JOB : CONSTRUCTION OF 2 Nos. ROLLING STOCK DEPOTS AT RANGE HILL & VANAZ INCLUDING CIVIL AND E&M WORKS FOR PUNE METRO
Common Activity: CONCRETING WORK ( by Transit Mixture, Boom Placer ) .
Risk of workers
Fall / tilting of Boom Placer P D R A getting hurt by - - - - 2 2 4
flying boom
Slip, Trip and falling. Failure of Cuts/frictions /
P ID R A - - - - 4 2 8
PPEs Major Injuries
Common Activity : Material Handling ( lifting & shifting of Shuttering material and Cement bag / cubes)
Manual
Material
Handling
( lifting & Strain, Cramp, major
Repetitive heavy Lifting causing
2 shifting of ergonomically hazards E ID R A Injuries, material - CE - - 4 2 8
Shuttering handling
material and
Concrete
Block)
Fractures, sprains
and strains,
Bulky/ oversized and unstable slip/trip / Falling.
load handling, uneven surface PS ID R A Damage due to - - - - 2 2 4
area, obstructions. Direct holding Unstable load or
of load by bare hand Human error./
Electorcution risk
Overloading with lifting Fracture / Major
appliances, wrong rigging PS D R A Injuries/ Impact - - - IPC 1 3 3
practices, and sharp edges of Damage
load.
HEIGHT
3 Fall and falling objects. Slip & Trip P ID R A Major Injuries - - - IPC 4 2 8
WORK
Incomplete platform. Unsafe P D R A Major Injuries - - - - 3 2 6
scaffold, Sick /un- healthy person
Common Activity : SCAFOLD ERRECTION and HEIGHT WORK (e.g.Repairing and strengthening of concrete structures)
SCAFOLD
ERRECTION
4 Fall and falling objects. Slip & Trip P ID R A Major Injuries - - - - 4 2 8
and HEIGHT
WORK
Batching Plant
5 P ID R A Major Injury - - - - 1 3 3
operation
Unsafe handling of Aggregate PS D R A Major Injury - - - - 5 2 10
and other material
Quality / HSE
System
6 Chemicals Hazard C ID R A Major Injuries - - LC - 4 2 8
related
activities
Risk of workers
Wrong side driving / reversing getting hurt by
PS D R A wrong side driving / - - - - 4 3 12
TMs
Reversing TMs
Serious reation
First Aid expiry items P ID R E - - LC - 4 4 16
Injury
Major Injuries /
Electrocution , Short circuiting P ID R A - - LC IPC 2 4 8
Damage
Abbrevations:
Probability
R/NR Routine/Non Routine Exposure of Score Severity Score Risk 1 <=4 Very Low
Risk Score
=
N/A/E Normal/Abnormal/emergency Continuous 5 Several Fatality 5 Likely 2 05 <=08 Low
hood
Score
DE Domino Effect Daily 4 One Fatality 4 X 3 09 <=12 Medium
Severi
IPC Interested Party Concern Monthly 3 Serious Injury 3 ty 4 13 <=16 High
Score
CE Chronic Effect Yearly 2 Major Injury 2 5 17 <=25 Very High
Signature/ Date
SYSTEM
ASSESSMENT
Date of Revision : 23.04.2019 Issue : 00
After
Ensure Boom placer is placed on placement Keep vigilent on
levelled compacted ground, if necessary water such unsafe In- Charge - Depot / Depot &
VL place wooden pallets under outriggers. leakage condition all the P&M, SHE Engineer
Only authorized operator to run boom below times
placer all the times. outrigger
Ensure fall protection (hand rails, and
toe guard.) Safety net, life line. Safety In- Charge - Depot & P&M,,
L harness and other required PPEs for Stores, SHE Engineer
height work
Worker
Ensure checking of PPEs with all worker cutting
at site. Ensure Double lane yard full one rope Tool Box Talk and
body harness with scaffold hook with all of safety Specific Training on In- Charge - Depot & P&M,,
H workers working at height. All belt for correct Safety Stores, SHE Engineer
workers /staff using Body harness must making Harness /PPEs.
be trained in correct usage of Body lifting
harness. hook
Work under competent Supervision. Do
not allow shortcuts and half hearted
work for scaffold erection. No Tool Box Talk and In- Charge - Depot & P&M,,
L improvised (Jugaad) lifitng Specific Training. Stores, SHE Engineer
equipments / tools / Tackles to be
encouraged at site
directly
supervisor
decided to Always look for such
Always plan in advance for any height work w/o unsafe acts and Respective Incharges, P&M, SHE
L work to reduce risk and do as much informatio inform to respective Supervisor
work at ground level as possible. n to incharges
respective
incharge
Security to be
During instructed to act
Security to be vigilent for all ladders for holidays accordingly Respective Incharges, P&M,
some
H such unsafe acts. If no work is emergency HR&Admin incharges, SHE
person
underway remove such ladders situation and inform Supervisor
doing HR/Admin/Hse
unsafe act immediately
Sick
ProperIllumination. Medical checkup of coming at Always
person look out for Respective Incharges, P&M, HR
such unsafe
L all workers to avoid any sickness of of worker & admin Incharhes, Security
site to condition
height phobia. Person, SHE Supervisor
avoid at entry point level.
absentism
Limit
No person is allowed to give signal to switch not Limit switch to be
B/P operator to start mixing except B/P available made available all In- Charge - Depot & P&M, SHE
H to check and verify himself whether so system the times for closing Engineer
cleaning operation is finished and no bypassed of mixing drum
person is still inside mixer by cover
electrician
Never allow any person to work under In- Charge - Depot & P&M, SHE
H mixer when B/P is under operation Engineer
Never allow any person to work alone
inside cement godown whether B/P is
under operation or idle. Always use
Buddy system to raise alarm if someone
gets trapped under falling cement bags. In
Store Cement bags as per IS code emergenc
recommendation oonly. Proper y only one Do not encourage
illumination is to be maintained all the person any single person to In- Charge - Depot & P&M,,
H times. Cement shall be stored on the working go inside cement Stores, SHE Supervisor
wooden planks at minimum 150 mm inside godown.
clear distance from the floor . The cement
height of the bags shall be not more godown
than 10 bags to avoid the toppling over
when arranged alternatively length wise
and cross wise. About 600 mm clear
cover shall be left from the any exterior
walls to allow the circulation of the air.
ProperIllumination. Medical checkup of Specific Training on In- Charge - Depot & P&M, SHE
L all workers to avoid any sickness of WAH. supervisor
height phobia.
First aid
All chemicals if used in QC lab must be not
prepared Follow up training In- Charge - Depot & QC, Stores,
provided with MSDS. Only authorised
L for Hazards
person to use chemicals with necessary as SHE Engineer
PPEs mentioned mentioned in MSDS
in MSDS
Prepare OCP if not there, Training & Strict Supervision C Chemical Hazards