4 PEKERJAAN MAN HOLE 80 X 80
Penutup Man Hole besi plat 80 x 80 2.00 2.00 2.00
5 TANGGA MONYET DAN PLAKAT NAMA
Tangga Monyet Pipa GIP Ø 3/4 1.00 1.00 1.00
Plakat Nama 1.00 1.00 1.00

E. PEKERJAAN BOX VALVE


1 PAS BATU BATA ½ 1 : 4 SNI 6987:2008 1.76
Bata Merah 70.00 123.20 123.20
Semen Portland 0.23 0.40 0.40
Pasir pasang 0.04 0.08 0.08
Pekerja 0.30 0.53 0.53
Tukang 0.10 0.18 0.18
2 PLESTERAN 1 : 3 TEBAL 15 mm SNI 2837:2008 2.40
Semen Pc. 50 Kg 0.16 0.37 0.37
Pasir Pasangan 0.02 0.06 0.06
Tukang Batu 0.15 0.36 0.36
Pekerja 0.30 0.72 0.72

RESERVOIR
Volume
URAIAN Koef Volume Kontribusi Masyarakat
Total APBDes APBN
inCash inKind
F. PEKERJAAN PIPA 1.00
Pipa Inlet, Penguras, Peluap GI Ø 2 SNI 1.00 1.00 1.00
Gate Valve GI Ø 2" 2.00 2.00 2.00
Socket Drat Dalam Ø 2" 6.00 6.00 6.00
Socket Drat Luar Ø 2" 4.00 4.00 4.00
Knee 90 GI Ø 2" 8.00 8.00 8.00
G. LANSIRAN MATERIAL
Semen Portland 47
Pasir 5
Kerikil beton 3
Batu Kali 7
Besi Beton 35

Diketahui Oleh : Diperiksa Oleh :


PPK PAMSIMAS Kab. Luwu Timur Senior Fasilitator Fasilitator Masyarakat

ARVAN, ST PEMIDELIUS GALA, ST A.IIS ARISKA PABENTENGI, A.Md


NIP. 19801222 201101 1 006 TFM WSS

RESERVOIR
ANGGARAN BIAYA
: Sulawesi Selatan / Luwu Timur / Towuti / Buangin
Sub pekerjaan/Kegiatan : Reservoir
Ukuran/Dimensi : 3,5x 4x 2 M

Harga Biaya (Rp)


SAT Satuan Kontribusi Masyarakat
Total APBDes APBN
(Rp) inCash inKind
7 8 9=2x8 10=3*8 11=4x8 13=6x8
972,000
M3 60,000 972,000 - - 972,000
Hok 100,000 972,000 - - 972,000
M3 20,000 108,000 - - 108,000
Hok 100,000 108,000 - - 108,000
7,426,293
M3 530,100 1,064,448 - - 1,064,448
M3 150,000 518,400 - - 518,400
M3 150,000 186,624 - - 186,624
Hok 100,000 224,640 - - 224,640
Hok 120,000 134,784 - - 134,784
M3 938,250 6,361,845 - - 6,361,845
M3 150,000 1,512,000 - - 1,512,000
Zak 70,000 2,375,520 2,375,520
M3 112,500 458,325 - - 458,325
Hok 100,000 1,260,000 - - 1,260,000
Hok 120,000 756,000 - - 756,000
29,052,850
1,666,404
M3 1,411,500 486,684 - - 486,684
Zak 70,000 169,344 - - 169,344
M3 150,000 29,160 - - 29,160
M3 250,000 72,900 - - 72,900
Hok 100,000 203,400 - - 203,400
Hok 120,000 11,880 - - 11,880
Kg 2,329,000 930,240 - - 930,240
Kg 10,500 837,900 - - 837,900
Kg 25,000 28,500 - - 28,500
Hok 120,000 63,840 - - 63,840
633,500 249,480 - - 249,480
M3 2,500,000 180,000 - - 180,000
Kg 18,000 9,720 - - 9,720
Ltr 25,000 3,600 - - 3,600
Hok 120,000 56,160 - - 56,160

RESERVOIR
Harga Biaya (Rp)
SAT Satuan Kontribusi Masyarakat
Total APBDes APBN
(Rp) inCash inKind
2,180,261
M3 1,523,500 644,501 - - 644,501
Zak 70,000 203,213 - - 203,213
M3 150,000 34,992 - - 34,992
M3 250,000 87,480 - - 87,480
Hok 100,000 304,560 - - 304,560
Hok 120,000 14,256 - - 14,256
M3 3,493,500 771,120 - - 771,120
Kg 10,500 694,575 - - 694,575
Kg 25,000 23,625 - - 23,625
Hok 120,000 52,920 - - 52,920
2,192,500 764,640 - - 764,640
M3 3,000,000 194,400 - - 194,400
Kg 18,000 31,104 - - 31,104
M3 2,500,000 432,000 - - 432,000
Ltr 25,000 21,600 - - 21,600
Hok 120,000 85,536 - - 85,536
1,064,909
M3 1,467,500 341,256 - - 341,256
Zak 70,000 112,896 - - 112,896
M3 150,000 19,440 - - 19,440
M3 250,000 48,600 - - 48,600
Hok 100,000 152,400 - - 152,400
Hok 120,000 7,920 - - 7,920
M3 2,329,000 358,853 - - 358,853
Kg 10,500 323,232 - - 323,232
Kg 25,000 10,994 - - 10,994
Hok 120,000 24,627 - - 24,627
971,500 364,800 - - 364,800
M3 3,000,000 108,000 - - 108,000
Kg 18,000 17,280 - - 17,280
M3 2,500,000 180,000 - - 180,000
Ltr 25,000 12,000 - - 12,000
Hok 120,000 47,520 - - 47,520
11,509,975
1,316,900 6,321,120 - - 6,321,120
Zak 70,000 2,257,920 - - 2,257,920
M3 150,000 388,800 - - 388,800
M3 250,000 972,000 - - 972,000
Hok 100,000 2,544,000 - - 2,544,000
Hok 120,000 158,400 - - 158,400

RESERVOIR
Harga Biaya (Rp)
SAT Satuan Kontribusi Masyarakat
Total APBDes APBN
(Rp) inCash inKind
M3 1,836,000 3,588,535 - - 3,588,535
Kg 10,500 3,232,320 - - 3,232,320
Kg 25,000 109,943 - - 109,943
Hok 120,000 246,272 - - 246,272
1,333,600 1,600,320 - - 1,600,320
M3 3,000,000 576,000 - - 576,000
Kg 18,000 69,120 - - 69,120
M3 2,500,000 720,000 - - 720,000
Ltr 25,000 48,000 - - 48,000
Hok 120,000 187,200 - - 187,200
3,647,279
M3 1,316,900 1,106,196 - - 1,106,196
Zak 70,000 395,136 - - 395,136
M3 150,000 68,040 - - 68,040
M3 250,000 170,100 - - 170,100
Hok 100,000 445,200 - - 445,200
Hok 120,000 27,720 - - 27,720
Kg 1,836,000 1,794,267 - - 1,794,267
Kg 10,500 1,616,160 - - 1,616,160
Kg 25,000 54,971 - - 54,971
Hok 120,000 123,136 - - 123,136
M2 1,333,600 746,816 - - 746,816
M3 3,000,000 268,800 - - 268,800
Kg 18,000 32,256 - - 32,256
M3 2,500,000 336,000 - - 336,000
Ltr 25,000 22,400 - - 22,400
Hok 120,000 87,360 - - 87,360
8,984,021
M3 1,383,500 4,876,744 - - 4,876,744
Zak 70,000 1,741,985 - - 1,741,985
M3 150,000 299,959 - - 299,959
M3 250,000 749,898 - - 749,898
Hok 100,000 1,962,696 - - 1,962,696
Hok 120,000 122,206 - - 122,206
M3 1,746,750 3,619,589 - - 3,619,589
Kg 10,500 3,260,292 - - 3,260,292
Kg 25,000 110,894 - - 110,894
Hok 120,000 248,403 - - 248,403

RESERVOIR
Harga Biaya (Rp)
SAT Satuan Kontribusi Masyarakat
Total APBDes APBN
(Rp) inCash inKind
M² 1,346,500 487,688 - - 487,688
M3 2,500,000 126,563 - - 126,563
Kg 18,000 24,300 - - 24,300
M3 2,500,000 253,125 - - 253,125
Lbr 25,000 16,875 - - 16,875
Hok 120,000 66,825 - - 66,825
10,968,030
M² 61,474 3,989,530 - - 3,989,530
Zak 70,000 696,730 - - 696,730
M3 150,000 220,800 - - 220,800
Hok 120,000 1,152,000 - - 1,152,000
Hok 100,000 1,920,000 - - 1,920,000
M² 36,550 2,339,200 - - 2,339,200
Zak 70,000 291,200 - - 291,200
Hok 100,000 1,280,000 - - 1,280,000
Hok 120,000 768,000 - - 768,000
M² 44,075 1,939,300 - - 1,939,300
Kg 58,000 765,600 - - 765,600
Kg 30,000 198,000 198,000
Kg 60,000 264,000 264,000
Ltr 25,000 82,500 82,500
Lbr 3,000 13,200 - - 13,200
Hok 120,000 396,000 - - 396,000
Hok 100,000 220,000 - - 220,000
Ls 1,400,000 1,400,000
Ls 700,000 1,400,000 - - 1,400,000
Ls 1,300,000 1,300,000
Ls 800,000 800,000 - - 800,000
Bh 500,000 500,000 - - 500,000

