Civil Works, Erection, Stringing, Testi


Guddu

Tower No 410 411 412 413 414 415 416 417 418 419 420
Tower Type SGM SGM SGM SGM DGM DGM SGM
Foundation Type pile pile pile pile pile Do
Tower Make Up B+0+6.0 B+0+4.5 B+0+4.5 B+0+4.5 B+4.6+6.1 B+4.5+6.0

Foundation Conventional
Pile
Pile Cap
Erection
Tightening Inspection
Stringing
Stringing of OPGW
Stringing of Shield Wire

Tower No 440 441 442 443 444 445 446 447 448 449 450
Tower Type SGM SGM SGM SGM SGM SGM AGM SGM SGM SGM SGM
Foundation Type Do Do Do Do Do Do Do Do Do Do Do
Tower Make Up B+9.0+4.5 B+0+6.0 B+4.5+6 B+0+6.0 B+4.5+4.5 B+0+4.5 B+0+4.6 B+0+6.0 B+0+6.0 B+4.5+4.5 B+0+6.0

Foundation Conventional
Pile
Pile Cap
Erection
`

Civil Works, Erection, Stringing, Testi


Guddu

Tightening Inspection
Stringing
Stringing of OPGW
Stringing of Shield Wire

Tower No 469 470 471 472 473 474 475 476 477 478 479
Tower Type AGM SGM AGM SGM SGM SGM SGM SGM SGM SGM SGM
Foundation Type pile pile pile pile pile pile Do Do Do Do Do
Tower Make Up B+0+6.1 B+0+4.5 B+4.6+6.1 B+4.5+6 B+0+6.0 B+0+4.5 B+0+3.0 B+0+6.0 B+4.5+6 B+0+6.0 B+4.5+6.0

Foundation Conventional
Pile
Pile Cap
Erection
Tightening Inspection
Stringing
Stringing of OPGW
Stringing of Shield Wire

Tower No 499 500 501 502 503 504 505 506 507 508/509
Tower Type SGM SGM SGM SGM AGM SGM SGM SGM SGM AGM
Foundation Type Do Do Do Do pile Do Do Do pile Do
`

Civil Works, Erection, Stringing, Testi


Guddu

Tower Make Up B+0+6.0 B+0+6.0 B+0+6.0 B+0+4.5 B+4.6+6.1 B+9.0+4.5 B+0+6.0 B+0+6.0 B+4.5+6.0 B+4.6+6.1

Foundation Conventional
Pile
Pile Cap
Erection
Tightening Inspection
Stringing
Stringing of OPGW
Stringing of Shield Wire

Tower No 528 529 530 531 532 533 534 535 536 537 538
Tower Type SGM AGM SGM SGM SGM SGM SGM AGM SGM SGM SGM
Foundation Type Do Do S1 S1 Do Do Do Do Do Do Do
Tower Make Up B+0+6.0 B+4.6+6.1 B+0+6.0 B+0+4.5 B+0+6.0 B+0+6.0 B+4.5+3.0 B+4.6+4.6 B+0+6.0 B+0+3.0 B+0+3.0

Foundation Conventional
Pile
Pile Cap
Erection
Tightening Inspection
Stringing
Stringing of OPGW
`

Civil Works, Erection, Stringing, Testi


Guddu

Stringing of Shield Wire

Tower No 557 558 559 560 561 562 563 564 565 566 567
Tower Type DGM AGM SGM SGM DGM SGM AGM DGM DGM AGM SGM
Foundation Type D1 pile D1 D1 D1 D1 Do Do Do Do D1
Tower Make Up B+4.6+6.1 B+4.6+6.1 B+0+6.0 B+4.5+6.0 B+4.6+6.1 B+4.5+6.0 B+4.6+6.1 B+4.6+4.6 B+4.6+6.1 B+4.6+6.1 B+9+6.0

Foundation Conventional
Pile
Pile Cap
Erection
Tightening Inspection
Stringing of OPGW
Stringing of Shield Wire
Stringing
`

