Sei sulla pagina 1di 30

EAPL Method and Schedule for flushing, hydrotesting and vacuum testing for Evaporator bodies, tanks, lineRUCHIRA

and pipings
PAPERS LIMITED
Chennai EBAA0700

Sno Area Tag No's Activities

CV/ FE 's to
Cleaning Flushing be removed Hydrotesting
while flushing

Completed on 26-10-2016 Status: Pending.


WBL I/L LINE
1 TO 6th Effect EVP-WBL-0001-100-CS2 Remarks: Leaks found at LV 002 Target Date: 31-10-2016
welding, gaskets and attended Remarks:

EVP-WBL-0030-025-CS2 Target Date: 31-10-2016 DM -003 Target Date: 31-10-2016


Completed on 31-10-2016 Completed on 31-10-2016

Completed on 26-10-2016
Remarks: Leaks found at
EVP-WBL-0002-100-CS2 DV 003 Target Date: 31-10-2016
welding, gaskets at WBLFT I/L Completed on 31-10-2016
and attended

EVP-WBL-0003-100-CS2 Completed on 26-10-2016 EFM 001 Target Date: 31-10-2016


Completed on 31-10-2016

EVP-WBL-0004-100-CS2 Completed on 26-10-2016 Target Date: 31-10-2016


Completed on 31-10-2016

6th effect body,


2 vapor
seperator
EAPL Method and Schedule for flushing, hydrotesting and vacuum testing for Evaporator bodies, tanks, lineRUCHIRA
and pipings
PAPERS LIMITED
Chennai EBAA0700

Status: Pending.
Completed on 26-10-2016.
EVP-WBL-0005-250-CS3 Target Date: 09-11-2016
Remarks:

Calendria Hydro completed


Pending.
on 26-10-2016.
VI BODY Target Date: 03-11-2016 Target Date: 02-11-2016 Body Hydro pending.
Remarks: After flushing Completed on 02-11-2016 Target date: 09-11-2016

EVP-WBL-0006-200-CS3 Target Date: 02-11-2016 Target Date: 02-11-2016


Completed on 02-11-2016 Completed on 02-11-2016

EVP-WBL-0008-100-CS3 Target Date: 02-11-2016 Target Date: 02-11-2016


Completed on 02-11-2016 Completed on 02-11-2016

EVP-WBL-0009-100-CS3 Target Date: 02-11-2016 Target Date: 02-11-2016


Completed on 02-11-2016 Completed on 02-11-2016

Pending. Pending. Status: Pending.


vapor seperator Target Date: 03-11-2016 Target Date: 04-11-2016 LV 005 Target Date: 09-11-2016
Remarks: After flushing Remarks:
EAPL Method and Schedule for flushing, hydrotesting and vacuum testing for Evaporator bodies, tanks, lineRUCHIRA
and pipings
PAPERS LIMITED
Chennai EBAA0700

5th effect body,


3 vapor
seperator

Status: Pending.
Completed on 26-10-2016.
EVP-WBL-0010-250-CS3 Target Date: 09-11-2016
Remarks:

Calendria Hydro completed


Pending. on 26-10-2016.
V BODY Target Date: 03-11-2016 Target Date: 02-11-2016 Body Hydro pending.
Remarks: After flushing Completed on 02-11-2016 Target date: 09-11-2016

EVP-WBL-0011-200-CS3 Target Date: 02-11-2016 Target Date: 02-11-2016


Completed on 02-11-2016 Completed on 02-11-2016

EVP-WBL-0013-100-CS3 Target Date: 02-11-2016 Target Date: 02-11-2016


Completed on 02-11-2016 Completed on 02-11-2016

EVP-WBL-0014-100-CS3 Target Date: 02-11-2016 Target Date: 02-11-2016


Completed on 02-11-2016 Completed on 02-11-2016

Pending. Pending. Status: Pending.