337,135
M² 107,700 187,528 - - 187,528
bh 600 73,920 - - 73,920
Zak 70,000 28,336 - - 28,336
M3 150,000 11,352 - - 11,352
Hok 100,000 52,800 - - 52,800
Hok 120,000 21,120 - - 21,120
M² 55,614 149,607 - - 149,607
Zak 70,000 26,127 - - 26,127
M3 150,000 8,280 - - 8,280
Hok 120,000 43,200 - - 43,200
Hok 100,000 72,000 - - 72,000

RESERVOIR
Harga Biaya (Rp)
SAT Satuan Kontribusi Masyarakat
Total APBDes APBN
(Rp) inCash inKind
1,745,000 - 1,745,000
btg 450,000 450,000 - - 450,000
Bh 375,000 750,000 - - 750,000
Bh 27,500 165,000 165,000
Bh 40,000 160,000 - - 160,000
Bh 27,500 220,000 - - 220,000
560,000 560,000
Zak 5,000 235,000 235,000
M3 10,000 50,000 50,000
M3 10,000 30,000 30,000
M3 10,000 70,000 70,000
Btg 5,000 175,000 175,000
UPAH 17,184,981 - - 17,184,981
DIBULATKAN 17,185,000 - - 17,185,000
BAHAN 32,344,327 - - 32,344,327
DIBULATKAN 32,340,000 - - 32,340,000
JUMLAH TOTAL 49,525,000 - - 49,525,000

Buangin, Desember 2017

Dibuat Oleh :
KKM Lamonto Satlak Pamsimas

MAKSUM AHMAD MUJIONO


Koordinator Ketua

RESERVOIR
RENCANA ANGGARAN BIAYA
Provinsi / Kabupaten / Kecamatan / Desa : Sulawesi Selatan / Luw
Nomor RAB : 01
Pekerjaan Kegiatan : Sarana Kesehatan

Volume
Kontribusi Masyarakat
URAIAN
Volume Koef Total APBN APBDes
inCash inKind

1 2=3+4+5 3 4 5 6
A PEKERJAAN GALIAN TANAH
Pekerja 0.072 0.563 0.04 - - 0.04

B PEKERJAAN BETON
Lantai Beton 0.18
Semen portland 0.18 326.000 58.68 - - 58.68
Pasir beton 0.18 0.543 0.10 - - 0.10
Kerikil beton 0.18 0.762 0.14 - - 0.14
Pekerja 0.18 1.650 0.30 - - 0.30
Tukang 0.18 0.275 0.05 - - 0.05
PEMBESIAN 10.00
Besi Beton Ø8 10.00 1.050 10.50 - - 10.50
Kawat beton 10.00 0.015 0.15 - - 0.15
Pekerja 10.00 0.007 0.07 - - 0.07
Tukang 10.00 0.007 0.07 - - 0.07
C. PEKERJAAN BATU
PAS. BATA 1.26
Batu bata 1.26 70.000 88.06 - - 88.06
Semen Portland 1.26 326.000 410.11 - - 410.11
Pasir pasang 1.26 0.543 0.68 - - 0.68
Pekerja 1.26 0.762 0.96 - - 0.96
Tukang 1.26 0.762 0.96 - - 0.96
D PEKERJAAN FINISHING
Plesteran 1:2 1.21
Semen Portland 1.21 13.632 16.49 - - 16.49
Pasir pasang 1.21 0.027 0.03 - - 0.03
Pekerja 1.21 0.400 0.48 - - 0.48
Tukang 1.21 0.200 0.24 - - 0.24

SCT
Volume
Kontribusi Masyarakat
URAIAN
Volume Koef Total APBN APBDes
inCash inKind

Acian 1.21
Semen Portland 1.21 3.250 3.93 - - 3.93
Pekerja 1.21 0.200 0.24 - - 0.24
Tukang 1.21 0.100 0.12 - - 0.12
Pengecatan 1.21
Cat dasar 1.21 0.120 0.15 - - 0.15
Cat penutup 2 kali 1.21 0.180 0.22 - - 0.22
Pekerja 1.21 0.028 0.03 - - 0.03
Tukang 1.21 0.042 0.05 - - 0.05
E PEKERJAAN PIPA
Clam Sadl 1 1/2 -1/2' 1.00 1.000 1.00 - - 1.00
Sock Drat Luar Pvc 1/2' 1.00 1.000 1.00 - - 1.00
Knee Pvc 1/2' 4.00 1.000 4.00 - - 4.00
Tee Pvc 1/2' 1.00 1.000 1.00 - - 1.00
Sock Drat Dalam Pvc 1/2' 2.00 1.000 2.00 - - 2.00
Water Meter standard PDAM 1/2" 1.00 1.000 1.00 1.00
Kran Air 1/2" 3.00 1.000 3.00 - - 3.00
Pipa Pvc 1/2' 10.00 1.000 10.00 - - 10.00
Saringan Air 1 ' 1.00 1.000 1.00 - - 1.00
Tempat Sabun 2.00 1.000 2.00 - - 2.00

Diketahui Oleh :
PPK PAMSIMAS Kab. Luwu Timur Senior Fasilitator FM - WSS

ARVAN, ST PEMIDELIUS GALA, ST A.IIS ARISKA PABENTENGI,


NIP. 19801222 201101 1 006 TFM WSS

SCT
GGARAN BIAYA
lawesi Selatan / Luwu Timur / Towuti / Buangin
Sub pekerjaan/Kegiatan : : Sarana Cuci Tangan
Ukuran/Dimensi : : 0.75 X 2,0 M

Biaya (Rp)
Jumlah Kontribusi Masyarakat
Satuan Harga
Satuan (RP) Total APBN APBDes
inCash inKind

7 8 9=2x10 10=3x10 11=4x10 12=5x10 13=5x10

M3 100,000 4,054 - 4,054 -

400,067 - - - 400,067 -
Kg 1,400 82,152 82,152 -
M3 250,000 24,435 24,435 -
M 3
250,000 34,290 34,290 -
O/H 100,000 29,700 - 29,700 -
O/H 120,000 5,940 - 5,940 -
111,775 - - - 111,775 -
Kg 8,750 91,875 91,875 -
Kg 30,000 4,500 4,500 -
O/H 100,000 7,000 - 7,000 -
O/H 120,000 8,400 - 8,400 -

944,293 - - - 944,293 -
M3 800 70,448 - 70,448 -
Kg 1,400 574,151 - 574,151 -
M3 130,000 88,802 - 88,802 -
O/H 100,000 95,860 - 95,860 -
O/H 120,000 115,032 - 115,032 -

104,780 - - - 104,780 -
Kg 1,400 23,093 23,093 -
M3 130,000 4,247 - 4,247 -
O/H 100,000 48,400 - 48,400 -
O/H 120,000 29,040 - 29,040 -

SCT
Biaya (Rp)
Jumlah Kontribusi Masyarakat
Satuan Harga
Satuan (RP) Total APBN APBDes
inCash inKind

44,226 - - - 44,226 -
Kg 1,400 5,506 5,506 -
O/H 100,000 24,200 - 24,200 -
O/H 120,000 14,520 - 14,520 -
46,948 - - - 46,948 -
Kg 48,000 6,970 6,970 -
Kg 140,000 30,492 30,492 -
O/H 100,000 3,388 - 3,388 -
O/H 120,000 6,098 - 6,098 -
1,035,000 - - - 1,035,000 -
Bh 29,000 29,000 29,000 -
Bh 21,000 21,000 21,000 -
Bh 5,000 20,000 20,000 -
Bh 10,000 10,000 10,000 -
Bh 40,000 80,000 80,000 -
Bh 175,000 175,000 175,000 -
Bh 25,000 75,000 75,000 -
Btg 20,000 200,000 200,000 -
Bh 25,000 25,000 25,000 -
Bh 200,000 400,000 400,000 -
UPAH 391,631 - - 391,631 -
DI BULATKAN 392,000 - - 392,000 -
BAHAN 2,299,141 - - 2,299,141 -
DI BULATKAN 2,299,000 - - 2,299,000 -
TOTAL 2,691,000 - - 2,691,000 -

Buangin, Desember 2017


Dibuat Oleh :
FM - WSS Koordinator KKM Satlak PAMSIMAS

S ARISKA PABENTENGI, A.Md MAKSUM AHMAD MUJIONO


TFM WSS Koordinator Ketua

SCT
BAB IV
REKAPITULASI ANGGARAN BIAYA DAN BIAYA RKM
Tabel Kegiatan dan Biaya RKM
Jumlah Harga
Kegiatan Kontribusi
Total APBDes
Masyarakat

1 9=2x7 10=3x7

I PEKERJAAN SARANA AIR MINUM 410,379,000 71,232,000 44,520,000


A PEKERJAAN SCT 2,691,000
B PEKERJAAN LINTASAN 14,261,000
C PEMASANGAN POMPA 52,400,000
D PEMASANGAN POMPA BOOSTER 34,200,000
E PEMASANGAN LISTRIK 5,015,000
F PIPA DAN ASSECORIES 227,497,000 44,520,000
G PEMASANGAN PIPA 71,232,000 71,232,000
H ALAT SAB 3,083,000
II KESEHATAN 14,270,000
A PHBS MASYARAKAT 4,790,000
B PHBS SEKOLAH 8,680,000
C SURVEYLANCE KUALITAS AIR 800,000

III PEMBERDAYAAN 2,743,000


A PELATIHAN TEKNIK 652,000

B PELATIHAN ADMINISTRASI KEUANGAN 636,000

C PELATIHAN PENGADAAN BARANG DAN JASA 743,000

D PELATIHAN KPSPAM 712,000

IV BIAYA OPERASIONAL KKM 17,808,000 17,808,000


A ALAT TULIS KANTOR (ATK) 1,768,000 1,768,000
B ADMINISTRASI DAN PELAPORAN 2,890,000 2,890,000
C TRANSPORTASI DLL 13,150,000 13,150,000
TOTAL 445,200,000 89,040,000 44,520,000
PPn 31,800,000 - -
PPh 6,360,000 - -
TOTAL 483,360,000 89,040,000 44,520,000
BAB IV
I ANGGARAN BIAYA DAN BIAYA RKM

