Calculation of LNG Supply from Loading Terminal to Power Plant Name : Hilda Gl
On this assignment, we will do a calculation and plan about LNG supply from loading terminal to
electricity power plant. Three alternative by truck, by pipeline and by barge transport will be calculate
here. The one of advantage condition will chossen from this alternative.
LNG Conversion
2. OBJECTIVES
This is the first assignment for LNG Technology lecture, and the objectives from this assignment are:
1. Student can calculate and do a unit conversion by right from a case study is choosen.
2. Student can plan or design a simple LNG supply chain from loading terminal to electricity power plant.
3. CALCULATION
3.1 Scenarios
Safety stock
Tank Capacity
BOG rate
2. Calculation of
Trip duration
Loading time
Unloading time
Capacity/truck
Source: Dirjen Migas 2012
Total truck neede
Loading terminal in this scenario taken from Bontang in East Kalimantan. At Bontang loading Time for one tru
terminal, with a capacity of 21.6 million tons / annum (http://www.badaklng.co.id/). From here, the LNG
will be supplied to the receiving terminal in Gresik, East Java. The capacity of the storage tank will be
planned on the calculations. Distance Bontang - Gresik is 690 Nautical miles (ports.com). To meet this Page 1 of 10
LNG supply, used LNG carrier with its capacity will be planned as well.
Loading terminal in this scenario taken from Bontang in East Kalimantan. At Bontang loading
terminal, with a capacity of 21.6 million tons / annum (http://www.badaklng.co.id/). From here, the LNG
will be supplied to the receiving terminal in Gresik, East Java. The capacity of the storage tank will be
planned on the calculations. Distance Bontang - Gresik is 690 Nautical miles (ports.com). To meet this If per truck
LNG supply, used LNG carrier with its capacity will be planned as well.
So, total truck ne
Regasification un
High pressure pu
Low pressure pu
BOG compressso
Total Cost
Fuel cost
Fuel consumptio
Distance
Distce. One truck
Total fuel cost
Source: Kadek Fendi Sutrisna, 2011.
Kondisi Kelistrikan di Beberapa Wilayah
Indonesia
Maintenance Est
So, maintenance
3.2 Data
Loading Terminal Driver
Location Bontang Monthly salary
Storage tank capacity MTPY 22 Total driver's sal
3. Calculation of
UNIT CONVERSION
Trip duration
1 MTPY LNG 140 MMSCFD Gas
1 m3 LNG 600 m3 gas
21.20 MMBTU
1 Juta m3 LNG 460,000 Tonnes LNG Loading time
21,200 Cubic Feet Gas Unloading time
Specific gravity LNG 0.46 Capacity/barge
Caloric value 1,000 BTU/Standard Cubic Feet
Total barge need
Page 2 of 10
Total barge need
100 MMSCFD 700 MW (Typical combined cycle)
500 MW (Typical steam cycle) Time for one bar
730,000 TPY LNG
2,100 TPD LNG If per barge
Source: Offshore Oil and Gas (2003)
on Soegiono and Ketut Buda Artana So, total barge n
(2006)
3.1 Total cost
Cap. of PP Price of one barg
Demand per day = x 100 MMSCFD
500 Investment for b
225
= x 100
500
= 45 MMSCFD Regasification un
High pressure pu
Demand per day Low pressure pu
LNG Conversion = x 730,000
100 BOG compressso
45 Total cost
= x 730,000
100
328,500 Fuel cost
= = 900 TPD
365 Fuel consuption
Distance
= 900 x 2 = 1,800 m3/day Distce. One barg
Total fuel cost
= 1,800 x 365 = 657,000 m3/year
Crews
3.4 Calculation for LNG carrier Monthly salary
As the ship comparison, will be used MV. SURYA AKI. The vessels particular is: Total Crew's sala
Name Parameter
IMO 9,060,534 Total driver's sal
Ship's name SURYA AKI
Draught 6,7m LNG price
Vs 13,5 knots Total LNG / day
Gross Tonnage 20,524 LNG price / day
Summer DWT 11612 t Total LNG price
Capacity 19.100 m3
Flag BAHAMAS Source: marinetrafic.com Income calculati
404,920
From 1 ship's capacity can supply LNG needed in PLTG at (days) = = 9
Page 3 of 10
From 1 ship's capacity can supply LNG needed in PLTG at (days) = = 9
46,800
So, to meet the needs of LNG for PLTG Grati just used one 1 ship
Scenario:
Bontang
3 days
Loading time = 1.5 day
Unloading time = 1.5 day
15,573,846
So, the min. total required tank =
50,000
= 311 tanks
3.6 Alternative for transporting LNG from receiving terminal to power plant