vapor seperator Target Date: 03-11-2016 Target Date: 04-11-2016 LV 007 Target Date: 09-11-2016
Remarks: After flushing Remarks:
EAPL Method and Schedule for flushing, hydrotesting and vacuum testing for Evaporator bodies, tanks, lineRUCHIRA
and pipings
PAPERS LIMITED
Chennai EBAA0700

4th effect body,


4 vapor
seperator

Completed on 27-10-2016.
EVP-WBL-0015-250-CS3

Calendria Hydro completed


Pending. on 27-10-2016.
IV BODY Target Date: 04-11-2016 Target Date: 02-11-2016 Body Hydro pending.
Remarks: After flushing Completed on 02-11-2016 Target date: 09-11-2016

EVP-WBL-0016-200-CS3 Target Date: 02-11-2016 Target Date: 02-11-2016


Completed on 02-11-2016 Completed on 02-11-2016

EVP-WBL-0018-100-CS3 Target Date: 02-11-2016 Target Date: 02-11-2016


Completed on 02-11-2016 Completed on 02-11-2016
EAPL Method and Schedule for flushing, hydrotesting and vacuum testing for Evaporator bodies, tanks, lineRUCHIRA
and pipings
PAPERS LIMITED
Chennai EBAA0700

EVP-WBL-0019-100-CS3 Target Date: 02-11-2016 Target Date: 02-11-2016


Completed on 02-11-2016 Completed on 02-11-2016

Pending. Pending. Status: Pending.


vapor seperator Target Date: 04-11-2016 Target Date: 04-11-2016 LV 009 Target Date: 09-11-2016
Remarks: After flushing Remarks:

3rd effect body,


5 vapor
seperator

Completed on 27-10-2016.
EVP-WBL-0020-250-CS3

Calendria Hydro completed


Pending. on 27-10-2016.
III BODY Target Date: 04-11-2016 Target Date: 03-11-2016
Body Hydro pending.
Remarks: After flushing Completed on 03-11-2016 Target date: 09-11-2016

EVP-WBL-0021-200-CS3 Target Date: 03-11-2016 Target Date: 03-11-2016


Completed on 03-11-2016 Completed on 03-11-2016
EAPL Method and Schedule for flushing, hydrotesting and vacuum testing for Evaporator bodies, tanks, lineRUCHIRA
and pipings
PAPERS LIMITED
Chennai EBAA0700

EVP-WBL-0023-080-CS3 Target Date: 03-11-2016 Target Date: 03-11-2016


Completed on 03-11-2016 Completed on 03-11-2016

EVP-WBL-0024-080-CS3 Target Date: 03-11-2016 Target Date: 03-11-2016


Completed on 03-11-2016 Completed on 03-11-2016

Pending. Pending. Status: Pending.


vapor seperator Target Date: 04-11-2016 Target Date: 04-11-2016 LV 011 Target Date: 09-11-2016
Remarks: After flushing Remarks:

2nd effect
6 body, vapor
seperator

Completed on 27-10-2016.
EVP-WBL-0025-250-CS3

Calendria Hydro completed


on 27-10-2016.
II BODY Target Date: 04-11-2016 Body Hydro pending.
Completed on 02-11-2016 Target date: 09-11-2016
EAPL Method and Schedule for flushing, hydrotesting and vacuum testing for Evaporator bodies, tanks, lineRUCHIRA
and pipings
PAPERS LIMITED
Chennai EBAA0700

EVP-WBL-0026-200-CS3 Target Date: 04-11-2016 Target Date: 04-11-2016


Completed on 02-11-2016 Completed on 02-11-2016

EVP-WBL-0028-080-CS3 Target Date: 04-11-2016 Target Date: 04-11-2016


Completed on 02-11-2016 Completed on 02-11-2016

EVP-WBL-0029-050-CS3 Target Date: 04-11-2016 Target Date: 04-11-2016


Completed on 02-11-2016 Completed on 02-11-2016

Pending. Pending. Status: Pending.


