Infrastructure Plans

Jakarta & Eastern Greater Jakarta

As of August 3rd, 2018


Jabodetabek Urban Railway Network Map (2020)

© 2018 Jones Lang LaSalle IP, Inc. All rights reserved. 2


Light Rail Transit (LRT) Jabodebek, Jakarta-Cikampek II
Elevated Toll Road & High Speed Rail (HSR) Jakarta-Bandung

Jakarta-Cikampek II
Elevated Toll Road

High Speed Rail (HSR)


Jakarta-Bandung

Light Rail Transit (LRT)


Jabodebek

© 2018 Jones Lang LaSalle IP, Inc. All rights reserved. 3


Light Rail Transit (LRT) Jabodebek
Light Rail Transit (LRT) Jabodebek

Phase 1
Lines • Cawang-Cibubur : 13.7 km (Phase I A) – 61.07% completed as of June 2018
: • Cawang-Dukuh Atas : 10.5 km (Phase I A) – 25.48% completed as of June 2018
• Cawang-Bekasi Timur : 17.9 km (Phase I B) – 35.85% completed as of June 2018
Stations : Cawang-Cibubur Line Cawang-Dukuh Atas Line Cawang-Bekasi Timur Line
1. Cibubur Station 1. Cawang Station 1. Bekasi Timur Station
2. Ciracas Station 2. Ciliwung Station 2. Bekasi Barat Station
3. Kampung Rambutan Station 3. Cikoko Station 3. Cikunir 2 Station
4. Taman Mini Station 4. Pancoran Station 4. Cikunir Station
5. Cawang Station 5. Kuningan Station 5. Jati Cempaka Station
6. Rasuna Said Station 6. Cawang Station
7. Setiabudi Station
8. Dukuh Atas Station
Target Completion : Mid 2019
Target Operation : Mid 2019
Phase 2
Construction : • To start after completion of Phase 1
Extension of lines • Cibubur-Bogor Baranangsiang : 25 km
of Phase 1 : • Dukuh Atas-Palmerah-Senayan: 7.8 km
• Palmerah-Grogol : 5.7 km
Source:
• https://en.wikipedia.org/wiki/Jakarta_LRT
• http://lrtjabodebek.com/category/ruang-media/berita/
• http://www.tribunnews.com/metropolitan/2018/03/11/beroperasi-2019-stasiun-lrt-jabodebek-akan-terdiri-dari-dua-lantai
• https://www.pwc.com/id/en/media-centre/infrastructure-news/april-2018/phase-II-of-jabodebek-lrt-project-could-save-up-to-Rp1-75-trillion.html
© 2018 Jones Lang LaSalle IP, Inc. All rights reserved. 5
Light Rail Transit (LRT) Jabodebek

L1: Senayan-Baranangsiang Line


Senayan - Gelora - Palmerah - Dukuh Atas -
Kuningan Sentral - Soemantri Brodjonegoro -
Kuningan - SMESCO - Pancoran - Tebet BKPM -
Cikoko - Cawang - Taman Mini - Kampung
Rambutan - Ciracas - Cibubur - Cibinong - Sirkuit
Sentul - Sentul City - Baranangsiang

L2: Cawang-Bekasi Timur Line


Cawang - Jaticempaka - Jatibening - Cikunir -
Bekasi Barat - Bekasi Timur

L3: Palmerah-Grogol Line


Palmerah - Tomang - Grogol
* Proposed route extension: Grogol - Pesing - Rawa
Buaya - Kamal Raya - Dadap - Soekarno–Hatta
International Airport

Source:
• https://en.wikipedia.org/wiki/Jakarta_LRT
© 2018 Jones Lang LaSalle IP, Inc. All rights reserved. 6
Light Rail Transit (LRT) Jabodebek

Source:
• http://www.adhi.co.id/media/kcfinder/docs/profil-lrt-kirim-ke-corsec-.pdf
© 2018 Jones Lang LaSalle IP, Inc. All rights reserved. 7
Light Rail Transit (LRT) Jabodebek

Phase 1
Cawang-Cibubur Line – Route & Stations (per March 2017)

Source:
• http://www.adhi.co.id/media/kcfinder/docs/profil-lrt-kirim-ke-corsec-.pdf

© 2018 Jones Lang LaSalle IP, Inc. All rights reserved. 8


Light Rail Transit (LRT) Jabodebek

Phase 1
Cawang-Dukuh Atas Line – Route & Stations (per March 2017)

Source:
• http://www.adhi.co.id/media/kcfinder/docs/profil-lrt-kirim-ke-corsec-.pdf

© 2018 Jones Lang LaSalle IP, Inc. All rights reserved. 9


Light Rail Transit (LRT) Jabodebek

Phase 1
Cawang-Bekasi Timur Line – Route & Stations (per March 2017)