A. 1st Alternative : by truck
Page 4 of 10
Semi - Trailer LNG Truck tank
Name Parameter
Effective Capacity 5 - 50 m3
Water Capacity 5 - 50 m3
Filling rate 92%
Working pressure 0,1 - 2,0 MPa
Design temp minus 196 deg celcius
Material 304 (inner tank) / Q245R (outer tank)
Standard GB 150 / ASME
Certificate CSEI / LR / BV
Content Liquid Oxygen, Liquid Argon,
Liquid Nitrogen, Liquid Natural
Gas
Insulation High - vacuum multi-layer insulation
Price US $ 10.000 - 50.000 / set
Source: alibaba.com
Total truck calculation:
Distance Assumption mean of truck velocity = 60
Trip duration =
Truck velocity
98
= = 1.63 hours
60
Loading time = 2 hours
Unloading time = 2 hours
Capacity/truck = 50 m3
Total cap. Needed in PP 1,800
Total truck needed = = = 36 units
Truck capacity 50
Time for one truck = 2 + 1.63 + 2 + 1.63
= 7.26 hours
If per truck 2 x trip per day, so need: 15 hours per day
36
So, total truck needed = = 18 units
2
Page 5 of 10
Estimate = US $ 200 , for maintenance one truck per year
So, maintenance cost for total truck per year = 200 x 18
= US $ 3,600
Design data
a. Pipeline Design Data
Design flow rate = 45 MMSCFD
Fluid = Natural Gas
Design Pressure = 1150 psig
b. Pipe Specification
Material Grade = API 5L X 56
SMYS = 65000 psi = 448 MPa
Nominal Diameter = 32 inch
F = design factor
= 0.80 Location class 1, Division 1
= 0.72 Location class 1, Division 2
= 0.60 Location class 2
= 0.50 Location class 3
= 0.40 Location class 4
Notes:
Class 1 :reflect areas such as wasteland, deserts, mountains, grazing land, farmland, and
sparsely populated areas.
Page 6 of 10
reflect areas such as wasteland, deserts, mountains, grazing land, farmland, and
sparsely populated areas.
Class 2 :reflect areas where the degree of population is intermediate between Location Class
1 and Location Class 3, such as fringe areas around cities and towns, industrial
areas, ranch or country
estates, etc.
Class 3 :reflect areas such as suburban housing developments, shopping centers, residential
areas, industrial areas, and other populated areas not meeting Location Class 4
requirements.
Class 4 :areas where multistory buildings are prevalent, where traffic is heavy or dense, and
where there may be numerous other utilities underground.
Source: ASME B31.8-2012
E = Longitudinal joint factor
= 1.00 for API 5 L Submerged Arc Welded Pipes
Summary
Location class Long (m) * t (in) t selected (in) weight (kg/m) weight (kg)
Class 1 Div. 1 2,000 0.354 0.375 189 378,000
Class 1 Div. 2 2,500 0.393 0.406 204 510,000
Class 2 9,500 0.472 0.500 251 2,384,500
Class 3 76,000 0.566 0.625 312 23,712,000
Page 7 of 10
Class 4 8,000 0.708 0.750 373 2,984,000
Total weight (kg) 29,968,500
Total weight (ton) 29,969
* Long pipe for each class is assume with total long = distance Gresik - Grati = 98 km.
Pipe specification
Seamless/ERW steel line pipe for oil, gas and water. Standard API 5L PSL 1.
Name Parameter
Size 3/8" - 36" (17,1 - 914 mm)
Wall thickness 2,31 - 50 mm
Steel grade X 56
Tensile strength (MPa) > 490
Yield strength (MPa) >390
Price US $ 420 - 1300 / ton
Source: alibaba.com
Page 8 of 10
Income calculation in 1st year:
Income = LNG price – (Investment cost + installation cost + land aquisition cost +
operational cost)
= US $ 45,127,745
Barge specification
Self propelled transport barge
Name Parameter
Poonton L = 28 m
B = 5,4 m
D = 1,5 m
Power 95 kW
Gearbox Type 60
Propeller Diameter 86 cm
Capacity 80 tons
Winch Type 250 Power 7,5 kW
Electricity generator 30 kW
Operating room 1 room
Price US $ 10.000 - 100.000
Source: alibaba.com
Page 9 of 10
Fuel consuption = 0.4 liters/km
Distce. of Gresik - Grati = 98 km
Distce. One barge / day = 98 x 2 x 2 = 392 km/day
Total fuel cost = 392 x 6 x 0.4 x 0.5
= US $ 405 / day
= US $ 147,937 / year
4. Conclusion
From the calculation about design of LNG supply chain from Bontang - Gresik - PLTG Grati, can
be concluded as several of these statements below:
a. Total LNG Carrier used is one, with its capacity 19.100 m3. The carrier's price is US $ 4.049.200
b. Total storage tank used is 311 tanks, with its capacity is 50.000 liters.