Jumlah Harga

APBN

13=6x7

294,627,000
2,691,000
14,261,000
52,400,000
34,200,000
5,015,000
182,977,000

3,083,000
14,270,000
4,790,000
8,680,000
800,000
2,743,000
652,000
636,000
743,000
712,000

311,640,000
31,800,000
6,360,000
349,800,000
REKAPITULASI ANGG
Provinsi / Kabupaten / Kecamatan / Desa : Sulawe
Harga
URAIAN Kontribusi Masyarakat
Total APBDes
inCash inKind
1 2=3+4+5+6 3 4

I PEKERJAAN SARANA AIR MINUM


1 PEKERJAAN SCT
- BAHAN 2,299,000
- UPAH 392,000
2 PEKERJAAN LINTASAN
LINTASAN
- BAHAN 10,970,000
- UPAH 3,291,000
3 PIPA DAN ASSECORIES
- BAHAN 227,497,000 44,520,000
4 PEMASANGAN POMPA
- BAHAN 46,400,000 -
- UPAH 6,000,000
5 PEMASANGAN POMPA BOOSTER
- BAHAN - -
- UPAH -
6 PEMASANGAN LISTRIK
-BIAYA PASANG BARU 3,524,000 -
-BAHAN 500,000
-UPAH 991,000
7 PEMASANGAN PIPA
- UPAH 71,232,000 71,232,000
8 ALAT SAB
ALAT BANTU TEKNIS 3,083,000 -
II KESEHATAN
A PHBS MASYARAKAT 4,790,000
B PHBS SEKOLAH 8,680,000
C SURVEYLANCE KUALITAS AIR 800,000
III PEMBERDAYAAN
Harga
URAIAN Kontribusi Masyarakat
Total APBDes
inCash inKind
1 2=3+4+5+6 3 4

A PELATIHAN TEKNIK 652,000


B PELATIHAN ADMINISTRASI KEUANGAN 636,000
C PELATIHAN PENGADAAN BARANG DAN JASA 743,000
D PELATIHAN KPSPAM 712,000
Harga
URAIAN Kontribusi Masyarakat
Total APBDes
inCash inKind
1 2=3+4+5+6 3 4

IV BIAYA OPERASIONAL KKM


A ALAT TULIS KANTOR (ATK) 1,768,000 1,768,000
B ADMINISTRASI DAN PELAPORAN 2,890,000 2,890,000
C TRANSPORTASI, DLL 13,150,000 13,150,000

Diketahui Oleh : Diperiksa Oleh :


PPK PAMSIMAS Kab. Luwu Timur Senior Fasilitator Fasilitator Masyarakat

ARVAN, ST PEMIDELIUS GALA, ST A.IIS ARISKA PABENTENGI, A.Md


NIP. 19801222 201101 1 006 FM WSS
LASI ANGGARAN BIAYA
esa : Sulawesi Selatan / Luwu Timur / Towuti / Buangin
Harga Jumlah Harga
Jumlah Satuan Kontribusi Masyarakat
APBD Total APBDes APBD
(Rp) inCash inKind
6 7 8 9=2x7 10=3x7 11=4x7 13=6x7

410,379,000 71,232,000 44,520,000 294,627,000


2,691,000 2,691,000
2,299,000 1 Unit 2,299,000 - - 2,299,000
392,000 1 Unit 392,000 - - 392,000
14,261,000 - 14,261,000
1 Unit 14,261,000 - - 14,261,000
10,970,000 1 Unit 10,970,000 - - 10,970,000
3,291,000 1 Unit 3,291,000 - - 3,291,000
227,497,000 - - 44,520,000 182,977,000
182,977,000 1 Paket 227,497,000 - - 44,520,000 182,977,000
52,400,000 - - - 52,400,000
46,400,000 1 Paket 46,400,000 - - - 46,400,000
6,000,000 1 Paket 6,000,000 6,000,000
34,200,000 - - - 34,200,000
- 1 Paket 28,200,000 - - - 28,200,000
- 1 Paket 6,000,000 6,000,000
5,015,000 - - - 5,015,000
3,524,000 1 Paket 3,524,000 - - - 3,524,000
500,000 1 Paket 500,000 500,000
991,000 1 Paket 991,000 991,000
71,232,000 - 71,232,000 -
1 Paket 71,232,000 - 71,232,000 -
3,083,000 - - 3,083,000
3,083,000 1 Paket 3,083,000 - - 3,083,000
14,270,000 - - 14,270,000
4,790,000 1 Paket 4,790,000 - - 4,790,000
8,680,000 1 Paket 8,680,000 - - 8,680,000
800,000 1 Paket 800,000 - - 800,000
2,743,000 - - 2,743,000
Harga Jumlah Harga
Jumlah Satuan Kontribusi Masyarakat
APBD Total APBDes APBD
(Rp) inCash inKind
6 7 8 9=2x7 10=3x7 11=4x7 13=6x7

652,000 1 Paket 652,000 - - 652,000


636,000 1 Paket 636,000 - 636,000
743,000 1 Paket 743,000 - - 743,000
712,000 1 Paket 712,000 - 712,000
Harga Jumlah Harga
Jumlah Satuan Kontribusi Masyarakat
APBD Total APBDes APBD
(Rp) inCash inKind
6 7 8 9=2x7 10=3x7 11=4x7 13=6x7

17,808,000 17,808,000 - -
1 Paket 1,768,000 1,768,000 - -
- 1 Paket 2,890,000 2,890,000 - -
1 Paket 13,150,000 13,150,000 - -
TOTAL 445,200,000 17,808,000 71,232,000 44,520,000 311,640,000
PPn 31,800,000 - - - 31,800,000
PPh 6,360,000 - - - 6,360,000
TOTAL 483,360,000 17,808,000 71,232,000 44,520,000 349,800,000
Buangin, Desember 2017
h: Dibuat Oleh :
rakat KKM Lamonto Satlak PAMSIMAS

ENGI, A.Md MAKSUM AHMAD MUJIONO


Koordinator Ketua
PEMAKETAN PENGADAAN

No Paket Urain Harga Satuan Jumlah


Volume Satuan
Pengadaan Material (Rp) Biaya (Rp)
1 2 3 4 5 6 7
1 PAKET I
Pipa Inlet, Penguras, Peluap GI Ø 2 SNI 2.00 Btg 450,000 900,000
Socket drad dalam PVC Ø 2" Polos 10.00 bh 80,000 800,000
Socket Drad luar Ø 2" 6.00 bh 40,000 240,000
Err:509 Err:509 bh Err:509 Err:509
Knee 90 GI Ø 2" 10.00 bh 27,500 275,000
Knee 45 PVC Ø 3" 8.00 bh 35,000 280,000
Knee 45" Ø 3" GIP #REF! bh 80,000 #REF!
Err:509 Err:509 bh Err:509 Err:509
Knee 90 PVC Ø 3" 5.00 bh 35,000 175,000
Dop PVC Ø 3" 6.00 bh 30,000 180,000
Tee Ø 3x3x3" PVC 5.00 bh 175,000 875,000
Sney Pembuat Ulir Ø 1/2 - Ø 3" 1.00 Bh 2,000,000 2,000,000
Kunci Pipa 2.00 Bh 300,000 600,000
Lem Pipa 265.00 bh 75,000 19,875,000
Gate Valve GI Ø 2" 2.00 bh 375,000 750,000
Err:509 Err:509 btg 255,000 Err:509
0 0.00 btg 0 -
Pipa Gip Ø 3" (Medium A) #REF! btg 745,000 #REF!
Mobilisasi 1.00 Ret 7,000,000 7,000,000
SUB TOTAL PAKET III Err:509
Metoda Waktu
Pengadaan Pelaksanaan
8 9