Source:
• http://www.adhi.co.id/media/kcfinder/docs/profil-lrt-kirim-ke-corsec-.pdf

© 2018 Jones Lang LaSalle IP, Inc. All rights reserved. 10


Jakarta Outer Ring Road (JORR) 2
Jakarta Outer Ring Road 2

© 2018 Jones Lang LaSalle IP, Inc. All rights reserved. 12


Jakarta Outer Ring Road 2

10. Tanjung Priok Access Toll Road 11. Cibitung-Cilincing Toll Road
Length : 11.4 km Length : 33.9 km
• Section 1: East 1 (E1), Rorotan – Cilincing • Section 1: Cibitung – Telaga Asih (2.96 km)
(3.4 km) • Section 2: Telaga Asih – Tembelang (9.41 km)
Sections :
• Section 2: East 2 (E2), Cilincing – Jampea • Section 3: Tembelang – Mekarjaya (13.09 km)
(2.74 km) • Section 4: Mekarjaya – Cilincing (8.56 km)
• Section 3: East 2-A (E2A), Cilincing – Jampea Toll Gates : TBC
Sections :
Interchange (1.92 km)
• Section 4: North-South Link (NS Link), Yos • Land clearance: 40% (per April 2018)
Progress :
Sudarso-Jampea Interchange (2.24 km) • Construction : 7-8% (per April 2018)
• Section 5: North-South Direct Ramp (NS Target
Direct) (1.1 km) : 2019
Completion
Remarks : In operation since 2017 Target
: 2019
Operation
Source:
• https://id.wikipedia.org/wiki/Jalan_Tol_Akses_Tanjung_Priok Source:
• http://https://properti.kompas.com/read/2017/04/15/100000521/dibangun.8 • https://id.wikipedia.org/wiki/Jalan_Tol_Lingkar_Luar_Jakarta_2
.tahun.jalan.tol.akses.tanjung.priok.siap.dibuka • https://kppip.go.id/proyek-strategis-nasional/a-sektor-jalan/jalan-tol-ciawi-
sukabumi-54km-3/
• https://ekonomi.kompas.com/read/2018/04/10/211400726/waskita-
pastikan-tol-cibitung-cilincing-beroperasi-tahun-depan

© 2018 Jones Lang LaSalle IP, Inc. All rights reserved. 13


Jakarta Outer Ring Road 2

12. Cimanggis-Cibitung (Cimaci) Toll Road 13. Cinere-Jagorawi (Cijago) Toll Road
Length : 26.3 km Length : 14.6 km
• Section 1: Cimanggis – Transyogi (3.5 km) • Section 1: Jagorawi – Raya Bogor (3.7 km)
Sections :
• Section 2: Transyogi – Cibitung (22.8 km) Sections : • Section 2: Raya Bogor – Kukusan (5.5 km)
Toll Gates : TBC • Section 3: Kukusan – Cinere (5.44 km)

• Section 1: Under construction Toll Gates : TBC


Progress : • Section 2: Land clearance: 61% • Section 1: In operation
(per July 2018) Progress : • Section 2: Construction: 90% (per July 2018)
Target • Section 1: December 2018 • Section 3: Construction: 0%
:
Completion • Section 2: 2019 Target • Section 2: November 2018
:
Target Completion • Section 3: TBC
: 2019
Operation Target • Section 2: December 2018
:
Operation • Section 3: TBC
Source:
• http://www.pikiran-rakyat.com/jawa-barat/2018/07/12/pembangunan-tol- Source:
cimaci-masuki-kabupaten-bekasi-427298 • https://id.wikipedia.org/wiki/Jalan_Tol_Lingkar_Luar_Jakarta_2
• https://properti.kompas.com/read/2018/07/14/193000321/dua-masalah- • https://kppip.go.id/proyek-strategis-nasional/a-sektor-jalan/jalan-tol-cinere-
yang-mengganjal-tol-cimanggis-cibitung-terselesaikan- jagorawi-1464km/
• https://properti.kompas.com/read/2018/07/14/214855121/pembangunan-
tol-cijago-terganjal-lahan-500-meter