vapor seperator Target Date: 04-11-2016 Target Date: 04-11-2016 FV 013 Target Date: 09-11-2016
Remarks: After flushing Remarks:

IB effect body,
7 vapor
seperator

Completed on 27-10-2016.
EVP-WBL-0032-300-CS3

Calendria Hydro completed


Pending.
on 27-10-2016.
IB BODY Target Date: 05-11-2016 Target Date: 04-11-2016 Body Hydro pending.
Remarks: After flushing Completed on 03-11-2016 Target date: 09-11-2016
EAPL Method and Schedule for flushing, hydrotesting and vacuum testing for Evaporator bodies, tanks, lineRUCHIRA
and pipings
PAPERS LIMITED
Chennai EBAA0700

EVP-WBL-0033-250-CS3 Target Date: 04-11-2016 Target Date: 04-11-2016


Completed on 03-11-2016 Completed on 03-11-2016

EVP-WBL-0035-050-CS3 Target Date: 04-11-2016 Target Date: 04-11-2016


Completed on 03-11-2016 Completed on 03-11-2016

Pending. Status: Pending.


vapor seperator Target Date: 05-11-2016 Target Date: 04-11-2016 HV 017 Target Date: 09-11-2016
Remarks: After flushing Completed on 03-11-2016 Remarks:

EVP-WBL-0031-050-CS3 Target Date: 04-11-2016 Target Date: 04-11-2016


Completed on 03-11-2016 Completed on 03-11-2016

EVP-WBL-0036-050-CS3 Target Date: 04-11-2016 HV 014 Target Date: 04-11-2016


Completed on 03-11-2016 Completed on 03-11-2016

LV 015A

IA effect body,
8 vapor
seperator

Completed on 27-10-2016.
EVP-WBL-0038-300-CS3
EAPL Method and Schedule for flushing, hydrotesting and vacuum testing for Evaporator bodies, tanks, lineRUCHIRA
and pipings
PAPERS LIMITED
Chennai EBAA0700

Calendria Hydro completed


Pending. on 27-10-2016.
IA BODY Target Date: 05-11-2016 Target Date: 04-11-2016 Body Hydro pending.
Remarks: After flushing Completed on 02-11-2016 Target date: 09-11-2016

EVP-WBL-0039-250-CS3 Target Date: 04-11-2016 Target Date: 04-11-2016


Completed on 02-11-2016 Completed on 02-11-2016

EVP-WBL-0035-050-CS3 Target Date: 04-11-2016 Target Date: 04-11-2016


Completed on 02-11-2016 Completed on 02-11-2016

Pending. Pending. Status: Pending.


vapor seperator Target Date: 05-11-2016 Target Date: 03-11-2016 HV 017 Target Date: 09-11-2016
Remarks: After flushing Remarks:

EVP-WBL-0041-050-CS3 Target Date: 04-11-2016 Target Date: 04-11-2016


Completed on 02-11-2016 Completed on 02-11-2016

Target Date: 04-11-2016 LV 019A


Completed on 02-11-2016

Pending. Status: Pending.


9 PLFT EVP-TA-002 Target Date: 04-11-2016 Target Date: 09-11-2016
Remarks:

Pending. Status: Pending.


EVP-SBL-0042-050-CS3 Target Date: 04-11-2016 Target Date: 09-11-2016
Remarks:
EAPL Method and Schedule for flushing, hydrotesting and vacuum testing for Evaporator bodies, tanks, lineRUCHIRA
and pipings
PAPERS LIMITED
Chennai EBAA0700

Pending. Status: Pending.


EVP-SBL-0043-050-CS3 Target Date: 04-11-2016 MFM-022 Target Date: 09-11-2016
Remarks:

Pending. Status: Pending.