Pemilihan T1, T2, dan


Langsung T3
BAB V RENCANA PENGADAAN BARANG DAN JASA DI TINGKAT MASYARA

No Paket Urain Harga Satuan Jumlah


Volume Satuan
Pengadaan Material (Rp) Biaya (Rp)
1 2 3 4 5 6 7
1 Paket I
Pasir Pasangan 0.10 m3 130,000 12,706
Pasir Beton 0.11 m4 250,000 27,000
Bata Merah 90.00 Bh 800 72,000
Kerikil Beton 0.14 m3 250,000 35,000
SUB Total Paket I 146,706
2 Paket II
Clam Sadl 1 1/2 -1/2' 1 Bh 29,000 29,000
Sock Drat Luar Pvc 1/2' 1 Bh 21,000 21,000
Knee Pvc 1/2' 4 Bh 5,000 20,000
Tee Pvc 1/2' 1 Bh 10,000 10,000
Sock Drat Dalam Pvc 1/2' 2 Bh 40,000 80,000
Water Meter standard PDAM 1/2" 1 Bh 175,000 175,000
Kran Air 1/2" 3 Bh 25,000 75,000
Pipa Pvc 1/2' 10 Btg 20,000 200,000
Saringan Air 1 ' 1 Bh 25,000 25,000
Tempat Sabun 2 Bh 200,000 400,000
Besi Beton Ø8 3 Btg 41,000 123,000
Material Cat dasar 1.00 Kg 48,000 48,000
Toko Cat penutup 2 kali 1.00 Kg 140,000 140,000
Kawat beton 1.00 Kg 30,000 30,000
Sement Portland 50 Kg 10.00 Zak 70,000 700,000
Sekop 1.00 Bh 85,000 85,000
Meteran 5 1.00 Bh 34,000 34,000
Meteran roll 50 mtr 1.00 Bh 75,000 75,000
Ember Cor 2.00 Bh 15,000 30,000
Kuas Cat Besar 3.00 Bh 25,000 75,000
Kuas Cat Kecil 2.00 Bh 6,000 12,000
Linggis 2.00 Bh 86,000 172,000
SUB TOTAL PAKET II 2,559,000.00
3 Paket III
Vertical Centrifugal Grundfos Pump 40 m 1.00 Set 28,200,000 28,200,000
Vertical Centrifugal Grundfos Pump 60 m 1.00 Set 46,400,000 46,400,000
Pipa PVC Ø 3" (S12,5 Panjang 6 Mtr) 264.00 Btg 255,000 67,320,000
Pipa PVC Ø 2" (S12,5 Panjang 6 Mtr) 785.00 Btg 125,000 98,125,000
Pipa Gip Ø 3" (Medium A) 10.00 Btg 745,000 7,450,000
Pipa HDPE Ø 1/2" 1440.00 m 25,000 36,000,000
Knee 45 PVC Ø 3" 8.00 Bh 35,000 280,000
Knee 45 PVC Ø 2" 15.00 Bh 30,000 450,000
Knee 90 PVC Ø 3" 5.00 Bh 35,000 175,000
Knee 90 PVC Ø 2" 15.00 Bh 30,000 450,000
Tee Ø 3x3x3" PVC 5.00 Bh 175,000 875,000
Tee Ø 2x2x2" PVC 13.00 Bh 85,000 1,105,000
Dop PVC Ø 3" 6.00 Bh 30,000 180,000
Material Dop PVC Ø 2" 11.00 Bh 22,000 242,000
Toko
Lem Pipa 26.00 Klg 75,000 1,950,000
Clamp Sadle Ø 2 - 3/4" 240.00 Bh 35,000 8,400,000
Seal Tape 9.00 Bh 5,000 45,000
Gate Valve Ø 3" 3.00 Bh 400,000 1,200,000
Reducer Ø 3-2" 6.00 Bh 50,000 300,000
Socket Drat dalam PVC Ø 3" - Polos 16.00 Bh 80,000 1,280,000
Socket Drat dalam Gip 6.00 Bh 80,000 480,000
Knee 90" Ø 3" GIP 6.00 Bh 80,000 480,000
Knee 45" Ø 3" GIP 16.00 Bh 80,000 1,280,000
Kunci Pipa 2.00 Bh 300,000 600,000
Sney Pembuat Ulir Ø 1/2 - Ø 3" 1.00 Bh 2,000,000 2,000,000
SUB TOTAL PAKET III 305,267,000.00
4 Paket IV
Tukang Batu 1.43 Hok 120,000 171,600
Upah Pekerja 3.00 Hok 100,000 300,000
Upah 30 % dari Bahan Lintasan 1.00 Ls 3,291,000 3,291,000
SUB TOTAL PAKET IV 3,762,600
5 Paket V
Langsiran 1 Ls 10,400,000 10,400,000
Mobilisasi
SUB TOTAL PAKET V 10,400,000.00
KAT MASYARAKAT

Metoda Waktu
Pengadaan Pelaksanaan
8 9

Penunjukan
T.1
Langsung

Survey
Perbandingan T.1
Harga
Pemilihan T.1, T.2 dan
Langsung T.3

Penunjukan
Langsung T.1

Penunjukan T.1, T.2


Langsung
RENCANA ANGGARAN BIAY
Provinsi / Kabupaten / Kecamatan / Desa : Sulawesi Selatan / Luwu
Nomor RAB : 02
Pekerjaan Kegiatan : Sarana Air Minum
Volume
URAIAN Volume Kontribusi Masyarakat
Total APBDes
inCash inKind
1 2=3+4+5 3 4 6

A. Pipa Distribusi
1 Pipa SR
Pipa HDPE Ø 1/2" 1,440 240.00 240.00
Clamp Sadle Ø 2 - 3/4" 240 240.00 240.00
Seal Tape 9 9.00 9.00
Lem Pipa 1 1.00 1.00
SUB TOTAL 1
JUMLAH TOTAL
DIBULATKAN

Diketahui Oleh : Diperiksa Oleh :


PPK PAMSIMAS Kab. Luwu Timur Fasilitator Senior Fasilitator Masyarakat

ARVAN, ST PEMIDELIUS GALA, ST A.IIS ARISKA PABENTENGI, A.Md


NIP. 19801222 201101 1 006 TFM WSS
ANA ANGGARAN BIAYA
n / Desa : Sulawesi Selatan / Luwu Timur / Towuti / Buangin
Sub pekerjaan/Kegiatan : Pengadaan Pipa dan Accessories

Harga Biaya (Rp)


Satuan Satuan Kontribusi Masyarakat
Total APBDes
(Rp) inCash inKind
7 8 9=2x8 10=3*8 11=4x8 13=6x8

44,520,000 - - 44,520,000

btg 25,000.00 36,000,000 36,000,000


bh 35,000.00 8,400,000 8,400,000
bh 5,000.00 45,000 45,000
bh 75,000.00 75,000 75,000
44,520,000 - 44,520,000
44,520,000 - 44,520,000
44,520,000 - 44,520,000

Buangin, Desember 2017


Dibuat Oleh :
KKM Lamonto Satlak PAMSIMAS

MAKSUM AHMAD MUJIONO


Koordinator Ketua
RENCANA ANGGARAN BIA
Provinsi / Kabupaten / Kecamatan / Desa : Sulawesi Selatan / L
Nomor RAB : 03
Pekerjaan Kegiatan : Sarana Air Minum
Volume
URAIAN Volume Kontribusi Masyarakat
Total APBD
inCash inKind
1 2=3+4+5 3 4 6

A. DISTRIBUSI
1. Res -Desa
Pipa PVC Ø 3" (S12,5 Panjang 6 Mtr) 1,580 264.00 - - 264.00
Pipa PVC Ø 2" (S12,5 Panjang 6 Mtr) 4,709 785.00 - - 785.00

2. Accecories
Knee 45 PVC Ø 3" 8.00 8.00 - - 8.00
Knee 45 PVC Ø 2" 15.00 15.00 - - 15.00
Knee 90 PVC Ø 3" 5.00 5.00 - - 5.00
Knee 90 PVC Ø 2" 15.00 15.00 - - 15.00
Tee Ø 3x3x3" PVC 5.00 5.00 - - 5.00
Tee Ø 2x2x2" PVC 13.00 13.00 - - 13.00
Gate Valve Ø 3" 3.00 3.00 3.00
Reducer Ø 3-2" 6.00 4.00 6.00
Dop PVC Ø 3" 6.00 6.00 6.00
Dop PVC Ø 2" 11.00 11.00 11.00
Lem Pipa 25.00 25.00 - - 25.00
SUB TOTAL 1
B. EKSPEDISI PIPA DAN AKSESORIS
1 Dari Makassar ke Desa 1 1 - - 1
SUB TOTAL 2
JUMLAH TOTAL

Diketahui Oleh : Diperiksa Oleh :


PPK PAMSIMAS Kab. Luwu Timur Fasilitator Senior Fasilitator Masyarakat

ARVAN, ST PEMIDELIUS GALA, ST A.IIS ARISKA PABENTENGI, A.Md


NIP. 19801222 201101 1 006 TFM WSS
CANA ANGGARAN BIAYA
n / Desa : Sulawesi Selatan / Luwu Timur / Towuti / Buangin
Sub pekerjaan/Kegiatan : Pengadaan Pipa dan Accessories

Harga Biaya (Rp)


Satuan Satuan Kontribusi Masyarakat
Total APBD
(Rp) inCash inKind
7 8 9=2x8 10=3*8 11=4x8 13=6x8

165,445,000 - - 165,445,000
Btg 255,000.00 67,320,000 - - 67,320,000
Btg 125,000.00 98,125,000 - - 98,125,000

7,032,000 7,132,000
bh 35,000.00 280,000 - - 280,000
bh 30,000.00 450,000 - - 450,000
bh 35,000.00 175,000 - - 175,000
bh 30,000.00 450,000 - - 450,000
bh 175,000.00 875,000 - - 875,000
bh 85,000.00 1,105,000 - - 1,105,000
bh 400,000.00 1,200,000 - - 1,200,000
bh 50,000.00 200,000 - - 300,000
bh 30,000.00 180,000 - - 180,000
bh 22,000.00 242,000 - - 242,000
bh 75,000.00 1,875,000 - - 1,875,000
172,477,000 - - 172,577,000

Ret 10,400,000.00 10,400,000 - - 10,400,000


10,400,000 - - 10,400,000
182,977,000 - - 182,977,000

Buangin, Desember 2017


Dibuat Oleh :
KKM Lamonto Satlak PAMSIMAS

MAKSUM AHMAD MUJIONO


Koordinator Ketua
138 / Pompa

RENCANA ANGGARAN BIAYA (RAB)


Provinsi/Kabupaten-Kota/Kecamatan/Desa: Sulawesi Selatan/Barru/Tanete Riaja/Libureng
Nomor RAB : I.5 Sub pekerjaan/Kegiatan :
Pekerjaan Kegiatan : Sarana Air Minum

Volume
Harga
No URAIAN Volume Kontribusi Masy. Satuan
Total APBDes APBD Satuan Rp
inCash inKind
1 1 2 3=4+5+6 4 5 6 7 8
1 BAHAN

