Jakarta-Cikampek II
Elevated Toll Road
Phase 1
Lines • Cawang-Cibubur : 13.7 km (Phase I A) – 61.07% completed as of June 2018
: • Cawang-Dukuh Atas : 10.5 km (Phase I A) – 25.48% completed as of June 2018
• Cawang-Bekasi Timur : 17.9 km (Phase I B) – 35.85% completed as of June 2018
Stations : Cawang-Cibubur Line Cawang-Dukuh Atas Line Cawang-Bekasi Timur Line
1. Cibubur Station 1. Cawang Station 1. Bekasi Timur Station
2. Ciracas Station 2. Ciliwung Station 2. Bekasi Barat Station
3. Kampung Rambutan Station 3. Cikoko Station 3. Cikunir 2 Station
4. Taman Mini Station 4. Pancoran Station 4. Cikunir Station
5. Cawang Station 5. Kuningan Station 5. Jati Cempaka Station
6. Rasuna Said Station 6. Cawang Station
7. Setiabudi Station
8. Dukuh Atas Station
Target Completion : Mid 2019
Target Operation : Mid 2019
Phase 2
Construction : • To start after completion of Phase 1
Extension of lines • Cibubur-Bogor Baranangsiang : 25 km
of Phase 1 : • Dukuh Atas-Palmerah-Senayan: 7.8 km
• Palmerah-Grogol : 5.7 km
Source:
• https://en.wikipedia.org/wiki/Jakarta_LRT
• http://lrtjabodebek.com/category/ruang-media/berita/
• http://www.tribunnews.com/metropolitan/2018/03/11/beroperasi-2019-stasiun-lrt-jabodebek-akan-terdiri-dari-dua-lantai
• https://www.pwc.com/id/en/media-centre/infrastructure-news/april-2018/phase-II-of-jabodebek-lrt-project-could-save-up-to-Rp1-75-trillion.html
© 2018 Jones Lang LaSalle IP, Inc. All rights reserved. 5
Light Rail Transit (LRT) Jabodebek
Source:
• https://en.wikipedia.org/wiki/Jakarta_LRT
© 2018 Jones Lang LaSalle IP, Inc. All rights reserved. 6
Light Rail Transit (LRT) Jabodebek
Source:
• http://www.adhi.co.id/media/kcfinder/docs/profil-lrt-kirim-ke-corsec-.pdf
© 2018 Jones Lang LaSalle IP, Inc. All rights reserved. 7
Light Rail Transit (LRT) Jabodebek
Phase 1
Cawang-Cibubur Line – Route & Stations (per March 2017)
Source:
• http://www.adhi.co.id/media/kcfinder/docs/profil-lrt-kirim-ke-corsec-.pdf
Phase 1
Cawang-Dukuh Atas Line – Route & Stations (per March 2017)
Source:
• http://www.adhi.co.id/media/kcfinder/docs/profil-lrt-kirim-ke-corsec-.pdf
Phase 1
Cawang-Bekasi Timur Line – Route & Stations (per March 2017)
Source:
• http://www.adhi.co.id/media/kcfinder/docs/profil-lrt-kirim-ke-corsec-.pdf
10. Tanjung Priok Access Toll Road 11. Cibitung-Cilincing Toll Road
Length : 11.4 km Length : 33.9 km
• Section 1: East 1 (E1), Rorotan – Cilincing • Section 1: Cibitung – Telaga Asih (2.96 km)
(3.4 km) • Section 2: Telaga Asih – Tembelang (9.41 km)
Sections :
• Section 2: East 2 (E2), Cilincing – Jampea • Section 3: Tembelang – Mekarjaya (13.09 km)
(2.74 km) • Section 4: Mekarjaya – Cilincing (8.56 km)
• Section 3: East 2-A (E2A), Cilincing – Jampea Toll Gates : TBC
Sections :
Interchange (1.92 km)
• Section 4: North-South Link (NS Link), Yos • Land clearance: 40% (per April 2018)
Progress :
Sudarso-Jampea Interchange (2.24 km) • Construction : 7-8% (per April 2018)
• Section 5: North-South Direct Ramp (NS Target
Direct) (1.1 km) : 2019
Completion
Remarks : In operation since 2017 Target
: 2019
Operation
Source:
• https://id.wikipedia.org/wiki/Jalan_Tol_Akses_Tanjung_Priok Source:
• http://https://properti.kompas.com/read/2017/04/15/100000521/dibangun.8 • https://id.wikipedia.org/wiki/Jalan_Tol_Lingkar_Luar_Jakarta_2
.tahun.jalan.tol.akses.tanjung.priok.siap.dibuka • https://kppip.go.id/proyek-strategis-nasional/a-sektor-jalan/jalan-tol-ciawi-
sukabumi-54km-3/
• https://ekonomi.kompas.com/read/2018/04/10/211400726/waskita-
pastikan-tol-cibitung-cilincing-beroperasi-tahun-depan