EVP-SBL-0044-050-CS3 Target Date: 04-11-2016 LV-021 Target Date: 09-11-2016
Remarks:

Status: Pending.
Surface
10 EVP-SYC-0294-040-CS2 Target Date: 04-11-2016 Target Date: 05-11-2016
Condenser Completed on 31-10-2016

FE-025,
Orifice to be
removed and Status: Pending.
LIVE STEAM
11 EVP-LPS-01510250-CS6 orifice holes Target Date: 03-11-2016
LINE to be flushed
along with
line flushing
EAPL Method and Schedule for flushing, hydrotesting and vacuum testing for Evaporator bodies, tanks, lineRUCHIRA
and pipings
PAPERS LIMITED
Chennai EBAA0700

FV-0025, BY
PASS valve
CAN BE
OPENED

Status: Completed Status: Completed Status: Pending.


Target Date: 05-11-2016. Target Date: 09-11-2016.
11 Tanks PLFT Target Date: 09-11-2016
Actual: 04-11-2016 Actual: 04-11-2016

Status: Completed Status: Completed Status: Pending.


Target Date: 05-11-2016. Target Date: 09-11-2016.
COND POT -1 Target Date: 09-11-2016
Actual: 04-11-2016 Actual: 04-11-2016

Status: Completed Status: Completed Status: Pending.


Target Date: 05-11-2016. Target Date: 09-11-2016.
COND POT -2 Target Date: 09-11-2016
Actual: 04-11-2016 Actual: 04-11-2016

Status: Completed Status: Completed Status: Pending.


Target Date: 05-11-2016. Target Date: 09-11-2016.
PCFT-1 Target Date: 09-11-2016
Actual: 04-11-2016 Actual: 04-11-2016

Status: Completed Status: Completed Status: Pending.


Target Date: 05-11-2016. Target Date: 09-11-2016.
PCFT-2 Target Date: 09-11-2016
Actual: 04-11-2016 Actual: 04-11-2016

Status: Completed Status: Completed Status: Pending.


Target Date: 05-11-2016. Target Date: 09-11-2016.
SCFT-1 Target Date: 09-11-2016
Actual: 04-11-2016 Actual: 04-11-2016
EAPL Method and Schedule for flushing, hydrotesting and vacuum testing for Evaporator bodies, tanks, lineRUCHIRA
and pipings
PAPERS LIMITED
Chennai EBAA0700

Status: Completed Status: Completed Status: Pending.


Target Date: 05-11-2016. Target Date: 09-11-2016.
SCFT-2 Target Date: 09-11-2016
Actual: 04-11-2016 Actual: 04-11-2016

Status: Completed Status: Completed


Status: Pending.
Target Date: 05-11-2016. Target Date: 09-11-2016.
SCFT-3 Target Date: 09-11-2016
Actual: 04-11-2016 Actual: 04-11-2016

Status: Completed Status: Completed Status: Pending.


Target Date: 05-11-2016. Target Date: 09-11-2016.
SCFT-4 Target Date: 09-11-2016
Actual: 04-11-2016 Actual: 04-11-2016

Status: Completed Status: Completed Status: Pending.


Target Date: 05-11-2016. Target Date: 09-11-2016.
SCFT-5 Target Date: 09-11-2016
Actual: 04-11-2016 Actual: 04-11-2016

Status: Completed Status: Completed Status: Pending.


Target Date: 05-11-2016. Target Date: 09-11-2016.
Pre-cooler Target Date: 09-11-2016
Actual: 04-11-2016 Actual: 04-11-2016

Status: Completed Status: Completed


Status: Pending.
Target Date: 05-11-2016. Target Date: 09-11-2016.
WBLFT Target Date: 09-11-2016
Actual: 04-11-2016 Actual: 04-11-2016

Status: Pending. Status: Pending.


12 Vapor headers Vapor header Target Date: 09-11-2016 Target Date: 09-11-2016

Status: Pending. Status: Pending.