1 Vertical Centrifugal Grundfos Pump 1 1 - - 1 Set 11,200,000

Type :CM-5
Debit 1,5 l/dtk
Head Max : 90 M
MATERIAL POMPA :
pump housing: cast iron
impeller:stainless steel
pump inlet: 1 1/4"
pump oulet: 1 "
Rated voltage : 1 x 220 V
Main Frequenzy : 50 Hz
Power : 2200 Watt
2 Basic Control Panel Incluiding motor Protec 1 1 - - 1 bh 6,000,000
3 Stabilizer 5 KVA 1 1 - - 1 bh 6,500,000
4 Drop Cable Power 1 1 1 Roll 2,500,000
5 Drop Cable Water level Control 1 1 1 Roll 2,000,000
Sub Total 1
Dibulatkan
2 UPAH
139 / Pompa

Volume
Harga
No URAIAN Volume Kontribusi Masy. Satuan
Total APBDes APBD Satuan Rp
inCash inKind

Biaya pemasangan dan Uji Coba ( Include 1 1 - - 1 Lot 6,000,000


Transportasi dan akomodasi

Sub Total II
Jumlah
Dibulatkan

Diketahui Oleh : Diperiksa Oleh :


PPK PAMSIMAS Kab. Luwu Timur Senior Fasilitator Fasilitator Masyarakat

ARVAN, ST PEMIDELIUS GALA, ST A.IIS ARISKA PABENTENGI, A.Md


NIP. 19801222 201101 1 006 FM WSS
140 / Pompa

NA ANGGARAN BIAYA (RAB)


/Kecamatan/Desa: Sulawesi Selatan/Barru/Tanete Riaja/Libureng
Sub pekerjaan/Kegiatan : Pengadaan Pompa

Biaya (Rp)
Kontribusi Masyarakat
Total APBDes APBD
inCash inKind
9=3x8 10=4x8 11=5x8 13=6x8

11,200,000 - - 11,200,000

- -

6,000,000 - - 6,000,000
6,500,000 - - 6,500,000
2,500,000 2,500,000
2,000,000 2,000,000
28,200,000 - - 28,200,000
28,200,000 - - 28,200,000
141 / Pompa

Biaya (Rp)
Kontribusi Masyarakat
Total APBDes APBD
inCash inKind

6,000,000 - - 6,000,000

6,000,000 - - 6,000,000
34,200,000 - - 34,200,000
34,200,000 - - 34,200,000

Tombolo , 21 Oktober 2016

Dibuat Oleh :
KKM Lamonto Satlak PAMSIMAS

MAKSUM AHMAD MUJIONO


Koordinator Ketua
142 / Pompa

RENCANA ANGGARAN BIAYA (RAB)


Provinsi/Kabupaten-Kota/Kecamatan/Desa: Sulawesi Selatan/Barru/Tanete Riaja/Libureng
Nomor RAB : I.5 Sub pekerjaan/Kegiatan :
Pekerjaan Kegiatan : Sarana Air Minum

Volume
Harga
No URAIAN Volume Kontribusi Masy. Satuan
Total APBDes APBD Satuan Rp
inCash inKind
1 1 2 3=4+5+6 4 5 6 7 8
1 BAHAN

1 Vertical Centrifugal Grundfos Pump 1 1 - - 1 Set 29,400,000

Type :CM-5
Debit 1,5 l/dtk
Head Max : 90 M
MATERIAL POMPA :
pump housing: cast iron
impeller:stainless steel
pump inlet: 1 1/4"
pump oulet: 1 "
Rated voltage : 1 x 220 V
Main Frequenzy : 50 Hz
Power : 2200 Watt
2 Basic Control Panel Incluiding motor Protec 1 1 - - 1 bh 6,000,000
3 Stabilizer 5 KVA 1 1 - - 1 bh 6,500,000
4 Drop Cable Power 1 1 1 Roll 2,500,000
5 Drop Cable Water level Control 1 1 1 Roll 2,000,000
Sub Total 1
Dibulatkan
2 UPAH
143 / Pompa

Volume
Harga
No URAIAN Volume Kontribusi Masy. Satuan
Total APBDes APBD Satuan Rp
inCash inKind

Biaya pemasangan dan Uji Coba ( Include 1 1 - - 1 Lot 6,000,000


Transportasi dan akomodasi

Sub Total II
Jumlah
Dibulatkan

Diketahui Oleh : Diperiksa Oleh :


PPK PAMSIMAS Kab. Luwu Timur Senior Fasilitator Fasilitator Masyarakat

ARVAN, ST PEMIDELIUS GALA, ST A.IIS ARISKA PABENTENGI, A.Md


NIP. 19801222 201101 1 006 FM WSS
144 / Pompa

NA ANGGARAN BIAYA (RAB)


/Kecamatan/Desa: Sulawesi Selatan/Barru/Tanete Riaja/Libureng
Sub pekerjaan/Kegiatan : Pengadaan Pompa

Biaya (Rp)
Kontribusi Masyarakat
Total APBDes APBD
inCash inKind
9=3x8 10=4x8 11=5x8 13=6x8

29,400,000 - - 29,400,000

- -

6,000,000 - - 6,000,000
6,500,000 - - 6,500,000
2,500,000 2,500,000
2,000,000 2,000,000
46,400,000 - - 46,400,000
46,400,000 - - 46,400,000
145 / Pompa

Biaya (Rp)
Kontribusi Masyarakat
Total APBDes APBD
inCash inKind

6,000,000 - - 6,000,000

6,000,000 - - 6,000,000
52,400,000 - - 52,400,000
52,400,000 - - 52,400,000

Tombolo , 21 Oktober 2016

Dibuat Oleh :
KKM Lamonto Satlak PAMSIMAS

MAKSUM AHMAD MUJIONO


Koordinator Ketua
146 / Listrik PLN

RENCANA ANGGARAN BIAYA

Provinsi / Kabupaten / Kecamatan / Desa : Sulawesi Selatan / Luwu Timur / Towuti / Buangin
Nomor RAB : I.7 Sub peke
Pekerjaan Kegiatan : Sarana Air Minum

Volume Harga
URAIAN Kontribusi Masyarakat Satuan Satuan
Total APBD APBDes
inCash inKind (Rp)
1 2=3+4+5 3 4 5 6 7 8
1. BIAYA PASANG BARU
1 Biaya Pasang Baru Listrik PLN daya 2200 Watt 1.00 - - 1.00 Paket 3,000,000
2 Sertifikasi sambungan baru 1.00 - - 1.00 Paket 500,000
3 Materai 3.00 - - 3.00 lembar 8,000

Sub Total 1
2 JASA PEMASANGAN
UPAH 1.00 1.00 Paket 500,000
Sub Total 2
3 ASESORIS INSTALASI LISTRIK
1 MCB 2 mm 2.00 2.00 unit 17,000
2 Box MCB 1.00 1.00 unit 12,000
3 Sakl;ar seri 1.00 1.00 unit 25,000
4 Fitting Lampu 2.00 2.00 Buah 15,000
5 Bohlan lampu 2.00 2.00 Buah 35,000
6 Stop kontak 6A 1.00 1.00 unit 20,000
7 Kabel 2 x 2.5 m 10.00 10.00 m 25,000
8 Kabel 3 x 2.5 m 10.00 10.00 m 30,000
9 Kabel 2 x 1.5 m 10.00 10.00 m 15,000
10 Kabel SR hitam 10.00 10.00 m 10,000

Sub Total 3
Jumlah Total)
147 / Listrik PLN

Volume Harga
URAIAN Kontribusi Masyarakat Satuan Satuan
Total APBD APBDes
inCash inKind (Rp)
1 2=3+4+5 3 4 5 6 7 8
Dibulatkan

Disetujui Oleh : Diperiksa Oleh :


PPK PAMSIMAS Kab. Luwu Timur Fasilitator Senior FM - WSS

ARVAN, ST PEMIDELIUS GALA, ST A.IIS ARISKA PABENTENGI, A.Md


NIP. 19801222 201101 1 006
148 / Listrik PLN

NA ANGGARAN BIAYA

Desa : Sulawesi Selatan / Luwu Timur / Towuti / Buangin


Sub pekerjaan/Kegiatan : Listrik PLN

Biaya (Rp)
Kontribusi Masyarakat
Total APBD APBDes
inCash inKind
9=2x8 10=3*8 11=4x8 12=5x8 13=6x8

3,000,000 - - 3,000,000 -
500,000 - - 500,000 -
24,000 - - 24,000 -

3,524,000 - 3,524,000 -

500,000 500,000
500,000 - 500,000 -

34,000 34,000
12,000 12,000
25,000 25,000
30,000 30,000
70,000 70,000
20,000 20,000
250,000 250,000 -
300,000 300,000 -
150,000 150,000 -
100,000 100,000 -

991,000 - - 991,000 -
5,015,000 - - 5,015,000 -
149 / Listrik PLN

Biaya (Rp)
Kontribusi Masyarakat
Total APBD APBDes
inCash inKind
9=2x8 10=3*8 11=4x8 12=5x8 13=6x8
5,015,000 - - 5,015,000 -
Buangin, Desember 2017
Dibuat Oleh :
KKM Lamonto Satlak PAMSIMAS

MAKSUM AHMAD MUJIONO


Koordinator Ketua
ANALISA GALIAN TANAH JALUR PIPA
No Diameter Jumlah Pipa Panjang Lebar Tinggi Galian