Civil Works, Erection, Stringing, Testi


Guddu

Tower No 587 588 589 590 591 592 593 594 595 596
Tower Type SGM SGM SGM SGM SGM SGM AGM SGM SGM SGM
Foundation Type Do Do Do Do Do Do S Pile Pile Pile
Tower Make Up B+0+4.5 B+0+6.0 B+4.5+6.0 B+4.5+6.0 B+0+3.0 B+0+6.0 B+4.6+6.1 B+0+6.0 B+0+6.0 B+4.5+6.0

Foundation Conventional
Pile
Pile Cap
Erection
Tightening Inspection
Stringing
Stringing of OPGW
Status
Stringing of Shield Wire
of
Concr
eted Stringing
Tower Stringing
s Foundation Type Total Concreted Balance Total Line
Completed
Conventional Found 145 136 9 Length (Km)
(Km)
Pile 44 41.5 2.5
69 0
`

Civil Works, Erection, Stringing, Testi


Guddu

69 0
Pile Cap 44 34.5 9.5
Total 189 177.5 11.5

LEGEND
Foundation Completed
Pile
Pile Cap
Tower Erection Completed
Tower Erection in Progress
Tightening Inspection Completed
Tightening Inspection in progress
Stringing
Stringing of OPGW
Stringing of Shield Wire
CONTRACT No. TLC-03-2017 Lot-II
for
ng, Testing and Commissioning of 500kV single circuit Transmission Line Guddu-Muzaffargarh
Guddu-Muzaffargarh and from Location No 395 to 597 (69.0KM)
PROGRESS CHART (AS ON 22 April , 2019)
421 422 423 424 425 426 427 428 429 430 431 432 433 434
SGM SGM SGM SGM SGM SGM SGM SGM SGM SGM SGM DGM SGM SGM
Do Do Do Do Do Do Do Do Do Do Do Do Do Do
B+0+6.0 B+0+6.0 B+0+6.0 B+0+3.0 B+4.5+6.0 B+0+6.0 B+0+6.0 B+4.5+3.0 B+0+4.5 B+0+6.0 B+0+6.0 B+0+6.1 B+0+4.5 B+0+4.5

451 452 453 454 455 456 457 457-A 458 459 460 461 462 463
SGM DGM SGM SGM SGM SGM SGM SGM DGM SGM SGM SGM SGM DGM
pile pile pile pile pile pile pile pile pile pile pile pile pile pile
B+0+6.0 B+4.6+3.1 B+0+4.5 B+0+3.0 B+0+4.5 B+0+3.0 B+0+4.5 B+0+4.5 B+4.6+6.1 B+0+6.0 B+0+6.0 B+0+6.0 B+0+6.0 B+4.6+6.1
CONTRACT No. TLC-03-2017 Lot-II
for
ng, Testing and Commissioning of 500kV single circuit Transmission Line Guddu-Muzaffargarh
Guddu-Muzaffargarh and from Location No 395 to 597 (69.0KM)
PROGRESS CHART (AS ON 22 April , 2019)

480 481 482 483 484 485 486 487 488 489 490 491 492 493
AGM SGM SGM DGM SGM SGM SGM SGM SGM SGM AGM SGM DGM SGM
pile Do Do Do Do Do Do Do Do Do Do Do Do Do
B+4.6+6.1 B+0+6.0 B+4.5+6.0 B+0+6.1 B+4.5+3 B+4.5+6 B+4.5+6 B+0+6.0 B+0+6.0 B+4.5+6.0 B+4.6+4.6 B+4.5+4.5 B+4.6+6.1 B+0+6.0

510 511 512 513 514 515 516 517 518 518-A 519 520 521 522
SGM SGM SGM SGM SGM SGM SGM SGM SGM SGM DGM SGM SGM SGM
Do Do Do Do Do Do S1 S1 Do Do Do Do Do Do
CONTRACT No. TLC-03-2017 Lot-II
for
ng, Testing and Commissioning of 500kV single circuit Transmission Line Guddu-Muzaffargarh
Guddu-Muzaffargarh and from Location No 395 to 597 (69.0KM)
PROGRESS CHART (AS ON 22 April , 2019)
B+0+3.0 B+0+4.5 B+0+4.5 B+0+3.0 B+0+6.0 B+0+6.0 B+4.5+4.5 B+0+6.0 B+0+6.0 B+0+4.5 B+4.6+6.1 B+0+6.0 B+9+4.5 B+4.5+6.0