Vapor piping Target Date: 09-11-2016 Target Date: 09-11-2016
EAPL Method and Schedule for flushing, hydrotesting and vacuum testing for Evaporator bodies, tanks, lineRUCHIRA
and pipings
PAPERS LIMITED
Chennai EBAA0700

Status: Pending. Status: Pending.


NCG Piping Target Date: 09-11-2016 Target Date: 09-11-2016

Status: Pending. Status: Pending.


Wash Liquor
12 Inlet wash liquor lines Target Date: 03-11-2016 Target Date: 03-11-2016
Lines

Status: Pending. Status: Pending.


Outlet wash liquor lines Target Date: 03-11-2016 Target Date: 03-11-2016

Status: Pending. Status: Pending.


13 Mill water lines Target Date: 02-11-2016 Target Date: 02-11-2016

Status: Pending. Status: Pending.


14 Cooling water Target Date: 09-11-2016 Target Date: 09-11-2016
lines

Preliminary Hydrotest Final Hydrotest


Pre-final Hydrotest
Evaporator Status: Completed Status: Pending.
15 Status: Pending.
Hydrotest Target-04-11-2016 Target Date: 09-11-2016
Target-08-11-2016
Completed: 04-11-2016

Evaporator
16 vacuum leak
test
EAPL Method and Schedule for flushing, hydrotesting and vacuum testing for Evaporator bodies, tanks, lineRUCHIRA
and pipings
PAPERS LIMITED
Chennai EBAA0700

17 Evaporator BL
water boiling

Evaporator BL
intake
EAPL Method and Schedule for flushing, hydrotesting and vacuum testing for Evaporator bodies, tanks, lineRUCHIRA
and pipings
PAPERS LIMITED
Chennai EBAA0700

Requirements

Vacuum testing

Status: Pending
Target Date: 10-11-
water connection at WBL I/L
2016
Remarks:

pressure guage of hydroetsting and


gaskets for leaking joints

After flushing and before hydrotesting


bodies shall be opened and checked.

All the equipments to be replaced for


hydroetesting vacuum testing

Liquor sampling lines shall be flushed


along with body flushing

Status: Pending
Target Date: 10-11-
2016
Remarks:
EAPL Method and Schedule for flushing, hydrotesting and vacuum testing for Evaporator bodies, tanks, lineRUCHIRA
and pipings
PAPERS LIMITED
Chennai EBAA0700

Pump 003 should be ready

water connection at WBL I/L

pressure guage of hydroetsting and


gaskets for leaking joints

All the equipments LIKE


INSTRUMENTS, DROPELET
SEPEARTORS removed for flushing and
to be replaced for hydroetesting,
vacuum testing

After flushing and before hydrotesting


bodies shall be opened and checked.

LT's tapping shall be flushed during


flushing and LT's shall be calibrated
after hydroetsting
EAPL Method and Schedule for flushing, hydrotesting and vacuum testing for Evaporator bodies, tanks, lineRUCHIRA
and pipings
PAPERS LIMITED
Chennai EBAA0700

while flushing vapor seperator can be


filled upto spectacle flange and
flushed
EAPL Method and Schedule for flushing, hydrotesting and vacuum testing for Evaporator bodies, tanks, lineRUCHIRA
and pipings
PAPERS LIMITED
Chennai EBAA0700

Status: Pending
Target Date: 10-11- Liquor sampling lines shall be flushed
2016 along with body flushing
Remarks:

Pump 007 should be ready

water connection at WBL I/L

pressure guage of hydroetsting and


gaskets for leaking joints

All the equipments LIKE


INSTRUMENTS, DROPELET
SEPEARTORS removed for flushing and
to be replaced for hydroetesting,
vacuum testing

After flushing and before hydrotesting


bodies shall be opened and checked.
EAPL Method and Schedule for flushing, hydrotesting and vacuum testing for Evaporator bodies, tanks, lineRUCHIRA
and pipings
PAPERS LIMITED
Chennai EBAA0700