1 Pipa Dia. 3 264 Btg 1,584 M 0.3 M 0.6

2 Pipa Dia. 2 785.0 Btg 4,710 M 0.25 M 0.47192

3 Pipa Dia. 1 1/2 - Btg - M 0.2 M 0.5

1333 130.8
7998
7,698 50
1,283 8.333333
214
214
1333.333

44
Tinggi Galian Volume

M 285.12 M3 55200000

M 555.6858 M3

M 0 M3

840.8058 M3
#REF!

55,200,000

Err:509
RENCANA ANGGARAN
Provinsi / Kabupaten / Kecamatan / Desa : Sulawesi Selatan
Nomor RAB : 04
Pekerjaan Kegiatan : Sarana Air Minum
Volume
URAIAN Koef Volume Total Kontribusi Masyarakat APBD
inCash inKind
1 2=3+4+5 3 4
A. PEKERJAAN TANAH
1 Galian Tanah ( SNI 2835:2008 ) 841
Pekerja 0.75 631 - 586
2 Urugan Kembali ( SNI 2835:2008 ) 280
Pekerja 0.25 70 - 70
B. PEMASANGAN PIPATRANSMISI DAN DISTRIBUSI
1 Pipa PVC Ø 3" 785
Pekerja 0.054 42 - 42.39
2 Pipa PVC Ø 2" 264
Pekerja 0.054 14 - 14.26
TOTAL
DIBULATKAN

Diketahui Oleh : Diperiksa Oleh :


PPK PAMSIMAS Kab. Luwu Timur Fasilitator Senior Fasilitator Masyarakat

ARVAN, ST PEMIDELIUS GALA, ST A.IIS ARISKA PABENTENGI, A.Md


NIP. 19801222 201101 1 006 TFM WSS
NA ANGGARAN BIAYA
n / Desa : Sulawesi Selatan / Luwu Timur / Towuti / Buangin
Sub pekerjaan/Kegiatan : Pemasangan Pipa

Harga Biaya (Rp)


APBN Satuan Satuan Total Kontribusi Masyarakat APBD APBN
(Rp) inCash inKind
6 7 8 9=2x8 10=3*8 11=4x8 13=6x8

M3 60,000 58,560,435 - 58,560,435 -


45 HOK 100,000 58,560,435 - 58,560,435
20,000 7,006,715 - 7,006,715 -
HOK 100,000 7,006,715 - 7,006,715 -

Btg 5,400 4,239,000 - 4,239,000 -


HOK 100,000 4,239,000 - 4,239,000 -
Btg 8,100 1,425,600 - 1,425,600 -
HOK 100,000 1,425,600 - 1,425,600 -
71,231,750 - 71,231,750 -
71,232,000 - 71,232,000 -
Buangin, Desember 2017
Diperiksa Oleh : Dibuat Oleh :
litator Masyarakat KKM Lamonto Satlak PAMSIMAS

KA PABENTENGI, A.Md MAKSUM AHMAD MUJIONO


TFM WSS Koordinator Ketua
RENCANA ANGGARAN BIAYA

Provinsi / Kabupaten / Kecamatan / Desa : Sulawesi Selatan /


Nomor RAB : 05
Pekerjaan Kegiatan : Sarana Air Minum dan Sanitasi Sekolah

Volume
URAIAN Kontribusi Masyarakat
Total APBD
inCash inKind
1 2=3+4+5+6 3 4 5
ALAT BANTU TEKNIS
1 Gerobak Dorong - - - 1
2 Sekop 1 - - 4
3 Meteran 5 1 - - 1
4 Kunci Pipa 2 - - 2
5 Sney Pembuat Ulir Ø 1/2 - Ø 3" 1 - - 1
6 Meteran roll 50 mtr 1 - - 1
7 Ember Cor 2 - - 10
8 Kuas Cat Besar 3 - - 4
9 Kuas Cat Kecil 2 - - 2
10 Linggis 2 - - 2

Disetujui Oleh :

Satker PIP Kab. Luwu Timur Fasilitator Senior

ARVAN, ST PEMIDELIUS GALA, ST


NIP. 19801222 201101 1 006
RENCANA ANGGARAN BIAYA

atan / Desa : Sulawesi Selatan / Luwu Timur / Towuti / Buangin


Sub pekerjaan/Kegiatan : Pengadaan Perlengkapan SAB

Harga Biaya (Rp)


Satuan Satuan Kontribusi Masyarakat
Total APBD
Rp inCash inKind
6 7 8=2x7 9=3x7 11=4x8 12=5x8

Bh 500,000 - - - 500,000
Bh 85,000 85,000 - - 340,000
Bh 34,000 34,000 - - 34,000
Bh 300,000 600,000 - - 600,000
Bh 2,000,000 2,000,000 - - 2,000,000
Bh 75,000 75,000 - - 75,000
Bh 15,000 30,000 - - 150,000
Bh 25,000 75,000 - - 100,000
Bh 6,000 12,000 - - 12,000
Bh 86,000 172,000 - - 172,000
Jumlah Total 3,083,000 - - 3,983,000

Buangin, Desember 2017


Diperiksa Oleh Dibuat Oleh :

Fasilitator Masyarakat KKM Lamonto Satlak Pamsimas

A.IIS ARISKA PABENTENGI, A.Md MAKSUM AHMAD MUJIONO


TFM WSS Koordinator Ketua
RENCANA ANGGARAN BIA
Provinsi / Kabupaten / Kecamatan / Desa : Sulawesi Selatan / Luw
Nomor RAB : 03
Pekerjaan Kegiatan : Sarana Air Minum

Volume
URAIAN Koef Volume Kontribusi Masyarakat
Total APBDes
inCash inKind
1 2=3+4+5 3 4
A. PEKERJAAN TANAH ( SNI 2835:2008 )
GALIAN TANAH 3.000
Pekerja 0.75 2.25 0.00
URUGAN PASIR Bawah pondasi 1.000
Pasir urug 1.20 1.20
Pekerja 0.30 0.00
URUGAN KEMBALI 0.50
Pekerja 0.25 0.13
B. PEKERJAAN PASANGAN BATU ( SNI 2836:2008 )
Pek. pondasi batu belah, campuran 1 PC : 4 PP 0.30
Batu belah 10/15 cm 1.20 0.36
Semen portland 3.26 0.98
Pasir pasang 0.52 0.16
Pekerja 1.50 0.45
Tukang 0.75 0.23
C. PEKERJAAN BETON (SNI 7394:2008)
LANTAI KERJA BETON MUTU f'c = 7,4 Mpa (K100) slump (3-6) cm, w/c = 0,87 (A)
0.20
Semen portland 6.72 1.344
Pasir Beton 0.54 0.108
Kerikil beton 0.81 0.162
Pekerja 5.3 1.060
Tukang 0.275 0.055
D. PEKERJAAN FINISHING
1 PLESTERAN 1 : 3 TEBAL 15 mm SNI 2837:2008 0.700
Semen Pc. 50 Kg 0.16 0.11
Pasir Pasangan 0.02 0.02
Tukang Batu 0.15 0.11
Pekerja 0.30 0.21
2 ACIAN SNI 2837:2008 0.01
Semen Pc. 50 Kg 1.00 0.01
Pekerja 7.00 0.10
Tukang 21.00 0.29
3 PENGECATAN SNI 2839:2008 0.70
Cat cat anti Lumut 0.30 0.21
Cat Dasar 0.15 0.11
Plamur 0.10 0.07
Minyak Cat 0.08 0.05
Kertas Gosok 0.10 0.07
Tukang Cat 0.08 0.05
Pekerja 0.05 0.04
F. PERLENGKAPAN 1.00
Pipa Inlet PVC Ø 3/4", SNI 17.00 17.00
Gate Valve GI Ø 3/4" 1.00 1.00
socket Drat luar PVC Ø 3/4" 2.00 2.00
Socket Drat dalam PVC Ø 3/4" 2.00 2.00
Tee PVC Ø 3/4" 15.00 15.00
Clamp sadle Ø 2" - 3/4" 1.00 1.00
Water meter Ø3/4" (Standar PDAM) 1.00 1.00
Kran Air 3/4 6.00 6.00
Knee 90 Ø3/4 15.00 15.00

Diketahui Oleh : Diperiksa Oleh :


PPK PAMSIMAS Kab. Luwu Timur Senior Fasilitator Fasilitator Masyarakat

ARVAN, ST PEMIDELIUS GALA, ST A.IIS ARISKA PABENTENGI, A.M


NIP. 19801222 201101 1 006 TFM WSS
ANGGARAN BIAYA
a : Sulawesi Selatan / Luwu Timur / Towuti / Buangin
Sub pekerjaan/Kegiatan : SCT
Ukuran/Dimensi : 0,5 X 0,5

Volume Harga Biaya (Rp)


SAT Satuan Kontribusi Masyarakat
APBN Total APBDes APBN
(Rp) inCash inKind
6 7 8 9=2x8 10=3*8 11=4x8 13=6x8

M3 60,000 225,000 - - 225,000


2.25 Hok 100,000 225,000 - - 225,000
M3 144,000 135,000 - - 135,000
1.20 M3 112,500 135,000 - - 135,000
0.00 Hok 100,000 - - - -
M3 20,000 12,500 - - 12,500
0.13 Hok 100,000 12,500 - - 12,500

M3 879,070 208,164 - - 208,164


0.36 M3 150,000 54,000 - - 54,000
0.98 Zak 68,000 66,504 66,504
0.16 M3 100,000 15,660 - - 15,660
0.45 Hok 100,000 45,000 - - 45,000
0.23 Hok 120,000 27,000 - - 27,000

M3 1,295,478 257,980 - - 257,980


1.344 Zak 70,000 94,080 - - 94,080
0.108 M3 100,000 10,800 - - 10,800
0.162 M3 250,000 40,500 - - 40,500
1.060 Hok 100,000 106,000 - - 106,000
0.055 Hok 120,000 6,600 - - 6,600

