7. BORED PILES
THE REQUIRED ULTIMATE BEARING PER BORED PILE SHALL BE AS TABULATED BELOW:
ULTIMATE BEARING
LOCATION DIAMETER (mm) LENGTH (m)
CAPACITY, kN
ABUTMENT A & B 1800 30.00 -
PREPARED BY :
PROJECT & LOCATION: SHEET CONTENTS : SUBMITTED : RECOMMENDING APPROVAL: APPROVED: SET NO. SHEET NO.
JOHN MARK B. AGUELO
REPUBLIC OF THE PHILIPPINES PLAN FOR THE
ENGINEER II
CADD BY :
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS CONVERGENCE AND SPECIAL SUPPORT PROGRAM
CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS
JOHN MYRON A. CONSUELA
OFFICE OF THE REGIONAL DIRECTOR LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES
GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS ENGINEER I
IMELDA L. ALBANO YOLANDA L. TANGCO SAMSON L. HEBRA, CESO IV
LINK ROAD CONNECTING AGUINALDO HIGHWAY AND GOVERNOR'S ROAD CHECKED BY:
REGION IV-A, EDSA, QUEZON CITY IN SUPPORT OF IT BPM INDUSTRY, INCL. BRIDGE, DASMARIÑAS CITY, CAVITE
DIRECTOR IV
BRIDGE 1 LENGTH = 30.00 L.M.
ARLENE R. SIOJO - MAÑOSCA CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
STA 036+435.60 - STA 036+465.60 ENGINEER III