LT's tapping shall be flushed during


flushing and LT's shall be calibrated
after hydroetsting

while flushing vapor seperator can be


filled upto spectacle flange and
flushed

Status: Pending
Target Date: 10-11- Liquor sampling lines shall be flushed
2016 along with body flushing
Remarks:

Pump 005 should be ready

water connection at WBL I/L

pressure guage of hydroetsting and


gaskets for leaking joints

All the equipments LIKE


INSTRUMENTS, DROPELET
SEPEARTORS removed for flushing and
to be replaced for hydroetesting,
vacuum testing
EAPL Method and Schedule for flushing, hydrotesting and vacuum testing for Evaporator bodies, tanks, lineRUCHIRA
and pipings
PAPERS LIMITED
Chennai EBAA0700

After flushing and before hydrotesting


bodies shall be opened and checked.

LT's tapping shall be flushed during


flushing and LT's shall be calibrated
after hydroetsting

while flushing vapor seperator can be


filled upto spectacle flange and
flushed

Status: Pending
Target Date: 10-11- Liquor sampling lines shall be flushed
2016 along with body flushing
Remarks:

Pump 006 should be ready

water connection at WBL I/L


EAPL Method and Schedule for flushing, hydrotesting and vacuum testing for Evaporator bodies, tanks, lineRUCHIRA
and pipings
PAPERS LIMITED
Chennai EBAA0700

pressure guage of hydroetsting and


gaskets for leaking joints

All the equipments LIKE


INSTRUMENTS, DROPELET
SEPEARTORS removed for flushing and
to be replaced for hydroetesting,
vacuum testing

After flushing and before hydrotesting


bodies shall be opened and checked.

LT's tapping shall be flushed during


flushing and LT's shall be calibrated
after hydroetsting

while flushing vapor seperator can be


filled upto spectacle flange and
flushed

Liquor sampling lines shall be flushed


along with body flushing

Status: Pending
Target Date: 10-11- Pump 007,008,009 should be ready
2016
Remarks:

water connection at WBL I/L


EAPL Method and Schedule for flushing, hydrotesting and vacuum testing for Evaporator bodies, tanks, lineRUCHIRA
and pipings
PAPERS LIMITED
Chennai EBAA0700

pressure guage of hydroetsting and


gaskets for leaking joints

All the equipments LIKE


INSTRUMENTS, DROPELET
SEPEARTORS removed for flushing and
to be replaced for hydroetesting,
vacuum testing

After flushing and before hydrotesting


bodies shall be opened and checked.

LT's tapping shall be flushed during


flushing and LT's shall be calibrated
after hydroetsting

while flushing vapor seperator can be


filled upto spectacle flange and
flushed

Status: Pending
Target Date: 10-11- Liquor sampling lines shall be flushed
2016 along with body flushing
Remarks:

Pump 010 should be ready


EAPL Method and Schedule for flushing, hydrotesting and vacuum testing for Evaporator bodies, tanks, lineRUCHIRA
and pipings
PAPERS LIMITED
Chennai EBAA0700

water connection at WBL I/L

pressure guage of hydroetsting and


gaskets for leaking joints

All the equipments LIKE


INSTRUMENTS, DROPELET
SEPEARTORS removed for flushing and
to be replaced for hydroetesting,
vacuum testing

After flushing and before hydrotesting


bodies shall be opened and checked.

LT's tapping shall be flushed during


flushing and LT's shall be calibrated
after hydroetsting

while flushing vapor seperator can be


filled upto spectacle flange and
flushed

Status: Pending
Target Date: 10-11- Liquor sampling lines shall be flushed
2016 along with body flushing
Remarks:

Pump 011 should be ready


EAPL Method and Schedule for flushing, hydrotesting and vacuum testing for Evaporator bodies, tanks, lineRUCHIRA
and pipings
PAPERS LIMITED
Chennai EBAA0700

water connection at WBL I/L

pressure guage of hydroetsting and


gaskets for leaking joints

All the equipments LIKE


INSTRUMENTS, DROPELET
SEPEARTORS removed for flushing and
to be replaced for hydroetesting,
vacuum testing

After flushing and before hydrotesting


bodies shall be opened and checked.