M² 55,709 43,032 - - 43,032


0.11 Zak 70,000 7,620 - - 7,620
0.02 M3 112,500 1,811 - - 1,811
0.11 Hok 120,000 12,600 - - 12,600
0.21 Hok 100,000 21,000 - - 21,000
M² 30,420 46,060 - - 46,060
0.01 Zak 70,000 980 - - 980
0.10 Hok 100,000 9,800 - - 9,800
0.29 Hok 120,000 35,280 - - 35,280
M² 25,580 19,656 - - 19,656
0.21 Kg 38,000 7,980 - - 7,980
0.11 Kg 9,000 945 945
0.07 Kg 7,800 546 546
0.05 Ltr 4,000 210 210
0.07 Lbr 2,500 175 - - 175
0.05 Hok 120,000 6,300 - - 6,300
0.04 Hok 100,000 3,500 - - 3,500
1,204,500
17.00 Btg 29,500 501,500 - - 501,500
1.00 Bh 47,000 47,000 - - 47,000
2.00 Bh 6,000 12,000 12,000
2.00 Bh 10,000 20,000 - - 20,000
15.00 Bh 15,000 225,000 225,000
1.00 Bh 29,000 29,000 - - 29,000
1.00 Bh 175,000 175,000 175,000
6.00 Bh 17,500 105,000 - - 105,000
15.00 Bh 6,000 90,000 - - 90,000
UPAH 510,580 - - 510,580
DIBULATKAN 511,000 - - 511,000
BAHAN 1,653,912 - - 1,653,912
DIBULATKAN 1,654,000 - - 1,654,000
JUMLAH TOTAL 2,165,000 - - 2,165,000

Buangin, Desember 2017

Diperiksa Oleh : Dibuat Oleh :


Fasilitator Masyarakat KKM Lamonto Satlak Pamsimas

S ARISKA PABENTENGI, A.Md MAKSUM AHMAD MUJIONO


TFM WSS Koordinator Ketua
RENCANA ANGGARAN BI
Provinsi / Kabupaten / Kecamatan / Desa : Sulawesi Selatan / Luw
Nomor RAB : 06
Pekerjaan Kegiatan : Jembatan Pipa GI (Lintasan)

Volume
URAIAN Volume Kontribusi Masyarakat
Total APBD
inCash inKind
1 2 3=4+5+6 4 5 6
A. AKSESORIS DAN PERLENGKAPAN
Pipa Gip Ø 3" (Medium A) 60.00 10.00 10.00
Socket Drat dalam PVC Ø 3" - Polos 16.00 16.00 16.00
Socket Drat dalam Gip 6.00 6.00 6.00
Knee 90" Ø 3" GIP 6.00 6.00 6.00
Knee 45" Ø 3" GIP 16.00 16.00 16.00
B. JASA
Upah 30 % dari Bahan 1.00 1.00 1.00

JU

Diketahui Oleh : Diperiksa Oleh :


PPK PAMSIMAS Kab. Luwu Timur Senior Fasilitator Fasilitator Masyarakat

ARVAN, ST PEMIDELIUS GALA, ST A.IIS ARISKA PABENTENGI, AM,d


NIP. 19801222 201101 1 006 FM WSS
ANGGARAN BIAYA
sa : Sulawesi Selatan / Luwu Timur / Towuti / Buangin
Sub pekerjaan/Kegiatan : Lintasan
Ukuran/Dimensi :

Harga Biaya (Rp)


SAT Satuan Kontribusi Masyarakat
Total APBD
(Rp) inCash inKind
7 8 9=2x8 10=3*8 11=4x8 13=6x8
10,970,000 10,970,000
Btg 745,000 7,450,000 7,450,000
Bh 80,000 1,280,000 1,280,000
Bh 80,000 480,000 480,000
Bh 80,000 480,000 480,000
Bh 80,000 1,280,000 1,280,000
3,291,000
Ls 3,291,000 3,291,000 - - 3,291,000
UPAH 3,291,000 - - 3,291,000
DIBULATKAN 3,291,000 - - 3,291,000
BAHAN 10,970,000 - - 10,970,000
DIBULATKAN 10,970,000 - - 10,970,000
JUMLAH TOTAL 14,261,000 - - 14,261,000

Buangin, Desember 2017

Dibuat Oleh :
KKM Lamonto Satlak PAMSIMAS

MAKSUM AHMAD MUJIONO


Koordinator Ketua
RENCANA ANGGARAN BIAYA
Provinsi / Kabupaten / Kecamatan / Desa : Sulawesi Selatan / Luwu Timur /
Nomor RAB :
Pekerjaan Kegiatan : Sarana Air Minum
Volume
URAIAN Volume Kontribusi Masyarakat
Total APBDes
inCash inKind
1 2=3+4+5 3 4 6
A. Pengadaan Pipa Sambungan Rumah
1. Accessories dan Perlengkapan
Pipa GI Ø 1/2 (S12,5 Panjang 6 Mtr) 6 1.00 - - 1.00
Clamd Saddle CI Ø 2" x 1/2" 1.00 1.00 - - 1.00
Socket Drad luar GI Ø 1/2" 1.00 1.00 - - 1.00
Knee 90 GI Ø 1/2" 6.00 6.00 - - 6.00
Tee GI Ø 1/2" 1.00 1.00 - - 1.00
Fix Coupling 2.00 2.00 2.00
Double Nepple 1.00 1.00 1.00
Seal Tape 2.00 2.00 2.00
Gate Valve 1.00 1.00 - - 1.00
Kran Air 1.00 1.00 1.00
Water Meter 1.00 1.00 - - 1.00
2 Jasa
Upah 30% dari bahan 1 1.00 - - 1.00

DIB

DIB
JUMLA

Diketahui Oleh : Diperiksa Oleh :


Kasatker PIP Kab. Luwu Timur Fasilitator Senior Fasilitator Masyarakat

ARVAN, ST PEMIDELIUS GALA, ST A.IIS ARISKA PABENTENGI, A.Md


NIP. 19801222 201101 1 006 TFM WSS
GGARAN BIAYA
awesi Selatan / Luwu Timur / Towuti / Buangin
Sub pekerjaan/Kegiatan : Pengadaan Pipa Sambungan Rumah

Harga Biaya (Rp)


Satuan Satuan Kontribusi Masyarakat
Total APBDes
(Rp) inCash inKind
7 8 9=2x8 10=3*8 11=4x8 13=6x8

623,500 - - 623,500
Btg 115,000.00 115,000 - - 115,000
bh 29,000.00 29,000 - - 29,000
bh 4,000.00 4,000 - - 4,000
bh 4,500.00 27,000 - - 27,000
bh 5,000.00 5,000 - - 5,000
bh 12,000.00 24,000 - - 24,000
bh 12,000.00 12,000 - - 12,000
Roll 5,000.00 10,000 - - 10,000
bh 80,000.00 80,000 - - 80,000
bh 17,500.00 17,500 - - 17,500
bh 300,000.00 300,000 - - 300,000
187,050 - - 187,050
Ls 187,050.00 187,050 - - 187,050
UPAH 187,050 - - 187,050
DIBULATKAN 187,000 - - 187,000
BAHAN 623,500 623,500
DIBULATKAN 624,000 - - 624,000
JUMLAH TOTAL 812,000 - - 812,000

Buangin, Desember 2017


Dibuat Oleh :
KKM Lamonto Satlak Pamsimas

MAKSUM AHMAD MUJIONO


Koordinator Ketua
Upah
Harga Satuan Angkut/Biaya Total Harga
No Nama Barang/Alat/Jasa Satuan
(Rp) Transportasi Satuan (Rp)
(Rp)
(1) (2) (3) (4) (5) (6)
I PAKET I

1 Pasir Pasangan
2 Pasir Beton
3 Bata Merah
4 Kerikil Beton

II PAKET II
1 Clam Sadl 1 1/2 -1/2'
2 Sock Drat Luar Pvc 1/2'
3 Knee Pvc 1/2'
4 Tee Pvc 1/2'
5 Sock Drat Dalam Pvc 1/2'
6 Water Meter standard PDAM 1/2"
7 Kran Air 1/2"
8 Pipa Pvc 1/2'
9 Saringan Air 1 '
10 Tempat Sabun
11 Besi Beton Ø8
12 Cat dasar
13 Cat penutup 2 kali
14 Kawat beton
15 Sement Portland 50 Kg
16 Sekop
17 Meteran 5
18 Meteran roll 50 mtr
19 Ember Cor
20 Kuas Cat Besar
21 Kuas Cat Kecil
22 Linggis

III PAKET III


1 Vertical Centrifugal Grundfos Pump 40 m
2 Vertical Centrifugal Grundfos Pump 60 m
3 Pipa PVC Ø 3" (S12,5 Panjang 6 Mtr)
4 Pipa PVC Ø 2" (S12,5 Panjang 6 Mtr)
5 Pipa Gip Ø 3" (Medium A)
6 Pipa HDPE Ø 1/2"
7 Knee 45 PVC Ø 3"
8 Knee 45 PVC Ø 2"
9 Knee 90 PVC Ø 3"
10 Knee 90 PVC Ø 2"
11 Tee Ø 3x3x3" PVC
12 Tee Ø 2x2x2" PVC
13 Dop PVC Ø 3"
14 Dop PVC Ø 2"
15 Lem Pipa
16 Clamp Sadle Ø 2 - 3/4"
17 Seal Tape
18 Gate Valve Ø 3"
19 Reducer Ø 3-2"
20 Socket Drat dalam PVC Ø 3" - Polos
21 Socket Drat dalam Gip
22 Knee 90" Ø 3" GIP
23 Knee 45" Ø 3" GIP
24 Kunci Pipa
25 Sney Pembuat Ulir Ø 1/2 - Ø 3"

IV PAKET IV
1 Tukang Batu
2 Pekerja
Spesifikasi
Keterangan
Teknis **)

(7) (8)
Total Harga (Rp)
No Nama Barang/Alat/Jasa Satuan
(Isi Nama) (Isi Nama) (Isi Nama)
Toko/Supplier Toko/Supplier Toko/Supplier
(1) (2) (3) (4) (5) (6)
I PAKET I
1 Pasir Pasangan
2 Pasir Beton
3 Bata Merah
4 Kerikil Beton