© 2018 Jones Lang LaSalle IP, Inc. All rights reserved. 14


Jakarta Outer Ring Road 2

14. Depok-Antasari (Desari) Toll Road 15. Serpong-Cinere Toll Road


Length : 22.8 km Length : 10.1 km
• Section 1: Antasari – Brigif (5.8 km) • Section 1: Serpong Junction –
Sections : • Section 2: Brigif – Sawangan (6.3 km) Sections : Pamulang/Martadinata (6.675 km)
• Section 3: Sawangan – Bojonggede (9.5 km) • Section 2: Pamulang – Cinere (3.647 km)
• Cilandak (KM 0) • Serpong Interchange (KM 50)
• Andara (KM 3) Toll Gates : • Pamulang (KM 57)
• Brigif (KM 5) • Limo (KM 61)
Toll Gates :
• Krukut (KM 8) • Land clearance: 70% (per April 2018)
• Sawangan (KM 13) Progress :
• Construction : 15% (per April 2018)
• Bojonggede (KM 27)
Target • Section 1: December 2018
• Section 1: Completed; to test feasibility :
Completion • Section 2: 2019
Progress : • Section 2: Construction: 35% (per July 2018)
• Section 3: Land clearance mapping Target
: 2019
Operation
Target • Section 2: End of 2018
:
Completion • Section 3: 2021 Source:
• https://kppip.go.id/proyek-strategis-nasional/a-sektor-jalan/jalan-tol-
• Section 1: August 2018 serpong-cinere-1014km/
Target
: • Section 2: End of 2018 or early 2019 • https://id.wikipedia.org/wiki/Jalan_Tol_Serpong%E2%80%93Cinere
Operation • https://ekonomi.kompas.com/read/2018/04/11/113000026/waskita-
• Section 3: 2021
pastikan-tol-cinere-serpong-beroperasi-tahun-depan
Source:
• https://finance.detik.com/infrastruktur/d-4114255/sempat-molor-tol-depok-
antasari-seksi-i-akan-diresmikan-agustus/1
• https://id.wikipedia.org/wiki/Jalan_Tol_Depok%E2%80%93Antasari
• https://finance.detik.com/infrastruktur/d-4118516/tol-desari-ditarget-
tembus-sawangan-akhir-tahun-2018

© 2018 Jones Lang LaSalle IP, Inc. All rights reserved. 15


Jakarta Outer Ring Road 2

16. Kunciran-Serpong Toll Road 17. Cengkareng-Kunciran Toll Road


Length : 11.2 km Length : 14.19 km
• Section 1: Kunciran – Parigi (9.9 km) • Section 1: Kunciran Interchange – Sultan
Sections :
• Section 2: Parigi – Serpong (4.3 km) Ageng Tirtayasa Interchange (2.04 km)
• Serpong Interchange • Section 2: Sultan Ageng Tirtayasa Interchange
Toll Gates : • Parigi/Graha Raya/Bintaro Jaya – Benteng Betawi (3.52 km)
Sections :
• Kunciran Interchange/Alam Sutera • Section 3: Benteng Betawi – Husein
Sastranegara (6.57 km)
• Land clearance: 96.69% (per July 2018) • Section 4: Husein Sastranegara – Benda
• Construction : Interchange (2.06 km)
Progress :
o Section 1 : 55.9% (per July 2018))
o Section 2 : 60.3% (per July 2018) • Benda Interchange (KM 25)
• Batuceper (KM 34)
Target Toll Gates :
: January 2019 • Cipete (KM 38)
Completion • Kunciran Interchange (KM 40)
Target • Land clearance: 44.42% (per July 2018)
: March or April 2019 Progress :
Operation • Construction : 15.51% (per July 2018)
Source: Target
• https://id.wikipedia.org/wiki/Jalan_Tol_Kunciran%E2%80%93Serpong : February 2019
Completion
• https://economy.okezone.com/read/2018/07/20/320/1925192/pembebasan
-lahan-nyaris-100-tol-kunciran-serpong-beroperasi-awal-2019 Target
• https://properti.kompas.com/read/2018/07/20/193000821/dapat-kredit-
: March 2019
Operation
sindikasi-tol-kunciran-serpong-dikebut-pengerjaannya
Source:
• https://properti.kompas.com/read/2018/07/12/111403121/tol-kunciran-
cengkareng-jalur-alternatif-baru-ke-bandara
• https://id.wikipedia.org/wiki/Jalan_Tol_Cengkareng%E2%80%93Batucepe
r%E2%80%93Kunciran