LT's tapping shall be flushed during


flushing and LT's shall be calibrated
after hydroetsting

while flushing vapor seperator can be


filled upto spectacle flange and
flushed

Status: Pending
Target Date: 10-11- Liquor sampling lines shall be flushed
2016 along with body flushing
Remarks:

Shall be flushed along with IA & IB


Bodies
EAPL Method and Schedule for flushing, hydrotesting and vacuum testing for Evaporator bodies, tanks, lineRUCHIRA
and pipings
PAPERS LIMITED
Chennai EBAA0700

After flushing and before hydrotesting


bodies shall be opened and checked.

Pump 012,013 should be ready

Liquor sampling lines shall be flushed


along with body flushing

LT's tapping shall be flushed during


flushing and LT's shall be calibrated
after hydroetsting

Status: Pending All the equipments LIKE


Target Date: 10-11- INSTRUMENTS, removed for flushing
2016 and to be replaced for hydroetesting,
Remarks: vacuum testing

Calendria to be hydroetsted

body hydrotested shall be carried out


EAPL Method and Schedule for flushing, hydrotesting and vacuum testing for Evaporator bodies, tanks, lineRUCHIRA
and pipings
PAPERS LIMITED
Chennai EBAA0700

line to be hydroetsted from LP steam


header to before Body inlet

water connection at steam line I/L

Status: Pending
Target Date: 10-11- pressure guage of hydroetsting and
2016 gaskets for leaking joints
Remarks:

These shall be flushed and hydrotested


during complete evaporator hydrotest

Orifce plates shall be by passed during


flushing and taken in line during hydro

pressure guage of hydroetsting and


gaskets for leaking joints

LT's tapping shall be flushed during


flushing and LT's shall be calibrated
after hydroetsting
EAPL Method and Schedule for flushing, hydrotesting and vacuum testing for Evaporator bodies, tanks, lineRUCHIRA
and pipings
PAPERS LIMITED
Chennai EBAA0700

Status: Pending.
Target Date: 10-11-
2016

Status: Pending.
Target Date: 10-11-
2016
EAPL Method and Schedule for flushing, hydrotesting and vacuum testing for Evaporator bodies, tanks, lineRUCHIRA
and pipings
PAPERS LIMITED
Chennai EBAA0700

Status: Pending.
Target Date: 14-11-2016

Status: Pending.
Target Date: 15-11-2016
ENMAS ANDRITZ PVT LTD RUCHIRA PAPERS LIMITED
Chennai Tentative Commissioning Schedule for 40 TPH NEW EVAPORATOR EBAA0700

10/29/2016

10/30/2016

10/31/2016

11/10/2016

11/11/2016

11/12/2016
11/1/2016

11/2/2016

11/3/2016

11/4/2016

11/5/2016

11/6/2016

11/7/2016

11/8/2016

11/9/2016
Sno Area Description

1 Process
Cleaning
Flushing
Water Circulation
Hydrotesting
Vacuum leak testing

water boiling
BL intake
2 Electrical
Motor no load Completed

Load Trial
3 Instrumentation
Loop Checking from Field to marshalling panel

Power on DCS.
Loop Checking from DCS to Field
Calibration of all instruments
Checking sequence logics
checking Auxillary Interlocks
Checking Auto Control loops

Date: 05-11-2016
ENMAS ANDRITZ PVT LTD RUCHIRA PAPERS LIMITED
Chennai Tentative Commissioning Schedule for 40 TPH NEW EVAPORATOR EBAA0700
11/13/2016

11/14/2016

11/15/2016
Remarks

Insulation to be done

Pumps vendors to be
called

Yokogawa Engineer to
be called

Date: 05-11-2016

Potrebbero piacerti anche