12. Cimanggis-Cibitung (Cimaci) Toll Road 13. Cinere-Jagorawi (Cijago) Toll Road
Length : 26.3 km Length : 14.6 km
• Section 1: Cimanggis – Transyogi (3.5 km) • Section 1: Jagorawi – Raya Bogor (3.7 km)
Sections :
• Section 2: Transyogi – Cibitung (22.8 km) Sections : • Section 2: Raya Bogor – Kukusan (5.5 km)
Toll Gates : TBC • Section 3: Kukusan – Cinere (5.44 km)
Length : 36.84 km (from Cikunir (KM 9+500) to Karawang Barat (KM 47+500)
• Section 1 : Cikunir – Bekasi Barat (2.99 km)
• Section 2 : Bekasi Barat – Bekasi Timur (3.63 km)
• Section 3 : Bekasi Timur – Tambun (4.34 km)
• Section 4 : Tambun – Cibitung (3.3 km)
Sections : • Section 5 : Cibitung – Cikarang Utama (4.46 km)
• Section 6 : Cikarang Utama – Cikarang Barat (2.72 km)
• Section 7 : Cikarang Barat – Cibatu (3.16 km)
• Section 8 : Cibatu – Cikarang Timur (2.45 km)
• Section 9 : Cikarang Timur – Karawang Barat (9.79 km)
Progress : 40.29% completed per July 2018
Target Completion : March 2019
Target Operation : March 2019
• Only for small vehicles (Category I and II)
Remarks :
• For vehicles going to Cikunir-Karawang Barat (exit only at Cikunir and Karawang Barat)
Source:
• https://properti.kompas.com/read/2018/07/31/161944821/tol-layang-jakarta-cikampek-jalan-tol-syariah-pertama-di-indonesia
• https://finance.detik.com/berita-ekonomi-bisnis/d-4004322/apa-kabar-proyek-tol-layang-jakarta-cikampek
• https://www.liputan6.com/bisnis/read/3606073/banyak-rekor-terpecahkan-di-proyek-tol-jakarta-cikampek-ii-elevated
• https://www.liputan6.com/bisnis/read/3602245/begini-detil-proyek-jalan-tol-layang-jakarta-cikampek
• https://economy.okezone.com/read/2017/09/02/320/1768007/fakta-jalan-tol-layang-jakarta-cikampek-panjang-38-km-bertujuan-urai-kemacetan
36.84 km
Length : 64 km
Planned Routes : Jatiasih – Cipularang – Sadang
• To start land acquisition in 2018
Progress :
• Construction targeted to start in early 2018
Target Operation : 2020
Source:
• http://industri.bisnis.com/read/20180212/45/737496/jalan-tol-jakarta-cikampek-ii-sisi-selatan-masih-tunggu-penetapan-lokasi
• http://industri.bisnis.com/read/20180604/45/802894/begini-progres-proyek-tol-jakartacikampek-ii-selatan
• http://ramadan.bisnis.com/read/20171123/45/711891/konsorsium-jasa-marga-akan-bangun-2-jalan-tol-baru-tahun-depan
© 2018 Jones Lang LaSalle IP, Inc. All rights reserved. 21
High Speed Rail (HSR) Jakarta-Bandung
High Speed Rail (HSR) Jakarta-Bandung
Length : 143 km
• Halim Station
• Karawang Station
Stations :
• Walini Station
• Tegalluar Station
• Land clearance : 73% per July 2018
Progress :
• Construction : 5% per June 2018
Target Completion : End of 2020
Target Operation : March 2021
• Developed by PT Kereta Cepat
Indonesia-China (KCIC), a joint
Remarks :
venture of an Indonesian consortium
and a Chinese consortium
Source:
• https://finance.detik.com/infrastruktur/d-3954595/rini-soemarno-pastikan-
kontruksi-kereta-cepat-jkt-bdg-mulai-
mei?_ga=2.68578385.1302635776.1533021918-1420624481.1528796046
• https://finance.detik.com/infrastruktur/d-4096277/pembebasan-lahan-
kereta-cepat-jakarta-bandung-capai-73
• https://www.liputan6.com/bisnis/read/3551810/pembangunan-kereta-cepat-
jakarta-bandung-baru-5-persen
• https://finance.detik.com/berita-ekonomi-bisnis/d-4000750/kapan-kereta-
cepat-jkt-bdg-beroperasi-rini-maret-
2021?_ga=2.59745645.1302635776.1533021918-
1420624481.1528796046
• http://kcic.co.id/faq/
• http://kcic.co.id/siapa-kami/
Source:
• http://kcic.co.id/konsep-pembangunan-terintegrasi/
• http://industri.bisnis.com/read/20160203/98/515700/kereta-
cepat-kawasan-tod-kcic-identifikasi-lahan-di-empat-titik