539 540 541 542 543 544 545 546 546A 547 548 549 550 551
SGM AGM SGM SGM SGM SGM AGM SGM SGM DGM DD1 AGM SGM AGM
Pile Pile Do Do Do Do Do Do Do Pile Pile Do Do Do
B+4.5+6.0 B+4.6+6.1 B+0+3.0 B+0+3.0 B+0+4.5 B+0+6.0 B+0+6.1 B+4.5+4.5 B+0+6.0 B+9.1+6.1 B+0+8.0 B+4.6+6.1 B+4.5+6.0 B+4.6+6.1
CONTRACT No. TLC-03-2017 Lot-II
for
ng, Testing and Commissioning of 500kV single circuit Transmission Line Guddu-Muzaffargarh
Guddu-Muzaffargarh and from Location No 395 to 597 (69.0KM)
PROGRESS CHART (AS ON 22 April , 2019)

568 569 570 571 572 573 574 575 576 577 578 579 580 581
AGM SGM SGM AGM DGM SGM SGM SGM DGM SGM SGM SGM DGM SGM
Do D1 D1 Do Do D1 D1 D1 Do Do D1 Do Do Do
B+9.1+6.1 B+0+3.0 B+0+6.0 B+4.6+6.1 B+0+6.1 B+0+6.0 B+0+4.5 B+0+1.5 B+9.1+6.1 B+9.0+6.0 B+0+6.0 B+4.5+4.5 B+0+6.1 B+0+6.0
CONTRACT No. TLC-03-2017 Lot-II
for
ng, Testing and Commissioning of 500kV single circuit Transmission Line Guddu-Muzaffargarh
Guddu-Muzaffargarh and from Location No 395 to 597 (69.0KM)
PROGRESS CHART (AS ON 22 April , 2019)

ng Status of Erected Towers


Remaining
Total Towers Erected Towers Remaining
(Km)
69 189 136 53
CONTRACT No. TLC-03-2017 Lot-II
for
ng, Testing and Commissioning of 500kV single circuit Transmission Line Guddu-Muzaffargarh
Guddu-Muzaffargarh and from Location No 395 to 597 (69.0KM)
PROGRESS CHART (AS ON 22 April , 2019)
69 189 136 53

Status of Inspected Towers


Inspected
Total Towers Remaining
Towers

189 126 63
n Line Guddu-Muzaffargarh

435 436 437 438 439


SGM SGM SGM SGM SGM
Do pile pile Do Do
B+4.5+6 B+0+6.0 B+0+6.0 B+0+6.0 B+9.0+6.0

464 465 466 467 468


SGM SGM AGM SGM SGM
pile pile pile pile pile
B+0+6.0 B+0+6.0 B+4.6+6.1 B+0+3.0 B+0+6.0
n Line Guddu-Muzaffargarh

494 495 496 497 498


SGM SGM DGM SGM SGM
Do Do Do Do Do
B+4.5+6 B+4.5+6 B+4.6+4.6 B+0+6.0 B+0+6.0

523 524 525 526 527


SGM SGM DGM SGM SGM
Do Do Do Do Do
n Line Guddu-Muzaffargarh

B+0+6.0 B+0+6.0 B+0+6.1 B+0+6.0 B+0+3.0

552 553 554 555 556


SGM SGM SGM DGM DGM
Do Do pile D1 D1
B+0+4.5 B+0+6.0 B+9.0+6.0 B+0+6.1 B+0+1.5
n Line Guddu-Muzaffargarh

582 583 584 585 586


SGM SGM AGM SGM SGM
Do D1 Do D1 D1
B+4.5+3.0 B+0+4.5 B+4.6+6.1 B+0+6.0 B+4.5+6.0

.
n Line Guddu-Muzaffargarh

Status of Erected Towers

Remaining

53
n Line Guddu-Muzaffargarh

53

Status of Inspected Towers

Remaining

63