II PAKET II
1 Clam Sadl 1 1/2 -1/2'
2 Sock Drat Luar Pvc 1/2'
3 Knee Pvc 1/2'
4 Tee Pvc 1/2'
5 Sock Drat Dalam Pvc 1/2'
6 Water Meter standard PDAM 1/2"
7 Kran Air 1/2"
8 Pipa Pvc 1/2'
9 Saringan Air 1 '
10 Tempat Sabun
11 Besi Beton Ø8
12 Cat dasar
13 Cat penutup 2 kali
14 Kawat beton
15 Sement Portland 50 Kg
16 Sekop
17 Meteran 5
18 Meteran roll 50 mtr
19 Ember Cor
20 Kuas Cat Besar
21 Kuas Cat Kecil
22 Linggis

III PAKET III


1 Vertical Centrifugal Grundfos Pump 40 m
2 Vertical Centrifugal Grundfos Pump 60 m
3 Pipa PVC Ø 3" (S12,5 Panjang 6 Mtr)
4 Pipa PVC Ø 2" (S12,5 Panjang 6 Mtr)
5 Pipa Gip Ø 3" (Medium A)
6 Pipa HDPE Ø 1/2"
7 Knee 45 PVC Ø 3"
8 Knee 45 PVC Ø 2"
9 Knee 90 PVC Ø 3"
10 Knee 90 PVC Ø 2"
11 Tee Ø 3x3x3" PVC
12 Tee Ø 2x2x2" PVC
13 Dop PVC Ø 3"
14 Dop PVC Ø 2"
15 Lem Pipa
16 Clamp Sadle Ø 2 - 3/4"
17 Seal Tape
18 Gate Valve Ø 3"
19 Reducer Ø 3-2"
20 Socket Drat dalam PVC Ø 3" - Polos
21 Socket Drat dalam Gip
22 Knee 90" Ø 3" GIP
23 Knee 45" Ø 3" GIP
24 Kunci Pipa
25 Sney Pembuat Ulir Ø 1/2 - Ø 3"

IV PAKET IV
1 Tukang Batu
2 Pekerja
(Rp) Harga
Satuan
(Isi Nama) Ditetapkan
Toko/Supplier (Rp)
(7) (8)
Harga Satuan
No Nama Barang/Alat/Jasa Satuan
RKM (Rp) Update (Rp)
(1) (2) (3) (4) (5)
I PAKET I

1 Pasir Pasangan
2 Pasir Beton
3 Bata Merah
4 Kerikil Beton

II PAKET II
1 Clam Sadl 1 1/2 -1/2'
2 Sock Drat Luar Pvc 1/2'
3 Knee Pvc 1/2'
4 Tee Pvc 1/2'
5 Sock Drat Dalam Pvc 1/2'
6 Water Meter standard PDAM 1/2"
7 Kran Air 1/2"
8 Pipa Pvc 1/2'
9 Saringan Air 1 '
10 Tempat Sabun
11 Besi Beton Ø8
12 Cat dasar
13 Cat penutup 2 kali
14 Kawat beton
15 Sement Portland 50 Kg
16 Sekop
17 Meteran 5
18 Meteran roll 50 mtr
19 Ember Cor
20 Kuas Cat Besar
21 Kuas Cat Kecil
22 Linggis
III PAKET III
1 Vertical Centrifugal Grundfos Pump 40 m
2 Vertical Centrifugal Grundfos Pump 60 m
3 Pipa PVC Ø 3" (S12,5 Panjang 6 Mtr)
4 Pipa PVC Ø 2" (S12,5 Panjang 6 Mtr)
5 Pipa Gip Ø 3" (Medium A)
6 Pipa HDPE Ø 1/2"
7 Knee 45 PVC Ø 3"
8 Knee 45 PVC Ø 2"
9 Knee 90 PVC Ø 3"
10 Knee 90 PVC Ø 2"
11 Tee Ø 3x3x3" PVC
12 Tee Ø 2x2x2" PVC
13 Dop PVC Ø 3"
14 Dop PVC Ø 2"
15 Lem Pipa
16 Clamp Sadle Ø 2 - 3/4"
17 Seal Tape
18 Gate Valve Ø 3"
19 Reducer Ø 3-2"
20 Socket Drat dalam PVC Ø 3" - Polos
21 Socket Drat dalam Gip
22 Knee 90" Ø 3" GIP
23 Knee 45" Ø 3" GIP
24 Kunci Pipa
25 Sney Pembuat Ulir Ø 1/2 - Ø 3"

IV PAKET IV
1 Tukang Batu
2 Pekerja
Keterangan

(8)
No Nama Barang/Alat/Jasa Satuan Volume Spesifikasi Teknis *)

(1) (2) (3) (4) (8)

I PIPA

1 Pipa PVC Ø 3" (S12,5 Panjang 6 Mtr) Btg 264 SNI


2 Pipa PVC Ø 2" (S12,5 Panjang 6 Mtr) Btg 785 SNI
3 Pipa Gip Ø 3" (Medium A) Btg 10 SNI
4 Pipa HDPE Ø 1/2" m 1440 SNI

II ASSESORIES
1 Knee 45 PVC Ø 3" Bh 8
2 Knee 45 PVC Ø 2" Bh 15
3 Knee 90 PVC Ø 3" Bh 5
4 Knee 90 PVC Ø 2" Bh 15
5 Tee Ø 3x3x3" PVC Bh 5
6 Tee Ø 2x2x2" PVC Bh 13
7 Dop PVC Ø 3" Bh 6
8 Dop PVC Ø 2" Bh 11
9 Lem Pipa Klg 26
10 Clamp Sadle Ø 2 - 3/4" Bh 240
11 Seal Tape Bh 9
12 Gate Valve Ø 3" Bh 3
13 Reducer Ø 3-2" Bh 6
14 Socket Drat dalam PVC Ø 3" - Polos Bh 16
15 Socket Drat dalam Gip Bh 6
16 Knee 90" Ø 3" GIP Bh 6
17 Knee 45" Ø 3" GIP Bh 16
18 Kunci Pipa Bh 2
19 Sney Pembuat Ulir Ø 1/2 - Ø 3" Bh 1

III POMPA
1 Vertical Centrifugal Grundfos Pump 40 m Set 1.00
2 Vertical Centrifugal Grundfos Pump 60 m Set 1.00
No Nama Barang/Alat/Jasa Satuan Harga Satuan

I PIPA
1 Pipa PVC Ø 3" (S12,5 Panjang 6 Mtr) Btg
2 Pipa PVC Ø 2" (S12,5 Panjang 6 Mtr) Btg
3 Pipa Gip Ø 3" (Medium A) Btg
4 Pipa HDPE Ø 1/2" m
II ASSESORIES
1 Knee 45 PVC Ø 3" Bh
2 Knee 45 PVC Ø 2" Bh
3 Knee 90 PVC Ø 3" Bh
4 Knee 90 PVC Ø 2" Bh
5 Tee Ø 3x3x3" PVC Bh
6 Tee Ø 2x2x2" PVC Bh
7 Dop PVC Ø 3" Bh
8 Dop PVC Ø 2" Bh
9 Lem Pipa Klg
10 Clamp Sadle Ø 2 - 3/4" Bh
11 Seal Tape Bh
12 Gate Valve Ø 3" Bh
13 Reducer Ø 3-2" Bh
14 Socket Drat dalam PVC Ø 3" - Polos Bh
15 Socket Drat dalam Gip Bh
16 Knee 90" Ø 3" GIP Bh
17 Knee 45" Ø 3" GIP Bh
18 Kunci Pipa Bh
19 Sney Pembuat Ulir Ø 1/2 - Ø 3" Bh
III POMPA
1 Vertical Centrifugal Grundfos Pump 40 m Set
2 Vertical Centrifugal Grundfos Pump 60 m Set
No Nama Barang/Alat/Jasa Volume Satuan Harga Satuan (Rp.)

(1) (2) (4) (3)

I PIPA

1 Pipa PVC Ø 3" (S12,5 Panjang 6 Mtr) 264 Btg


2 Pipa PVC Ø 2" (S12,5 Panjang 6 Mtr) 785 Btg
3 Pipa Gip Ø 3" (Medium A) 10 Btg
4 Pipa HDPE Ø 1/2" 1440 m

II ASSESORIES
1 Knee 45 PVC Ø 3" 8 Bh
2 Knee 45 PVC Ø 2" 15 Bh
3 Knee 90 PVC Ø 3" 5 Bh
4 Knee 90 PVC Ø 2" 15 Bh
5 Tee Ø 3x3x3" PVC 5 Bh
6 Tee Ø 2x2x2" PVC 13 Bh
7 Dop PVC Ø 3" 6 Bh
8 Dop PVC Ø 2" 11 Bh
9 Lem Pipa 26 Klg
10 Clamp Sadle Ø 2 - 3/4" 240 Bh
11 Seal Tape 9 Bh
12 Gate Valve Ø 3" 3 Bh
13 Reducer Ø 3-2" 6 Bh
14 Socket Drat dalam PVC Ø 3" - Polos 16 Bh
15 Socket Drat dalam Gip 6 Bh
16 Knee 90" Ø 3" GIP 6 Bh
17 Knee 45" Ø 3" GIP 16 Bh
18 Kunci Pipa 2 Bh
19 Sney Pembuat Ulir Ø 1/2 - Ø 3" 1 Bh

III POMPA
1 Vertical Centrifugal Grundfos Pump 40 m 1.00 Set
2 Vertical Centrifugal Grundfos Pump 60 m 1.00 Set
Spesifikasi
Jumlah Harga (Rp.)
Teknis *)
(8)

SNI
SNI
SNI
SNI

Potrebbero piacerti anche