© 2018 Jones Lang LaSalle IP, Inc. All rights reserved. 16


Jakarta-Cikampek II Elevated Toll Road
Jakarta-Cikampek II Elevated Toll Road

Length : 36.84 km (from Cikunir (KM 9+500) to Karawang Barat (KM 47+500)
• Section 1 : Cikunir – Bekasi Barat (2.99 km)
• Section 2 : Bekasi Barat – Bekasi Timur (3.63 km)
• Section 3 : Bekasi Timur – Tambun (4.34 km)
• Section 4 : Tambun – Cibitung (3.3 km)
Sections : • Section 5 : Cibitung – Cikarang Utama (4.46 km)
• Section 6 : Cikarang Utama – Cikarang Barat (2.72 km)
• Section 7 : Cikarang Barat – Cibatu (3.16 km)
• Section 8 : Cibatu – Cikarang Timur (2.45 km)
• Section 9 : Cikarang Timur – Karawang Barat (9.79 km)
Progress : 40.29% completed per July 2018
Target Completion : March 2019
Target Operation : March 2019
• Only for small vehicles (Category I and II)
Remarks :
• For vehicles going to Cikunir-Karawang Barat (exit only at Cikunir and Karawang Barat)
Source:
• https://properti.kompas.com/read/2018/07/31/161944821/tol-layang-jakarta-cikampek-jalan-tol-syariah-pertama-di-indonesia
• https://finance.detik.com/berita-ekonomi-bisnis/d-4004322/apa-kabar-proyek-tol-layang-jakarta-cikampek
• https://www.liputan6.com/bisnis/read/3606073/banyak-rekor-terpecahkan-di-proyek-tol-jakarta-cikampek-ii-elevated
• https://www.liputan6.com/bisnis/read/3602245/begini-detil-proyek-jalan-tol-layang-jakarta-cikampek
• https://economy.okezone.com/read/2017/09/02/320/1768007/fakta-jalan-tol-layang-jakarta-cikampek-panjang-38-km-bertujuan-urai-kemacetan

© 2018 Jones Lang LaSalle IP, Inc. All rights reserved. 18


Jakarta-Cikampek II Elevated Toll Road

36.84 km

© 2018 Jones Lang LaSalle IP, Inc. All rights reserved. 19


Jakarta-Cikampek II South Side Toll Road
Jakarta-Cikampek II South Side Toll Road

Length : 64 km
Planned Routes : Jatiasih – Cipularang – Sadang
• To start land acquisition in 2018
Progress :
• Construction targeted to start in early 2018
Target Operation : 2020

Source:
• http://industri.bisnis.com/read/20180212/45/737496/jalan-tol-jakarta-cikampek-ii-sisi-selatan-masih-tunggu-penetapan-lokasi
• http://industri.bisnis.com/read/20180604/45/802894/begini-progres-proyek-tol-jakartacikampek-ii-selatan
• http://ramadan.bisnis.com/read/20171123/45/711891/konsorsium-jasa-marga-akan-bangun-2-jalan-tol-baru-tahun-depan
© 2018 Jones Lang LaSalle IP, Inc. All rights reserved. 21
High Speed Rail (HSR) Jakarta-Bandung
High Speed Rail (HSR) Jakarta-Bandung

Length : 143 km
• Halim Station
• Karawang Station
Stations :
• Walini Station
• Tegalluar Station
• Land clearance : 73% per July 2018
Progress :
• Construction : 5% per June 2018
Target Completion : End of 2020
Target Operation : March 2021
• Developed by PT Kereta Cepat
Indonesia-China (KCIC), a joint
Remarks :
venture of an Indonesian consortium
and a Chinese consortium
Source:
• https://finance.detik.com/infrastruktur/d-3954595/rini-soemarno-pastikan-
kontruksi-kereta-cepat-jkt-bdg-mulai-
mei?_ga=2.68578385.1302635776.1533021918-1420624481.1528796046
• https://finance.detik.com/infrastruktur/d-4096277/pembebasan-lahan-
kereta-cepat-jakarta-bandung-capai-73
• https://www.liputan6.com/bisnis/read/3551810/pembangunan-kereta-cepat-
jakarta-bandung-baru-5-persen
• https://finance.detik.com/berita-ekonomi-bisnis/d-4000750/kapan-kereta-
cepat-jkt-bdg-beroperasi-rini-maret-
2021?_ga=2.59745645.1302635776.1533021918-
1420624481.1528796046
• http://kcic.co.id/faq/
• http://kcic.co.id/siapa-kami/

© 2018 Jones Lang LaSalle IP, Inc. All rights reserved. 23


High Speed Rail (HSR) Jakarta-Bandung

© 2018 Jones Lang LaSalle IP, Inc. All rights reserved. 24


High Speed Rail (HSR) Jakarta-Bandung

Transit-Oriented Development (TOD) Plan

Planned land areas per February 2016:


1. TOD Halim : 25 Ha
2. TOD Karawang : 250 Ha
3. TOD Walini : 1,270 Ha
4. TOD Tegalluar : 400 Ha

Source:
• http://kcic.co.id/konsep-pembangunan-terintegrasi/
• http://industri.bisnis.com/read/20160203/98/515700/kereta-
cepat-kawasan-tod-kcic-identifikasi-lahan-di-empat-titik

© 2018 Jones Lang LaSalle IP, Inc. All rights reserved. 25


© 2017 Jones Lang LaSalle IP, Inc. All rights reserved. 26