IR - INSPECTION REQUEST
west umar-secrow es
= | Contractor No.: AWQ0109
2KonMobil Project Title: Eco
Produced Water Treatment M109 a
vocarionsos [RNOFRNECECOIT | sue reo retary 2007 DAScPUNE: cv
sumer: | wines INSPECTION REQUIRED DATEO7 Febwary 2017 | TME1-00
REF.SPECIFICATION: 1QWOQ-FT-NSPDS-00-040901 REV.1 EARTHWORK
1QWQ-CE1091-COFND-D6-0002 REV.1 FOUNDATION FOR PRE-SEPARATOR IQD6-
ee ‘AB/681050 PLAN SECTION & DETAIL
RFF ITP: : 1QWQ-CE1092-CPQAC-00-0001 REV. C CIVIL INSPECTION AND TEST PLAN
(OTHERS REF.: PEPE
ATTACHMENT /CHECK LIST IF ANY:
NAME OF CONTRACTOR/SUBCONTRACTOR: (CPECC/AL MADAR
‘Our request the inspection of the following works for certificate/witness that ail items has been properly executed in
accordance with approved procedures, specifications, drawings and all tems has been coordinated with future works.
DDISCRIPTION OF WORK TO BE WITNESS:
Before backfiling, we have scarified end rolled the top of the original layer under tank foundation in DSB, end
have coordinated with AL- FAO laboratory to take samples to test Proctor Density for information. No loose soll on
the top of the original layer. Request witness,
‘COMMENTS:
‘Biaccerren = Claccepreo wit comments [
i Clworkis nat ready
Se Clunacceptable inspection result
see comments
| Cl tice tis Box iF “NO” EMIL / SOC and fits a “WITNESS” as por ITP,
{by ticking this box means CPECC needs to produce all te related documents and sign / close this IR}
SIGNATURE FOR NOTIFICATION/ ACKNOWLEGEMENT
‘SUBCONTRACTOR ‘COMPANY OTHERS
PRINT NAME: PRINT NAME PRINT NAME
Valid we beeof waned ge
SATE 7 earn SIGNATURE? SIGNATURE
hs MOE
| pare: Z-2— DOW | oare: ofr} ORE) ype P| ATEExonMobil Eco
West Qurna | Form No. F70102Q
Contract:AWQ0109 Rev. 0
Project Location: Basra, Iraq Serial No.
QUALITY CHECKSHEET - FIELD COMPACTION TEST RECORD
‘Tag Description Tag No. DSE
Contract No. Awioley ‘System No.
Contractor CPE ‘Sub-System No. DS—- BI bz 1050
Drawing Reference Vawp-cxier/-Lophpk-o-2} | Location Psb-AsTlsie Jomedpon
‘Type Fill Subsraute Lik Thi
ickness
fy Vest Date 20N. DI
S-cEoleg-Emil—o 008
Min, Compaction Required: Jo %
Laboratory Standard
Field Test Equip:
2
Type Compaction Date Jot].2all Max. Density _ G42 SYym3_ Optimum Moisture __ 15-2 Z,
oe Want
Type SIN Conestion Factor
ean Se se [Pee | a [oy [oe [ie
t 9 |eze| 97
2. ‘7 teges| 95
Comments
ContrastoriConstruction Rep. Contractor Quality Rep. Company Rep.
vine nolitwhesd|| sn Me Fane =
Signature: Spee Z| sina Jt 7 ‘Signature:
Die
Tae 2077, 1. FP
*PL/i*AL FAO COMPANY
2 hel Tel TaN cia oat cae
eo 2 Se aati
3 ( iS Dee aw ow] Ran] Onto oN i]
NO: 947
. Date: 11/02/2017
i Fao Code:738/17
To\China Petroleum Engineering & Construction Corporation
Sub\ Test Report (Re-Compaction of Soil)
Information requested test :
No. @ Date of test request Area Location
CE-C0027@ 05 -02-2017
CPECC/MADAR
Test date : 09-01-2017
Result:
Max dry density (gm /em’)
Optimum moisture content (%)
Notes: The test for M.D.D done according to(ASTM D 1557-002), and for soil test according to (1D2937-07).
~ The result represents sample tested only.
The Sample brought and received by Mr.: ( i
+ Executive Manager
Ahlam Almansor
Sec mM. Abacc
FP13-04
heeam
ay
Pagel3)(2