The total storage tank's price is US $ 2.803.292
c. The income comparasionfrom three alternative:
= 1st alternative : 2nd alternative : 3th alternative
= by truck : by pipelines : by barge
= US $ 82,074,823 : US $ 45,127,745 : US $ 82,722,663
The 3th alternative by barge give highest income betwen the other.
So, the transport of LNG from the receiving terminal to the power plant is recommended to by barge.
4. References
a. ANSI B 36.10. Dimensions and Weights of Seamless and Welded Steel Pipe
b. Dirjen Migas 2012
c. Kadek Fendi Sutrisna, 2011. Kondisi Kelistrikan di Beberapa Wilayah Indonesia.
d. M, Saeid. 2014. Handbook of Liquefied Natural Gas.
e. Soegiono and Ketut Buda Artana. 2006. Transportasi LNG Indonesia. Surabaya: Airlangga.
f. Standard ASME B 31.8 (2012) Gas Transmission and Distribution Piping System.
g. http://www.marinetrafic.com
Page 10 of 10
h. http://www.alibaba.com
Page 11 of 10
Assignment 1 LNG
Name : Hilda Gloria N.TH (4213100047)
A power plant having a capacity of 200 MW to be supplied by natural Gas from LNG terminal with the distance of
200 km, if the LNG will be transported by LNG trucks of 20 m3 for each, Design the LNG chain it be assumed the
average speed of trucks 40km/hour. What is the cost of the LNG required by the power plant for 1 year? compare the
LNG chain if we are going transport to LNG barge?
Page 12 of 10
= 14.00 hours
If per truck 2 x trip per day = 28 hours per day
80
So, total truck needed = = 40 units
2
Driver = 40 persons
Monthly salary = US $ 280 / person
Total driver's salary = 40 x 280
= US $ 11,200 / month
Total driver's salary/year = US $ 134,400 / year
Income calculation in 1st y = LNG price – (Investment cost + transportation cost + maintenance cost +
driver's salary)
= US $ 79,330,780
Page 13 of 10
Total barge needed = = = 10 units
Barge capacity 80
Time for one barge = 2 + 6.00 + 2 + 6.00
= 16.00 hours
If per barge 2 x trip per day = 32 hours per day
10
So, total barge needed = = 5 units
2
3.1 Total cost
Price of one barge = US $ 50,000
Investment for barge = total barge x price of one barge
= 5 x 50,000
= US $ 250,000
Regasification unit = US $ 200,000
High pressure pump = US $ 28,000
Low pressure pump = US $ 26,500
BOG compresssor = Investment
US $ 25,000
of barge+raragasification unit+high pressure pump+low
Total cost = pressure pump+BOG compressor
US $ 529,500
Fuel cost = US $ 0.5 / liter
Fuel consuption = 0.4 liters/km
Distance = 200 km 108 nm
Distce. One barge / day = 200 x 2 x 2 = 800 km/day
Total fuel cost = 800 x 5 x 0.4 x 0.5
= US $ 736 / day
= US $ 268,640 / year
Estimate for maintenance one barge per year = 10% price one barge.
So, maintenance cost for total barge per year = 10% x US $ 250,000
= US $ 25,000
Income calculation 1st year = LNG price – (Investment cost + transportation cost + maintenance cost +
crew's salary)
= US $ 82,811,460
Barge specification
Length = 20 m
Width = 4.2 m
Depth = 2.6 m
Max capacity = 60 ton
Total installed power = 45 KW
Generator set = 50 KW
RPM = 1,100
Page 14 of 10
So, if the natural gas transported by :
1. Trucks 2.Barge
US $ 79,330,780 US $ 82,811,460
Page 15 of 10
mended to by barge.